1. Curriculum Vitae
CV
Personal Information:
Name: Mohammed Mustafa Saif Hayl.
Date of Birth: 10-07-1977
Address: Apt (3) Blg. No. (227-A), Block (6), Al-Mansoora-ENMA, Aden.
Marital Status: Married.
Home Phone Number: (02) 344-472.
Cell Phone Number: (00967)711-410-526.
E-mail: m.mustafa.dome@gmail.com.
Nationality: Yemeni.
Objective and Resume Summary:
• A competent professional with overall 10 years’ experience for
projects execution and management, worked extensively on
piping, pipeline, tanks (Construction and confined space repairing
works), structural and relative civil construction works with Oil &
Gas and power plant projects with good knowledge in terms of
performing and supervising of various engineering activities such
as preparation of piping Design Basics, Piping Material
Specification (MTO), verification of Piping & Instrumentation
Diagram (P&ID), Plant and Equipment layout, piping General
Arrangement Drawing & Isometrics, As built drawings, Shop and
field fabrications, site installation, inspection and testing, Good
knowledge with Tanks design and erection according to API
standard including Tanks internal cleaning, Repairing,
sandblasting and painting according to client specification,
• Preparation of work procedures, Planning schedule, project Cost
estimation, punch list & clearing the items, Manpower &
equipment’s lists and piping and pipeline sizing calculation.
• Attending weekly meeting with client Construction/Project
Manager discussing the ongoing, outstanding and upcoming
projects with respect of health and safety environment issues,
• Sharing kick off meeting for SIMOPS, shutdown and any other
critical activities with client with good knowledge of job risk
assessments (JRA),
November, 2016Page1
2. Curriculum Vitae
• Reporting to Deputy of General Manager (DGM) and General
Manager.
Work History and Experience:
(2010-2015, CONSTRUCTION ENGINEER) With DOME
TRADING & CONTRACTING CO. LTD. For the Following
Client’s Projects:
• Installation of FGTU (Fuel Gas Treatment Unit), at Bayoot-CPU
DOVE ENERGY LTD, (2015).
• Fabricate and install flare system spools at B-CPU, DOVE ENERGY
LTD, (2015).
• Construct Bund wall for diesel tank as standard, DOVE ENERGY
LTD, (2014).
• Replace flame arrestor and 14” gas line header from V-110
(K.O.D.) to vertical flare, DOVE ENERGY LTD, (2014).
• Installation Utlility water line from B-CPU separator area to FGTU
plant (PHASE I &II), DOVE ENERGY LTD, (2014).
• Cleaning and internal inspection for V-603 test separator, at
Bayoot-CPU, DOVE ENERGY LTD, (2014).
• Cleaning and internal inspection for V-601 test separator, at
Bayoot-CPU, DOVE ENERGY LTD, (2014).
• Cleaning and internal inspection for V-604 test separator, at
Bayoot-CPU, DOVE ENERGY LTD, (2014).
• Installation of 90 MW rental power station at (Yemen-Aden-
Almansurah), PUBLIC ELECTRICITY CORPORATION YEMEN, (2013-
2014).
November, 2016Page2
3. Curriculum Vitae
• Well head connection Kha 1-44 Oil basement, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2012).
• Well head connection Kha 1-30 Oil basement, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2012).
• Fabrication and welding of Modules (1 and 2) for Kharir KHA 1-19,
TOTAL EXPLORATION & PRODUCTION YEMEN, (2012).
• Internal cleaning of Electrostatic Dehydrator (3K-UZ-2101), TOTAL
EXPLORATION & PRODUCTION YEMEN, (2012).
• JATHMA 1 well pad connection including E& I works, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2012).
• Well connection (WI) Kha 1-77 including 6” flow line up to Tie-In,
TOTAL EXPLORATION & PRODUCTION YEMEN, (2012).
• Well connection (WI) Kha 1-78, TOTAL EXPLORATION &
PRODUCTION YEMEN, (2012).
• Repair of 8” export line at Atuf Site, TOTAL EXPLORATION &
PRODUCTION YEMEN, (2012).
• Relocation of Atuf diesel filling station, TOTAL EXPLORATION &
PRODUCTION YEMEN, (2012).
• Gas Bath Heater (GBH) repairing inside GTU, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2012).
• Well connection (WI) Kha 1-76 including 6” flow line up to Tie-In,
TOTAL EXPLORATION & PRODUCTION YEMEN, (2012).
• Central Filtration Unit (CFU) Media Filters (A, B, C, D &E) internal
cleaning inside CPU, TOTAL EXPLORATION & PRODUCTION
YEMEN, (2012).
