SlideShare a Scribd company logo
1 of 3
Victor Groves
6315 Thornton Dr.  Missouri City, TX 77459
832-387-2571  groves_victor@yahoo.com
Piping System Design/Plant Layout
A Recognized Expert in Petrochemical, Refining, Nuclear, and Offshore Industries,
Experienced in All Aspects of Piping System Design
Over 40 years of comprehensive experience in the layout and design of piping systems for the
Petrochemical, refining, nuclear, and offshore industries seeking increased efficiency, service levels and
performance. Internationally seasoned and experienced with conceptual plot plan development and
plant layouts. Experience with the layout and orientation of multi-tray and packed towers, reactors,
drums, flare stacks, and storage tanks. Proficient with the manual design and drafting for all types of
plants including plans and isometrics. Career projects include refinery, chemical, ammonia, LNG,
nuclear reprocessing, ethylene, olefins, oilrigs, and FPSO’s.
CORE COMPETENCIES
3D CAD Programs  Smart Plant Design  Plant Design Management System  Plant Design System

Team Management  Solutions Advice  Cost Reduction  Resource Management  Leadership
Isometrics  Stress Calculations  Expander  Compressor  Communication  Client Reviews
Staff Recruitment and Training  Opportunity Identification  Subcontractor Management
Loss Assessment  EPA Regulations  Field Verification & Routing 
EXPERIENCES AND ACHIEVEMENTS
TECHNIP, Houston, TX. 2013 – Current
Principal Piping Designer
Sasol North America Inc. Ethane cracker unit.
Responsible for the plant layout of the Ethane Cracker unit (refrigeration section) including
tower and drum orientation, simple stress calculations and pipe support systems. Operated equipment
and associated systems for the following primary equipment, expander, compressor, demethanizer,
cold box structure, C2 splitter.
Bechtel, Houston, TX. 2010 – 2013
Design Supervisor
Chevron Wheatstone project. LNG plant (Train 1).
Supervised plant layout for six modules of the Cryo rack (Train 1) including all air coolers,
relief valves, and depressurizing systems from various sections within the train, the entire fuel gas and
defrost gas supply for the train. Included 30% to 90% client reviews.
Chevron Base oil project.
Completed and finalized the position of all equipment including pumps and exchangers.
Routed all associated piping.
 Identified the plant layout and orientation of IDW and HSF reactors, trayed vessels and drums
using PDS.
Shaw Stone & Webster, Houston, TX. 2006 – 2010
Area Lead
Marathon IRD project (MSAT2 Unit). Benzene removal.
Responsible for the plant layout and orientation several multi-tray towers and drums using
PDS and Microstation for equipment orientations. Finalized positions of equipment including pumps and
exchangers. Routed all associated piping including supports associated with the splitter tower area,
splitter re-boiler heater, split cell heater, air coolers the splitter section, air coolers for the recovery
section, and the Benzene tower area. Also.
Victor Groves Resume, Page 2
Marathon GME project. HCU unit.
Supervised the Marathon GME project HCU unit fractionation area, heavy Naphtha guard
beds, reactor feed train one and two, North and South pipe rack, feed and distribution for reactors,
charge and feed furnaces, feed trains, and air coolers along the East and West pipe rack.
Bechtel, Houston, TX. 2005 – 2006
Senior Designer
Reliance Jamnagar Export Refinery project. Clean fuels unit.
Plant layout and orientation of several towers and drums using PDS, Microstation and
drawing manager. Routed all associated piping systems including supports associated with LCO
fractionation area, heavy Naphtha guard beds, hot oil furnaces, HP recycled gas compressor, LP
recycled gas compressor, scan fining feeds sections, and DHDS feed surge section.
t Supervised equipment orientations and the finalization of positions for pumps, exchangers,
filters, and compressors.
Shaw Stone & Webster, Houston, TX. 2005 – 2005
Senior Designer
Valero Unicracker sat gas plant.
Plant layout and orientation for various trayed vessels, drums, finalization of positions of
all equipment, pumps, exchangers for the Deethanizer area. Routed all associated piping including
supports. Extracted all isometrics for stress and checking purposes. Laid out the utility level of the
North and South pipe rack. Input all of the above into PDS. Checked the Hydrogen reciprocating
compressor and all associated equipment and piping for the Marathon DHT diesel hydrotreater.
t Familiar with piping specifications administrative and technical practices, design instructions,
plot plans, flow diagrams and interpreting vendor information.
Parsons E&C, London, England. 2004 – 2005
Senior Designer
Agip KCO overall onshore processing facility.
Plant layout and design of the LPG bullets and associated LPG transfer export pumps.
Input information into PDS. Draw and update material and stress sketches. Communicated and
interfaced with other engineering disciplines. Knowledge of industry, regulatory codes and standards.
t Conducted the layout of the receiver traps for the offshore oil and gas export pipelines and
launcher traps for the oil and gas export pipelines.
KBR, Houston, TX. 2003 – 2004
Area Lead
ExxonMobil Cerro Negro Upgrader project and the Debottleneck of Delayed Coker Complex.
Plant layout and design of equipment and piping systems.
Chevron/Texaco Benguela/Belize project compliant tower.
Responsible for plant layout and input into PDMS of all equipment, piping and pipe
supports for the North Production module.
t Responsible for six designers, client reviews and acted as the liaison with other departments for
vessel orientation and problems caused during the design and release of isometrics.
Alliance Engineering, Houston, TX. 2002 – 2003
Senior Piping Designer
Conoco Ocean Energy Magnolia tension leg platform.
Responsible for the plant layout and input into PDMS for the export gas compressors,
primary generators, oil and gas pig receivers, and associated sales gas meters. Conceptualized plans,
details and sections to accurately convey construction and fabrication requirements. Checked and back
checked computer models and piping drawings. Ensured compliance with approved design standards to
provide quality design.
t Conceptualized plans, details and sections to accurately convey fabrication requirements.
Victor Groves Resume, Page 3
EDUCATION
Part I City & Guilds.
Ordinary National Certificate. (With Distinctions).
Higher National Certificate – Mechanical Engineering, South Thames Technical College, London, England.
Responsibilities prior to 2002 available upon request

