page 1 16:48:52 Jun 18, 2014 Project File: Load Flow
ATS # 2 ATS # 1
ATS Admin ATS # 4
Bus36
0.4 kV 98.63% Bus42
0.4 kV 99.23%
Bus43
0.4 kV
100%
Bus40
0.4 kV
Bus20
0.4 kV 99.3%
Bus31
0.4 kV 99.42%
Bus290.4 kV
99.77%
Bus47
0.4 kV
100%
Bus48
0.4 kV 99.23% Bus46
0.4 kV 99.23%
Bus16
0.4 kV
Bus37
0.4 kVBus13
0.4 kV
98.89%
Bus17
11 kV
Bus14
0.4 kV
99.72%
Bus33
0.4 kV
100%
U1
1880 MVAsc
T1
3000 kVA
Open
Cable8
Cable15
Gen1
1200 kW
Cable13
Cable11
Open
Cable10
Open
Cable34
Load14
416 kVA
Open
Cable36
Open
Cable38
592.2
Gen4
720 kW
Gen5
1000
Cable42
Cable44
Ca
Cable48
Load16
520 kVA
53
744.8
Load10
485 kVA
Gen2
1200 kW
Cable27
319.8
Cable19
881.3
Cable21
Open
Open
Load12
554 kVA
Cable23
795
Cable25
881.3
532.3
Open
Open
695.1
Load10
485 kVA
Load12
554 kVA
Load14
416 kVA
Load16
520 kVA
U1
1880 MVAsc
Gen1
1200 kW
Gen2
1200 kW
Gen4
720 kW
Gen5
1000
Cable8
Cable10
Cable11
Cable13
Cable15
Cable19
Cable21
Cable23
Cable25
Cable27
Cable34
Cable36 Cable38
Cable42
Cable44
Ca
Cable48
T1
3000 kVA
Bus13
0.4 kVBus14
0.4 kV
Bus16
0.4 kV
Bus17
11 kV
Bus20
0.4 kV
Bus290.4 kV
Bus31
0.4 kV
Bus33
0.4 kV
Bus36
0.4 kV
Bus37
0.4 kV
Bus40
0.4 kV
Bus42
0.4 kV
Bus43
0.4 kV
Bus46
0.4 kV
Bus47
0.4 kV
Bus48
0.4 kV
967.6
483.8
483.8
272.5
795
397.5
397.5
592.2
592.2
532.3 53
1064.6
136.2
136.2
99.23%
100%
99.23%
100%
100%
99.3%
99.72% 98.89%
695.1
967.6
Open
Open
99.77%
99.42%
795
795
881.3
397.5
98.63%
592.2
592.2
Open
Open
Open
Open
53
53
99.23%
744.8
1064.6
Open
Open
Open
532.3
532.3
592.2
397.5
881.3
319.8
136.2
136.2
272.5
483.8
483.8
One-Line Diagram - OLV1 (Load Flow Analysis)
page 2 16:48:52 Jun 18, 2014 Project File: Load Flow
100%
99.69%
5
0 kW
able46
532.3
5
0 kW
able46
532.3
99.69%
100%
532.3
532.3

More Related Content

What's hot

CG (Crompton Greaves) Alternators
CG (Crompton Greaves) AlternatorsCG (Crompton Greaves) Alternators
CG (Crompton Greaves) AlternatorsRichard Schembri
 
Applied motion products 1240i datasheet
Applied motion products 1240i datasheetApplied motion products 1240i datasheet
Applied motion products 1240i datasheetElectromate
 
Manual of trr Measurement Equipment
Manual of trr Measurement EquipmentManual of trr Measurement Equipment
Manual of trr Measurement EquipmentTsuyoshi Horigome
 
IEEEVTC2016_Innovia_RE_CENELEC_Compliance
IEEEVTC2016_Innovia_RE_CENELEC_ComplianceIEEEVTC2016_Innovia_RE_CENELEC_Compliance
IEEEVTC2016_Innovia_RE_CENELEC_ComplianceJian Shen
 
