SlideShare a Scribd company logo
1 of 1
Assignment Name:                               Approx. Value of the contract (in current US$ or
Technical Representative GMG MD-80             Euro): 500K
Heavy Maintenance C-Check

Country: Turkey                                Duration of assignment (months):
Location within country: Istanbul              2 Months (May be extended)
Name of Client:                                Total No. of staff-months of the assignment:
Aero Intelligence for GMG Airlines             1

Address:                             Approx. value of the services provided by your firm
MNG TECHNICS MRO Facility, Istanbul, under the contract (in current US$ or Euro):
Turkey                               24K
Start date : Nov 02, 2010                      NO. of professional staff-months provided by
Completion date: Dec. 15, 2010                 associated Consultants: 2
Name of associated Consultants, if any:        Name of senior professional staff of your firm
Varghese Samuel, Director of Engineering       involved and functions performed
Vsamuel@gmgairlines.com                        Lawrence Juman Parris


Narrative description of Project:
Re-structure GMG Airlines Engineering Department. Prior Staff in Turkey overseeing MD-80 check
removed. Procedures and policies to be put in place to strengthen all safety and quality aspect of the
airlines operation. Tachyon has also traveled to Bangladesh to access their operations and make the
necessary recommendations to executive staff. While being downgraded by ICAO and the CAAB, we
have been tasked to improve the company’s engineering standards, which will ensure GMG acceptance
to operate Internationally.


Description of actual services provided by your staff within the assignment:
   Conduct audits of MNG Facilities and Staff
   Oversee and direct heavy maintenance check for MD 80 GMG Airlines Aircraft.
   Liaison with Civil Aviation Authority of Bangladesh for re-issuance of aircraft’s Certificate of
   Airworthiness. Facilitate his Inspection, and correct issues and findings.
   Manage Parts procurement and logistics for Turkey operation and Dhaka, Bangladesh operations.
   Audit GMG’s Dhaka operations, and make recommendations for corrections to problems found.
   Safety and Quality oversight.
                                     Firm’s Name: IOS Partners, Inc.

More Related Content

Viewers also liked (17)

Slides embraer 344
Slides embraer 344Slides embraer 344
Slides embraer 344
 
Guiòn del estudiante
Guiòn  del estudianteGuiòn  del estudiante
Guiòn del estudiante
 
Scannen0221[2]
Scannen0221[2]Scannen0221[2]
Scannen0221[2]
 
Memorandum
MemorandumMemorandum
Memorandum
 
Begrüssung und SuisseID heute
Begrüssung und SuisseID heuteBegrüssung und SuisseID heute
Begrüssung und SuisseID heute
 
El twitter franklin
El twitter franklinEl twitter franklin
El twitter franklin
 
Blogs
BlogsBlogs
Blogs
 
Carta
CartaCarta
Carta
 
P+V_1-11_U4-U1.pdf
P+V_1-11_U4-U1.pdfP+V_1-11_U4-U1.pdf
P+V_1-11_U4-U1.pdf
 
Chrons
ChronsChrons
Chrons
 
Cartaz s. martinho_2011
Cartaz s. martinho_2011Cartaz s. martinho_2011
Cartaz s. martinho_2011
 
Radio Active section
Radio Active sectionRadio Active section
Radio Active section
 
Mandala froitos do outono
Mandala froitos do outonoMandala froitos do outono
Mandala froitos do outono
 
Artigo - Gentileza Gera Gentileza
Artigo  - Gentileza Gera GentilezaArtigo  - Gentileza Gera Gentileza
Artigo - Gentileza Gera Gentileza
 
Quando a mulher deseja
Quando a mulher desejaQuando a mulher deseja
Quando a mulher deseja
 
Digital project research proposal
Digital project research proposalDigital project research proposal
Digital project research proposal
 
Dissidio do sincofarma -sp 2011
Dissidio do sincofarma -sp 2011Dissidio do sincofarma -sp 2011
Dissidio do sincofarma -sp 2011
 

