Luca Vignati
Aktau, 25 September 2012
KARACHAGANAK ACTIVITY REVIEW AND
LONG TERM DEVELOPMENT PLANS
WORLD CLASS EXPERTISE – WORLD CLASS ASSET
FIELD OVERVIEW
 One of the world’s largest gas condensate fields;
 Discovered in 1979;
 Gross reserves – over 2.4 billion barrels of
condensate and 16 tcf of gas.
New agreement – 14 December 2011
29.25%
29.25%
18%
13.5%
The Republic of Kazakhstan, the Contracting Companies and
KPO have recently completed the agreement in relation to the
Karachaganak Project that was initially signed on 14 December
2011.
Under the terms of the agreement the Republic has acquired a
10% interest in the Karachaganak Final Production Sharing
Agreement.
The Republic’s interest in the Final Production Sharing
Agreement will be managed by the national oil company,
KazMunaiGas (KMG).
The consideration under the agreement also includes the
allocation of an additional 2 million tonnes per year capacity in
the Caspian Pipeline Consortium export pipeline over the
remaining life of the Final Production Sharing Agreement .
10%
RESERVES AND INVESTMENTS
Karachaganak holds an estimated 9 billion barrels of
condensate and 48 trillion cubic feet (tcf) of gas.
To date, around 7-8% of the recoverable hydrocarbons
initially in place have been produced.
Since the signing of the FPSA:
• $15.3 bln invested into developing the field, applying
industry leading technology aimed at maximizing
sustainable economic value
• $14.6 bln of direct payments to RoK budget
KPC
Unit 2
Unit 3
Unstabilised Oil
Sour Gas to Re-injection
Unstabilised Oil
65 000 BOEPD
Sour Gas
24 MSM3/day
Orenburg
Stabilised Oil
242 402 BOPD
CPC
Mini
Refinery
Unstabilised Oil
15 000 BOEPD
Injection
Wells
Production
from Wells
Fuel Gas
2.4MSm3/d
FACILITIES OVERVIEW
Sour Gas
Production
from Wells
Orenburg
Production
from Wells
24 MSM3/day
50 MW
Power
Community
 KPC- Atyrau oil pipeline
(635km), operating since 2003
 Two pumping stations, one at
KPC, the other at Bolshoi
Chagan; terminal at Atyrau
for receipt and storage
 Stabilised liquids exported
via CPC and Atyrau – Samara
 Principal sale points of
stabilised liquids are
Novorossyisk (Black Sea) and
Primorsk (Baltic)
 Sour gas and unstabilised
liquids sent to Orenburg
PRINCIPAL EXPORT ROUTES
PRODUCTION AND INJECTION HISTORY
0
100
200
300
400
500
600
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
KBarrelsperday)
Gas Injection
Gas Sales
Liquid Production
PSPA FPSA
Field Development Plan - Gas Balancing
Description
 Maximise production of
liquids based upon current
gas handling limitations
 Transfer currently shut-in
KPC wells to Unit 2
 Installation of two 5960m
10” pipelines between
RMS-M and Unit2
Proposed Gas
Balancing lines
P2M
P2ME
P2ME2
P2ME3
Proposed Gas
Balancing lines
P2M
P2ME
P2ME2
P2ME3
Q1 Q2 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
FEED (internal)
VAR 3
FID
Bid & Award LLI
Deliver Line Pipe
Deliver Valves
Detailed Design
Prefabrication & RMS M mod.
Pipeline Construction & Commissioning
Start Up
Gas Balancing
2011 2012 20152013 2014
Field Development Plan - Plateau Extension Wells
(P2ME3)
Structure on Top Reservoir
Description
 Continuation of existing
Phase IIM,P2ME and
P2ME2 drilling programme
 Commencing either
 2017 – 1 rig
 2014 – 2 rigs
 Total 12 wells
Phase 2ME (purple)
Phase 2ME2 (brown)
Phase 2ME3 (yellow)
Field Development Plan - Unit 2 Gas Injection Upgrade
Project
Description
 Maximise volume of injected gas
