WASIT PROJECTS DEPARTMENT
WASIT SRU & UTILITIES PROJECT
WASIT SAPMT SITE OFFICE SRU BLDG. ROOM # 07
SAUDI ARABIA
DOCUMENT TRANSMITTAL
8-May-14
Contract No. 6600026171(IK)
TO: Kee Nam (Kenney) Cho
Contractor Representative
SK Engineering & Construction Co Ltd
Wasit Site Office
FROM:
TEL. NO.:
FAX NO. :
Mr. Ahmed A. Al-Awaji,
Company Representative (IK)
679 - 7200
679-7286
SRU TRANSMITTAL NO.: WPD-WUC-T-0262-14
SK TRANSMITTAL
NO.:
SK/IK-US-T-S4240/2014
is transmitted herewith
Documents EDiskettes Drawings
EDisapproval EApproval
Information 0Review 8, Comments
Title:
Pkg#3
Request for Interview Schedule to Instrument QC Inspector (Mr. Muhammad Talha Kaleem) - SKEC-
Comments:
COMPANY has approved without comments.
20 4.05. 1 2
SKEC
WASIT PKG#3 .
WASIT PKG # 3 PROJECT
Dept Act. int, Dept Act int.
PD HSE
CD OC 
PM Admin
SM Schedule
CM Material
MPCM Civil
PCM Arch
...r
PPD Mech
PPM HVAC
MFEM Piping
FEM STUSTR
Sub—con Elec/Inst
Contract Paint
H/0
C: C over Only ca.:.1intil 3pages
ashy
ORIGINATOR:
Ahmed .Awa
NMS IHT
Or
NOTE:
RECEIVED BY: DATE:
Attachments:
Response Required: / N
DUE
DATE:
cc:
Note: COMPANY's review, revision, certification, acceptance or approval of documents in this correspondence shall not have the effect of
amending, modifying or limiting, in any way the CONTRACTOR's obligations stipulated in Contract No.6600026172(00K) or
6600026171(IK). Deviation to project standards, procedures, specifications...etc. shall be raised independently as a waiver request and
agreed according to contractual terms.
INSPECTION DEPARTMENT
SOUTHERN AREA PROJECTS INSPECTION DIVISION
WASIT PROJECTS INSPECTION SECTION
Room 03, PKG-3 SAPMT office building, WASIT
Tel: 679-7200; Fax: TBA
DOCUMENT REVIEW RESPONSE
Response No.: WPIS-SRU-799-14
SUBMITTING ARAMCO ORGANIZATION
Representative
r.)NAME:
DEPARTMENT:
ADDRESS:
TELEPHONE:
Ahmed A. Awaji, Company
SAPM 0 MAY 20V
SAPMT
679-7200
Project Description Wasit GAS program, SRU  Utilities Project (WUC)
BI/JO 10-00914-0004 Main Contractor: SK Engrg.  Const.
Reference
Your Transmittal: WPD/WUC/PID/T-0148-14 Ref. No. SK/IK-US-T-S4240-14
Submitted Document INSTRUMENT QC INSPECTOR (Mr MUHAMMAD TALHA KALEEM)
REVIEW STATUS REVIEW DEFINITIONS
1 — Approved without comments 7 — Reviewed with comments
2 — Approved with comments 8 — Partially reviewed with comments
3 — Approved with JC Cards attached 9 — Review not required
4 — Partial approval
5 — Not approved
6 — Reviewed, no comments
COMMENTS
Status-1-Approved without comments.
Note:-
• PID reserves the right to re-evaluate and revoke
expected level.
• Approval is for Pkg-3 Only.
this approval if his performance falls below the
Name of Signatory : Mohiddine Akkad-Salam
Supervisor
Date: 05/08/2014
Initial by: kif n Project File : SRU-799
engineeringengineering  construction
WASIT GAS PROGRAM, SRU  UTILITIES PROJECT (WUC)
TRANSMITTAL
To,
Mr, Ahmed A. AL-Awaji DATE : 07 / Apr / 2014
Company Representative (1K) TR. NO. : SK/IK-US-T-S4240/2014
Saudi Aramco CONTRACT NO. : 6600026171 (1K)
Saudi Aramco Oil Company 31311 REFERENCE : -
Dhahran, Saudi Arabia
THE FOLLOWING •DRAWINGS inSPECIFICATION IIPROCEDURE
• DATA SHEETS •CALCULATION IIIMATERIAL REQUITION
• TBE •VENDOR DOCUMENT sOTHERS
ARE TRANSMITTED sAPPROVAL •REVIEW •INFORMATION
, INRECORD •QUOTATION •CONSTRUCTION
THIS IS sORIGINAL •REVISION •FINAL
DRAWINGS OR DOCUMENT NO. SIZE REV. NO. NO. OF COPIES DESCRIPTION OR TITLE
QCISKPCM-US-T-073712014 A4 A 3 Request for Interview Schedule to Instrument QC Inspector.
(Mr, Muhammad Talha Kaleem) SKEC-Direct Team-Pkg #3.
ae
Iklk
Signed :
Kwang Nam (Cavin) Youn / Site Manager
NOTE :
• RECEIPT NOT REQUIRED
RECEIPT REQUIRED (PLEASE ACKNOWLEDGE THE RECEIPT OF THE DUPLICATE AND RETURN BY FAX)
THE ABOVE DOCUMENT RECEIVED WITH ELECTRONIC COPY IN CD BY
SIGNATURE TITLE DATE

