SlideShare a Scribd company logo
1 of 4
Page 1
R.Sriram
1/170, 3rd cross, vasan city,
Trichy, Tamil Nadu – 620 102.
India.
Mobile : +91 9245453170
Email : srivaidu@yahoo.com
Professional Profile
Graduate Mechanical Engineer and a Certified Lead auditor by the International Register of certificated
Auditors (IRCA) with an excellent exposure of over 25 years to various market segments like
automobiles, plastics, Terminal automation / Flow measurement devices, valve industry, Industrial
boiler / Industrial Power Plant industry and Fabrication Industry (Storage Tanks - Cryogenic storage
tanks, High pressure Spheres, Mounded storage bullets & Process Equipment - columns and towers,
pressure vessels and heat exchangers, reactors and separators) coupled with my exposure to various
corporate functions like Marketing, Tendering and Estimation, Business group, Projects Procurement,
Vendor Development and Logistics will be highly effective in providing the necessary impetus for
Business Development and product management by providing complete solutions to various
requirements of customers.
Computer-literate performer with extensive software proficiency covering wide variety of applications
for Windows XP including PowerPoint, Excel, Word and have worked in company developed ERP
systems.
Areas of Expertise
 Strategic Planning  Marketing
 Supply Chain Management  Forecasting
 Vendor Development and Management  Dealer Management
 Materials Management and Logistics  Lost order Analysis
 Negotiation  Project Management
Professional Experience
Vijay Tanks and Vessels (P) Ltd – Nov 2014 till Present
Company Profile : Vijay Tanks & Vessels (P) Ltd. is an international Engineering, Procurement,
Fabrication & Construction Company in the Energy Sector and amongst the World's Leading Service
Providers for Storage Tanks (especially Cryogenic storage tanks, High pressure Spheres, Mounded
storage bullets) & Process Equipment (especially columns and towers, pressure vessels and heat
exchangers, reactors and separators) .
Designation: Senior Manager - Sales and Estimation
Job profile:
 Marketing storage tanks and process equipments.
 Registration with new customers
 Revalidation of approvals of existing customers, consultants.
 Quoting for new tenders, customer enquiries and follow up for orders.
Cethar Ltd. - April 2006 to March 2014
Company Profile : Cethar Limited is one of the largest manufacturers of Industrial Boilers (PC, CFBC,
AFBC, Travelling grate and HRSG Boilers), Power plants (up to 350 MW), BOP (WTP, Fuel/material
Page 2
handling system, Electrical, control, instrumentation systems and civil work), Boiler accessories (ESP
and Fans) having its manufacturing set up at Trichy.
Designation: Manager Procurement
Job Profile: Procurement of bought outs for boiler division and heading a team of 25 Engineers.
Negotiating, ordering and organizing dispatches of various bought out components like Feed pump, HT
motor, Ash handling System, Castings etc to suit site requirements.
Strategic Planning
 Formulating long term/short term strategic plans to enhance materials management
operations.
 Establishing systems/ process, conceptualizing & implementing strict measures in operating
procedures to optimize resource/capacity utilization.
Supply Chain Management
 Planning, Sourcing, cost effective procurement of Project equipments (International & Local)
and for plant operational purchase.
 Establishing systems and procedures to ensure the procurement of required goods and services
and ensure adherence to appropriate cost, quality and delivery requirements.
 Receive quotations, do techno commercial evaluation, negotiate with the Suppliers and release
orders.
Vendor Development & Management
 Identifying and developing a dedicated and alternate vendor source for achieving cost effective
purchases and reduction in delivery time.
 Assessing the performance of the vendors based on various criterions such as on time delivery
percentage of rejections, quality improvement rate and credit terms.
Materials Management & Logistics
 Budgeting and planning material requirement using forecast based planning for procurement
and sourcing of materials, ensuring optimum utilization of materials for maximum cost
reduction.
 Designing, implementing & monitoring effective procurement schedules along with finalizing
specifications of materials & establishing quality & quantity limits for effective inventory
control.
 Planning Fund Management for matching vendor payments with customer project payments.
 Overseeing logistic functions & negotiating with transporters for cost effective transport
solution.
 Handling fleet of vehicles & transporters, ensuring on time delivery and Monitoring and
analyzing the loss in transit and undertaking measures to control the same.
Alfa Engineers-April 2005 till April 2006
Designation: Project Manager
Job profile: Erection and commissioning of the entire plant (a green field project)
 Preparation of factory Layout drawings including drawings for underground SKO Tank.
 Purchase of machinery for fettling operation including a Hanger type shot Blasting machine.
 Complete Construction of office building and fettling shop.
 Procurement and Erection of underground SKO Tank.
 Coordinating with electricity Board Pudukkotai and coordinating with Chief Electrical Engineer
