KEVIN QUIGLEY
Senior Project Engineer
PROFILE
▪ An enthusiastic and self-motivated senior project engineer/sub agent with 5
years experience in the civil and construction industry. Gaining my vast
experience working for major contractors such as Galliford Try, Costain, BAM
Nuttall, Carillion, Balfour Beatty, Kier and Wates I have a proven track record in
delivering accurate and concise setting-out in all aspects of construction and
controlling cost and time variations, maximising profitability. I have recently
been required to manage projects from start to finish and on times oversee
multiple projects at one time, acting as a small works project manager.
▪ An extremely personable and likeable individual with great sense of humour
and willingness to get ‘stuck-in’, over and above the call of duty, where needs
must.
▪ My current role at J Murphy and Sons has demanded myself to further
improve my skillset and areas of knowledge and I have now moved into
managing projects in the clean water industry and pipelines.
5/19/2015
2
PROFESSIONAL QUALIFICATIONS
▪ CPCS Appointed Person, Crane
Supervisor, Slinger Signaller
▪ NVQ Level 6 Controlling Lifting
Operations
▪ APM Introduction to Project
Manangement
▪ City and Guilds - NRSWA Supervisor
▪ City and Guilds – Confined Spaces Entry
AP1 and Rescue AP2
▪ City and Guilds Fire Marshall
▪ Temporary Works Coordination –
Thomas Telford Training
▪ Temporary Works Design (Below
Ground) – Thomas Telford Training
▪ EUSR Shea Process and National Water
Hygiene
▪ CTS 5 day Setting Out For Construction
course – Oct 2011
▪ SMSTS Certified – Feb 2011
▪ First Aid At Work- 8 May 2014
▪ QCF Level 2 Emergency First Aid and
Debrilator
▪ Cable Avoidance (CAT and Genny)
course – RD4000 and Cat4
▪ Non Licensed asbestos removal
▪ HNC Civil and Construction Engineering
▪ CSCS – Academically Qualified
Managerial Card
PROJECT PORTFOLIO
Senior Project Engineer
Responsible for overseeing 3 sites in parallel and managing 5 Junior Engineers.
J Murphy and Sons
Jan 2013 – Present
▪ Commonhead Growth Upgrade
▪ Haydon End Growth Development
▪ Swindon Sewage Treatment Works Upgrade
▪ Ysbyty Ifan Clean Water Network Upgrade
▪ Rhiwsaeson Wastewater Treatment Works
5/19/2015
3
COMMONHEAD NETWORK GROWTH
UPGRADE
6 October 2014 – Present
£3.5 million
Scope of Works
▪ Installation of 225dia rising main servicing new
1000 house development and upgrading existing
sewer network.
▪ Directional drilling and opencut of 225dia rising
main 1km long.
▪ Opencut and Pipe Jacked Auger Bore of 300dia
vitrous clay gravity sewer linking new development
sewage pumping station and existing SPS.
▪ 15m Diameter x 15m Deep Precast Concrete
Storage Shaft and associated M and E works.
COMMONHEAD NETWORK GROWTH
UPGRADE
Responsibilities
▪ Management of sub-contractors and directly employed operatives.
▪ Risk Assesment, Traffic Management and Method Statement Compilation
▪ Site Control establishment and maintenance.
▪ Compiling and reporting of wage sheets
• Allocation Sheets, Toolbox talks and Daily Briefings.
• Compiling and Updating Construction Programme.
• Setting out Line and Level of rising main, manholes and chambers and ensuring drilling rig
service avoidance.
• Quality control, daily record sheets, PUWER and LOLER checks and updates.
• Procurement, planning and organisation of construction materials, plant and sub-contractors.
• Liaison with residents, general public and local council streetworks and highways agency.
▪ Logging of Drill depth and recording as-built depth and line.
5/19/2015
4
COMMONHEAD NETWORK GROWTH
UPGRADE
COMMONHEAD NETWORK GROWTH
UPGRADE
5/19/2015
5
HAYDON END NETWORK GROWTH
UPGRADE
