This unit consists of plant air and
instrument air and comprises of basically
two Air Compressors and Dryers. Air is
compressed by air compressors and supplied
to the Air Receiver, from where air is then
supplied to IGG Plant, Plant air header and a
part of this air is passed through a dryer unit
for purification where moisture is absorbed
and the dryer outlet air is supplied to the
Instrument Air Receiver for the use of
different instruments.
In normal operation, compressed
air is extracted from downstream of
the 3rd Separator (1-S-423) of
Process Air Compressor (1-K-402) in
Ammonia Plant and fed to the
Compressed Air Receiver (3-V-811)
via a pressure indicating controller
(3-PIC-801) set at 9.8 Kg/cm2G.
Plant Air Consumption
• Continuous Use
– Instrument air dryer : 1250 Nm3/hr.
– Inert gas generation : 1500 Nm3/hr.
– Cooling air of flame scanners : 160 Nm3/hr.
• Intermittent Use
– Plant air header : 500 Nm3/hr.
(per one Uty. Station)
Equipment Design Data
• Type : Screw.
• Capacity : 2000 Nm3/hr X
10.43 Kg/cm2G
• Driver : Elec. Motor, 315
KW.
Air Compressor (3-K-801/802)
Air Dryer (3-DR-821/822)
• Type : Pressure swing,
heat less.
• Capacity : 500 Nm3/hr.
• Desiccant : Activated Alumina.
Plant/ Inst. Air Receiver (3-
V-811/821)
• Type : Cylindrical, Vertical
• Size : 2700 ID X 7500 H
Start-up of Plant Air System
Start-up of Air Compressors (3-K-
801/802) after prolonged
shutdown shall always be carried
out locally to assure safe and
stable operation of the
compressors.
Start-up Preparation:
• Confirm availability of the following utilities:
• Electric Power
• Cooling Water
• CLOSE the valves 3-PV-801 and 802, 3-PV-803 A, 3-PV-807,
along with the upstream block valves and by pass valves of
the control valves.
• OPEN cooling water line isolation valves to the
compressors.
• OPEN the discharge valves of the compressors.
• CHECK lube oil levels in the compressors are OK.
• Open all the instrument block valves.
Local Start-up of Air Compressors:
• Put the selector of the compressor 3-K-801/802 into LOCAL position.
• Move the toggle switch of UNLOAD/NORMAL to UNLOAD position.
• Take final clearance from Power Generation Section to START the
Compressor 3-K-801/802.
• Press RESET-START button to start (1st) the Compressor. Check that
oil pressure is over 1.2 kg/cm2 G. There is no vibration, abnormal
sound, lube oil or water leakage.
• Move the toggle switch to
NORMAL position after 3/4 min
to load the compressor and
pressurize the Compressed
Air Receiver (3-V-811).
• Look for cooling water return line temperature and regulate
this so that the temperature rise is within 100 C.
• Slowly pressurize the air Receiver to normal operating
pressure of 9.8 kg/cm2G and slowly open the air outlet to
other consumers.
• Confirm that the compressor operation shifts to “unloaded
operation” automatically when discharge pressure reaches
to preset unloading pressure. Also confirm the “loaded
operation”.
• Start 2nd Compressor as the same procedure for 1st and
confirm load/unload function of this Compressor.
A. Change Over from Utility Compressors to Process Air:
 Both the compressors are running with loading/unloading
operation.
 Take clearance from CCR to receive process air from Ammonia.
 Open U/S isolation valve of 3-PIC-801 slowly. This will increase the
Air Receiver pressure.
 So, the compressors discharge pressure will also increase to
unloading set point (i.e. 9.6 & 9.7 Kg/cm2G.). And the result will
both the compressors undergo unloading operation.
 After 20 minutes of unloading operation the compressor will stop
automatically one by one to auto stand-by position.
Automatic Operation of Air Compressors:
B. Change Over from Process Air to Utility Compressors:
 Confirm both the Compressors are auto stand-by position.
 Check CW line isolation valves are open & L/O level OK.
 Check discharge valves of the compressors open.
 Take clearance for compressor start-up and to cut Process Air
from Power Generation & Ammonia Plant.
 Close U/S isolation valve of 3-PIC-801 slowly.
 When isolation valve almost close, Air Receiver pressure
decreases to auto start set point (i.e. PAL-9.5 & PALL-9.4
Kg/cm2G.) and the compressors start automatically one by one.
 Confirm loading/unloading function of the Compressors.
Tea Break !!
P & I Diagram of
