OVERVIEW
Life cycle management of Computerized system consists of the following major steps:
• Requirements
• Development
• Validation
• Implementation/Deployment
• Control
• Maintenance and
• Retirement
COMPUTERIZED SYSTEM LIFE CYCLE MANAGEMENT FLOWCHART
Change Control
Initiation
Initial Risk Assessment
System Information
Business Requirement
GXP Relevance
ER/ES Relevance
GAMP Categorization
New System or Existing
System or Laboratory
software or Production
Equipment related or Other
control system or etc.
User Requirement
Specification (URS)
• Purpose of the system
• Brief description of the system
• Design and Environment
• Regulatory requirements
• Service Requirement
• References
1
2
3
COMPUTERIZED SYSTEM LIFE CYCLE MANAGEMENT FLOWCHART
Vendor Identification
and Assessment
Identification of Suitable vendor
Vendor assessment through audits as applicable
Finalization of the vendor
Vendor documents DS/FS/CS/operation manual Assessment
Validation Plan
Validation plan explains about how the necessary requirements will be fulfilled.
It will provide the list of life cycle documentation, role and responsibility and
define testing strategy, criteria for final acceptance, release of system and
maintenance of lifetime compliance.
Validation of computerized system shall be performed in a logical, systematic
manner and risk based approach shall be followed.
4
5
COMPUTERIZED SYSTEM LIFE CYCLE MANAGEMENT FLOWCHART
System Installation
Qualification
Type of Environment – Validation Server or Production Server
System Details like Software name, Version,
Installation Checklist (Installation of Instrument/Equipment,
Installation and Configuration of Application Software
Verification of Pre-Installation Checklist (PO, Intactness of system
components, etc.)
Deviation record, if any.
6
COMPUTERIZED SYSTEM LIFE CYCLE MANAGEMENT FLOWCHART
System Installation
Qualification
Type of Environment – Validation Server or Production Server
System Details like Software name, Version,
Installation Checklist (Installation of Instrument/Equipment,
Installation and Configuration of Application Software
Verification of Pre-Installation Checklist (PO, Intactness of system
components, etc.)
Deviation record, if any.
Summary and conclusion
7
COMPUTERIZED SYSTEM LIFE CYCLE MANAGEMENT FLOWCHART
System Operation
Qualification
Roles of different personnel involved in the qualification of system
Reference documents to perform OQ
Test Planning [Test Items, Components and functions to be tested]
Test Strategy [Test Objective, Test Approach, Recording of results,
Acceptance criteria]
Deviation record, if any
Summary and conclusion
8
COMPUTERIZED SYSTEM LIFE CYCLE MANAGEMENT FLOWCHART
System Performance
Qualification
Roles of different personnel involved in the qualification of system
Reference documents to perform PQ
Test Planning [Test Items, Components and functions to be tested]
Test Strategy [Test Objective, Test Approach, Recording of results,
Acceptance criteria]
Deviation record, if any
Summary and conclusion
9
COMPUTERIZED SYSTEM LIFE CYCLE MANAGEMENT FLOWCHART
Validation
Summary Report
Objective: The objectives of this VSR are to summarize the results
of the validation effort for <Computerized system> to show that
the system is validated according to standards and applicable
regulatory requirements.
Deviations from the Validation Plan, if any
Follow up actions w.r.t the deviations
Summary and Assessment of System Life Cycle Documentation,
e.g. Name Document ID
User requirement Specification To record
Initial Risk Assessment To record
Validation Plan To record
Function Specification To record
Traceability Matrix To record
Risk Assessment (FMECA) To record
Post Implementation review, System acceptance and release
10
COMPUTERIZED SYSTEM LIFE CYCLE MANAGEMENT FLOWCHART
Traceability
Matrix
URS ID
URS specification or
Parameter
IQ test ID OQ test ID PQ test ID
Remarks
If any
URS-01
URS-02
URS-03
URS-04
Traceability matrix outline the User Requirement and the section in which
that particular requirement is tested.
11
COMPUTERIZED SYSTEM LIFE CYCLE MANAGEMENT FLOWCHART
Post
Implementation
Review
Validation Documents Review
Deviation/Change Record Review
Audit Trail Record Review
System Security and Access Control Review
Software and Data Backups Review
Training Record Review
SOPs Review
12
COMPUTERIZED SYSTEM LIFE CYCLE MANAGEMENT FLOWCHART
Periodic Review
Sr.
No.
Name of Computerized
System
Version no.
/Release no.
Frequency of
Review
Date of
Validation
Last Periodic
Review done
on
Next Periodic
Review due
on
Periodic
Review
done on
Periodic
Review
Report No.
Periodic Review of system shall be conducted every year, to assess the continuity of
system operation. Any upgradation/Change in the system shall be assessed for re-
qualification
13
COMPUTERIZED SYSTEM LIFE CYCLE MANAGEMENT FLOWCHART
Revalidation Any major Changes/ Upgradation in the system needs to be re-validated.
System
Retirement
Any system which has gone outdated /Non-Functional needs to be obsoleted through
proper documentation. A risk assessment may be performed to assess the impact on
the particular system retirement on Product/Business continuity/Output etc.
14
15
THANK YOU

