B.C.'s Gas Towns and Projects
Liane Salo | J A N 6 , 2 0 1 4

	
  

With proposals, approvals and a whole lot of opposition in between, here’s
what’s happening (and when) across the province
Natural Gas Pipelines
APPROVED
Pacific Trail Pipeline
Capacity: 1 billion cubic feet per day
Project Cost: $1 billion

	
  
In early 2013 Chevron Corp. bought out EOG Resources and Calgary-based Encana Corp. to
establish itself as managing operator and 50 per cent owner of this 463-kilometre pipeline
with Apache Corp. The project has obtained an export licence and has been approved to
extend from Summit Lake to the Kitimat LNG export facility to transport natural gas to Asian
markets. However, the project has recently had difficulty securing some sales contracts in
Asia because buyers are pushing for deals linked to distressed North American gas prices.
Apache and Chevron have argued higher prices are needed to justify the large building costs.
Construction was intended to start summer 2013 but the B.C. Environmental Assessment
Office has given a 2018 extension.
PROPOSED
Coastal GasLink
Capcity: 1.7 billion cubic feet per day
Projected Cost: $4 billion
TransCanada was selected by Shell Ltd. to build and operate a proposed pipeline from the
Montney gas-producing region, near Dawson Creek, to a liquefied natural gas export facility
near Kitimat. Korea Gas Corp., Mitsubishi Corp. and PetroChina Co. Ltd. are partners in the
project. Environmental field studies began January 2013, with a plan to submit an
environmental assessment application in early 2014.
PROPOSED
Prince Rupert Gas Transmission Line
Capacity: 2 billion cubic feet per day
Projected Cost: $5 billion
In January 2013 Progress Energy Canada Ltd., a subsidiary of Malaysian-owned firm
Petronas, selected TransCanada Corp. to build a 900-kilometre shale-gas pipeline
connecting Hudson’s Hope to a proposed Pacific NorthWest LNG facility on Lelu Island, near
Prince Rupert. The LNG facility is expected to include two plants capable of processing six
million tons of gas annually. The project is still in early stages as the pipeline route is
currently up for discussion in the communities affected, and the first project description was
submitted to the B.C. Environmental Assessment Office in May 2013.
PROPOSED
Westcoast Connector
Capacity: 4.2 billion cubic feet per day
Projected Cost: $8 billion
A 50-50 partnership between pipeline maker Spectra Energy Corp. and gas producer and
marketer BG Group, the proposed pipe will move gas from the Cypress area of northeast
B.C. to Prince Rupert at Ridley Island. A feasibility study was completed in May 2013 and the
project is currently working through the environmental assessment and permitting process. If
approved, the pipeline is projected to be operational by 2019.

Oil Pipelines
PROPOSED
Northern Gateway Pipeline
Capacity: 525,000 barrels per day
Projected Cost: $6 billion
Canada’s oil and gas pipeline giant Enbridge Inc. plans to build a twin pipe between
Bruderheim, Alberta, and Kitimat, B.C. One pipe would carry diluted bitumen, a heavy oil
product, west, while the other smaller pipe would flow east carrying imported condensate,
used in oil transport to improve the viscosity of heavy oil. While the pipeline has been met
with a lot of public resistance, in November 2013 B.C. and Alberta governments officially
agreed to work through the pipeline conditions together after a previously tense relationship.
PROPOSED
Trans Mountain Expansion
Capacity: 890,000 barrels per day
Porjected Cost: $5.4 billion
Kinder Morgan wants to expand its existing buried pipeline by 980 kilometres to go from
Edmonton to Burnaby and then on to Washington state’s Puget Sound. With 12 new pump
stations and 20 new storage tanks, capacity would greatly increase from its current 300,000
barrels per day. The project would cause Burnaby’s Westridge Marine Terminal to expand
from one tanker to three, and Metro Vancouver has ordered a report on the environmental
impacts of the larger fleet. If the pipeline is approved it’s intended to be operational by 2017.

