MUSA SAKIN
Msc ELECTROMECHANICAL ENGINEER
DEPUTY PROJECT MANAGER
Family
Address
Cengiztopel Caddesi, Aksemseddin Mahallesi, Güneş Sokak, No:57/6 , Eyüp / İstanbul
Doha/Qata
r Address
Ezdan Hotels & Suits , West Bay
Cellphone +90 530 204 7229 / +974 33378990
Contact e-
mail
address
adsiz@hotmail.com
Linkedin
Profile
https://www.linkedin.com/profile/view?id=120779348&trk=nav_responsive_tab_profile
Country Turkey
Nationality Turkish
Marital
status
Married with two daughter
Birth Date 10th
/ September /1973
Gender Male
Driving
license
English and Turkish (B) license
Languages Turkish Level: Advanced (writing, speaking, reading)
English Level: Advanced (writing, speaking, reading)
Chinese Level: Beginner
Arabic Level: Beginner
Religion Islamic
1
Key Qualifications Profile
I am extremely committed to as an electromechanical engineer/manager with the
ability to take on responsibility , good communication skill, fast learner, able to work
alone or as part of the team, able to throw myself whole –heartedly into project.
Since 1995, I have been working on industrial systems. But after 1996 have been
dealing major international underground/metro projects. That is why my skills
include ability to manage projects on underground/metro, mass transit in all phases
from planning to designing, construction and operation and asset
managements(assembling, maintenance, breakdown etc.). Also recent
achievements have included designed for many different type of stations
electromechanical and rail systems which the supervision of the Rail Systems
Contractor site installation activities at Maintenance Depot, both Stabling Yards,
Stations, Tunnels, Elevated and At-Grade
Professional experience also includes acting as a leader or a flexible team member
for all multi-disciplinary engineering works include short term contracts ,re- organized
work to increase efficiency & productivity .
Finally I am a positive, well-motivated person who strives to encourage colleague
and others who works with me.
Education
1998- 2000
The Institute of Hampstead Garden Suburb ( Follows University
of Cambridge and London of Commerce Examination),
London, UK
Studied Advanced English and LCCIEB accrediting skills for
business and management.
1996-1998
Master in
Science(MSc)
Sakarya University, Turkey
Mechanical Engineering; Course involved programming
robotic machines by using CAD- CAM (pro-engineer) and
automatic control.
1991-1996
Undergraduate
(BSc)
Erciyes University, Turkey
Mechanical Engineering. Covered subjects such as
Construction Engineering , Planning, Manufacturing and
Drawing
1988-1991
High school
Yozgat High school
Eleven subject at above GCSE standards (overall B)
Professional Experience
Period 2016 April – Present
Organization Alarko Corporate Group/Istanbul/Turkey
Department /
Position
Project Management / Deputy Project Manager
2
Job Responsibilities and Major Activities
• The supervision of the Rail Systems Contractor site installation activities at
Maintenance Depot, both Stabling Yards, Stations, Tunnels, Elevated and At-
Grade and other locations as may be identified.
• Because holder of 2014 Occupational Health and Safety – group B
certification, I am acting as a fire & life safety coordinater.
• Ensure that the site activities are properly coordinated and well planned, and
shall review the progress of the Contractors progress, to suggest corrective
action or improvements to the works necessitated by site conditions meet, for;
Signalling, Energy, Tunnel Ventilation, Telecommunications, Platform Screen
doors, SCADA, ICC
• Coordinates the review by the team of RE and ARE for recommendation of
approval to the Employer of the Contractors installation method statements,
ITP, construction shop and as-built drawings
• Develop working templates for establishing and tracking project MEP
requirements, technical specifications, cost estimations and appointment of
contractors.
• Work with the Project Manager to establish key performance indicators for
critical MEP parameters on the project.
• Develop systems for reporting to monitor and track MEP technical issues.
• Review the supervision consultant’s procedures for quality checks and site
inspections for MEP and monitor processes to address all MEP site related
issues.
• Control railway system shopdrawing include spaceproofing , according to
dinamic and static train size.
• Coordinate with the project commissioning consultants to ensure that all
projects are commissioned to meet the contract requirements.
• Monitor MEP work such as installation of power Sub Station and Distribution
works, UPS, Air conditioning, BMS systems, Lifts, Escalator's, Fire hydrant &
protection system, Hydro pneumatic systems, water distribution
system,railway ,rail grainding , chiller plant and other MEP activities as
required.
• Serve as the MEP expert in the PM team for all matters related to design,
quality assurance and documentation of mechanical works.
• Acquire a detailed understanding of contract documents (drawings and
specifications), phasing plans, MEP systems interrelationships, construction
sequencing, and project schedules to advise the project manager as
necessary.
3
• Assist in the development and review of MEP systems for the project.
Manage the supervision consultant to approve the contractor’s as-built
drawings and submittals and log MEP changes and as-built information.
• Define scope, budget and justification of MEP change work orders.
• Ensure appropriate usage and application of the Project Management System
(PMS) with respect to entry and analysis of work related data.
• Oversee the testing and commissioning of MEP equipment and the review
and approval process for all mechanical and technical submittals.
• Monitor design consultants and the MEP supervision consultants with regard
to approvals and liaise with local authorities and ministerial agencies as
necessary.
• Assist project team in negotiations with contractors regarding the value of
claims or changes in schedules and prepare recommendations on claims -
approval or rejection.
• Assist in development of Tenders as part of the procurement process.
Coordinate with the Project Manager, Construction Manager (onsite) to
collate and analyze periodic reports to help understand project performance
against MEP standards and drive remedial actions.
• Interface with client in relation to MEP activities on site.
• Oversee and advise on the estimates prepared by the QS/Cost Control
relating to MEP works and collate and analyze periodic cost reports to
monitor cost performance.
• Prepare Factory Acceptance Procedure (FAP) and other test procedure for
Electro – mechanic system`s goods and make sure that FAP and rest of them
applied during all the tests and report them.
• For the system operational training activities,.prepared training instruments,
Operation and Maintenance Manuals and documents for Electro-mechanic
Systems, interfaces.
• Analyzing SES and CFD reports to find acceptable solution for Tunnel and
HVAC Systems.
• Designing operation and maintenance and breakdown systems and during
the probationary period coordinate operation and service activities which are
Periodic Planed Maintenance (PPM) and emergency& non-emergency break
down cover. End of the probationary period, make sure the all the PAL list. If
there is any final acceptance list and finishes those and end project.
• Controlling Safety documentations before starting operation line, (System
Safety Plan, System RAM Plan, Preliminary Hazard Identification and
Analysis, System and Subsystems Safety Requirements, Evacuation and
4
Rescue Concept etc.)
For more details: It is summarized on the following page
Period 2014 August – 2016 April
Organization Egis Rail Gold Line
Department /
Position
Engineering Department / Sr. MEP Engineer(Manager)
Job Responsibilities and Major Activities
• MEP design review. Construction supervision
• Develop systems for reporting to monitor and track MEP technical issues.
• Review the supervision consultant’s procedures for quality checks and site
inspections for MEP and monitor processes to address all MEP site related
issues.
• Coordinate with the project commissioning consultants to ensure that all
projects are commissioned to meet the contract requirements.
• Monitor MEP work such as technical drawing of power Sub Station and
Distribution works, UPS, HVAC, Chiller plant, BMS systems, SCADA, Lifts,
Escalator's, Fire hydrant & protection system, Hydro pneumatic systems,
water distribution system and other MEP activities as required.
• Develop working templates for establishing and tracking project MEP
requirements, technical specifications, cost estimations and appointment of
contractors.
• Work with the Project Manager to establish key performance indicators for
critical MEP parameters on the project.
• Develop systems for reporting to monitor and track MEP technical issues.
• Review the supervision consultant’s procedures for quality checks and site
inspections for MEP and monitor processes to address all MEP site related
issues.
• Coordinate with the project commissioning consultants to ensure that all
projects are commissioned to meet the contract requirements.
• Monitor MEP work such as installation of power Sub Station and Distribution
works, UPS, Air conditioning, BMS systems, Lifts, Escalator's, Fire hydrant &
5
protection system, Hydro pneumatic systems, water distribution
system,railway ,rail grainding , chiller plant and other MEP activities as
required.
• Serve as the MEP expert in the PM team for all matters related to design,
quality assurance and documentation of mechanical works.
• Acquire a detailed understanding of contract documents (drawings and
specifications), phasing plans, MEP systems interrelationships, construction
sequencing, and project schedules to advise the project manager as
necessary.
• Control railway system shopdrawing include spaceproofing , according to
dinamic and static train size.
• Serve as the MEP expert in the PM team for all matters related to design,
quality assurance and documentation of mechanical Works and to lead a
team of 6 MEP engineers.
• Acquire a detailed understanding of contract documents (drawings and
specifications), phasing plans, MEP systems interrelationships, construction
sequencing, and project schedules to advise the project manager as
necessary.
• Ensure appropriate usage and application of the Project Management System
(PMS) with respect to entry and analysis of work related data.
• Assist project team in negotiations with contractors regarding the value of
claims or changes in schedules and prepare recommendations on claims -
approval or rejection.
• Assist in development of RFPs/Tenders by QPM as part of the procurement
process. Coordinate with the Project Manager, Construction Manager (onsite)
to collate and analyze periodic reports to help understand project
performance against MEP standards and drive remedial actions.
• Oversee and advise on the estimates prepared by the QS/Cost Control
relating to MEP works and collate and analyze periodic cost reports to
monitor cost performance.
• MEP contract procurement (strategy, ITT, tender evaluation)
• MEP interface management
For more details: It is summarized on the following page.
Period 2011 February – 2014 August
Organization
Istanbul Ulasim Company (The Greater City Municipality of İstanbul`s
Transport Company)
Department /
Position
Electro Mechanic System Manager include railway and third rail.
6
Job Responsibilities and Major Activities
• Control railway system shopdrawing include spaceproofing , according to
dinamic and static train size.
• Because holder of 2014 Occupational Health and Safety – group B
certification, I am acting as a fire & life safety coordinater.
• The supervision of the Rail Systems Contractor site installation activities at
Maintenance Depot, both Stabling Yards, Stations, Tunnels, Elevated and At-
Grade and other locations as may be identified.
• Ensure that the site activities are properly coordinated and well planned, and
shall review the progress of the Contractors progress, to suggest corrective
action or improvements to the works necessitated by site conditions meet, for;
Signalling, Energy, Tunnel Ventilation, Telecommunications, Platform Screen
doors, SCADA, ICC / ECC and AFC.
• Coordinates the review by the team of RE and ARE for recommendation of
approval to the Employer of the Contractors installation method statements,
ITP, construction shop and as-built drawings
• Develop working templates for establishing and tracking project MEP
requirements, technical specifications, cost estimations and appointment of
contractors.
• Work with the Project Manager to establish key performance indicators for
critical MEP parameters on the project.
• Develop systems for reporting to monitor and track MEP technical issues.
• Review the supervision consultant’s procedures for quality checks and site
inspections for MEP and monitor processes to address all MEP site related
issues.
• Coordinate with the project commissioning consultants to ensure that all
projects are commissioned to meet the contract requirements.
• Monitor MEP work such as installation of power Sub Station and Distribution
works, UPS, Air conditioning, BMS systems, Lifts, Escalator's, Fire hydrant &
protection system, Hydro pneumatic systems, water distribution
system,railway ,rail grainding , chiller plant and other MEP activities as
required.
• Serve as the MEP expert in the PM team for all matters related to design,
quality assurance and documentation of mechanical works.
• Acquire a detailed understanding of contract documents (drawings and
specifications), phasing plans, MEP systems interrelationships, construction
