page 1 17:18:21 Jun 18, 2014 Project File: Load Flow
ATS # 2 ATS # 1
ATS Admin ATS # 4
Bus16
0.4 kV
48.5 kA
Bus36
0.4 kV
Bus42
0.4 kV
Bus43
0.4 kV
Bus40
0.4 kV
Bus20
0.4 kV
Bus31
0.4 kV
Bus290.4 kV
Bus47
0.4 kV
Bus48
0.4 kV
Bus46
0.4 kV
Bus37
0.4 kVBus13
0.4 kV
Bus17
11 kV
Bus14
0.4 kV
Bus33
0.4 kV
U1
1880 MVAsc
1.76
T1
3000 kVA
Cable8
Cable15
Gen1
1200 kW
Cable13
Cable11
Cable10
Cable34
Load14
416 kVA
Cable36 Cable38
Gen4
720 kW
Gen5
1000
Cable42
Cable44
Ca
Cable48
Load16
520 kVA
Load10
485 kVA
Gen2
1200 kW
Cable27
Cable19
Cable21
Load12
554 kVA
Cable23
Cable25
OpenOpen
Open
Open Open
Open
Open Open
Load10
485 kVA
Load12
554 kVA
Load14
416 kVA
Load16
520 kVA
U1
1880 MVAsc
Gen1
1200 kW
Gen2
1200 kW
Gen4
720 kW
Gen5
1000
Cable8
Cable10
Cable11
Cable13
Cable15
Cable19
Cable21
Cable23
Cable25
Cable27
Cable34
Cable36 Cable38
Cable42
Cable44
Ca
Cable48
T1
3000 kVA
Bus13
0.4 kVBus14
0.4 kV
Bus17
11 kV
Bus20
0.4 kV
Bus290.4 kV
Bus31
0.4 kV
Bus33
0.4 kV
Bus36
0.4 kV
Bus37
0.4 kV
Bus40
0.4 kV
Bus42
0.4 kV
Bus43
0.4 kV
Bus46
0.4 kV
Bus47
0.4 kV
Bus48
0.4 kV
Bus16
0.4 kV
48.47
48.5 kA
48.471.76
Open Open
Open
Open
Open OpenOpen
Open
One-Line Diagram - OLV1 (Short-Circuit Analysis)
page 2 17:18:21 Jun 18, 2014 Project File: Load Flow
5
0 kW
able46
5
0 kW
able46

More Related Content

What's hot

Fairwaves UmTRX - GNU Radio Conference 2013 presentation
Fairwaves UmTRX - GNU Radio Conference 2013 presentationFairwaves UmTRX - GNU Radio Conference 2013 presentation
Fairwaves UmTRX - GNU Radio Conference 2013 presentationAlexander Chemeris
 
Semiconductor rf generator may 20th 2020
Semiconductor rf generator may 20th 2020Semiconductor rf generator may 20th 2020
Semiconductor rf generator may 20th 2020Emily Tan
 
Manual of trr Measurement Equipment
Manual of trr Measurement EquipmentManual of trr Measurement Equipment
Manual of trr Measurement EquipmentTsuyoshi Horigome
 
Power vamp 1224ga
Power vamp 1224gaPower vamp 1224ga
Power vamp 1224gagelbyson
 
Giuliano david bozzo
Giuliano david bozzoGiuliano david bozzo
Giuliano david bozzogiuliano45
 
Li-Wen Yip Breakout Session 4.4 v2
Li-Wen Yip Breakout Session 4.4 v2Li-Wen Yip Breakout Session 4.4 v2
Li-Wen Yip Breakout Session 4.4 v2Li-Wen Yip
 
CG (Crompton Greaves) Alternators
CG (Crompton Greaves) AlternatorsCG (Crompton Greaves) Alternators
CG (Crompton Greaves) AlternatorsRichard Schembri
 