Other Proposed LNG Facilities
AltaGas Idemitsu Joint Venture
Calgary-based AltaGas Ltd. and Japanese oil refiner Idemitsu Kosan Co. Ltd. have applied to
the National Energy Board for a 25-year licence to export liquefied natural gas from
northwestern B.C. The two companies signed an agreement in January 2013 to form their
joint venture, which now has been named Triton LNG LP. Triton aims to export up to 2.3
million tonnes of LNG annually, or roughly 115 billion cubic feet from either Kitimat or Prince
Rupert.
PACIFIC OIL & GAS
The Singapore company has proposed an LNG processing and shipping facility in Woodfibre.
B.C. LNG Export Co-Operative
B.C. LNG will be operated by Douglas Channel Energy Partners, which is a partnership
between LNG Partners and the Haisla Nation in B.C. Currently, there are 16 members of the
co-operative. In 2011, the National Energy Board granted
B.C. LNG a 20-year licence for the export of 1.8 million tonnes of LNG annually from Kitimat,
B.C. In May 2013 an unnamed Asian investor and Golar LNG, a Bermuda-based company
that runs a fleet of LNG tankers, announced they have purchased a 25-per-cent stake in the
project.
Imperial Oil/Exxon LNG Project
Imperial Oil Ltd. and its parent, Exxon Mobil Corp., are in the early stages of planning an
LNG export business from B.C. The facility will build on their $3.1- billion acquisition of
natural gas producer Celtic Exploration Ltd., as well as gas holdings they already own in
western Alberta and in the Horn River shale gas play in B.C. The capacity of the facility has
not yet been disclosed. Imperial Oil Ltd./Exxon Mobil have also recently submitted nonbinding expressions of interest to acquire Crown land at Grassy Point, B.C., for development
of an LNG export facility.
Nexen/Inpex LNG Project
Nexen Inc. and Japan’s Inpex Corp. have a joint venture to develop unconventional shale gas
assets in the Horn River, Cordova and Liard basins in northeastern B.C. As part of the joint
venture, the partners intend to jointly investigate the feasibility of a potential downstream
project, including an LNG export facility.
Fortune Creek Gas Plant and Discovery LNG
In October, Texas-based oil and gas production company Quicksilver Resources Inc. was
issued a conditional Environmental Assessment Certificate for the Fortune Creek Gas Plant,
located near the Horn River Basin. The plant will remove hydrogen sulphide and carbon
dioxide from raw natural gas to produce treated gas for transport to market. QRI is proposing
to develop the facility in stages, with the initial phase having a processing capacity of 4.25
million cubic metres per day and further phases bringing the total processing capacity up to
16.9 million cubic metres per day. This gas would be transported to another potential QRI
project: a storage and loading facility titled Discovery LNG on the north side of Campbell
River. This proposed facility would be built and operated by a partnership between QRI and a
yet-to-be-determined third party in order to convert natural gas into LNG for export to Pacific
Rim markets in Asia.
Aurora LNG
In 2011 China’s CNOOC Ltd. acquired Calgary-based Nexen Inc. as a subsidiary. Inpex
Corp. and JGC Corp., both of Japan, have now partnered with Nexen in a proposed LNG
facility and export terminal called Aurora LNG to be located at Grassy Point, near Prince
Rupert. As of November 2013 the Nexen-led venture paid $24 million to the Government of
B.C. as part of an exclusive agreement for the right to pursue long- term access to the Crown
land at Grassy Point to examine the project’s potential. The next steps will involve a siteviability review, an environmental impact assessment and stakeholder consultation. The
companies are also looking into developing shale gas assets in the Horn River, Cordova and
Liard basins in northeastern B.C.

	
  
http://www.bcbusiness.ca/natural-­‐resources/bcs-­‐gas-­‐towns-­‐and-­‐projects	
  

More Related Content

What's hot

Stewart - Reducing Emissions in the Marine Transportation Sector
Stewart - Reducing Emissions in the Marine Transportation SectorStewart - Reducing Emissions in the Marine Transportation Sector
Stewart - Reducing Emissions in the Marine Transportation SectorEnvironmental Initiative
 
Gary Cochrane - Bounty Mining
Gary Cochrane - Bounty MiningGary Cochrane - Bounty Mining
Gary Cochrane - Bounty MiningInforma Australia
 
LNG Philippines - Situationer
LNG Philippines - SituationerLNG Philippines - Situationer
LNG Philippines - Situationernoelgamboaylopez
 
Clare Penrose - No CCS, No 2 degrees. Japan Clean Coal Day 2014
Clare Penrose - No CCS, No 2 degrees. Japan Clean Coal Day 2014Clare Penrose - No CCS, No 2 degrees. Japan Clean Coal Day 2014
Clare Penrose - No CCS, No 2 degrees. Japan Clean Coal Day 2014Global CCS Institute
 
Michael Moore - Regional Perspectives on CO2-EOR: The US
Michael Moore - Regional Perspectives on CO2-EOR: The USMichael Moore - Regional Perspectives on CO2-EOR: The US
Michael Moore - Regional Perspectives on CO2-EOR: The USGlobal CCS Institute
 
Unlocking the potential of appalachian ethane
Unlocking the potential of appalachian ethaneUnlocking the potential of appalachian ethane
Unlocking the potential of appalachian ethaneAdvisian
 
Liquid natural gas projects List as of Sep_24
Liquid natural gas projects List as of Sep_24Liquid natural gas projects List as of Sep_24
Liquid natural gas projects List as of Sep_24Roopmathi Gunna
 
Liquefied Natural Gas Limited Bear Head, Nova Scotia LNG Project
Liquefied Natural Gas Limited Bear Head, Nova Scotia LNG ProjectLiquefied Natural Gas Limited Bear Head, Nova Scotia LNG Project
Liquefied Natural Gas Limited Bear Head, Nova Scotia LNG ProjectMarcellus Drilling News
 
Xebec Biogas 2010 Presentation
Xebec Biogas 2010 PresentationXebec Biogas 2010 Presentation
Xebec Biogas 2010 Presentationsorschak
 
Economics of promotions_of_r&d_of_carbon_capture
Economics of promotions_of_r&d_of_carbon_captureEconomics of promotions_of_r&d_of_carbon_capture
Economics of promotions_of_r&d_of_carbon_captureSuresh Malluswamy
 
Peter O'Sullivan - Gladstone Port Corporation
Peter O'Sullivan - Gladstone Port CorporationPeter O'Sullivan - Gladstone Port Corporation
Peter O'Sullivan - Gladstone Port CorporationInforma Australia
 
Issue of Kalabagh Dam in Pakistan
Issue of Kalabagh Dam in PakistanIssue of Kalabagh Dam in Pakistan
Issue of Kalabagh Dam in PakistanBilal Mirani
 
12 months, 5 sites, 1 billion tonnes of co2 storage by 2030. the eti introduc...
12 months, 5 sites, 1 billion tonnes of co2 storage by 2030. the eti introduc...12 months, 5 sites, 1 billion tonnes of co2 storage by 2030. the eti introduc...
12 months, 5 sites, 1 billion tonnes of co2 storage by 2030. the eti introduc...Global CCS Institute
 

