SUMMARY OF QUALIFICATION AND SKILLS:
More than 15 years of experience and conversant with Testing & Commissioning of Electrical
system and Installations. Operates with the minimum of supervision and take
initiative within delegated boundaries. Remain calm under pressure, command respect,
Gaining the confidence of colleagues and can communicate effectively at all levels.
Leadership and coordination with improvement involved in the construction and
supervision of electrical installation.
……………………………………………………………………………………………………..
Qualifications: Bachelor of Science in Electrical Engineering
……………………………………………………………………………………………………..
Industry Experience - 20 years
Career History
1996-2005 2005-2006 2006-2011 2011-2012 2012-2013 2014-Present
Sumisetsu Phil. Thermo LCC Leighton Muhibbah Siemens SIBS Group
Inc. Dubai, UAE Qatar Eng`g. Qatar WLL, Qatar Qatar
Engineer / TAB/ Commissioning Commissioning MEP Commissioning
CAD Commissioning Engineer Engineer Engineer Engineer
Engineer
…………………………………………………………………………………………………………………………...
SPECIAL KNOWLEDGE: Proficient in Auto CAD
EMPLOYMENT RECORD:
INCLUSIVE/DATE:
2014 – Present SIBS GROUP Commissioning Solution - QATAR
Main Projects: Hilton Hotel, National Museum, CMC, Sidra
Hospital & Rail (Red line north)
• Responsible for Inspection of Installation prior to commencement
of Testing & Commissioning for High and Low Voltage switch gear,
Motor Control Centers, Sub Main Distribution Boards and
Distribution Boards.
• On site Building Service Commissioning, Testing & Witnessing
• Generating Commissioning Test packs, Method Statement & ITP
for T&C.
• Preparations and checks of all the necessary materials, plant and
equipment to be used for the specified works and the same are
approved.
• Ensure that the equipment are inspected by the plant department
and are safe to use
• Ensure work place is kept organized and clean at all times. All
tools and equipment to be stored properly to prevent their
deterioration and avoid any safety incidents.
• Implement the ZERO ACCIDENT PROGRAM and follow HSE
recommendations.
INCLUSIVE/DATE:
2012 – 2013 SIEMENS – QATAR
Main Projects: Education City Project (HQ Building)
• Ensuring MEP works are carried out in accordance with the
schedule. Assist the inspection of completed works, rectifying the
snags.
• Maintain records of inspection.
• Review and approval of As-built drawing
• Implement the ZERO ACCIDENT PROGRAM and follow HSE
recommendations.
2011 – 2012 MUHIBBAH ENGINEERING – QATAR
Main Projects: New Doha International Airport.
• Review and approval of As-built drawing
• Responsible for Inspection of Installation prior to commencement
of Testing & Commissioning.
• Perform surveillance and monitoring of phases of quality control
work on each installations per specifications.
• Witness testing and review of results of test and inspections. Liaise
with consultant, client and subcontractors.
• Review of SAT, MS, Test procedures, As-built Drawings, Material
Submittals. Closing of snags with site engineers.
• Implement the ZERO ACCIDENT PROGRAM and follow HSE
recommendations.
2006 – 2011 LEIGHTON WLL. – QATAR
Main Projects: Al Shaqab Equestrian Centre (Education City)
• Responsible for Inspection of Installation prior to commencement
of Testing & Commissioning.
• Ensure all inspections and testing being carried-out is based on
the relevant approved ITP. All materials/equipment to be used are
approved and/or inspected relative to the scope of works.
• Witness testing and review of result of test and inspection.
2005 – 2006 THERMO LLC. – DUBAI
Main Projects: Dubai International Airport – Expansion Project phase 3
• Balancing of ventilation, A/C and CHW system
• Generation of TAB reports
• Witnessing of all test and inspection results to clients
representatives
1996 – 2005 SUMISETSU PHILIPPINES INC. – PHILIPPINES
Main Projects:
- Benguet General Hospital
- Mitsumi Building No.3
- Nidec Generator House
- EDSA LIGHT RAIL TRANSIT Line-1, Phase-1 (Depot Maintenance Bldg.)
& Edsa Lrt
- Ninoy Aquino International Airport
- International School of Manila
- Jae Philippines (Semi-conductor)
- Imasen Philippines (Semi-conductor)
- Sanyo Philippines (Semi-Conductor )
• Task to prepare construction drawings, plans as (ISD) Builders
work layout, power system, lighting system,
• Preparation of BMS / SCADA,ACCESS CONTROL SYSTEM shop
drawings
• Preparation MPC-P&ID DRAWINGS and other MEP services plan
and detail
• Initiate correction, edit and plotting of plans and contract drawings
procured from drawing offices in reference to company
standards and manuals.
• Prepares plan of primary containment layout, electrical layout,
miscellaneous installation details and other reference drawings.
• Provide technical support on integrated management team in
terms of providing details, section and coordination layouts of
services.
• In-charge for coordination of installation conflicts with other
diciplines.
PERSONAL INFORMATION:
DATE OF BIRTH : May 3, 1966
NATIONALITY : Filipino
EDUCATION : Bachelor of Science in Electrical Engineering
Feati University, Manila, Philippines
SEMINARS/TRAINING : Computer Aided Analysis & Design
ATTENDED
LANGUAGES & DEGREE : English-Proficient, written and oral
Filipino-Mother tongue
REFERENCE: Ms. Myrna Marzo – Senior ELV Engineer (Louise Berger)
Tel.: +97466829874
Mr. Grant Lemuel Ang – Senior Engineer (Leighton Contracting Qatar)
Tel.: +97477368176
Mr. Ruel Dela Cruz – Senior Engineer (HITACHI Engineering)
Tel.: +97466459610
F.M.Camus (CV 2016)