Neway power three phase power inverter specification
Neway power three phase power inverter specificationNeway power three phase power inverter specification
Neway power three phase power inverter specificationNEWAY POWER
 
Proportional Amplifier | P9000
Proportional Amplifier | P9000Proportional Amplifier | P9000
Proportional Amplifier | P9000RunnTech Controls
 
Hartwick National Rresearch Ccouncil of Canada Dec. 2009 ReGen-X Generator Te...
Hartwick National Rresearch Ccouncil of Canada Dec. 2009 ReGen-X Generator Te...Hartwick National Rresearch Ccouncil of Canada Dec. 2009 ReGen-X Generator Te...
Hartwick National Rresearch Ccouncil of Canada Dec. 2009 ReGen-X Generator Te...Potential Difference Inc.
 
IEEEVTC2016_Innovia_RE_CENELEC_Compliance
IEEEVTC2016_Innovia_RE_CENELEC_ComplianceIEEEVTC2016_Innovia_RE_CENELEC_Compliance
IEEEVTC2016_Innovia_RE_CENELEC_ComplianceJian Shen
 
Rsf electronik incremental_rotary_encoder_dg150_specsheet
Rsf electronik incremental_rotary_encoder_dg150_specsheetRsf electronik incremental_rotary_encoder_dg150_specsheet
Rsf electronik incremental_rotary_encoder_dg150_specsheetElectromate
 

What's hot (18)

Ct & pt specification
Ct & pt specificationCt & pt specification
Ct & pt specification
 
Fairwaves UmTRX - GNU Radio Conference 2013 presentation
Fairwaves UmTRX - GNU Radio Conference 2013 presentationFairwaves UmTRX - GNU Radio Conference 2013 presentation
Fairwaves UmTRX - GNU Radio Conference 2013 presentation
 
Semiconductor rf generator may 20th 2020
Semiconductor rf generator may 20th 2020Semiconductor rf generator may 20th 2020
Semiconductor rf generator may 20th 2020
 
Manual of trr Measurement Equipment
Manual of trr Measurement EquipmentManual of trr Measurement Equipment
Manual of trr Measurement Equipment
 
Power vamp 1224ga
Power vamp 1224gaPower vamp 1224ga
Power vamp 1224ga
 
Giuliano david bozzo
Giuliano david bozzoGiuliano david bozzo
Giuliano david bozzo
 
Li-Wen Yip Breakout Session 4.4 v2
Li-Wen Yip Breakout Session 4.4 v2Li-Wen Yip Breakout Session 4.4 v2
Li-Wen Yip Breakout Session 4.4 v2
 
CG (Crompton Greaves) Alternators
CG (Crompton Greaves) AlternatorsCG (Crompton Greaves) Alternators
CG (Crompton Greaves) Alternators
 
Neway power three phase power inverter specification
Neway power three phase power inverter specificationNeway power three phase power inverter specification
Neway power three phase power inverter specification
 
Catalogue siemens contactor 3 tb5
Catalogue siemens contactor 3 tb5Catalogue siemens contactor 3 tb5
Catalogue siemens contactor 3 tb5
 
sujesh
sujeshsujesh
sujesh
 
Statcomatpdraw
StatcomatpdrawStatcomatpdraw
Statcomatpdraw
 
Proportional Amplifier | P9000
Proportional Amplifier | P9000Proportional Amplifier | P9000
Proportional Amplifier | P9000
 
68311721 abb parts
68311721   abb parts68311721   abb parts
68311721 abb parts
 
Hartwick National Rresearch Ccouncil of Canada Dec. 2009 ReGen-X Generator Te...
Hartwick National Rresearch Ccouncil of Canada Dec. 2009 ReGen-X Generator Te...Hartwick National Rresearch Ccouncil of Canada Dec. 2009 ReGen-X Generator Te...
Hartwick National Rresearch Ccouncil of Canada Dec. 2009 ReGen-X Generator Te...
 
