Saad-Al-Hassan has over 7 years of experience in transmission technology including microwave and optical fiber networks. He has worked on projects in Bangladesh, Malaysia, Indonesia, South Africa, and Myanmar. His experience includes planning, installation, testing, commissioning, and optimization of microwave radios, multiplexers, and network management systems from vendors such as Huawei and Ericsson.
1. Saad-Al-Hassan
House-12,Road-3,Sector-1,Appertment-B1,Uttara Model Town, Dhaka,Bangladesh,Telephone +880-1614404468,
Email-saad007bd@hotmail.com
SUMMARY OF QUALIFICATION
More than seven (7) years of technical experiences in Transmission Technologywhich includes installation,testing,
commissioning,projectco-ordination,management,Microwave Planning,Mux planning,as well as product
acceptance of various telecommunication equipmentfrom differentvendor. Worked in Bangladesh,Malaysia,
Indonesia for differentprojects as an Transmission Expert
Hands on experience on Microwave Radios,Optical Line Terminal Equipment,PDH/SDH Multiplexers,fiber optic
network, knowledgeable on Network ManagementSystems,DCN Equipmentfor LAN/WAN applications.
Technical Summery
Well experienced in Transmission productofHuawei & Ericsson.
Expert in IP based Network,Packet Radio Transmission.
Experienced in installation & commissioning ofHuawei Microwave Products (RTN 600,900).
Experienced in MUX plan of Microwave planning ofHybrid network of Huawei RTN & Minilink TN,
Minilink CN.
Experienced in Transmission Projectroll out coordination.
Highly experienced in Huawei Transmission NMS (U2000,T2000) for integrating new IDU (RTN), &
OSN (Optical MUX).
Capable oftraining new engineers for projectroll out purpose.
Have very good experience in Microwave Transmission swap (HotSwap & Cold Swap) of Minilink TN
to RTN.
Good experience with Optical Transmission system,OSN Commissioning,Familiar with DWDM.
Obtained International Training in Malaysia on MPLS Tunneling,ATM, EthernetConfiguration.
Technologyand Tools:
Mapinfo, Pathloss,Minilink Manager, Minilink LCT, SOA (OMS),IManeger M2000, T2000, U2000
Transmission Engineer (Consultant)- Huawei Technologies South Africa Ltd
: 1st
April 2015- April 2016
Phase 1: Microwave Back Office Engineer
Supportand Integration of L2 and L3 transmission network over RTN 950 for NodeB and 2G of
Ericsson and Huawei Product.
Prepare and provide Network performance statistic data analysis,Signal tracing and data analysis to
improve Network performance
Troubleshooting and provide training to Local Engineers and provide full documentation for handover
to Local Engineer’s Team.
Upgrade Capacity,Enable AM,frequency auditing,
Advanced RTN-950 Microwave setup, including AM-XPIC
Advanced level supporton Ethernet service:E-line and E-LAN service on RTN-950
2. Working on MPLS, MPLS TE, setup on RTN-950
Fluently using U2000 for adding node,view alarm,remote NE access by LCT or telnet, NE
backup/restore
Co- Ordinate and synchronize with differenttypes of vendors for Optical and Microwave transmission.
Find out the actual problem on optical and Microwave transmission path and provide solution
accordingly
timeline.
Reportto the respective departmentregularly.
Escalate mostcritical problem to the respective solution provider.
Phase 2: Microwave Planner
Responsible for all Transmission planning,design and engineering activities to be performed
according to the service contracts and approved business case for the MTN South Africa, securing the
fulfillmentofits contractual requirements and the approved business case
• Responsible for the cost-effectiveness ofthe transmission solution,byconsidering the initial
implementation costs and the running operational costs
• Leading the Transmission Planning Team(Microwave,circuitplanning)
• Leading the independentauditofthe transmission network to examine the performance with
respectto setKey Performance Indicators
• Prepare HLD Plan for MTN Network Northern region.
• Supervise the team for LLD planning.
• Preparing Swap strategy for the network
Huawei TRX Deployment Supervisor – Ericsson Myanmar
Outsource Company name: Global Technical Support
Ericsson Myanmar: September 12th- 11th
March
Advanced RTN Microwave setup.