OFC 2017 (Th1D.2) - Deep dive: commodity Ethernet switch with integrated cohe...
OFC 2017 (Th1D.2) - Deep dive: commodity Ethernet switch with integrated cohe...OFC 2017 (Th1D.2) - Deep dive: commodity Ethernet switch with integrated cohe...
OFC 2017 (Th1D.2) - Deep dive: commodity Ethernet switch with integrated cohe...Mark Filer
 
Unconventional Wells.ppt
Unconventional Wells.pptUnconventional Wells.ppt
Unconventional Wells.pptJerry Beets
 
Semiconductor Equipment Parts in Asia
Semiconductor Equipment Parts in AsiaSemiconductor Equipment Parts in Asia
Semiconductor Equipment Parts in AsiaEmily Tan
 
UC3638DWG4- Componentschip.com
UC3638DWG4- Componentschip.comUC3638DWG4- Componentschip.com
UC3638DWG4- Componentschip.comKenny Choi
 
CS0012 - Creep Crane for Large Aircraft Manufacturer
CS0012 - Creep Crane for Large Aircraft ManufacturerCS0012 - Creep Crane for Large Aircraft Manufacturer
CS0012 - Creep Crane for Large Aircraft ManufacturerGuy Black
 
Nidec asi electric power solutions for ship to shore connection
Nidec asi electric power solutions for ship to shore connectionNidec asi electric power solutions for ship to shore connection
Nidec asi electric power solutions for ship to shore connectionNidec Corporation
 
Hartwick National Rresearch Ccouncil of Canada Dec. 2009 ReGen-X Generator Te...
Hartwick National Rresearch Ccouncil of Canada Dec. 2009 ReGen-X Generator Te...Hartwick National Rresearch Ccouncil of Canada Dec. 2009 ReGen-X Generator Te...
Hartwick National Rresearch Ccouncil of Canada Dec. 2009 ReGen-X Generator Te...Potential Difference Inc.
 
Gesture control robot using accelerometer documentation
Gesture control robot using accelerometer documentationGesture control robot using accelerometer documentation
Gesture control robot using accelerometer documentationRajendra Prasad
 
Project main page 2
Project main page 2Project main page 2
Project main page 2Ranjan kumar
 
Project main page 2
Project main page 2Project main page 2
Project main page 2Ranjan kumar
 

What's hot (20)

CG (Crompton Greaves) Alternators
CG (Crompton Greaves) AlternatorsCG (Crompton Greaves) Alternators
CG (Crompton Greaves) Alternators
 
Applied motion products 1240i datasheet
Applied motion products 1240i datasheetApplied motion products 1240i datasheet
Applied motion products 1240i datasheet
 
Manual of trr Measurement Equipment
Manual of trr Measurement EquipmentManual of trr Measurement Equipment
Manual of trr Measurement Equipment
 
IEEEVTC2016_Innovia_RE_CENELEC_Compliance
IEEEVTC2016_Innovia_RE_CENELEC_ComplianceIEEEVTC2016_Innovia_RE_CENELEC_Compliance
IEEEVTC2016_Innovia_RE_CENELEC_Compliance
 
Demo
DemoDemo
Demo
 
OFC 2017 (Th1D.2) - Deep dive: commodity Ethernet switch with integrated cohe...
OFC 2017 (Th1D.2) - Deep dive: commodity Ethernet switch with integrated cohe...OFC 2017 (Th1D.2) - Deep dive: commodity Ethernet switch with integrated cohe...
OFC 2017 (Th1D.2) - Deep dive: commodity Ethernet switch with integrated cohe...
 
