SUBRATOMUKHERJEE
Senior Engineer/Site-In-Charge at Dhrub Construction, U.P, India
E-mail: subratom89@gmail.com & smukherjee_2009@yahoo.in
Mobile: 919163210262 & 919198637206
Passport No.- K8122701
_____________________________________________________________________________________________
SUMMARY
OBJECTIVE:- Senior Engineer/Site-In-Charge with 23+ years experience(including site
management and execution, finance planning and management, managing bills and payments of
subcontractors and vendors and quality and safety compliance) seeking relocation in India and
abroad.
FUNCTIONAL AREA:- High-rise (up to G+29) and multistoried residential and commercial
building projects (including club house, car park, podium/raised garden and shopping mall and project
infrastructure), Irrigation and water related projects (aqueduct, pump house, canal, STP, WTP/UGR,
cofferdam, causeway), roads and infrastructural projects(bitumen road, RCC drain, boundary wall,
sewer & water main line, electrical sub-station), bore pile, driven pile and pile cap and earth-moving
works.
SKILL SET:- Site planning,execution and management; planning,allocation and reconciliation of
resources;budget monitoring, site-financeplanningand optimum fund utilization:measurement of
works, bill preparation and verification; management of bills and payments of subcontractors and
vendors; quality and safety compliance;management of client,vendors, contractors and consultant;
preparation and submission of work-progress reportto superior.
___________________________________________________________________________________
BRIEF WORKHISTORY
A. High-rise, Multistoried buildings/Villas- 12 years.
B. Road & Infrastructure works-4 years.
C. Irrigation & water related structures-3 years 11 months.
D. PILING & PILE CAPS - 2 years 2 months.
E. STP, WTP/UGR, Sewer & Water pipeline network- 1 year
TOTAL EXPERIENCE:- 23 years 1 months (as on February, 2016).
(NOTE- Above statement is approximateas some of the projects were handled simultaneously)
___________________________________________________________________________________
CURRENT EMPLOYMENT
Dhrub Construction, Uttar Pradesh
Senior Engineer/Site-In-Charge
October, 2014 – present (1 year 5 months)
Project- Construction of AQUEDUCT ( atch.-14.59km) on Arjun feeder canal (site- Basaria village,
near Panwari) in Arjun Sahayak Pariyojna,under Mahoba division of dept. of Irrigation,Uttar Pradesh.
Consisting - RCC raft(1500-2000 mm thick), 2 nos. piers(1500 mm thick), 2 nos. abutments(2000 mm
thick), canal deck slab(900 mm thick), foot over-bridge, 4 wing walls each for canal & river, PCC
thrust blocks on u/s & d/s side of river and boulder pitching on river u/s & d/s side.
Achievements- Completed- 1. > 4900cum RCC in raft, piers,abutments.
2. >29000 cum earth cutting/filling for preparation of PCC block bed, canal bed etc and
3. >1300 nos. PCC blocks (1mx1mx1m) includingblock-laying–in about 300 working days (no work
for about 75 days due to shortage of cement & steel).
4. Worked as FinanceManager(simultaneously);responsibilities:-totalmanagement of site
finance including finance planning, optimum fund utilization and reconciliation; budget monitoring,
finance control, cost cutting, optimum utilization of resources; bill preparation and verification;
managing bills and payments of vendors and sub-contractors.
