SlideShare a Scribd company logo
1 of 10
Curriculum Vitae
CV
Personal Information:
Name: Mohammed Mustafa Saif Hayl.
Date of Birth: 10-07-1977
Address: Apt (3) Blg. No. (227-A), Block (6), Al-Mansoora-ENMA, Aden.
Marital Status: Married.
Home Phone Number: (02) 344-472.
Cell Phone Number: (00967)711-410-526.
E-mail: m.mustafa.dome@gmail.com.
Nationality: Yemeni.
Objective and Resume Summary:
• A competent professional with overall 10 years’ experience for
projects execution and management, worked extensively on
piping, pipeline, tanks (Construction and confined space repairing
works), structural and relative civil construction works with Oil &
Gas and power plant projects with good knowledge in terms of
performing and supervising of various engineering activities such
as preparation of piping Design Basics, Piping Material
Specification (MTO), verification of Piping & Instrumentation
Diagram (P&ID), Plant and Equipment layout, piping General
Arrangement Drawing & Isometrics, As built drawings, Shop and
field fabrications, site installation, inspection and testing, Good
knowledge with Tanks design and erection according to API
standard including Tanks internal cleaning, Repairing,
sandblasting and painting according to client specification,
• Preparation of work procedures, Planning schedule, project Cost
estimation, punch list & clearing the items, Manpower &
equipment’s lists and piping and pipeline sizing calculation.
• Attending weekly meeting with client Construction/Project
Manager discussing the ongoing, outstanding and upcoming
projects with respect of health and safety environment issues,
• Sharing kick off meeting for SIMOPS, shutdown and any other
critical activities with client with good knowledge of job risk
assessments (JRA),
November, 2016Page1
Curriculum Vitae
• Reporting to Deputy of General Manager (DGM) and General
Manager.
Work History and Experience:
(2010-2015, CONSTRUCTION ENGINEER) With DOME
TRADING & CONTRACTING CO. LTD. For the Following
Client’s Projects:
• Installation of FGTU (Fuel Gas Treatment Unit), at Bayoot-CPU
DOVE ENERGY LTD, (2015).
• Fabricate and install flare system spools at B-CPU, DOVE ENERGY
LTD, (2015).
• Construct Bund wall for diesel tank as standard, DOVE ENERGY
LTD, (2014).
• Replace flame arrestor and 14” gas line header from V-110
(K.O.D.) to vertical flare, DOVE ENERGY LTD, (2014).
• Installation Utlility water line from B-CPU separator area to FGTU
plant (PHASE I &II), DOVE ENERGY LTD, (2014).
• Cleaning and internal inspection for V-603 test separator, at
Bayoot-CPU, DOVE ENERGY LTD, (2014).
• Cleaning and internal inspection for V-601 test separator, at
Bayoot-CPU, DOVE ENERGY LTD, (2014).
• Cleaning and internal inspection for V-604 test separator, at
Bayoot-CPU, DOVE ENERGY LTD, (2014).
• Installation of 90 MW rental power station at (Yemen-Aden-
Almansurah), PUBLIC ELECTRICITY CORPORATION YEMEN, (2013-
2014).
November, 2016Page2
Curriculum Vitae
• Well head connection Kha 1-44 Oil basement, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2012).
• Well head connection Kha 1-30 Oil basement, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2012).
• Fabrication and welding of Modules (1 and 2) for Kharir KHA 1-19,
TOTAL EXPLORATION & PRODUCTION YEMEN, (2012).
• Internal cleaning of Electrostatic Dehydrator (3K-UZ-2101), TOTAL
EXPLORATION & PRODUCTION YEMEN, (2012).
• JATHMA 1 well pad connection including E& I works, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2012).
• Well connection (WI) Kha 1-77 including 6” flow line up to Tie-In,
TOTAL EXPLORATION & PRODUCTION YEMEN, (2012).
• Well connection (WI) Kha 1-78, TOTAL EXPLORATION &
PRODUCTION YEMEN, (2012).
• Repair of 8” export line at Atuf Site, TOTAL EXPLORATION &
PRODUCTION YEMEN, (2012).
• Relocation of Atuf diesel filling station, TOTAL EXPLORATION &
PRODUCTION YEMEN, (2012).
• Gas Bath Heater (GBH) repairing inside GTU, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2012).
• Well connection (WI) Kha 1-76 including 6” flow line up to Tie-In,
TOTAL EXPLORATION & PRODUCTION YEMEN, (2012).