sequencing, and project schedules to advise the project manager as
necessary.
7
•
• Work with the Metro System General Manager to establish key performance
indicators for critical MEP parameters on the extantion of the line.
• Develop systems for reporting to monitor and track MEP technical issues.
• Review the supervision consultant’s procedures for quality checks and site
inspections for MEP and monitor processes to address all MEP site related
issues.
• Coordinate with the project commissioning consultants to ensure that all
projects are commissioned to meet the contract requirements.
• Monitor MEP work such as installation of power Sub Station and Distribution
works, Emergency power plant, HVAC,Chiller, BMS systems, Lifts,
Escalator's, Fire hydrant & protection system, Hydro pneumatic systems,
water distribution system,railway ,rail grainding , chiller plant and other MEP
activities as required.
• Serve as the MEP expert in the PM team for all matters related to design,
quality assurance and documentation of mechanical works.
• Acquire a detailed understanding of contract documents (drawings and
specifications), phasing plans, MEP systems interrelationships, construction
sequencing, and project schedules to advise the general manager as
necessary.
• Assist in the development and review of MEP systems for the project.
Manage the supervision consultant to approve the contractor’s as-built
drawings and submittals and log MEP changes and as-built information.
• Define scope, budget and justification of MEP change work orders.
• Ensure appropriate usage and application of the Project Management System
(PMS) with respect to entry and analysis of work related data.
• Oversee the testing and commissioning of MEP equipment and the review
and approval process for all mechanical and technical submittals.
• Monitor design consultants and the MEP supervision consultants with regard
to approvals and liaise with local authorities and ministerial agencies as
necessary.
• Assist project team in negotiations with contractors regarding the value of
claims or changes in schedules and prepare recommendations on claims -
approval or rejection.
• Assist in development of Tenders as part of the procurement process.
Coordinate with the Project Manager, Construction Manager (onsite) to
collate and analyze periodic reports to help understand project performance
8
against MEP standards and drive remedial actions.
• Interface with client in relation to MEP activities on site.
• Oversee and advise on the estimates prepared by the QS/Cost Control
relating to MEP works and collate and analyze periodic cost reports to
monitor cost performance.
• Prepare Factory Acceptance Procedure (FAP) and other test procedure for
Electro – mechanic system`s goods and make sure that FAP and rest of them
applied during all the tests and report them.
• For the system operational training activities,.prepared training instruments,
Operation and Maintenance Manuals and documents for Electro-mechanic
Systems, interfaces.
• Analyzing SES and CFD reports to find acceptable solution for Tunnel and
HVAC Systems.
• Designing operation and maintenance and breakdown systems and during
the probationary period coordinate operation and service activities which are
Periodic Planed Maintenance (PPM) and emergency& non-emergency break
down cover. End of the probationary period, make sure the all the PAL list. If
there is any final acceptance list and finishes those and end project.
• Controlling Safety documentations before starting operation line, (System
Safety Plan, System RAM Plan, Preliminary Hazard Identification and
Analysis, System and Subsystems Safety Requirements, Evacuation and
Rescue Concept etc.)
• Chiller plant project and maintenance.
• Analyzing the overall systems to prepare Provisional Acceptance List (PAL)
for new built stations.
• Analyzing the overall systems and prepare innovation report for more than 15
years old stations.
• Platform screen door construction and maintenance.
• Designed operation and maintenance and breakdown systems forasset
management systems for Istanbul Metro lines.and end of the probationary
period, prepare final acceptance list and finishes project include the Grinding
Machine.
• Managing the Grinding Machine which doing rail grinding according to
preventive maintenance program.
• Coordinated the relations between DLH , IMM and other municipalities as
Istanbul Ulasim AS delegate.
9
For more details: It is summarized on the following page
 Period 2009- 2011
 Organizatio
n Alsim –Alarko- Rotem Incorporated Company
 Department
/ Position Electro mechanic Construction Manager include railway and third rail
Job Responsibilities and Major Activities
• The supervision of the Rail Systems Contractor site installation activities at
Maintenance Depot, both Stabling Yards, Stations, Tunnels, Elevated and At-
Grade and other locations as may be identified.
• Ensure that the site activities are properly coordinated and well planned, and
shall review the progress of the Contractors progress, to suggest corrective
action or improvements to the works necessitated by site conditions meet, for;
Signalling, Energy, Tunnel Ventilation, Telecommunications, Platform Screen
doors, SCADA, ICC / ECC and AFC.
• Coordinates the review by the team of RE and ARE for recommendation of
approval to the Employer of the Contractors installation method statements,
ITP, construction shop and as-built drawings
• Develop working templates for establishing and tracking project MEP
requirements, technical specifications, cost estimations and appointment of
contractors.
• Work with the Project Manager to establish key performance indicators for
critical MEP parameters on the project.
• Develop systems for reporting to monitor and track MEP technical issues.
• Review the supervision consultant’s procedures for quality checks and site
inspections for MEP and monitor processes to address all MEP site related
issues.
• Control railway system shopdrawing include spaceproofing , according to
dinamic and static train size.
• Coordinate with the project commissioning consultants to ensure that all
projects are commissioned to meet the contract requirements.
• Monitor MEP work such as installation of power Sub Station and Distribution
works, UPS, Air conditioning, BMS systems, Lifts, Escalator's, Fire hydrant &
protection system, Hydro pneumatic systems, water distribution
system,railway ,rail grainding , chiller plant and other MEP activities as
required.
• Serve as the MEP expert in the PM team for all matters related to design,
10
quality assurance and documentation of mechanical works.
• Acquire a detailed understanding of contract documents (drawings and
specifications), phasing plans, MEP systems interrelationships, construction
sequencing, and project schedules to advise the project manager as
necessary.
•
• Work with the Project Manager to establish key performance indicators for
critical MEP parameters on the project.
• Develop systems for reporting to monitor and track MEP technical issues.
• Review the supervision consultant’s procedures for quality checks and site
inspections for MEP and monitor processes to address all MEP site related
issues.
• Coordinate with the project commissioning consultants to ensure that all
projects are commissioned to meet the contract requirements.
• Monitor MEP work such as installation of power Sub Station and Distribution
works, UPS, HVAC, BMS systems, Lifts, Escalator's, Fire hydrant &
protection system, Hydro pneumatic systems, water distribution
system,railway ,rail grainding , chiller plant and other MEP activities as
required.
• Serve as the MEP expert in the PM team for all matters related to design,
quality assurance and documentation of mechanical works.
• Acquire a detailed understanding of contract documents (drawings and
specifications), phasing plans, MEP systems interrelationships, construction
sequencing, and project schedules to advise the project manager as
necessary.
• Assist in the development and review of MEP systems for the project.
Manage the supervision consultant to approve the contractor’s as-built
drawings and submittals and log MEP changes and as-built information.
• Define scope, budget and justification of MEP change work orders.
• Ensure appropriate usage and application of the Project Management System
(PMS) with respect to entry and analysis of work related data.
• Oversee the testing and commissioning of MEP equipment and the review
and approval process for all mechanical and technical submittals.
• Monitor design consultants and the MEP supervision consultants with regard
to approvals and liaise with local authorities and ministerial agencies as
necessary.
11
• Prepare Factory Acceptance Procedure (FAP) and other test procedure for
Electro – mechanic system`s goods and make sure that FAP and rest of them
applied during all the tests and report them
• Assist project team in negotiations with contractors regarding the value of
claims or changes in schedules and prepare recommendations on claims -
approval or rejection.
• Assist in development of Tenders as part of the procurement process.
Coordinate with the Project Manager, Construction Manager (onsite) to
collate and analyze periodic reports to help understand project performance
against MEP standards and drive remedial actions.
• Interface with client in relation to MEP activities on site.
• Oversee and advise on the estimates prepared by the QS/Cost Control
relating to MEP works and collate and analyze periodic cost reports to
monitor cost performance.
• Prepare Factory Acceptance Procedure (FAP) and other test procedure for
Electro – mechanic system`s goods and make sure that FAP and rest of them
applied during all the tests and report them.
• For the system operational training activities,.prepared training instruments,
Operation and Maintenance Manuals and documents for Electro-mechanic
Systems, interfaces.
• Analyzing SES and CFD reports to find acceptable solution for Tunnel and
HVAC Systems.
• Designed operation and maintenance and breakdown systems and during
the probationary period coordinate operation and service activities which are
Periodic Planed Maintenance (PPM) and emergency& non-emergency break
down cover. End of the probationary period, make sure the all the PAL list. If
there is any final acceptance list and finishes those and end project.
• Controlling Safety documentations before starting operation line, (System
Safety Plan, System RAM Plan, Preliminary Hazard Identification and
Analysis, System and Subsystems Safety Requirements, Evacuation and
Rescue Concept etc.)
• Responsible over 120 engineers, technician and workers not include
subcontractor.
For more details: It is summarized on the following page
 Period 1999 - 2009
12
 Organizatio
n
Emcor Rail ve Infrastructure/Tube Line ,London , UK
 Department
/ Position
Electro Mechanic Department Manager for Jubilee, Northern and Piccadilly Lines
Job
Responsibilities and Major Activities
• The supervision of the Rail Systems Contractor site installation activities at
Maintenance Depot, both Stabling Yards, Stations, Tunnels, Elevated and At-
Grade and other locations as may be identified.
• Ensure that the site activities are properly coordinated and well planned, and
shall review the progress of the Contractors progress, to suggest corrective
action or improvements to the works necessitated by site conditions meet, for;
Signalling, Energy, Tunnel Ventilation, Telecommunications, Platform Screen
doors, SCADA, ICC / ECC and AFC.
• Coordinates the review by the team of RE and ARE for recommendation of
approval to the Employer of the Contractors installation method statements,
ITP, construction shop and as-built drawings
• Develop working templates for establishing and tracking project MEP
requirements, technical specifications, cost estimations and appointment of
contractors.
• Work with the Project Manager to establish key performance indicators for
critical MEP parameters on the project.
• Develop systems for reporting to monitor and track MEP technical issues.
• Review the supervision consultant’s procedures for quality checks and site
inspections for MEP and monitor processes to address all MEP site related
issues.
• Coordinate with the project commissioning consultants to ensure that all
projects are commissioned to meet the contract requirements.
• Monitor MEP work such as installation of power Sub Station and Distribution
works, UPS, Air conditioning, BMS systems, Lifts, Escalator's, Fire hydrant &
protection system, Hydro pneumatic systems, water distribution
system,railway ,rail grainding , chiller plant and other MEP activities as
required.
• Serve as the MEP expert in the PM team for all matters related to design,
quality assurance and documentation of mechanical works.
• Acquire a detailed understanding of contract documents (drawings and
specifications), phasing plans, MEP systems interrelationships, construction
sequencing, and project schedules to advise the project manager as
13
necessary.
•
• Develop working templates for establishing and tracking project MEP
requirements, technical specifications, cost estimations and appointment of
contractors.
• Work with the Project Manager to establish key performance indicators for
critical MEP parameters on the project.
• Coordinate with the project commissioning consultants to ensure that all
projects are commissioned to meet the contract requirements.
• Monitor MEP work such as installation and maintenance of HVAC,Chiller,
BMS systems, Lifts, Escalator's, Fire hydrant & protection system, Hydro
pneumatic systems, water distribution system and and other MEP activities as
required.
• Serve as the MEP expert in the PM team for all matters related to design,