CURRENT SALARY- INR 6,00,000 per annum(CTC) plus free lodging,medical & accidental insurance
EXPECTED SALARY (minimum) - INR 6,50,000 per annum(in India) and INR 12,00,000(for abroad)
NOITICE PERIOD- 15 days
__________________________________________________________________________________
PREVIOUS EMPLOYMENTS
Citystar Infrastructure Ltd.
Senior Engineer/Site-In-Charge
April, 2011 - September, 2014 (3 years 5 months)
Projects-
1. Construction of multistoried buildings up to G+3 and Officers’ club complex (in IOCL,
Paradip, Odisha) – June, 2011-November, 2012 & June, 2013 - September, 2014
2. Construction of cofferdam and causeway over ‘SANTRA CREEK’ in IOCL, Paradip, Odisha -
June, 2011- November, 2012
3. Bore piles and pile caps in IOCL, Paradip, Odisha - July, 2011 - June, 2012
4. Profile making of national highway (Bhubaneshwar/Puri- part) – November, 2012 – June,
2013
5. Construction of pump house in Chillimal, Uttar Pradesh under dept. of Irrigation, Uttar
Pradesh - April, 2011- June, 2011
Achievements- 1.Completed works worth > INR 280 million alongwith sitemanagement,
resourcemanagement, financecontrol,billingand quality & safety compliance.
2. Worked as FinanceManager(simultaneously);responsibilities:- totalmanagement of site
finance including finance planning, optimum fund utilization and reconciliation; budget monitoring,
finance control, cost cutting and optimum utilization of resources; managing bills and payments of
vendors and subcontractors; bill preparation and verification; procurement of payment.
__________________________________________________________________________
Keppel-Magus Development Pvt. Ltd., Kolkata
(jointventure between KEPPEL LAND of Singapore and JATIA GROUP of India)
Senior Engineer
August, 2007- March, 2011 (3 years 8 months)
Project- Ellita Garden Vista (New Town, Kolkata)High rise residential building project Consisting -
15 nos. residential apartment blocks (G+14 to G+29), one club house, RCC covered car park(at GL),
raised garden/podium above car park of 29000sqm area, shopping mall and project infrastructure
works.
Achievements- Completed:- 1.construction of model flat
2. Property survey, block layout and pile-point layout with surveyors
3.>1450 nos. driven cast-in-situ RCC piles, >255 nos. pile caps (1 pileto 56 piles),
4. Grade slab of 4 blocks, RCC structure, brickwork and finishingof one G+24 block (jointly with
another engineer)
5. (i)>250nos. RCC piles & 36 nos. RCC columns in CLUB HOUSE.
(ii)>750nos.RCC columns foundations, > 840nos. RCC columns (300x500),> 95000m long RCC
tie-beam(300x600),aprox.29000sq m RCC slab(200 thick) & aprox.7500m long1-1.2m high RCC wall
in CAR-PARK & PODIUM.
(iii) Totalquantity of RCC > 26,000cum
- Completed the whole work in (aprox.) 480 working days
6. (i)>2.5km of RCC drain (600mmx600mm) and
(ii)>1.5 km of boundary wall in about 100 working days
(iii) >2.0km of road profile consisting- box cutting(of earth), sand filling,doublelayer B.F.S & WBM in
aprox.65 workingdays
7. civil works of 4 nos. electrical sub-station
8. RCC structureof 3nos. UGR/WTP (-40,000 lit.water storagetank+ filtration plant,pumps etc. in two
adjoining chambers at 8.50m below G.L and 1no. STP ( -80,000 lit. sludge storage tank+ filtration plant,
pump etc. in two adjoiningchambers at8.0m below G.L)