More Related Content

What's hot

Computerized System Validation : Understanding basics
Computerized System Validation : Understanding basics Computerized System Validation : Understanding basics
Computerized System Validation : Understanding basics Anand Pandya
 
An Inside Look at Changes to the New ISO 14971:2019 from a Member of the Stan...
An Inside Look at Changes to the New ISO 14971:2019 from a Member of the Stan...An Inside Look at Changes to the New ISO 14971:2019 from a Member of the Stan...
An Inside Look at Changes to the New ISO 14971:2019 from a Member of the Stan...Greenlight Guru
 
Overview of computer system validation
Overview of computer system validationOverview of computer system validation
Overview of computer system validationNilesh Damale
 
QMS For Primary Packaging | ISO 15378
QMS For Primary Packaging | ISO 15378QMS For Primary Packaging | ISO 15378
QMS For Primary Packaging | ISO 15378Anil Chaudhari
 
FDA Warning letter
FDA Warning letterFDA Warning letter
FDA Warning letterSridhar S
 
Qms ISO 13485 2016 short overview
Qms ISO 13485 2016 short overview Qms ISO 13485 2016 short overview
Qms ISO 13485 2016 short overview RohitParkale
 
Iso 13485 certification
Iso 13485 certificationIso 13485 certification
Iso 13485 certificationursindia2
 
Qualification & validation concept & terminology
Qualification & validation concept & terminologyQualification & validation concept & terminology
Qualification & validation concept & terminologyMuhammad Luqman Ikram
 
Risk Management for Medical Devices - ISO 14971 Overview
Risk Management for Medical Devices - ISO 14971 Overview Risk Management for Medical Devices - ISO 14971 Overview
Risk Management for Medical Devices - ISO 14971 Overview Greenlight Guru
 
Overview of Computerized Systems Compliance Using the GAMP® 5 Guide
Overview of Computerized Systems Compliance Using the GAMP® 5 GuideOverview of Computerized Systems Compliance Using the GAMP® 5 Guide
Overview of Computerized Systems Compliance Using the GAMP® 5 GuideProPharma Group
 
Computer System Validation
Computer System ValidationComputer System Validation
Computer System Validationchitralekha48
 
Computer System Validation
Computer System ValidationComputer System Validation
Computer System ValidationEric Silva
 
Difference between fda 21 cfr part 820 and ISO 13485
Difference between fda 21 cfr part 820 and ISO 13485Difference between fda 21 cfr part 820 and ISO 13485
Difference between fda 21 cfr part 820 and ISO 13485Anil Chaudhari
 
PECB Webinar: Overview of ISO 13485 - Medical Devices
PECB Webinar: Overview of ISO 13485 - Medical DevicesPECB Webinar: Overview of ISO 13485 - Medical Devices
PECB Webinar: Overview of ISO 13485 - Medical DevicesPECB
 
Computer System Validation - The Validation Master Plan
Computer System Validation - The Validation Master PlanComputer System Validation - The Validation Master Plan
Computer System Validation - The Validation Master PlanWolfgang Kuchinke
 

What's hot (20)

Computerized System Validation : Understanding basics
Computerized System Validation : Understanding basics Computerized System Validation : Understanding basics
Computerized System Validation : Understanding basics
 
An Inside Look at Changes to the New ISO 14971:2019 from a Member of the Stan...
An Inside Look at Changes to the New ISO 14971:2019 from a Member of the Stan...An Inside Look at Changes to the New ISO 14971:2019 from a Member of the Stan...
An Inside Look at Changes to the New ISO 14971:2019 from a Member of the Stan...
 