Trichy for laying a separate 3000KVA, 15 KM line from Alundur substation to our fettling shop
for our power requirement of 400KVA.
 Coordinating for approval of CEIG inspection and approval (Chief electrical Engineer to
Government).
 Getting approvals from Pollution control board, Inspector of factories and CCOE approval.
Page 3
KSB Pumps Limited-April 2001 to Oct 2004
Company Profile: KSB in India is a leading international manufacturer of pumps and valves and has a
presence on all continents with its own sales and marketing companies, manufacturing facilities and
service operations. More than 2,000 employees generate annual consolidated sales revenue of over
two billion Euros.
Designation: Assistant Manager-Business Group and Marketing
Job profile: Business group and marketing Section head of two zones
Project orders
 Analysis of tenders of project orders.
 Identifying the product mix, analyzing the viability of the project in terms of the time required
for completion of the project.
 The profit margin involved and then Quoting for the Project Order.
 Negotiating on the technical and commercial aspects of Project orders.
 Procurement of bought out items for project orders
 Negotiating for the best possible delivery and price for bought out items like Ball valves,
actuators from various suppliers.
 Quoted for various project enquiries which were converted to orders.
Forecasting
 Identifying expected project orders and organizing for manufacture of the required valves to
facilitate dispatch of the customer orders having very short delivery period.
Dealer management
 Management of the extensive dealer network
 Advising them on the technical modifications possible in the product range to suit the
requirement of the customer.
 Maximum discounts that can be offered for various products.
 The delivery period within which the products can be delivered.
 Analysis of the profitability of orders received by Dealers.
Customer issue reconciliation
 Sorted out various issues with one of the major customers leading to collection of pending
payments of over Rs.50 Lakhs.
FMC Sanmar Ltd - June 1997 to April 2001
Company Profile - Manufacturers of Smith flow meters ( Positive displacement meters, Mass flow
meters, Turbine meters) and accessories (Batch controller and other flow control/measurement
accessories) having technical collaboration with FMC Corporation USA.
Designation: Senior Engineer Marketing Services
Job Profile - Sales Coordination and customer support (Projects Management)
 Audit of Purchase Orders - Review of customer PO and contacting customers for techno-
commercial clarification.
 Coordination with internal departments for completion of customer orders
 Coordinating with Engineering /QA to ensure that all required documents like GAD / QAP are
submitted to the customer/consultant for approval.
 Coordinating with customers/consultant for getting GAD/QAP approval, documents required for
dispatch like road permit, CT3 form etc.
 Organizing for Inspection of the finished products by the customer or their authorized
Inspection agency like Lloyds Register of Shipping, Engineers India Ltd, SQAEE/MSQA, ONGC
(QA), Fluid control research institute, TUV, Legal Metrology etc.
 Customer Support: Attending to customer complaints both technical and commercial.
Page 4
 Identification of recurring customer complaints in the product and sorting out the same by
consulting with quality control, engineering and production departments
 Initiating the corrective action required so as to sort out the current complaint and prevent the
occurrence of similar complaints in future supplies.
 Collection of Payment: Follow up with the customer/branches for realization of payments and
sorting out any problems, which may hinder quick realization of the payment.
 Customer Training Program: Organizing of training programs for customers.
Started my own Plastic Molding unit - 1994 - 1997
Job Profile: Business head
 Meeting customers, identifying their requirements regarding the type of plastic required and
designing the required moulds.
 Thoroughly conversant with the design of moulds.
 Modified a semi automatic hydraulic ram type machine for automatic closing and opening of
the mould with automatic ejection of the plastic component which led to increased productivity
by 60%.
Standard Motor Products of India Ltd – 1992 to 1993
Company Profile: Manufacturers of Light Commercial Vehicles
Designation: Graduate engineer Trainee
Job Profile: Part of a large Sales team
 Organizing Sales Promotion campaigns,
 Conducting market survey, Meeting customers, sorting our complaints.
 Impressing on the dealer network about the importance of having a customer orientation.
 Motivation of the extensive dealer network so as to enable them to attain their targets.
 Identification of the requirement of a vehicle with a full floating axle as compared to the
standard design of a semi floating axle, which performed excellently in the market.
Education
Bachelor’s degree in Mechanical Engineering with first class from MVJ College of Engineering, White
field, Bangalore, Bangalore University - 1990
Certified as a ISO 9000: 2000 series Lead auditor by the International Register of certificated Auditors
(IRCA) in June 2008.
Personal Data
Date of Birth: 16/07/1968
Nationality: Indian
Languages known: Tamil, English and Hindi
Marital Status: Married with one daughter

