1. Patrick B Wiseman
PERSONAL DATA
Language Spoken : English
SUMMARY OF QUALIFICATION
CWI #04091201 Expired on January 08, 2013
AWS member #472689, OSHA 30 hour cert. 9 FEMA qualifications in emergency
management, operator qualifications and team development (Six Sigma)
Level II Mag Particle and Dye Penetrate.
Level I in Ultrasonic’s.
Asnt-tc1a level III / RT certified for 8 years, Automated UT experience.
Coordinate all platform construction (jackets, piles and fabrication) at Brown and Root,
Delta Engineering located in Houston during the years 1991 and 1995.
Extensive experience of laying / repairing / boring (HDD), demolition of pipelines, the
research and development for alloy (Inconel and Molly) piping / pipelines.
CAREER SUMMARY
Project Management QA / QC for platform construction, drill rig refurbishment supervision
and NDE requirements.
X-ray and Gamma Ray film interpretation, development of x-ray procedures for 125KV
thru 350 KV Conical and straight beam tubes using lead and FM screens, gamma ray (25
thru 250 curies) weld quality procedures for Siapem.
Research and Development for Shell, Exxon Mobil to expedite gamma ray and x-ray
inspection to accommodate J-lay, conventional lay, double joint and quad joint
installation, 14 years experiences in pipeline installation for onshore and offshore lay
barges.
Welder, welding procedure qualifications; Inspection / Traceability / installation of spool
pipe, P / L and deck construction, which includes Jacket and pile construction extensions
and revisions, Pressure Vessel Construction and repair qualification procedures.
Projects areas consist of Nigeria, Baku Azerbaijan, Israel, Angola Africa, Trinidad and
Cameroon Africa.
Operations manager for HBH construction that included the construction of jet barges,
fabrication for offshore platforms and the construction of an offshore lay / derrick barge.
Installation of E&I service units for offshore, onshore construction.
Jumper, Plem, Plet, construction and installation of fabrication for deep water projects.
Fixable riser, stiff leg construction and Fat’s prior to installation.
Hydro testing of pipelines, heat exchangers, valves assemblies and flow meter
calibrations for turbine flow meters.
Installation of flow meters on GE and Rolls Royce turbines for all electrical power and
transmission of fluids for offshore and onshore facilities.