Unconventional Wells.ppt
Unconventional Wells.pptUnconventional Wells.ppt
Unconventional Wells.ppt
 
Semiconductor Equipment Parts in Asia
Semiconductor Equipment Parts in AsiaSemiconductor Equipment Parts in Asia
Semiconductor Equipment Parts in Asia
 
Quadcopter
QuadcopterQuadcopter
Quadcopter
 
Yantra_PPT_EN_2015
Yantra_PPT_EN_2015Yantra_PPT_EN_2015
Yantra_PPT_EN_2015
 
UC3638DWG4- Componentschip.com
UC3638DWG4- Componentschip.comUC3638DWG4- Componentschip.com
UC3638DWG4- Componentschip.com
 
CS0012 - Creep Crane for Large Aircraft Manufacturer
CS0012 - Creep Crane for Large Aircraft ManufacturerCS0012 - Creep Crane for Large Aircraft Manufacturer
CS0012 - Creep Crane for Large Aircraft Manufacturer
 
68311721 abb parts
68311721   abb parts68311721   abb parts
68311721 abb parts
 
Nidec asi electric power solutions for ship to shore connection
Nidec asi electric power solutions for ship to shore connectionNidec asi electric power solutions for ship to shore connection
Nidec asi electric power solutions for ship to shore connection
 
Hartwick National Rresearch Ccouncil of Canada Dec. 2009 ReGen-X Generator Te...
Hartwick National Rresearch Ccouncil of Canada Dec. 2009 ReGen-X Generator Te...Hartwick National Rresearch Ccouncil of Canada Dec. 2009 ReGen-X Generator Te...
Hartwick National Rresearch Ccouncil of Canada Dec. 2009 ReGen-X Generator Te...
 
Work_Sample_2
Work_Sample_2Work_Sample_2
Work_Sample_2
 
Gesture control robot using accelerometer documentation
Gesture control robot using accelerometer documentationGesture control robot using accelerometer documentation
Gesture control robot using accelerometer documentation
 
Project main page 2
Project main page 2Project main page 2
Project main page 2
 
Project main page 2
Project main page 2Project main page 2
Project main page 2
 
2008 sensor manual
2008 sensor manual2008 sensor manual
2008 sensor manual
 

Viewers also liked

Load flow analysis of 132 kv substation using etap
Load flow analysis of 132 kv substation using etapLoad flow analysis of 132 kv substation using etap
Load flow analysis of 132 kv substation using etapmajeed khan
 
Optimal Capacitor Placement for IEEE 14 bus system using Genetic Algorithm
Optimal Capacitor Placement for IEEE 14 bus system using Genetic AlgorithmOptimal Capacitor Placement for IEEE 14 bus system using Genetic Algorithm
Optimal Capacitor Placement for IEEE 14 bus system using Genetic AlgorithmAM Publications
 
Newton Raphson method for load flow analysis
Newton Raphson method for load flow analysisNewton Raphson method for load flow analysis
Newton Raphson method for load flow analysisdivyanshuprakashrock
 

Viewers also liked (7)

Load flow analysis of 132 kv substation using etap
Load flow analysis of 132 kv substation using etapLoad flow analysis of 132 kv substation using etap
Load flow analysis of 132 kv substation using etap
 
Load flow study
Load flow studyLoad flow study
Load flow study
 
UDSLF
UDSLFUDSLF
UDSLF
 
load flow 1
 load flow 1 load flow 1
load flow 1
 
Optimal Capacitor Placement for IEEE 14 bus system using Genetic Algorithm
Optimal Capacitor Placement for IEEE 14 bus system using Genetic AlgorithmOptimal Capacitor Placement for IEEE 14 bus system using Genetic Algorithm
Optimal Capacitor Placement for IEEE 14 bus system using Genetic Algorithm
 
Newton Raphson method for load flow analysis
Newton Raphson method for load flow analysisNewton Raphson method for load flow analysis
Newton Raphson method for load flow analysis
 
Slideshare ppt
Slideshare pptSlideshare ppt
Slideshare ppt
 

Similar to OLV1 (Load Flow Analysis) in Synch Mod

Iirdem mitigation of voltage collapse at davanagere receiving station
Iirdem mitigation of voltage collapse at davanagere receiving stationIirdem mitigation of voltage collapse at davanagere receiving station
Iirdem mitigation of voltage collapse at davanagere receiving stationIaetsd Iaetsd
 
Simulating connected capacitor bank
Simulating connected capacitor bankSimulating connected capacitor bank
Simulating connected capacitor bankFebrian Sasi Kirana
 
Optimum design and performance for nablus network
Optimum design and performance for nablus networkOptimum design and performance for nablus network
Optimum design and performance for nablus networkslmnsvn
 