PSRR and CMRR
PSRR and CMRRPSRR and CMRR
PSRR and CMRR
 
IEEEVTC2016_Innovia_RE_CENELEC_Compliance
IEEEVTC2016_Innovia_RE_CENELEC_ComplianceIEEEVTC2016_Innovia_RE_CENELEC_Compliance
IEEEVTC2016_Innovia_RE_CENELEC_Compliance
 
Rsf electronik incremental_rotary_encoder_dg150_specsheet
Rsf electronik incremental_rotary_encoder_dg150_specsheetRsf electronik incremental_rotary_encoder_dg150_specsheet
Rsf electronik incremental_rotary_encoder_dg150_specsheet
 

Viewers also liked

Visio-Tobacco Box Tilt Unit
Visio-Tobacco Box Tilt UnitVisio-Tobacco Box Tilt Unit
Visio-Tobacco Box Tilt UnitMuhammad Sarfraz
 
Efficient Load Management System (ELMS) with ATS_AMF Generator Control Drawing
Efficient Load Management System (ELMS) with ATS_AMF Generator Control DrawingEfficient Load Management System (ELMS) with ATS_AMF Generator Control Drawing
Efficient Load Management System (ELMS) with ATS_AMF Generator Control DrawingMuhammad Sarfraz
 
schneider gv2 motor circuit breaker
schneider gv2 motor circuit breakerschneider gv2 motor circuit breaker
schneider gv2 motor circuit breakerconsungcon2020
 
PLC Control Panel for HVACR System
PLC Control Panel for HVACR SystemPLC Control Panel for HVACR System
PLC Control Panel for HVACR SystemMuhammad Sarfraz
 
PLC Control Panel for Tobacco Filling Station
PLC Control Panel for Tobacco Filling StationPLC Control Panel for Tobacco Filling Station
PLC Control Panel for Tobacco Filling StationMuhammad Sarfraz
 
MCC PANEL WIRING, GA and BOM Sample
MCC PANEL WIRING, GA and BOM SampleMCC PANEL WIRING, GA and BOM Sample
MCC PANEL WIRING, GA and BOM SampleShashi Kant
 
Industrial electrical symbols
Industrial electrical symbolsIndustrial electrical symbols
Industrial electrical symbolsAyub Abd Rahman
 

Viewers also liked (15)

Visio-Tobacco Box Tilt Unit
Visio-Tobacco Box Tilt UnitVisio-Tobacco Box Tilt Unit
Visio-Tobacco Box Tilt Unit
 
BMS-walls
BMS-wallsBMS-walls
BMS-walls
 
PI&T Conceptual Drawing
PI&T Conceptual DrawingPI&T Conceptual Drawing
PI&T Conceptual Drawing
 
Plishing Plant Drawing
Plishing Plant DrawingPlishing Plant Drawing
Plishing Plant Drawing
 
Visio-Drawing
Visio-DrawingVisio-Drawing
Visio-Drawing
 
ITM_KDF-TPU600
ITM_KDF-TPU600ITM_KDF-TPU600
ITM_KDF-TPU600
 
Visio-BMS
Visio-BMSVisio-BMS
Visio-BMS
 
Efficient Load Management System (ELMS) with ATS_AMF Generator Control Drawing
Efficient Load Management System (ELMS) with ATS_AMF Generator Control DrawingEfficient Load Management System (ELMS) with ATS_AMF Generator Control Drawing
Efficient Load Management System (ELMS) with ATS_AMF Generator Control Drawing
 
schneider gv2 motor circuit breaker
schneider gv2 motor circuit breakerschneider gv2 motor circuit breaker
schneider gv2 motor circuit breaker
 
Atlas Honda Buner
Atlas Honda BunerAtlas Honda Buner
Atlas Honda Buner
 
PLC Control Panel for HVACR System
PLC Control Panel for HVACR SystemPLC Control Panel for HVACR System
PLC Control Panel for HVACR System
 