9.layingof-(I)>2.0 km swear main line (600mm dia.HDPE Main linewith 200/300mm dia.HDPE
Branch lines) alongwith manholes;and (ii)>1.5km water main line
10. total > 46000 cum RCC in 3 years 8 months and all other works as mentioned above; total bill
generated > Rs.56,00,00000
11. worked as Deputy Quality-In-charge time to time
12. provided technical and practical inputs for cost-cutting resulting saving of >INR 25 millions.
___________________________________________________________________________________
Pradip Construction,Durgapur,WestBengal
Site Engineer
January, 2002 - February, 2007 (5 years 1 months)
Projects- residential,commercial & industrial constructions
Achievements- Completed:- 1. Numerous residential,commercial and industrial construction
works includingQS & billing.
2. Construction of several residential and commercial buildings.
3. Systemized construction procedure, billingand material reconciliation.
4. Total billed amount of completed works >Rs.12,50,00000.
___________________________________________________________________________________
Durgapur Municipal Corporation, WestBengal
Licensed building planner and Estimator
April, 1993-March – 2001 (8 years)
Project- Preparation and (getting) approval of plans & estimates of multistoried buildings and villas
and supervision of construction works.
Achievements-1.Completed plans of >180 nos. residential, > 25nos. commercial & 5 nos.
industrial buildings and one stadium includingapproval.
2. Prepared cost& material estimateof all abovementioned works
3. Supervised construction of all abovementioned works
___________________________________________________________________________________
Chandak Engineering Works,Durgapur,WestBengal
Site Engineer
February, 1991-August, 1991 (6 months)
Project- Earth-moving works in 220kv/400kv sub-station under NTPC (Mithan TL) and Haldia
Petrochemical Ltd.
Achievements- 1. Completed works valued > Rs.2,50,00000 includingoverall supervision of
works; planning,deployment & controllingall machineries,consumables and manpower; survey
works; soil testing& billing.
2. Provided technical help in preparation of tender-quotation, negotiated contractand disputes in
works several times.
Dept. of Irrigation & Waterways, Govt.of West Bengal
Trainee Apprenticeship Engineer
September, 1989 -September, 1990 (1year)
Project- Trainingin differentirrigation structures and systems
Achievements- 1. Supervised construction of PCC canal lining of RBMC & LBMC of Durgapur
Barrage.
2. Prepared daily reportof water intakeand outflow of differentirrigation structures.
3. Getting familiarized with different irrigation structures by visitingtheseseveral times with
superiors.
___________________________________________________________________________________
PERSONAL INFORMATION
EDUCATION
1. Diploma in Civil Engineering from State Council for Engineering and Technical Education, Govt. of
West Bengal (1984-1987) with 75%.
2. Higher Secondary Certificate (12th standard science) from West Bengal Council for Higher
Secondary Education (1982-1984) with 54%.
3. Secondary Certificate (10th standard) from West Bengal board of Secondary Education with 66%.
ADDRESS
Present- site & office-vill.-Basaria, P.S- Mahukanth(near Panwari),Dist.-Banda, Utter
Pradesh.
Permanent- C-11 Amarabati Colony,Durgapur,WestBengal.PIN-713214.
Passport no.- K8122701, valid up to -05.03.2023