• Central Filtration Unit (CFU) Media Filters (A, B, C, D &E) internal
cleaning inside CPU, TOTAL EXPLORATION & PRODUCTION
YEMEN, (2012).
• Repair and Refurbishment of damaged duct elements inside BPU,
TOTAL EXPLORATION & PRODUCTION YEMEN, (2012).
November, 2016Page3
Curriculum Vitae
• Pipe line between Tie-In Point and Kha1-73 well head, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2012).
• Well head connection Kha 1-73 oil basement, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2012).
• Internal Cleaning of D-2030/ DS-2030 separators and FWKOD
inside CPU during shutdown, TOTAL EXPLORATION &
PRODUCTION YEMEN, (2012).
• Well pad monitoring Project, TOTAL EXPLORATION &
PRODUCTION YEMEN, (2011-2012).
• Fire walls and diesel tank installation TPU, TOTAL EXPLORATION
& PRODUCTION YEMEN, (2011).
• Water bath heater separators cleaning in WADI TARIBA, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2011).
• Water bath heater separators cleaning in WADI TARIBA, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2011).
• Water bath heater separators cleaning in WADI TARIBA, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2011).
• Blower Package with interposing panel installation in BPU, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2011).
• Installation Diesel Filtration unit including the interconnection
piping Project inside Kharir CPU, TOTAL EXPLORATION &
PRODUCTION YEMEN, (2011).
• Well head connection Kha 1-71 oil basement, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2011).
• GTU 2nd
Water Bath Heater De-Bottlenecking Project, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2011).
November, 2016Page4
Curriculum Vitae
• Well head connection Kha 1-68 including 6”xS80 x API 5L Gr X60
flow line between Kha 1-68 and IRS1, TOTAL EXPLORATION &
PRODUCTION YEMEN, (2011).
• Installation 20 numbers 30Cum diesel tanks nearby new pipe
yard, TOTAL EXPLORATION & PRODUCTION YEMEN, (2011).
• Installation new temporary 12” by-pass between WEMCO and
Clean water tank T-5100 including pump installation, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2011).
• Kharir Revamping Power Generator, TOTAL EXPLORATION &
PRODUCTION YEMEN, (2011).
• Installation 6”x S40 flow line between S4 and W3manifolds,
TOTAL EXPLORATION & PRODUCTION YEMEN, (2011).
• Modification of Main DG supply inside Kharir CPU, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2011).
• Fabrication and welding water line between S4 and inside BPU
Tie-in, TOTAL EXPLORATION & PRODUCTION YEMEN, (2011).
• Cleaning, Grit sandblasting and painting of WI tanks T-4100, T-
110, T4120 and T-5100 inside Kharir CPU, TOTAL EXPLORATION &
PRODUCTION YEMEN, (2011).
• Well connection (WI) Kha 1-61, TOTAL EXPLORATION &
PRODUCTION YEMEN, (2011).
• DE-BOTTLE NECKING UPTO 70000 bwpd inside Kharir CPU. TOTAL
EXPLORATION & PRODUCTION YEMEN, (2010).
November, 2016Page5
Curriculum Vitae
(2008-2010, FIELD PROJECT ENGINEER) Worked With
DOME TRADING & CONTRACTING CO. LTD.For the
Following Client’s Projects:
• Installation of 6” flow line between Kha 1-62 to jump over
connection, TOTAL EXPLORATION & PRODUCTION YEMEN,
(2010).
• Pre-fabrication, welding and installation spools at W3, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2010).
• Installation 6”xS80 flow line between Kha 2-24 and TL, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2010).
• Prefabrication and welding PSV’s headers inside Kharir CPU
including platform access, TOTAL EXPLORATION & PRODUCTION
YEMEN, (2010).
• 6”xS80 flow line between KHA-224 and TL, TOTAL EXPLORATION
& PRODUCTION YEMEN, (2010).
• M200 piping work inside Kharir CPU, TOTAL EXPLORATION &
PRODUCTION YEMEN, (2010).
• Fabrication and welding spools for KHA-159 well head piping,
TOTAL EXPLORATION & PRODUCTION YEMEN, (2010).
• Fabrication and welding spools for KHA-143 well head piping,
TOTAL EXPLORATION & PRODUCTION YEMEN, (2010).
• Fabrication and welding spools for KHA-156 well head piping,
TOTAL EXPLORATION & PRODUCTION YEMEN, (2010).
• Supervision TPU project between Kharir CPU and new TPU, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2009).