Configure E-LAN, E-Line service.
IP routing,OSPF/ISIS, setup on RTN-950
Setup MPLS, MPLS TE configuration.
Configure L3VPN.
RegularlyConfigure Layer 2/ Layer 3 services
OSPF/ISIS Setup
Remotelysupportto Installation and Commissioning Team
Frequently adding nodes,viewing alarms,NE Backup and restore
Transmission Engineer: Huawei Technologies Bangladesh (www.huawei.com)
1st
July-2010-30th
August 2014
Projects under Bangladesh Huawei
Banglalink (Working as Consultant from Huawei) January 2014-August 2014
Responsible for all Transmission planning,design and engineering activities to be performed
according to the service contracts and approved business case for the Banglalink,securing the
fulfillmentofits contractual requirements and the approved business case
3. Requirementanalysis ofcustomer’s requestfor changes and for translating the contractual and
technical requirements to the MS delivery units and for validating and approving all activities
performed by those units under the scope ofthe contract.
Responsible for Microwave network plan,link budgetdesign,frequencyplanning,MUX design(OSN
product), equipmentdimensioning,technical proposal write up,BOQ output, contract negotiation &
documentation etc
Responsible to secure thatthe transmission network is implemented as per design guideline and that
it is satisfying customer requirements
Design the LLD & HLD network as per 3G requirement.
Single handedlycompleted 1000 LLD link budgets in less than 2 months.
Preparing Swap strategy for the network
Transmission Planning Engineer:
Huawei Technologies Bangladesh: February 2013- December 2013:
Leading Microwave planning
Preparation of annual budgetfor related to microwave planning
Manage & lead the contract & agreementfinalization with differentvendors including definition &
establishmentofprojectscope,productspecification,BOQ, SLA, responsibilitymatrix, acceptance
criteria etc
Provide supportto prepare core transmission planning annual budget
Design link plan and link budgetfor radio links using PathLoss4.0
ADM planning,E1 mapping,and fiber route planning
Protection planning for fiber, MW and ADM
Optimization of network
PT Huawei Tech Investment Indonesia (Workedas a support Engineer from Bangladesh from April 2012-
September 2012)
ImplementMajor Cutovers & SDH links e.g. 3+1 FD, 4(1+1) SD link.
Node B transmission swap from NSN to Huawei RTN links.
Configure Ethernetboards EMS6T, EM4T for packetservice using ELAN service.
Engineering design for IDU (RTN) of the overall smooth migration from TDM to IP based service ofthe
network.
Regularlytrouble shootthe interference problems.
Follow up subcontractors for the project rollout.
Update HQ for synchronization of the overall projectrollout.
Plane,execute, and supervise the installation,commission & testing of Transmission NMS
server (U2000 Server).
Perform version Upgrade,patch upgrade of U2000.
Manage and conductfieldwork of Subcon engineers for MW installation,rectification,upgradation,
commissioning,ATP and optimization
Analyze and clarify customer queries through troubleshooting and researching existing
knowledgebase articles/known issues.
Arrange and conduct training courses for Huawei and Subcon engineers under Local Training Unit.
Coordinating with customers and other vendors
Transmission Engineer: Microwave & Optics
July 2010-30th
March2012: Huawei Technologies (Bangladesh) Ltd. (www.huawei.com)
Design the Mux plan of whole three hundred twelve Bts of Airtel Expansion projectusing MicrosoftVisio
which includes all the necessarydiagram ofrequired hardwires like RTN 900 series IFcard, SL1D card.
Map the E1 Traffic towards BSC of the Mux Plan
Map the E1 Traffic for the Bts which passes through Ericsson Product.For which I had to check all the
“Traffic Node” files of Ericsson Bts,Check the NMS if E1 slotis empty, also check the existing OMS
Mux if connectivity is possible.
Frequently update the customer (Airtel) for the Mux Plan
RTN Software Patch Upgrade.
4. Coordinate with Transmission Planning division ofHuawei,Update the planning ifthe Network is
changed and also inform the Transmission Planning division ifthe given capacity does notsupportthe
E1 Traffic.