Flexible ac transmission FACTs
Flexible ac transmission FACTsFlexible ac transmission FACTs
Flexible ac transmission FACTsMOHAN RAKIB
 
FACTs_Final_Presensation
FACTs_Final_PresensationFACTs_Final_Presensation
FACTs_Final_PresensationMOHAN RAKIB
 
Analysis for underground cable system, lakeside pokhara
Analysis for underground cable system, lakeside pokharaAnalysis for underground cable system, lakeside pokhara
Analysis for underground cable system, lakeside pokharaBishal Rimal
 
199833536 ee2404-lab-manual
199833536 ee2404-lab-manual199833536 ee2404-lab-manual
199833536 ee2404-lab-manualhomeworkping4
 
Analysis optimization and monitoring system
Analysis optimization and monitoring system Analysis optimization and monitoring system
Analysis optimization and monitoring system slmnsvn
 
M. standard-stock-materials-for-33k v-system
M. standard-stock-materials-for-33k v-systemM. standard-stock-materials-for-33k v-system
M. standard-stock-materials-for-33k v-systemRamesh Meti
 
Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.Smarter Grid Solutions
 
Power transformers rating
Power transformers ratingPower transformers rating
Power transformers ratingLeonardo ENERGY
 
Load Flow Analysis of 66 kV substation using ETAP Software
Load Flow Analysis of 66 kV substation using ETAP SoftwareLoad Flow Analysis of 66 kV substation using ETAP Software
Load Flow Analysis of 66 kV substation using ETAP SoftwareIRJET Journal
 
General condition-relating-to-electricity new
General condition-relating-to-electricity newGeneral condition-relating-to-electricity new
General condition-relating-to-electricity newDineshsenthil
 
Voltage Profile Improvement using Switched Capacitors: Case of Single Wire Ea...
Voltage Profile Improvement using Switched Capacitors: Case of Single Wire Ea...Voltage Profile Improvement using Switched Capacitors: Case of Single Wire Ea...
Voltage Profile Improvement using Switched Capacitors: Case of Single Wire Ea...IJMERJOURNAL
 
ENHANCEMENT OF ACTIVE POWER FLOW CAPACITY OF A TRANSMISSION LINE USING MSC‐TC...
ENHANCEMENT OF ACTIVE POWER FLOW CAPACITY OF A TRANSMISSION LINE USING MSC‐TC...ENHANCEMENT OF ACTIVE POWER FLOW CAPACITY OF A TRANSMISSION LINE USING MSC‐TC...
ENHANCEMENT OF ACTIVE POWER FLOW CAPACITY OF A TRANSMISSION LINE USING MSC‐TC...ijiert bestjournal
 
Batch congestion management No 08_073001.pptx
Batch congestion management No 08_073001.pptxBatch congestion management No 08_073001.pptx
Batch congestion management No 08_073001.pptxNAVEENKUMARR78
 

Similar to OLV1 (Load Flow Analysis) in Synch Mod (20)

Iirdem mitigation of voltage collapse at davanagere receiving station
Iirdem mitigation of voltage collapse at davanagere receiving stationIirdem mitigation of voltage collapse at davanagere receiving station
Iirdem mitigation of voltage collapse at davanagere receiving station
 
Simulating connected capacitor bank
Simulating connected capacitor bankSimulating connected capacitor bank
Simulating connected capacitor bank
 
Optimum design and performance for nablus network
Optimum design and performance for nablus networkOptimum design and performance for nablus network
Optimum design and performance for nablus network
 
Flexible ac transmission FACTs
Flexible ac transmission FACTsFlexible ac transmission FACTs
Flexible ac transmission FACTs
 
FACTs_Final_Presensation
FACTs_Final_PresensationFACTs_Final_Presensation
FACTs_Final_Presensation
 
Analysis for underground cable system, lakeside pokhara
Analysis for underground cable system, lakeside pokharaAnalysis for underground cable system, lakeside pokhara
Analysis for underground cable system, lakeside pokhara
 