with existing facilities
 Phase 1
 Additional gas/liquid separation
equipment for sustained flowrate
 Phase 2
 Process plant, field injection
facilities and wells
Q1 Q2 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Evaluation
VAR 1
Pre FEED
VAR 2
FEED (internal)
VAR 3
FID
Execution
Production
2011 2012 2013 2014
Unit 2 Gas Injection Upgrade Project
2015 2016 2017
Unit 2
Additional trunk line
Field Development Plan - KPC Gas Debottlenecking Project
Description
 Increase overall KPC gas
processing by expanding MP gas
handling capacity
 MP gas handling system enhanced
including new combined MP
dehydration and dew-pointing train
 Potential additional pipeline from
KPC to Unit 3
Q1 Q2 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Train 4 Test Run
Mobilise Project Team
Concept Studies
VAR 2
FEED
Tender & Award EPC
VAR 3
FID
Execution
Start Up
2011 2012 2016
KPC Gas Debottlenecking Project
2014 2015 20172013
2011 PERFORMANCE & ACHIEVEMENTS
SAFETY
 LITF & RTIF – KPO in the top 10 best performers of oil & gas producers
 Road Traffic Incident – reduction of 85% from 2010
ENVIRONMENT
 Gas Utilisation Rate - 99.92% (99.87% in 2010) whilst the regulatory
target approved within gas utilisation programme is 99.75%.
LATEST PROJECTS
 TRAIN 4 - State Acceptance on 1 Dec. 2011
 UGPP - State Acceptance on 9 Sept. 2011
 3rd Storage tank on KPC
LOCAL CONTENT
Some 2,500 Kazakh vendors are currently registered on supplier
database.
Since beginning of the FPSA in 1997, total value of contracts assigned
to Kazakh companies exceeded $4 billion.
In 2011, KPO awarded contracts worth over $428 million to 341 Kazakh
companies for the provision of goods, works and services.
In Q2 2012 the Local Content in Karachaganak project makes up to 56%
LOCAL CONTENT DEVELOPMENT INITIATIVES
• Pilot Project on organizing the manufacturing of high technology products for KPO and
other O&G operators’ needs
• Aksai Industrial Park project is under implementation
• AIP Project included to the Industrialisation Map, will employ 130 experts
• Spare Parts and Equipment Manufacturing Localisation Project
• By WKO Entrepreneurs Association and support of WKO Akimat Technical Expert
Group has been created to perform the project.
• Working Group of KMG, KPO and “Kazakhstan Union of Machinery building companies”
was created
• Local Content reporting in compliance with the current legislation requirements
• KPO was registered in the MOG reporting system
• Integrated Contract Plan for 2011-2014 placed on to KPO web-site and become visible
for all RoK business union
HUMAN RESOURCES
Total KPO Employees – 3681
NATIONAL EMPLOYEES UP TO 93% OF TOTAL KPO POPULATION
KPO NATIONAL STAFF HAS GROWN FROM:
1,186 IN THE YEAR 2000
3,410 NOW
EXPATRIATE RESOURCES HAVE BEEN REDUCED BY 55% FROM:
587 IN THE YEAR 2000
271 NOW
Investments (plan 2012)
• Annual nationals salary fund – $163 M
• Annual training and development budget for nationals – $14.5 M
• Annual payments for nationals as a part of collective agreement and
company social responsibility – $6.2 M
KPO NATIONALIZATION PROGRAMME (2009-2018)
Cat Description 31 Jan, 2012 Target 2013 (program) Dec, 2018
1 Management 69% 60% 70%
2 Professional staff and Supervisors 95% 91% 95%
3 Technical staff 100% 100% 100%
4 Support and Clerical 100% 100% 100%
Nationalization as of 31 of January 2012 vs Plan
KPO Nationalization trend 1998 - 2037
THANK YOU!

