SlideShare a Scribd company logo
LTI Frequency Rate
Severity (S) F/R
Date:
1 to 28 February
2022
Page 1 to 6
Total Ave. Manpower:1752
1698
328
Direct Man-Power Indirect Man-Power
Total Man-hours:
7,072,891
9,482,718
1,529,541
PROJECT MAN-HOURS WITHOUT LTI
DIRECT MAN-HOURS
INDIRECT MAN-HOURS
11,012,259
0.265
0.27
0.275
0.28
0.285
0.29
DEC-21 JAN-22
0.53
0.54
0.55
0.56
0.57
0.58
Dec-21 Jan-22
Fatality
Serious
Minor Injuries
Near Miss
Unsafe
Act/Condition
HSE ACCIDENT TRIANGLE DIAGRAM PATTERN HSE ACCIDENT/INCIDENT INDICATOR
QIN PROJECT No. 285 Prepared by RCA H&S Manager RBD
HSE Monthly Performance
20,000,000 HRS
3,932,898 LOST MAN-HOURS
7,072,891 HRS W/O LTI 17,000,000 HRS
PROJECT TARGET HOURS PROJECTED
RE-START
START
Date:
1 to 28 February
202022 HSE Monthly Performance
Page 2 to 6
QIN PROJECT No. 285 Prepared by RCA H&S Manager RBD.
Activity Involve in Accident
Accident and Incident
Category
3
7
2
Fallen object
Road Traffic
Cought in Between
Accident Incident Location
4
1 1 1 1
2
1 1 1 1 1
Icon
Tower
B-900 P-500 B-300 B-801 B-102 B-200 T-400 P300 P-700 QIN
Road
1
2
1
2
4
1 1 1 1 1
Lifting Backfilling Concreting Shuttering Shifting of
Doka
Pedestrian Coring
Concrete
MEP Block works Hualing
Injuries and First Aid Case
3
5
Injuries FAC
2
1
0
0
1
BODY PARTS AFFECTED BT WORKS
INJURIES
0
4
HEAD
HAND
ARM
FACIAL
0
WRIST
LEG
KNEE
0
ANKLE
FOOT
0
BODY SYSTEMS
0
SHOULDER
0
NECK
Date:
1 to 28 February
2022
Toolbox Talk Attended Per Topic
1320
1355
1390
1420
Electrical Safety
It won’t happen to me
Work at height
Hand and power tool
Page 3 to 6
STARRT CARD FOREMAN CONDUCTED
378
422
JANUARY
FEBRUARY
0
3
0 0
4
7
0 0 0 0
4
2
Lagging Indicators
Activity Hazards
14
2 4 1
16
9
16
1 1
7
2 2
16
4 2
22
Total Number of RCA Internal Safety Observation Raised: 119
QIN PROJECT No. 285 Prepared by RCA H&S Manager RBD.
HSE Monthly Performance
RCA Safety Officers Observation
Raised: 119
16 17
39
14 12 5 10 4
13
17
37
8 11 5 8 4
3 0 2 6 1 0 2 0
1 1 2 2 4 0 0 0
AMOS A. DAVID BRIGHT SHAKAWAT
HOSSAIN
ATIBA JOHNSON SAMUEL VIVEK JUSTINE
No. of Safety Ob No. Closed Ob No. Open Ob Good Ob
Date:
1 to 28 February
2022
Quarterly Safety Inspection
IOR Site Engineer Close-out and Good Practices Performance Hazard & Risk
Falling from Height
Fire
Permit To Work
Working at
Height
Excavation
Access/Egress
Void Spaces
Scaffolding
Housekeeping
Compliances
CONSULTANT RAISED and CLOSED-OUT REPORT
Ext. Report
Closed Out %
% for Closed
Reports
75%
Remaining
Closed HS
Report
Page 4 to 6
QIN PROJECT No. 285 Prepared by RCA H&S Manager RBD.
1
5
9 9
1 2
5
20
7
5 6
4
1 1
11
8
0
4
9 9
1 2
5
20
7
5 5
3
1 1
10
8
1 1 0 0 0 0 0 0 0 0 1 1 0 0 1 0
ENG.
ABDULLA
ENG.
AMMAR
ENG.
EHAB
ENG.
FRANCIS
ENG.
HAMDI
ENG.
HOSSAIN
ENG.
JABER
ENG.
JAWAD
ENG. JOE ENG.
MAZIM
ENG.
MOATH
ENG.
MOAZ
ENG.
MEHADY
ENG.
OMAR
ENG.
RAUF
ENG.
RYAN
No. of Safety Ob No. Closed Ob No. Open Ob Good Ob
HSE Monthly Performance
NCN HSE LEADERSHIP SITE WALK HSE INSPECTION REPORT NON HSE OBSERVATION
REPORT
SEE AND ACT OBSERVATION
REPORT
16 13
141
271
22
15 6
123
228
14
ISSUED REPORT CLOSED
Date:
1 to 28 February
2022
HSE STAFF REQUIREMENT PROJECT SAFETY PERFORMANCE
Training Hours
Training By Activity
Total No. HSE Inducted. 7044
RAMs Reviewed 241
HSE Meetings
1 1 1
0
0.2
0.4
0.6
0.8
1
1.2
Safety Lead Walk Logistic Meeting HSE Safety Officer
Meeting
128
247
January
February
Page 5 to 6
226 11 1 3
APPROVE AS
NOTED
NOT APPROVE FOR
INFORMATION
UNDER REVIEW
9200
4728
280
200
Working at Height
Scaffolding
Confined Space
Rigging and Slinggers
1150
197
35
25
Working at Height
Scaffolding
Confined Space
Rigging and Slinggers
QIN PROJECT No. 285 Prepared by RCA H&S Manager RBD.
HSE Monthly Performance
1
24
1 2 1 1
0%
20%
40%
60%
80%
100%
120%
0
5
10
15
20
25
30
HSE MANAGER SAFETY OFFICERS SITE DOCTOR NURSE ENVIRONMENTAL
MANAGER
ENVIRONMENTAL
ENGINEER
Series1 Series2
INTERNAL
OBSERVATION
INT/EXT
MEETINGS
CONSULTANT
RCO
RAMS REVIEW WEEKLY TBT HSE STAFF
84%
100%
75%
94%
100%
93%
Date:
1 to 28 February
2022 HSE Monthly Performance
HSE TOOLBOX MEETINGS HSE OBSERVATION AND INSPECTION
GOOD OBSERVATION
Scaffolding Inspection Fire Extinguisher
Inspection
Electrical DB
Inspection
Page 6 to 6