More Related Content

What's hot

Eduardo parisca resume (rev 07tier)
Eduardo parisca resume (rev 07tier)Eduardo parisca resume (rev 07tier)
Eduardo parisca resume (rev 07tier)Eduardo Parisca
 
CV - Philip Turner [Photo] - Nov 2015
CV - Philip Turner [Photo] - Nov 2015CV - Philip Turner [Photo] - Nov 2015
CV - Philip Turner [Photo] - Nov 2015Philip Turner
 
RonWells m-resume
RonWells m-resumeRonWells m-resume
RonWells m-resumeRon Wells
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P. Henderson
 
sameer-parab_resume
sameer-parab_resumesameer-parab_resume
sameer-parab_resumeSAMEER PARAB
 
11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan Kilpatrick11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan KilpatrickDanny Kilpatrick
 
Projects CV January 2016
Projects CV January 2016Projects CV January 2016
Projects CV January 2016Bryan Johnson
 
Resume for Kenneth Peartree (Full)
Resume for Kenneth Peartree (Full)Resume for Kenneth Peartree (Full)
Resume for Kenneth Peartree (Full)Ken Peartree
 
Resume Alanna Scott - Project Controls Specialist
Resume Alanna Scott - Project Controls SpecialistResume Alanna Scott - Project Controls Specialist
Resume Alanna Scott - Project Controls SpecialistAlanna Scott
 
5_2016 Resume_ Dan Kilpatrick (1)
5_2016  Resume_ Dan Kilpatrick (1)5_2016  Resume_ Dan Kilpatrick (1)
5_2016 Resume_ Dan Kilpatrick (1)Danny Kilpatrick
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerTarun Sharna
 

What's hot (20)