Electrical
ElectricalElectrical
Electrical
 
PLC Control Panel for Tobacco Filling Station
PLC Control Panel for Tobacco Filling StationPLC Control Panel for Tobacco Filling Station
PLC Control Panel for Tobacco Filling Station
 
MCC PANEL WIRING, GA and BOM Sample
MCC PANEL WIRING, GA and BOM SampleMCC PANEL WIRING, GA and BOM Sample
MCC PANEL WIRING, GA and BOM Sample
 
Industrial electrical symbols
Industrial electrical symbolsIndustrial electrical symbols
Industrial electrical symbols
 

Similar to OLV1 (Short-Circuit Analysis) on Wapda

Iirdem mitigation of voltage collapse at davanagere receiving station
Iirdem mitigation of voltage collapse at davanagere receiving stationIirdem mitigation of voltage collapse at davanagere receiving station
Iirdem mitigation of voltage collapse at davanagere receiving stationIaetsd Iaetsd
 
Simulating connected capacitor bank
Simulating connected capacitor bankSimulating connected capacitor bank
Simulating connected capacitor bankFebrian Sasi Kirana
 
Analysis for underground cable system, lakeside pokhara
Analysis for underground cable system, lakeside pokharaAnalysis for underground cable system, lakeside pokhara
Analysis for underground cable system, lakeside pokharaBishal Rimal
 
Modelling and Simulation of Facts Devices TCSC and SVC for A 11 Bus Power System
Modelling and Simulation of Facts Devices TCSC and SVC for A 11 Bus Power SystemModelling and Simulation of Facts Devices TCSC and SVC for A 11 Bus Power System
Modelling and Simulation of Facts Devices TCSC and SVC for A 11 Bus Power Systemijtsrd
 
Coautor en Revista JCR, International Transactions on Electrical Energy Syste...
Coautor en Revista JCR, International Transactions on Electrical Energy Syste...Coautor en Revista JCR, International Transactions on Electrical Energy Syste...
Coautor en Revista JCR, International Transactions on Electrical Energy Syste...Grupo Termoeléctrico La Pereda-Hunosa
 
Rehabilitation of nablus electrical network by adding a new connection point
Rehabilitation of nablus electrical network by adding a new connection pointRehabilitation of nablus electrical network by adding a new connection point
Rehabilitation of nablus electrical network by adding a new connection pointslmnsvn
 
132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report 132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report imkanhaiyalal
 
Design of 4-stage Marx generator using gas discharge tube
Design of 4-stage Marx generator using gas discharge tubeDesign of 4-stage Marx generator using gas discharge tube
Design of 4-stage Marx generator using gas discharge tubejournalBEEI
 
Cable size available guidelines network design
Cable size available guidelines network designCable size available guidelines network design
Cable size available guidelines network designManikandan Mani
 
System Studies on interaction of HTS cables with power grids
System Studies on interaction of HTS cables with power gridsSystem Studies on interaction of HTS cables with power grids
System Studies on interaction of HTS cables with power gridsDutch Power
 
Load Flow and PV Curve Analysis of a 220kV Substation
Load Flow and PV Curve Analysis of a 220kV SubstationLoad Flow and PV Curve Analysis of a 220kV Substation
Load Flow and PV Curve Analysis of a 220kV SubstationIRJET Journal
 
Role of Flexible AC Transmission in Power System Contingency
Role of Flexible AC Transmission in Power System ContingencyRole of Flexible AC Transmission in Power System Contingency
Role of Flexible AC Transmission in Power System ContingencySayantan Datta
 
Reparation of Inductive Power in Power System by the use of FACTS devices
Reparation of Inductive Power in Power System by the use of FACTS devicesReparation of Inductive Power in Power System by the use of FACTS devices
Reparation of Inductive Power in Power System by the use of FACTS devicesIJMTST Journal
 
Presentation PT.pptx
Presentation PT.pptxPresentation PT.pptx
Presentation PT.pptxKASHIFzaman16
 

