SlideShare a Scribd company logo
1 of 3
CoreCompetencies ProfileSummary
Energetic, driven, and accomplished professional with a track record of
success in supervising complex day-to-day operational aspects of projects and
project scope by effectively applying methodologies that enforce project
standards and by minimizing exposure and risks on projects
Maintain extensive knowledge of building codes, specifications, and
regulations; simultaneously manage multiple projects and frequently finish
ahead of schedule as a result of effective staff development, motivation and
workload planning
Possessing excellent client facing skills and highly successful in helping define
company direction, achieving goals and optimizing business
Proven progression of project management promotions and responsibilities
as a result of an excellent performance track record in scheduling and
managing activities
Education
Postgraduate Programme in Project Management from School of Distance
Education, NICMAR Punein 2013-2015
B.E. (Civil Engineering) from Bhopal University in 1986; scored 72%
11th (Higher Secondary) from M. P. Board of Secondary Education, Bhopal with
70% marks
Career Timeline
Soft Skills
Mohan Kishor Parmar
High-performing, results-focused Project Manager offering over 27 years of
experience in technical project leadership and a strong background in program
management and applied technology; targeting assignments in Project
Management/Site & Construction Management with an organization of repute
preferably in Building & Infrastructure Construction or Industrial Structure
preferably in Madhya Pradesh or any other Metro cities.
Rapid
Contracting Co.
Pvt. Ltd
+91-9810416891 mkparmar7@yahoo.com
Project Management
Project Set-up and Stabilization
Client Relationship Management
Site Management
Contract Management
Budgeting & Cost Control
Materials Management
Sourcing & Procurement
Team Building & Leadership
Change Agent
Collaborator
Communicator
Motivator
Planner
Oct’06-Jul’08
Jan’09 tilldate
Nov’00 – Sep’01
Oct’01 - Oct’06 Aug’96 – Nov’00
Jun’91 - Jul’96
ProfessionalAffiliations
Effectively implemented GRP Pipeline laying works in Basrah, Iraq & Ziletin Libya
Raw Water System comprising of 120m Approach bridge, Intake Well and 40m long Intake
Tunnel opening into river bed
Power House Building construction, erection commissioning in coordination with the Mech.,
Elect. Instrumentation & other engineering teams
Ensured proper manufacturing & supply of Pre-stressed & Pre-cast slabs for Railway
bridges
Work Experience
May’13 till date with Jaiprakash Associates Limited, as Dy. General Manager at Construction
of 15 nos. Multistorey Residential Towers (23 to 29 Storied) for the Kasa Isles Project in
Wish Town, Noida
Jan’09 to May’13 at Bina Power Project, Bina till May’ 13 – Site mobilization, Base
camp buildings, Plant works of Power House Building, Ash handling system etc.
Key Result Areas:
Ensuring execution of the project frominception to completion i.e. Plant
Synchronization Stage
Developing project baselines; monitoring & controlling projects with respect to cost,
resource deployment, time over-runs and quality compliance to ensure satisfactory
execution of projects
Creating and executing project work plans and revising as appropriate to meet changing
needs & requirements including the identification of needed resources and assignment to
appropriate personnel
Interacting with team members to ensure smooth progress of project work
Ensuring adherence to quality norms throughout the implementation process
Managing the bidding process from floating of bids to awarding of the contracts;
coordinating with bidders with regard to negotiations
Anchoring on-site construction activities to ensure completion of project within the time &
cost parameters and effective resource utilization to maximize output
Supervising the preparation of monthly progress reports entailing progress & details for engineering, procurement,
construction and commissioning activities
Important Assignments / Projects:
The Real Estate Project of Wish Town, Noida since May 2013 - Execution of Civil & Structural works of 15 Towers up to 29
Storied through contractors. Project Management, Planning, Coordination, QA-QC & Billing
Construction of 2x250 MW Thermal Power Project. Works of Site Mobilization, Survey, Camp / Township construction,
Boiler Foundations works, Ash handling system works and Power House Building works in coordination with the Mech.,
Elect. &Instrumentation teams till commissioning of the Power Plant
Process Waste Sewer & Sewage Waste Sewer lines execution including Manufacturing of RCC P1 class pipes of dia. 200mm
to 2200mm
Previous Experience
Oct’06 to Jul’08 with D. S. Constructions Limited, Tripoli, Libya as Dy. General Manager
Important Assignments / Projects:
Surman City Sewage Treatment PlantBalance Works and Commissioning
Sabrata Hotel Project – Construction, internal & external finishing, Landscape works, Lift, Laundry & Kitchen Equipment
Procurement & Furnishing Works
Ziletin City Storm Water network (GRP Pipeline)- Survey, Global Vendor Approval for GRP Pipes Procurement and Laying
Tajura Infrastructure Project – Construction of Drainage culvert with Pre-cast Elements, Other Infrastructure Works in
Tajura area
Oct’01 - Oct’06 with Jaiprakash Associates Limited, at Raghogarh, Guna as Sr. Project Engineer
Construction of Institutional Complex for Jaypee Institute of Engineering &Technology, Raghogarh, Dist. Guna, (M. P.)
Worked from Project inception to completion stage i. e. Survey, Site mobilization, Coordination with Architectural,
Plumbing, Landscape and Electrical Consultants, QA-QC, Billing, Planning & execution coordination of the project works for
all structures like Academic blocks, Lab. Building, Library, Hostels, Faculty residences, Lake & Playgrounds
Key Clients
Nov’00 – Sep’01 with M/s Nirman Architect, Abu Road as Project Manager
Important Assignments / Projects:
Construction of:
o LPG Township Complex for GAIL India Ltd. Construction ofDifferent Category Staff Quarters, Community Centre
Building etc.
Aug’96 – Nov’00 with Engineers India Limited, Vijayawada, Haldia and Abu Road as Sr. Engineer
Important Assignments / Projects:
HPCL’s Oil Pipeline Receiving Terminal Project Vijayawada (A. P) – Construction works of Rail Loading Gantry with Pile
foundations, ETP works,Pipeline Control Room Building
Haldia Petrochemical Ltd., Haldia (W. B.)- Process Waste Sewer & Sewage Waste Sewer lines execution including
Manufacturing of RCC P1 class pipes of dia. 200mm to 2200mm
GAIL’s Jamnagar Loni Pipeline Project, Abu Road (Raj.) – Booster Station buildings, Pump Foundations and so on
Jun’91 - Jul’96 with Rapid Contracting Co. Pvt. Ltd.,at Kota, Manmad & Leh as Project Engineer
(Formerly Uttam Singh Dugal & Co.)
Important Assignments / Projects:
Chambal Fertilizers & Chemicals Ltd., Gadepan, Kota (Raj.)– Raw Water System including construction of 120m long Intake
Bridge, 40m long Intake Tunnel(2m x 2m) opening into river bed water, Intake well, Left bank facilities building
Central Engg. Workshop, Central Railway, Manmad (M. S.) – Manufacturing &supply of Pre-stressed Pre-cast slabs for
Railway Bridges employing Steam curing for early strength gain of concrete
All India Radio, Leh, Ladakh (J & K) – 100m high TV Tower Project construction of foundations
Dec’87 – Jan’91 with Jai Prakash Associates Ltd., as Field Engineer
Important Assignments / Projects:
Basrah, Iraq for Basrah City Drainage & Sewerage Scheme
Executed laying Trunk Sewer Pipeline with GRP Pipes of dia. 1200 to 1800mm
Lakhwar Dam Project – Construction of Tail Race Tunnel for U/G Power House
Feb’87 – Dec’87 with M/s Om Metals & Minerals Pvt. Ltd., New Delhi as Assistant Engineer
PersonalDetails
Date of birth: 07th December 1963
Languages Known: Hindi, English & Arabic
Address:269, Sector '2A', Saket Nagar, Bhopal – 462024 (M. P.)
Passport No.: H 7816204 Valid up to 14.10.2019