5 January 2014 – Present
£4.2 Million
Scope of Works
▪ Upgrade of existing sewage network which was prone to flooding.
▪ 2no Storage Shafts, 9m diameter 18m deep and 10.5m diameter 21m deep, both
by method of underpinning.
▪ 2no Weir Chambers 4m dia 10m deep
▪ Risk Assesment, Traffic Management and Method Statement Compilation
▪ 2no Discharge Chambers and 2no Pumping Station Kiosks
▪ Associated 600mm diameter pipelines and ancillary structures.
▪ Access road, kerb laying, path edgings and re-landscaping.
HAYDON END NETWORK GROWTH
UPGRADE
Responsibilities
▪ Management and supervision of sub-contractors and directly employed
operatives.
▪ Allocation Sheets, Toolbox talks and Daily Briefings.
• Checking junior engineers setting out Line and Level of ductile iron pipework,
shafts and chambers. Management of junior engineers workload and career
professional development.
• Procurement, planning and organisation of construction materials, plant and sub-
contractors.
▪ Logging and monitoring of pre-cast concrete shaft depth.
▪ Planning and Controlling all lifting operations, both simple and Complex
5/19/2015
6
HAYDON END NETWORK GROWTH
UPGRADE PHOTOGRAPHS
HAYDON END NETWORK GROWTH
PHOTOGRAPHS
5/19/2015
7
HAYDON END NETWORK GROWTH
LIFT PLAN
SWINDON SEWAGE TREATMENT WORKS
5 January 2014 – 6 October 2014
£8 Million
Scope of Works
▪ Installation of triple 900mm dia ductile iron gravity
sewer.
▪ Installation of 380m of 4x2m precast concrete box
culvert.
▪ Construction of new 25m x 8m Combined sewage
outfall chamber, incorporating existing 4x4m box
culvert system.
▪ 6m diameter x 12m deep storage shaft, weir and
discharge chambers and pumping station.
▪ Access road and kerblaying.
5/19/2015
8
SWINDON SEWAGE TREATMENT WORKS
Responsibilities
▪ Management and supervision of sub-contractors and directly employed operatives.
▪ Allocation Sheets, Toolbox talks and Daily Briefings.
• Checking junior engineers setting out Line and Level of ductile iron pipework, shafts
and chambers. Management of junior engineers workload and career professional
development.
• Procurement, planning and organisation of construction materials, plant and sub-
contractors.
• Risk Assesment, Traffic Management and Method Statement Compilation
• Temporary works Co’ordination
• Risk Assesment, Traffic Management and Method Statement Compilation
▪ Logging and monitoring of pre-cast concrete shaft depth.
▪ Planning and Controlling all lifting operations, both simple and Complex
SWINDON SEWAGE TREATMENT WORKS
PHOTOGRAPHS
5/19/2015
9
SWINDON SEWAGE TREATMENT WORKS
PHOTOGRAPHS
SWINDON SEWAGE TREATMENT WORKS
PHOTOGRAPHS
5/19/2015
10
SWINDON SEWAGE TREATMENT WORKS
RHIWSAESON WASTEWATER TREATMENT
WORKS
7 January 2013 – 20 December 2013
£2.8 Million
Scope of Works
▪ Sewage treatment works upgrade.
▪ Construction of Inlet Tank including 1m diameter ductile iron
inlet pipework and mechanical screens and pumping station.
▪ Construction of 24m diameter x 6m deep Humous Settlement
Tank
▪ Construction of 22m diameter x 4m deep Primary Settlement
Tank
▪ Construction of 28m diameter x 3m deep clean stone filled
bioflilter tank.
▪ Construction of Access road and ancillary structures including
pumping chamber, desludge tank, HST, Biofilter and PST
distribution chambers and sitewide clean water distribution
pipework, service ducting and flowmeter manholes.
5/19/2015
11
RHIWSAESON WASTEWATER TREATMENT
WORKS
Responsibilities
▪ Management and supervision of sub-contractors and directly employed
operatives.
▪ Allocation Sheets, Toolbox talks and Daily Briefings.
• Setting out Line and Level of ductile iron pipework, concrete bases, shuttering