Plant air & Instrument air system
Line-up of Instrument Air System:
A. Instrument Air Receiver (3-V-821) Line-up:
o Pressurize 3-V-821 by opening bypass valve of 3-PV-802 and 3-DR-
821/822 upto 7 kg/cm2G (slowly).
o Then open isolation valve of 3-PV-802 and put 3-PIC-802 into service.
o Confirm 3-PIC-802 is operating on
automatic at set-point 8.0 kg/cm2G.
o Close the bypass valve of 3-PV-802.
B. Line-up Air Dryers:
o Open the block valves to Pre-filters and partially open the block
valves of the After-filter.
o Adjust the moisture indicator bleed valve such that only small
amount of air is felt flowing.
o Confirm pressurization of Dryer & Energize the Dryer.
o Dryer would operate on FIXED mode until the desiccant beds
are regenerated to the extent necessary to obtain dry air at the
dryer's rated dew point. The control system will then
automatically shift to the AMLOC mode.
o Confirm that purge air pressure for regeneration is ~80 psig.
o Close the by-pass valves of 3-DR-821/822.
Line-up Plant Air to Header:
• Confirm Instrument Air pressure normal (~7.8 kg/cm2G
or more than 6.8 kg/cm2G).
• Selection position of 3-PV-803A in Unlatch condition and
PV should be in close position.
• Open slowly the isolation valve of 3-PV-803A to full.
• Open slowly 3-PV-803A by hand-wheel to pressurize
header.
• After pressurization air header, close PV by hand-wheel.
• Change actuator position into Latch and this will open PV
full.
Line-up Plant Air to IGG Plant:
• Confirm Instrument Air pressure normal (~7.8 kg/cm2G or more
than 6.0 kg/cm2G).
• Selection position of 3-PV-803B in Unlatch condition and PV
should be in close position.
• Open slowly the U/S isolation valve of 3-PV-807 to full.
• Open slowly 3-PV-807 through 3-PIC-807 manually.
• Open slowly 3-PV-803B by hand-wheel to pressurize header.
• After pressurization air header, Close 3-PV-803B by hand-wheel.
• Change actuator position into Latch and this will open 3-PV-803B
fully.
• Adjust set of 3-PIC-807 at 9.2 kg/cm2G and put it into auto.
Line-up Plant Air to Boiler Scanner:
After clearance from CCR, open scanner
line isolation valve slowly and lock the
valve for confirmation of always opening.
Shutdown of Plant Air System
• Before shutting down of this unit it must be
required to inform the whole plant.
• Close U/S isolation valve of 3-PV-801
• Turn the switch Loading to Unloading and move
“LOCAL/REMOTE” Switches to “LOCAL”.
• Press stop button of 3-K-801/802
• De-energize the local control panel of one of the air
dryers to stop the operation of the dryer.
• Open drain line of LP and HP line.
Problems and Troubleshooting
Total Power Failure
This failure will cause immediate shutdown of the
process air compressor (1-K-402) due to the stop of
the Flue Gas Fan (1-K-101A/B). Accordingly, the
air compressors (3-K-801/802) backed-up by
emergency power will start automatically.
The action to be taken at the time is to confirm that
the air compressors (3-K-801 / 802) are put into
service and the system is steady.
Cooling Water Failure
In order to prevent cooling water failure which
causes shutdown of the plant air and instrument
air system, cooling water for air compressors is
supplied by critical cooling water system which
is equipped with steam turbine riven pump and
standby motor driven pump backed-up by
emergency power to continue operation even in
case of electrical power failure.
Process Air Failure
• After plant air failed, when air receiver pressure
drops to set point of the air compressors, then
air compressors start automatically.
• Check oil pressure, temperature and lube oil
level are normal.
• Check LP/HP out temperature are normal.
• Close isolation valve of 3-PV-801 and put the
controller into manual.
Air Compressors fail with process air
• Immediately Air receiver pressure will fall, at the
same time Instrument air receiver pressure also
drops.
• Instrument air pressure at 6.8 kg/cm2G, plant
air header supply valve 3-PV-803A will close
automatically.
• Instrument air pressure at 6.0 kg/cm2G IGG
plant header supply valve 3-PV-803B will close
automatically.
Instrument Air Dryer Failure
• If dryer fails then instrument air pressure
will fall. It may cause Plant air header
/IGG air supply disconnection.
• To recover the set pressure OPEN dryer
by pass valve.
Thank You
!!

