SlideShare a Scribd company logo
1 of 5
Saad-Al-Hassan
House-12,Road-3,Sector-1,Appertment-B1,Uttara Model Town, Dhaka,Bangladesh,Telephone +880-1614404468,
Email-saad007bd@hotmail.com
SUMMARY OF QUALIFICATION
More than seven (7) years of technical experiences in Transmission Technologywhich includes installation,testing,
commissioning,projectco-ordination,management,Microwave Planning,Mux planning,as well as product
acceptance of various telecommunication equipmentfrom differentvendor. Worked in Bangladesh,Malaysia,
Indonesia for differentprojects as an Transmission Expert
Hands on experience on Microwave Radios,Optical Line Terminal Equipment,PDH/SDH Multiplexers,fiber optic
network, knowledgeable on Network ManagementSystems,DCN Equipmentfor LAN/WAN applications.
Technical Summery
 Well experienced in Transmission productofHuawei & Ericsson.
 Expert in IP based Network,Packet Radio Transmission.
 Experienced in installation & commissioning ofHuawei Microwave Products (RTN 600,900).
 Experienced in MUX plan of Microwave planning ofHybrid network of Huawei RTN & Minilink TN,
Minilink CN.
 Experienced in Transmission Projectroll out coordination.
 Highly experienced in Huawei Transmission NMS (U2000,T2000) for integrating new IDU (RTN), &
OSN (Optical MUX).
 Capable oftraining new engineers for projectroll out purpose.
 Have very good experience in Microwave Transmission swap (HotSwap & Cold Swap) of Minilink TN
to RTN.
 Good experience with Optical Transmission system,OSN Commissioning,Familiar with DWDM.
 Obtained International Training in Malaysia on MPLS Tunneling,ATM, EthernetConfiguration.
Technologyand Tools:
Mapinfo, Pathloss,Minilink Manager, Minilink LCT, SOA (OMS),IManeger M2000, T2000, U2000
Transmission Engineer (Consultant)- Huawei Technologies South Africa Ltd
: 1st
April 2015- April 2016
Phase 1: Microwave Back Office Engineer
 Supportand Integration of L2 and L3 transmission network over RTN 950 for NodeB and 2G of
Ericsson and Huawei Product.
 Prepare and provide Network performance statistic data analysis,Signal tracing and data analysis to
improve Network performance
 Troubleshooting and provide training to Local Engineers and provide full documentation for handover
to Local Engineer’s Team.
 Upgrade Capacity,Enable AM,frequency auditing,
 Advanced RTN-950 Microwave setup, including AM-XPIC
 Advanced level supporton Ethernet service:E-line and E-LAN service on RTN-950
 Working on MPLS, MPLS TE, setup on RTN-950
 Fluently using U2000 for adding node,view alarm,remote NE access by LCT or telnet, NE
backup/restore
 Co- Ordinate and synchronize with differenttypes of vendors for Optical and Microwave transmission.
 Find out the actual problem on optical and Microwave transmission path and provide solution
accordingly
 timeline.
Reportto the respective departmentregularly.
 Escalate mostcritical problem to the respective solution provider.
Phase 2: Microwave Planner
Responsible for all Transmission planning,design and engineering activities to be performed
according to the service contracts and approved business case for the MTN South Africa, securing the
fulfillmentofits contractual requirements and the approved business case
• Responsible for the cost-effectiveness ofthe transmission solution,byconsidering the initial
implementation costs and the running operational costs
• Leading the Transmission Planning Team(Microwave,circuitplanning)
• Leading the independentauditofthe transmission network to examine the performance with
respectto setKey Performance Indicators
• Prepare HLD Plan for MTN Network Northern region.
• Supervise the team for LLD planning.
• Preparing Swap strategy for the network
Huawei TRX Deployment Supervisor – Ericsson Myanmar
Outsource Company name: Global Technical Support
Ericsson Myanmar: September 12th- 11th
March
 Advanced RTN Microwave setup.
 Configure E-LAN, E-Line service.
 IP routing,OSPF/ISIS, setup on RTN-950