Similar to GMG Airlines Project

KRISHANU KUNDU _Resume Technical Documentation Engineer
KRISHANU KUNDU _Resume Technical Documentation  EngineerKRISHANU KUNDU _Resume Technical Documentation  Engineer
KRISHANU KUNDU _Resume Technical Documentation Engineerkrishanu kundu
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan
 
Why Chartered Engineer Certificate Is Important
Why Chartered Engineer Certificate Is ImportantWhy Chartered Engineer Certificate Is Important
Why Chartered Engineer Certificate Is ImportantSGNCO_Gurgaon
 
TransDigm GROUP INC. FINANCIAL ANALYSIS1Financial Ac.docx
TransDigm GROUP INC. FINANCIAL ANALYSIS1Financial Ac.docxTransDigm GROUP INC. FINANCIAL ANALYSIS1Financial Ac.docx
TransDigm GROUP INC. FINANCIAL ANALYSIS1Financial Ac.docxedwardmarivel
 
Adnan -updated CV
Adnan -updated CVAdnan -updated CV
Adnan -updated CVAdnan TV
 
SRINIVASAN_LATEST RESUME_01-12-2016
SRINIVASAN_LATEST RESUME_01-12-2016SRINIVASAN_LATEST RESUME_01-12-2016
SRINIVASAN_LATEST RESUME_01-12-2016Srinivasan S
 
SUJITH RESUME (1)
SUJITH RESUME (1)SUJITH RESUME (1)
SUJITH RESUME (1)Sujith sv
 
CV_Chetan Kumar RJ
CV_Chetan Kumar RJCV_Chetan Kumar RJ
CV_Chetan Kumar RJChetan Kumar
 

Similar to GMG Airlines Project (20)

KRISHANU KUNDU _Resume Technical Documentation Engineer
KRISHANU KUNDU _Resume Technical Documentation  EngineerKRISHANU KUNDU _Resume Technical Documentation  Engineer
KRISHANU KUNDU _Resume Technical Documentation Engineer
 
Resume
ResumeResume
Resume
 
Dipanjan Sikidar-CV
Dipanjan Sikidar-CVDipanjan Sikidar-CV
Dipanjan Sikidar-CV
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV Instrument
 
CV-VA- March2016
CV-VA- March2016CV-VA- March2016
CV-VA- March2016
 
Why Chartered Engineer Certificate Is Important
Why Chartered Engineer Certificate Is ImportantWhy Chartered Engineer Certificate Is Important
Why Chartered Engineer Certificate Is Important
 
Dhimantha Gupta C G_Hardware
Dhimantha Gupta C G_HardwareDhimantha Gupta C G_Hardware
Dhimantha Gupta C G_Hardware
 
IRESUME PDF FORMET LATEST
IRESUME PDF FORMET LATESTIRESUME PDF FORMET LATEST
IRESUME PDF FORMET LATEST
 
MIDHUN CHANDRAN CV
MIDHUN CHANDRAN CVMIDHUN CHANDRAN CV
MIDHUN CHANDRAN CV
 
TransDigm GROUP INC. FINANCIAL ANALYSIS1Financial Ac.docx
TransDigm GROUP INC. FINANCIAL ANALYSIS1Financial Ac.docxTransDigm GROUP INC. FINANCIAL ANALYSIS1Financial Ac.docx
TransDigm GROUP INC. FINANCIAL ANALYSIS1Financial Ac.docx
 
Personal Presentation
Personal PresentationPersonal Presentation
Personal Presentation
 
Adnan -updated CV
Adnan -updated CVAdnan -updated CV
Adnan -updated CV
 
SRINIVASAN_LATEST RESUME_01-12-2016
SRINIVASAN_LATEST RESUME_01-12-2016SRINIVASAN_LATEST RESUME_01-12-2016
SRINIVASAN_LATEST RESUME_01-12-2016
 
dileepkumar ade
dileepkumar adedileepkumar ade
dileepkumar ade
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
SUJITH RESUME (1)
SUJITH RESUME (1)SUJITH RESUME (1)
SUJITH RESUME (1)
 
koshy cv
koshy cvkoshy cv
koshy cv
 
CV QC
CV QCCV QC
CV QC
 
CV_Chetan Kumar RJ
CV_Chetan Kumar RJCV_Chetan Kumar RJ
CV_Chetan Kumar RJ
 
Prashant_CV
Prashant_CVPrashant_CV
Prashant_CV
 

More from TACHYON INTERNATIONAL INCORPORATED (10)

Seeking Experts In UAV Technologies; Systems And Usages For Short Term Projec...
Seeking Experts In UAV Technologies; Systems And Usages For Short Term Projec...Seeking Experts In UAV Technologies; Systems And Usages For Short Term Projec...
Seeking Experts In UAV Technologies; Systems And Usages For Short Term Projec...
 