More Related Content

What's hot

Facility location production and operation managemtn
Facility location production and operation managemtnFacility location production and operation managemtn
Facility location production and operation managemtnDivya Paulose
 
Deepak_Thakur 31.05.2016
Deepak_Thakur 31.05.2016Deepak_Thakur 31.05.2016
Deepak_Thakur 31.05.2016deepak thakur
 
5 need for selecting a suitable location
5 need for selecting a suitable location5 need for selecting a suitable location
5 need for selecting a suitable locationSalamat Ali
 
Amiit Resume
Amiit ResumeAmiit Resume
Amiit ResumeAmit Mane
 
plant location
plant locationplant location
plant locationSanjay War
 
Udit Puri New
Udit Puri NewUdit Puri New
Udit Puri NewUdit Puri
 
Facility Location/Prduction Design & Development/Process Selection
Facility Location/Prduction Design & Development/Process SelectionFacility Location/Prduction Design & Development/Process Selection
Facility Location/Prduction Design & Development/Process Selectionviveksangwan007
 
facility location and planning layout
facility location and planning layoutfacility location and planning layout
facility location and planning layoutDipak Mer
 
venu QAQC Resume
venu QAQC Resumevenu QAQC Resume
venu QAQC ResumeVenu Prasad
 

What's hot (20)

Ops class4
Ops class4Ops class4
Ops class4
 
Sathishkumar_ Updated
Sathishkumar_ UpdatedSathishkumar_ Updated
Sathishkumar_ Updated
 
Krishnan Resume
Krishnan ResumeKrishnan Resume
Krishnan Resume
 
Facility location production and operation managemtn
Facility location production and operation managemtnFacility location production and operation managemtn
Facility location production and operation managemtn
 
CAPACITY PLANNING
CAPACITY PLANNINGCAPACITY PLANNING
CAPACITY PLANNING
 
Deepak_Thakur 31.05.2016
Deepak_Thakur 31.05.2016Deepak_Thakur 31.05.2016
Deepak_Thakur 31.05.2016
 
Manohar Resume
Manohar ResumeManohar Resume
Manohar Resume
 
Ch 8 solutions
Ch 8 solutionsCh 8 solutions
Ch 8 solutions
 
5 need for selecting a suitable location
5 need for selecting a suitable location5 need for selecting a suitable location
5 need for selecting a suitable location
 