• Vessel inspection campaign during Atuf Shutdown, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2009).
November, 2016Page6
Curriculum Vitae
• Installation 3km 6” flow line to KHA 136, TOTAL EXPLORATION &
PRODUCTION YEMEN, (2008-2009).
• Design the upgrade NEBRAGA BASEMENT CPU upgrade including
the MTO preparation, Sizing and supervision during the
construction, DNO YEMEN (2008).
• Loading and Offloading unit at SAFER for CALVALY exporting line
using the mobile trucks, (Dome Trading and Contracting Co. Ltd,
2008).
• Installation Pig-launcher and receiver at W3, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2008).
• Vessel inspection campaign during TEPY Kharir Shutdown, TOTAL
EXPLORATION & PRODUCTION YEMEN, (2008).
(2005-2008, MECHANICAL SUPERVISOR) Worked With
DOME TRADING & CONTRACTING CO. LTD. For the
Following Client’s Projects:
• Prefabrication and welding including the installation in place the
degassing boot at Bayoot, DOVE ENERGY LTD, (2008).
• Prefabrication and welding the well head piping at Sharyoof 24,
DOVE ENERGY LTD, (2008).
• Installation 6”, 4” and 2” diesel lines between the diesel topping
plant and Sharyoof wells including the sizing calculation, DOVE
ENERGY LTD, (2008).
• Installation 6” oil line 6 km between CPF manifold and Bayoot,
DOVE ENERGY LTD, (2007).
• Installation Diesel Plant Unit (DPU) at DOVE CPF, DOVE ENERGY
LTD, (2007).
November, 2016Page7
Curriculum Vitae
• Upgrade the water line from 10” to 24” lines inside DOVE CPF
between the water Skim and new 10000 BBL tank including the
siphon system, DOVE ENERGY LTD, (2006).
• Fabrication and welding 10”xS40 water line 5km length between
DOVE CPF and Bayoot facility, DOVE ENERGY LTD, (2005).
• Installation the HPS suction and discharge lines at , Sharyoof (07),
DOVE ENERGY LTD,(2005)
(2003-2005, MECHANICAL ENGINEER)For the Following
Owners)
• United Co. for Beverages Bottling Ltd. in A/C system & generators
services. ( 12/2004 - 10/2005)
• Red Bricks Co. Ltd. For 7 months as mechanical engineer in both
power plant and line of production. (6/2003 - 12/2003)
Education and Training Courses:
November, 2016Page8
Curriculum Vitae
• 1997-2002 Faculty of Engineering Aden.
(B.Sc in Mechanical Engineering with VERY GOOG GRADE),
Thermal section
• 1996-1997 Higher Technical Institute, Aden.
(Higher Technical Diploma with EXCELENT GRADE)
In Refrigeration & A/C Engineering
• 1992-1996 Higher Technical Institute, Aden.
(Technical Secondary with EXCELENT GRADE)
In Refrigeration & A/C Engineering
• IOSH Safety requirement Course in Sana’a.
• Piping design course in Sana’a.
• Piping design course in MALAYSIA.
• Management Course in MALAYSIA.
• Training courses with Glomacks for Mechanical integrity, for
petroleum field and refineries.
• Training courses with Al-Esayi Beverage Co.Ltd.
• Training courses with Wartsila 4X200 Engine at Aden
Container Terminal power plant.
• Training courses with Aden Refinery Co.
Computer Skill:
• Good knowledge with Microsoft Excel, Microsoft Word, Microsoft
project and AutoCAD.
November, 2016Page9
Curriculum Vitae
Language:
• Arabic (Mother tongue).
• English (Good writing and spoken).
International Codes and Standards:
• ASME B31.3 for process piping,
• ASME B31.4 for liquid pipeline,
• ASME B31.8 for Gas transmission and distribution piping system.
• ASME B16.25 Butt welding ends,
• ASME B16.5 Pipe Flanges,
• ASME B16.9 WROUGHT steel butt weld fittings.
• ASME B16.10 Face to face dimension values,
• ASME B16.11 Forged fittings,
• ASME B16.25 Butt welding end,
• ASME B16.34 Valves Flanged, threaded and welding end,
• ASME IIC-SFA-5.1,
• ASME IIC –SFA- 5.4,
• ASME IIC-SFA-5.5,
• API 650 for welding storage tank, (Atmospheric tank),
• API 1104 for welding pipeline and related facilities,
• API 653, For Tank inspection and repair.
• Draft piping design,
• Rule Thump of pipeline design,
• GS-EP-COR-350, External protection,
• GS-EP-COR-352, Internal protection,
• GS-EP-PVV-111, Piping design specification,
• GS-EP-PVV-112, Piping design specification,
• GS-EP-PVV-171, Steel piping fabrication,
• GS-EP-SAF-021, Layout,
• Pipe Blue book.
November, 2016Page10