What's hot (20)

OTC14038
OTC14038OTC14038
OTC14038
 
Stewart - Reducing Emissions in the Marine Transportation Sector
Stewart - Reducing Emissions in the Marine Transportation SectorStewart - Reducing Emissions in the Marine Transportation Sector
Stewart - Reducing Emissions in the Marine Transportation Sector
 
Liquefied Natural Gas (LNG) Life Cycle
Liquefied Natural Gas (LNG) Life CycleLiquefied Natural Gas (LNG) Life Cycle
Liquefied Natural Gas (LNG) Life Cycle
 
Gary Cochrane - Bounty Mining
Gary Cochrane - Bounty MiningGary Cochrane - Bounty Mining
Gary Cochrane - Bounty Mining
 
LNG Philippines - Situationer
LNG Philippines - SituationerLNG Philippines - Situationer
LNG Philippines - Situationer
 
SKKmigas
SKKmigasSKKmigas
SKKmigas
 
PETROBRAS LNG PROJECT
PETROBRAS LNG PROJECTPETROBRAS LNG PROJECT
PETROBRAS LNG PROJECT
 
Clare Penrose - No CCS, No 2 degrees. Japan Clean Coal Day 2014
Clare Penrose - No CCS, No 2 degrees. Japan Clean Coal Day 2014Clare Penrose - No CCS, No 2 degrees. Japan Clean Coal Day 2014
Clare Penrose - No CCS, No 2 degrees. Japan Clean Coal Day 2014
 
Kansas City Regional Clean Cities Coalition
Kansas City Regional Clean Cities CoalitionKansas City Regional Clean Cities Coalition
Kansas City Regional Clean Cities Coalition
 
Michael Moore - Regional Perspectives on CO2-EOR: The US
Michael Moore - Regional Perspectives on CO2-EOR: The USMichael Moore - Regional Perspectives on CO2-EOR: The US
Michael Moore - Regional Perspectives on CO2-EOR: The US
 
Gogakos
GogakosGogakos
Gogakos
 
LNGT
LNGTLNGT
LNGT
 
Unlocking the potential of appalachian ethane
Unlocking the potential of appalachian ethaneUnlocking the potential of appalachian ethane
Unlocking the potential of appalachian ethane
 
Liquid natural gas projects List as of Sep_24
Liquid natural gas projects List as of Sep_24Liquid natural gas projects List as of Sep_24
Liquid natural gas projects List as of Sep_24
 
Liquefied Natural Gas Limited Bear Head, Nova Scotia LNG Project
Liquefied Natural Gas Limited Bear Head, Nova Scotia LNG ProjectLiquefied Natural Gas Limited Bear Head, Nova Scotia LNG Project
Liquefied Natural Gas Limited Bear Head, Nova Scotia LNG Project
 
Xebec Biogas 2010 Presentation
Xebec Biogas 2010 PresentationXebec Biogas 2010 Presentation
Xebec Biogas 2010 Presentation
 
Economics of promotions_of_r&d_of_carbon_capture
Economics of promotions_of_r&d_of_carbon_captureEconomics of promotions_of_r&d_of_carbon_capture
Economics of promotions_of_r&d_of_carbon_capture
 
Peter O'Sullivan - Gladstone Port Corporation
Peter O'Sullivan - Gladstone Port CorporationPeter O'Sullivan - Gladstone Port Corporation
Peter O'Sullivan - Gladstone Port Corporation
 
Issue of Kalabagh Dam in Pakistan
Issue of Kalabagh Dam in PakistanIssue of Kalabagh Dam in Pakistan
Issue of Kalabagh Dam in Pakistan
 
12 months, 5 sites, 1 billion tonnes of co2 storage by 2030. the eti introduc...
12 months, 5 sites, 1 billion tonnes of co2 storage by 2030. the eti introduc...12 months, 5 sites, 1 billion tonnes of co2 storage by 2030. the eti introduc...
12 months, 5 sites, 1 billion tonnes of co2 storage by 2030. the eti introduc...
 

Similar to All of these Mega Projects require vast amounts of Construction aggregate

Project Engagement Overview Dec 15, 14
Project Engagement Overview Dec 15, 14Project Engagement Overview Dec 15, 14
Project Engagement Overview Dec 15, 14sarahartis
 
Highbank NEWS May 23.2017 Highbank arranges demand loan for $100,000 & pr...
Highbank NEWS May 23.2017 Highbank arranges demand loan for $100,000 & pr...Highbank NEWS May 23.2017 Highbank arranges demand loan for $100,000 & pr...
Highbank NEWS May 23.2017 Highbank arranges demand loan for $100,000 & pr...Follow me on Twitter @Stockshaman
 
Has Boutique LNG Gone Mainstream? (Part 2)
Has Boutique LNG Gone Mainstream? (Part 2)Has Boutique LNG Gone Mainstream? (Part 2)
Has Boutique LNG Gone Mainstream? (Part 2)Weston Shepherd
 
Pembina pipeline pitchbook
Pembina pipeline   pitchbookPembina pipeline   pitchbook
Pembina pipeline pitchbookJeffrey Kelly
 
Highbank Resources Ltd. - Pi Financial LNG Industry Update (HBK Mentioned on ...
Highbank Resources Ltd. - Pi Financial LNG Industry Update (HBK Mentioned on ...Highbank Resources Ltd. - Pi Financial LNG Industry Update (HBK Mentioned on ...
Highbank Resources Ltd. - Pi Financial LNG Industry Update (HBK Mentioned on ...Follow me on Twitter @Stockshaman
 