 Setup MPLS, MPLS TE configuration.
 Configure L3VPN.
 RegularlyConfigure Layer 2/ Layer 3 services
 OSPF/ISIS Setup
 Remotelysupportto Installation and Commissioning Team
 Frequently adding nodes,viewing alarms,NE Backup and restore
Transmission Engineer: Huawei Technologies Bangladesh (www.huawei.com)
1st
July-2010-30th
August 2014
Projects under Bangladesh Huawei
Banglalink (Working as Consultant from Huawei) January 2014-August 2014
 Responsible for all Transmission planning,design and engineering activities to be performed
according to the service contracts and approved business case for the Banglalink,securing the
fulfillmentofits contractual requirements and the approved business case
 Requirementanalysis ofcustomer’s requestfor changes and for translating the contractual and
technical requirements to the MS delivery units and for validating and approving all activities
performed by those units under the scope ofthe contract.
 Responsible for Microwave network plan,link budgetdesign,frequencyplanning,MUX design(OSN
product), equipmentdimensioning,technical proposal write up,BOQ output, contract negotiation &
documentation etc
 Responsible to secure thatthe transmission network is implemented as per design guideline and that
it is satisfying customer requirements
 Design the LLD & HLD network as per 3G requirement.
 Single handedlycompleted 1000 LLD link budgets in less than 2 months.
 Preparing Swap strategy for the network
Transmission Planning Engineer:
Huawei Technologies Bangladesh: February 2013- December 2013:
 Leading Microwave planning
 Preparation of annual budgetfor related to microwave planning
 Manage & lead the contract & agreementfinalization with differentvendors including definition &
establishmentofprojectscope,productspecification,BOQ, SLA, responsibilitymatrix, acceptance
criteria etc
 Provide supportto prepare core transmission planning annual budget
 Design link plan and link budgetfor radio links using PathLoss4.0
 ADM planning,E1 mapping,and fiber route planning
 Protection planning for fiber, MW and ADM
 Optimization of network
PT Huawei Tech Investment Indonesia (Workedas a support Engineer from Bangladesh from April 2012-
September 2012)
 ImplementMajor Cutovers & SDH links e.g. 3+1 FD, 4(1+1) SD link.
 Node B transmission swap from NSN to Huawei RTN links.
 Configure Ethernetboards EMS6T, EM4T for packetservice using ELAN service.
 Engineering design for IDU (RTN) of the overall smooth migration from TDM to IP based service ofthe
network.
 Regularlytrouble shootthe interference problems.
 Follow up subcontractors for the project rollout.
 Update HQ for synchronization of the overall projectrollout.
 Plane,execute, and supervise the installation,commission & testing of Transmission NMS
server (U2000 Server).
 Perform version Upgrade,patch upgrade of U2000.
 Manage and conductfieldwork of Subcon engineers for MW installation,rectification,upgradation,
commissioning,ATP and optimization
 Analyze and clarify customer queries through troubleshooting and researching existing
knowledgebase articles/known issues.
 Arrange and conduct training courses for Huawei and Subcon engineers under Local Training Unit.
Coordinating with customers and other vendors
Transmission Engineer: Microwave & Optics
July 2010-30th
March2012: Huawei Technologies (Bangladesh) Ltd. (www.huawei.com)
 Design the Mux plan of whole three hundred twelve Bts of Airtel Expansion projectusing MicrosoftVisio
which includes all the necessarydiagram ofrequired hardwires like RTN 900 series IFcard, SL1D card.
 Map the E1 Traffic towards BSC of the Mux Plan
 Map the E1 Traffic for the Bts which passes through Ericsson Product.For which I had to check all the
“Traffic Node” files of Ericsson Bts,Check the NMS if E1 slotis empty, also check the existing OMS
Mux if connectivity is possible.
 Frequently update the customer (Airtel) for the Mux Plan
 RTN Software Patch Upgrade.