More Related Content

What's hot (20)

Richard Martinez #1 PDF
Richard Martinez #1 PDFRichard Martinez #1 PDF
Richard Martinez #1 PDF
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
4 Projects
4 Projects4 Projects
4 Projects
 
Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015
 
Mohamed Behiry CV
Mohamed Behiry CVMohamed Behiry CV
Mohamed Behiry CV
 
DVR CV NEW12
DVR CV NEW12DVR CV NEW12
DVR CV NEW12
 
Bert Savoie Resume
Bert Savoie ResumeBert Savoie Resume
Bert Savoie Resume
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDF
 
Kenyon Portfolio 2016 - rev2sm
Kenyon Portfolio 2016 - rev2smKenyon Portfolio 2016 - rev2sm
Kenyon Portfolio 2016 - rev2sm
 
Resume 1
Resume 1 Resume 1
Resume 1
 
larry_dosher opengr resume
larry_dosher opengr resumelarry_dosher opengr resume
larry_dosher opengr resume
 
T3 EUROPEAN PRESENTATION
T3 EUROPEAN PRESENTATIONT3 EUROPEAN PRESENTATION
T3 EUROPEAN PRESENTATION
 
CV - Philip Turner [Photo] - Nov 2015
CV - Philip Turner [Photo] - Nov 2015CV - Philip Turner [Photo] - Nov 2015
CV - Philip Turner [Photo] - Nov 2015
 
A Sattar CV-II
A Sattar CV-IIA Sattar CV-II
A Sattar CV-II
 
10 08 Investor Presentation
10 08 Investor Presentation10 08 Investor Presentation
10 08 Investor Presentation
 
R_SealsResume2015
R_SealsResume2015R_SealsResume2015
R_SealsResume2015
 
Bert Savoie Resume
Bert Savoie ResumeBert Savoie Resume
Bert Savoie Resume
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
MCS Presentation
MCS PresentationMCS Presentation
MCS Presentation
 
PRESENT
PRESENTPRESENT
PRESENT
 

Viewers also liked

Viewers also liked (20)

Clasificación liga centro 12-12-15
Clasificación liga centro 12-12-15Clasificación liga centro 12-12-15
Clasificación liga centro 12-12-15
 
Curso 42
Curso 42Curso 42
Curso 42
 
Katalog 2015 50plus Erlebnissprachreisen
Katalog 2015 50plus ErlebnissprachreisenKatalog 2015 50plus Erlebnissprachreisen
Katalog 2015 50plus Erlebnissprachreisen
 
Programm Connect China 2013
Programm Connect China 2013Programm Connect China 2013
Programm Connect China 2013
 
Resumo nr´s
Resumo nr´sResumo nr´s
Resumo nr´s
 
Certificate in Management / Hochschule Bremen
Certificate in Management / Hochschule BremenCertificate in Management / Hochschule Bremen
Certificate in Management / Hochschule Bremen
 
Exciting job opportunity: Prodev Group Holdings
Exciting job opportunity: Prodev Group HoldingsExciting job opportunity: Prodev Group Holdings
Exciting job opportunity: Prodev Group Holdings
 
Mamae camelo
Mamae cameloMamae camelo
Mamae camelo
 
Online Educational Solutions
Online Educational SolutionsOnline Educational Solutions
Online Educational Solutions
 
Politische Kommunikation mit Apps
Politische Kommunikation mit AppsPolitische Kommunikation mit Apps
Politische Kommunikation mit Apps
 
10 Most Expensive Project In The World
10 Most Expensive Project In The World10 Most Expensive Project In The World
10 Most Expensive Project In The World
 
