1. CoreCompetencies ProfileSummary
Energetic, driven, and accomplished professional with a track record of
success in supervising complex day-to-day operational aspects of projects and
project scope by effectively applying methodologies that enforce project
standards and by minimizing exposure and risks on projects
Maintain extensive knowledge of building codes, specifications, and
regulations; simultaneously manage multiple projects and frequently finish
ahead of schedule as a result of effective staff development, motivation and
workload planning
Possessing excellent client facing skills and highly successful in helping define
company direction, achieving goals and optimizing business
Proven progression of project management promotions and responsibilities
as a result of an excellent performance track record in scheduling and
managing activities
Education
Postgraduate Programme in Project Management from School of Distance
Education, NICMAR Punein 2013-2015
B.E. (Civil Engineering) from Bhopal University in 1986; scored 72%
11th (Higher Secondary) from M. P. Board of Secondary Education, Bhopal with
70% marks
Career Timeline
Soft Skills
Mohan Kishor Parmar
High-performing, results-focused Project Manager offering over 27 years of
experience in technical project leadership and a strong background in program
management and applied technology; targeting assignments in Project
Management/Site & Construction Management with an organization of repute
preferably in Building & Infrastructure Construction or Industrial Structure
preferably in Madhya Pradesh or any other Metro cities.
Rapid
Contracting Co.
Pvt. Ltd
+91-9810416891 mkparmar7@yahoo.com
Project Management
Project Set-up and Stabilization
Client Relationship Management
Site Management
Contract Management
Budgeting & Cost Control
Materials Management
Sourcing & Procurement
Team Building & Leadership
Change Agent
Collaborator
Communicator
Motivator
Planner
Oct’06-Jul’08
Jan’09 tilldate
Nov’00 – Sep’01
Oct’01 - Oct’06 Aug’96 – Nov’00
Jun’91 - Jul’96
2. ProfessionalAffiliations
Effectively implemented GRP Pipeline laying works in Basrah, Iraq & Ziletin Libya
Raw Water System comprising of 120m Approach bridge, Intake Well and 40m long Intake
Tunnel opening into river bed
Power House Building construction, erection commissioning in coordination with the Mech.,
Elect. Instrumentation & other engineering teams
Ensured proper manufacturing & supply of Pre-stressed & Pre-cast slabs for Railway
bridges
Work Experience
May’13 till date with Jaiprakash Associates Limited, as Dy. General Manager at Construction
of 15 nos. Multistorey Residential Towers (23 to 29 Storied) for the Kasa Isles Project in
Wish Town, Noida
Jan’09 to May’13 at Bina Power Project, Bina till May’ 13 – Site mobilization, Base
camp buildings, Plant works of Power House Building, Ash handling system etc.
Key Result Areas:
Ensuring execution of the project frominception to completion i.e. Plant
Synchronization Stage
Developing project baselines; monitoring & controlling projects with respect to cost,
resource deployment, time over-runs and quality compliance to ensure satisfactory
execution of projects
Creating and executing project work plans and revising as appropriate to meet changing
needs & requirements including the identification of needed resources and assignment to
appropriate personnel
Interacting with team members to ensure smooth progress of project work
Ensuring adherence to quality norms throughout the implementation process
Managing the bidding process from floating of bids to awarding of the contracts;
coordinating with bidders with regard to negotiations
Anchoring on-site construction activities to ensure completion of project within the time &
cost parameters and effective resource utilization to maximize output
Supervising the preparation of monthly progress reports entailing progress & details for engineering, procurement,
construction and commissioning activities
Important Assignments / Projects:
The Real Estate Project of Wish Town, Noida since May 2013 - Execution of Civil & Structural works of 15 Towers up to 29
Storied through contractors. Project Management, Planning, Coordination, QA-QC & Billing
Construction of 2x250 MW Thermal Power Project. Works of Site Mobilization, Survey, Camp / Township construction,
Boiler Foundations works, Ash handling system works and Power House Building works in coordination with the Mech.,
Elect. &Instrumentation teams till commissioning of the Power Plant
Process Waste Sewer & Sewage Waste Sewer lines execution including Manufacturing of RCC P1 class pipes of dia. 200mm
to 2200mm
Previous Experience
Oct’06 to Jul’08 with D. S. Constructions Limited, Tripoli, Libya as Dy. General Manager
Important Assignments / Projects:
Surman City Sewage Treatment PlantBalance Works and Commissioning
Sabrata Hotel Project – Construction, internal & external finishing, Landscape works, Lift, Laundry & Kitchen Equipment
Procurement & Furnishing Works
Ziletin City Storm Water network (GRP Pipeline)- Survey, Global Vendor Approval for GRP Pipes Procurement and Laying
Tajura Infrastructure Project – Construction of Drainage culvert with Pre-cast Elements, Other Infrastructure Works in
Tajura area
Oct’01 - Oct’06 with Jaiprakash Associates Limited, at Raghogarh, Guna as Sr. Project Engineer
Construction of Institutional Complex for Jaypee Institute of Engineering &Technology, Raghogarh, Dist. Guna, (M. P.)