 Coordinate with Transmission Planning division ofHuawei,Update the planning ifthe Network is
changed and also inform the Transmission Planning division ifthe given capacity does notsupportthe
E1 Traffic.
 Coordinate with BSS Departmentand Optical Manager for Abis traffic issues.
 Providing 2nd
Level Support for Managed Service Department.
 Upload the new sites according to the DCN plan in the NMS (U2000)
 Troubleshooting the U2000 & T2000 server.
 Supportthe field engineers in order to “On Air” the new Expansion sites.
 Successfullyplanned & executed Major PDH link up gradation & Traffic shifting of Super PDH 1+0 SD
link to 1+0 Xpic links.
 Have successfullyPlanned & Executed the Traffic Shifting of Transmission links ofdifferentexisting
Ericsson Traffic Nodes to Huawei RTN.
 Have successfullyPlanned & executed BSC Rehoming ofdifferentBTS.
 Currently doing the MUX Plan for Ericsson to Huawei Transmission Swap as well as execution which
includes involvementofRTN, TN, OMS, OSN(1500/3500)
 Making Cross Connection ofRTN (950/910) & OSN (1500/3500) in U2000 NMS, Minilink Manager (For
Ericsson Traffic Node),Minilink Craft (For Ericsson Traffic Node),SOA (ADM), Marconi LCT (ADM),
OSN.
 OSN Commissioning (Metro,1500,2500,3500)
 Checking loop testusing U2000,Minilink Manager/Craft & Check the resultin M2000.
 Have Given Training on U2000 to MSD Departmentas well as to the Customer technical Department
(Airtel).
Visited sites for new Links,which includes installation ofIDU, commissioning,troubleshooting the links,fulfill
Special Achievements
 Was given “Outstanding Performance Award” for Bharti Airtel Project.
 Was Chosen “The Employee of the Month”
Trainings Obtained:
International:Malaysia Huawei Global Training Center
 MPLS Tunneling
 Ethernet Configuration
 RTN Version 3 products of IDU 910, 950 & 980
 ATM Technology& its implementation.
 Ethernet Configuration (EMT6 & EMT8)
 Hybrid Microwave principal.
Local Trainings:
 Huawei Microwave RTN 600, 900 series Commissioning,Link Troubleshooting
 Metro OSN, 1500,2500,3500 series commissioning.
 DWDM Principal.
 Theoretical Training on SDH Principal
Associate Engineer : Transmission Planning
1st
January 2010- 30th
June 2010-WaridTelecom International Ltd. (Now Airtel Bangladesh)
www.airtel.com.bd
 Planning the cross connections from Base Transceiver Station to the Base Station Controller using
Ericsson’s Minilink Manager.
 Planning High and Low end Multiplexer cross connections and interfaces.
 Optimizing the interfering transmission link’s frequencyutilization.
 Preparing the transmission plan for the Upgrade ofaround 650 base stations.
 Planning the transmission for 700 new BTS deployed nationwide.
 Planning ofnew route of data with other topology of connection if the LOS (Line Of Sight) blockage is
occurred.
 Updating a web based software ofthe transmission line which includes all STM, E1, PDH
(Plesiochronous Digital Hierarchy),SDH (Synchronous Digital Hierarchy).
 Planning for protection of traffic through the available channels ofthe transmission network.
 Link Budget Preparation using Pathloss 4.0 Software
System Engineer
Road Max
January 2nd
2008- 30th
August 2009
 Producing and examining tender documents with upcoming international tender notices.
 Server upgrade.
 Troubleshooting Hardwares.
 Communication with Korean companies (Poongsang,Klnet)
 Administrator ofthe companywebsite.
 Software used:MicrosoftWord, Microsoft Access,AutoCAD, Adobe Photoshop,Microsoft
Dreamweaver
ACADEMIC BACKGROUND
Bachelor in Electronics & Telecommunication
North South University (www.northsouth.edu)
CGPA: 3.20 out of 4
Reference # 1
Mr. Chenxinyang (Peter)
Cooperation Strategy Dept
Huawei Technologies Co.,Ltd.
Contact No: 075518617090966
E-mail:chenxinyang@huawei.com
Saad-Al-Hassan
Reference # 2
Mr. Md. Amin Jamal
Microwave Implementation Team
Leader
Huawei Technologies Bangladesh
Email: md.amin.jamal1@huawei.com
Phone: +8801847130235