Seeking Experts In UAV Technology; Systems And Usages For Short Term Project ...
Seeking Experts In UAV Technology; Systems And Usages For Short Term Project ...Seeking Experts In UAV Technology; Systems And Usages For Short Term Project ...
Seeking Experts In UAV Technology; Systems And Usages For Short Term Project ...
 
Dolphin Air EASA 145 ISO 9001
Dolphin Air EASA 145 ISO 9001Dolphin Air EASA 145 ISO 9001
Dolphin Air EASA 145 ISO 9001
 
EAC FAA 145 EASA 145 ISO9001
EAC FAA 145 EASA 145 ISO9001EAC FAA 145 EASA 145 ISO9001
EAC FAA 145 EASA 145 ISO9001
 
AWAS Project Doltan Alabama
AWAS Project Doltan AlabamaAWAS Project Doltan Alabama
AWAS Project Doltan Alabama
 
Air Agency Certificate
Air Agency CertificateAir Agency Certificate
Air Agency Certificate
 
Past Performance Project 1 Dolphin Air Ljp
Past Performance Project 1 Dolphin Air LjpPast Performance Project 1 Dolphin Air Ljp
Past Performance Project 1 Dolphin Air Ljp
 
Eac Article0001
Eac Article0001Eac Article0001
Eac Article0001
 
Past Performance Project 2 Safi Airways
Past Performance Project 2 Safi AirwaysPast Performance Project 2 Safi Airways
Past Performance Project 2 Safi Airways
 
Tachyon Brochure
Tachyon BrochureTachyon Brochure
Tachyon Brochure
 

GMG Airlines Project

  • 1. Assignment Name: Approx. Value of the contract (in current US$ or Technical Representative GMG MD-80 Euro): 500K Heavy Maintenance C-Check Country: Turkey Duration of assignment (months): Location within country: Istanbul 2 Months (May be extended) Name of Client: Total No. of staff-months of the assignment: Aero Intelligence for GMG Airlines 1 Address: Approx. value of the services provided by your firm MNG TECHNICS MRO Facility, Istanbul, under the contract (in current US$ or Euro): Turkey 24K Start date : Nov 02, 2010 NO. of professional staff-months provided by Completion date: Dec. 15, 2010 associated Consultants: 2 Name of associated Consultants, if any: Name of senior professional staff of your firm Varghese Samuel, Director of Engineering involved and functions performed Vsamuel@gmgairlines.com Lawrence Juman Parris Narrative description of Project: Re-structure GMG Airlines Engineering Department. Prior Staff in Turkey overseeing MD-80 check removed. Procedures and policies to be put in place to strengthen all safety and quality aspect of the airlines operation. Tachyon has also traveled to Bangladesh to access their operations and make the necessary recommendations to executive staff. While being downgraded by ICAO and the CAAB, we have been tasked to improve the company’s engineering standards, which will ensure GMG acceptance to operate Internationally. Description of actual services provided by your staff within the assignment: Conduct audits of MNG Facilities and Staff Oversee and direct heavy maintenance check for MD 80 GMG Airlines Aircraft. Liaison with Civil Aviation Authority of Bangladesh for re-issuance of aircraft’s Certificate of Airworthiness. Facilitate his Inspection, and correct issues and findings. Manage Parts procurement and logistics for Turkey operation and Dhaka, Bangladesh operations. Audit GMG’s Dhaka operations, and make recommendations for corrections to problems found. Safety and Quality oversight. Firm’s Name: IOS Partners, Inc.