More Related Content

What's hot (19)

Ericresume1
Ericresume1Ericresume1
Ericresume1
 
Cv of yasser_alammari
Cv of yasser_alammari Cv of yasser_alammari
Cv of yasser_alammari
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 
USMAN RESUME.doc 2
USMAN RESUME.doc 2USMAN RESUME.doc 2
USMAN RESUME.doc 2
 
MAHDI CV
MAHDI CVMAHDI CV
MAHDI CV
 
Facility Engineer
Facility EngineerFacility Engineer
Facility Engineer
 
160615 cs2680551
160615 cs2680551160615 cs2680551
160615 cs2680551
 
ELEC TECH F
ELEC TECH FELEC TECH F
ELEC TECH F
 
THEODORE H Soper - resume
THEODORE H Soper - resumeTHEODORE H Soper - resume
THEODORE H Soper - resume
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816
 
amin resumee
amin resumeeamin resumee
amin resumee
 
Colin Crossley New CV
Colin Crossley New CVColin Crossley New CV
Colin Crossley New CV
 
Saravanan resume
Saravanan resumeSaravanan resume
Saravanan resume
 
Electrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CVElectrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CV
 
CV Power Plant
CV Power PlantCV Power Plant
CV Power Plant
 
Samuel WORDResume Test Tech
Samuel WORDResume Test TechSamuel WORDResume Test Tech
Samuel WORDResume Test Tech
 
JAI RESUME
JAI RESUMEJAI RESUME
JAI RESUME
 
Minder's Resume
Minder's ResumeMinder's Resume
Minder's Resume
 
CV-M.Hamza-KSA..
CV-M.Hamza-KSA.. CV-M.Hamza-KSA..
CV-M.Hamza-KSA..
 

Viewers also liked

Pitch presentation (1)
Pitch presentation (1)Pitch presentation (1)
Pitch presentation (1)Harley10
 
Trabajo final - Antropoligía Cultural
Trabajo final - Antropoligía CulturalTrabajo final - Antropoligía Cultural
Trabajo final - Antropoligía CulturalDavid Aciar
 
contaminación ambiental
contaminación ambiental contaminación ambiental
contaminación ambiental daniela tapia
 
MY2017 TAISHAN OPEN MODEL CATALOGUE
MY2017 TAISHAN OPEN MODEL CATALOGUEMY2017 TAISHAN OPEN MODEL CATALOGUE
MY2017 TAISHAN OPEN MODEL CATALOGUEChris Yu
 
Nibu George Varghese_CV
Nibu George Varghese_CVNibu George Varghese_CV
Nibu George Varghese_CVNibu George
 
Salah Mansour's CV-Electrical Engineer 1
Salah Mansour's CV-Electrical Engineer 1Salah Mansour's CV-Electrical Engineer 1
Salah Mansour's CV-Electrical Engineer 1Salah Mansour
 

Viewers also liked (20)

Tik bab 4
Tik bab 4Tik bab 4
Tik bab 4
 
Presentación1
Presentación1Presentación1
Presentación1
 
Pitch presentation (1)
Pitch presentation (1)Pitch presentation (1)
Pitch presentation (1)
 
Trabajo final - Antropoligía Cultural
Trabajo final - Antropoligía CulturalTrabajo final - Antropoligía Cultural
Trabajo final - Antropoligía Cultural
 