Similar to OLV1 (Short-Circuit Analysis) on Wapda (20)

Iirdem mitigation of voltage collapse at davanagere receiving station
Iirdem mitigation of voltage collapse at davanagere receiving stationIirdem mitigation of voltage collapse at davanagere receiving station
Iirdem mitigation of voltage collapse at davanagere receiving station
 
220 66 kv nrs sub report
220 66 kv nrs sub report220 66 kv nrs sub report
220 66 kv nrs sub report
 
Simulating connected capacitor bank
Simulating connected capacitor bankSimulating connected capacitor bank
Simulating connected capacitor bank
 
Load flow analysis of 10 bus loop distribution network excited by a generator...
Load flow analysis of 10 bus loop distribution network excited by a generator...Load flow analysis of 10 bus loop distribution network excited by a generator...
Load flow analysis of 10 bus loop distribution network excited by a generator...
 
Analysis for underground cable system, lakeside pokhara
Analysis for underground cable system, lakeside pokharaAnalysis for underground cable system, lakeside pokhara
Analysis for underground cable system, lakeside pokhara
 
Modelling and Simulation of Facts Devices TCSC and SVC for A 11 Bus Power System
Modelling and Simulation of Facts Devices TCSC and SVC for A 11 Bus Power SystemModelling and Simulation of Facts Devices TCSC and SVC for A 11 Bus Power System
Modelling and Simulation of Facts Devices TCSC and SVC for A 11 Bus Power System
 
Intro to Polyphase Metering - Tom Lawton_5-3-2023.pptx
Intro to Polyphase Metering - Tom Lawton_5-3-2023.pptxIntro to Polyphase Metering - Tom Lawton_5-3-2023.pptx
Intro to Polyphase Metering - Tom Lawton_5-3-2023.pptx
 
Coautor en Revista JCR, International Transactions on Electrical Energy Syste...
Coautor en Revista JCR, International Transactions on Electrical Energy Syste...Coautor en Revista JCR, International Transactions on Electrical Energy Syste...
Coautor en Revista JCR, International Transactions on Electrical Energy Syste...
 
Rehabilitation of nablus electrical network by adding a new connection point
Rehabilitation of nablus electrical network by adding a new connection pointRehabilitation of nablus electrical network by adding a new connection point
Rehabilitation of nablus electrical network by adding a new connection point
 
132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report 132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report
 
Design of 4-stage Marx generator using gas discharge tube
Design of 4-stage Marx generator using gas discharge tubeDesign of 4-stage Marx generator using gas discharge tube
Design of 4-stage Marx generator using gas discharge tube
 
Cable size available guidelines network design
Cable size available guidelines network designCable size available guidelines network design
Cable size available guidelines network design
 
System Studies on interaction of HTS cables with power grids
System Studies on interaction of HTS cables with power gridsSystem Studies on interaction of HTS cables with power grids
System Studies on interaction of HTS cables with power grids
 
CH1.ppt
CH1.pptCH1.ppt
CH1.ppt
 
kamal project ppt
kamal project pptkamal project ppt
kamal project ppt
 
Fault level calculations
Fault level calculationsFault level calculations
Fault level calculations
 
Load Flow and PV Curve Analysis of a 220kV Substation
Load Flow and PV Curve Analysis of a 220kV SubstationLoad Flow and PV Curve Analysis of a 220kV Substation
Load Flow and PV Curve Analysis of a 220kV Substation
 
Role of Flexible AC Transmission in Power System Contingency
Role of Flexible AC Transmission in Power System ContingencyRole of Flexible AC Transmission in Power System Contingency
Role of Flexible AC Transmission in Power System Contingency
 
Reparation of Inductive Power in Power System by the use of FACTS devices
Reparation of Inductive Power in Power System by the use of FACTS devicesReparation of Inductive Power in Power System by the use of FACTS devices
Reparation of Inductive Power in Power System by the use of FACTS devices
 