Eduardo parisca resume (rev 07tier)
Eduardo parisca resume (rev 07tier)Eduardo parisca resume (rev 07tier)
Eduardo parisca resume (rev 07tier)
 
CV - Philip Turner [Photo] - Nov 2015
CV - Philip Turner [Photo] - Nov 2015CV - Philip Turner [Photo] - Nov 2015
CV - Philip Turner [Photo] - Nov 2015
 
RonWells m-resume
RonWells m-resumeRonWells m-resume
RonWells m-resume
 
abhinav rawat
abhinav rawatabhinav rawat
abhinav rawat
 
Nabi Rasool.CV
Nabi Rasool.CVNabi Rasool.CV
Nabi Rasool.CV
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDF
 
sameer-parab_resume
sameer-parab_resumesameer-parab_resume
sameer-parab_resume
 
11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan Kilpatrick11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan Kilpatrick
 
Projects CV January 2016
Projects CV January 2016Projects CV January 2016
Projects CV January 2016
 
Resume for Kenneth Peartree (Full)
Resume for Kenneth Peartree (Full)Resume for Kenneth Peartree (Full)
Resume for Kenneth Peartree (Full)
 
Resume Alanna Scott - Project Controls Specialist
Resume Alanna Scott - Project Controls SpecialistResume Alanna Scott - Project Controls Specialist
Resume Alanna Scott - Project Controls Specialist
 
5_2016 Resume_ Dan Kilpatrick (1)
5_2016  Resume_ Dan Kilpatrick (1)5_2016  Resume_ Dan Kilpatrick (1)
5_2016 Resume_ Dan Kilpatrick (1)
 
Yasser Hatem CV
Yasser Hatem CVYasser Hatem CV
Yasser Hatem CV
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineer
 
Senthil Nathan Senior Piping Stress Engineer
Senthil Nathan Senior Piping Stress EngineerSenthil Nathan Senior Piping Stress Engineer
Senthil Nathan Senior Piping Stress Engineer
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
TGC_expertise5_s
TGC_expertise5_sTGC_expertise5_s
TGC_expertise5_s
 
Materialhandling
MaterialhandlingMaterialhandling
Materialhandling
 
Oam mechanical eng
Oam mechanical engOam mechanical eng
Oam mechanical eng
 
CV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - Copy
CV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - CopyCV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - Copy
CV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - Copy
 

Viewers also liked

Italcementi sopralluoghi arpa 2009 non e' stata presentata istanza a.i.a. ved...
Italcementi sopralluoghi arpa 2009 non e' stata presentata istanza a.i.a. ved...Italcementi sopralluoghi arpa 2009 non e' stata presentata istanza a.i.a. ved...
Italcementi sopralluoghi arpa 2009 non e' stata presentata istanza a.i.a. ved...Pino Ciampolillo
 
BI Analytics Overview Observations and Demo for Entrisik, Domo and Tableau
BI Analytics Overview Observations and Demo for Entrisik, Domo and TableauBI Analytics Overview Observations and Demo for Entrisik, Domo and Tableau
BI Analytics Overview Observations and Demo for Entrisik, Domo and TableauKent Brooks
 
Η βιβλιοπαρουσίασή μας!!
Η βιβλιοπαρουσίασή μας!!Η βιβλιοπαρουσίασή μας!!
Η βιβλιοπαρουσίασή μας!!NatasaSkorda
 
Проектирование интерфейсов. Декорации и архитектура
Проектирование интерфейсов. Декорации и архитектураПроектирование интерфейсов. Декорации и архитектура
Проектирование интерфейсов. Декорации и архитектураAny Void
 
第1回 女性会計士イベント企画 当日配布資料
第1回 女性会計士イベント企画 当日配布資料第1回 女性会計士イベント企画 当日配布資料
第1回 女性会計士イベント企画 当日配布資料Mio Fujii
 

Viewers also liked (16)

FAMILY CHILDHOOD
FAMILY CHILDHOODFAMILY CHILDHOOD
FAMILY CHILDHOOD
 
Fabricación aditiva
Fabricación aditivaFabricación aditiva
Fabricación aditiva
 
Italcementi sopralluoghi arpa 2009 non e' stata presentata istanza a.i.a. ved...
Italcementi sopralluoghi arpa 2009 non e' stata presentata istanza a.i.a. ved...Italcementi sopralluoghi arpa 2009 non e' stata presentata istanza a.i.a. ved...
Italcementi sopralluoghi arpa 2009 non e' stata presentata istanza a.i.a. ved...
 