More Related Content

What's hot (20)

Training report of Alcatel Lucent for 3G
Training report of Alcatel Lucent for 3GTraining report of Alcatel Lucent for 3G
Training report of Alcatel Lucent for 3G
 
Rahul resume.
Rahul resume.Rahul resume.
Rahul resume.
 
Wyden Sagun's CV
Wyden Sagun's CVWyden Sagun's CV
Wyden Sagun's CV
 
Resume
ResumeResume
Resume
 
Metro Rf Services Technical Review
Metro Rf Services   Technical ReviewMetro Rf Services   Technical Review
Metro Rf Services Technical Review
 
Curriculum-Vitae1.3
Curriculum-Vitae1.3Curriculum-Vitae1.3
Curriculum-Vitae1.3
 
AlaaEldin-Ahmed CV
AlaaEldin-Ahmed CVAlaaEldin-Ahmed CV
AlaaEldin-Ahmed CV
 
alexander Eze
alexander Ezealexander Eze
alexander Eze
 
Asif-Res-2015
Asif-Res-2015Asif-Res-2015
Asif-Res-2015
 
MANISH KUMAR GUPTA.docx
MANISH KUMAR GUPTA.docxMANISH KUMAR GUPTA.docx
MANISH KUMAR GUPTA.docx
 
AlaaEldin-Ahmed CV
AlaaEldin-Ahmed CVAlaaEldin-Ahmed CV
AlaaEldin-Ahmed CV
 
Mir Ahmed Raza
Mir Ahmed RazaMir Ahmed Raza
Mir Ahmed Raza
 
Divaker resume updated
Divaker resume updatedDivaker resume updated
Divaker resume updated
 
Resume
ResumeResume
Resume
 
Resume_Mohit_Panwar
Resume_Mohit_PanwarResume_Mohit_Panwar
Resume_Mohit_Panwar
 
CV - Rashid
CV - RashidCV - Rashid
CV - Rashid
 
RESUME_Sushil
RESUME_SushilRESUME_Sushil
RESUME_Sushil
 
CV-Trivinder
CV-TrivinderCV-Trivinder
CV-Trivinder
 
LTE ebook No 7 - Guide to radio access placement for better coverage & capaci...
LTE ebook No 7 - Guide to radio access placement for better coverage & capaci...LTE ebook No 7 - Guide to radio access placement for better coverage & capaci...
LTE ebook No 7 - Guide to radio access placement for better coverage & capaci...
 
Resume Deepak Pandey Ericsson
Resume  Deepak Pandey EricssonResume  Deepak Pandey Ericsson
Resume Deepak Pandey Ericsson
 

Similar to Expert Transmission Engineer resume summary

Similar to Expert Transmission Engineer resume summary (20)

Avinash_cv for Txn
Avinash_cv for TxnAvinash_cv for Txn
Avinash_cv for Txn
 
RAMZAN MALIK
RAMZAN MALIKRAMZAN MALIK
RAMZAN MALIK
 
ADEEL SHAHZAD Resume
ADEEL SHAHZAD ResumeADEEL SHAHZAD Resume
ADEEL SHAHZAD Resume
 
shriram2016
shriram2016shriram2016
shriram2016
 
CV_VIKAS RAJPUROHIT
CV_VIKAS RAJPUROHITCV_VIKAS RAJPUROHIT
CV_VIKAS RAJPUROHIT
 
Attique Mahmood_CV
Attique Mahmood_CVAttique Mahmood_CV
Attique Mahmood_CV
 
Wied Resume 2016
Wied  Resume 2016Wied  Resume 2016
Wied Resume 2016
 
Ibrahim AlGhamdi CV
Ibrahim AlGhamdi CVIbrahim AlGhamdi CV
Ibrahim AlGhamdi CV
 
Ammar Murtaza-IM
Ammar Murtaza-IMAmmar Murtaza-IM
Ammar Murtaza-IM
 
Esrar Alam Transmission Engineer
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission Engineer
 
Alia khan1
Alia khan1Alia khan1
Alia khan1
 
Saeed Jalal CV
Saeed Jalal CVSaeed Jalal CV
Saeed Jalal CV
 
Bashir_cv
Bashir_cvBashir_cv
Bashir_cv
 
Imran_Resume
Imran_ResumeImran_Resume
Imran_Resume
 
AHSANULLAH BHUTTO CV-DT
AHSANULLAH BHUTTO CV-DTAHSANULLAH BHUTTO CV-DT
AHSANULLAH BHUTTO CV-DT
 
Mohammed Abu Aqel Cv 11 10 2012
Mohammed Abu Aqel Cv 11 10 2012Mohammed Abu Aqel Cv 11 10 2012
Mohammed Abu Aqel Cv 11 10 2012
 