Overview of computer system validation
Overview of computer system validationOverview of computer system validation
Overview of computer system validation
 
QMS For Primary Packaging | ISO 15378
QMS For Primary Packaging | ISO 15378QMS For Primary Packaging | ISO 15378
QMS For Primary Packaging | ISO 15378
 
FDA Warning letter
FDA Warning letterFDA Warning letter
FDA Warning letter
 
Qms ISO 13485 2016 short overview
Qms ISO 13485 2016 short overview Qms ISO 13485 2016 short overview
Qms ISO 13485 2016 short overview
 
Iso 13485 certification
Iso 13485 certificationIso 13485 certification
Iso 13485 certification
 
Qualification & validation concept & terminology
Qualification & validation concept & terminologyQualification & validation concept & terminology
Qualification & validation concept & terminology
 
Risk Management for Medical Devices - ISO 14971 Overview
Risk Management for Medical Devices - ISO 14971 Overview Risk Management for Medical Devices - ISO 14971 Overview
Risk Management for Medical Devices - ISO 14971 Overview
 
Overview of Computerized Systems Compliance Using the GAMP® 5 Guide
Overview of Computerized Systems Compliance Using the GAMP® 5 GuideOverview of Computerized Systems Compliance Using the GAMP® 5 Guide
Overview of Computerized Systems Compliance Using the GAMP® 5 Guide
 
Computer System Validation
Computer System ValidationComputer System Validation
Computer System Validation
 
Computer System Validation
Computer System ValidationComputer System Validation
Computer System Validation
 
Difference between fda 21 cfr part 820 and ISO 13485
Difference between fda 21 cfr part 820 and ISO 13485Difference between fda 21 cfr part 820 and ISO 13485
Difference between fda 21 cfr part 820 and ISO 13485
 
Csv concepts
Csv conceptsCsv concepts
Csv concepts
 
Doc in pharma
Doc in pharmaDoc in pharma
Doc in pharma
 
PECB Webinar: Overview of ISO 13485 - Medical Devices
PECB Webinar: Overview of ISO 13485 - Medical DevicesPECB Webinar: Overview of ISO 13485 - Medical Devices
PECB Webinar: Overview of ISO 13485 - Medical Devices
 
Computer System Validation
Computer System ValidationComputer System Validation
Computer System Validation
 
Computer System Validation - The Validation Master Plan
Computer System Validation - The Validation Master PlanComputer System Validation - The Validation Master Plan
Computer System Validation - The Validation Master Plan
 
21 CFR PART 11
21 CFR PART 1121 CFR PART 11
21 CFR PART 11
 
ISO 13485.pptx
ISO 13485.pptxISO 13485.pptx
ISO 13485.pptx
 

Similar to Life Cycle Management of Computerized System.pdf

Equipment Qualification.pptx
Equipment Qualification.pptxEquipment Qualification.pptx
Equipment Qualification.pptxNeeraj Kumar Rai
 
Data Integrity II - Chromatography data system (CDS) in Pharma
Data Integrity II - Chromatography data system (CDS) in PharmaData Integrity II - Chromatography data system (CDS) in Pharma
Data Integrity II - Chromatography data system (CDS) in PharmaSathish Vemula
 
Concept of URS,DQ,IQ,OQ,PQ
Concept of URS,DQ,IQ,OQ,PQConcept of URS,DQ,IQ,OQ,PQ
Concept of URS,DQ,IQ,OQ,PQdhavalrock24
 
CONCEPT OF URS, DQ, IQ, OQ, PQ
CONCEPT OF URS, DQ, IQ, OQ, PQCONCEPT OF URS, DQ, IQ, OQ, PQ
CONCEPT OF URS, DQ, IQ, OQ, PQROHIT
 
Webinar: How to Ace Your SaaS-based EDC System Validation for Sponsors and CROs
Webinar: How to Ace Your SaaS-based EDC System Validation for Sponsors and CROsWebinar: How to Ace Your SaaS-based EDC System Validation for Sponsors and CROs
Webinar: How to Ace Your SaaS-based EDC System Validation for Sponsors and CROsStatistics & Data Corporation
 
Computerized System Validation.vinay (1).pptx
Computerized  System  Validation.vinay (1).pptxComputerized  System  Validation.vinay (1).pptx
Computerized System Validation.vinay (1).pptxKIET GROUP OF INSITITUTE
 
Cleanroom Qualification
Cleanroom QualificationCleanroom Qualification
Cleanroom QualificationAnwar Munjewar
 
Validation : Project Management
Validation : Project ManagementValidation : Project Management
Validation : Project ManagementDipen Shroff
 
Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects Apoorva Bauskar
 
Software audiit information management
Software audiit   information managementSoftware audiit   information management
Software audiit information managementHallmark B-school
 
Computerized system validation (CSV) as a requirement for good manufacturing ...
Computerized system validation (CSV) as a requirement for good manufacturing ...Computerized system validation (CSV) as a requirement for good manufacturing ...
Computerized system validation (CSV) as a requirement for good manufacturing ...Ahmed Hasham
 