Wood MacKenzie Alaska LNG Competitiveness Study Aug 2016
Wood MacKenzie Alaska LNG Competitiveness Study   Aug 2016Wood MacKenzie Alaska LNG Competitiveness Study   Aug 2016
Wood MacKenzie Alaska LNG Competitiveness Study Aug 2016Brad Keithley
 
New base energy news issue 951 dated 20 november 2016
New base energy news issue  951 dated 20 november 2016New base energy news issue  951 dated 20 november 2016
New base energy news issue 951 dated 20 november 2016Khaled Al Awadi
 
Pipeline Oil & Gas Magazine - October 2014 Featuring Thorne & Derrick
Pipeline Oil & Gas Magazine - October 2014 Featuring Thorne & DerrickPipeline Oil & Gas Magazine - October 2014 Featuring Thorne & Derrick
Pipeline Oil & Gas Magazine - October 2014 Featuring Thorne & DerrickThorne & Derrick International
 
Platts oilgram news julio 29 2014 articulo pag 7 Colombia oil Orlando Hernandez
Platts oilgram news julio 29 2014 articulo pag 7 Colombia oil Orlando HernandezPlatts oilgram news julio 29 2014 articulo pag 7 Colombia oil Orlando Hernandez
Platts oilgram news julio 29 2014 articulo pag 7 Colombia oil Orlando HernandezOrlando Hernandez
 
Cbi lng journal_jan_feb05
Cbi lng journal_jan_feb05Cbi lng journal_jan_feb05
Cbi lng journal_jan_feb05Natalia Camba
 
2019 Election| Natural Resources| LNG| Canada| July 2019
2019 Election| Natural Resources| LNG| Canada| July 20192019 Election| Natural Resources| LNG| Canada| July 2019
2019 Election| Natural Resources| LNG| Canada| July 2019paul young cpa, cga
 
2019 Election| LNG| Natural Resources| Canada| August 2019
2019 Election| LNG| Natural Resources| Canada| August 20192019 Election| LNG| Natural Resources| Canada| August 2019
2019 Election| LNG| Natural Resources| Canada| August 2019paul young cpa, cga
 
How Do You Solve a Problem Like Malampaya
How Do You Solve a Problem Like MalampayaHow Do You Solve a Problem Like Malampaya
How Do You Solve a Problem Like MalampayaFernando Penarroyo
 
New base special 24 march 2014
New base special  24 march 2014New base special  24 march 2014
New base special 24 march 2014Khaled Al Awadi
 

Similar to All of these Mega Projects require vast amounts of Construction aggregate (20)

Project Engagement Overview Dec 15, 14
Project Engagement Overview Dec 15, 14Project Engagement Overview Dec 15, 14
Project Engagement Overview Dec 15, 14
 
Hbk.nr dec.1.16
Hbk.nr dec.1.16Hbk.nr dec.1.16
Hbk.nr dec.1.16
 
Highbank NEWS May 23.2017 Highbank arranges demand loan for $100,000 & pr...
Highbank NEWS May 23.2017 Highbank arranges demand loan for $100,000 & pr...Highbank NEWS May 23.2017 Highbank arranges demand loan for $100,000 & pr...
Highbank NEWS May 23.2017 Highbank arranges demand loan for $100,000 & pr...
 
Has Boutique LNG Gone Mainstream? (Part 2)
Has Boutique LNG Gone Mainstream? (Part 2)Has Boutique LNG Gone Mainstream? (Part 2)
Has Boutique LNG Gone Mainstream? (Part 2)
 
Pembina pipeline pitchbook
Pembina pipeline   pitchbookPembina pipeline   pitchbook
Pembina pipeline pitchbook
 
Highbank Resources Ltd. - Pi Financial LNG Industry Update (HBK Mentioned on ...
Highbank Resources Ltd. - Pi Financial LNG Industry Update (HBK Mentioned on ...Highbank Resources Ltd. - Pi Financial LNG Industry Update (HBK Mentioned on ...
Highbank Resources Ltd. - Pi Financial LNG Industry Update (HBK Mentioned on ...
 
PNG LNG
PNG LNGPNG LNG
PNG LNG
 
Wood MacKenzie Alaska LNG Competitiveness Study Aug 2016
Wood MacKenzie Alaska LNG Competitiveness Study   Aug 2016Wood MacKenzie Alaska LNG Competitiveness Study   Aug 2016
Wood MacKenzie Alaska LNG Competitiveness Study Aug 2016
 
New base energy news issue 951 dated 20 november 2016
New base energy news issue  951 dated 20 november 2016New base energy news issue  951 dated 20 november 2016
New base energy news issue 951 dated 20 november 2016
 
Pipeline Oil & Gas Magazine - October 2014 Featuring Thorne & Derrick
Pipeline Oil & Gas Magazine - October 2014 Featuring Thorne & DerrickPipeline Oil & Gas Magazine - October 2014 Featuring Thorne & Derrick
Pipeline Oil & Gas Magazine - October 2014 Featuring Thorne & Derrick
 
Platts oilgram news julio 29 2014 articulo pag 7 Colombia oil Orlando Hernandez
Platts oilgram news julio 29 2014 articulo pag 7 Colombia oil Orlando HernandezPlatts oilgram news julio 29 2014 articulo pag 7 Colombia oil Orlando Hernandez
Platts oilgram news julio 29 2014 articulo pag 7 Colombia oil Orlando Hernandez
 
