COVER2
- 1. architecture
urban design
engineering
interior design
ISSUED FOR: DATE:
INTERNATIONAL LTD.
American Dream
Tripple Five
MALL CONNECTOR - BUILDING G
1 Base Building Budgeting 13-05-10
2 Budget price package 13-07-16
3 IGMP Preparation 14-03-31
4 GMP 14-06-01
5 FINAL GMP 14-09-01
6 Foundation Permit 14-09-01
7 DCA SUBMITTAL 15-05-01
8 IFC 15-05-01
ben@countyglass.com
6/17/2015 8:38 AM EST
69.122.16.73, 1170662