and chambers. Management of trainee engineers workload and career
professional development.
• Procurement, planning and organisation of construction materials, plant and sub-
contractors.
• Temporary works Co’ordination
▪ Planning and Controlling all lifting operations, both simple and Complex
RHIWSAESON WASTEWATER
TREATMENT WORKS
5/19/2015
12
RHIWSAESON WASTEWATER
TREATMENT WORKS
RHIWSAESON WASTEWATER
TREATMENT WORKS
5/19/2015
13
RHIWSAESON WASTEWATER
TREATMENT WORKS
RHIWSAESON WASTEWATER
TREATMENT WORKS
5/19/2015
14
PROJECT PORTFOLIO
Senior Site Engineer
Responsible for overseeing 2 sites, managing, supervision and engineering
D20 Ltd
February 2012– December 2012
▪ RUH Hospital, Bath
▪ Junction 3 Development, M32
▪ Dick Lovett Garage, Bristol
▪ Western Super-Mare Waste Transfer Station
▪ Wiltshire County Council Offices, Trowbridge, Bath
RUH HOSPITAL, BATH
Scope of Works
▪ Reduction of existing ground and stoning to
formation.
▪ Excavation and concrete Pad and Beam
foundations including positioning of steel
reinforcement and starter bars for cast on site
columns.
▪ 3 floors of finished concrete slab pours utilizing
temporary works for shuttering.
▪ Small diameter drainage and manhole construction
▪ Access road and external finished including
landscaping, tarmac and block paving.
5/19/2015
15
RUH HOSPITAL, BATH
Responsibilities
▪ Management and supervision of sub-contractors and directly employed
operatives.
▪ Establishment of co’ordinated and levelled site control.
▪ Allocation Sheets, Toolbox talks and Daily Briefings.
• Setting out Line and Level of pad and beam foundations, steel starter bars and
cast in-situ concrete columns as well as drainage, service ducting and access
roads.
• Setting out and post pour checks of all concrete columns, 3 floors of finished
structural slab and 2 lift shafts and staircases.
• Procurement, planning and organisation of construction materials, plant and sub-
contractors.
• Liaising with client and producing as-built drawings.
RUH HOSPITAL, BATH
5/19/2015
16
RUH HOSPITAL, BATH
JUNCTION 3, M32
Scope of Works
▪ Access roads, cycle paths and footpaths to new
housing development.
▪ All civils works up to and including finished slab
level.
▪ Landscaping and block paving.
▪ Large soakaway to service all storm water drainage
for the development.
5/19/2015
17
DICK LOVETT BMW, BRISTOL
Scope of Works
▪ Access roads, cycle paths and footpaths to
new BMW showroom.
▪ All civils works up to and including
finished slab level.
▪ Landscaping and block paving.
▪ Large perimeter sustainable urban
drainage system, collecting stormwater
runoff from the forecourt surface and
showrooms roof area to be utilized in the
flushing of toilets and watering of
landscaping. All excess water was to be
stored below the surface and trickled into
the existing storm network to help
alleviate the pressure the existing system
was already under.
WESTERN SUPERMARE WASTE TRANSFER
Scope of Works
▪ Upgrade of existing waste transfer station
▪ Reinforced Concrete Retaining Walls
▪ Drainage, Ducting and Lighting Columns.
▪ Clean Water Supply
▪ Access Roads and Pull-In Bays
▪ Finished Concrete Slabs and Steel Framed
Unit
5/19/2015
18
WESTERN SUPERMARE WASTE TRANSFER
HASKINS GARDEN CENTRE
Site Engineer
Lawton Construction – Haskins Garden Centre
June 2011 - February 2012
Scope of Works
▪ Greenfield site construction of a garden centre and
250 car parking spaces including access roads, pad
foundations, ducting and services and site drainage.
▪ Responsible for site setting out and Risk
Assessment/Method Statement compiling.
▪ Reportable to senior engineer/site manager.
5/19/2015
19
HASKINS GARDEN CENTRE
HASKINS GARDEN CENTRE