More Related Content

What's hot

SANJAY KUMAR RESUME
SANJAY KUMAR RESUMESANJAY KUMAR RESUME
SANJAY KUMAR RESUMESanjay Kumar
 
Steam Reforming - Types of Reformer Design
Steam Reforming - Types of Reformer DesignSteam Reforming - Types of Reformer Design
Steam Reforming - Types of Reformer DesignGerard B. Hawkins
 
Chapter 7 capital cost estimation
Chapter 7 capital cost estimationChapter 7 capital cost estimation
Chapter 7 capital cost estimationjose2424
 
Benfield system
Benfield systemBenfield system
Benfield systemPrem Baboo
 
Fired Heater Operation and Trouble Shooting.pdf
Fired Heater  Operation and Trouble Shooting.pdfFired Heater  Operation and Trouble Shooting.pdf
Fired Heater Operation and Trouble Shooting.pdfMuhammadNaeem191352
 
Precommissioning and Commissioning
Precommissioning and CommissioningPrecommissioning and Commissioning
Precommissioning and CommissioningWendy Soerachman
 
Steam Turbine Parts.pdf
Steam Turbine Parts.pdfSteam Turbine Parts.pdf
Steam Turbine Parts.pdfKAhmedRehman
 
Design Calculations of Venting in Atmospheric and Low-pressure Storage Tanks ...
Design Calculations of Venting in Atmospheric and Low-pressure Storage Tanks ...Design Calculations of Venting in Atmospheric and Low-pressure Storage Tanks ...
Design Calculations of Venting in Atmospheric and Low-pressure Storage Tanks ...Pradeep Dhondi
 
Rules of thumb for process engineer
Rules of thumb for process engineerRules of thumb for process engineer
Rules of thumb for process engineerKarnav Rana
 
Heat Exchanger Cleaning And Maintenance
Heat Exchanger Cleaning And MaintenanceHeat Exchanger Cleaning And Maintenance
Heat Exchanger Cleaning And MaintenanceCallumJennings
 
Sizing of relief valves for supercritical fluids
Sizing of relief valves for supercritical fluidsSizing of relief valves for supercritical fluids
Sizing of relief valves for supercritical fluidsAlexis Torreele
 
Ammonia Plant - Methanation Operations
Ammonia Plant - Methanation OperationsAmmonia Plant - Methanation Operations
Ammonia Plant - Methanation OperationsGerard B. Hawkins
 
Process Engineer Training PID.ppt.pdf
Process Engineer Training PID.ppt.pdfProcess Engineer Training PID.ppt.pdf
Process Engineer Training PID.ppt.pdfFaustoMarceloCaibe
 

What's hot (20)

SANJAY KUMAR RESUME
SANJAY KUMAR RESUMESANJAY KUMAR RESUME
SANJAY KUMAR RESUME
 
Steam Reforming - Types of Reformer Design
Steam Reforming - Types of Reformer DesignSteam Reforming - Types of Reformer Design
Steam Reforming - Types of Reformer Design
 
crude oil refining process - CDU & VDU
crude oil refining process - CDU & VDUcrude oil refining process - CDU & VDU
crude oil refining process - CDU & VDU
 
Chapter 7 capital cost estimation
Chapter 7 capital cost estimationChapter 7 capital cost estimation
Chapter 7 capital cost estimation
 
Benfield system
Benfield systemBenfield system
Benfield system
 
Fired Heater Operation and Trouble Shooting.pdf
Fired Heater  Operation and Trouble Shooting.pdfFired Heater  Operation and Trouble Shooting.pdf
Fired Heater Operation and Trouble Shooting.pdf
 
Precommissioning and Commissioning
Precommissioning and CommissioningPrecommissioning and Commissioning
Precommissioning and Commissioning
 
Piping Material Specification
Piping Material Specification Piping Material Specification
Piping Material Specification
 
Steam Turbine Parts.pdf
Steam Turbine Parts.pdfSteam Turbine Parts.pdf
Steam Turbine Parts.pdf
 
Design Calculations of Venting in Atmospheric and Low-pressure Storage Tanks ...
Design Calculations of Venting in Atmospheric and Low-pressure Storage Tanks ...Design Calculations of Venting in Atmospheric and Low-pressure Storage Tanks ...
Design Calculations of Venting in Atmospheric and Low-pressure Storage Tanks ...
 