Highbank Resources 43-101 Technical Report
Highbank Resources 43-101 Technical Report Highbank Resources 43-101 Technical Report
Highbank Resources 43-101 Technical Report
 
Cbi lng journal_jan_feb05
Cbi lng journal_jan_feb05Cbi lng journal_jan_feb05
Cbi lng journal_jan_feb05
 
2019 Election| Natural Resources| LNG| Canada| July 2019
2019 Election| Natural Resources| LNG| Canada| July 20192019 Election| Natural Resources| LNG| Canada| July 2019
2019 Election| Natural Resources| LNG| Canada| July 2019
 
FERC_LNG
FERC_LNGFERC_LNG
FERC_LNG
 
2019 Election| LNG| Natural Resources| Canada| August 2019
2019 Election| LNG| Natural Resources| Canada| August 20192019 Election| LNG| Natural Resources| Canada| August 2019
2019 Election| LNG| Natural Resources| Canada| August 2019
 
How Do You Solve a Problem Like Malampaya
How Do You Solve a Problem Like MalampayaHow Do You Solve a Problem Like Malampaya
How Do You Solve a Problem Like Malampaya
 
Invest in kazakhstan us companies look for the next big thing
Invest in kazakhstan   us companies look for the next big thingInvest in kazakhstan   us companies look for the next big thing
Invest in kazakhstan us companies look for the next big thing
 
Lecture -1.pdf
Lecture -1.pdfLecture -1.pdf
Lecture -1.pdf
 
New base special 24 march 2014
New base special  24 march 2014New base special  24 march 2014
New base special 24 march 2014
 

More from Follow me on Twitter @Stockshaman

MONTORO RESOURCES ENTERS INTO FINANCING FACILITY UP TO $2-MILLION CAD AND APP...
MONTORO RESOURCES ENTERS INTO FINANCING FACILITY UP TO $2-MILLION CAD AND APP...MONTORO RESOURCES ENTERS INTO FINANCING FACILITY UP TO $2-MILLION CAD AND APP...
MONTORO RESOURCES ENTERS INTO FINANCING FACILITY UP TO $2-MILLION CAD AND APP...Follow me on Twitter @Stockshaman
 
Montoro NEWS release 03.12.19 doubles size estimate of Pecors Nickel copper p...
Montoro NEWS release 03.12.19 doubles size estimate of Pecors Nickel copper p...Montoro NEWS release 03.12.19 doubles size estimate of Pecors Nickel copper p...
Montoro NEWS release 03.12.19 doubles size estimate of Pecors Nickel copper p...Follow me on Twitter @Stockshaman
 
ZTEM 2D Synthetic Modelling - Pecors Magmatic Massive Sulphide Target - Power...
ZTEM 2D Synthetic Modelling - Pecors Magmatic Massive Sulphide Target - Power...ZTEM 2D Synthetic Modelling - Pecors Magmatic Massive Sulphide Target - Power...
ZTEM 2D Synthetic Modelling - Pecors Magmatic Massive Sulphide Target - Power...Follow me on Twitter @Stockshaman
 
International Montoro Res. Wicheeda North_Mag_Em_inv_interp_summary
International Montoro Res. Wicheeda North_Mag_Em_inv_interp_summaryInternational Montoro Res. Wicheeda North_Mag_Em_inv_interp_summary
International Montoro Res. Wicheeda North_Mag_Em_inv_interp_summaryFollow me on Twitter @Stockshaman
 
International Montoro Resources Inc. Wicheeda (Rare Earth Element, REE) proje...
International Montoro Resources Inc. Wicheeda (Rare Earth Element, REE) proje...International Montoro Resources Inc. Wicheeda (Rare Earth Element, REE) proje...
International Montoro Resources Inc. Wicheeda (Rare Earth Element, REE) proje...Follow me on Twitter @Stockshaman
 
International Montoro Res.(IMT.V) (IMTFF-OTC) (O4T1- Franfurt) Wicheeda North...
International Montoro Res.(IMT.V) (IMTFF-OTC) (O4T1- Franfurt) Wicheeda North...International Montoro Res.(IMT.V) (IMTFF-OTC) (O4T1- Franfurt) Wicheeda North...
International Montoro Res.(IMT.V) (IMTFF-OTC) (O4T1- Franfurt) Wicheeda North...Follow me on Twitter @Stockshaman
 
International Montoro Resources Inc. (IMTFF- USA) (IMT -TSXV) (O4T1-Frankfurt...
International Montoro Resources Inc. (IMTFF- USA) (IMT -TSXV) (O4T1-Frankfurt...International Montoro Resources Inc. (IMTFF- USA) (IMT -TSXV) (O4T1-Frankfurt...
International Montoro Resources Inc. (IMTFF- USA) (IMT -TSXV) (O4T1-Frankfurt...Follow me on Twitter @Stockshaman
 
International Montoro Res. Conductivity 2 d ztem inversion start model test ...
International Montoro Res. Conductivity  2 d ztem inversion start model test ...International Montoro Res. Conductivity  2 d ztem inversion start model test ...
International Montoro Res. Conductivity 2 d ztem inversion start model test ...Follow me on Twitter @Stockshaman
 
Montoro - Serpent River, Ontario Ni Cu PGE project 2D Geotech ZTEM survey r...
Montoro - Serpent River, Ontario  Ni Cu PGE project  2D Geotech ZTEM survey r...Montoro - Serpent River, Ontario  Ni Cu PGE project  2D Geotech ZTEM survey r...
Montoro - Serpent River, Ontario Ni Cu PGE project 2D Geotech ZTEM survey r...Follow me on Twitter @Stockshaman
 