More Related Content

What's hot

Oil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanOil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanDavid H Moloney
 
Airport Buildings & Structures Construction
Airport Buildings & Structures ConstructionAirport Buildings & Structures Construction
Airport Buildings & Structures ConstructionDavid H Moloney
 
Dart Underground, Dublin - Light Rail Network in Tunnels
Dart Underground, Dublin - Light Rail Network in TunnelsDart Underground, Dublin - Light Rail Network in Tunnels
Dart Underground, Dublin - Light Rail Network in TunnelsDavid H Moloney
 
Metro North, Dublin - Construction Explained
Metro North, Dublin  - Construction ExplainedMetro North, Dublin  - Construction Explained
Metro North, Dublin - Construction ExplainedDavid H Moloney
 
Sea Port Construction, Project Execution Plan
Sea Port Construction, Project Execution PlanSea Port Construction, Project Execution Plan
Sea Port Construction, Project Execution PlanDavid H Moloney
 
Route 2020 Metro Dubai Construction Details
Route 2020 Metro Dubai   Construction DetailsRoute 2020 Metro Dubai   Construction Details
Route 2020 Metro Dubai Construction DetailsDavid H Moloney
 
Heathrow 3rd Runway Construction
Heathrow 3rd Runway ConstructionHeathrow 3rd Runway Construction
Heathrow 3rd Runway ConstructionDavid H Moloney
 
Motorway Construction, Project Execution Plan
Motorway Construction, Project Execution PlanMotorway Construction, Project Execution Plan
Motorway Construction, Project Execution PlanDavid H Moloney
 
Whitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyWhitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyAndrew White
 
Project Execution Plan for Bridge Construction
Project Execution Plan for Bridge ConstructionProject Execution Plan for Bridge Construction
Project Execution Plan for Bridge ConstructionDavid H Moloney
 
Ken Edgar CV
Ken Edgar CVKen Edgar CV
Ken Edgar CVKen Edgar
 
Civil Engineering Construction Techniques
Civil Engineering  Construction TechniquesCivil Engineering  Construction Techniques
Civil Engineering Construction TechniquesDavid H Moloney
 
Attachement 3 61T01411 - Construction Execution Plan
Attachement 3 61T01411 - Construction Execution PlanAttachement 3 61T01411 - Construction Execution Plan
Attachement 3 61T01411 - Construction Execution PlanJames Zhang (Chi, Zhang)
 
Rockaway projectupdateapril2015
Rockaway projectupdateapril2015Rockaway projectupdateapril2015
Rockaway projectupdateapril2015Rose Klein
 
07.site preparation.civil
07.site preparation.civil07.site preparation.civil
07.site preparation.civilNguyen Bao
 
Construction Methods & Sequence
Construction  Methods & SequenceConstruction  Methods & Sequence
Construction Methods & SequenceDavid H Moloney
 

What's hot (20)

Oil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanOil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution Plan
 
Airport Buildings & Structures Construction
Airport Buildings & Structures ConstructionAirport Buildings & Structures Construction
Airport Buildings & Structures Construction
 
Dart Underground, Dublin - Light Rail Network in Tunnels
Dart Underground, Dublin - Light Rail Network in TunnelsDart Underground, Dublin - Light Rail Network in Tunnels
Dart Underground, Dublin - Light Rail Network in Tunnels
 
Metro North, Dublin - Construction Explained
Metro North, Dublin  - Construction ExplainedMetro North, Dublin  - Construction Explained
Metro North, Dublin - Construction Explained
 
Sea Port Construction, Project Execution Plan
Sea Port Construction, Project Execution PlanSea Port Construction, Project Execution Plan
Sea Port Construction, Project Execution Plan
 
Route 2020 Metro Dubai Construction Details
Route 2020 Metro Dubai   Construction DetailsRoute 2020 Metro Dubai   Construction Details
Route 2020 Metro Dubai Construction Details
 
Heathrow 3rd Runway Construction
Heathrow 3rd Runway ConstructionHeathrow 3rd Runway Construction
Heathrow 3rd Runway Construction
 
tims resume
tims resumetims resume
tims resume
 
Motorway Construction, Project Execution Plan
Motorway Construction, Project Execution PlanMotorway Construction, Project Execution Plan
Motorway Construction, Project Execution Plan
 
Whitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyWhitescape Civil Engineering Case Study
Whitescape Civil Engineering Case Study
 
Project Execution Plan for Bridge Construction
Project Execution Plan for Bridge ConstructionProject Execution Plan for Bridge Construction
Project Execution Plan for Bridge Construction
 
Ken Edgar CV
Ken Edgar CVKen Edgar CV
Ken Edgar CV
 
Civil Engineering Construction Techniques
Civil Engineering  Construction TechniquesCivil Engineering  Construction Techniques
Civil Engineering Construction Techniques
 
Attachement 3 61T01411 - Construction Execution Plan
Attachement 3 61T01411 - Construction Execution PlanAttachement 3 61T01411 - Construction Execution Plan
Attachement 3 61T01411 - Construction Execution Plan
 
Industry Resume
Industry ResumeIndustry Resume
Industry Resume
 
Rockaway projectupdateapril2015
Rockaway projectupdateapril2015Rockaway projectupdateapril2015
Rockaway projectupdateapril2015
 
Poornesha Shetty-QA QC
Poornesha Shetty-QA QCPoornesha Shetty-QA QC
Poornesha Shetty-QA QC
 
07.site preparation.civil
07.site preparation.civil07.site preparation.civil
07.site preparation.civil
 
Construction Methods & Sequence
Construction  Methods & SequenceConstruction  Methods & Sequence
Construction Methods & Sequence
 
Markfel S. Lamban CV
Markfel S. Lamban CVMarkfel S. Lamban CV
Markfel S. Lamban CV
 

Similar to Kevin Quigley Portfolio Condensed

Chandler Geoff 2016 cv
Chandler Geoff 2016 cvChandler Geoff 2016 cv
Chandler Geoff 2016 cvGeoff Chandler
 
Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01Zachary Maddox
 
AllenCon Capability
AllenCon CapabilityAllenCon Capability
AllenCon CapabilityDamien Allen
 
Muthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMuthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMUTHUKUMAR428109
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaMine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaStephen McKnight
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 SunocoKarl Keller
 
shane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsonsshane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley ParsonsShane Reynolds
 
Linkedin Presentation Krysyian Gnysinski
Linkedin Presentation Krysyian GnysinskiLinkedin Presentation Krysyian Gnysinski
Linkedin Presentation Krysyian GnysinskiKrystian Gnysinski
 
Alun Pike.Resume
Alun Pike.ResumeAlun Pike.Resume
Alun Pike.ResumeAlun Pike
 
Cv SF van Zyl - December 2015
Cv SF van Zyl - December 2015Cv SF van Zyl - December 2015
Cv SF van Zyl - December 2015Frans Van Zyl
 
Contour Brochure 2022
Contour Brochure 2022Contour Brochure 2022
Contour Brochure 2022ContourMC
 
Demolition, Deconstruction & Dismantling
Demolition, Deconstruction & Dismantling Demolition, Deconstruction & Dismantling
Demolition, Deconstruction & Dismantling Emma Attwood
 
Advent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxAdvent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxShyamPrasadThiraviam
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Crosstown TO
 
Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Crosstown TO
 
My Current resume 2016
My Current resume 2016My Current resume 2016
My Current resume 2016Michael Duffy
 

Similar to Kevin Quigley Portfolio Condensed (20)

Chandler Geoff 2016 cv
Chandler Geoff 2016 cvChandler Geoff 2016 cv
Chandler Geoff 2016 cv
 
Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01
 
AllenCon Capability
AllenCon CapabilityAllenCon Capability
AllenCon Capability
 
Muthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMuthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdf
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaMine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
Barry-Knight-5
Barry-Knight-5Barry-Knight-5
Barry-Knight-5
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 Sunoco
 
shane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsonsshane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsons
 
Linkedin Presentation Krysyian Gnysinski
Linkedin Presentation Krysyian GnysinskiLinkedin Presentation Krysyian Gnysinski
Linkedin Presentation Krysyian Gnysinski
 