Hazop Study
Hazop StudyHazop Study
Hazop Study
 
Rules of thumb for process engineer
Rules of thumb for process engineerRules of thumb for process engineer
Rules of thumb for process engineer
 
Heat Exchanger Cleaning And Maintenance
Heat Exchanger Cleaning And MaintenanceHeat Exchanger Cleaning And Maintenance
Heat Exchanger Cleaning And Maintenance
 
Sizing of relief valves for supercritical fluids
Sizing of relief valves for supercritical fluidsSizing of relief valves for supercritical fluids
Sizing of relief valves for supercritical fluids
 
Ammonia Plant - Methanation Operations
Ammonia Plant - Methanation OperationsAmmonia Plant - Methanation Operations
Ammonia Plant - Methanation Operations
 
Lube Oil Rundown Tank - System Design and Operational Aspects
Lube Oil Rundown Tank - System Design and Operational AspectsLube Oil Rundown Tank - System Design and Operational Aspects
Lube Oil Rundown Tank - System Design and Operational Aspects
 
Process Engineer Training PID.ppt.pdf
Process Engineer Training PID.ppt.pdfProcess Engineer Training PID.ppt.pdf
Process Engineer Training PID.ppt.pdf
 
Steam turbine
Steam turbineSteam turbine
Steam turbine
 
Scope of work
Scope of workScope of work
Scope of work
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
 

Similar to Plant Air & Inst Air.ppt

Compressed Air system.pdf
Compressed Air system.pdfCompressed Air system.pdf
Compressed Air system.pdfmanotos
 
B737 NG Air Systems
B737 NG Air SystemsB737 NG Air Systems
B737 NG Air Systemstheoryce
 
Screwcompressors 100208111533-phpapp02
Screwcompressors 100208111533-phpapp02Screwcompressors 100208111533-phpapp02
Screwcompressors 100208111533-phpapp02rajsrma
 
Screw Air Compressors
Screw Air CompressorsScrew Air Compressors
Screw Air Compressorsksatm
 
Thermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations TrainingThermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations TrainingManohar Tatwawadi
 
YALE F876 GDP230DCS LIFT TRUCK Service Repair Manual
YALE F876 GDP230DCS LIFT TRUCK Service Repair ManualYALE F876 GDP230DCS LIFT TRUCK Service Repair Manual
YALE F876 GDP230DCS LIFT TRUCK Service Repair Manualyehnmdm jnkmem
 
YALE F877 GDP300EC LIFT TRUCK Service Repair Manual
YALE F877 GDP300EC LIFT TRUCK Service Repair ManualYALE F877 GDP300EC LIFT TRUCK Service Repair Manual
YALE F877 GDP300EC LIFT TRUCK Service Repair Manualuhsejmkm jksemmd
 
Types, Operations and Maintenance of Air Compressor Plants
Types, Operations and Maintenance of Air  Compressor PlantsTypes, Operations and Maintenance of Air  Compressor Plants
Types, Operations and Maintenance of Air Compressor PlantsNejat Öztezcan
 
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIESCOMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIESManohar Tatwawadi
 
Final Turbine rolling ppt Akshay.pptx
Final Turbine rolling ppt Akshay.pptxFinal Turbine rolling ppt Akshay.pptx
Final Turbine rolling ppt Akshay.pptxBhimarajuKanireddy
 
Compressed air and refrigeration system
Compressed air and refrigeration systemCompressed air and refrigeration system
Compressed air and refrigeration systemD.Pawan Kumar
 
INTERNSHIP (1).pptx
INTERNSHIP (1).pptxINTERNSHIP (1).pptx
INTERNSHIP (1).pptxGoogles3
 
Technical description bvg 2014 (upgrading) (en) light
Technical description bvg 2014 (upgrading) (en) lightTechnical description bvg 2014 (upgrading) (en) light
Technical description bvg 2014 (upgrading) (en) lightAdicomp s.r.l
 
Chapter 49
Chapter 49Chapter 49
Chapter 49mcfalltj
 
Technical description bvg 2014 (en) light
Technical description bvg 2014 (en) lightTechnical description bvg 2014 (en) light
Technical description bvg 2014 (en) lightAdicomp s.r.l
 