quality assurance and documentation of mechanical works.
• Acquire a detailed understanding of contract documents (drawings and
specifications), phasing plans, MEP systems interrelationships, construction
sequencing, and project schedules to advise the project manager as
necessary.
• Oversee the testing and commissioning of MEP equipment and the review
and approval process for all mechanical and technical submittals.
• Assist project team in negotiations with contractors regarding the value of
claims or changes in schedules and prepare recommendations on claims -
approval or rejection.
• Interface with client in relation to MEP activities on site.
• Coordinate with QA and HSE to monitor compliance by the MEP consultants
and contractors with management plans .
• Programing operation and maintenance and breakdown systems and during
the probationary period and after coordinate operation and service activities
which are Periodic Planed Maintenance (PPM) and emergency& non-
emergency break down cover.
• Manage over 90 engineers, technician and workers include subcontractor.
• Analyzing the overall systems and prepare innovation report for very old
stations.
14
For more details: It is summarized on the following page
Period 1995 - 1998
Organization Erbay Electromechanical Company,
Department
/Position
Electromechanic (MEP) Construction Manager
Job
Responsibilities and Major Activities
• Develop working templates for establishing and tracking project MEP
requirements, technical specifications, cost estimations and appointment of
contractors.
• Work with the Project Manager/Company owner to establish key performance
indicators for critical MEP parameters on the project.
• Develop systems for reporting to monitor and track MEP technical issues.
• Coordinate with the project commissioning consultants to ensure that all
projects are commissioned to meet the contract requirements.
• Monitor MEP work such as installation of HVAC,Chiller ,BMS systems, Lifts,
Escalator's, Fire hydrant & protection system, Hydro pneumatic systems,
water distribution system and other MEP activities as required.
• Acquire a detailed understanding of contract documents (drawings and
specifications), phasing plans, MEP systems interrelationships, construction
sequencing, and project schedules to advise the project manager as
necessary.
• Assist in the development and review of MEP systems for the project.
Manage the supervision consultant to approve the contractor’s as-built
drawings and submittals and log MEP changes and as-built information.
• Define scope, budget and justification of MEP change work orders.
• Oversee the testing and commissioning of MEP equipment and the review
and approval process for all mechanical and technical submittals.
• Assist project team in negotiations with contractors regarding the value of
claims or changes in schedules and prepare recommendations on claims -
approval or rejection.
• Interface with client in relation to MEP activities on site.
• Oversee and advise on the estimates prepared by the QS/Cost Control
relating to MEP works and collate and analyze periodic cost reports to
15
monitor cost performance.
• Preparing Tender Documents for subcontractor and hiring subcontractors for
designing systems, draw application projects and assembling The Electro-
mechanic systems etc.
• Responsible preparing Operation and Maintenance Manuals for Electro-
mechanic systems, interfaces.
• Responsible organize electromechanical representation and prepared As-
built project.
• End of the probationary period, make sure the all the PAL list is done. If there
is any final acceptance list and finishes those and end project.
• Responsible over 200 engineers, technician and workers not include
subcontractor.
For more details: It is summarized on the following page
Member ship
Additional
Information,
Computer Skills
and courses:
 Member of chamber of Mechanical Engineers (London, İstanbul).
 Member of chamber of HVAC Engineers (London)
Computer Skils
 Autocad and solid works.
 SES
 CFD
 HVAC design programs HAP
 Fire pump systems design programs from KSB.
 Office programs
Additional Course and Training
 Railway Grinding Machine Training,
 Third Rail training and course
 35 kV medium tension course,
 Rail Grinding Course and Training
16
 Railway and Switches Training, etc.
 Railway engineering course,
 Rail measurement course,
 Rail System Expert Training Certificate
 Construction chief certificate.
 Railway Interlocking Systems Course
 2014 Occupational Health and Safety – group B certification (Istanbul)
 Primavera P6
 Fire protection and prevention training
 Escalator course
 Elevator course,
 Fire pumps course,
 Drainage and sewage pumps course,
 Tunnel fans course
 First aid course
 Fire systems (hydrants , springs , gas etc.) course
 Automatic control systems(SCADA),course
 Electric course until 1000 volt electricity,
 Computerize building management (SCADA)system,
 HVAC systems course and training(HAP)
 Pressure Air systems courses
 Air compressor Training
 High pressure steam systems training,
 High pressure hydraulic oil systems course and training
 High fog fire systems training,
 SES and CFD program training
 FIDIC International Agreement Course,
 KSB pump selection program course,
 Increase of System productivity course,
 Argonite ,FM200 systems training
 Emergency turbo generator course,
 SIMATICS S7 200 PLC Course,
 Inverter Course
 Internal inspection according to ISO 9001,14001,18001 Integrated Management
 RAMS Analysis
 Fail Safe PLCs (HIMA)
 PLC Programming (SIMATICS S7 300, S7 400, S7 1200, Schneider, Mitsubishi)
 Industrial Communication Systems (Profibus, Profinet, Industrial Ethernet,
Modbus)
 Functional Safety and Its Applications to Automation Systems
 Process Control
 Computer Aided Control System Design
 Training on Siemens Process Control Systems Program named PCS7.
17
 2014 Occupational Health and Safety – group B certification (Istanbul)
 M2 Istanbul Metro Line Maintenance, Operations and Managerial Trainings
 Functional Safety course at Yildiz Technical University (14 weeks) 2012
 Engineer Management course at Yildiz Technical University (14 weeks) 2012
 Signaling Systems Course at Yildiz Technical University (14 weeks) 2013
 Risk Assessment Training
Some References
• Mustafa Caner Çıdam, Atlas Copco, +905397816374
• Singh Deepakkumar, ATKINS GOLDLINE MEP HOD of Property DesignDoha,
deepakkumar.singh@atkinsglobal.com , +9747021734 7
• Thomas Mayer, PMC Engineering Manager, tmayer_pmc@qr.com.qa
• Remmy Vandenbussche, PMC Project Director, rvandenbussche_pmc@qr.com.qa
• Maung Myo Maw, PMC Deputy Engineering Manager, +97474468907,
mmaw_pmc@qr.com.qa
• Faruk Asli, MEP Construction Manager , fasli_pmc@qr.cpm.qa, +97474468920
• Memet Meşe, Railway System Manager (Qatar Rail),mmese@qr.com.qr, +97466037310
• Yücel Temiz , PMC Technical Manager on Red Line ( working for DB) +97455702685
• M. Tarık Dündar , Civil Engineer(Parsons Brinckerhoff Design Manager) + 966 560 671
615
• Hamit Ateş, Mechanical Engineer ( Project Manager of Railway Cons. Dep. for IBB)0090
5335022930
• İsmail Eroğlu , Mechanical Engineer(Alsim-Alarko Project Manager) 0090 212 526
8540/5426331597
• Musa Otcu , Mechanical Engineer(Alsim-Alarko Technical Manager) 0090 212 526
8540/5333386008
• Hatice Orcan , Electrical Engineer(Alsim-Alarko Technical Manager) 0090 212 526
8540/5307878348
• Keith Dubois, Electro-mechanic Engineer( Tube lines Service Engineer) 0044 7598
589421
• Sean Hickey, Mechanical Engineer (Tube Lines Manager /LUL) 0044 775 3979653.
• Chris Stephenson, Electrical Engineer (Tube Lines Supervisor /LUL) 0044 772 0421080.
• Erhan Kakı, Mechanical Engineer (Erbay Design Manager) 0090 532 597 3786
18
• Yalcin EYIGUN, Civil Eng. (Dep.Gen. Man.of Infr. Inv. of Trans. Ministry ) 90 312 203 15
05
• Dursun BALCIOGLU, Civil Engineer (Head of Railway Cons. Department for IBB ) 90 212
449 41 50
WORK EXPERIENCE IN PUBLIC TRANSIT SYSTEMS
( 2016 April - Present ) Alarko Corporate Group /Istanbul/ Turkey
MEP Project Manager
M7 36 km Kabataş- Mahmutbey Metro Line will have 19 metro station and stabling
yards. Alarko rewarded the tender 6 month ago and it is 2,5 billion euro project. As a
head of the my department , leading design, procurement , tender, construction etc.
team to key finish the MEP systems. Include 2 years warranty periods as well.
During warranty period our responsibility is brake down service and maintenance.
(2015 August – 2016 April ) Egis Rail Gold Line ,Doha, Qatar
Engineering Department /Senior MEP Manager
Gold line total 10 metro station. I was responsible MEP design review and contract
procurement (strategy, ITT, tender evaluation) , MEP interface management ,to lead a
team of MEP engineers.
(2011 February – 2015 September ) Istanbul Ulasim Company (The Greater
City Municipality of İstanbul`s Transport Company)
Electro mechanic System Manager
Istanbul Ulasim A.S. is an affiliate company of Istanbul Metropolitan Municipality
operating the tramway, metro , light rail, funicular and aerial cable cars in Istanbul.
Founded by the Istanbul Metropolitan Municipality for operating the urban railway network
in the metropolitan area, the company currently operates 7 urban railway lines of 100 km.
M1 Line has started to operation from 1989. There are many revision and renovation
projects has done for these systems.
At the moment I am mainly dealing ;M2 Halic Metro Crossing Bridge ,M2 and M7
undergrounds /metro lines.
19
My responsibility for M2 Halic Metro Crossing Bridge, M2 line are; these bridge and the
line construction nearly going end. I am trying close PAL and preparing the final
acceptance of M2 construction project. I have been working M2 underground /metro line
from the beginning which the one of the design and requirement team member (When I
have this responsibilities , I used to work Alarko) . later on ,I led the purchasing
department for electro mechanic equipment after that as a construction manager ,
managing the subcontractor and our worker to build the whole electro mechanic systems
include railway and third rail.
My responsibility for M7 line are; this line construction just recently started. I am member
of the design and requirement team member. we have prepared M7 line `s electro
mechanic technical tender document and construction drawing . We done the first stage
of the project. We are waiting second stage which municipality has to go tender for a
contract.
My skills have used these project as written below;
 M2 metro line (Yenikapı to Hacıosman ) include Train maintenance, depot and store
house building (18 stations ,16 km)
 M1B and M3 metro line (Esenler to Başakşehir )stations (11 stations , 16 km)
 M4 metro line (Kadıköy to Kartal ) include Train maintenance, depot and store house
building (17 station, 26,5 km)
 M5 metro line (Üsküdar to Ümraniye) include Train maintenance, depot and store house
building ( 16 station, 22 km )
 Funicular Kabataş to Taksim (2 station, 1 km)
 Golden Horn Cable Stand Metro Railway Bridge with swing bridge part.
 T4 tram line Topkapı to Sultançifliği ( 22 station, 11 km)
 Metro bus line from Asia to Europe more than 50 stations.
 Marmaray project from Asia to Europe 5 station section of Bosporus under pass.
For further information about company look at to the web site :
http://www.istanbul-ulasim.com.tr/about-us/introduction.aspx
(2009 - 2011 ) Alsim –Alarko- Rotem Incorporated Company
Construction Manager
Alsim –Alarko –Rotem Incorporated Company is one of the construction company . They
have been building metro line more than 15 years.
My skills have used these projects as written below;
 M2 metro line (Yenikapı to Hacıosman ) include Train maintenance, depot and store
house building (18 stations ,19 km)
 Antalya metro line include Train maintenance, depot and store house building (14
stations ,16 km)
 IETT historical tunnel funicular line (Karaköy to Beyoğlu , 2 station,0.7 km)
20
(1999 - 2009 ) Emcor Rail & Infrastructure/Tube Line ,London , UK
Electromechanic Department Manager
Emcor Rail & Infrastructure LTD. One of the subcontractor of Tube Lines. But All the
staffs are straight connect to the main company. Emcor is one of the USA base company
in UK. Drake & Scroll was the first name of the company. They changed their name later
on. They do construction and asset management all over the world.
My responsibility had started on Jubilee Line ; this line construction was nearly going end.
I was trying to close PAL and prepared the final acceptance of Jubilee Line construction
project.
When the construction worked finished. Our company had maintenance and breakdown
construct. Later on we had maintenance - breakdown construct and some of renewal
construct for Northern, Piccadilly and District Lines. These old lines, our company
My skills have used these projects as written below;
 Jubilee Line (27 stations, 29 mile)
 Northern Line (50 station , 35 mile)
 Piccadilly Line ( 39 station, 32 mile)
 District Line (58 station, 39 mile)
For further information about company look at to the web site :
http://tfl.gov.uk/maps/track/tube
http://tfl.gov.uk/cdn/static/cms/documents/standard-tube-map.pdf
(1995- 1998 ) Erbay Company , İstanbul ,Turkey
Construction Manager
Erbay is one of construction company in Turkey but same time they manufacture all kind
of industrial cooling units.
My skills have used these projects as written below;
 PNS (Pendik starch factory) 24.000 m2 covered area. De-montage three medium starch
factory in Spain and built up one big starch factory in Turkey.
 Besler cooking oil factory is built up brand-new 30000 m2 covered area.
 Gebze Biscuit factory is built up brand-new 24000 m2 covered area.
 Topkapı Biscuit Factory .
21