More Related Content

Viewers also liked (7)

Sr. Exe for HR & Admin Updated
Sr. Exe for HR & Admin UpdatedSr. Exe for HR & Admin Updated
Sr. Exe for HR & Admin Updated
 
Wild life
Wild lifeWild life
Wild life
 
CenterviewCrossingFlyer
CenterviewCrossingFlyerCenterviewCrossingFlyer
CenterviewCrossingFlyer
 
Eρμηνεία Mαλακών Στόχων
Eρμηνεία Mαλακών ΣτόχωνEρμηνεία Mαλακών Στόχων
Eρμηνεία Mαλακών Στόχων
 
ENG ISLAM SAID
ENG ISLAM SAIDENG ISLAM SAID
ENG ISLAM SAID
 
NASPA Region I Presentation
NASPA Region I PresentationNASPA Region I Presentation
NASPA Region I Presentation
 
Presentation argentinacontrasts
Presentation argentinacontrastsPresentation argentinacontrasts
Presentation argentinacontrasts
 

Similar to S MUKHERJEE RESUME MARCH 3 (20)

Markfel S. Lamban CV
Markfel S. Lamban CVMarkfel S. Lamban CV
Markfel S. Lamban CV
 
Resume-up-Aug-16
Resume-up-Aug-16Resume-up-Aug-16
Resume-up-Aug-16
 
CV M.Ilyas - 1
CV M.Ilyas - 1CV M.Ilyas - 1
CV M.Ilyas - 1
 
Rajbir Singh-2
Rajbir Singh-2Rajbir Singh-2
Rajbir Singh-2
 
RS Resume
RS ResumeRS Resume
RS Resume
 
hidayath cv 2016
hidayath cv 2016hidayath cv 2016
hidayath cv 2016
 
shishir_cv
shishir_cvshishir_cv
shishir_cv
 
Saikat 07-profile
Saikat 07-profileSaikat 07-profile
Saikat 07-profile
 
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
 
Resume140515
Resume140515Resume140515
Resume140515
 
final resume Rakesh kumar
final resume Rakesh kumarfinal resume Rakesh kumar
final resume Rakesh kumar
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
 
RETIRED--CV-RESUME OF Self - Copy
RETIRED--CV-RESUME OF Self - CopyRETIRED--CV-RESUME OF Self - Copy
RETIRED--CV-RESUME OF Self - Copy
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
MAINTENANCE MANAGER
MAINTENANCE MANAGERMAINTENANCE MANAGER
MAINTENANCE MANAGER
 
madhankumar new CV 2016 june...
madhankumar new CV 2016 june...madhankumar new CV 2016 june...
madhankumar new CV 2016 june...
 
Chandra Sekhar Reddy
Chandra Sekhar ReddyChandra Sekhar Reddy
Chandra Sekhar Reddy
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
CV of Purushotham (1)
CV of Purushotham (1)CV of Purushotham (1)
CV of Purushotham (1)
 