More Related Content

What's hot (17)

Alex v g
Alex v gAlex v g
Alex v g
 
ANISUR RAHMAN DRAUGHTSMAN
ANISUR RAHMAN DRAUGHTSMANANISUR RAHMAN DRAUGHTSMAN
ANISUR RAHMAN DRAUGHTSMAN
 
Fact sheet faststream
Fact sheet faststreamFact sheet faststream
Fact sheet faststream
 
ENP-YER-MTBE-SITE-T-15-0103 - YASREF Inspector Resume (Islam abdelrhman) 6
ENP-YER-MTBE-SITE-T-15-0103 - YASREF Inspector Resume (Islam abdelrhman) 6ENP-YER-MTBE-SITE-T-15-0103 - YASREF Inspector Resume (Islam abdelrhman) 6
ENP-YER-MTBE-SITE-T-15-0103 - YASREF Inspector Resume (Islam abdelrhman) 6
 
Yadav Manojkumar Indrapalbhai
Yadav  Manojkumar  IndrapalbhaiYadav  Manojkumar  Indrapalbhai
Yadav Manojkumar Indrapalbhai
 
Profile_UGS Group of Companies
Profile_UGS Group of CompaniesProfile_UGS Group of Companies
Profile_UGS Group of Companies
 
GMG Airlines Project
GMG Airlines ProjectGMG Airlines Project
GMG Airlines Project
 
Al Qasr Mall presentation
Al Qasr Mall presentationAl Qasr Mall presentation
Al Qasr Mall presentation
 
COMPANY PROFILE pdf2
COMPANY PROFILE pdf2COMPANY PROFILE pdf2
COMPANY PROFILE pdf2
 
MORGAN RESUME.doc 1
MORGAN RESUME.doc 1MORGAN RESUME.doc 1
MORGAN RESUME.doc 1
 
2014 Alan Sinclair Resume 10-14
2014 Alan Sinclair Resume 10-142014 Alan Sinclair Resume 10-14
2014 Alan Sinclair Resume 10-14
 
Resume
ResumeResume
Resume
 
Attachment 3
Attachment 3Attachment 3
Attachment 3
 
cv new
cv newcv new
cv new
 
sunil k v document.DOCX
sunil k v document.DOCXsunil k v document.DOCX
sunil k v document.DOCX
 
COVER2
COVER2COVER2
COVER2
 
ATA
ATAATA
ATA
 

Viewers also liked

Viewers also liked (16)

Ventajas y desventajas de las redes sociales en educación 2 2.png
Ventajas y desventajas de las redes sociales en educación 2 2.pngVentajas y desventajas de las redes sociales en educación 2 2.png
Ventajas y desventajas de las redes sociales en educación 2 2.png
 