Alun Pike.Resume
Alun Pike.ResumeAlun Pike.Resume
Alun Pike.Resume
 
Cv SF van Zyl - December 2015
Cv SF van Zyl - December 2015Cv SF van Zyl - December 2015
Cv SF van Zyl - December 2015
 
Contour Brochure 2022
Contour Brochure 2022Contour Brochure 2022
Contour Brochure 2022
 
Demolition, Deconstruction & Dismantling
Demolition, Deconstruction & Dismantling Demolition, Deconstruction & Dismantling
Demolition, Deconstruction & Dismantling
 
Advent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxAdvent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptx
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
 
Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017
 
My Current resume 2016
My Current resume 2016My Current resume 2016
My Current resume 2016
 

Kevin Quigley Portfolio Condensed

  • 1. 5/19/2015 1 KEVIN QUIGLEY Senior Project Engineer PROFILE ▪ An enthusiastic and self-motivated senior project engineer/sub agent with 5 years experience in the civil and construction industry. Gaining my vast experience working for major contractors such as Galliford Try, Costain, BAM Nuttall, Carillion, Balfour Beatty, Kier and Wates I have a proven track record in delivering accurate and concise setting-out in all aspects of construction and controlling cost and time variations, maximising profitability. I have recently been required to manage projects from start to finish and on times oversee multiple projects at one time, acting as a small works project manager. ▪ An extremely personable and likeable individual with great sense of humour and willingness to get ‘stuck-in’, over and above the call of duty, where needs must. ▪ My current role at J Murphy and Sons has demanded myself to further improve my skillset and areas of knowledge and I have now moved into managing projects in the clean water industry and pipelines.
  • 2. 5/19/2015 2 PROFESSIONAL QUALIFICATIONS ▪ CPCS Appointed Person, Crane Supervisor, Slinger Signaller ▪ NVQ Level 6 Controlling Lifting Operations ▪ APM Introduction to Project Manangement ▪ City and Guilds - NRSWA Supervisor ▪ City and Guilds – Confined Spaces Entry AP1 and Rescue AP2 ▪ City and Guilds Fire Marshall ▪ Temporary Works Coordination – Thomas Telford Training ▪ Temporary Works Design (Below Ground) – Thomas Telford Training ▪ EUSR Shea Process and National Water Hygiene ▪ CTS 5 day Setting Out For Construction course – Oct 2011 ▪ SMSTS Certified – Feb 2011 ▪ First Aid At Work- 8 May 2014 ▪ QCF Level 2 Emergency First Aid and Debrilator ▪ Cable Avoidance (CAT and Genny) course – RD4000 and Cat4 ▪ Non Licensed asbestos removal ▪ HNC Civil and Construction Engineering ▪ CSCS – Academically Qualified Managerial Card PROJECT PORTFOLIO Senior Project Engineer Responsible for overseeing 3 sites in parallel and managing 5 Junior Engineers. J Murphy and Sons Jan 2013 – Present ▪ Commonhead Growth Upgrade ▪ Haydon End Growth Development ▪ Swindon Sewage Treatment Works Upgrade ▪ Ysbyty Ifan Clean Water Network Upgrade ▪ Rhiwsaeson Wastewater Treatment Works
  • 3. 5/19/2015 3 COMMONHEAD NETWORK GROWTH UPGRADE 6 October 2014 – Present £3.5 million Scope of Works ▪ Installation of 225dia rising main servicing new 1000 house development and upgrading existing sewer network. ▪ Directional drilling and opencut of 225dia rising main 1km long. ▪ Opencut and Pipe Jacked Auger Bore of 300dia vitrous clay gravity sewer linking new development sewage pumping station and existing SPS. ▪ 15m Diameter x 15m Deep Precast Concrete Storage Shaft and associated M and E works. COMMONHEAD NETWORK GROWTH UPGRADE Responsibilities ▪ Management of sub-contractors and directly employed operatives. ▪ Risk Assesment, Traffic Management and Method Statement Compilation ▪ Site Control establishment and maintenance. ▪ Compiling and reporting of wage sheets • Allocation Sheets, Toolbox talks and Daily Briefings. • Compiling and Updating Construction Programme. • Setting out Line and Level of rising main, manholes and chambers and ensuring drilling rig service avoidance. • Quality control, daily record sheets, PUWER and LOLER checks and updates. • Procurement, planning and organisation of construction materials, plant and sub-contractors. • Liaison with residents, general public and local council streetworks and highways agency. ▪ Logging of Drill depth and recording as-built depth and line.