Coordinate with BSS Departmentand Optical Manager for Abis traffic issues.
Providing 2nd
Level Support for Managed Service Department.
Upload the new sites according to the DCN plan in the NMS (U2000)
Troubleshooting the U2000 & T2000 server.
Supportthe field engineers in order to “On Air” the new Expansion sites.
Successfullyplanned & executed Major PDH link up gradation & Traffic shifting of Super PDH 1+0 SD
link to 1+0 Xpic links.
Have successfullyPlanned & Executed the Traffic Shifting of Transmission links ofdifferentexisting
Ericsson Traffic Nodes to Huawei RTN.
Have successfullyPlanned & executed BSC Rehoming ofdifferentBTS.
Currently doing the MUX Plan for Ericsson to Huawei Transmission Swap as well as execution which
includes involvementofRTN, TN, OMS, OSN(1500/3500)
Making Cross Connection ofRTN (950/910) & OSN (1500/3500) in U2000 NMS, Minilink Manager (For
Ericsson Traffic Node),Minilink Craft (For Ericsson Traffic Node),SOA (ADM), Marconi LCT (ADM),
OSN.
OSN Commissioning (Metro,1500,2500,3500)
Checking loop testusing U2000,Minilink Manager/Craft & Check the resultin M2000.
Have Given Training on U2000 to MSD Departmentas well as to the Customer technical Department
(Airtel).
Visited sites for new Links,which includes installation ofIDU, commissioning,troubleshooting the links,fulfill
Special Achievements
Was given “Outstanding Performance Award” for Bharti Airtel Project.
Was Chosen “The Employee of the Month”
Trainings Obtained:
International:Malaysia Huawei Global Training Center
MPLS Tunneling
Ethernet Configuration
RTN Version 3 products of IDU 910, 950 & 980
ATM Technology& its implementation.
Ethernet Configuration (EMT6 & EMT8)
Hybrid Microwave principal.
Local Trainings:
Huawei Microwave RTN 600, 900 series Commissioning,Link Troubleshooting
Metro OSN, 1500,2500,3500 series commissioning.
DWDM Principal.
Theoretical Training on SDH Principal
Associate Engineer : Transmission Planning
1st
January 2010- 30th
June 2010-WaridTelecom International Ltd. (Now Airtel Bangladesh)
www.airtel.com.bd
Planning the cross connections from Base Transceiver Station to the Base Station Controller using
Ericsson’s Minilink Manager.
Planning High and Low end Multiplexer cross connections and interfaces.
Optimizing the interfering transmission link’s frequencyutilization.
Preparing the transmission plan for the Upgrade ofaround 650 base stations.
Planning the transmission for 700 new BTS deployed nationwide.
Planning ofnew route of data with other topology of connection if the LOS (Line Of Sight) blockage is
occurred.
Updating a web based software ofthe transmission line which includes all STM, E1, PDH
(Plesiochronous Digital Hierarchy),SDH (Synchronous Digital Hierarchy).
Planning for protection of traffic through the available channels ofthe transmission network.
Link Budget Preparation using Pathloss 4.0 Software
5. System Engineer
Road Max
January 2nd
2008- 30th
August 2009
Producing and examining tender documents with upcoming international tender notices.
Server upgrade.
Troubleshooting Hardwares.
Communication with Korean companies (Poongsang,Klnet)
Administrator ofthe companywebsite.
Software used:MicrosoftWord, Microsoft Access,AutoCAD, Adobe Photoshop,Microsoft
Dreamweaver
ACADEMIC BACKGROUND
Bachelor in Electronics & Telecommunication
North South University (www.northsouth.edu)
CGPA: 3.20 out of 4
Reference # 1
Mr. Chenxinyang (Peter)
Cooperation Strategy Dept
Huawei Technologies Co.,Ltd.
Contact No: 075518617090966
E-mail:chenxinyang@huawei.com
Saad-Al-Hassan
Reference # 2
Mr. Md. Amin Jamal
Microwave Implementation Team
Leader
Huawei Technologies Bangladesh
Email: md.amin.jamal1@huawei.com
Phone: +8801847130235