Belmont to DRILL for #lithium brine #Nevada November - KB3- 139 feet 393ppm #...
Belmont to DRILL for #lithium brine #Nevada November - KB3- 139 feet 393ppm #...Belmont to DRILL for #lithium brine #Nevada November - KB3- 139 feet 393ppm #...
Belmont to DRILL for #lithium brine #Nevada November - KB3- 139 feet 393ppm #...Follow me on Twitter @Stockshaman
 
Belmont to DRILL for #lithium brine #Nevada November - KB3- 139 feet 393ppm #...
Belmont to DRILL for #lithium brine #Nevada November - KB3- 139 feet 393ppm #...Belmont to DRILL for #lithium brine #Nevada November - KB3- 139 feet 393ppm #...
Belmont to DRILL for #lithium brine #Nevada November - KB3- 139 feet 393ppm #...Follow me on Twitter @Stockshaman
 
International Montoro Resources (IMT-TSXV) Duhamel,Quebec - Ni, Cu, Co, Ti, ...
International Montoro Resources (IMT-TSXV) Duhamel,Quebec -  Ni, Cu, Co, Ti, ...International Montoro Resources (IMT-TSXV) Duhamel,Quebec -  Ni, Cu, Co, Ti, ...
International Montoro Resources (IMT-TSXV) Duhamel,Quebec - Ni, Cu, Co, Ti, ...Follow me on Twitter @Stockshaman
 
NEWS Montoro adds #Vanadium Titanium #Chromium ground@ Duhamel -#Nickel #Copp...
NEWS Montoro adds #Vanadium Titanium #Chromium ground@ Duhamel -#Nickel #Copp...NEWS Montoro adds #Vanadium Titanium #Chromium ground@ Duhamel -#Nickel #Copp...
NEWS Montoro adds #Vanadium Titanium #Chromium ground@ Duhamel -#Nickel #Copp...Follow me on Twitter @Stockshaman
 

More from Follow me on Twitter @Stockshaman (20)

MONTORO RESOURCES ENTERS INTO FINANCING FACILITY UP TO $2-MILLION CAD AND APP...
MONTORO RESOURCES ENTERS INTO FINANCING FACILITY UP TO $2-MILLION CAD AND APP...MONTORO RESOURCES ENTERS INTO FINANCING FACILITY UP TO $2-MILLION CAD AND APP...
MONTORO RESOURCES ENTERS INTO FINANCING FACILITY UP TO $2-MILLION CAD AND APP...
 
Imt black fly mobilization and permit
Imt black fly mobilization and permitImt black fly mobilization and permit
Imt black fly mobilization and permit
 
PDAC 2020 ppp hand out 2020 [autosaved]
PDAC 2020 ppp hand out 2020 [autosaved]PDAC 2020 ppp hand out 2020 [autosaved]
PDAC 2020 ppp hand out 2020 [autosaved]
 
Lamontage down hole probe data pecors
Lamontage down hole probe data pecorsLamontage down hole probe data pecors
Lamontage down hole probe data pecors
 
Rich tv 2019 international montoro resources inc
Rich tv 2019 international montoro resources incRich tv 2019 international montoro resources inc
Rich tv 2019 international montoro resources inc
 
Montoro NEWS release 03.12.19 doubles size estimate of Pecors Nickel copper p...
Montoro NEWS release 03.12.19 doubles size estimate of Pecors Nickel copper p...Montoro NEWS release 03.12.19 doubles size estimate of Pecors Nickel copper p...
Montoro NEWS release 03.12.19 doubles size estimate of Pecors Nickel copper p...
 
ZTEM 2D Synthetic Modelling - Pecors Magmatic Massive Sulphide Target - Power...
ZTEM 2D Synthetic Modelling - Pecors Magmatic Massive Sulphide Target - Power...ZTEM 2D Synthetic Modelling - Pecors Magmatic Massive Sulphide Target - Power...
ZTEM 2D Synthetic Modelling - Pecors Magmatic Massive Sulphide Target - Power...
 
International Montoro Res. Wicheeda North_Mag_Em_inv_interp_summary
International Montoro Res. Wicheeda North_Mag_Em_inv_interp_summaryInternational Montoro Res. Wicheeda North_Mag_Em_inv_interp_summary
International Montoro Res. Wicheeda North_Mag_Em_inv_interp_summary
 
International Montoro Resources Inc. Wicheeda (Rare Earth Element, REE) proje...
International Montoro Resources Inc. Wicheeda (Rare Earth Element, REE) proje...International Montoro Resources Inc. Wicheeda (Rare Earth Element, REE) proje...
International Montoro Resources Inc. Wicheeda (Rare Earth Element, REE) proje...
 
International Montoro Res.(IMT.V) (IMTFF-OTC) (O4T1- Franfurt) Wicheeda North...
International Montoro Res.(IMT.V) (IMTFF-OTC) (O4T1- Franfurt) Wicheeda North...International Montoro Res.(IMT.V) (IMTFF-OTC) (O4T1- Franfurt) Wicheeda North...
International Montoro Res.(IMT.V) (IMTFF-OTC) (O4T1- Franfurt) Wicheeda North...
 
International Montoro Resources Inc. (IMTFF- USA) (IMT -TSXV) (O4T1-Frankfurt...
International Montoro Resources Inc. (IMTFF- USA) (IMT -TSXV) (O4T1-Frankfurt...International Montoro Resources Inc. (IMTFF- USA) (IMT -TSXV) (O4T1-Frankfurt...
International Montoro Resources Inc. (IMTFF- USA) (IMT -TSXV) (O4T1-Frankfurt...
 