Presentation PT.pptx
Presentation PT.pptxPresentation PT.pptx
Presentation PT.pptx
 

More from Muhammad Sarfraz (13)

HMI_1
HMI_1HMI_1
HMI_1
 
PLC_1
PLC_1PLC_1
PLC_1
 
CPU
CPUCPU
CPU
 
SIEMENS Certification
SIEMENS CertificationSIEMENS Certification
SIEMENS Certification
 
Application Flow Sizing and Order Code Configuration
Application Flow Sizing and Order Code ConfigurationApplication Flow Sizing and Order Code Configuration
Application Flow Sizing and Order Code Configuration
 
xxxQxxx Quotation Estimate for Electrical Work of Poultry Processing Plant
xxxQxxx Quotation Estimate for Electrical Work of Poultry Processing PlantxxxQxxx Quotation Estimate for Electrical Work of Poultry Processing Plant
xxxQxxx Quotation Estimate for Electrical Work of Poultry Processing Plant
 
Test Bench
Test BenchTest Bench
Test Bench
 
merged
mergedmerged
merged
 
OutE62
OutE62OutE62
OutE62
 
HMI_1
HMI_1HMI_1
HMI_1
 
ActiveReports Document
ActiveReports DocumentActiveReports Document
ActiveReports Document
 
merged
mergedmerged
merged
 
LOGO!Soft Comfort - Condensate Water Tank
LOGO!Soft Comfort  - Condensate Water TankLOGO!Soft Comfort  - Condensate Water Tank
LOGO!Soft Comfort - Condensate Water Tank
 

OLV1 (Short-Circuit Analysis) on Wapda

  • 1. One-Line Diagram - OLV1 (Short-Circuit Analysis) page 1 17:18:21 Jun 18, 2014 Project File: Load Flow ATS # 2 ATS # 1 ATS Admin ATS # 4 Bus16 0.4 kV 48.5 kA Bus36 0.4 kV Bus42 0.4 kV Bus43 0.4 kV Bus40 0.4 kV Bus20 0.4 kV Bus31 0.4 kV Bus290.4 kV Bus47 0.4 kV Bus48 0.4 kV Bus46 0.4 kV Bus37 0.4 kVBus13 0.4 kV Bus17 11 kV Bus14 0.4 kV Bus33 0.4 kV U1 1880 MVAsc 1.76 T1 3000 kVA Cable8 Cable15 Gen1 1200 kW Cable13 Cable11 Cable10 Cable34 Load14 416 kVA Cable36 Cable38 Gen4 720 kW Gen5 1000 Cable42 Cable44 Ca Cable48 Load16 520 kVA Load10 485 kVA Gen2 1200 kW Cable27 Cable19 Cable21 Load12 554 kVA Cable23 Cable25 OpenOpen Open Open Open Open Open Open Load10 485 kVA Load12 554 kVA Load14 416 kVA Load16 520 kVA U1 1880 MVAsc Gen1 1200 kW Gen2 1200 kW Gen4 720 kW Gen5 1000 Cable8 Cable10 Cable11 Cable13 Cable15 Cable19 Cable21 Cable23 Cable25 Cable27 Cable34 Cable36 Cable38 Cable42 Cable44 Ca Cable48 T1 3000 kVA Bus13 0.4 kVBus14 0.4 kV Bus17 11 kV Bus20 0.4 kV Bus290.4 kV Bus31 0.4 kV Bus33 0.4 kV Bus36 0.4 kV Bus37 0.4 kV Bus40 0.4 kV Bus42 0.4 kV Bus43 0.4 kV Bus46 0.4 kV Bus47 0.4 kV Bus48 0.4 kV Bus16 0.4 kV 48.47 48.5 kA 48.471.76 Open Open Open Open Open OpenOpen Open
  • 2. One-Line Diagram - OLV1 (Short-Circuit Analysis) page 2 17:18:21 Jun 18, 2014 Project File: Load Flow 5 0 kW able46 5 0 kW able46