Worked from Project inception to completion stage i. e. Survey, Site mobilization, Coordination with Architectural,
Plumbing, Landscape and Electrical Consultants, QA-QC, Billing, Planning & execution coordination of the project works for
all structures like Academic blocks, Lab. Building, Library, Hostels, Faculty residences, Lake & Playgrounds
Key Clients
3. Nov’00 – Sep’01 with M/s Nirman Architect, Abu Road as Project Manager
Important Assignments / Projects:
Construction of:
o LPG Township Complex for GAIL India Ltd. Construction ofDifferent Category Staff Quarters, Community Centre
Building etc.
Aug’96 – Nov’00 with Engineers India Limited, Vijayawada, Haldia and Abu Road as Sr. Engineer
Important Assignments / Projects:
HPCL’s Oil Pipeline Receiving Terminal Project Vijayawada (A. P) – Construction works of Rail Loading Gantry with Pile
foundations, ETP works,Pipeline Control Room Building
Haldia Petrochemical Ltd., Haldia (W. B.)- Process Waste Sewer & Sewage Waste Sewer lines execution including
Manufacturing of RCC P1 class pipes of dia. 200mm to 2200mm
GAIL’s Jamnagar Loni Pipeline Project, Abu Road (Raj.) – Booster Station buildings, Pump Foundations and so on
Jun’91 - Jul’96 with Rapid Contracting Co. Pvt. Ltd.,at Kota, Manmad & Leh as Project Engineer
(Formerly Uttam Singh Dugal & Co.)
Important Assignments / Projects:
Chambal Fertilizers & Chemicals Ltd., Gadepan, Kota (Raj.)– Raw Water System including construction of 120m long Intake
Bridge, 40m long Intake Tunnel(2m x 2m) opening into river bed water, Intake well, Left bank facilities building
Central Engg. Workshop, Central Railway, Manmad (M. S.) – Manufacturing &supply of Pre-stressed Pre-cast slabs for
Railway Bridges employing Steam curing for early strength gain of concrete
All India Radio, Leh, Ladakh (J & K) – 100m high TV Tower Project construction of foundations
Dec’87 – Jan’91 with Jai Prakash Associates Ltd., as Field Engineer
Important Assignments / Projects:
Basrah, Iraq for Basrah City Drainage & Sewerage Scheme
Executed laying Trunk Sewer Pipeline with GRP Pipes of dia. 1200 to 1800mm
Lakhwar Dam Project – Construction of Tail Race Tunnel for U/G Power House
Feb’87 – Dec’87 with M/s Om Metals & Minerals Pvt. Ltd., New Delhi as Assistant Engineer
PersonalDetails
Date of birth: 07th December 1963
Languages Known: Hindi, English & Arabic
Address:269, Sector '2A', Saket Nagar, Bhopal – 462024 (M. P.)
Passport No.: H 7816204 Valid up to 14.10.2019