Capacity planning
Capacity planning Capacity planning
Capacity planning
 
Amiit Resume
Amiit ResumeAmiit Resume
Amiit Resume
 
Plant location
Plant locationPlant location
Plant location
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
plant location
plant locationplant location
plant location
 
MEP procurement engineer
MEP procurement engineerMEP procurement engineer
MEP procurement engineer
 
Udit Puri New
Udit Puri NewUdit Puri New
Udit Puri New
 
Cv(Haytham Ashrey)
Cv(Haytham Ashrey)Cv(Haytham Ashrey)
Cv(Haytham Ashrey)
 
Facility Location/Prduction Design & Development/Process Selection
Facility Location/Prduction Design & Development/Process SelectionFacility Location/Prduction Design & Development/Process Selection
Facility Location/Prduction Design & Development/Process Selection
 
facility location and planning layout
facility location and planning layoutfacility location and planning layout
facility location and planning layout
 
venu QAQC Resume
venu QAQC Resumevenu QAQC Resume
venu QAQC Resume
 

Viewers also liked

Note on the Nonlinear Fokker-Planck Diffusion –Convection Model Arising In Gr...
Note on the Nonlinear Fokker-Planck Diffusion –Convection Model Arising In Gr...Note on the Nonlinear Fokker-Planck Diffusion –Convection Model Arising In Gr...
Note on the Nonlinear Fokker-Planck Diffusion –Convection Model Arising In Gr...Conferenceproceedings
 
Presentation3
Presentation3Presentation3
Presentation3JF19
 
Opie Pop Art Pet Portrait
Opie Pop Art Pet PortraitOpie Pop Art Pet Portrait
Opie Pop Art Pet PortraitMattsCanvas
 
Dossier pedagogique cycle 1et 2
Dossier pedagogique cycle 1et 2Dossier pedagogique cycle 1et 2
Dossier pedagogique cycle 1et 2Vesunna
 
Diffuse lung disease
Diffuse lung diseaseDiffuse lung disease
Diffuse lung diseaseSpringer
 
Mate mayo 3 2010
Mate  mayo  3   2010Mate  mayo  3   2010
Mate mayo 3 2010kako1950
 
Better man robbie williams
Better man   robbie williamsBetter man   robbie williams
Better man robbie williamskbeca
 
Opie Pop Art Pet Portrait
Opie Pop Art Pet PortraitOpie Pop Art Pet Portrait
Opie Pop Art Pet PortraitMattsCanvas
 
χριστουγεννιάτικες συνταγές
χριστουγεννιάτικες  συνταγέςχριστουγεννιάτικες  συνταγές
χριστουγεννιάτικες συνταγέςavramaki
 
Кепканова О.І. Психологічна культура як умова професійної успішності педагога
Кепканова О.І. Психологічна культура як  умова професійної успішності педагогаКепканова О.І. Психологічна культура як  умова професійної успішності педагога
Кепканова О.І. Психологічна культура як умова професійної успішності педагогаКиїв Київ
 
πλοία αρχαίας Ελλάδας
πλοία αρχαίας Ελλάδαςπλοία αρχαίας Ελλάδας
πλοία αρχαίας Ελλάδαςavramaki
 
Ha4goもくもく報告2016年11月分
Ha4goもくもく報告2016年11月分Ha4goもくもく報告2016年11月分
Ha4goもくもく報告2016年11月分Masayuki KaToH
 
Effects of LEMS on P/Q type Calcium Channels
Effects of LEMS on P/Q type Calcium ChannelsEffects of LEMS on P/Q type Calcium Channels
Effects of LEMS on P/Q type Calcium Channelsmaryvi
 
Value based lesson plan
Value based lesson planValue based lesson plan
Value based lesson planDr Nirmaljit
 
resume sanjay patil
resume sanjay patilresume sanjay patil
resume sanjay patilSanjay Patil
 