Tik bab 2
Tik bab 2Tik bab 2
Tik bab 2
 
Tik bab 2
Tik bab 2Tik bab 2
Tik bab 2
 
Tik bab 2
Tik bab 2Tik bab 2
Tik bab 2
 
Tik bab 1
Tik bab 1Tik bab 1
Tik bab 1
 
Tik bab 5
Tik bab 5Tik bab 5
Tik bab 5
 
WAT oferta edukacyjna
WAT oferta edukacyjnaWAT oferta edukacyjna
WAT oferta edukacyjna
 
Tik bab 1
Tik bab 1Tik bab 1
Tik bab 1
 
Trabajo final
Trabajo finalTrabajo final
Trabajo final
 
contaminación ambiental
contaminación ambiental contaminación ambiental
contaminación ambiental
 
Tik bab 2
Tik bab 2Tik bab 2
Tik bab 2
 
Tik bab 1
Tik bab 1Tik bab 1
Tik bab 1
 
MY2017 TAISHAN OPEN MODEL CATALOGUE
MY2017 TAISHAN OPEN MODEL CATALOGUEMY2017 TAISHAN OPEN MODEL CATALOGUE
MY2017 TAISHAN OPEN MODEL CATALOGUE
 
Tik bab 6.
Tik bab 6.Tik bab 6.
Tik bab 6.
 
Nibu George Varghese_CV
Nibu George Varghese_CVNibu George Varghese_CV
Nibu George Varghese_CV
 
CV- en
CV- enCV- en
CV- en
 
Salah Mansour's CV-Electrical Engineer 1
Salah Mansour's CV-Electrical Engineer 1Salah Mansour's CV-Electrical Engineer 1
Salah Mansour's CV-Electrical Engineer 1
 

Similar to F.M.Camus (CV 2016) (20)

Mohammed Islam's Resume-05-20-15
Mohammed Islam's Resume-05-20-15Mohammed Islam's Resume-05-20-15
Mohammed Islam's Resume-05-20-15
 
Farookh Engr
Farookh EngrFarookh Engr
Farookh Engr
 
CV
CVCV
CV
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
 
Mohammed seddik-cv
Mohammed seddik-cvMohammed seddik-cv
Mohammed seddik-cv
 
YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG
 
Rama nand yadav cv
Rama nand yadav   cvRama nand yadav   cv
Rama nand yadav cv
 
Electrical Engineer with 4yrs experience (Projects & Estimation)
Electrical Engineer with 4yrs experience (Projects & Estimation)Electrical Engineer with 4yrs experience (Projects & Estimation)
Electrical Engineer with 4yrs experience (Projects & Estimation)
 
MUSA SAKIN
MUSA SAKINMUSA SAKIN
MUSA SAKIN
 
CV
CVCV
CV
 
Abdelrhman CV
Abdelrhman CVAbdelrhman CV
Abdelrhman CV
 
M Imran
M ImranM Imran
M Imran
 
roshan-CV1
roshan-CV1roshan-CV1
roshan-CV1
 
Nallusamy Gandhi
Nallusamy GandhiNallusamy Gandhi
Nallusamy Gandhi
 
Cv
CvCv
Cv
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
Syed C.V
Syed C.VSyed C.V
Syed C.V
 
Ahmed-shawky
Ahmed-shawkyAhmed-shawky
Ahmed-shawky
 
C.V -updated
C.V -updatedC.V -updated
C.V -updated
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 

F.M.Camus (CV 2016)