More Related Content

What's hot

Oil and gas infrastructure of Georgia: ongoing and prospective projects
Oil and gas infrastructure of Georgia: ongoing and prospective projectsOil and gas infrastructure of Georgia: ongoing and prospective projects
Oil and gas infrastructure of Georgia: ongoing and prospective projectsITE Oil&Gas
 
Trans Adriatic Pipeline (TAP) – The European leg of the Southern Gas Corridor
Trans Adriatic Pipeline (TAP) – The European leg of the Southern Gas CorridorTrans Adriatic Pipeline (TAP) – The European leg of the Southern Gas Corridor
Trans Adriatic Pipeline (TAP) – The European leg of the Southern Gas CorridorAlbania Energy Association
 
Oil in Georgia: Dream or Challenge?
Oil in Georgia: Dream or Challenge?Oil in Georgia: Dream or Challenge?
Oil in Georgia: Dream or Challenge?ITE Oil&Gas
 
How Albanian legislation facilitates the exploration and development of hydro...
How Albanian legislation facilitates the exploration and development of hydro...How Albanian legislation facilitates the exploration and development of hydro...
How Albanian legislation facilitates the exploration and development of hydro...Albania Energy Association
 
What are the challenges facing china's pipeline network
What are the challenges facing china's pipeline networkWhat are the challenges facing china's pipeline network
What are the challenges facing china's pipeline networkNicholas Newman
 
The revival and transformation of Europe’s largest onshore oilfield; the Pato...
The revival and transformation of Europe’s largest onshore oilfield; the Pato...The revival and transformation of Europe’s largest onshore oilfield; the Pato...
The revival and transformation of Europe’s largest onshore oilfield; the Pato...Albania Energy Association
 
Department of Public Enterprises presentation on SOEs
Department of Public Enterprises presentation on SOEsDepartment of Public Enterprises presentation on SOEs
Department of Public Enterprises presentation on SOEsSABC News
 
Albpetrol status update in the era of privatisation
Albpetrol status update in the era of privatisationAlbpetrol status update in the era of privatisation
Albpetrol status update in the era of privatisationAlbania Energy Association
 
Options for gas to power in South Africa
Options for gas to power in South AfricaOptions for gas to power in South Africa
Options for gas to power in South AfricaNicholas Newman
 
B.C. LNG: Myths and Realities - #LNGinBCForum
B.C. LNG: Myths and Realities - #LNGinBCForumB.C. LNG: Myths and Realities - #LNGinBCForum
B.C. LNG: Myths and Realities - #LNGinBCForumPembina Institute
 
Climate implications of Pacific NorthWest LNG - #LNGinBCForum
Climate implications of Pacific NorthWest LNG - #LNGinBCForumClimate implications of Pacific NorthWest LNG - #LNGinBCForum
Climate implications of Pacific NorthWest LNG - #LNGinBCForumPembina Institute
 
Overall analysis of the onshore sector of Albania and current developments
Overall analysis of the onshore sector of Albania and current developmentsOverall analysis of the onshore sector of Albania and current developments
Overall analysis of the onshore sector of Albania and current developmentsAlbania Energy Association
 
7th study meeting Tokyo - Holger Bietz
7th study meeting Tokyo - Holger Bietz7th study meeting Tokyo - Holger Bietz
7th study meeting Tokyo - Holger BietzGlobal CCS Institute
 
Arb port emission reduction
Arb port emission reductionArb port emission reduction
Arb port emission reductionyuweili14
 
All of these Mega Projects require vast amounts of Construction aggregate
All of these Mega Projects require vast amounts of Construction aggregateAll of these Mega Projects require vast amounts of Construction aggregate
All of these Mega Projects require vast amounts of Construction aggregateFollow me on Twitter @Stockshaman
 

What's hot (20)

Iraq Pipeline 2012
Iraq Pipeline 2012Iraq Pipeline 2012
Iraq Pipeline 2012
 
Oil and gas infrastructure of Georgia: ongoing and prospective projects
Oil and gas infrastructure of Georgia: ongoing and prospective projectsOil and gas infrastructure of Georgia: ongoing and prospective projects
Oil and gas infrastructure of Georgia: ongoing and prospective projects
 
Trans Adriatic Pipeline (TAP) – The European leg of the Southern Gas Corridor
Trans Adriatic Pipeline (TAP) – The European leg of the Southern Gas CorridorTrans Adriatic Pipeline (TAP) – The European leg of the Southern Gas Corridor
Trans Adriatic Pipeline (TAP) – The European leg of the Southern Gas Corridor
 
TWCOG
TWCOGTWCOG
TWCOG
 
Oil in Georgia: Dream or Challenge?
Oil in Georgia: Dream or Challenge?Oil in Georgia: Dream or Challenge?
Oil in Georgia: Dream or Challenge?
 
How Albanian legislation facilitates the exploration and development of hydro...
How Albanian legislation facilitates the exploration and development of hydro...How Albanian legislation facilitates the exploration and development of hydro...
How Albanian legislation facilitates the exploration and development of hydro...
 
What are the challenges facing china's pipeline network
What are the challenges facing china's pipeline networkWhat are the challenges facing china's pipeline network
What are the challenges facing china's pipeline network
 
The revival and transformation of Europe’s largest onshore oilfield; the Pato...
The revival and transformation of Europe’s largest onshore oilfield; the Pato...The revival and transformation of Europe’s largest onshore oilfield; the Pato...
The revival and transformation of Europe’s largest onshore oilfield; the Pato...
 