ICT use in B.Ed. Teacher Education course
ICT use in B.Ed. Teacher Education courseICT use in B.Ed. Teacher Education course
ICT use in B.Ed. Teacher Education coursejagannath Dange
 

Viewers also liked (20)

Note on the Nonlinear Fokker-Planck Diffusion –Convection Model Arising In Gr...
Note on the Nonlinear Fokker-Planck Diffusion –Convection Model Arising In Gr...Note on the Nonlinear Fokker-Planck Diffusion –Convection Model Arising In Gr...
Note on the Nonlinear Fokker-Planck Diffusion –Convection Model Arising In Gr...
 
Presentation3
Presentation3Presentation3
Presentation3
 
Opie Pop Art Pet Portrait
Opie Pop Art Pet PortraitOpie Pop Art Pet Portrait
Opie Pop Art Pet Portrait
 
Dossier pedagogique cycle 1et 2
Dossier pedagogique cycle 1et 2Dossier pedagogique cycle 1et 2
Dossier pedagogique cycle 1et 2
 
LaForce CV
LaForce CVLaForce CV
LaForce CV
 
Diffuse lung disease
Diffuse lung diseaseDiffuse lung disease
Diffuse lung disease
 
Mate mayo 3 2010
Mate  mayo  3   2010Mate  mayo  3   2010
Mate mayo 3 2010
 
Better man robbie williams
Better man   robbie williamsBetter man   robbie williams
Better man robbie williams
 
Opie Pop Art Pet Portrait
Opie Pop Art Pet PortraitOpie Pop Art Pet Portrait
Opie Pop Art Pet Portrait
 
Rubbens brochure Vapogrill FR
Rubbens brochure Vapogrill FRRubbens brochure Vapogrill FR
Rubbens brochure Vapogrill FR
 
χριστουγεννιάτικες συνταγές
χριστουγεννιάτικες  συνταγέςχριστουγεννιάτικες  συνταγές
χριστουγεννιάτικες συνταγές
 
Кепканова О.І. Психологічна культура як умова професійної успішності педагога
Кепканова О.І. Психологічна культура як  умова професійної успішності педагогаКепканова О.І. Психологічна культура як  умова професійної успішності педагога
Кепканова О.І. Психологічна культура як умова професійної успішності педагога
 
Enzymes
EnzymesEnzymes
Enzymes
 
πλοία αρχαίας Ελλάδας
πλοία αρχαίας Ελλάδαςπλοία αρχαίας Ελλάδας
πλοία αρχαίας Ελλάδας
 
Migration from 8.1 to 11.3
Migration from 8.1 to 11.3Migration from 8.1 to 11.3
Migration from 8.1 to 11.3
 
Ha4goもくもく報告2016年11月分
Ha4goもくもく報告2016年11月分Ha4goもくもく報告2016年11月分
Ha4goもくもく報告2016年11月分
 
Effects of LEMS on P/Q type Calcium Channels
Effects of LEMS on P/Q type Calcium ChannelsEffects of LEMS on P/Q type Calcium Channels
Effects of LEMS on P/Q type Calcium Channels
 
Value based lesson plan
Value based lesson planValue based lesson plan
Value based lesson plan
 
resume sanjay patil
resume sanjay patilresume sanjay patil
resume sanjay patil
 
ICT use in B.Ed. Teacher Education course
ICT use in B.Ed. Teacher Education courseICT use in B.Ed. Teacher Education course
ICT use in B.Ed. Teacher Education course
 

Similar to resume

CV for Procurement_Harender Sahrawat
CV for Procurement_Harender SahrawatCV for Procurement_Harender Sahrawat
CV for Procurement_Harender SahrawatHarender Sahrawat
 
Updtd tbm-jkf-photo-cv 06032016
Updtd tbm-jkf-photo-cv 06032016Updtd tbm-jkf-photo-cv 06032016
Updtd tbm-jkf-photo-cv 06032016khaja jeelani
 