RESUME-1
RESUME-1RESUME-1
RESUME-1
 

S MUKHERJEE RESUME MARCH 3

  • 1. SUBRATOMUKHERJEE Senior Engineer/Site-In-Charge at Dhrub Construction, U.P, India E-mail: subratom89@gmail.com & smukherjee_2009@yahoo.in Mobile: 919163210262 & 919198637206 Passport No.- K8122701 _____________________________________________________________________________________________ SUMMARY OBJECTIVE:- Senior Engineer/Site-In-Charge with 23+ years experience(including site management and execution, finance planning and management, managing bills and payments of subcontractors and vendors and quality and safety compliance) seeking relocation in India and abroad. FUNCTIONAL AREA:- High-rise (up to G+29) and multistoried residential and commercial building projects (including club house, car park, podium/raised garden and shopping mall and project infrastructure), Irrigation and water related projects (aqueduct, pump house, canal, STP, WTP/UGR, cofferdam, causeway), roads and infrastructural projects(bitumen road, RCC drain, boundary wall, sewer & water main line, electrical sub-station), bore pile, driven pile and pile cap and earth-moving works. SKILL SET:- Site planning,execution and management; planning,allocation and reconciliation of resources;budget monitoring, site-financeplanningand optimum fund utilization:measurement of works, bill preparation and verification; management of bills and payments of subcontractors and vendors; quality and safety compliance;management of client,vendors, contractors and consultant; preparation and submission of work-progress reportto superior. ___________________________________________________________________________________ BRIEF WORKHISTORY A. High-rise, Multistoried buildings/Villas- 12 years. B. Road & Infrastructure works-4 years. C. Irrigation & water related structures-3 years 11 months. D. PILING & PILE CAPS - 2 years 2 months. E. STP, WTP/UGR, Sewer & Water pipeline network- 1 year TOTAL EXPERIENCE:- 23 years 1 months (as on February, 2016). (NOTE- Above statement is approximateas some of the projects were handled simultaneously) ___________________________________________________________________________________ CURRENT EMPLOYMENT Dhrub Construction, Uttar Pradesh Senior Engineer/Site-In-Charge October, 2014 – present (1 year 5 months) Project- Construction of AQUEDUCT ( atch.-14.59km) on Arjun feeder canal (site- Basaria village, near Panwari) in Arjun Sahayak Pariyojna,under Mahoba division of dept. of Irrigation,Uttar Pradesh. Consisting - RCC raft(1500-2000 mm thick), 2 nos. piers(1500 mm thick), 2 nos. abutments(2000 mm
  • 2. thick), canal deck slab(900 mm thick), foot over-bridge, 4 wing walls each for canal & river, PCC thrust blocks on u/s & d/s side of river and boulder pitching on river u/s & d/s side. Achievements- Completed- 1. > 4900cum RCC in raft, piers,abutments. 2. >29000 cum earth cutting/filling for preparation of PCC block bed, canal bed etc and 3. >1300 nos. PCC blocks (1mx1mx1m) includingblock-laying–in about 300 working days (no work for about 75 days due to shortage of cement & steel). 4. Worked as FinanceManager(simultaneously);responsibilities:-totalmanagement of site finance including finance planning, optimum fund utilization and reconciliation; budget monitoring, finance control, cost cutting, optimum utilization of resources; bill preparation and verification; managing bills and payments of vendors and sub-contractors. CURRENT SALARY- INR 6,00,000 per annum(CTC) plus free lodging,medical & accidental insurance EXPECTED SALARY (minimum) - INR 6,50,000 per annum(in India) and INR 12,00,000(for abroad) NOITICE PERIOD- 15 days __________________________________________________________________________________ PREVIOUS EMPLOYMENTS Citystar Infrastructure Ltd. Senior Engineer/Site-In-Charge April, 2011 - September, 2014 (3 years 5 months) Projects- 1. Construction of multistoried buildings up to G+3 and Officers’ club complex (in IOCL, Paradip, Odisha) – June, 2011-November, 2012 & June, 2013 - September, 2014 2. Construction of cofferdam and causeway over ‘SANTRA CREEK’ in IOCL, Paradip, Odisha - June, 2011- November, 2012 3. Bore piles and pile caps in IOCL, Paradip, Odisha - July, 2011 - June, 2012 4. Profile making of national highway (Bhubaneshwar/Puri- part) – November, 2012 – June, 2013 5. Construction of pump house in Chillimal, Uttar Pradesh under dept. of Irrigation, Uttar Pradesh - April, 2011- June, 2011 Achievements- 1.Completed works worth > INR 280 million alongwith sitemanagement, resourcemanagement, financecontrol,billingand quality & safety compliance. 2. Worked as FinanceManager(simultaneously);responsibilities:- totalmanagement of site finance including finance planning, optimum fund utilization and reconciliation; budget monitoring, finance control, cost cutting and optimum utilization of resources; managing bills and payments of vendors and subcontractors; bill preparation and verification; procurement of payment. __________________________________________________________________________ Keppel-Magus Development Pvt. Ltd., Kolkata (jointventure between KEPPEL LAND of Singapore and JATIA GROUP of India) Senior Engineer August, 2007- March, 2011 (3 years 8 months) Project- Ellita Garden Vista (New Town, Kolkata)High rise residential building project Consisting - 15 nos. residential apartment blocks (G+14 to G+29), one club house, RCC covered car park(at GL), raised garden/podium above car park of 29000sqm area, shopping mall and project infrastructure works.