More Related Content

What's hot

Electromechanical engineer (2)
Electromechanical engineer (2)Electromechanical engineer (2)
Electromechanical engineer (2)Mohammad Zakir
 
-04,016-CURRICULUM VITA-Engسيرة ذاتية معتمدة
-04,016-CURRICULUM VITA-Engسيرة ذاتية معتمدة-04,016-CURRICULUM VITA-Engسيرة ذاتية معتمدة
-04,016-CURRICULUM VITA-Engسيرة ذاتية معتمدةMohammad Ehsan
 
Chief engineer Qahtan adnan CV 20-8-2016
Chief engineer Qahtan adnan CV 20-8-2016Chief engineer Qahtan adnan CV 20-8-2016
Chief engineer Qahtan adnan CV 20-8-2016Qahtan Adnan
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latestArun Das
 
Main resume edited copy
Main resume edited  copyMain resume edited  copy
Main resume edited copyMoe El Turkey
 
CV - Ammar Syed
CV - Ammar SyedCV - Ammar Syed
CV - Ammar SyedAmmar Syed
 
14. shift engineer noef lf_vd sms-e&i
14. shift engineer  noef lf_vd sms-e&i14. shift engineer  noef lf_vd sms-e&i
14. shift engineer noef lf_vd sms-e&ikaran sharma
 
Ahmed Rageh_CV (3)
Ahmed Rageh_CV (3)Ahmed Rageh_CV (3)
Ahmed Rageh_CV (3)Ahmed Rageh
 

What's hot (19)

Electromechanical engineer (2)
Electromechanical engineer (2)Electromechanical engineer (2)
Electromechanical engineer (2)
 
-04,016-CURRICULUM VITA-Engسيرة ذاتية معتمدة
-04,016-CURRICULUM VITA-Engسيرة ذاتية معتمدة-04,016-CURRICULUM VITA-Engسيرة ذاتية معتمدة
-04,016-CURRICULUM VITA-Engسيرة ذاتية معتمدة
 
Jeff Ross Resume
Jeff Ross ResumeJeff Ross Resume
Jeff Ross Resume
 
Chief engineer Qahtan adnan CV 20-8-2016
Chief engineer Qahtan adnan CV 20-8-2016Chief engineer Qahtan adnan CV 20-8-2016
Chief engineer Qahtan adnan CV 20-8-2016
 