Mechanical engg-- 8+Yrs. Exp.
Mechanical engg-- 8+Yrs. Exp.Mechanical engg-- 8+Yrs. Exp.
Mechanical engg-- 8+Yrs. Exp.prabu s
 
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)Aniket Dalvi
 
Chetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerChetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerCHETAN SHARMA
 
CV-R-GARG-01062016
CV-R-GARG-01062016CV-R-GARG-01062016
CV-R-GARG-01062016RAJESH GARG
 
Harish Resume.pdf
Harish Resume.pdfHarish Resume.pdf
Harish Resume.pdfNaga Harish
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016sathish kumar
 

Similar to resume (20)

CV for Procurement_Harender Sahrawat
CV for Procurement_Harender SahrawatCV for Procurement_Harender Sahrawat
CV for Procurement_Harender Sahrawat
 
Amol-KulkarniResume
Amol-KulkarniResumeAmol-KulkarniResume
Amol-KulkarniResume
 
Updtd tbm-jkf-photo-cv 06032016
Updtd tbm-jkf-photo-cv 06032016Updtd tbm-jkf-photo-cv 06032016
Updtd tbm-jkf-photo-cv 06032016
 
CV_SV_New1
CV_SV_New1CV_SV_New1
CV_SV_New1
 
CV_Pooranpr
CV_PooranprCV_Pooranpr
CV_Pooranpr
 
vinoth-projects
vinoth-projectsvinoth-projects
vinoth-projects
 
Resume New
Resume NewResume New
Resume New
 
Hedayatullah CV
Hedayatullah CVHedayatullah CV
Hedayatullah CV
 
Mechanical engg-- 8+Yrs. Exp.
Mechanical engg-- 8+Yrs. Exp.Mechanical engg-- 8+Yrs. Exp.
Mechanical engg-- 8+Yrs. Exp.
 
CV_Pooranpr
CV_PooranprCV_Pooranpr
CV_Pooranpr
 
JAYANT KUMAR
JAYANT KUMARJAYANT KUMAR
JAYANT KUMAR
 
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
 
Chetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerChetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical Engineer
 
CV-R-GARG-01062016
CV-R-GARG-01062016CV-R-GARG-01062016
CV-R-GARG-01062016
 
Harish Resume.pdf
Harish Resume.pdfHarish Resume.pdf
Harish Resume.pdf
 
CV_Gaurav Mohite
CV_Gaurav MohiteCV_Gaurav Mohite
CV_Gaurav Mohite
 
CV Max KM
CV Max KMCV Max KM
CV Max KM
 
SUDHIR_-_CV -Latest
SUDHIR_-_CV -LatestSUDHIR_-_CV -Latest
SUDHIR_-_CV -Latest
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 