International Montoro Res. Conductivity 2 d ztem inversion start model test ...
International Montoro Res. Conductivity  2 d ztem inversion start model test ...International Montoro Res. Conductivity  2 d ztem inversion start model test ...
International Montoro Res. Conductivity 2 d ztem inversion start model test ...
 
Montoro - Serpent River, Ontario Ni Cu PGE project 2D Geotech ZTEM survey r...
Montoro - Serpent River, Ontario  Ni Cu PGE project  2D Geotech ZTEM survey r...Montoro - Serpent River, Ontario  Ni Cu PGE project  2D Geotech ZTEM survey r...
Montoro - Serpent River, Ontario Ni Cu PGE project 2D Geotech ZTEM survey r...
 
Ppt 3 d geotechppp 3d_ztem_inversion_results_v4
Ppt 3 d geotechppp 3d_ztem_inversion_results_v4Ppt 3 d geotechppp 3d_ztem_inversion_results_v4
Ppt 3 d geotechppp 3d_ztem_inversion_results_v4
 
Geotech IMT ZTEM 3d ppp Nov.2018
Geotech IMT ZTEM 3d ppp Nov.2018Geotech IMT ZTEM 3d ppp Nov.2018
Geotech IMT ZTEM 3d ppp Nov.2018
 
Benchmark Megafactory Assessment exceeds 1 TWh by 2028
Benchmark Megafactory Assessment exceeds 1 TWh by 2028Benchmark Megafactory Assessment exceeds 1 TWh by 2028
Benchmark Megafactory Assessment exceeds 1 TWh by 2028
 
Belmont to DRILL for #lithium brine #Nevada November - KB3- 139 feet 393ppm #...
Belmont to DRILL for #lithium brine #Nevada November - KB3- 139 feet 393ppm #...Belmont to DRILL for #lithium brine #Nevada November - KB3- 139 feet 393ppm #...
Belmont to DRILL for #lithium brine #Nevada November - KB3- 139 feet 393ppm #...
 
Belmont to DRILL for #lithium brine #Nevada November - KB3- 139 feet 393ppm #...
Belmont to DRILL for #lithium brine #Nevada November - KB3- 139 feet 393ppm #...Belmont to DRILL for #lithium brine #Nevada November - KB3- 139 feet 393ppm #...
Belmont to DRILL for #lithium brine #Nevada November - KB3- 139 feet 393ppm #...
 
International Montoro Resources (IMT-TSXV) Duhamel,Quebec - Ni, Cu, Co, Ti, ...
International Montoro Resources (IMT-TSXV) Duhamel,Quebec -  Ni, Cu, Co, Ti, ...International Montoro Resources (IMT-TSXV) Duhamel,Quebec -  Ni, Cu, Co, Ti, ...
International Montoro Resources (IMT-TSXV) Duhamel,Quebec - Ni, Cu, Co, Ti, ...
 
NEWS Montoro adds #Vanadium Titanium #Chromium ground@ Duhamel -#Nickel #Copp...
NEWS Montoro adds #Vanadium Titanium #Chromium ground@ Duhamel -#Nickel #Copp...NEWS Montoro adds #Vanadium Titanium #Chromium ground@ Duhamel -#Nickel #Copp...
NEWS Montoro adds #Vanadium Titanium #Chromium ground@ Duhamel -#Nickel #Copp...
 