174072012 ee2404-lm
174072012 ee2404-lm174072012 ee2404-lm
174072012 ee2404-lm
 
199833536 ee2404-lab-manual
199833536 ee2404-lab-manual199833536 ee2404-lab-manual
199833536 ee2404-lab-manual
 
Analysis optimization and monitoring system
Analysis optimization and monitoring system Analysis optimization and monitoring system
Analysis optimization and monitoring system
 
Fault level calculations
Fault level calculationsFault level calculations
Fault level calculations
 
M. standard-stock-materials-for-33k v-system
M. standard-stock-materials-for-33k v-systemM. standard-stock-materials-for-33k v-system
M. standard-stock-materials-for-33k v-system
 
Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.
 
CH1.ppt
CH1.pptCH1.ppt
CH1.ppt
 
Power transformers rating
Power transformers ratingPower transformers rating
Power transformers rating
 
Load Flow Analysis of 66 kV substation using ETAP Software
Load Flow Analysis of 66 kV substation using ETAP SoftwareLoad Flow Analysis of 66 kV substation using ETAP Software
Load Flow Analysis of 66 kV substation using ETAP Software
 
General condition-relating-to-electricity new
General condition-relating-to-electricity newGeneral condition-relating-to-electricity new
General condition-relating-to-electricity new
 
Load flow analysis of 10 bus loop distribution network excited by a generator...
Load flow analysis of 10 bus loop distribution network excited by a generator...Load flow analysis of 10 bus loop distribution network excited by a generator...
Load flow analysis of 10 bus loop distribution network excited by a generator...
 
Voltage Profile Improvement using Switched Capacitors: Case of Single Wire Ea...
Voltage Profile Improvement using Switched Capacitors: Case of Single Wire Ea...Voltage Profile Improvement using Switched Capacitors: Case of Single Wire Ea...
Voltage Profile Improvement using Switched Capacitors: Case of Single Wire Ea...
 
ENHANCEMENT OF ACTIVE POWER FLOW CAPACITY OF A TRANSMISSION LINE USING MSC‐TC...
ENHANCEMENT OF ACTIVE POWER FLOW CAPACITY OF A TRANSMISSION LINE USING MSC‐TC...ENHANCEMENT OF ACTIVE POWER FLOW CAPACITY OF A TRANSMISSION LINE USING MSC‐TC...
ENHANCEMENT OF ACTIVE POWER FLOW CAPACITY OF A TRANSMISSION LINE USING MSC‐TC...
 
Batch congestion management No 08_073001.pptx
Batch congestion management No 08_073001.pptxBatch congestion management No 08_073001.pptx
Batch congestion management No 08_073001.pptx
 

More from Muhammad Sarfraz (20)

Atlas Honda Buner
Atlas Honda BunerAtlas Honda Buner
Atlas Honda Buner
 
HMI_1
HMI_1HMI_1
HMI_1
 
PLC Control Panel for HVACR System
PLC Control Panel for HVACR SystemPLC Control Panel for HVACR System
PLC Control Panel for HVACR System
 
PLC_1
PLC_1PLC_1
PLC_1
 
CPU
CPUCPU
CPU
 
Efficient Load Management System (ELMS) with ATS_AMF Generator Control Drawing
Efficient Load Management System (ELMS) with ATS_AMF Generator Control DrawingEfficient Load Management System (ELMS) with ATS_AMF Generator Control Drawing
Efficient Load Management System (ELMS) with ATS_AMF Generator Control Drawing
 
SIEMENS Certification
SIEMENS CertificationSIEMENS Certification
SIEMENS Certification
 
Application Flow Sizing and Order Code Configuration
Application Flow Sizing and Order Code ConfigurationApplication Flow Sizing and Order Code Configuration
Application Flow Sizing and Order Code Configuration
 
xxxQxxx Quotation Estimate for Electrical Work of Poultry Processing Plant
xxxQxxx Quotation Estimate for Electrical Work of Poultry Processing PlantxxxQxxx Quotation Estimate for Electrical Work of Poultry Processing Plant
xxxQxxx Quotation Estimate for Electrical Work of Poultry Processing Plant
 