resume

  • 1. Page 1 R.Sriram 1/170, 3rd cross, vasan city, Trichy, Tamil Nadu – 620 102. India. Mobile : +91 9245453170 Email : srivaidu@yahoo.com Professional Profile Graduate Mechanical Engineer and a Certified Lead auditor by the International Register of certificated Auditors (IRCA) with an excellent exposure of over 25 years to various market segments like automobiles, plastics, Terminal automation / Flow measurement devices, valve industry, Industrial boiler / Industrial Power Plant industry and Fabrication Industry (Storage Tanks - Cryogenic storage tanks, High pressure Spheres, Mounded storage bullets & Process Equipment - columns and towers, pressure vessels and heat exchangers, reactors and separators) coupled with my exposure to various corporate functions like Marketing, Tendering and Estimation, Business group, Projects Procurement, Vendor Development and Logistics will be highly effective in providing the necessary impetus for Business Development and product management by providing complete solutions to various requirements of customers. Computer-literate performer with extensive software proficiency covering wide variety of applications for Windows XP including PowerPoint, Excel, Word and have worked in company developed ERP systems. Areas of Expertise  Strategic Planning  Marketing  Supply Chain Management  Forecasting  Vendor Development and Management  Dealer Management  Materials Management and Logistics  Lost order Analysis  Negotiation  Project Management Professional Experience Vijay Tanks and Vessels (P) Ltd – Nov 2014 till Present Company Profile : Vijay Tanks & Vessels (P) Ltd. is an international Engineering, Procurement, Fabrication & Construction Company in the Energy Sector and amongst the World's Leading Service Providers for Storage Tanks (especially Cryogenic storage tanks, High pressure Spheres, Mounded storage bullets) & Process Equipment (especially columns and towers, pressure vessels and heat exchangers, reactors and separators) . Designation: Senior Manager - Sales and Estimation Job profile:  Marketing storage tanks and process equipments.  Registration with new customers  Revalidation of approvals of existing customers, consultants.  Quoting for new tenders, customer enquiries and follow up for orders. Cethar Ltd. - April 2006 to March 2014 Company Profile : Cethar Limited is one of the largest manufacturers of Industrial Boilers (PC, CFBC, AFBC, Travelling grate and HRSG Boilers), Power plants (up to 350 MW), BOP (WTP, Fuel/material
  • 2. Page 2 handling system, Electrical, control, instrumentation systems and civil work), Boiler accessories (ESP and Fans) having its manufacturing set up at Trichy. Designation: Manager Procurement Job Profile: Procurement of bought outs for boiler division and heading a team of 25 Engineers. Negotiating, ordering and organizing dispatches of various bought out components like Feed pump, HT motor, Ash handling System, Castings etc to suit site requirements. Strategic Planning  Formulating long term/short term strategic plans to enhance materials management operations.  Establishing systems/ process, conceptualizing & implementing strict measures in operating procedures to optimize resource/capacity utilization. Supply Chain Management  Planning, Sourcing, cost effective procurement of Project equipments (International & Local) and for plant operational purchase.  Establishing systems and procedures to ensure the procurement of required goods and services and ensure adherence to appropriate cost, quality and delivery requirements.  Receive quotations, do techno commercial evaluation, negotiate with the Suppliers and release orders. Vendor Development & Management  Identifying and developing a dedicated and alternate vendor source for achieving cost effective purchases and reduction in delivery time.  Assessing the performance of the vendors based on various criterions such as on time delivery percentage of rejections, quality improvement rate and credit terms. Materials Management & Logistics  Budgeting and planning material requirement using forecast based planning for procurement and sourcing of materials, ensuring optimum utilization of materials for maximum cost reduction.  Designing, implementing & monitoring effective procurement schedules along with finalizing specifications of materials & establishing quality & quantity limits for effective inventory control.  Planning Fund Management for matching vendor payments with customer project payments.  Overseeing logistic functions & negotiating with transporters for cost effective transport solution.  Handling fleet of vehicles & transporters, ensuring on time delivery and Monitoring and analyzing the loss in transit and undertaking measures to control the same. Alfa Engineers-April 2005 till April 2006 Designation: Project Manager Job profile: Erection and commissioning of the entire plant (a green field project)  Preparation of factory Layout drawings including drawings for underground SKO Tank.  Purchase of machinery for fettling operation including a Hanger type shot Blasting machine.  Complete Construction of office building and fettling shop.  Procurement and Erection of underground SKO Tank.  Coordinating with electricity Board Pudukkotai and coordinating with Chief Electrical Engineer Trichy for laying a separate 3000KVA, 15 KM line from Alundur substation to our fettling shop for our power requirement of 400KVA.  Coordinating for approval of CEIG inspection and approval (Chief electrical Engineer to Government).  Getting approvals from Pollution control board, Inspector of factories and CCOE approval.