More Related Content

What's hot (20)

CV -BOSE
CV -BOSECV -BOSE
CV -BOSE
 
Thangamani CV -Sept 2016
Thangamani CV -Sept 2016Thangamani CV -Sept 2016
Thangamani CV -Sept 2016
 
Ravi Resume
Ravi ResumeRavi Resume
Ravi Resume
 
V.BASKAR CV
V.BASKAR CVV.BASKAR CV
V.BASKAR CV
 
Resume-up-Aug-16
Resume-up-Aug-16Resume-up-Aug-16
Resume-up-Aug-16
 
CV M.Ilyas - 1
CV M.Ilyas - 1CV M.Ilyas - 1
CV M.Ilyas - 1
 
Manoj resume
Manoj resumeManoj resume
Manoj resume
 
Sharma cv
Sharma  cv Sharma  cv
Sharma cv
 
RANJI -CV
RANJI -CVRANJI -CV
RANJI -CV
 
Cv vinaya
Cv vinayaCv vinaya
Cv vinaya
 
659193
659193659193
659193
 
NIAZ ALI KHAN CV UPDATE
NIAZ ALI KHAN CV UPDATENIAZ ALI KHAN CV UPDATE
NIAZ ALI KHAN CV UPDATE
 
Resume
ResumeResume
Resume
 
AjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjayasankarK M _ Engineer
AjayasankarK M _ Engineer
 