Department of Public Enterprises presentation on SOEs
Department of Public Enterprises presentation on SOEsDepartment of Public Enterprises presentation on SOEs
Department of Public Enterprises presentation on SOEs
 
Albpetrol status update in the era of privatisation
Albpetrol status update in the era of privatisationAlbpetrol status update in the era of privatisation
Albpetrol status update in the era of privatisation
 
Options for gas to power in South Africa
Options for gas to power in South AfricaOptions for gas to power in South Africa
Options for gas to power in South Africa
 
CMS
CMSCMS
CMS
 
SKKmigas
SKKmigasSKKmigas
SKKmigas
 
B.C. LNG: Myths and Realities - #LNGinBCForum
B.C. LNG: Myths and Realities - #LNGinBCForumB.C. LNG: Myths and Realities - #LNGinBCForum
B.C. LNG: Myths and Realities - #LNGinBCForum
 
Climate implications of Pacific NorthWest LNG - #LNGinBCForum
Climate implications of Pacific NorthWest LNG - #LNGinBCForumClimate implications of Pacific NorthWest LNG - #LNGinBCForum
Climate implications of Pacific NorthWest LNG - #LNGinBCForum
 
Overall analysis of the onshore sector of Albania and current developments
Overall analysis of the onshore sector of Albania and current developmentsOverall analysis of the onshore sector of Albania and current developments
Overall analysis of the onshore sector of Albania and current developments
 
7th study meeting Tokyo - Holger Bietz
7th study meeting Tokyo - Holger Bietz7th study meeting Tokyo - Holger Bietz
7th study meeting Tokyo - Holger Bietz
 
Man diesel & turbo
Man diesel & turboMan diesel & turbo
Man diesel & turbo
 
Arb port emission reduction
Arb port emission reductionArb port emission reduction
Arb port emission reduction
 
All of these Mega Projects require vast amounts of Construction aggregate
All of these Mega Projects require vast amounts of Construction aggregateAll of these Mega Projects require vast amounts of Construction aggregate
All of these Mega Projects require vast amounts of Construction aggregate
 

Similar to Karachaganak overview WKIF Aktau 25.09.12 Eng Rev-4

PROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCOPROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCOHITESH RATHOD
 
Ensuring Affordable Fuel Security for NTPC - Presentation
Ensuring Affordable Fuel Security for NTPC - PresentationEnsuring Affordable Fuel Security for NTPC - Presentation
Ensuring Affordable Fuel Security for NTPC - PresentationSantosh Verma
 
Sui Northern Gas Pipelines Limited
Sui Northern Gas Pipelines LimitedSui Northern Gas Pipelines Limited
Sui Northern Gas Pipelines LimitedMark Peterson
 
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...zubeditufail
 
Gtl hi lite - A Case on Simenggaris and Bengara PSC - Indonesia
Gtl hi lite - A Case on Simenggaris and Bengara PSC - IndonesiaGtl hi lite - A Case on Simenggaris and Bengara PSC - Indonesia
Gtl hi lite - A Case on Simenggaris and Bengara PSC - IndonesiaFurqon Hanief
 
19.11.2013 Spotlight presentations showcasing Mongolian investment opportunit...
19.11.2013 Spotlight presentations showcasing Mongolian investment opportunit...19.11.2013 Spotlight presentations showcasing Mongolian investment opportunit...
19.11.2013 Spotlight presentations showcasing Mongolian investment opportunit...The Business Council of Mongolia
 
09.02.2012 Baganuur Coal Mine Expansion: Opportunities for investors, Baganuu...
09.02.2012 Baganuur Coal Mine Expansion: Opportunities for investors, Baganuu...09.02.2012 Baganuur Coal Mine Expansion: Opportunities for investors, Baganuu...
09.02.2012 Baganuur Coal Mine Expansion: Opportunities for investors, Baganuu...The Business Council of Mongolia
 
R4 v03fbe eia of cpp project bin qasim fertilizer complex-unprotected
R4 v03fbe   eia of cpp project bin qasim fertilizer complex-unprotectedR4 v03fbe   eia of cpp project bin qasim fertilizer complex-unprotected
R4 v03fbe eia of cpp project bin qasim fertilizer complex-unprotectedzubeditufail
 