  • 1. FERNANDO M. CAMUS Capital Building, Room no.2 Alsad, Doha,Qatar Tel. +97466696088 E-Mail add - dingcamus@yahoo.com SUMMARY OF QUALIFICATION AND SKILLS: More than 15 years of experience and conversant with Testing & Commissioning of Electrical system and Installations. Operates with the minimum of supervision and take initiative within delegated boundaries. Remain calm under pressure, command respect, Gaining the confidence of colleagues and can communicate effectively at all levels. Leadership and coordination with improvement involved in the construction and supervision of electrical installation. …………………………………………………………………………………………………….. Qualifications: Bachelor of Science in Electrical Engineering …………………………………………………………………………………………………….. Industry Experience - 20 years Career History 1996-2005 2005-2006 2006-2011 2011-2012 2012-2013 2014-Present Sumisetsu Phil. Thermo LCC Leighton Muhibbah Siemens SIBS Group Inc. Dubai, UAE Qatar Eng`g. Qatar WLL, Qatar Qatar Engineer / TAB/ Commissioning Commissioning MEP Commissioning CAD Commissioning Engineer Engineer Engineer Engineer Engineer …………………………………………………………………………………………………………………………... SPECIAL KNOWLEDGE: Proficient in Auto CAD EMPLOYMENT RECORD: INCLUSIVE/DATE: 2014 – Present SIBS GROUP Commissioning Solution - QATAR Main Projects: Hilton Hotel, National Museum, CMC, Sidra Hospital & Rail (Red line north) • Responsible for Inspection of Installation prior to commencement of Testing & Commissioning for High and Low Voltage switch gear, Motor Control Centers, Sub Main Distribution Boards and Distribution Boards. • On site Building Service Commissioning, Testing & Witnessing • Generating Commissioning Test packs, Method Statement & ITP for T&C. • Preparations and checks of all the necessary materials, plant and equipment to be used for the specified works and the same are approved. • Ensure that the equipment are inspected by the plant department and are safe to use • Ensure work place is kept organized and clean at all times. All tools and equipment to be stored properly to prevent their deterioration and avoid any safety incidents.
  • 2. • Implement the ZERO ACCIDENT PROGRAM and follow HSE recommendations. INCLUSIVE/DATE: 2012 – 2013 SIEMENS – QATAR Main Projects: Education City Project (HQ Building) • Ensuring MEP works are carried out in accordance with the schedule. Assist the inspection of completed works, rectifying the snags. • Maintain records of inspection. • Review and approval of As-built drawing • Implement the ZERO ACCIDENT PROGRAM and follow HSE recommendations. 2011 – 2012 MUHIBBAH ENGINEERING – QATAR Main Projects: New Doha International Airport. • Review and approval of As-built drawing • Responsible for Inspection of Installation prior to commencement of Testing & Commissioning. • Perform surveillance and monitoring of phases of quality control work on each installations per specifications. • Witness testing and review of results of test and inspections. Liaise with consultant, client and subcontractors. • Review of SAT, MS, Test procedures, As-built Drawings, Material Submittals. Closing of snags with site engineers. • Implement the ZERO ACCIDENT PROGRAM and follow HSE recommendations. 2006 – 2011 LEIGHTON WLL. – QATAR Main Projects: Al Shaqab Equestrian Centre (Education City) • Responsible for Inspection of Installation prior to commencement of Testing & Commissioning. • Ensure all inspections and testing being carried-out is based on the relevant approved ITP. All materials/equipment to be used are approved and/or inspected relative to the scope of works. • Witness testing and review of result of test and inspection. 2005 – 2006 THERMO LLC. – DUBAI Main Projects: Dubai International Airport – Expansion Project phase 3 • Balancing of ventilation, A/C and CHW system • Generation of TAB reports • Witnessing of all test and inspection results to clients representatives 1996 – 2005 SUMISETSU PHILIPPINES INC. – PHILIPPINES
  • 3. Main Projects: - Benguet General Hospital - Mitsumi Building No.3 - Nidec Generator House - EDSA LIGHT RAIL TRANSIT Line-1, Phase-1 (Depot Maintenance Bldg.) & Edsa Lrt - Ninoy Aquino International Airport - International School of Manila - Jae Philippines (Semi-conductor) - Imasen Philippines (Semi-conductor) - Sanyo Philippines (Semi-Conductor ) • Task to prepare construction drawings, plans as (ISD) Builders work layout, power system, lighting system, • Preparation of BMS / SCADA,ACCESS CONTROL SYSTEM shop drawings • Preparation MPC-P&ID DRAWINGS and other MEP services plan and detail • Initiate correction, edit and plotting of plans and contract drawings procured from drawing offices in reference to company standards and manuals. • Prepares plan of primary containment layout, electrical layout, miscellaneous installation details and other reference drawings. • Provide technical support on integrated management team in terms of providing details, section and coordination layouts of services. • In-charge for coordination of installation conflicts with other diciplines. PERSONAL INFORMATION: DATE OF BIRTH : May 3, 1966 NATIONALITY : Filipino EDUCATION : Bachelor of Science in Electrical Engineering Feati University, Manila, Philippines SEMINARS/TRAINING : Computer Aided Analysis & Design ATTENDED LANGUAGES & DEGREE : English-Proficient, written and oral Filipino-Mother tongue REFERENCE: Ms. Myrna Marzo – Senior ELV Engineer (Louise Berger) Tel.: +97466829874 Mr. Grant Lemuel Ang – Senior Engineer (Leighton Contracting Qatar) Tel.: +97477368176 Mr. Ruel Dela Cruz – Senior Engineer (HITACHI Engineering) Tel.: +97466459610