Rome et son empire
Rome et son empireRome et son empire
Rome et son empire
 
Aula c3
Aula c3Aula c3
Aula c3
 
Html1
Html1Html1
Html1
 
PHP
PHPPHP
PHP
 
Resume 1 - Copy
Resume 1 - CopyResume 1 - Copy
Resume 1 - Copy
 
Oclusion Total Crónica Coronaria: Abordaje Actual
Oclusion Total Crónica Coronaria: Abordaje ActualOclusion Total Crónica Coronaria: Abordaje Actual
Oclusion Total Crónica Coronaria: Abordaje Actual
 
Seja girassol
Seja girassolSeja girassol
Seja girassol
 
Vortrag Georg-Simon-Ohm Hochschule:
Vortrag Georg-Simon-Ohm Hochschule: Vortrag Georg-Simon-Ohm Hochschule:
Vortrag Georg-Simon-Ohm Hochschule:
 
Ch03 Ch06 Des And Others
Ch03 Ch06 Des And OthersCh03 Ch06 Des And Others
Ch03 Ch06 Des And Others
 

Similar to Mohd Mustafa CV

Similar to Mohd Mustafa CV (20)

Viswanath_AMD
Viswanath_AMDViswanath_AMD
Viswanath_AMD
 
Tushar resume
Tushar resumeTushar resume
Tushar resume
 
Mechanical cv
Mechanical cvMechanical cv
Mechanical cv
 
Satyavir-Resume_01
Satyavir-Resume_01Satyavir-Resume_01
Satyavir-Resume_01
 
Roy Shilling
Roy ShillingRoy Shilling
Roy Shilling
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project Engineer
 
Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux - CV2015 English Linkedin no page 6Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux - CV2015 English Linkedin no page 6
 
HARIDI CV2015
HARIDI CV2015HARIDI CV2015
HARIDI CV2015
 
NAIYAR CV 1st FEB 2015
NAIYAR CV 1st  FEB 2015NAIYAR CV 1st  FEB 2015
NAIYAR CV 1st FEB 2015
 
A Sattar CV-II
A Sattar CV-IIA Sattar CV-II
A Sattar CV-II
 
OKEREKE CHISOM CV
OKEREKE CHISOM CVOKEREKE CHISOM CV
OKEREKE CHISOM CV
 
Hisham Resume ( CV )
Hisham Resume ( CV )Hisham Resume ( CV )
Hisham Resume ( CV )
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
 
Hisham.cv
Hisham.cvHisham.cv
Hisham.cv
 
Ali
AliAli
Ali
 
Amjad survey inspector
Amjad survey inspectorAmjad survey inspector
Amjad survey inspector
 
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
 
Cv english
Cv englishCv english
Cv english
 
Siddharth_resume_Engg.
Siddharth_resume_Engg.Siddharth_resume_Engg.
Siddharth_resume_Engg.
 
Patrick B Wiseman work experience
Patrick B Wiseman work experiencePatrick B Wiseman work experience
Patrick B Wiseman work experience
 