02.20-21.2014, PRESENTATION, Aduunchuluun power and CTR project, J.Zoljargal
02.20-21.2014, PRESENTATION, Aduunchuluun power and CTR project, J.Zoljargal02.20-21.2014, PRESENTATION, Aduunchuluun power and CTR project, J.Zoljargal
02.20-21.2014, PRESENTATION, Aduunchuluun power and CTR project, J.ZoljargalThe Business Council of Mongolia
 
Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...
Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...
Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...Global CCS Institute
 
fgp-wpmp-overview
fgp-wpmp-overviewfgp-wpmp-overview
fgp-wpmp-overviewJeremy Ball
 
Power industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanPower industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanIBRAR AHMAD
 
2011 LNG AS PROPULSION FUEL
2011 LNG AS PROPULSION FUEL2011 LNG AS PROPULSION FUEL
2011 LNG AS PROPULSION FUELMEC Intelligence
 
Wac Ncc100809 China’s Energy,Strategic Perspective
Wac Ncc100809 China’s Energy,Strategic PerspectiveWac Ncc100809 China’s Energy,Strategic Perspective
Wac Ncc100809 China’s Energy,Strategic PerspectiveDavid Edick Jr
 

Similar to Karachaganak overview WKIF Aktau 25.09.12 Eng Rev-4 (20)

Be
BeBe
Be
 
PROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCOPROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCO
 
Ensuring Affordable Fuel Security for NTPC - Presentation
Ensuring Affordable Fuel Security for NTPC - PresentationEnsuring Affordable Fuel Security for NTPC - Presentation
Ensuring Affordable Fuel Security for NTPC - Presentation
 
Sui Northern Gas Pipelines Limited
Sui Northern Gas Pipelines LimitedSui Northern Gas Pipelines Limited
Sui Northern Gas Pipelines Limited
 
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...
 
Gtl hi lite - A Case on Simenggaris and Bengara PSC - Indonesia
Gtl hi lite - A Case on Simenggaris and Bengara PSC - IndonesiaGtl hi lite - A Case on Simenggaris and Bengara PSC - Indonesia
Gtl hi lite - A Case on Simenggaris and Bengara PSC - Indonesia
 
19.11.2013 Spotlight presentations showcasing Mongolian investment opportunit...
19.11.2013 Spotlight presentations showcasing Mongolian investment opportunit...19.11.2013 Spotlight presentations showcasing Mongolian investment opportunit...
19.11.2013 Spotlight presentations showcasing Mongolian investment opportunit...
 
09.02.2012 Baganuur Coal Mine Expansion: Opportunities for investors, Baganuu...
09.02.2012 Baganuur Coal Mine Expansion: Opportunities for investors, Baganuu...09.02.2012 Baganuur Coal Mine Expansion: Opportunities for investors, Baganuu...
09.02.2012 Baganuur Coal Mine Expansion: Opportunities for investors, Baganuu...
 
R4 v03fbe eia of cpp project bin qasim fertilizer complex-unprotected
R4 v03fbe   eia of cpp project bin qasim fertilizer complex-unprotectedR4 v03fbe   eia of cpp project bin qasim fertilizer complex-unprotected
R4 v03fbe eia of cpp project bin qasim fertilizer complex-unprotected
 
Khursaniyah Project Brochure
Khursaniyah Project BrochureKhursaniyah Project Brochure
Khursaniyah Project Brochure
 
Ports_presentation.ppt
Ports_presentation.pptPorts_presentation.ppt
Ports_presentation.ppt
 
02.20-21.2014, PRESENTATION, Aduunchuluun power and CTR project, J.Zoljargal
02.20-21.2014, PRESENTATION, Aduunchuluun power and CTR project, J.Zoljargal02.20-21.2014, PRESENTATION, Aduunchuluun power and CTR project, J.Zoljargal
02.20-21.2014, PRESENTATION, Aduunchuluun power and CTR project, J.Zoljargal
 
Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...
Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...
Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...
 