  • 5. 5/19/2015 5 HAYDON END NETWORK GROWTH UPGRADE 5 January 2014 – Present £4.2 Million Scope of Works ▪ Upgrade of existing sewage network which was prone to flooding. ▪ 2no Storage Shafts, 9m diameter 18m deep and 10.5m diameter 21m deep, both by method of underpinning. ▪ 2no Weir Chambers 4m dia 10m deep ▪ Risk Assesment, Traffic Management and Method Statement Compilation ▪ 2no Discharge Chambers and 2no Pumping Station Kiosks ▪ Associated 600mm diameter pipelines and ancillary structures. ▪ Access road, kerb laying, path edgings and re-landscaping. HAYDON END NETWORK GROWTH UPGRADE Responsibilities ▪ Management and supervision of sub-contractors and directly employed operatives. ▪ Allocation Sheets, Toolbox talks and Daily Briefings. • Checking junior engineers setting out Line and Level of ductile iron pipework, shafts and chambers. Management of junior engineers workload and career professional development. • Procurement, planning and organisation of construction materials, plant and sub- contractors. ▪ Logging and monitoring of pre-cast concrete shaft depth. ▪ Planning and Controlling all lifting operations, both simple and Complex
  • 6. 5/19/2015 6 HAYDON END NETWORK GROWTH UPGRADE PHOTOGRAPHS HAYDON END NETWORK GROWTH PHOTOGRAPHS
  • 7. 5/19/2015 7 HAYDON END NETWORK GROWTH LIFT PLAN SWINDON SEWAGE TREATMENT WORKS 5 January 2014 – 6 October 2014 £8 Million Scope of Works ▪ Installation of triple 900mm dia ductile iron gravity sewer. ▪ Installation of 380m of 4x2m precast concrete box culvert. ▪ Construction of new 25m x 8m Combined sewage outfall chamber, incorporating existing 4x4m box culvert system. ▪ 6m diameter x 12m deep storage shaft, weir and discharge chambers and pumping station. ▪ Access road and kerblaying.
  • 8. 5/19/2015 8 SWINDON SEWAGE TREATMENT WORKS Responsibilities ▪ Management and supervision of sub-contractors and directly employed operatives. ▪ Allocation Sheets, Toolbox talks and Daily Briefings. • Checking junior engineers setting out Line and Level of ductile iron pipework, shafts and chambers. Management of junior engineers workload and career professional development. • Procurement, planning and organisation of construction materials, plant and sub- contractors. • Risk Assesment, Traffic Management and Method Statement Compilation • Temporary works Co’ordination • Risk Assesment, Traffic Management and Method Statement Compilation ▪ Logging and monitoring of pre-cast concrete shaft depth. ▪ Planning and Controlling all lifting operations, both simple and Complex SWINDON SEWAGE TREATMENT WORKS PHOTOGRAPHS
  • 9. 5/19/2015 9 SWINDON SEWAGE TREATMENT WORKS PHOTOGRAPHS SWINDON SEWAGE TREATMENT WORKS PHOTOGRAPHS
  • 10. 5/19/2015 10 SWINDON SEWAGE TREATMENT WORKS RHIWSAESON WASTEWATER TREATMENT WORKS 7 January 2013 – 20 December 2013 £2.8 Million Scope of Works ▪ Sewage treatment works upgrade. ▪ Construction of Inlet Tank including 1m diameter ductile iron inlet pipework and mechanical screens and pumping station. ▪ Construction of 24m diameter x 6m deep Humous Settlement Tank ▪ Construction of 22m diameter x 4m deep Primary Settlement Tank ▪ Construction of 28m diameter x 3m deep clean stone filled bioflilter tank. ▪ Construction of Access road and ancillary structures including pumping chamber, desludge tank, HST, Biofilter and PST distribution chambers and sitewide clean water distribution pipework, service ducting and flowmeter manholes.