L'altra Italia
L'altra ItaliaL'altra Italia
L'altra Italia
 
MS PETITE USA 2015 PRESS RELEASE_
MS PETITE USA 2015 PRESS RELEASE_MS PETITE USA 2015 PRESS RELEASE_
MS PETITE USA 2015 PRESS RELEASE_
 
10 sterke punten 140410
10 sterke punten 14041010 sterke punten 140410
10 sterke punten 140410
 
Medios sociales y educación
Medios sociales y educaciónMedios sociales y educación
Medios sociales y educación
 
Alp forum q&a
Alp forum q&aAlp forum q&a
Alp forum q&a
 
Mt. Tom Ecol. Connections
Mt. Tom Ecol. ConnectionsMt. Tom Ecol. Connections
Mt. Tom Ecol. Connections
 
Technical research
Technical researchTechnical research
Technical research
 
Undangan pengantin
Undangan pengantinUndangan pengantin
Undangan pengantin
 
Lower-Garage-Lighting-Costs-and-Improve-Illumination-IPI-Dallas-2008
Lower-Garage-Lighting-Costs-and-Improve-Illumination-IPI-Dallas-2008Lower-Garage-Lighting-Costs-and-Improve-Illumination-IPI-Dallas-2008
Lower-Garage-Lighting-Costs-and-Improve-Illumination-IPI-Dallas-2008
 
Wees slim en plan je huiswerk
Wees slim en plan je huiswerkWees slim en plan je huiswerk
Wees slim en plan je huiswerk
 
Suld setguul - 2012 2015 on
Suld setguul - 2012 2015 onSuld setguul - 2012 2015 on
Suld setguul - 2012 2015 on
 
Experienc Latter Descon
Experienc Latter  Descon Experienc Latter  Descon
Experienc Latter Descon
 
Transkrip Nilai S.Ked
Transkrip Nilai S.KedTranskrip Nilai S.Ked
Transkrip Nilai S.Ked
 
8 het letterbord 140410
8 het letterbord 1404108 het letterbord 140410
8 het letterbord 140410
 
Un día de nuestras vidas
Un día de nuestras vidasUn día de nuestras vidas
Un día de nuestras vidas
 

Similar to Inspector Approval Wasit Gas Plan

Similar to Inspector Approval Wasit Gas Plan (20)

Sakil-resume
Sakil-resumeSakil-resume
Sakil-resume
 
Bb06 srihari six_sigma project
Bb06 srihari six_sigma projectBb06 srihari six_sigma project
Bb06 srihari six_sigma project
 
ashraf letest cv.
ashraf letest cv.ashraf letest cv.
ashraf letest cv.
 
kraikeesh-CV
kraikeesh-CVkraikeesh-CV
kraikeesh-CV
 
altaf resume work preparation
altaf resume work preparationaltaf resume work preparation
altaf resume work preparation
 
M.faqih.cv 5
M.faqih.cv   5M.faqih.cv   5
M.faqih.cv 5
 
CV QC
CV QCCV QC
CV QC
 
Mechanical Inspector - API 653 - KSA - CV.pdf
Mechanical Inspector - API 653 - KSA - CV.pdfMechanical Inspector - API 653 - KSA - CV.pdf
Mechanical Inspector - API 653 - KSA - CV.pdf
 
wps
wpswps
wps
 
A.H.K.C.V.NEW (2)
A.H.K.C.V.NEW (2)A.H.K.C.V.NEW (2)
A.H.K.C.V.NEW (2)
 
Project _TQR_Manager
Project _TQR_ManagerProject _TQR_Manager
Project _TQR_Manager
 
QA new resume - Jaffer
QA  new resume - JafferQA  new resume - Jaffer
QA new resume - Jaffer
 
QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.
 