Mohd Mustafa CV

  • 1. Curriculum Vitae CV Personal Information: Name: Mohammed Mustafa Saif Hayl. Date of Birth: 10-07-1977 Address: Apt (3) Blg. No. (227-A), Block (6), Al-Mansoora-ENMA, Aden. Marital Status: Married. Home Phone Number: (02) 344-472. Cell Phone Number: (00967)711-410-526. E-mail: m.mustafa.dome@gmail.com. Nationality: Yemeni. Objective and Resume Summary: • A competent professional with overall 10 years’ experience for projects execution and management, worked extensively on piping, pipeline, tanks (Construction and confined space repairing works), structural and relative civil construction works with Oil & Gas and power plant projects with good knowledge in terms of performing and supervising of various engineering activities such as preparation of piping Design Basics, Piping Material Specification (MTO), verification of Piping & Instrumentation Diagram (P&ID), Plant and Equipment layout, piping General Arrangement Drawing & Isometrics, As built drawings, Shop and field fabrications, site installation, inspection and testing, Good knowledge with Tanks design and erection according to API standard including Tanks internal cleaning, Repairing, sandblasting and painting according to client specification, • Preparation of work procedures, Planning schedule, project Cost estimation, punch list & clearing the items, Manpower & equipment’s lists and piping and pipeline sizing calculation. • Attending weekly meeting with client Construction/Project Manager discussing the ongoing, outstanding and upcoming projects with respect of health and safety environment issues, • Sharing kick off meeting for SIMOPS, shutdown and any other critical activities with client with good knowledge of job risk assessments (JRA), November, 2016Page1
  • 2. Curriculum Vitae • Reporting to Deputy of General Manager (DGM) and General Manager. Work History and Experience: (2010-2015, CONSTRUCTION ENGINEER) With DOME TRADING & CONTRACTING CO. LTD. For the Following Client’s Projects: • Installation of FGTU (Fuel Gas Treatment Unit), at Bayoot-CPU DOVE ENERGY LTD, (2015). • Fabricate and install flare system spools at B-CPU, DOVE ENERGY LTD, (2015). • Construct Bund wall for diesel tank as standard, DOVE ENERGY LTD, (2014). • Replace flame arrestor and 14” gas line header from V-110 (K.O.D.) to vertical flare, DOVE ENERGY LTD, (2014). • Installation Utlility water line from B-CPU separator area to FGTU plant (PHASE I &II), DOVE ENERGY LTD, (2014). • Cleaning and internal inspection for V-603 test separator, at Bayoot-CPU, DOVE ENERGY LTD, (2014). • Cleaning and internal inspection for V-601 test separator, at Bayoot-CPU, DOVE ENERGY LTD, (2014). • Cleaning and internal inspection for V-604 test separator, at Bayoot-CPU, DOVE ENERGY LTD, (2014). • Installation of 90 MW rental power station at (Yemen-Aden- Almansurah), PUBLIC ELECTRICITY CORPORATION YEMEN, (2013- 2014). November, 2016Page2
  • 3. Curriculum Vitae • Well head connection Kha 1-44 Oil basement, TOTAL EXPLORATION & PRODUCTION YEMEN, (2012). • Well head connection Kha 1-30 Oil basement, TOTAL EXPLORATION & PRODUCTION YEMEN, (2012). • Fabrication and welding of Modules (1 and 2) for Kharir KHA 1-19, TOTAL EXPLORATION & PRODUCTION YEMEN, (2012). • Internal cleaning of Electrostatic Dehydrator (3K-UZ-2101), TOTAL EXPLORATION & PRODUCTION YEMEN, (2012). • JATHMA 1 well pad connection including E& I works, TOTAL EXPLORATION & PRODUCTION YEMEN, (2012). • Well connection (WI) Kha 1-77 including 6” flow line up to Tie-In, TOTAL EXPLORATION & PRODUCTION YEMEN, (2012). • Well connection (WI) Kha 1-78, TOTAL EXPLORATION & PRODUCTION YEMEN, (2012). • Repair of 8” export line at Atuf Site, TOTAL EXPLORATION & PRODUCTION YEMEN, (2012). • Relocation of Atuf diesel filling station, TOTAL EXPLORATION & PRODUCTION YEMEN, (2012). • Gas Bath Heater (GBH) repairing inside GTU, TOTAL EXPLORATION & PRODUCTION YEMEN, (2012). • Well connection (WI) Kha 1-76 including 6” flow line up to Tie-In, TOTAL EXPLORATION & PRODUCTION YEMEN, (2012). • Central Filtration Unit (CFU) Media Filters (A, B, C, D &E) internal cleaning inside CPU, TOTAL EXPLORATION & PRODUCTION YEMEN, (2012). • Repair and Refurbishment of damaged duct elements inside BPU, TOTAL EXPLORATION & PRODUCTION YEMEN, (2012). November, 2016Page3