Principle of Validation and Qualification
Principle of Validation and QualificationPrinciple of Validation and Qualification
Principle of Validation and QualificationPharmaguideline
 
Process and Regulated Processes Software Validation Elements
Process and Regulated Processes Software Validation ElementsProcess and Regulated Processes Software Validation Elements
Process and Regulated Processes Software Validation ElementsArta Doci
 
Validation Program Design
Validation Program DesignValidation Program Design
Validation Program Designbwbslide
 
Risk assessment for computer system validation
Risk assessment for computer system validationRisk assessment for computer system validation
Risk assessment for computer system validationBangaluru
 
Analytical instrument qualification
Analytical instrument qualificationAnalytical instrument qualification
Analytical instrument qualificationmanusb07
 

Similar to Life Cycle Management of Computerized System.pdf (20)

Equipment Qualification.pptx
Equipment Qualification.pptxEquipment Qualification.pptx
Equipment Qualification.pptx
 
Data Integrity II - Chromatography data system (CDS) in Pharma
Data Integrity II - Chromatography data system (CDS) in PharmaData Integrity II - Chromatography data system (CDS) in Pharma
Data Integrity II - Chromatography data system (CDS) in Pharma
 
Vaidation ppt.pptx
Vaidation ppt.pptxVaidation ppt.pptx
Vaidation ppt.pptx
 
Concept of URS,DQ,IQ,OQ,PQ
Concept of URS,DQ,IQ,OQ,PQConcept of URS,DQ,IQ,OQ,PQ
Concept of URS,DQ,IQ,OQ,PQ
 
Testing Process
Testing ProcessTesting Process
Testing Process
 
CONCEPT OF URS, DQ, IQ, OQ, PQ
CONCEPT OF URS, DQ, IQ, OQ, PQCONCEPT OF URS, DQ, IQ, OQ, PQ
CONCEPT OF URS, DQ, IQ, OQ, PQ
 
Webinar: How to Ace Your SaaS-based EDC System Validation for Sponsors and CROs
Webinar: How to Ace Your SaaS-based EDC System Validation for Sponsors and CROsWebinar: How to Ace Your SaaS-based EDC System Validation for Sponsors and CROs
Webinar: How to Ace Your SaaS-based EDC System Validation for Sponsors and CROs
 
Computerized System Validation.vinay (1).pptx
Computerized  System  Validation.vinay (1).pptxComputerized  System  Validation.vinay (1).pptx
Computerized System Validation.vinay (1).pptx
 
Cleanroom Qualification
Cleanroom QualificationCleanroom Qualification
Cleanroom Qualification
 
Validation : Project Management
Validation : Project ManagementValidation : Project Management
Validation : Project Management
 
Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects
 
Software audiit information management
Software audiit   information managementSoftware audiit   information management
Software audiit information management
 
Computerized system validation (CSV) as a requirement for good manufacturing ...
Computerized system validation (CSV) as a requirement for good manufacturing ...Computerized system validation (CSV) as a requirement for good manufacturing ...
Computerized system validation (CSV) as a requirement for good manufacturing ...
 
Principle of Validation and Qualification
Principle of Validation and QualificationPrinciple of Validation and Qualification
Principle of Validation and Qualification
 
Equipment Qualification
Equipment QualificationEquipment Qualification
Equipment Qualification
 
Process and Regulated Processes Software Validation Elements
Process and Regulated Processes Software Validation ElementsProcess and Regulated Processes Software Validation Elements
Process and Regulated Processes Software Validation Elements
 
Validation Program Design
Validation Program DesignValidation Program Design
Validation Program Design
 
Urs,dq, iq,oq,pq
Urs,dq, iq,oq,pqUrs,dq, iq,oq,pq
Urs,dq, iq,oq,pq
 
Risk assessment for computer system validation
Risk assessment for computer system validationRisk assessment for computer system validation
Risk assessment for computer system validation
 
Analytical instrument qualification
Analytical instrument qualificationAnalytical instrument qualification
Analytical instrument qualification
 

Recently uploaded

Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterMateoGardella
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 

Recently uploaded (20)

Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 

Life Cycle Management of Computerized System.pdf

  • 1. LIFE CYCLE MANAGEMENT OF COMPUTERIZED SYSTEM RAKTIM DEY DY. MANAGER-VALIDATION AND QUALIFICATION GRANULES INDIA LIMITED
  • 2. OVERVIEW Life cycle management of Computerized system consists of the following major steps: • Requirements • Development • Validation • Implementation/Deployment • Control • Maintenance and • Retirement
  • 3. COMPUTERIZED SYSTEM LIFE CYCLE MANAGEMENT FLOWCHART Change Control Initiation Initial Risk Assessment System Information Business Requirement GXP Relevance ER/ES Relevance GAMP Categorization New System or Existing System or Laboratory software or Production Equipment related or Other control system or etc. User Requirement Specification (URS) • Purpose of the system • Brief description of the system • Design and Environment • Regulatory requirements • Service Requirement • References 1 2 3
  • 4. COMPUTERIZED SYSTEM LIFE CYCLE MANAGEMENT FLOWCHART Vendor Identification and Assessment Identification of Suitable vendor Vendor assessment through audits as applicable Finalization of the vendor Vendor documents DS/FS/CS/operation manual Assessment Validation Plan Validation plan explains about how the necessary requirements will be fulfilled. It will provide the list of life cycle documentation, role and responsibility and define testing strategy, criteria for final acceptance, release of system and maintenance of lifetime compliance. Validation of computerized system shall be performed in a logical, systematic manner and risk based approach shall be followed. 4 5
  • 5. COMPUTERIZED SYSTEM LIFE CYCLE MANAGEMENT FLOWCHART System Installation Qualification Type of Environment – Validation Server or Production Server System Details like Software name, Version, Installation Checklist (Installation of Instrument/Equipment, Installation and Configuration of Application Software Verification of Pre-Installation Checklist (PO, Intactness of system components, etc.) Deviation record, if any. 6
  • 6. COMPUTERIZED SYSTEM LIFE CYCLE MANAGEMENT FLOWCHART System Installation Qualification Type of Environment – Validation Server or Production Server System Details like Software name, Version, Installation Checklist (Installation of Instrument/Equipment, Installation and Configuration of Application Software Verification of Pre-Installation Checklist (PO, Intactness of system components, etc.) Deviation record, if any. Summary and conclusion 7
  • 7. COMPUTERIZED SYSTEM LIFE CYCLE MANAGEMENT FLOWCHART System Operation Qualification Roles of different personnel involved in the qualification of system Reference documents to perform OQ Test Planning [Test Items, Components and functions to be tested] Test Strategy [Test Objective, Test Approach, Recording of results, Acceptance criteria] Deviation record, if any Summary and conclusion 8
  • 8. COMPUTERIZED SYSTEM LIFE CYCLE MANAGEMENT FLOWCHART System Performance Qualification Roles of different personnel involved in the qualification of system Reference documents to perform PQ Test Planning [Test Items, Components and functions to be tested] Test Strategy [Test Objective, Test Approach, Recording of results, Acceptance criteria] Deviation record, if any Summary and conclusion 9
  • 9. COMPUTERIZED SYSTEM LIFE CYCLE MANAGEMENT FLOWCHART Validation Summary Report Objective: The objectives of this VSR are to summarize the results of the validation effort for <Computerized system> to show that the system is validated according to standards and applicable regulatory requirements. Deviations from the Validation Plan, if any Follow up actions w.r.t the deviations Summary and Assessment of System Life Cycle Documentation, e.g. Name Document ID User requirement Specification To record Initial Risk Assessment To record Validation Plan To record Function Specification To record Traceability Matrix To record Risk Assessment (FMECA) To record Post Implementation review, System acceptance and release 10
  • 10. COMPUTERIZED SYSTEM LIFE CYCLE MANAGEMENT FLOWCHART Traceability Matrix URS ID URS specification or Parameter IQ test ID OQ test ID PQ test ID Remarks If any URS-01 URS-02 URS-03 URS-04 Traceability matrix outline the User Requirement and the section in which that particular requirement is tested. 11
  • 11. COMPUTERIZED SYSTEM LIFE CYCLE MANAGEMENT FLOWCHART Post Implementation Review Validation Documents Review Deviation/Change Record Review Audit Trail Record Review System Security and Access Control Review Software and Data Backups Review Training Record Review SOPs Review 12
  • 12. COMPUTERIZED SYSTEM LIFE CYCLE MANAGEMENT FLOWCHART Periodic Review Sr. No. Name of Computerized System Version no. /Release no. Frequency of Review Date of Validation Last Periodic Review done on Next Periodic Review due on Periodic Review done on Periodic Review Report No. Periodic Review of system shall be conducted every year, to assess the continuity of system operation. Any upgradation/Change in the system shall be assessed for re- qualification 13
  • 13. COMPUTERIZED SYSTEM LIFE CYCLE MANAGEMENT FLOWCHART Revalidation Any major Changes/ Upgradation in the system needs to be re-validated. System Retirement Any system which has gone outdated /Non-Functional needs to be obsoleted through proper documentation. A risk assessment may be performed to assess the impact on the particular system retirement on Product/Business continuity/Output etc. 14 15