Cv of yasser_alammari
Cv of yasser_alammari Cv of yasser_alammari
Cv of yasser_alammari
 
MOHANNAD CV
MOHANNAD  CVMOHANNAD  CV
MOHANNAD CV
 
Basim resume (3)
Basim resume (3)Basim resume (3)
Basim resume (3)
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latest
 
Main resume edited copy
Main resume edited  copyMain resume edited  copy
Main resume edited copy
 
CV - Ammar Syed
CV - Ammar SyedCV - Ammar Syed
CV - Ammar Syed
 
KahsayResume (1)
KahsayResume (1)KahsayResume (1)
KahsayResume (1)
 
Hussein Ahmad Salem-CV
Hussein Ahmad Salem-CVHussein Ahmad Salem-CV
Hussein Ahmad Salem-CV
 
14. shift engineer noef lf_vd sms-e&i
14. shift engineer  noef lf_vd sms-e&i14. shift engineer  noef lf_vd sms-e&i
14. shift engineer noef lf_vd sms-e&i
 
resume 04092015
resume 04092015resume 04092015
resume 04092015
 
Colin Crossley New CV
Colin Crossley New CVColin Crossley New CV
Colin Crossley New CV
 
Ahmed Rageh_CV (3)
Ahmed Rageh_CV (3)Ahmed Rageh_CV (3)
Ahmed Rageh_CV (3)
 
cv ehab
cv ehabcv ehab
cv ehab
 
roshan-CV1
roshan-CV1roshan-CV1
roshan-CV1
 
Yasser Wahba CV
Yasser Wahba CVYasser Wahba CV
Yasser Wahba CV
 

Similar to MUSA SAKIN

Similar to MUSA SAKIN (20)

1.mep engineer latest
1.mep engineer latest1.mep engineer latest
1.mep engineer latest
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latest
 
CV
CVCV
CV
 
Ahmed Elrassas CV_11_2015-rev2
Ahmed Elrassas CV_11_2015-rev2Ahmed Elrassas CV_11_2015-rev2
Ahmed Elrassas CV_11_2015-rev2
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume
 
Arun das latest resume (1)
Arun das latest resume (1)Arun das latest resume (1)
Arun das latest resume (1)
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume
 
Arun das latest resume
Arun das latest resumeArun das latest resume
Arun das latest resume
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 
Abdelmouizz Mahfouz
Abdelmouizz MahfouzAbdelmouizz Mahfouz
Abdelmouizz Mahfouz
 
CV SAdikh 2 (1)
CV SAdikh 2 (1)CV SAdikh 2 (1)
CV SAdikh 2 (1)
 
Ayman curriculum vitae
Ayman curriculum vitaeAyman curriculum vitae
Ayman curriculum vitae
 
Instrument commissioning engineer
Instrument commissioning engineerInstrument commissioning engineer
Instrument commissioning engineer
 
Mohammed Islam's Resume-05-20-15
Mohammed Islam's Resume-05-20-15Mohammed Islam's Resume-05-20-15
Mohammed Islam's Resume-05-20-15
 
vijins new-11-2016
vijins new-11-2016vijins new-11-2016
vijins new-11-2016
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume
 
F.M.Camus (CV 2016)
F.M.Camus (CV 2016)F.M.Camus (CV 2016)
F.M.Camus (CV 2016)
 
Vladimir Nikitin - Completed CV
Vladimir Nikitin - Completed CVVladimir Nikitin - Completed CV
Vladimir Nikitin - Completed CV
 
Nisanth April 2015
Nisanth April 2015Nisanth April 2015
Nisanth April 2015
 
Samuel resume cv
Samuel resume cvSamuel resume cv
Samuel resume cv
 

Recently uploaded

Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 

Recently uploaded (20)

Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 

MUSA SAKIN

  • 1. MUSA SAKIN Msc ELECTROMECHANICAL ENGINEER DEPUTY PROJECT MANAGER Family Address Cengiztopel Caddesi, Aksemseddin Mahallesi, Güneş Sokak, No:57/6 , Eyüp / İstanbul Doha/Qata r Address Ezdan Hotels & Suits , West Bay Cellphone +90 530 204 7229 / +974 33378990 Contact e- mail address adsiz@hotmail.com Linkedin Profile https://www.linkedin.com/profile/view?id=120779348&trk=nav_responsive_tab_profile Country Turkey Nationality Turkish Marital status Married with two daughter Birth Date 10th / September /1973 Gender Male Driving license English and Turkish (B) license Languages Turkish Level: Advanced (writing, speaking, reading) English Level: Advanced (writing, speaking, reading) Chinese Level: Beginner Arabic Level: Beginner Religion Islamic 1
  • 2. Key Qualifications Profile I am extremely committed to as an electromechanical engineer/manager with the ability to take on responsibility , good communication skill, fast learner, able to work alone or as part of the team, able to throw myself whole –heartedly into project. Since 1995, I have been working on industrial systems. But after 1996 have been dealing major international underground/metro projects. That is why my skills include ability to manage projects on underground/metro, mass transit in all phases from planning to designing, construction and operation and asset managements(assembling, maintenance, breakdown etc.). Also recent achievements have included designed for many different type of stations electromechanical and rail systems which the supervision of the Rail Systems Contractor site installation activities at Maintenance Depot, both Stabling Yards, Stations, Tunnels, Elevated and At-Grade Professional experience also includes acting as a leader or a flexible team member for all multi-disciplinary engineering works include short term contracts ,re- organized work to increase efficiency & productivity . Finally I am a positive, well-motivated person who strives to encourage colleague and others who works with me. Education 1998- 2000 The Institute of Hampstead Garden Suburb ( Follows University of Cambridge and London of Commerce Examination), London, UK Studied Advanced English and LCCIEB accrediting skills for business and management. 1996-1998 Master in Science(MSc) Sakarya University, Turkey Mechanical Engineering; Course involved programming robotic machines by using CAD- CAM (pro-engineer) and automatic control. 1991-1996 Undergraduate (BSc) Erciyes University, Turkey Mechanical Engineering. Covered subjects such as Construction Engineering , Planning, Manufacturing and Drawing 1988-1991 High school Yozgat High school Eleven subject at above GCSE standards (overall B) Professional Experience Period 2016 April – Present Organization Alarko Corporate Group/Istanbul/Turkey Department / Position Project Management / Deputy Project Manager 2
  • 3. Job Responsibilities and Major Activities • The supervision of the Rail Systems Contractor site installation activities at Maintenance Depot, both Stabling Yards, Stations, Tunnels, Elevated and At- Grade and other locations as may be identified. • Because holder of 2014 Occupational Health and Safety – group B certification, I am acting as a fire & life safety coordinater. • Ensure that the site activities are properly coordinated and well planned, and shall review the progress of the Contractors progress, to suggest corrective action or improvements to the works necessitated by site conditions meet, for; Signalling, Energy, Tunnel Ventilation, Telecommunications, Platform Screen doors, SCADA, ICC • Coordinates the review by the team of RE and ARE for recommendation of approval to the Employer of the Contractors installation method statements, ITP, construction shop and as-built drawings • Develop working templates for establishing and tracking project MEP requirements, technical specifications, cost estimations and appointment of contractors. • Work with the Project Manager to establish key performance indicators for critical MEP parameters on the project. • Develop systems for reporting to monitor and track MEP technical issues. • Review the supervision consultant’s procedures for quality checks and site inspections for MEP and monitor processes to address all MEP site related issues. • Control railway system shopdrawing include spaceproofing , according to dinamic and static train size. • Coordinate with the project commissioning consultants to ensure that all projects are commissioned to meet the contract requirements. • Monitor MEP work such as installation of power Sub Station and Distribution works, UPS, Air conditioning, BMS systems, Lifts, Escalator's, Fire hydrant & protection system, Hydro pneumatic systems, water distribution system,railway ,rail grainding , chiller plant and other MEP activities as required. • Serve as the MEP expert in the PM team for all matters related to design, quality assurance and documentation of mechanical works. • Acquire a detailed understanding of contract documents (drawings and specifications), phasing plans, MEP systems interrelationships, construction sequencing, and project schedules to advise the project manager as necessary. 3
  • 4. • Assist in the development and review of MEP systems for the project. Manage the supervision consultant to approve the contractor’s as-built drawings and submittals and log MEP changes and as-built information. • Define scope, budget and justification of MEP change work orders. • Ensure appropriate usage and application of the Project Management System (PMS) with respect to entry and analysis of work related data. • Oversee the testing and commissioning of MEP equipment and the review and approval process for all mechanical and technical submittals. • Monitor design consultants and the MEP supervision consultants with regard to approvals and liaise with local authorities and ministerial agencies as necessary. • Assist project team in negotiations with contractors regarding the value of claims or changes in schedules and prepare recommendations on claims - approval or rejection. • Assist in development of Tenders as part of the procurement process. Coordinate with the Project Manager, Construction Manager (onsite) to collate and analyze periodic reports to help understand project performance against MEP standards and drive remedial actions. • Interface with client in relation to MEP activities on site. • Oversee and advise on the estimates prepared by the QS/Cost Control relating to MEP works and collate and analyze periodic cost reports to monitor cost performance. • Prepare Factory Acceptance Procedure (FAP) and other test procedure for Electro – mechanic system`s goods and make sure that FAP and rest of them applied during all the tests and report them. • For the system operational training activities,.prepared training instruments, Operation and Maintenance Manuals and documents for Electro-mechanic Systems, interfaces. • Analyzing SES and CFD reports to find acceptable solution for Tunnel and HVAC Systems. • Designing operation and maintenance and breakdown systems and during the probationary period coordinate operation and service activities which are Periodic Planed Maintenance (PPM) and emergency& non-emergency break down cover. End of the probationary period, make sure the all the PAL list. If there is any final acceptance list and finishes those and end project. • Controlling Safety documentations before starting operation line, (System Safety Plan, System RAM Plan, Preliminary Hazard Identification and Analysis, System and Subsystems Safety Requirements, Evacuation and 4
  • 5. Rescue Concept etc.) For more details: It is summarized on the following page Period 2014 August – 2016 April Organization Egis Rail Gold Line Department / Position Engineering Department / Sr. MEP Engineer(Manager) Job Responsibilities and Major Activities • MEP design review. Construction supervision • Develop systems for reporting to monitor and track MEP technical issues. • Review the supervision consultant’s procedures for quality checks and site inspections for MEP and monitor processes to address all MEP site related issues. • Coordinate with the project commissioning consultants to ensure that all projects are commissioned to meet the contract requirements. • Monitor MEP work such as technical drawing of power Sub Station and Distribution works, UPS, HVAC, Chiller plant, BMS systems, SCADA, Lifts, Escalator's, Fire hydrant & protection system, Hydro pneumatic systems, water distribution system and other MEP activities as required. • Develop working templates for establishing and tracking project MEP requirements, technical specifications, cost estimations and appointment of contractors. • Work with the Project Manager to establish key performance indicators for critical MEP parameters on the project. • Develop systems for reporting to monitor and track MEP technical issues. • Review the supervision consultant’s procedures for quality checks and site inspections for MEP and monitor processes to address all MEP site related issues. • Coordinate with the project commissioning consultants to ensure that all projects are commissioned to meet the contract requirements. • Monitor MEP work such as installation of power Sub Station and Distribution works, UPS, Air conditioning, BMS systems, Lifts, Escalator's, Fire hydrant & 5
  • 6. protection system, Hydro pneumatic systems, water distribution system,railway ,rail grainding , chiller plant and other MEP activities as required. • Serve as the MEP expert in the PM team for all matters related to design, quality assurance and documentation of mechanical works. • Acquire a detailed understanding of contract documents (drawings and specifications), phasing plans, MEP systems interrelationships, construction sequencing, and project schedules to advise the project manager as necessary. • Control railway system shopdrawing include spaceproofing , according to dinamic and static train size. • Serve as the MEP expert in the PM team for all matters related to design, quality assurance and documentation of mechanical Works and to lead a team of 6 MEP engineers. • Acquire a detailed understanding of contract documents (drawings and specifications), phasing plans, MEP systems interrelationships, construction sequencing, and project schedules to advise the project manager as necessary. • Ensure appropriate usage and application of the Project Management System (PMS) with respect to entry and analysis of work related data. • Assist project team in negotiations with contractors regarding the value of claims or changes in schedules and prepare recommendations on claims - approval or rejection. • Assist in development of RFPs/Tenders by QPM as part of the procurement process. Coordinate with the Project Manager, Construction Manager (onsite) to collate and analyze periodic reports to help understand project performance against MEP standards and drive remedial actions. • Oversee and advise on the estimates prepared by the QS/Cost Control relating to MEP works and collate and analyze periodic cost reports to monitor cost performance. • MEP contract procurement (strategy, ITT, tender evaluation) • MEP interface management For more details: It is summarized on the following page. Period 2011 February – 2014 August Organization Istanbul Ulasim Company (The Greater City Municipality of İstanbul`s Transport Company) Department / Position Electro Mechanic System Manager include railway and third rail. 6
  • 7. Job Responsibilities and Major Activities • Control railway system shopdrawing include spaceproofing , according to dinamic and static train size. • Because holder of 2014 Occupational Health and Safety – group B certification, I am acting as a fire & life safety coordinater. • The supervision of the Rail Systems Contractor site installation activities at Maintenance Depot, both Stabling Yards, Stations, Tunnels, Elevated and At- Grade and other locations as may be identified. • Ensure that the site activities are properly coordinated and well planned, and shall review the progress of the Contractors progress, to suggest corrective action or improvements to the works necessitated by site conditions meet, for; Signalling, Energy, Tunnel Ventilation, Telecommunications, Platform Screen doors, SCADA, ICC / ECC and AFC. • Coordinates the review by the team of RE and ARE for recommendation of approval to the Employer of the Contractors installation method statements, ITP, construction shop and as-built drawings • Develop working templates for establishing and tracking project MEP requirements, technical specifications, cost estimations and appointment of contractors. • Work with the Project Manager to establish key performance indicators for critical MEP parameters on the project. • Develop systems for reporting to monitor and track MEP technical issues. • Review the supervision consultant’s procedures for quality checks and site inspections for MEP and monitor processes to address all MEP site related issues. • Coordinate with the project commissioning consultants to ensure that all projects are commissioned to meet the contract requirements. • Monitor MEP work such as installation of power Sub Station and Distribution works, UPS, Air conditioning, BMS systems, Lifts, Escalator's, Fire hydrant & protection system, Hydro pneumatic systems, water distribution system,railway ,rail grainding , chiller plant and other MEP activities as required. • Serve as the MEP expert in the PM team for all matters related to design, quality assurance and documentation of mechanical works. • Acquire a detailed understanding of contract documents (drawings and specifications), phasing plans, MEP systems interrelationships, construction sequencing, and project schedules to advise the project manager as necessary. 7