  • 4. Curriculum Vitae • Pipe line between Tie-In Point and Kha1-73 well head, TOTAL EXPLORATION & PRODUCTION YEMEN, (2012). • Well head connection Kha 1-73 oil basement, TOTAL EXPLORATION & PRODUCTION YEMEN, (2012). • Internal Cleaning of D-2030/ DS-2030 separators and FWKOD inside CPU during shutdown, TOTAL EXPLORATION & PRODUCTION YEMEN, (2012). • Well pad monitoring Project, TOTAL EXPLORATION & PRODUCTION YEMEN, (2011-2012). • Fire walls and diesel tank installation TPU, TOTAL EXPLORATION & PRODUCTION YEMEN, (2011). • Water bath heater separators cleaning in WADI TARIBA, TOTAL EXPLORATION & PRODUCTION YEMEN, (2011). • Water bath heater separators cleaning in WADI TARIBA, TOTAL EXPLORATION & PRODUCTION YEMEN, (2011). • Water bath heater separators cleaning in WADI TARIBA, TOTAL EXPLORATION & PRODUCTION YEMEN, (2011). • Blower Package with interposing panel installation in BPU, TOTAL EXPLORATION & PRODUCTION YEMEN, (2011). • Installation Diesel Filtration unit including the interconnection piping Project inside Kharir CPU, TOTAL EXPLORATION & PRODUCTION YEMEN, (2011). • Well head connection Kha 1-71 oil basement, TOTAL EXPLORATION & PRODUCTION YEMEN, (2011). • GTU 2nd Water Bath Heater De-Bottlenecking Project, TOTAL EXPLORATION & PRODUCTION YEMEN, (2011). November, 2016Page4
  • 5. Curriculum Vitae • Well head connection Kha 1-68 including 6”xS80 x API 5L Gr X60 flow line between Kha 1-68 and IRS1, TOTAL EXPLORATION & PRODUCTION YEMEN, (2011). • Installation 20 numbers 30Cum diesel tanks nearby new pipe yard, TOTAL EXPLORATION & PRODUCTION YEMEN, (2011). • Installation new temporary 12” by-pass between WEMCO and Clean water tank T-5100 including pump installation, TOTAL EXPLORATION & PRODUCTION YEMEN, (2011). • Kharir Revamping Power Generator, TOTAL EXPLORATION & PRODUCTION YEMEN, (2011). • Installation 6”x S40 flow line between S4 and W3manifolds, TOTAL EXPLORATION & PRODUCTION YEMEN, (2011). • Modification of Main DG supply inside Kharir CPU, TOTAL EXPLORATION & PRODUCTION YEMEN, (2011). • Fabrication and welding water line between S4 and inside BPU Tie-in, TOTAL EXPLORATION & PRODUCTION YEMEN, (2011). • Cleaning, Grit sandblasting and painting of WI tanks T-4100, T- 110, T4120 and T-5100 inside Kharir CPU, TOTAL EXPLORATION & PRODUCTION YEMEN, (2011). • Well connection (WI) Kha 1-61, TOTAL EXPLORATION & PRODUCTION YEMEN, (2011). • DE-BOTTLE NECKING UPTO 70000 bwpd inside Kharir CPU. TOTAL EXPLORATION & PRODUCTION YEMEN, (2010). November, 2016Page5
  • 6. Curriculum Vitae (2008-2010, FIELD PROJECT ENGINEER) Worked With DOME TRADING & CONTRACTING CO. LTD.For the Following Client’s Projects: • Installation of 6” flow line between Kha 1-62 to jump over connection, TOTAL EXPLORATION & PRODUCTION YEMEN, (2010). • Pre-fabrication, welding and installation spools at W3, TOTAL EXPLORATION & PRODUCTION YEMEN, (2010). • Installation 6”xS80 flow line between Kha 2-24 and TL, TOTAL EXPLORATION & PRODUCTION YEMEN, (2010). • Prefabrication and welding PSV’s headers inside Kharir CPU including platform access, TOTAL EXPLORATION & PRODUCTION YEMEN, (2010). • 6”xS80 flow line between KHA-224 and TL, TOTAL EXPLORATION & PRODUCTION YEMEN, (2010). • M200 piping work inside Kharir CPU, TOTAL EXPLORATION & PRODUCTION YEMEN, (2010). • Fabrication and welding spools for KHA-159 well head piping, TOTAL EXPLORATION & PRODUCTION YEMEN, (2010). • Fabrication and welding spools for KHA-143 well head piping, TOTAL EXPLORATION & PRODUCTION YEMEN, (2010). • Fabrication and welding spools for KHA-156 well head piping, TOTAL EXPLORATION & PRODUCTION YEMEN, (2010). • Supervision TPU project between Kharir CPU and new TPU, TOTAL EXPLORATION & PRODUCTION YEMEN, (2009). • Vessel inspection campaign during Atuf Shutdown, TOTAL EXPLORATION & PRODUCTION YEMEN, (2009). November, 2016Page6