Resume
ResumeResume
Resume
 
BI Analytics Overview Observations and Demo for Entrisik, Domo and Tableau
BI Analytics Overview Observations and Demo for Entrisik, Domo and TableauBI Analytics Overview Observations and Demo for Entrisik, Domo and Tableau
BI Analytics Overview Observations and Demo for Entrisik, Domo and Tableau
 
Boletim de janeiro
Boletim de janeiroBoletim de janeiro
Boletim de janeiro
 
Comidas típicas guayacas
Comidas típicas guayacasComidas típicas guayacas
Comidas típicas guayacas
 
FAMILY CHILDHOOD
FAMILY CHILDHOODFAMILY CHILDHOOD
FAMILY CHILDHOOD
 
DFD_HRIS_0111
DFD_HRIS_0111DFD_HRIS_0111
DFD_HRIS_0111
 
SIDS RESUME.RTF
SIDS RESUME.RTFSIDS RESUME.RTF
SIDS RESUME.RTF
 
Η βιβλιοπαρουσίασή μας!!
Η βιβλιοπαρουσίασή μας!!Η βιβλιοπαρουσίασή μας!!
Η βιβλιοπαρουσίασή μας!!
 
ibrahim cv10
ibrahim cv10ibrahim cv10
ibrahim cv10
 
FAMILY CHILDHOOD
FAMILY CHILDHOODFAMILY CHILDHOOD
FAMILY CHILDHOOD
 
Проектирование интерфейсов. Декорации и архитектура
Проектирование интерфейсов. Декорации и архитектураПроектирование интерфейсов. Декорации и архитектура
Проектирование интерфейсов. Декорации и архитектура
 
Las tics una llave
Las tics una llaveLas tics una llave
Las tics una llave
 
第1回 女性会計士イベント企画 当日配布資料
第1回 女性会計士イベント企画 当日配布資料第1回 女性会計士イベント企画 当日配布資料
第1回 女性会計士イベント企画 当日配布資料
 

Similar to PRESENT

CA_2016_MASTER Rev 1
CA_2016_MASTER Rev 1CA_2016_MASTER Rev 1
CA_2016_MASTER Rev 1craig alden
 
Current Fluor Resume
Current Fluor ResumeCurrent Fluor Resume
Current Fluor ResumeRoy Firtha
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16Sudhakar Vallala
 
Resume talley 1.5.2016.formatted
Resume talley 1.5.2016.formattedResume talley 1.5.2016.formatted
Resume talley 1.5.2016.formattedDennis Talley
 
Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015Rocky Prosper
 
resume-garychu
resume-garychuresume-garychu
resume-garychuGary Chu
 
Resume holley troyhilite
Resume holley troyhiliteResume holley troyhilite
Resume holley troyhiliteTroy D Holley
 
Roger Berryment Resume 2
Roger Berryment Resume 2Roger Berryment Resume 2
Roger Berryment Resume 2Roger Berryment
 
Resume - Timothy Fitch - Mech Design
Resume - Timothy Fitch - Mech DesignResume - Timothy Fitch - Mech Design
Resume - Timothy Fitch - Mech DesignTimothy Fitch
 
Sam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical EngineerSam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical EngineerSam Sun
 

Similar to PRESENT (20)

CA_2016_MASTER Rev 1
CA_2016_MASTER Rev 1CA_2016_MASTER Rev 1
CA_2016_MASTER Rev 1
 
Current Fluor Resume
Current Fluor ResumeCurrent Fluor Resume
Current Fluor Resume
 