CV_Devesh
CV_DeveshCV_Devesh
CV_Devesh
 
Alpesh Joshi Optical Expert
Alpesh Joshi Optical ExpertAlpesh Joshi Optical Expert
Alpesh Joshi Optical Expert
 
telecom engineer cv-1
telecom engineer cv-1telecom engineer cv-1
telecom engineer cv-1
 
Resume
ResumeResume
Resume
 

Expert Transmission Engineer resume summary

  • 1. Saad-Al-Hassan House-12,Road-3,Sector-1,Appertment-B1,Uttara Model Town, Dhaka,Bangladesh,Telephone +880-1614404468, Email-saad007bd@hotmail.com SUMMARY OF QUALIFICATION More than seven (7) years of technical experiences in Transmission Technologywhich includes installation,testing, commissioning,projectco-ordination,management,Microwave Planning,Mux planning,as well as product acceptance of various telecommunication equipmentfrom differentvendor. Worked in Bangladesh,Malaysia, Indonesia for differentprojects as an Transmission Expert Hands on experience on Microwave Radios,Optical Line Terminal Equipment,PDH/SDH Multiplexers,fiber optic network, knowledgeable on Network ManagementSystems,DCN Equipmentfor LAN/WAN applications. Technical Summery  Well experienced in Transmission productofHuawei & Ericsson.  Expert in IP based Network,Packet Radio Transmission.  Experienced in installation & commissioning ofHuawei Microwave Products (RTN 600,900).  Experienced in MUX plan of Microwave planning ofHybrid network of Huawei RTN & Minilink TN, Minilink CN.  Experienced in Transmission Projectroll out coordination.  Highly experienced in Huawei Transmission NMS (U2000,T2000) for integrating new IDU (RTN), & OSN (Optical MUX).  Capable oftraining new engineers for projectroll out purpose.  Have very good experience in Microwave Transmission swap (HotSwap & Cold Swap) of Minilink TN to RTN.  Good experience with Optical Transmission system,OSN Commissioning,Familiar with DWDM.  Obtained International Training in Malaysia on MPLS Tunneling,ATM, EthernetConfiguration. Technologyand Tools: Mapinfo, Pathloss,Minilink Manager, Minilink LCT, SOA (OMS),IManeger M2000, T2000, U2000 Transmission Engineer (Consultant)- Huawei Technologies South Africa Ltd : 1st April 2015- April 2016 Phase 1: Microwave Back Office Engineer  Supportand Integration of L2 and L3 transmission network over RTN 950 for NodeB and 2G of Ericsson and Huawei Product.  Prepare and provide Network performance statistic data analysis,Signal tracing and data analysis to improve Network performance  Troubleshooting and provide training to Local Engineers and provide full documentation for handover to Local Engineer’s Team.  Upgrade Capacity,Enable AM,frequency auditing,  Advanced RTN-950 Microwave setup, including AM-XPIC  Advanced level supporton Ethernet service:E-line and E-LAN service on RTN-950
  • 2.  Working on MPLS, MPLS TE, setup on RTN-950  Fluently using U2000 for adding node,view alarm,remote NE access by LCT or telnet, NE backup/restore  Co- Ordinate and synchronize with differenttypes of vendors for Optical and Microwave transmission.  Find out the actual problem on optical and Microwave transmission path and provide solution accordingly  timeline. Reportto the respective departmentregularly.  Escalate mostcritical problem to the respective solution provider. Phase 2: Microwave Planner Responsible for all Transmission planning,design and engineering activities to be performed according to the service contracts and approved business case for the MTN South Africa, securing the fulfillmentofits contractual requirements and the approved business case • Responsible for the cost-effectiveness ofthe transmission solution,byconsidering the initial implementation costs and the running operational costs • Leading the Transmission Planning Team(Microwave,circuitplanning) • Leading the independentauditofthe transmission network to examine the performance with respectto setKey Performance Indicators • Prepare HLD Plan for MTN Network Northern region. • Supervise the team for LLD planning. • Preparing Swap strategy for the network Huawei TRX Deployment Supervisor – Ericsson Myanmar Outsource Company name: Global Technical Support Ericsson Myanmar: September 12th- 11th March  Advanced RTN Microwave setup.  