Adnoc and masdar project may 2013
Adnoc and masdar project   may 2013Adnoc and masdar project   may 2013
Adnoc and masdar project may 2013
 
fgp-wpmp-overview
fgp-wpmp-overviewfgp-wpmp-overview
fgp-wpmp-overview
 
Cpcl
CpclCpcl
Cpcl
 
Cpcl
CpclCpcl
Cpcl
 
Power industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanPower industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistan
 
2011 LNG AS PROPULSION FUEL
2011 LNG AS PROPULSION FUEL2011 LNG AS PROPULSION FUEL
2011 LNG AS PROPULSION FUEL
 
Wac Ncc100809 China’s Energy,Strategic Perspective
Wac Ncc100809 China’s Energy,Strategic PerspectiveWac Ncc100809 China’s Energy,Strategic Perspective
Wac Ncc100809 China’s Energy,Strategic Perspective
 

Karachaganak overview WKIF Aktau 25.09.12 Eng Rev-4

  • 1. Luca Vignati Aktau, 25 September 2012 KARACHAGANAK ACTIVITY REVIEW AND LONG TERM DEVELOPMENT PLANS WORLD CLASS EXPERTISE – WORLD CLASS ASSET
  • 2. FIELD OVERVIEW  One of the world’s largest gas condensate fields;  Discovered in 1979;  Gross reserves – over 2.4 billion barrels of condensate and 16 tcf of gas.
  • 3. New agreement – 14 December 2011 29.25% 29.25% 18% 13.5% The Republic of Kazakhstan, the Contracting Companies and KPO have recently completed the agreement in relation to the Karachaganak Project that was initially signed on 14 December 2011. Under the terms of the agreement the Republic has acquired a 10% interest in the Karachaganak Final Production Sharing Agreement. The Republic’s interest in the Final Production Sharing Agreement will be managed by the national oil company, KazMunaiGas (KMG). The consideration under the agreement also includes the allocation of an additional 2 million tonnes per year capacity in the Caspian Pipeline Consortium export pipeline over the remaining life of the Final Production Sharing Agreement . 10%
  • 4. RESERVES AND INVESTMENTS Karachaganak holds an estimated 9 billion barrels of condensate and 48 trillion cubic feet (tcf) of gas. To date, around 7-8% of the recoverable hydrocarbons initially in place have been produced. Since the signing of the FPSA: • $15.3 bln invested into developing the field, applying industry leading technology aimed at maximizing sustainable economic value • $14.6 bln of direct payments to RoK budget
  • 5. KPC Unit 2 Unit 3 Unstabilised Oil Sour Gas to Re-injection Unstabilised Oil 65 000 BOEPD Sour Gas 24 MSM3/day Orenburg Stabilised Oil 242 402 BOPD CPC Mini Refinery Unstabilised Oil 15 000 BOEPD Injection Wells Production from Wells Fuel Gas 2.4MSm3/d FACILITIES OVERVIEW Sour Gas Production from Wells Orenburg Production from Wells 24 MSM3/day 50 MW Power Community
  • 6.  KPC- Atyrau oil pipeline (635km), operating since 2003  Two pumping stations, one at KPC, the other at Bolshoi Chagan; terminal at Atyrau for receipt and storage  Stabilised liquids exported via CPC and Atyrau – Samara  Principal sale points of stabilised liquids are Novorossyisk (Black Sea) and Primorsk (Baltic)  Sour gas and unstabilised liquids sent to Orenburg PRINCIPAL EXPORT ROUTES
  • 7. PRODUCTION AND INJECTION HISTORY 0 100 200 300 400 500 600 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 KBarrelsperday) Gas Injection Gas Sales Liquid Production PSPA FPSA
  • 8. Field Development Plan - Gas Balancing Description  Maximise production of liquids based upon current gas handling limitations  Transfer currently shut-in KPC wells to Unit 2  Installation of two 5960m 10” pipelines between RMS-M and Unit2 Proposed Gas Balancing lines P2M P2ME P2ME2 P2ME3 Proposed Gas Balancing lines P2M P2ME P2ME2 P2ME3 Q1 Q2 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 FEED (internal) VAR 3 FID Bid & Award LLI Deliver Line Pipe Deliver Valves Detailed Design Prefabrication & RMS M mod. Pipeline Construction & Commissioning Start Up Gas Balancing 2011 2012 20152013 2014
  • 9. Field Development Plan - Plateau Extension Wells (P2ME3) Structure on Top Reservoir Description  Continuation of existing Phase IIM,P2ME and P2ME2 drilling programme  Commencing either  2017 – 1 rig  2014 – 2 rigs  Total 12 wells Phase 2ME (purple) Phase 2ME2 (brown) Phase 2ME3 (yellow)