Nadeem cv n
Nadeem cv nNadeem cv n
Nadeem cv n
 
Nadeem cv n
Nadeem cv nNadeem cv n
Nadeem cv n
 
Kumar.R Multi Inspector cv -5 - Copy
Kumar.R   Multi Inspector cv   -5 - CopyKumar.R   Multi Inspector cv   -5 - Copy
Kumar.R Multi Inspector cv -5 - Copy
 
Shakir CV
Shakir CV Shakir CV
Shakir CV
 
B.SAKTHEVEL CV GPS
B.SAKTHEVEL CV GPSB.SAKTHEVEL CV GPS
B.SAKTHEVEL CV GPS
 
Cost Forecast Report
Cost Forecast ReportCost Forecast Report
Cost Forecast Report
 
CV_Format_-_Shailendra_Shukla_16_07_2016
CV_Format_-_Shailendra_Shukla_16_07_2016CV_Format_-_Shailendra_Shukla_16_07_2016
CV_Format_-_Shailendra_Shukla_16_07_2016
 

More from Muhammad Talha Kaleem (12)

AMPPIU-KHRS-L-258-16 QC E&I Supervisor
AMPPIU-KHRS-L-258-16 QC E&I SupervisorAMPPIU-KHRS-L-258-16 QC E&I Supervisor
AMPPIU-KHRS-L-258-16 QC E&I Supervisor
 
AMPPIU-KHRS-L-258-16 QC E&I Supervisor
AMPPIU-KHRS-L-258-16 QC E&I SupervisorAMPPIU-KHRS-L-258-16 QC E&I Supervisor
AMPPIU-KHRS-L-258-16 QC E&I Supervisor
 
Petro Rabigh APPROVAL
Petro Rabigh APPROVALPetro Rabigh APPROVAL
Petro Rabigh APPROVAL
 
Yanbu Aramco Refinery APPROVAL
Yanbu Aramco Refinery APPROVALYanbu Aramco Refinery APPROVAL
Yanbu Aramco Refinery APPROVAL
 
SK Experience Latter
SK Experience LatterSK Experience Latter
SK Experience Latter
 
Petro Rabigh APPROVAL
Petro Rabigh APPROVALPetro Rabigh APPROVAL
Petro Rabigh APPROVAL
 
DAE Provisional
DAE Provisional DAE Provisional
DAE Provisional
 
Yanbu Aramco Refinery APPROVAL
Yanbu Aramco Refinery APPROVALYanbu Aramco Refinery APPROVAL
Yanbu Aramco Refinery APPROVAL
 
Experience Latter Sigma 18
Experience Latter Sigma 18Experience Latter Sigma 18
Experience Latter Sigma 18
 
Experienc Latter BHP
Experienc Latter BHP Experienc Latter BHP
Experienc Latter BHP
 
Experience Latter Dawn
Experience Latter Dawn Experience Latter Dawn
Experience Latter Dawn
 
Inspector Approval Wasit Gas Plan
Inspector Approval Wasit Gas PlanInspector Approval Wasit Gas Plan
Inspector Approval Wasit Gas Plan
 