  • 8. • • Work with the Metro System General Manager to establish key performance indicators for critical MEP parameters on the extantion of the line. • Develop systems for reporting to monitor and track MEP technical issues. • Review the supervision consultant’s procedures for quality checks and site inspections for MEP and monitor processes to address all MEP site related issues. • Coordinate with the project commissioning consultants to ensure that all projects are commissioned to meet the contract requirements. • Monitor MEP work such as installation of power Sub Station and Distribution works, Emergency power plant, HVAC,Chiller, BMS systems, Lifts, Escalator's, Fire hydrant & protection system, Hydro pneumatic systems, water distribution system,railway ,rail grainding , chiller plant and other MEP activities as required. • Serve as the MEP expert in the PM team for all matters related to design, quality assurance and documentation of mechanical works. • Acquire a detailed understanding of contract documents (drawings and specifications), phasing plans, MEP systems interrelationships, construction sequencing, and project schedules to advise the general manager as necessary. • Assist in the development and review of MEP systems for the project. Manage the supervision consultant to approve the contractor’s as-built drawings and submittals and log MEP changes and as-built information. • Define scope, budget and justification of MEP change work orders. • Ensure appropriate usage and application of the Project Management System (PMS) with respect to entry and analysis of work related data. • Oversee the testing and commissioning of MEP equipment and the review and approval process for all mechanical and technical submittals. • Monitor design consultants and the MEP supervision consultants with regard to approvals and liaise with local authorities and ministerial agencies as necessary. • Assist project team in negotiations with contractors regarding the value of claims or changes in schedules and prepare recommendations on claims - approval or rejection. • Assist in development of Tenders as part of the procurement process. Coordinate with the Project Manager, Construction Manager (onsite) to collate and analyze periodic reports to help understand project performance 8
  • 9. against MEP standards and drive remedial actions. • Interface with client in relation to MEP activities on site. • Oversee and advise on the estimates prepared by the QS/Cost Control relating to MEP works and collate and analyze periodic cost reports to monitor cost performance. • Prepare Factory Acceptance Procedure (FAP) and other test procedure for Electro – mechanic system`s goods and make sure that FAP and rest of them applied during all the tests and report them. • For the system operational training activities,.prepared training instruments, Operation and Maintenance Manuals and documents for Electro-mechanic Systems, interfaces. • Analyzing SES and CFD reports to find acceptable solution for Tunnel and HVAC Systems. • Designing operation and maintenance and breakdown systems and during the probationary period coordinate operation and service activities which are Periodic Planed Maintenance (PPM) and emergency& non-emergency break down cover. End of the probationary period, make sure the all the PAL list. If there is any final acceptance list and finishes those and end project. • Controlling Safety documentations before starting operation line, (System Safety Plan, System RAM Plan, Preliminary Hazard Identification and Analysis, System and Subsystems Safety Requirements, Evacuation and Rescue Concept etc.) • Chiller plant project and maintenance. • Analyzing the overall systems to prepare Provisional Acceptance List (PAL) for new built stations. • Analyzing the overall systems and prepare innovation report for more than 15 years old stations. • Platform screen door construction and maintenance. • Designed operation and maintenance and breakdown systems forasset management systems for Istanbul Metro lines.and end of the probationary period, prepare final acceptance list and finishes project include the Grinding Machine. • Managing the Grinding Machine which doing rail grinding according to preventive maintenance program. • Coordinated the relations between DLH , IMM and other municipalities as Istanbul Ulasim AS delegate. 9
  • 10. For more details: It is summarized on the following page  Period 2009- 2011  Organizatio n Alsim –Alarko- Rotem Incorporated Company  Department / Position Electro mechanic Construction Manager include railway and third rail Job Responsibilities and Major Activities • The supervision of the Rail Systems Contractor site installation activities at Maintenance Depot, both Stabling Yards, Stations, Tunnels, Elevated and At- Grade and other locations as may be identified. • Ensure that the site activities are properly coordinated and well planned, and shall review the progress of the Contractors progress, to suggest corrective action or improvements to the works necessitated by site conditions meet, for; Signalling, Energy, Tunnel Ventilation, Telecommunications, Platform Screen doors, SCADA, ICC / ECC and AFC. • Coordinates the review by the team of RE and ARE for recommendation of approval to the Employer of the Contractors installation method statements, ITP, construction shop and as-built drawings • Develop working templates for establishing and tracking project MEP requirements, technical specifications, cost estimations and appointment of contractors. • Work with the Project Manager to establish key performance indicators for critical MEP parameters on the project. • Develop systems for reporting to monitor and track MEP technical issues. • Review the supervision consultant’s procedures for quality checks and site inspections for MEP and monitor processes to address all MEP site related issues. • Control railway system shopdrawing include spaceproofing , according to dinamic and static train size. • Coordinate with the project commissioning consultants to ensure that all projects are commissioned to meet the contract requirements. • Monitor MEP work such as installation of power Sub Station and Distribution works, UPS, Air conditioning, BMS systems, Lifts, Escalator's, Fire hydrant & protection system, Hydro pneumatic systems, water distribution system,railway ,rail grainding , chiller plant and other MEP activities as required. • Serve as the MEP expert in the PM team for all matters related to design, 10
  • 11. quality assurance and documentation of mechanical works. • Acquire a detailed understanding of contract documents (drawings and specifications), phasing plans, MEP systems interrelationships, construction sequencing, and project schedules to advise the project manager as necessary. • • Work with the Project Manager to establish key performance indicators for critical MEP parameters on the project. • Develop systems for reporting to monitor and track MEP technical issues. • Review the supervision consultant’s procedures for quality checks and site inspections for MEP and monitor processes to address all MEP site related issues. • Coordinate with the project commissioning consultants to ensure that all projects are commissioned to meet the contract requirements. • Monitor MEP work such as installation of power Sub Station and Distribution works, UPS, HVAC, BMS systems, Lifts, Escalator's, Fire hydrant & protection system, Hydro pneumatic systems, water distribution system,railway ,rail grainding , chiller plant and other MEP activities as required. • Serve as the MEP expert in the PM team for all matters related to design, quality assurance and documentation of mechanical works. • Acquire a detailed understanding of contract documents (drawings and specifications), phasing plans, MEP systems interrelationships, construction sequencing, and project schedules to advise the project manager as necessary. • Assist in the development and review of MEP systems for the project. Manage the supervision consultant to approve the contractor’s as-built drawings and submittals and log MEP changes and as-built information. • Define scope, budget and justification of MEP change work orders. • Ensure appropriate usage and application of the Project Management System (PMS) with respect to entry and analysis of work related data. • Oversee the testing and commissioning of MEP equipment and the review and approval process for all mechanical and technical submittals. • Monitor design consultants and the MEP supervision consultants with regard to approvals and liaise with local authorities and ministerial agencies as necessary. 11
  • 12. • Prepare Factory Acceptance Procedure (FAP) and other test procedure for Electro – mechanic system`s goods and make sure that FAP and rest of them applied during all the tests and report them • Assist project team in negotiations with contractors regarding the value of claims or changes in schedules and prepare recommendations on claims - approval or rejection. • Assist in development of Tenders as part of the procurement process. Coordinate with the Project Manager, Construction Manager (onsite) to collate and analyze periodic reports to help understand project performance against MEP standards and drive remedial actions. • Interface with client in relation to MEP activities on site. • Oversee and advise on the estimates prepared by the QS/Cost Control relating to MEP works and collate and analyze periodic cost reports to monitor cost performance. • Prepare Factory Acceptance Procedure (FAP) and other test procedure for Electro – mechanic system`s goods and make sure that FAP and rest of them applied during all the tests and report them. • For the system operational training activities,.prepared training instruments, Operation and Maintenance Manuals and documents for Electro-mechanic Systems, interfaces. • Analyzing SES and CFD reports to find acceptable solution for Tunnel and HVAC Systems. • Designed operation and maintenance and breakdown systems and during the probationary period coordinate operation and service activities which are Periodic Planed Maintenance (PPM) and emergency& non-emergency break down cover. End of the probationary period, make sure the all the PAL list. If there is any final acceptance list and finishes those and end project. • Controlling Safety documentations before starting operation line, (System Safety Plan, System RAM Plan, Preliminary Hazard Identification and Analysis, System and Subsystems Safety Requirements, Evacuation and Rescue Concept etc.) • Responsible over 120 engineers, technician and workers not include subcontractor. For more details: It is summarized on the following page  Period 1999 - 2009 12
  • 13.  Organizatio n Emcor Rail ve Infrastructure/Tube Line ,London , UK  Department / Position Electro Mechanic Department Manager for Jubilee, Northern and Piccadilly Lines Job Responsibilities and Major Activities • The supervision of the Rail Systems Contractor site installation activities at Maintenance Depot, both Stabling Yards, Stations, Tunnels, Elevated and At- Grade and other locations as may be identified. • Ensure that the site activities are properly coordinated and well planned, and shall review the progress of the Contractors progress, to suggest corrective action or improvements to the works necessitated by site conditions meet, for; Signalling, Energy, Tunnel Ventilation, Telecommunications, Platform Screen doors, SCADA, ICC / ECC and AFC. • Coordinates the review by the team of RE and ARE for recommendation of approval to the Employer of the Contractors installation method statements, ITP, construction shop and as-built drawings • Develop working templates for establishing and tracking project MEP requirements, technical specifications, cost estimations and appointment of contractors. • Work with the Project Manager to establish key performance indicators for critical MEP parameters on the project. • Develop systems for reporting to monitor and track MEP technical issues. • Review the supervision consultant’s procedures for quality checks and site inspections for MEP and monitor processes to address all MEP site related issues. • Coordinate with the project commissioning consultants to ensure that all projects are commissioned to meet the contract requirements. • Monitor MEP work such as installation of power Sub Station and Distribution works, UPS, Air conditioning, BMS systems, Lifts, Escalator's, Fire hydrant & protection system, Hydro pneumatic systems, water distribution system,railway ,rail grainding , chiller plant and other MEP activities as required. • Serve as the MEP expert in the PM team for all matters related to design, quality assurance and documentation of mechanical works. • Acquire a detailed understanding of contract documents (drawings and specifications), phasing plans, MEP systems interrelationships, construction sequencing, and project schedules to advise the project manager as 13