• Repair and Refurbishment of damaged duct elements inside BPU,
TOTAL EXPLORATION & PRODUCTION YEMEN, (2012).
November, 2016Page3
4. Curriculum Vitae
• Pipe line between Tie-In Point and Kha1-73 well head, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2012).
• Well head connection Kha 1-73 oil basement, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2012).
• Internal Cleaning of D-2030/ DS-2030 separators and FWKOD
inside CPU during shutdown, TOTAL EXPLORATION &
PRODUCTION YEMEN, (2012).
• Well pad monitoring Project, TOTAL EXPLORATION &
PRODUCTION YEMEN, (2011-2012).
• Fire walls and diesel tank installation TPU, TOTAL EXPLORATION
& PRODUCTION YEMEN, (2011).
• Water bath heater separators cleaning in WADI TARIBA, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2011).
• Water bath heater separators cleaning in WADI TARIBA, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2011).
• Water bath heater separators cleaning in WADI TARIBA, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2011).
• Blower Package with interposing panel installation in BPU, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2011).
• Installation Diesel Filtration unit including the interconnection
piping Project inside Kharir CPU, TOTAL EXPLORATION &
PRODUCTION YEMEN, (2011).
• Well head connection Kha 1-71 oil basement, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2011).
• GTU 2nd
Water Bath Heater De-Bottlenecking Project, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2011).
November, 2016Page4
5. Curriculum Vitae
• Well head connection Kha 1-68 including 6”xS80 x API 5L Gr X60
flow line between Kha 1-68 and IRS1, TOTAL EXPLORATION &
PRODUCTION YEMEN, (2011).
• Installation 20 numbers 30Cum diesel tanks nearby new pipe
yard, TOTAL EXPLORATION & PRODUCTION YEMEN, (2011).
• Installation new temporary 12” by-pass between WEMCO and
Clean water tank T-5100 including pump installation, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2011).
• Kharir Revamping Power Generator, TOTAL EXPLORATION &
PRODUCTION YEMEN, (2011).
• Installation 6”x S40 flow line between S4 and W3manifolds,
TOTAL EXPLORATION & PRODUCTION YEMEN, (2011).
• Modification of Main DG supply inside Kharir CPU, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2011).
• Fabrication and welding water line between S4 and inside BPU
Tie-in, TOTAL EXPLORATION & PRODUCTION YEMEN, (2011).
• Cleaning, Grit sandblasting and painting of WI tanks T-4100, T-
110, T4120 and T-5100 inside Kharir CPU, TOTAL EXPLORATION &
PRODUCTION YEMEN, (2011).
• Well connection (WI) Kha 1-61, TOTAL EXPLORATION &
PRODUCTION YEMEN, (2011).
• DE-BOTTLE NECKING UPTO 70000 bwpd inside Kharir CPU. TOTAL
EXPLORATION & PRODUCTION YEMEN, (2010).
November, 2016Page5
6. Curriculum Vitae
(2008-2010, FIELD PROJECT ENGINEER) Worked With
DOME TRADING & CONTRACTING CO. LTD.For the
Following Client’s Projects:
• Installation of 6” flow line between Kha 1-62 to jump over
connection, TOTAL EXPLORATION & PRODUCTION YEMEN,
(2010).
• Pre-fabrication, welding and installation spools at W3, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2010).
• Installation 6”xS80 flow line between Kha 2-24 and TL, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2010).
• Prefabrication and welding PSV’s headers inside Kharir CPU
including platform access, TOTAL EXPLORATION & PRODUCTION
YEMEN, (2010).
• 6”xS80 flow line between KHA-224 and TL, TOTAL EXPLORATION
& PRODUCTION YEMEN, (2010).
• M200 piping work inside Kharir CPU, TOTAL EXPLORATION &
PRODUCTION YEMEN, (2010).
• Fabrication and welding spools for KHA-159 well head piping,
TOTAL EXPLORATION & PRODUCTION YEMEN, (2010).
• Fabrication and welding spools for KHA-143 well head piping,
TOTAL EXPLORATION & PRODUCTION YEMEN, (2010).
• Fabrication and welding spools for KHA-156 well head piping,
TOTAL EXPLORATION & PRODUCTION YEMEN, (2010).
• Supervision TPU project between Kharir CPU and new TPU, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2009).
• Vessel inspection campaign during Atuf Shutdown, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2009).
November, 2016Page6
7. Curriculum Vitae
• Installation 3km 6” flow line to KHA 136, TOTAL EXPLORATION &
PRODUCTION YEMEN, (2008-2009).