Inspector Approval Wasit Gas Plan

  • 1. WASIT PROJECTS DEPARTMENT WASIT SRU & UTILITIES PROJECT WASIT SAPMT SITE OFFICE SRU BLDG. ROOM # 07 SAUDI ARABIA DOCUMENT TRANSMITTAL 8-May-14 Contract No. 6600026171(IK) TO: Kee Nam (Kenney) Cho Contractor Representative SK Engineering & Construction Co Ltd Wasit Site Office FROM: TEL. NO.: FAX NO. : Mr. Ahmed A. Al-Awaji, Company Representative (IK) 679 - 7200 679-7286 SRU TRANSMITTAL NO.: WPD-WUC-T-0262-14 SK TRANSMITTAL NO.: SK/IK-US-T-S4240/2014 is transmitted herewith Documents EDiskettes Drawings EDisapproval EApproval Information 0Review 8, Comments Title: Pkg#3 Request for Interview Schedule to Instrument QC Inspector (Mr. Muhammad Talha Kaleem) - SKEC- Comments: COMPANY has approved without comments. 20 4.05. 1 2 SKEC WASIT PKG#3 . WASIT PKG # 3 PROJECT Dept Act. int, Dept Act int. PD HSE CD OC PM Admin SM Schedule CM Material MPCM Civil PCM Arch ...r PPD Mech PPM HVAC MFEM Piping FEM STUSTR Sub—con Elec/Inst Contract Paint H/0 C: C over Only ca.:.1intil 3pages ashy ORIGINATOR: Ahmed .Awa NMS IHT Or NOTE: RECEIVED BY: DATE: Attachments: Response Required: / N DUE DATE: cc: Note: COMPANY's review, revision, certification, acceptance or approval of documents in this correspondence shall not have the effect of amending, modifying or limiting, in any way the CONTRACTOR's obligations stipulated in Contract No.6600026172(00K) or 6600026171(IK). Deviation to project standards, procedures, specifications...etc. shall be raised independently as a waiver request and agreed according to contractual terms.
  • 2. INSPECTION DEPARTMENT SOUTHERN AREA PROJECTS INSPECTION DIVISION WASIT PROJECTS INSPECTION SECTION Room 03, PKG-3 SAPMT office building, WASIT Tel: 679-7200; Fax: TBA DOCUMENT REVIEW RESPONSE Response No.: WPIS-SRU-799-14 SUBMITTING ARAMCO ORGANIZATION Representative r.)NAME: DEPARTMENT: ADDRESS: TELEPHONE: Ahmed A. Awaji, Company SAPM 0 MAY 20V SAPMT 679-7200 Project Description Wasit GAS program, SRU Utilities Project (WUC) BI/JO 10-00914-0004 Main Contractor: SK Engrg. Const. Reference Your Transmittal: WPD/WUC/PID/T-0148-14 Ref. No. SK/IK-US-T-S4240-14 Submitted Document INSTRUMENT QC INSPECTOR (Mr MUHAMMAD TALHA KALEEM) REVIEW STATUS REVIEW DEFINITIONS 1 — Approved without comments 7 — Reviewed with comments 2 — Approved with comments 8 — Partially reviewed with comments 3 — Approved with JC Cards attached 9 — Review not required 4 — Partial approval 5 — Not approved 6 — Reviewed, no comments COMMENTS Status-1-Approved without comments. Note:- • PID reserves the right to re-evaluate and revoke expected level. • Approval is for Pkg-3 Only. this approval if his performance falls below the Name of Signatory : Mohiddine Akkad-Salam Supervisor Date: 05/08/2014 Initial by: kif n Project File : SRU-799
  • 3. engineeringengineering construction WASIT GAS PROGRAM, SRU UTILITIES PROJECT (WUC) TRANSMITTAL To, Mr, Ahmed A. AL-Awaji DATE : 07 / Apr / 2014 Company Representative (1K) TR. NO. : SK/IK-US-T-S4240/2014 Saudi Aramco CONTRACT NO. : 6600026171 (1K) Saudi Aramco Oil Company 31311 REFERENCE : - Dhahran, Saudi Arabia THE FOLLOWING •DRAWINGS inSPECIFICATION IIPROCEDURE • DATA SHEETS •CALCULATION IIIMATERIAL REQUITION • TBE •VENDOR DOCUMENT sOTHERS ARE TRANSMITTED sAPPROVAL •REVIEW •INFORMATION , INRECORD •QUOTATION •CONSTRUCTION THIS IS sORIGINAL •REVISION •FINAL DRAWINGS OR DOCUMENT NO. SIZE REV. NO. NO. OF COPIES DESCRIPTION OR TITLE QCISKPCM-US-T-073712014 A4 A 3 Request for Interview Schedule to Instrument QC Inspector. (Mr, Muhammad Talha Kaleem) SKEC-Direct Team-Pkg #3. ae Iklk Signed : Kwang Nam (Cavin) Youn / Site Manager NOTE : • RECEIPT NOT REQUIRED RECEIPT REQUIRED (PLEASE ACKNOWLEDGE THE RECEIPT OF THE DUPLICATE AND RETURN BY FAX) THE ABOVE DOCUMENT RECEIVED WITH ELECTRONIC COPY IN CD BY SIGNATURE TITLE DATE