  • 3. Achievements- Completed:- 1.construction of model flat 2. Property survey, block layout and pile-point layout with surveyors 3.>1450 nos. driven cast-in-situ RCC piles, >255 nos. pile caps (1 pileto 56 piles), 4. Grade slab of 4 blocks, RCC structure, brickwork and finishingof one G+24 block (jointly with another engineer) 5. (i)>250nos. RCC piles & 36 nos. RCC columns in CLUB HOUSE. (ii)>750nos.RCC columns foundations, > 840nos. RCC columns (300x500),> 95000m long RCC tie-beam(300x600),aprox.29000sq m RCC slab(200 thick) & aprox.7500m long1-1.2m high RCC wall in CAR-PARK & PODIUM. (iii) Totalquantity of RCC > 26,000cum - Completed the whole work in (aprox.) 480 working days 6. (i)>2.5km of RCC drain (600mmx600mm) and (ii)>1.5 km of boundary wall in about 100 working days (iii) >2.0km of road profile consisting- box cutting(of earth), sand filling,doublelayer B.F.S & WBM in aprox.65 workingdays 7. civil works of 4 nos. electrical sub-station 8. RCC structureof 3nos. UGR/WTP (-40,000 lit.water storagetank+ filtration plant,pumps etc. in two adjoining chambers at 8.50m below G.L and 1no. STP ( -80,000 lit. sludge storage tank+ filtration plant, pump etc. in two adjoiningchambers at8.0m below G.L) 9.layingof-(I)>2.0 km swear main line (600mm dia.HDPE Main linewith 200/300mm dia.HDPE Branch lines) alongwith manholes;and (ii)>1.5km water main line 10. total > 46000 cum RCC in 3 years 8 months and all other works as mentioned above; total bill generated > Rs.56,00,00000 11. worked as Deputy Quality-In-charge time to time 12. provided technical and practical inputs for cost-cutting resulting saving of >INR 25 millions. ___________________________________________________________________________________ Pradip Construction,Durgapur,WestBengal Site Engineer January, 2002 - February, 2007 (5 years 1 months) Projects- residential,commercial & industrial constructions Achievements- Completed:- 1. Numerous residential,commercial and industrial construction works includingQS & billing. 2. Construction of several residential and commercial buildings. 3. Systemized construction procedure, billingand material reconciliation. 4. Total billed amount of completed works >Rs.12,50,00000. ___________________________________________________________________________________ Durgapur Municipal Corporation, WestBengal Licensed building planner and Estimator April, 1993-March – 2001 (8 years) Project- Preparation and (getting) approval of plans & estimates of multistoried buildings and villas and supervision of construction works. Achievements-1.Completed plans of >180 nos. residential, > 25nos. commercial & 5 nos. industrial buildings and one stadium includingapproval. 2. Prepared cost& material estimateof all abovementioned works
  • 4. 3. Supervised construction of all abovementioned works ___________________________________________________________________________________ Chandak Engineering Works,Durgapur,WestBengal Site Engineer February, 1991-August, 1991 (6 months) Project- Earth-moving works in 220kv/400kv sub-station under NTPC (Mithan TL) and Haldia Petrochemical Ltd. Achievements- 1. Completed works valued > Rs.2,50,00000 includingoverall supervision of works; planning,deployment & controllingall machineries,consumables and manpower; survey works; soil testing& billing. 2. Provided technical help in preparation of tender-quotation, negotiated contractand disputes in works several times. Dept. of Irrigation & Waterways, Govt.of West Bengal Trainee Apprenticeship Engineer September, 1989 -September, 1990 (1year) Project- Trainingin differentirrigation structures and systems Achievements- 1. Supervised construction of PCC canal lining of RBMC & LBMC of Durgapur Barrage. 2. Prepared daily reportof water intakeand outflow of differentirrigation structures. 3. Getting familiarized with different irrigation structures by visitingtheseseveral times with superiors. ___________________________________________________________________________________ PERSONAL INFORMATION EDUCATION 1. Diploma in Civil Engineering from State Council for Engineering and Technical Education, Govt. of West Bengal (1984-1987) with 75%. 2. Higher Secondary Certificate (12th standard science) from West Bengal Council for Higher Secondary Education (1982-1984) with 54%. 3. Secondary Certificate (10th standard) from West Bengal board of Secondary Education with 66%. ADDRESS Present- site & office-vill.-Basaria, P.S- Mahukanth(near Panwari),Dist.-Banda, Utter Pradesh. Permanent- C-11 Amarabati Colony,Durgapur,WestBengal.PIN-713214. Passport no.- K8122701, valid up to -05.03.2023