  • 14. necessary. • • Develop working templates for establishing and tracking project MEP requirements, technical specifications, cost estimations and appointment of contractors. • Work with the Project Manager to establish key performance indicators for critical MEP parameters on the project. • Coordinate with the project commissioning consultants to ensure that all projects are commissioned to meet the contract requirements. • Monitor MEP work such as installation and maintenance of HVAC,Chiller, BMS systems, Lifts, Escalator's, Fire hydrant & protection system, Hydro pneumatic systems, water distribution system and and other MEP activities as required. • Serve as the MEP expert in the PM team for all matters related to design, quality assurance and documentation of mechanical works. • Acquire a detailed understanding of contract documents (drawings and specifications), phasing plans, MEP systems interrelationships, construction sequencing, and project schedules to advise the project manager as necessary. • Oversee the testing and commissioning of MEP equipment and the review and approval process for all mechanical and technical submittals. • Assist project team in negotiations with contractors regarding the value of claims or changes in schedules and prepare recommendations on claims - approval or rejection. • Interface with client in relation to MEP activities on site. • Coordinate with QA and HSE to monitor compliance by the MEP consultants and contractors with management plans . • Programing operation and maintenance and breakdown systems and during the probationary period and after coordinate operation and service activities which are Periodic Planed Maintenance (PPM) and emergency& non- emergency break down cover. • Manage over 90 engineers, technician and workers include subcontractor. • Analyzing the overall systems and prepare innovation report for very old stations. 14
  • 15. For more details: It is summarized on the following page Period 1995 - 1998 Organization Erbay Electromechanical Company, Department /Position Electromechanic (MEP) Construction Manager Job Responsibilities and Major Activities • Develop working templates for establishing and tracking project MEP requirements, technical specifications, cost estimations and appointment of contractors. • Work with the Project Manager/Company owner to establish key performance indicators for critical MEP parameters on the project. • Develop systems for reporting to monitor and track MEP technical issues. • Coordinate with the project commissioning consultants to ensure that all projects are commissioned to meet the contract requirements. • Monitor MEP work such as installation of HVAC,Chiller ,BMS systems, Lifts, Escalator's, Fire hydrant & protection system, Hydro pneumatic systems, water distribution system and other MEP activities as required. • Acquire a detailed understanding of contract documents (drawings and specifications), phasing plans, MEP systems interrelationships, construction sequencing, and project schedules to advise the project manager as necessary. • Assist in the development and review of MEP systems for the project. Manage the supervision consultant to approve the contractor’s as-built drawings and submittals and log MEP changes and as-built information. • Define scope, budget and justification of MEP change work orders. • Oversee the testing and commissioning of MEP equipment and the review and approval process for all mechanical and technical submittals. • Assist project team in negotiations with contractors regarding the value of claims or changes in schedules and prepare recommendations on claims - approval or rejection. • Interface with client in relation to MEP activities on site. • Oversee and advise on the estimates prepared by the QS/Cost Control relating to MEP works and collate and analyze periodic cost reports to 15
  • 16. monitor cost performance. • Preparing Tender Documents for subcontractor and hiring subcontractors for designing systems, draw application projects and assembling The Electro- mechanic systems etc. • Responsible preparing Operation and Maintenance Manuals for Electro- mechanic systems, interfaces. • Responsible organize electromechanical representation and prepared As- built project. • End of the probationary period, make sure the all the PAL list is done. If there is any final acceptance list and finishes those and end project. • Responsible over 200 engineers, technician and workers not include subcontractor. For more details: It is summarized on the following page Member ship Additional Information, Computer Skills and courses:  Member of chamber of Mechanical Engineers (London, İstanbul).  Member of chamber of HVAC Engineers (London) Computer Skils  Autocad and solid works.  SES  CFD  HVAC design programs HAP  Fire pump systems design programs from KSB.  Office programs Additional Course and Training  Railway Grinding Machine Training,  Third Rail training and course  35 kV medium tension course,  Rail Grinding Course and Training 16
  • 17.  Railway and Switches Training, etc.  Railway engineering course,  Rail measurement course,  Rail System Expert Training Certificate  Construction chief certificate.  Railway Interlocking Systems Course  2014 Occupational Health and Safety – group B certification (Istanbul)  Primavera P6  Fire protection and prevention training  Escalator course  Elevator course,  Fire pumps course,  Drainage and sewage pumps course,  Tunnel fans course  First aid course  Fire systems (hydrants , springs , gas etc.) course  Automatic control systems(SCADA),course  Electric course until 1000 volt electricity,  Computerize building management (SCADA)system,  HVAC systems course and training(HAP)  Pressure Air systems courses  Air compressor Training  High pressure steam systems training,  High pressure hydraulic oil systems course and training  High fog fire systems training,  SES and CFD program training  FIDIC International Agreement Course,  KSB pump selection program course,  Increase of System productivity course,  Argonite ,FM200 systems training  Emergency turbo generator course,  SIMATICS S7 200 PLC Course,  Inverter Course  Internal inspection according to ISO 9001,14001,18001 Integrated Management  RAMS Analysis  Fail Safe PLCs (HIMA)  PLC Programming (SIMATICS S7 300, S7 400, S7 1200, Schneider, Mitsubishi)  Industrial Communication Systems (Profibus, Profinet, Industrial Ethernet, Modbus)  Functional Safety and Its Applications to Automation Systems  Process Control  Computer Aided Control System Design  Training on Siemens Process Control Systems Program named PCS7. 17
  • 18.  2014 Occupational Health and Safety – group B certification (Istanbul)  M2 Istanbul Metro Line Maintenance, Operations and Managerial Trainings  Functional Safety course at Yildiz Technical University (14 weeks) 2012  Engineer Management course at Yildiz Technical University (14 weeks) 2012  Signaling Systems Course at Yildiz Technical University (14 weeks) 2013  Risk Assessment Training Some References • Mustafa Caner Çıdam, Atlas Copco, +905397816374 • Singh Deepakkumar, ATKINS GOLDLINE MEP HOD of Property DesignDoha, deepakkumar.singh@atkinsglobal.com , +9747021734 7 • Thomas Mayer, PMC Engineering Manager, tmayer_pmc@qr.com.qa • Remmy Vandenbussche, PMC Project Director, rvandenbussche_pmc@qr.com.qa • Maung Myo Maw, PMC Deputy Engineering Manager, +97474468907, mmaw_pmc@qr.com.qa • Faruk Asli, MEP Construction Manager , fasli_pmc@qr.cpm.qa, +97474468920 • Memet Meşe, Railway System Manager (Qatar Rail),mmese@qr.com.qr, +97466037310 • Yücel Temiz , PMC Technical Manager on Red Line ( working for DB) +97455702685 • M. Tarık Dündar , Civil Engineer(Parsons Brinckerhoff Design Manager) + 966 560 671 615 • Hamit Ateş, Mechanical Engineer ( Project Manager of Railway Cons. Dep. for IBB)0090 5335022930 • İsmail Eroğlu , Mechanical Engineer(Alsim-Alarko Project Manager) 0090 212 526 8540/5426331597 • Musa Otcu , Mechanical Engineer(Alsim-Alarko Technical Manager) 0090 212 526 8540/5333386008 • Hatice Orcan , Electrical Engineer(Alsim-Alarko Technical Manager) 0090 212 526 8540/5307878348 • Keith Dubois, Electro-mechanic Engineer( Tube lines Service Engineer) 0044 7598 589421 • Sean Hickey, Mechanical Engineer (Tube Lines Manager /LUL) 0044 775 3979653. • Chris Stephenson, Electrical Engineer (Tube Lines Supervisor /LUL) 0044 772 0421080. • Erhan Kakı, Mechanical Engineer (Erbay Design Manager) 0090 532 597 3786 18
  • 19. • Yalcin EYIGUN, Civil Eng. (Dep.Gen. Man.of Infr. Inv. of Trans. Ministry ) 90 312 203 15 05 • Dursun BALCIOGLU, Civil Engineer (Head of Railway Cons. Department for IBB ) 90 212 449 41 50 WORK EXPERIENCE IN PUBLIC TRANSIT SYSTEMS ( 2016 April - Present ) Alarko Corporate Group /Istanbul/ Turkey MEP Project Manager M7 36 km Kabataş- Mahmutbey Metro Line will have 19 metro station and stabling yards. Alarko rewarded the tender 6 month ago and it is 2,5 billion euro project. As a head of the my department , leading design, procurement , tender, construction etc. team to key finish the MEP systems. Include 2 years warranty periods as well. During warranty period our responsibility is brake down service and maintenance. (2015 August – 2016 April ) Egis Rail Gold Line ,Doha, Qatar Engineering Department /Senior MEP Manager Gold line total 10 metro station. I was responsible MEP design review and contract procurement (strategy, ITT, tender evaluation) , MEP interface management ,to lead a team of MEP engineers. (2011 February – 2015 September ) Istanbul Ulasim Company (The Greater City Municipality of İstanbul`s Transport Company) Electro mechanic System Manager Istanbul Ulasim A.S. is an affiliate company of Istanbul Metropolitan Municipality operating the tramway, metro , light rail, funicular and aerial cable cars in Istanbul. Founded by the Istanbul Metropolitan Municipality for operating the urban railway network in the metropolitan area, the company currently operates 7 urban railway lines of 100 km. M1 Line has started to operation from 1989. There are many revision and renovation projects has done for these systems. At the moment I am mainly dealing ;M2 Halic Metro Crossing Bridge ,M2 and M7 undergrounds /metro lines. 19
  • 20. My responsibility for M2 Halic Metro Crossing Bridge, M2 line are; these bridge and the line construction nearly going end. I am trying close PAL and preparing the final acceptance of M2 construction project. I have been working M2 underground /metro line from the beginning which the one of the design and requirement team member (When I have this responsibilities , I used to work Alarko) . later on ,I led the purchasing department for electro mechanic equipment after that as a construction manager , managing the subcontractor and our worker to build the whole electro mechanic systems include railway and third rail. My responsibility for M7 line are; this line construction just recently started. I am member of the design and requirement team member. we have prepared M7 line `s electro mechanic technical tender document and construction drawing . We done the first stage of the project. We are waiting second stage which municipality has to go tender for a contract. My skills have used these project as written below;  M2 metro line (Yenikapı to Hacıosman ) include Train maintenance, depot and store house building (18 stations ,16 km)  M1B and M3 metro line (Esenler to Başakşehir )stations (11 stations , 16 km)  M4 metro line (Kadıköy to Kartal ) include Train maintenance, depot and store house building (17 station, 26,5 km)  M5 metro line (Üsküdar to Ümraniye) include Train maintenance, depot and store house building ( 16 station, 22 km )  Funicular Kabataş to Taksim (2 station, 1 km)  Golden Horn Cable Stand Metro Railway Bridge with swing bridge part.  T4 tram line Topkapı to Sultançifliği ( 22 station, 11 km)  Metro bus line from Asia to Europe more than 50 stations.  Marmaray project from Asia to Europe 5 station section of Bosporus under pass. For further information about company look at to the web site : http://www.istanbul-ulasim.com.tr/about-us/introduction.aspx (2009 - 2011 ) Alsim –Alarko- Rotem Incorporated Company Construction Manager Alsim –Alarko –Rotem Incorporated Company is one of the construction company . They have been building metro line more than 15 years. My skills have used these projects as written below;  M2 metro line (Yenikapı to Hacıosman ) include Train maintenance, depot and store house building (18 stations ,19 km)  Antalya metro line include Train maintenance, depot and store house building (14 stations ,16 km)  IETT historical tunnel funicular line (Karaköy to Beyoğlu , 2 station,0.7 km) 20
  • 21. (1999 - 2009 ) Emcor Rail & Infrastructure/Tube Line ,London , UK Electromechanic Department Manager Emcor Rail & Infrastructure LTD. One of the subcontractor of Tube Lines. But All the staffs are straight connect to the main company. Emcor is one of the USA base company in UK. Drake & Scroll was the first name of the company. They changed their name later on. They do construction and asset management all over the world. My responsibility had started on Jubilee Line ; this line construction was nearly going end. I was trying to close PAL and prepared the final acceptance of Jubilee Line construction project. When the construction worked finished. Our company had maintenance and breakdown construct. Later on we had maintenance - breakdown construct and some of renewal construct for Northern, Piccadilly and District Lines. These old lines, our company My skills have used these projects as written below;  Jubilee Line (27 stations, 29 mile)  Northern Line (50 station , 35 mile)  Piccadilly Line ( 39 station, 32 mile)  District Line (58 station, 39 mile) For further information about company look at to the web site : http://tfl.gov.uk/maps/track/tube http://tfl.gov.uk/cdn/static/cms/documents/standard-tube-map.pdf (1995- 1998 ) Erbay Company , İstanbul ,Turkey Construction Manager Erbay is one of construction company in Turkey but same time they manufacture all kind of industrial cooling units. My skills have used these projects as written below;  PNS (Pendik starch factory) 24.000 m2 covered area. De-montage three medium starch factory in Spain and built up one big starch factory in Turkey.  Besler cooking oil factory is built up brand-new 30000 m2 covered area.  Gebze Biscuit factory is built up brand-new 24000 m2 covered area.  Topkapı Biscuit Factory . 21