More Related Content

What's hot

Accident reporting and investigation
Accident reporting and investigationAccident reporting and investigation
Accident reporting and investigation
Hien Dinh
 
Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012
ChinaHarbour
 
Line Of Fire.pptx
Line Of Fire.pptxLine Of Fire.pptx
Line Of Fire.pptx
RicardoDalisay6
 
FULL BODY HARNESS INSPECTION RECORD Form # HSEQ - FBHIR Rev 2.docx
FULL BODY HARNESS INSPECTION RECORD Form # HSEQ - FBHIR Rev 2.docxFULL BODY HARNESS INSPECTION RECORD Form # HSEQ - FBHIR Rev 2.docx
FULL BODY HARNESS INSPECTION RECORD Form # HSEQ - FBHIR Rev 2.docx
Dwarika Bhushan Sharma
 
Amn safety induction j 175 - staff rev 4 - s 14
Amn safety induction  j 175 - staff rev 4 - s 14Amn safety induction  j 175 - staff rev 4 - s 14
Amn safety induction j 175 - staff rev 4 - s 14
Mumtaz A. Khan CMIOSH, IDipNEBOSH
 
Reece scba ppt
Reece scba pptReece scba ppt
Reece scba ppt
Reece Mas
 
Near Miss Reporting
Near Miss ReportingNear Miss Reporting
02 alert ehs behaviour
02 alert ehs behaviour02 alert ehs behaviour
02 alert ehs behaviour
Dwarika Bhushan Sharma
 
EHS induction Presentation slides
EHS induction Presentation slidesEHS induction Presentation slides
EHS induction Presentation slides
Maffino
 
BBS TRAINING.pptx
BBS TRAINING.pptxBBS TRAINING.pptx
BBS TRAINING.pptx
Mirza Saifullah Baig
 
Safety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam AtifSafety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam Atif
Wessam Atif
 
Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014
Fitri Ifony
 
Hot Works Safety Training
Hot Works Safety TrainingHot Works Safety Training
Hot Works Safety Training
Gaurav Singh Rajput
 
3 emergency management risk assessment templates
3 emergency management risk assessment templates3 emergency management risk assessment templates
3 emergency management risk assessment templates
Dwarika Bhushan Sharma
 
Health & Safety Induction Training
Health & Safety Induction Training Health & Safety Induction Training
Health & Safety Induction Training
Claire
 
Staff safety hand book
Staff   safety hand bookStaff   safety hand book
Staff safety hand book
Mumtaz A. Khan CMIOSH, IDipNEBOSH
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.ppt
ssuser0ebdc3
 