Configure E-LAN, E-Line service.  IP routing,OSPF/ISIS, setup on RTN-950  Setup MPLS, MPLS TE configuration.  Configure L3VPN.  RegularlyConfigure Layer 2/ Layer 3 services  OSPF/ISIS Setup  Remotelysupportto Installation and Commissioning Team  Frequently adding nodes,viewing alarms,NE Backup and restore Transmission Engineer: Huawei Technologies Bangladesh (www.huawei.com) 1st July-2010-30th August 2014 Projects under Bangladesh Huawei Banglalink (Working as Consultant from Huawei) January 2014-August 2014  Responsible for all Transmission planning,design and engineering activities to be performed according to the service contracts and approved business case for the Banglalink,securing the fulfillmentofits contractual requirements and the approved business case
  • 3.  Requirementanalysis ofcustomer’s requestfor changes and for translating the contractual and technical requirements to the MS delivery units and for validating and approving all activities performed by those units under the scope ofthe contract.  Responsible for Microwave network plan,link budgetdesign,frequencyplanning,MUX design(OSN product), equipmentdimensioning,technical proposal write up,BOQ output, contract negotiation & documentation etc  Responsible to secure thatthe transmission network is implemented as per design guideline and that it is satisfying customer requirements  Design the LLD & HLD network as per 3G requirement.  Single handedlycompleted 1000 LLD link budgets in less than 2 months.  Preparing Swap strategy for the network Transmission Planning Engineer: Huawei Technologies Bangladesh: February 2013- December 2013:  Leading Microwave planning  Preparation of annual budgetfor related to microwave planning  Manage & lead the contract & agreementfinalization with differentvendors including definition & establishmentofprojectscope,productspecification,BOQ, SLA, responsibilitymatrix, acceptance criteria etc  Provide supportto prepare core transmission planning annual budget  Design link plan and link budgetfor radio links using PathLoss4.0  ADM planning,E1 mapping,and fiber route planning  Protection planning for fiber, MW and ADM  Optimization of network PT Huawei Tech Investment Indonesia (Workedas a support Engineer from Bangladesh from April 2012- September 2012)  ImplementMajor Cutovers & SDH links e.g. 3+1 FD, 4(1+1) SD link.  Node B transmission swap from NSN to Huawei RTN links.  Configure Ethernetboards EMS6T, EM4T for packetservice using ELAN service.  Engineering design for IDU (RTN) of the overall smooth migration from TDM to IP based service ofthe network.  Regularlytrouble shootthe interference problems.  Follow up subcontractors for the project rollout.  Update HQ for synchronization of the overall projectrollout.  Plane,execute, and supervise the installation,commission & testing of Transmission NMS server (U2000 Server).  Perform version Upgrade,patch upgrade of U2000.  Manage and conductfieldwork of Subcon engineers for MW installation,rectification,upgradation, commissioning,ATP and optimization  Analyze and clarify customer queries through troubleshooting and researching existing knowledgebase articles/known issues.  Arrange and conduct training courses for Huawei and Subcon engineers under Local Training Unit. Coordinating with customers and other vendors Transmission Engineer: Microwave & Optics July 2010-30th March2012: Huawei Technologies (Bangladesh) Ltd. (www.huawei.com)  Design the Mux plan of whole three hundred twelve Bts of Airtel Expansion projectusing MicrosoftVisio which includes all the necessarydiagram ofrequired hardwires like RTN 900 series IFcard, SL1D card.  Map the E1 Traffic towards BSC of the Mux Plan  Map the E1 Traffic for the Bts which passes through Ericsson Product.For which I had to check all the “Traffic Node” files of Ericsson Bts,Check the NMS if E1 slotis empty, also check the existing OMS Mux if connectivity is possible.  Frequently update the customer (Airtel) for the Mux Plan  RTN Software Patch Upgrade.