  • 7. Curriculum Vitae • Installation 3km 6” flow line to KHA 136, TOTAL EXPLORATION & PRODUCTION YEMEN, (2008-2009). • Design the upgrade NEBRAGA BASEMENT CPU upgrade including the MTO preparation, Sizing and supervision during the construction, DNO YEMEN (2008). • Loading and Offloading unit at SAFER for CALVALY exporting line using the mobile trucks, (Dome Trading and Contracting Co. Ltd, 2008). • Installation Pig-launcher and receiver at W3, TOTAL EXPLORATION & PRODUCTION YEMEN, (2008). • Vessel inspection campaign during TEPY Kharir Shutdown, TOTAL EXPLORATION & PRODUCTION YEMEN, (2008). (2005-2008, MECHANICAL SUPERVISOR) Worked With DOME TRADING & CONTRACTING CO. LTD. For the Following Client’s Projects: • Prefabrication and welding including the installation in place the degassing boot at Bayoot, DOVE ENERGY LTD, (2008). • Prefabrication and welding the well head piping at Sharyoof 24, DOVE ENERGY LTD, (2008). • Installation 6”, 4” and 2” diesel lines between the diesel topping plant and Sharyoof wells including the sizing calculation, DOVE ENERGY LTD, (2008). • Installation 6” oil line 6 km between CPF manifold and Bayoot, DOVE ENERGY LTD, (2007). • Installation Diesel Plant Unit (DPU) at DOVE CPF, DOVE ENERGY LTD, (2007). November, 2016Page7
  • 8. Curriculum Vitae • Upgrade the water line from 10” to 24” lines inside DOVE CPF between the water Skim and new 10000 BBL tank including the siphon system, DOVE ENERGY LTD, (2006). • Fabrication and welding 10”xS40 water line 5km length between DOVE CPF and Bayoot facility, DOVE ENERGY LTD, (2005). • Installation the HPS suction and discharge lines at , Sharyoof (07), DOVE ENERGY LTD,(2005) (2003-2005, MECHANICAL ENGINEER)For the Following Owners) • United Co. for Beverages Bottling Ltd. in A/C system & generators services. ( 12/2004 - 10/2005) • Red Bricks Co. Ltd. For 7 months as mechanical engineer in both power plant and line of production. (6/2003 - 12/2003) Education and Training Courses: November, 2016Page8
  • 9. Curriculum Vitae • 1997-2002 Faculty of Engineering Aden. (B.Sc in Mechanical Engineering with VERY GOOG GRADE), Thermal section • 1996-1997 Higher Technical Institute, Aden. (Higher Technical Diploma with EXCELENT GRADE) In Refrigeration & A/C Engineering • 1992-1996 Higher Technical Institute, Aden. (Technical Secondary with EXCELENT GRADE) In Refrigeration & A/C Engineering • IOSH Safety requirement Course in Sana’a. • Piping design course in Sana’a. • Piping design course in MALAYSIA. • Management Course in MALAYSIA. • Training courses with Glomacks for Mechanical integrity, for petroleum field and refineries. • Training courses with Al-Esayi Beverage Co.Ltd. • Training courses with Wartsila 4X200 Engine at Aden Container Terminal power plant. • Training courses with Aden Refinery Co. Computer Skill: • Good knowledge with Microsoft Excel, Microsoft Word, Microsoft project and AutoCAD. November, 2016Page9
  • 10. Curriculum Vitae Language: • Arabic (Mother tongue). • English (Good writing and spoken). International Codes and Standards: • ASME B31.3 for process piping, • ASME B31.4 for liquid pipeline, • ASME B31.8 for Gas transmission and distribution piping system. • ASME B16.25 Butt welding ends, • ASME B16.5 Pipe Flanges, • ASME B16.9 WROUGHT steel butt weld fittings. • ASME B16.10 Face to face dimension values, • ASME B16.11 Forged fittings, • ASME B16.25 Butt welding end, • ASME B16.34 Valves Flanged, threaded and welding end, • ASME IIC-SFA-5.1, • ASME IIC –SFA- 5.4, • ASME IIC-SFA-5.5, • API 650 for welding storage tank, (Atmospheric tank), • API 1104 for welding pipeline and related facilities, • API 653, For Tank inspection and repair. • Draft piping design, • Rule Thump of pipeline design, • GS-EP-COR-350, External protection, • GS-EP-COR-352, Internal protection, • GS-EP-PVV-111, Piping design specification, • GS-EP-PVV-112, Piping design specification, • GS-EP-PVV-171, Steel piping fabrication, • GS-EP-SAF-021, Layout, • Pipe Blue book. November, 2016Page10