  • 3. Page 3 KSB Pumps Limited-April 2001 to Oct 2004 Company Profile: KSB in India is a leading international manufacturer of pumps and valves and has a presence on all continents with its own sales and marketing companies, manufacturing facilities and service operations. More than 2,000 employees generate annual consolidated sales revenue of over two billion Euros. Designation: Assistant Manager-Business Group and Marketing Job profile: Business group and marketing Section head of two zones Project orders  Analysis of tenders of project orders.  Identifying the product mix, analyzing the viability of the project in terms of the time required for completion of the project.  The profit margin involved and then Quoting for the Project Order.  Negotiating on the technical and commercial aspects of Project orders.  Procurement of bought out items for project orders  Negotiating for the best possible delivery and price for bought out items like Ball valves, actuators from various suppliers.  Quoted for various project enquiries which were converted to orders. Forecasting  Identifying expected project orders and organizing for manufacture of the required valves to facilitate dispatch of the customer orders having very short delivery period. Dealer management  Management of the extensive dealer network  Advising them on the technical modifications possible in the product range to suit the requirement of the customer.  Maximum discounts that can be offered for various products.  The delivery period within which the products can be delivered.  Analysis of the profitability of orders received by Dealers. Customer issue reconciliation  Sorted out various issues with one of the major customers leading to collection of pending payments of over Rs.50 Lakhs. FMC Sanmar Ltd - June 1997 to April 2001 Company Profile - Manufacturers of Smith flow meters ( Positive displacement meters, Mass flow meters, Turbine meters) and accessories (Batch controller and other flow control/measurement accessories) having technical collaboration with FMC Corporation USA. Designation: Senior Engineer Marketing Services Job Profile - Sales Coordination and customer support (Projects Management)  Audit of Purchase Orders - Review of customer PO and contacting customers for techno- commercial clarification.  Coordination with internal departments for completion of customer orders  Coordinating with Engineering /QA to ensure that all required documents like GAD / QAP are submitted to the customer/consultant for approval.  Coordinating with customers/consultant for getting GAD/QAP approval, documents required for dispatch like road permit, CT3 form etc.  Organizing for Inspection of the finished products by the customer or their authorized Inspection agency like Lloyds Register of Shipping, Engineers India Ltd, SQAEE/MSQA, ONGC (QA), Fluid control research institute, TUV, Legal Metrology etc.  Customer Support: Attending to customer complaints both technical and commercial.
  • 4. Page 4  Identification of recurring customer complaints in the product and sorting out the same by consulting with quality control, engineering and production departments  Initiating the corrective action required so as to sort out the current complaint and prevent the occurrence of similar complaints in future supplies.  Collection of Payment: Follow up with the customer/branches for realization of payments and sorting out any problems, which may hinder quick realization of the payment.  Customer Training Program: Organizing of training programs for customers. Started my own Plastic Molding unit - 1994 - 1997 Job Profile: Business head  Meeting customers, identifying their requirements regarding the type of plastic required and designing the required moulds.  Thoroughly conversant with the design of moulds.  Modified a semi automatic hydraulic ram type machine for automatic closing and opening of the mould with automatic ejection of the plastic component which led to increased productivity by 60%. Standard Motor Products of India Ltd – 1992 to 1993 Company Profile: Manufacturers of Light Commercial Vehicles Designation: Graduate engineer Trainee Job Profile: Part of a large Sales team  Organizing Sales Promotion campaigns,  Conducting market survey, Meeting customers, sorting our complaints.  Impressing on the dealer network about the importance of having a customer orientation.  Motivation of the extensive dealer network so as to enable them to attain their targets.  Identification of the requirement of a vehicle with a full floating axle as compared to the standard design of a semi floating axle, which performed excellently in the market. Education Bachelor’s degree in Mechanical Engineering with first class from MVJ College of Engineering, White field, Bangalore, Bangalore University - 1990 Certified as a ISO 9000: 2000 series Lead auditor by the International Register of certificated Auditors (IRCA) in June 2008. Personal Data Date of Birth: 16/07/1968 Nationality: Indian Languages known: Tamil, English and Hindi Marital Status: Married with one daughter