  • 4.  Coordinate with Transmission Planning division ofHuawei,Update the planning ifthe Network is changed and also inform the Transmission Planning division ifthe given capacity does notsupportthe E1 Traffic.  Coordinate with BSS Departmentand Optical Manager for Abis traffic issues.  Providing 2nd Level Support for Managed Service Department.  Upload the new sites according to the DCN plan in the NMS (U2000)  Troubleshooting the U2000 & T2000 server.  Supportthe field engineers in order to “On Air” the new Expansion sites.  Successfullyplanned & executed Major PDH link up gradation & Traffic shifting of Super PDH 1+0 SD link to 1+0 Xpic links.  Have successfullyPlanned & Executed the Traffic Shifting of Transmission links ofdifferentexisting Ericsson Traffic Nodes to Huawei RTN.  Have successfullyPlanned & executed BSC Rehoming ofdifferentBTS.  Currently doing the MUX Plan for Ericsson to Huawei Transmission Swap as well as execution which includes involvementofRTN, TN, OMS, OSN(1500/3500)  Making Cross Connection ofRTN (950/910) & OSN (1500/3500) in U2000 NMS, Minilink Manager (For Ericsson Traffic Node),Minilink Craft (For Ericsson Traffic Node),SOA (ADM), Marconi LCT (ADM), OSN.  OSN Commissioning (Metro,1500,2500,3500)  Checking loop testusing U2000,Minilink Manager/Craft & Check the resultin M2000.  Have Given Training on U2000 to MSD Departmentas well as to the Customer technical Department (Airtel). Visited sites for new Links,which includes installation ofIDU, commissioning,troubleshooting the links,fulfill Special Achievements  Was given “Outstanding Performance Award” for Bharti Airtel Project.  Was Chosen “The Employee of the Month” Trainings Obtained: International:Malaysia Huawei Global Training Center  MPLS Tunneling  Ethernet Configuration  RTN Version 3 products of IDU 910, 950 & 980  ATM Technology& its implementation.  Ethernet Configuration (EMT6 & EMT8)  Hybrid Microwave principal. Local Trainings:  Huawei Microwave RTN 600, 900 series Commissioning,Link Troubleshooting  Metro OSN, 1500,2500,3500 series commissioning.  DWDM Principal.  Theoretical Training on SDH Principal Associate Engineer : Transmission Planning 1st January 2010- 30th June 2010-WaridTelecom International Ltd. (Now Airtel Bangladesh) www.airtel.com.bd  Planning the cross connections from Base Transceiver Station to the Base Station Controller using Ericsson’s Minilink Manager.  Planning High and Low end Multiplexer cross connections and interfaces.  Optimizing the interfering transmission link’s frequencyutilization.  Preparing the transmission plan for the Upgrade ofaround 650 base stations.  Planning the transmission for 700 new BTS deployed nationwide.  Planning ofnew route of data with other topology of connection if the LOS (Line Of Sight) blockage is occurred.  Updating a web based software ofthe transmission line which includes all STM, E1, PDH (Plesiochronous Digital Hierarchy),SDH (Synchronous Digital Hierarchy).  Planning for protection of traffic through the available channels ofthe transmission network.  Link Budget Preparation using Pathloss 4.0 Software
  • 5. System Engineer Road Max January 2nd 2008- 30th August 2009  Producing and examining tender documents with upcoming international tender notices.  Server upgrade.  Troubleshooting Hardwares.  Communication with Korean companies (Poongsang,Klnet)  Administrator ofthe companywebsite.  Software used:MicrosoftWord, Microsoft Access,AutoCAD, Adobe Photoshop,Microsoft Dreamweaver ACADEMIC BACKGROUND Bachelor in Electronics & Telecommunication North South University (www.northsouth.edu) CGPA: 3.20 out of 4 Reference # 1 Mr. Chenxinyang (Peter) Cooperation Strategy Dept Huawei Technologies Co.,Ltd. Contact No: 075518617090966 E-mail:chenxinyang@huawei.com Saad-Al-Hassan Reference # 2 Mr. Md. Amin Jamal Microwave Implementation Team Leader Huawei Technologies Bangladesh Email: md.amin.jamal1@huawei.com Phone: +8801847130235