Alzagon engineering solutions 1
Alzagon engineering solutions 1Alzagon engineering solutions 1
Alzagon engineering solutions 1
 
Alzagon engineering solutions
Alzagon engineering solutions Alzagon engineering solutions
Alzagon engineering solutions
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16
 
Alzagon engineering solutions
Alzagon engineering solutionsAlzagon engineering solutions
Alzagon engineering solutions
 
DHindmon_Resume2016
DHindmon_Resume2016DHindmon_Resume2016
DHindmon_Resume2016
 
Alzagon engineering solutions dec 2017a
Alzagon engineering solutions dec  2017aAlzagon engineering solutions dec  2017a
Alzagon engineering solutions dec 2017a
 
Resume talley 1.5.2016.formatted
Resume talley 1.5.2016.formattedResume talley 1.5.2016.formatted
Resume talley 1.5.2016.formatted
 
Nazmy Markos
Nazmy MarkosNazmy Markos
Nazmy Markos
 
Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015
 
resume-garychu
resume-garychuresume-garychu
resume-garychu
 
Resume holley troyhilite
Resume holley troyhiliteResume holley troyhilite
Resume holley troyhilite
 
Roger Berryment Resume 2
Roger Berryment Resume 2Roger Berryment Resume 2
Roger Berryment Resume 2
 
Resume - Timothy Fitch - Mech Design
Resume - Timothy Fitch - Mech DesignResume - Timothy Fitch - Mech Design
Resume - Timothy Fitch - Mech Design
 
CV of AKRAM (2)
CV of AKRAM (2)CV of AKRAM (2)
CV of AKRAM (2)
 
SUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CVSUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CV
 
Alzagon diversify inc 2014
Alzagon diversify inc 2014Alzagon diversify inc 2014
Alzagon diversify inc 2014
 
Sam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical EngineerSam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical Engineer
 