Updated C.V of water & sewerage
Updated  C.V of water & sewerageUpdated  C.V of water & sewerage
Updated C.V of water & sewerage
 
resume - Copy
resume - Copyresume - Copy
resume - Copy
 
Anand ponnaiah
Anand ponnaiahAnand ponnaiah
Anand ponnaiah
 
AmoghKarambelkar Resume
AmoghKarambelkar ResumeAmoghKarambelkar Resume
AmoghKarambelkar Resume
 
SHANTANU OJHA
SHANTANU OJHASHANTANU OJHA
SHANTANU OJHA
 
Cv 01
Cv 01Cv 01
Cv 01
 

Viewers also liked

World: Antimony - Market Report. Analysis And Forecast To 2020
World: Antimony - Market Report. Analysis And Forecast To 2020World: Antimony - Market Report. Analysis And Forecast To 2020
World: Antimony - Market Report. Analysis And Forecast To 2020IndexBox Marketing
 
World: Bismuth - Market Report. Analysis And Forecast To 2020
World: Bismuth - Market Report. Analysis And Forecast To 2020World: Bismuth - Market Report. Analysis And Forecast To 2020
World: Bismuth - Market Report. Analysis And Forecast To 2020IndexBox Marketing
 
My Personal Code Of Ethics
My Personal Code Of EthicsMy Personal Code Of Ethics
My Personal Code Of EthicsAnna
 
Bolton Wanderer SC
Bolton Wanderer SCBolton Wanderer SC
Bolton Wanderer SCWilliam Hay
 

Viewers also liked (11)

Nuestro árbol arce
Nuestro árbol arceNuestro árbol arce
Nuestro árbol arce
 
World: Antimony - Market Report. Analysis And Forecast To 2020
World: Antimony - Market Report. Analysis And Forecast To 2020World: Antimony - Market Report. Analysis And Forecast To 2020
World: Antimony - Market Report. Analysis And Forecast To 2020
 
Rimbun @ Embassy Row ( Business Capital Asia)
Rimbun @ Embassy Row ( Business Capital Asia)Rimbun @ Embassy Row ( Business Capital Asia)
Rimbun @ Embassy Row ( Business Capital Asia)
 
World: Bismuth - Market Report. Analysis And Forecast To 2020
World: Bismuth - Market Report. Analysis And Forecast To 2020World: Bismuth - Market Report. Analysis And Forecast To 2020
World: Bismuth - Market Report. Analysis And Forecast To 2020
 
Rubric
RubricRubric
Rubric
 
Task card
Task cardTask card
Task card
 
Proceso de redacción de textos narrativos
Proceso de redacción de textos narrativosProceso de redacción de textos narrativos
Proceso de redacción de textos narrativos
 
Altinsaray Konutları
Altinsaray KonutlarıAltinsaray Konutları
Altinsaray Konutları
 
LA MISA-Los Ritos Iniciales
LA MISA-Los Ritos InicialesLA MISA-Los Ritos Iniciales
LA MISA-Los Ritos Iniciales
 
My Personal Code Of Ethics
My Personal Code Of EthicsMy Personal Code Of Ethics
My Personal Code Of Ethics
 
Bolton Wanderer SC
Bolton Wanderer SCBolton Wanderer SC
Bolton Wanderer SC
 

Similar to Resume (2) (20)

MAKARAND GOVIND DHAWANE
MAKARAND GOVIND DHAWANEMAKARAND GOVIND DHAWANE
MAKARAND GOVIND DHAWANE
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
Manish kumar project planning & control with 3.7 years of experience
Manish kumar project planning & control with 3.7 years of experienceManish kumar project planning & control with 3.7 years of experience
Manish kumar project planning & control with 3.7 years of experience
 
CHVR CV
CHVR CVCHVR CV
CHVR CV
 
Jahangir.Contractor
Jahangir.ContractorJahangir.Contractor
Jahangir.Contractor
 
RESUME-1
RESUME-1RESUME-1
RESUME-1
 
CV hmsnegi
CV hmsnegiCV hmsnegi
CV hmsnegi
 
Iftekhar Civil Engineer CV
Iftekhar Civil Engineer CVIftekhar Civil Engineer CV
Iftekhar Civil Engineer CV
 
CURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEPCURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEP
 
cv new
cv newcv new
cv new
 
Ankur Parmar Jan 17
Ankur Parmar Jan 17Ankur Parmar Jan 17
Ankur Parmar Jan 17
 
Shabd saran sahu
Shabd saran sahuShabd saran sahu
Shabd saran sahu
 
JAMES -CV -
JAMES -CV -JAMES -CV -
JAMES -CV -
 
CV Project Manager
CV Project ManagerCV Project Manager
CV Project Manager
 
CV_Gursharan Choudhary
CV_Gursharan ChoudharyCV_Gursharan Choudhary
CV_Gursharan Choudhary
 
Siva Sankaran Menon - Resume
Siva Sankaran Menon - ResumeSiva Sankaran Menon - Resume
Siva Sankaran Menon - Resume
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
satheesh Resume
satheesh Resumesatheesh Resume
satheesh Resume
 
C.V. OF Mr.Arindam Guha.
C.V. OF Mr.Arindam Guha.C.V. OF Mr.Arindam Guha.
C.V. OF Mr.Arindam Guha.
 

Resume (2)

  • 1. CoreCompetencies ProfileSummary Energetic, driven, and accomplished professional with a track record of success in supervising complex day-to-day operational aspects of projects and project scope by effectively applying methodologies that enforce project standards and by minimizing exposure and risks on projects Maintain extensive knowledge of building codes, specifications, and regulations; simultaneously manage multiple projects and frequently finish ahead of schedule as a result of effective staff development, motivation and workload planning Possessing excellent client facing skills and highly successful in helping define company direction, achieving goals and optimizing business Proven progression of project management promotions and responsibilities as a result of an excellent performance track record in scheduling and managing activities Education Postgraduate Programme in Project Management from School of Distance Education, NICMAR Punein 2013-2015 B.E. (Civil Engineering) from Bhopal University in 1986; scored 72% 11th (Higher Secondary) from M. P. Board of Secondary Education, Bhopal with 70% marks Career Timeline Soft Skills Mohan Kishor Parmar High-performing, results-focused Project Manager offering over 27 years of experience in technical project leadership and a strong background in program management and applied technology; targeting assignments in Project Management/Site & Construction Management with an organization of repute preferably in Building & Infrastructure Construction or Industrial Structure preferably in Madhya Pradesh or any other Metro cities. Rapid Contracting Co. Pvt. Ltd +91-9810416891 mkparmar7@yahoo.com Project Management Project Set-up and Stabilization Client Relationship Management Site Management Contract Management Budgeting & Cost Control Materials Management Sourcing & Procurement Team Building & Leadership Change Agent Collaborator Communicator Motivator Planner Oct’06-Jul’08 Jan’09 tilldate Nov’00 – Sep’01 Oct’01 - Oct’06 Aug’96 – Nov’00 Jun’91 - Jul’96
  • 2. ProfessionalAffiliations Effectively implemented GRP Pipeline laying works in Basrah, Iraq & Ziletin Libya Raw Water System comprising of 120m Approach bridge, Intake Well and 40m long Intake Tunnel opening into river bed Power House Building construction, erection commissioning in coordination with the Mech., Elect. Instrumentation & other engineering teams Ensured proper manufacturing & supply of Pre-stressed & Pre-cast slabs for Railway bridges Work Experience May’13 till date with Jaiprakash Associates Limited, as Dy. General Manager at Construction of 15 nos. Multistorey Residential Towers (23 to 29 Storied) for the Kasa Isles Project in Wish Town, Noida Jan’09 to May’13 at Bina Power Project, Bina till May’ 13 – Site mobilization, Base camp buildings, Plant works of Power House Building, Ash handling system etc. Key Result Areas: Ensuring execution of the project frominception to completion i.e. Plant Synchronization Stage Developing project baselines; monitoring & controlling projects with respect to cost, resource deployment, time over-runs and quality compliance to ensure satisfactory execution of projects Creating and executing project work plans and revising as appropriate to meet changing needs & requirements including the identification of needed resources and assignment to appropriate personnel Interacting with team members to ensure smooth progress of project work Ensuring adherence to quality norms