Test Bench
Test BenchTest Bench
Test Bench
 
merged
mergedmerged
merged
 
PI&T Conceptual Drawing
PI&T Conceptual DrawingPI&T Conceptual Drawing
PI&T Conceptual Drawing
 
Visio-Drawing
Visio-DrawingVisio-Drawing
Visio-Drawing
 
BMS-walls
BMS-wallsBMS-walls
BMS-walls
 
OutE62
OutE62OutE62
OutE62
 
Visio-Tobacco Box Tilt Unit
Visio-Tobacco Box Tilt UnitVisio-Tobacco Box Tilt Unit
Visio-Tobacco Box Tilt Unit
 
HMI_1
HMI_1HMI_1
HMI_1
 
ActiveReports Document
ActiveReports DocumentActiveReports Document
ActiveReports Document
 
Plishing Plant Drawing
Plishing Plant DrawingPlishing Plant Drawing
Plishing Plant Drawing
 
Visio-BMS
Visio-BMSVisio-BMS
Visio-BMS
 

OLV1 (Load Flow Analysis) in Synch Mod

  • 1. One-Line Diagram - OLV1 (Load Flow Analysis) page 1 16:48:52 Jun 18, 2014 Project File: Load Flow ATS # 2 ATS # 1 ATS Admin ATS # 4 Bus36 0.4 kV 98.63% Bus42 0.4 kV 99.23% Bus43 0.4 kV 100% Bus40 0.4 kV Bus20 0.4 kV 99.3% Bus31 0.4 kV 99.42% Bus290.4 kV 99.77% Bus47 0.4 kV 100% Bus48 0.4 kV 99.23% Bus46 0.4 kV 99.23% Bus16 0.4 kV Bus37 0.4 kVBus13 0.4 kV 98.89% Bus17 11 kV Bus14 0.4 kV 99.72% Bus33 0.4 kV 100% U1 1880 MVAsc T1 3000 kVA Open Cable8 Cable15 Gen1 1200 kW Cable13 Cable11 Open Cable10 Open Cable34 Load14 416 kVA Open Cable36 Open Cable38 592.2 Gen4 720 kW Gen5 1000 Cable42 Cable44 Ca Cable48 Load16 520 kVA 53 744.8 Load10 485 kVA Gen2 1200 kW Cable27 319.8 Cable19 881.3 Cable21 Open Open Load12 554 kVA Cable23 795 Cable25 881.3 532.3 Open Open 695.1 Load10 485 kVA Load12 554 kVA Load14 416 kVA Load16 520 kVA U1 1880 MVAsc Gen1 1200 kW Gen2 1200 kW Gen4 720 kW Gen5 1000 Cable8 Cable10 Cable11 Cable13 Cable15 Cable19 Cable21 Cable23 Cable25 Cable27 Cable34 Cable36 Cable38 Cable42 Cable44 Ca Cable48 T1 3000 kVA Bus13 0.4 kVBus14 0.4 kV Bus16 0.4 kV Bus17 11 kV Bus20 0.4 kV Bus290.4 kV Bus31 0.4 kV Bus33 0.4 kV Bus36 0.4 kV Bus37 0.4 kV Bus40 0.4 kV Bus42 0.4 kV Bus43 0.4 kV Bus46 0.4 kV Bus47 0.4 kV Bus48 0.4 kV 967.6 483.8 483.8 272.5 795 397.5 397.5 592.2 592.2 532.3 53 1064.6 136.2 136.2 99.23% 100% 99.23% 100% 100% 99.3% 99.72% 98.89% 695.1 967.6 Open Open 99.77% 99.42% 795 795 881.3 397.5 98.63% 592.2 592.2 Open Open Open Open 53 53 99.23% 744.8 1064.6 Open Open Open 532.3 532.3 592.2 397.5 881.3 319.8 136.2 136.2 272.5 483.8 483.8
  • 2. One-Line Diagram - OLV1 (Load Flow Analysis) page 2 16:48:52 Jun 18, 2014 Project File: Load Flow 100% 99.69% 5 0 kW able46 532.3 5 0 kW able46 532.3 99.69% 100% 532.3 532.3