Happy National Safety Day
Happy National Safety DayHappy National Safety Day
Happy National Safety Day
vasant oak
 
Hse Action Plan
Hse Action PlanHse Action Plan
Hse Action Plan
Eddie Garcia
 
Hse plan
Hse planHse plan

What's hot (20)

Accident reporting and investigation
Accident reporting and investigationAccident reporting and investigation
Accident reporting and investigation
 
Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012
 
Line Of Fire.pptx
Line Of Fire.pptxLine Of Fire.pptx
Line Of Fire.pptx
 
FULL BODY HARNESS INSPECTION RECORD Form # HSEQ - FBHIR Rev 2.docx
FULL BODY HARNESS INSPECTION RECORD Form # HSEQ - FBHIR Rev 2.docxFULL BODY HARNESS INSPECTION RECORD Form # HSEQ - FBHIR Rev 2.docx
FULL BODY HARNESS INSPECTION RECORD Form # HSEQ - FBHIR Rev 2.docx
 
Amn safety induction j 175 - staff rev 4 - s 14
Amn safety induction  j 175 - staff rev 4 - s 14Amn safety induction  j 175 - staff rev 4 - s 14
Amn safety induction j 175 - staff rev 4 - s 14
 
Reece scba ppt
Reece scba pptReece scba ppt
Reece scba ppt
 
Near Miss Reporting
Near Miss ReportingNear Miss Reporting
Near Miss Reporting
 
02 alert ehs behaviour
02 alert ehs behaviour02 alert ehs behaviour
02 alert ehs behaviour
 
EHS induction Presentation slides
EHS induction Presentation slidesEHS induction Presentation slides
EHS induction Presentation slides
 
BBS TRAINING.pptx
BBS TRAINING.pptxBBS TRAINING.pptx
BBS TRAINING.pptx
 
Safety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam AtifSafety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam Atif
 
Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014
 
Hot Works Safety Training
Hot Works Safety TrainingHot Works Safety Training
Hot Works Safety Training
 
3 emergency management risk assessment templates
3 emergency management risk assessment templates3 emergency management risk assessment templates
3 emergency management risk assessment templates
 
Health & Safety Induction Training
Health & Safety Induction Training Health & Safety Induction Training
Health & Safety Induction Training
 
Staff safety hand book
Staff   safety hand bookStaff   safety hand book
Staff safety hand book
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.ppt
 
Happy National Safety Day
Happy National Safety DayHappy National Safety Day
Happy National Safety Day
 
Hse Action Plan
Hse Action PlanHse Action Plan
Hse Action Plan
 
Hse plan
Hse planHse plan
Hse plan
 

Recently uploaded

digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
awadeshbabu
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
Mukeshwaran Balu
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
Divyam548318
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
nooriasukmaningtyas
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 

Recently uploaded (20)

digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 

HSE Monthly Performance .pdf

  • 1. LTI Frequency Rate Severity (S) F/R Date: 1 to 28 February 2022 Page 1 to 6 Total Ave. Manpower:1752 1698 328 Direct Man-Power Indirect Man-Power Total Man-hours: 7,072,891 9,482,718 1,529,541 PROJECT MAN-HOURS WITHOUT LTI DIRECT MAN-HOURS INDIRECT MAN-HOURS 11,012,259 0.265 0.27 0.275 0.28 0.285 0.29 DEC-21 JAN-22 0.53 0.54 0.55 0.56 0.57 0.58 Dec-21 Jan-22 Fatality Serious Minor Injuries Near Miss Unsafe Act/Condition HSE ACCIDENT TRIANGLE DIAGRAM PATTERN HSE ACCIDENT/INCIDENT INDICATOR QIN PROJECT No. 285 Prepared by RCA H&S Manager RBD HSE Monthly Performance 20,000,000 HRS 3,932,898 LOST MAN-HOURS 7,072,891 HRS W/O LTI 17,000,000 HRS PROJECT TARGET HOURS PROJECTED RE-START START
  • 2. Date: 1 to 28 February 202022 HSE Monthly Performance Page 2 to 6 QIN PROJECT No. 285 Prepared by RCA H&S Manager RBD. Activity Involve in Accident Accident and Incident Category 3 7 2 Fallen object Road Traffic Cought in Between Accident Incident Location 4 1 1 1 1 2 1 1 1 1 1 Icon Tower B-900 P-500 B-300 B-801 B-102 B-200 T-400 P300 P-700 QIN Road 1 2 1 2 4 1 1 1 1 1 Lifting Backfilling Concreting Shuttering Shifting of Doka Pedestrian Coring Concrete MEP Block works Hualing Injuries and First Aid Case 3 5 Injuries FAC 2 1 0 0 1 BODY PARTS AFFECTED BT WORKS INJURIES 0 4 HEAD HAND ARM FACIAL 0 WRIST LEG KNEE 0 ANKLE FOOT 0 BODY SYSTEMS 0 SHOULDER 0 NECK
  • 3. Date: 1 to 28 February 2022 Toolbox Talk Attended Per Topic 1320 1355 1390 1420 Electrical Safety It won’t happen to me Work at height Hand and power tool Page 3 to 6 STARRT CARD FOREMAN CONDUCTED 378 422 JANUARY FEBRUARY 0 3 0 0 4 7 0 0 0 0 4 2 Lagging Indicators Activity Hazards 14 2 4 1 16 9 16 1 1 7 2 2 16 4 2 22 Total Number of RCA Internal Safety Observation Raised: 119 QIN PROJECT No. 285 Prepared by RCA H&S Manager RBD. HSE Monthly Performance RCA Safety Officers Observation Raised: 119 16 17 39 14 12 5 10 4 13 17 37 8 11 5 8 4 3 0 2 6 1 0 2 0 1 1 2 2 4 0 0 0 AMOS A. DAVID BRIGHT SHAKAWAT HOSSAIN ATIBA JOHNSON SAMUEL VIVEK JUSTINE No. of Safety Ob No. Closed Ob No. Open Ob Good Ob
  • 4. Date: 1 to 28 February 2022 Quarterly Safety Inspection IOR Site Engineer Close-out and Good Practices Performance Hazard & Risk Falling from Height Fire Permit To Work Working at Height Excavation Access/Egress Void Spaces Scaffolding Housekeeping Compliances CONSULTANT RAISED and CLOSED-OUT REPORT Ext. Report Closed Out % % for Closed Reports 75% Remaining Closed HS Report Page 4 to 6 QIN PROJECT No. 285 Prepared by RCA H&S Manager RBD. 1 5 9 9 1 2 5 20 7 5 6 4 1 1 11 8 0 4 9 9 1 2 5 20 7 5 5 3 1 1 10 8 1 1 0 0 0 0 0 0 0 0 1 1 0 0 1 0 ENG. ABDULLA ENG. AMMAR ENG. EHAB ENG. FRANCIS ENG. HAMDI ENG. HOSSAIN ENG. JABER ENG. JAWAD ENG. JOE ENG. MAZIM ENG. MOATH ENG. MOAZ ENG. MEHADY ENG. OMAR ENG. RAUF ENG. RYAN No. of Safety Ob No. Closed Ob No. Open Ob Good Ob HSE Monthly Performance NCN HSE LEADERSHIP SITE WALK HSE INSPECTION REPORT NON HSE OBSERVATION REPORT SEE AND ACT OBSERVATION REPORT 16 13 141 271 22 15 6 123 228 14 ISSUED REPORT CLOSED
  • 5. Date: 1 to 28 February 2022 HSE STAFF REQUIREMENT PROJECT SAFETY PERFORMANCE Training Hours Training By Activity Total No. HSE Inducted. 7044 RAMs Reviewed 241 HSE Meetings 1 1 1 0 0.2 0.4 0.6 0.8 1 1.2 Safety Lead Walk Logistic Meeting HSE Safety Officer Meeting 128 247 January February Page 5 to 6 226 11 1 3 APPROVE AS NOTED NOT APPROVE FOR INFORMATION UNDER REVIEW 9200 4728 280 200 Working at Height Scaffolding Confined Space Rigging and Slinggers 1150 197 35 25 Working at Height Scaffolding Confined Space Rigging and Slinggers QIN PROJECT No. 285 Prepared by RCA H&S Manager RBD. HSE Monthly Performance 1 24 1 2 1 1 0% 20% 40% 60% 80% 100% 120% 0 5 10 15 20 25 30 HSE MANAGER SAFETY OFFICERS SITE DOCTOR NURSE ENVIRONMENTAL MANAGER ENVIRONMENTAL ENGINEER Series1 Series2 INTERNAL OBSERVATION INT/EXT MEETINGS CONSULTANT RCO RAMS REVIEW WEEKLY TBT HSE STAFF 84% 100% 75% 94% 100% 93%
  • 6. Date: 1 to 28 February 2022 HSE Monthly Performance HSE TOOLBOX MEETINGS HSE OBSERVATION AND INSPECTION GOOD OBSERVATION Scaffolding Inspection Fire Extinguisher Inspection Electrical DB Inspection Page 6 to 6