Asco Series 551, 552, 553, Pilot Solenoid Valves, Atex Hazardous Areas - Proc...
Asco Series 551, 552, 553, Pilot Solenoid Valves, Atex Hazardous Areas - Proc...Asco Series 551, 552, 553, Pilot Solenoid Valves, Atex Hazardous Areas - Proc...
Asco Series 551, 552, 553, Pilot Solenoid Valves, Atex Hazardous Areas - Proc...Thorne & Derrick UK
 
POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW Manohar Tatwawadi
 

Similar to Plant Air & Inst Air.ppt (20)

Compressed Air system.pdf
Compressed Air system.pdfCompressed Air system.pdf
Compressed Air system.pdf
 
B737 NG Air Systems
B737 NG Air SystemsB737 NG Air Systems
B737 NG Air Systems
 
Screwcompressors 100208111533-phpapp02
Screwcompressors 100208111533-phpapp02Screwcompressors 100208111533-phpapp02
Screwcompressors 100208111533-phpapp02
 
Screw Air Compressors
Screw Air CompressorsScrew Air Compressors
Screw Air Compressors
 
Thermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations TrainingThermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations Training
 
Air compressor
Air compressorAir compressor
Air compressor
 
YALE F876 GDP230DCS LIFT TRUCK Service Repair Manual
YALE F876 GDP230DCS LIFT TRUCK Service Repair ManualYALE F876 GDP230DCS LIFT TRUCK Service Repair Manual
YALE F876 GDP230DCS LIFT TRUCK Service Repair Manual
 
YALE F877 GDP300EC LIFT TRUCK Service Repair Manual
YALE F877 GDP300EC LIFT TRUCK Service Repair ManualYALE F877 GDP300EC LIFT TRUCK Service Repair Manual
YALE F877 GDP300EC LIFT TRUCK Service Repair Manual
 
Types, Operations and Maintenance of Air Compressor Plants
Types, Operations and Maintenance of Air  Compressor PlantsTypes, Operations and Maintenance of Air  Compressor Plants
Types, Operations and Maintenance of Air Compressor Plants
 
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIESCOMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
 
Final Turbine rolling ppt Akshay.pptx
Final Turbine rolling ppt Akshay.pptxFinal Turbine rolling ppt Akshay.pptx
Final Turbine rolling ppt Akshay.pptx
 
Compressed air and refrigeration system
Compressed air and refrigeration systemCompressed air and refrigeration system
Compressed air and refrigeration system
 
INTERNSHIP (1).pptx
INTERNSHIP (1).pptxINTERNSHIP (1).pptx
INTERNSHIP (1).pptx
 
Airframe 1 (done)
Airframe 1 (done)Airframe 1 (done)
Airframe 1 (done)
 
SISTEMA DE AIRE FRENOS 793D
SISTEMA DE AIRE FRENOS 793DSISTEMA DE AIRE FRENOS 793D
SISTEMA DE AIRE FRENOS 793D
 
Technical description bvg 2014 (upgrading) (en) light
Technical description bvg 2014 (upgrading) (en) lightTechnical description bvg 2014 (upgrading) (en) light
Technical description bvg 2014 (upgrading) (en) light
 
Chapter 49
Chapter 49Chapter 49
Chapter 49
 
Technical description bvg 2014 (en) light
Technical description bvg 2014 (en) lightTechnical description bvg 2014 (en) light
Technical description bvg 2014 (en) light
 
Asco Series 551, 552, 553, Pilot Solenoid Valves, Atex Hazardous Areas - Proc...
Asco Series 551, 552, 553, Pilot Solenoid Valves, Atex Hazardous Areas - Proc...Asco Series 551, 552, 553, Pilot Solenoid Valves, Atex Hazardous Areas - Proc...
Asco Series 551, 552, 553, Pilot Solenoid Valves, Atex Hazardous Areas - Proc...
 
POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW
 

Recently uploaded

Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIkoyaldeepu123
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 

Recently uploaded (20)

Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AI
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 

Plant Air & Inst Air.ppt

  • 1. Operation of Plant air & Instrument air system. Line-up of Process air, Problems and Troubleshooting.
  • 2. This unit consists of plant air and instrument air and comprises of basically two Air Compressors and Dryers. Air is compressed by air compressors and supplied to the Air Receiver, from where air is then supplied to IGG Plant, Plant air header and a part of this air is passed through a dryer unit for purification where moisture is absorbed and the dryer outlet air is supplied to the Instrument Air Receiver for the use of different instruments.
  • 3. In normal operation, compressed air is extracted from downstream of the 3rd Separator (1-S-423) of Process Air Compressor (1-K-402) in Ammonia Plant and fed to the Compressed Air Receiver (3-V-811) via a pressure indicating controller (3-PIC-801) set at 9.8 Kg/cm2G.
  • 4. Plant Air Consumption • Continuous Use – Instrument air dryer : 1250 Nm3/hr. – Inert gas generation : 1500 Nm3/hr. – Cooling air of flame scanners : 160 Nm3/hr. • Intermittent Use – Plant air header : 500 Nm3/hr. (per one Uty. Station)
  • 5. Equipment Design Data • Type : Screw. • Capacity : 2000 Nm3/hr X 10.43 Kg/cm2G • Driver : Elec. Motor, 315 KW. Air Compressor (3-K-801/802)
  • 6.
  • 7. Air Dryer (3-DR-821/822) • Type : Pressure swing, heat less. • Capacity : 500 Nm3/hr. • Desiccant : Activated Alumina. Plant/ Inst. Air Receiver (3- V-811/821) • Type : Cylindrical, Vertical • Size : 2700 ID X 7500 H
  • 8. Start-up of Plant Air System Start-up of Air Compressors (3-K- 801/802) after prolonged shutdown shall always be carried out locally to assure safe and stable operation of the compressors.
  • 9. Start-up Preparation: • Confirm availability of the following utilities: • Electric Power • Cooling Water • CLOSE the valves 3-PV-801 and 802, 3-PV-803 A, 3-PV-807, along with the upstream block valves and by pass valves of the control valves. • OPEN cooling water line isolation valves to the compressors. • OPEN the discharge valves of the compressors. • CHECK lube oil levels in the compressors are OK. • Open all the instrument block valves.
  • 10. Local Start-up of Air Compressors: • Put the selector of the compressor 3-K-801/802 into LOCAL position. • Move the toggle switch of UNLOAD/NORMAL to UNLOAD position. • Take final clearance from Power Generation Section to START the Compressor 3-K-801/802. • Press RESET-START button to start (1st) the Compressor. Check that oil pressure is over 1.2 kg/cm2 G. There is no vibration, abnormal sound, lube oil or water leakage. • Move the toggle switch to NORMAL position after 3/4 min to load the compressor and pressurize the Compressed Air Receiver (3-V-811).
  • 11. • Look for cooling water return line temperature and regulate this so that the temperature rise is within 100 C. • Slowly pressurize the air Receiver to normal operating pressure of 9.8 kg/cm2G and slowly open the air outlet to other consumers. • Confirm that the compressor operation shifts to “unloaded operation” automatically when discharge pressure reaches to preset unloading pressure. Also confirm the “loaded operation”. • Start 2nd Compressor as the same procedure for 1st and confirm load/unload function of this Compressor.
  • 12. A. Change Over from Utility Compressors to Process Air:  Both the compressors are running with loading/unloading operation.  Take clearance from CCR to receive process air from Ammonia.  Open U/S isolation valve of 3-PIC-801 slowly. This will increase the Air Receiver pressure.  So, the compressors discharge pressure will also increase to unloading set point (i.e. 9.6 & 9.7 Kg/cm2G.). And the result will both the compressors undergo unloading operation.  After 20 minutes of unloading operation the compressor will stop automatically one by one to auto stand-by position. Automatic Operation of Air Compressors:
  • 13. B. Change Over from Process Air to Utility Compressors:  Confirm both the Compressors are auto stand-by position.  Check CW line isolation valves are open & L/O level OK.  Check discharge valves of the compressors open.  Take clearance for compressor start-up and to cut Process Air from Power Generation & Ammonia Plant.  Close U/S isolation valve of 3-PIC-801 slowly.  When isolation valve almost close, Air Receiver pressure decreases to auto start set point (i.e. PAL-9.5 & PALL-9.4 Kg/cm2G.) and the compressors start automatically one by one.  Confirm loading/unloading function of the Compressors.