• Design the upgrade NEBRAGA BASEMENT CPU upgrade including
the MTO preparation, Sizing and supervision during the
construction, DNO YEMEN (2008).
• Loading and Offloading unit at SAFER for CALVALY exporting line
using the mobile trucks, (Dome Trading and Contracting Co. Ltd,
2008).
• Installation Pig-launcher and receiver at W3, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2008).
• Vessel inspection campaign during TEPY Kharir Shutdown, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2008).
(2005-2008, MECHANICAL SUPERVISOR) Worked With
DOME TRADING & CONTRACTING CO. LTD. For the
Following Client’s Projects:
• Prefabrication and welding including the installation in place the
degassing boot at Bayoot, DOVE ENERGY LTD, (2008).
• Prefabrication and welding the well head piping at Sharyoof 24,
DOVE ENERGY LTD, (2008).
• Installation 6”, 4” and 2” diesel lines between the diesel topping
plant and Sharyoof wells including the sizing calculation, DOVE
ENERGY LTD, (2008).
• Installation 6” oil line 6 km between CPF manifold and Bayoot,
DOVE ENERGY LTD, (2007).
• Installation Diesel Plant Unit (DPU) at DOVE CPF, DOVE ENERGY
LTD, (2007).
November, 2016Page7
8. Curriculum Vitae
• Upgrade the water line from 10” to 24” lines inside DOVE CPF
between the water Skim and new 10000 BBL tank including the
siphon system, DOVE ENERGY LTD, (2006).
• Fabrication and welding 10”xS40 water line 5km length between
DOVE CPF and Bayoot facility, DOVE ENERGY LTD, (2005).
• Installation the HPS suction and discharge lines at , Sharyoof (07),
DOVE ENERGY LTD,(2005)
(2003-2005, MECHANICAL ENGINEER)For the Following
Owners)
• United Co. for Beverages Bottling Ltd. in A/C system & generators
services. ( 12/2004 - 10/2005)
• Red Bricks Co. Ltd. For 7 months as mechanical engineer in both
power plant and line of production. (6/2003 - 12/2003)
Education and Training Courses:
November, 2016Page8
9. Curriculum Vitae
• 1997-2002 Faculty of Engineering Aden.
(B.Sc in Mechanical Engineering with VERY GOOG GRADE),
Thermal section
• 1996-1997 Higher Technical Institute, Aden.
(Higher Technical Diploma with EXCELENT GRADE)
In Refrigeration & A/C Engineering
• 1992-1996 Higher Technical Institute, Aden.
(Technical Secondary with EXCELENT GRADE)
In Refrigeration & A/C Engineering
• IOSH Safety requirement Course in Sana’a.
• Piping design course in Sana’a.
• Piping design course in MALAYSIA.
• Management Course in MALAYSIA.
• Training courses with Glomacks for Mechanical integrity, for
petroleum field and refineries.
• Training courses with Al-Esayi Beverage Co.Ltd.
• Training courses with Wartsila 4X200 Engine at Aden
Container Terminal power plant.
• Training courses with Aden Refinery Co.
Computer Skill:
• Good knowledge with Microsoft Excel, Microsoft Word, Microsoft
project and AutoCAD.
November, 2016Page9
10. Curriculum Vitae
Language:
• Arabic (Mother tongue).
• English (Good writing and spoken).
International Codes and Standards:
• ASME B31.3 for process piping,
• ASME B31.4 for liquid pipeline,
• ASME B31.8 for Gas transmission and distribution piping system.
• ASME B16.25 Butt welding ends,
• ASME B16.5 Pipe Flanges,
• ASME B16.9 WROUGHT steel butt weld fittings.
• ASME B16.10 Face to face dimension values,
• ASME B16.11 Forged fittings,
• ASME B16.25 Butt welding end,
• ASME B16.34 Valves Flanged, threaded and welding end,
• ASME IIC-SFA-5.1,
• ASME IIC –SFA- 5.4,
• ASME IIC-SFA-5.5,
• API 650 for welding storage tank, (Atmospheric tank),
• API 1104 for welding pipeline and related facilities,
• API 653, For Tank inspection and repair.
• Draft piping design,
• Rule Thump of pipeline design,
• GS-EP-COR-350, External protection,
• GS-EP-COR-352, Internal protection,
• GS-EP-PVV-111, Piping design specification,
• GS-EP-PVV-112, Piping design specification,
• GS-EP-PVV-171, Steel piping fabrication,
• GS-EP-SAF-021, Layout,
• Pipe Blue book.
November, 2016Page10