1. WASIT PROJECTS DEPARTMENT
WASIT SRU & UTILITIES PROJECT
WASIT SAPMT SITE OFFICE SRU BLDG. ROOM # 07
SAUDI ARABIA
DOCUMENT TRANSMITTAL
8-May-14
Contract No. 6600026171(IK)
TO: Kee Nam (Kenney) Cho
Contractor Representative
SK Engineering & Construction Co Ltd
Wasit Site Office
FROM:
TEL. NO.:
FAX NO. :
Mr. Ahmed A. Al-Awaji,
Company Representative (IK)
679 - 7200
679-7286
SRU TRANSMITTAL NO.: WPD-WUC-T-0262-14
SK TRANSMITTAL
NO.:
SK/IK-US-T-S4240/2014
is transmitted herewith
Documents EDiskettes Drawings
EDisapproval EApproval
Information 0Review 8, Comments
Title:
Pkg#3
Request for Interview Schedule to Instrument QC Inspector (Mr. Muhammad Talha Kaleem) - SKEC-
Comments:
COMPANY has approved without comments.
20 4.05. 1 2
SKEC
WASIT PKG#3 .
WASIT PKG # 3 PROJECT
Dept Act. int, Dept Act int.
PD HSE
CD OC
PM Admin
SM Schedule
CM Material
MPCM Civil
PCM Arch
...r
PPD Mech
PPM HVAC
MFEM Piping
FEM STUSTR
Sub—con Elec/Inst
Contract Paint
H/0
C: C over Only ca.:.1intil 3pages
ashy
ORIGINATOR:
Ahmed .Awa
NMS IHT
Or
NOTE:
RECEIVED BY: DATE:
Attachments:
Response Required: / N
DUE
DATE:
cc:
Note: COMPANY's review, revision, certification, acceptance or approval of documents in this correspondence shall not have the effect of
amending, modifying or limiting, in any way the CONTRACTOR's obligations stipulated in Contract No.6600026172(00K) or
6600026171(IK). Deviation to project standards, procedures, specifications...etc. shall be raised independently as a waiver request and
agreed according to contractual terms.
2. INSPECTION DEPARTMENT
SOUTHERN AREA PROJECTS INSPECTION DIVISION
WASIT PROJECTS INSPECTION SECTION
Room 03, PKG-3 SAPMT office building, WASIT
Tel: 679-7200; Fax: TBA
DOCUMENT REVIEW RESPONSE
Response No.: WPIS-SRU-799-14
SUBMITTING ARAMCO ORGANIZATION
Representative
r.)NAME:
DEPARTMENT:
ADDRESS:
TELEPHONE:
Ahmed A. Awaji, Company
SAPM 0 MAY 20V
SAPMT
679-7200
Project Description Wasit GAS program, SRU Utilities Project (WUC)
BI/JO 10-00914-0004 Main Contractor: SK Engrg. Const.
Reference
Your Transmittal: WPD/WUC/PID/T-0148-14 Ref. No. SK/IK-US-T-S4240-14
Submitted Document INSTRUMENT QC INSPECTOR (Mr MUHAMMAD TALHA KALEEM)
REVIEW STATUS REVIEW DEFINITIONS
1 — Approved without comments 7 — Reviewed with comments
2 — Approved with comments 8 — Partially reviewed with comments
3 — Approved with JC Cards attached 9 — Review not required
4 — Partial approval
5 — Not approved
6 — Reviewed, no comments
COMMENTS
Status-1-Approved without comments.
Note:-
• PID reserves the right to re-evaluate and revoke
expected level.
• Approval is for Pkg-3 Only.
this approval if his performance falls below the
Name of Signatory : Mohiddine Akkad-Salam
Supervisor
Date: 05/08/2014
Initial by: kif n Project File : SRU-799
3. engineeringengineering construction
WASIT GAS PROGRAM, SRU UTILITIES PROJECT (WUC)
TRANSMITTAL
To,
Mr, Ahmed A. AL-Awaji DATE : 07 / Apr / 2014
Company Representative (1K) TR. NO. : SK/IK-US-T-S4240/2014
Saudi Aramco CONTRACT NO. : 6600026171 (1K)
Saudi Aramco Oil Company 31311 REFERENCE : -
Dhahran, Saudi Arabia
THE FOLLOWING •DRAWINGS inSPECIFICATION IIPROCEDURE
• DATA SHEETS •CALCULATION IIIMATERIAL REQUITION
• TBE •VENDOR DOCUMENT sOTHERS
ARE TRANSMITTED sAPPROVAL •REVIEW •INFORMATION
, INRECORD •QUOTATION •CONSTRUCTION
THIS IS sORIGINAL •REVISION •FINAL
DRAWINGS OR DOCUMENT NO. SIZE REV. NO. NO. OF COPIES DESCRIPTION OR TITLE
QCISKPCM-US-T-073712014 A4 A 3 Request for Interview Schedule to Instrument QC Inspector.
(Mr, Muhammad Talha Kaleem) SKEC-Direct Team-Pkg #3.
ae
Iklk
Signed :
Kwang Nam (Cavin) Youn / Site Manager
NOTE :
• RECEIPT NOT REQUIRED
RECEIPT REQUIRED (PLEASE ACKNOWLEDGE THE RECEIPT OF THE DUPLICATE AND RETURN BY FAX)
THE ABOVE DOCUMENT RECEIVED WITH ELECTRONIC COPY IN CD BY
SIGNATURE TITLE DATE