CWood-Resume
CWood-ResumeCWood-Resume
CWood-Resume
 

PRESENT

  • 1. Victor Groves 6315 Thornton Dr.  Missouri City, TX 77459 832-387-2571  groves_victor@yahoo.com Piping System Design/Plant Layout A Recognized Expert in Petrochemical, Refining, Nuclear, and Offshore Industries, Experienced in All Aspects of Piping System Design Over 40 years of comprehensive experience in the layout and design of piping systems for the Petrochemical, refining, nuclear, and offshore industries seeking increased efficiency, service levels and performance. Internationally seasoned and experienced with conceptual plot plan development and plant layouts. Experience with the layout and orientation of multi-tray and packed towers, reactors, drums, flare stacks, and storage tanks. Proficient with the manual design and drafting for all types of plants including plans and isometrics. Career projects include refinery, chemical, ammonia, LNG, nuclear reprocessing, ethylene, olefins, oilrigs, and FPSO’s. CORE COMPETENCIES 3D CAD Programs  Smart Plant Design  Plant Design Management System  Plant Design System  Team Management  Solutions Advice  Cost Reduction  Resource Management  Leadership Isometrics  Stress Calculations  Expander  Compressor  Communication  Client Reviews Staff Recruitment and Training  Opportunity Identification  Subcontractor Management Loss Assessment  EPA Regulations  Field Verification & Routing  EXPERIENCES AND ACHIEVEMENTS TECHNIP, Houston, TX. 2013 – Current Principal Piping Designer Sasol North America Inc. Ethane cracker unit. Responsible for the plant layout of the Ethane Cracker unit (refrigeration section) including tower and drum orientation, simple stress calculations and pipe support systems. Operated equipment and associated systems for the following primary equipment, expander, compressor, demethanizer, cold box structure, C2 splitter. Bechtel, Houston, TX. 2010 – 2013 Design Supervisor Chevron Wheatstone project. LNG plant (Train 1). Supervised plant layout for six modules of the Cryo rack (Train 1) including all air coolers, relief valves, and depressurizing systems from various sections within the train, the entire fuel gas and defrost gas supply for the train. Included 30% to 90% client reviews. Chevron Base oil project. Completed and finalized the position of all equipment including pumps and exchangers. Routed all associated piping.  Identified the plant layout and orientation of IDW and HSF reactors, trayed vessels and drums using PDS. Shaw Stone & Webster, Houston, TX. 2006 – 2010 Area Lead Marathon IRD project (MSAT2 Unit). Benzene removal. Responsible for the plant layout and orientation several multi-tray towers and drums using PDS and Microstation for equipment orientations. Finalized positions of equipment including pumps and exchangers. Routed all associated piping including supports associated with the splitter tower area, splitter re-boiler heater, split cell heater, air coolers the splitter section, air coolers for the recovery section, and the Benzene tower area. Also.
  • 2. Victor Groves Resume, Page 2 Marathon GME project. HCU unit. Supervised the Marathon GME project HCU unit fractionation area, heavy Naphtha guard beds, reactor feed train one and two, North and South pipe rack, feed and distribution for reactors, charge and feed furnaces, feed trains, and air coolers along the East and West pipe rack. Bechtel, Houston, TX. 2005 – 2006 Senior Designer Reliance Jamnagar Export Refinery project. Clean fuels unit. Plant layout and orientation of several towers and drums using PDS, Microstation and drawing manager. Routed all associated piping systems including supports associated with LCO fractionation area, heavy Naphtha guard beds, hot oil furnaces, HP recycled gas compressor, LP recycled gas compressor, scan fining feeds sections, and DHDS feed surge section. t Supervised equipment orientations and the finalization of positions for pumps, exchangers, filters, and compressors. Shaw Stone & Webster, Houston, TX. 2005 – 2005 Senior Designer Valero Unicracker sat gas plant. Plant layout and orientation for various trayed vessels, drums, finalization of positions of all equipment, pumps, exchangers for the Deethanizer area. Routed all associated piping including supports. Extracted all isometrics for stress and checking purposes. Laid out the utility level of the North and South pipe rack. Input all of the above into PDS. Checked the Hydrogen reciprocating compressor and all associated equipment and piping for the Marathon DHT diesel hydrotreater. t Familiar with piping specifications administrative and technical practices, design instructions, plot plans, flow diagrams and interpreting vendor information. Parsons E&C, London, England. 2004 – 2005 Senior Designer Agip KCO overall onshore processing facility. Plant layout and design of the LPG bullets and associated LPG transfer export pumps. Input information into PDS. Draw and update material and stress sketches. Communicated and interfaced with other engineering disciplines. Knowledge of industry, regulatory codes and standards. t Conducted the layout of the receiver traps for the offshore oil and gas export pipelines and launcher traps for the oil and gas export pipelines. KBR, Houston, TX. 2003 – 2004 Area Lead ExxonMobil Cerro Negro Upgrader project and the Debottleneck of Delayed Coker Complex. Plant layout and design of equipment and piping systems. Chevron/Texaco Benguela/Belize project compliant tower. Responsible for plant layout and input into PDMS of all equipment, piping and pipe supports for the North Production module. t Responsible for six designers, client reviews and acted as the liaison with other departments for vessel orientation and problems caused during the design and release of isometrics. Alliance Engineering, Houston, TX. 2002 – 2003 Senior Piping Designer Conoco Ocean Energy Magnolia tension leg platform. Responsible for the plant layout and input into PDMS for the export gas compressors, primary generators, oil and gas pig receivers, and associated sales gas meters. Conceptualized plans, details and sections to accurately convey construction and fabrication requirements. Checked and back checked computer models and piping drawings. Ensured compliance with approved design standards to provide quality design. t Conceptualized plans, details and sections to accurately convey fabrication requirements.
  • 3. Victor Groves Resume, Page 3 EDUCATION Part I City & Guilds. Ordinary National Certificate. (With Distinctions). Higher National Certificate – Mechanical Engineering, South Thames Technical College, London, England. Responsibilities prior to 2002 available upon request