  • 11. 5/19/2015 11 RHIWSAESON WASTEWATER TREATMENT WORKS Responsibilities ▪ Management and supervision of sub-contractors and directly employed operatives. ▪ Allocation Sheets, Toolbox talks and Daily Briefings. • Setting out Line and Level of ductile iron pipework, concrete bases, shuttering and chambers. Management of trainee engineers workload and career professional development. • Procurement, planning and organisation of construction materials, plant and sub- contractors. • Temporary works Co’ordination ▪ Planning and Controlling all lifting operations, both simple and Complex RHIWSAESON WASTEWATER TREATMENT WORKS
  • 14. 5/19/2015 14 PROJECT PORTFOLIO Senior Site Engineer Responsible for overseeing 2 sites, managing, supervision and engineering D20 Ltd February 2012– December 2012 ▪ RUH Hospital, Bath ▪ Junction 3 Development, M32 ▪ Dick Lovett Garage, Bristol ▪ Western Super-Mare Waste Transfer Station ▪ Wiltshire County Council Offices, Trowbridge, Bath RUH HOSPITAL, BATH Scope of Works ▪ Reduction of existing ground and stoning to formation. ▪ Excavation and concrete Pad and Beam foundations including positioning of steel reinforcement and starter bars for cast on site columns. ▪ 3 floors of finished concrete slab pours utilizing temporary works for shuttering. ▪ Small diameter drainage and manhole construction ▪ Access road and external finished including landscaping, tarmac and block paving.
  • 15. 5/19/2015 15 RUH HOSPITAL, BATH Responsibilities ▪ Management and supervision of sub-contractors and directly employed operatives. ▪ Establishment of co’ordinated and levelled site control. ▪ Allocation Sheets, Toolbox talks and Daily Briefings. • Setting out Line and Level of pad and beam foundations, steel starter bars and cast in-situ concrete columns as well as drainage, service ducting and access roads. • Setting out and post pour checks of all concrete columns, 3 floors of finished structural slab and 2 lift shafts and staircases. • Procurement, planning and organisation of construction materials, plant and sub- contractors. • Liaising with client and producing as-built drawings. RUH HOSPITAL, BATH
  • 16. 5/19/2015 16 RUH HOSPITAL, BATH JUNCTION 3, M32 Scope of Works ▪ Access roads, cycle paths and footpaths to new housing development. ▪ All civils works up to and including finished slab level. ▪ Landscaping and block paving. ▪ Large soakaway to service all storm water drainage for the development.
  • 17. 5/19/2015 17 DICK LOVETT BMW, BRISTOL Scope of Works ▪ Access roads, cycle paths and footpaths to new BMW showroom. ▪ All civils works up to and including finished slab level. ▪ Landscaping and block paving. ▪ Large perimeter sustainable urban drainage system, collecting stormwater runoff from the forecourt surface and showrooms roof area to be utilized in the flushing of toilets and watering of landscaping. All excess water was to be stored below the surface and trickled into the existing storm network to help alleviate the pressure the existing system was already under. WESTERN SUPERMARE WASTE TRANSFER Scope of Works ▪ Upgrade of existing waste transfer station ▪ Reinforced Concrete Retaining Walls ▪ Drainage, Ducting and Lighting Columns. ▪ Clean Water Supply ▪ Access Roads and Pull-In Bays ▪ Finished Concrete Slabs and Steel Framed Unit
  • 18. 5/19/2015 18 WESTERN SUPERMARE WASTE TRANSFER HASKINS GARDEN CENTRE Site Engineer Lawton Construction – Haskins Garden Centre June 2011 - February 2012 Scope of Works ▪ Greenfield site construction of a garden centre and 250 car parking spaces including access roads, pad foundations, ducting and services and site drainage. ▪ Responsible for site setting out and Risk Assessment/Method Statement compiling. ▪ Reportable to senior engineer/site manager.