All of these Mega Projects require vast amounts of Construction aggregate

  • 1. B.C.'s Gas Towns and Projects Liane Salo | J A N 6 , 2 0 1 4   With proposals, approvals and a whole lot of opposition in between, here’s what’s happening (and when) across the province Natural Gas Pipelines APPROVED Pacific Trail Pipeline Capacity: 1 billion cubic feet per day Project Cost: $1 billion  
  • 2. In early 2013 Chevron Corp. bought out EOG Resources and Calgary-based Encana Corp. to establish itself as managing operator and 50 per cent owner of this 463-kilometre pipeline with Apache Corp. The project has obtained an export licence and has been approved to extend from Summit Lake to the Kitimat LNG export facility to transport natural gas to Asian markets. However, the project has recently had difficulty securing some sales contracts in Asia because buyers are pushing for deals linked to distressed North American gas prices. Apache and Chevron have argued higher prices are needed to justify the large building costs. Construction was intended to start summer 2013 but the B.C. Environmental Assessment Office has given a 2018 extension. PROPOSED Coastal GasLink Capcity: 1.7 billion cubic feet per day Projected Cost: $4 billion TransCanada was selected by Shell Ltd. to build and operate a proposed pipeline from the Montney gas-producing region, near Dawson Creek, to a liquefied natural gas export facility near Kitimat. Korea Gas Corp., Mitsubishi Corp. and PetroChina Co. Ltd. are partners in the project. Environmental field studies began January 2013, with a plan to submit an environmental assessment application in early 2014. PROPOSED Prince Rupert Gas Transmission Line Capacity: 2 billion cubic feet per day Projected Cost: $5 billion In January 2013 Progress Energy Canada Ltd., a subsidiary of Malaysian-owned firm Petronas, selected TransCanada Corp. to build a 900-kilometre shale-gas pipeline connecting Hudson’s Hope to a proposed Pacific NorthWest LNG facility on Lelu Island, near Prince Rupert. The LNG facility is expected to include two plants capable of processing six million tons of gas annually. The project is still in early stages as the pipeline route is currently up for discussion in the communities affected, and the first project description was submitted to the B.C. Environmental Assessment Office in May 2013. PROPOSED Westcoast Connector Capacity: 4.2 billion cubic feet per day Projected Cost: $8 billion A 50-50 partnership between pipeline maker Spectra Energy Corp. and gas producer and marketer BG Group, the proposed pipe will move gas from the Cypress area of northeast B.C. to Prince Rupert at Ridley Island. A feasibility study was completed in May 2013 and the project is currently working through the environmental assessment and permitting process. If approved, the pipeline is projected to be operational by 2019. Oil Pipelines PROPOSED Northern Gateway Pipeline Capacity: 525,000 barrels per day Projected Cost: $6 billion Canada’s oil and gas pipeline giant Enbridge Inc. plans to build a twin pipe between Bruderheim, Alberta, and Kitimat, B.C. One pipe would carry diluted bitumen, a heavy oil product, west, while the other smaller pipe would flow east carrying imported condensate, used in oil transport to improve the viscosity of heavy oil. While the pipeline has been met with a lot of public resistance, in November 2013 B.C. and Alberta governments officially agreed to work through the pipeline conditions together after a previously tense relationship.
  • 3. PROPOSED Trans Mountain Expansion Capacity: 890,000 barrels per day Porjected Cost: $5.4 billion Kinder Morgan wants to expand its existing buried pipeline by 980 kilometres to go from Edmonton to Burnaby and then on to Washington state’s Puget Sound. With 12 new pump stations and 20 new storage tanks, capacity would greatly increase from its current 300,000 barrels per day. The project would cause Burnaby’s Westridge Marine Terminal to expand from one tanker to three, and Metro Vancouver has ordered a report on the environmental impacts of the larger fleet. If the pipeline is approved it’s intended to be operational by 2017. Other Proposed LNG Facilities AltaGas Idemitsu Joint Venture Calgary-based AltaGas Ltd. and Japanese oil refiner Idemitsu Kosan Co. Ltd. have applied to the National Energy Board for a 25-year licence to export liquefied natural gas from northwestern B.C. The two companies signed an agreement in January 2013 to form their joint venture, which now has been named Triton LNG LP. Triton aims to export up to 2.3 million tonnes of LNG annually, or roughly 115 billion cubic feet from either Kitimat or Prince Rupert. PACIFIC OIL & GAS The Singapore company has proposed an LNG processing and shipping facility in Woodfibre. B.C. LNG Export Co-Operative B.C. LNG will be operated by Douglas Channel Energy Partners, which is a partnership between LNG Partners and the Haisla Nation in B.C. Currently, there are 16 members of the co-operative. In 2011, the National Energy Board granted B.C. LNG a 20-year licence for the export of 1.8 million tonnes of LNG annually from Kitimat, B.C. In May 2013 an unnamed Asian investor and Golar LNG, a Bermuda-based company that runs a fleet of LNG tankers, announced they have purchased a 25-per-cent stake in the project. Imperial Oil/Exxon LNG Project Imperial Oil Ltd. and its parent, Exxon Mobil Corp., are in the early stages of planning an LNG export business from B.C. The facility will build on their $3.1- billion acquisition of natural gas producer Celtic Exploration Ltd., as well as gas holdings they already own in western Alberta and in the Horn River shale gas play in B.C. The capacity of the facility has not yet been disclosed. Imperial Oil Ltd./Exxon Mobil have also recently submitted nonbinding expressions of interest to acquire Crown land at Grassy Point, B.C., for development of an LNG export facility. Nexen/Inpex LNG Project Nexen Inc. and Japan’s Inpex Corp. have a joint venture to develop unconventional shale gas assets in the Horn River, Cordova and Liard basins in northeastern B.C. As part of the joint venture, the partners intend to jointly investigate the feasibility of a potential downstream project, including an LNG export facility. Fortune Creek Gas Plant and Discovery LNG In October, Texas-based oil and gas production company Quicksilver Resources Inc. was issued a conditional Environmental Assessment Certificate for the Fortune Creek Gas Plant, located near the Horn River Basin. The plant will remove hydrogen sulphide and carbon dioxide from raw natural gas to produce treated gas for transport to market. QRI is proposing to develop the facility in stages, with the initial phase having a processing capacity of 4.25
  • 4. million cubic metres per day and further phases bringing the total processing capacity up to 16.9 million cubic metres per day. This gas would be transported to another potential QRI project: a storage and loading facility titled Discovery LNG on the north side of Campbell River. This proposed facility would be built and operated by a partnership between QRI and a yet-to-be-determined third party in order to convert natural gas into LNG for export to Pacific Rim markets in Asia. Aurora LNG In 2011 China’s CNOOC Ltd. acquired Calgary-based Nexen Inc. as a subsidiary. Inpex Corp. and JGC Corp., both of Japan, have now partnered with Nexen in a proposed LNG facility and export terminal called Aurora LNG to be located at Grassy Point, near Prince Rupert. As of November 2013 the Nexen-led venture paid $24 million to the Government of B.C. as part of an exclusive agreement for the right to pursue long- term access to the Crown land at Grassy Point to examine the project’s potential. The next steps will involve a siteviability review, an environmental impact assessment and stakeholder consultation. The companies are also looking into developing shale gas assets in the Horn River, Cordova and Liard basins in northeastern B.C.   http://www.bcbusiness.ca/natural-­‐resources/bcs-­‐gas-­‐towns-­‐and-­‐projects