  • 15. P & I Diagram of Plant air & Instrument air system
  • 16. Line-up of Instrument Air System: A. Instrument Air Receiver (3-V-821) Line-up: o Pressurize 3-V-821 by opening bypass valve of 3-PV-802 and 3-DR- 821/822 upto 7 kg/cm2G (slowly). o Then open isolation valve of 3-PV-802 and put 3-PIC-802 into service. o Confirm 3-PIC-802 is operating on automatic at set-point 8.0 kg/cm2G. o Close the bypass valve of 3-PV-802.
  • 17. B. Line-up Air Dryers: o Open the block valves to Pre-filters and partially open the block valves of the After-filter. o Adjust the moisture indicator bleed valve such that only small amount of air is felt flowing. o Confirm pressurization of Dryer & Energize the Dryer. o Dryer would operate on FIXED mode until the desiccant beds are regenerated to the extent necessary to obtain dry air at the dryer's rated dew point. The control system will then automatically shift to the AMLOC mode. o Confirm that purge air pressure for regeneration is ~80 psig. o Close the by-pass valves of 3-DR-821/822.
  • 18. Line-up Plant Air to Header: • Confirm Instrument Air pressure normal (~7.8 kg/cm2G or more than 6.8 kg/cm2G). • Selection position of 3-PV-803A in Unlatch condition and PV should be in close position. • Open slowly the isolation valve of 3-PV-803A to full. • Open slowly 3-PV-803A by hand-wheel to pressurize header. • After pressurization air header, close PV by hand-wheel. • Change actuator position into Latch and this will open PV full.
  • 19. Line-up Plant Air to IGG Plant: • Confirm Instrument Air pressure normal (~7.8 kg/cm2G or more than 6.0 kg/cm2G). • Selection position of 3-PV-803B in Unlatch condition and PV should be in close position. • Open slowly the U/S isolation valve of 3-PV-807 to full. • Open slowly 3-PV-807 through 3-PIC-807 manually. • Open slowly 3-PV-803B by hand-wheel to pressurize header. • After pressurization air header, Close 3-PV-803B by hand-wheel. • Change actuator position into Latch and this will open 3-PV-803B fully. • Adjust set of 3-PIC-807 at 9.2 kg/cm2G and put it into auto.
  • 20. Line-up Plant Air to Boiler Scanner: After clearance from CCR, open scanner line isolation valve slowly and lock the valve for confirmation of always opening.
  • 21. Shutdown of Plant Air System • Before shutting down of this unit it must be required to inform the whole plant. • Close U/S isolation valve of 3-PV-801 • Turn the switch Loading to Unloading and move “LOCAL/REMOTE” Switches to “LOCAL”. • Press stop button of 3-K-801/802 • De-energize the local control panel of one of the air dryers to stop the operation of the dryer. • Open drain line of LP and HP line.
  • 22. Problems and Troubleshooting Total Power Failure This failure will cause immediate shutdown of the process air compressor (1-K-402) due to the stop of the Flue Gas Fan (1-K-101A/B). Accordingly, the air compressors (3-K-801/802) backed-up by emergency power will start automatically. The action to be taken at the time is to confirm that the air compressors (3-K-801 / 802) are put into service and the system is steady.
  • 23. Cooling Water Failure In order to prevent cooling water failure which causes shutdown of the plant air and instrument air system, cooling water for air compressors is supplied by critical cooling water system which is equipped with steam turbine riven pump and standby motor driven pump backed-up by emergency power to continue operation even in case of electrical power failure.
  • 24. Process Air Failure • After plant air failed, when air receiver pressure drops to set point of the air compressors, then air compressors start automatically. • Check oil pressure, temperature and lube oil level are normal. • Check LP/HP out temperature are normal. • Close isolation valve of 3-PV-801 and put the controller into manual.
  • 25. Air Compressors fail with process air • Immediately Air receiver pressure will fall, at the same time Instrument air receiver pressure also drops. • Instrument air pressure at 6.8 kg/cm2G, plant air header supply valve 3-PV-803A will close automatically. • Instrument air pressure at 6.0 kg/cm2G IGG plant header supply valve 3-PV-803B will close automatically.
  • 26. Instrument Air Dryer Failure • If dryer fails then instrument air pressure will fall. It may cause Plant air header /IGG air supply disconnection. • To recover the set pressure OPEN dryer by pass valve.