throughout the implementation process Managing the bidding process from floating of bids to awarding of the contracts; coordinating with bidders with regard to negotiations Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize output Supervising the preparation of monthly progress reports entailing progress & details for engineering, procurement, construction and commissioning activities Important Assignments / Projects: The Real Estate Project of Wish Town, Noida since May 2013 - Execution of Civil & Structural works of 15 Towers up to 29 Storied through contractors. Project Management, Planning, Coordination, QA-QC & Billing Construction of 2x250 MW Thermal Power Project. Works of Site Mobilization, Survey, Camp / Township construction, Boiler Foundations works, Ash handling system works and Power House Building works in coordination with the Mech., Elect. &Instrumentation teams till commissioning of the Power Plant Process Waste Sewer & Sewage Waste Sewer lines execution including Manufacturing of RCC P1 class pipes of dia. 200mm to 2200mm Previous Experience Oct’06 to Jul’08 with D. S. Constructions Limited, Tripoli, Libya as Dy. General Manager Important Assignments / Projects: Surman City Sewage Treatment PlantBalance Works and Commissioning Sabrata Hotel Project – Construction, internal & external finishing, Landscape works, Lift, Laundry & Kitchen Equipment Procurement & Furnishing Works Ziletin City Storm Water network (GRP Pipeline)- Survey, Global Vendor Approval for GRP Pipes Procurement and Laying Tajura Infrastructure Project – Construction of Drainage culvert with Pre-cast Elements, Other Infrastructure Works in Tajura area Oct’01 - Oct’06 with Jaiprakash Associates Limited, at Raghogarh, Guna as Sr. Project Engineer Construction of Institutional Complex for Jaypee Institute of Engineering &Technology, Raghogarh, Dist. Guna, (M. P.) Worked from Project inception to completion stage i. e. Survey, Site mobilization, Coordination with Architectural, Plumbing, Landscape and Electrical Consultants, QA-QC, Billing, Planning & execution coordination of the project works for all structures like Academic blocks, Lab. Building, Library, Hostels, Faculty residences, Lake & Playgrounds Key Clients
  • 3. Nov’00 – Sep’01 with M/s Nirman Architect, Abu Road as Project Manager Important Assignments / Projects: Construction of: o LPG Township Complex for GAIL India Ltd. Construction ofDifferent Category Staff Quarters, Community Centre Building etc. Aug’96 – Nov’00 with Engineers India Limited, Vijayawada, Haldia and Abu Road as Sr. Engineer Important Assignments / Projects: HPCL’s Oil Pipeline Receiving Terminal Project Vijayawada (A. P) – Construction works of Rail Loading Gantry with Pile foundations, ETP works,Pipeline Control Room Building Haldia Petrochemical Ltd., Haldia (W. B.)- Process Waste Sewer & Sewage Waste Sewer lines execution including Manufacturing of RCC P1 class pipes of dia. 200mm to 2200mm GAIL’s Jamnagar Loni Pipeline Project, Abu Road (Raj.) – Booster Station buildings, Pump Foundations and so on Jun’91 - Jul’96 with Rapid Contracting Co. Pvt. Ltd.,at Kota, Manmad & Leh as Project Engineer (Formerly Uttam Singh Dugal & Co.) Important Assignments / Projects: Chambal Fertilizers & Chemicals Ltd., Gadepan, Kota (Raj.)– Raw Water System including construction of 120m long Intake Bridge, 40m long Intake Tunnel(2m x 2m) opening into river bed water, Intake well, Left bank facilities building Central Engg. Workshop, Central Railway, Manmad (M. S.) – Manufacturing &supply of Pre-stressed Pre-cast slabs for Railway Bridges employing Steam curing for early strength gain of concrete All India Radio, Leh, Ladakh (J & K) – 100m high TV Tower Project construction of foundations Dec’87 – Jan’91 with Jai Prakash Associates Ltd., as Field Engineer Important Assignments / Projects: Basrah, Iraq for Basrah City Drainage & Sewerage Scheme Executed laying Trunk Sewer Pipeline with GRP Pipes of dia. 1200 to 1800mm Lakhwar Dam Project – Construction of Tail Race Tunnel for U/G Power House Feb’87 – Dec’87 with M/s Om Metals & Minerals Pvt. Ltd., New Delhi as Assistant Engineer PersonalDetails Date of birth: 07th December 1963 Languages Known: Hindi, English & Arabic Address:269, Sector '2A', Saket Nagar, Bhopal – 462024 (M. P.) Passport No.: H 7816204 Valid up to 14.10.2019