  • 10. Field Development Plan - Unit 2 Gas Injection Upgrade Project Description  Maximise volume of injected gas with existing facilities  Phase 1  Additional gas/liquid separation equipment for sustained flowrate  Phase 2  Process plant, field injection facilities and wells Q1 Q2 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Evaluation VAR 1 Pre FEED VAR 2 FEED (internal) VAR 3 FID Execution Production 2011 2012 2013 2014 Unit 2 Gas Injection Upgrade Project 2015 2016 2017 Unit 2 Additional trunk line
  • 11. Field Development Plan - KPC Gas Debottlenecking Project Description  Increase overall KPC gas processing by expanding MP gas handling capacity  MP gas handling system enhanced including new combined MP dehydration and dew-pointing train  Potential additional pipeline from KPC to Unit 3 Q1 Q2 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Train 4 Test Run Mobilise Project Team Concept Studies VAR 2 FEED Tender & Award EPC VAR 3 FID Execution Start Up 2011 2012 2016 KPC Gas Debottlenecking Project 2014 2015 20172013
  • 12. 2011 PERFORMANCE & ACHIEVEMENTS SAFETY  LITF & RTIF – KPO in the top 10 best performers of oil & gas producers  Road Traffic Incident – reduction of 85% from 2010 ENVIRONMENT  Gas Utilisation Rate - 99.92% (99.87% in 2010) whilst the regulatory target approved within gas utilisation programme is 99.75%. LATEST PROJECTS  TRAIN 4 - State Acceptance on 1 Dec. 2011  UGPP - State Acceptance on 9 Sept. 2011  3rd Storage tank on KPC
  • 13. LOCAL CONTENT Some 2,500 Kazakh vendors are currently registered on supplier database. Since beginning of the FPSA in 1997, total value of contracts assigned to Kazakh companies exceeded $4 billion. In 2011, KPO awarded contracts worth over $428 million to 341 Kazakh companies for the provision of goods, works and services. In Q2 2012 the Local Content in Karachaganak project makes up to 56%
  • 14. LOCAL CONTENT DEVELOPMENT INITIATIVES • Pilot Project on organizing the manufacturing of high technology products for KPO and other O&G operators’ needs • Aksai Industrial Park project is under implementation • AIP Project included to the Industrialisation Map, will employ 130 experts • Spare Parts and Equipment Manufacturing Localisation Project • By WKO Entrepreneurs Association and support of WKO Akimat Technical Expert Group has been created to perform the project. • Working Group of KMG, KPO and “Kazakhstan Union of Machinery building companies” was created • Local Content reporting in compliance with the current legislation requirements • KPO was registered in the MOG reporting system • Integrated Contract Plan for 2011-2014 placed on to KPO web-site and become visible for all RoK business union
  • 15. HUMAN RESOURCES Total KPO Employees – 3681 NATIONAL EMPLOYEES UP TO 93% OF TOTAL KPO POPULATION KPO NATIONAL STAFF HAS GROWN FROM: 1,186 IN THE YEAR 2000 3,410 NOW EXPATRIATE RESOURCES HAVE BEEN REDUCED BY 55% FROM: 587 IN THE YEAR 2000 271 NOW Investments (plan 2012) • Annual nationals salary fund – $163 M • Annual training and development budget for nationals – $14.5 M • Annual payments for nationals as a part of collective agreement and company social responsibility – $6.2 M
  • 16. KPO NATIONALIZATION PROGRAMME (2009-2018) Cat Description 31 Jan, 2012 Target 2013 (program) Dec, 2018 1 Management 69% 60% 70% 2 Professional staff and Supervisors 95% 91% 95% 3 Technical staff 100% 100% 100% 4 Support and Clerical 100% 100% 100% Nationalization as of 31 of January 2012 vs Plan KPO Nationalization trend 1998 - 2037

Editor's Notes

  1. Aksai 18 April 2012
  2. Aksai 18 April 2012
  3. Aksai 18 April 2012
  4. Aksai 18 April 2012
  5. Aksai 18 April 2012
  6. Aksai 18 April 2012
  7. Aksai 18 April 2012
  8. Aksai 18 April 2012
  9. Aksai 18 April 2012
  10. Aksai 18 April 2012
  11. Aksai 18 April 2012
  12. Aksai 18 April 2012
  13. Aksai 18 April 2012
  14. Aksai 18 April 2012
  15. Aksai 18 April 2012
  16. Aksai 18 April 2012
  17. Aksai 18 April 2012