SlideShare a Scribd company logo
1 of 2
CHANDAN SINGH
Contact: +966 66533133821(Saudi) +97334465928(Bahrain) +919044436934(India)
E-Mail: chandan21282@gmail.com
Seeking Senior Level assignments in Microwave Planning, Project Management, Microwave Network
Transmission Optimization, and Rollout & Integration Support with a reputed organization.
PROFILE SUMMARY
• An astute and dynamic professional with 10 years of experience in Microwave Network planning & optimization,
Project management & Optimization.
• Hands-on experience on Microwave Planning , Frequency planning , Interference Calculation , BoQ Analysis and
ordering , Managing Microwave transmission network in MS environment Presales Support for MW Projects , Network
performance audits, quality and capacity optimization, parameter planning, network feature planning, network
statistics analysis, troubleshooting and performance management
PROJECT DETAILS
• STC / Zain Project- Riyadh Saudi Arabia – Ongoing Project –MW Planning and Design for STC and Zain
Projects. Also Presales Support for next bidding of STC for USF12&13 Project.
• MBNL- Ryder Project, United Kingdom –Transmission Performance and Optimization for MBNL-UK (EE+3UK+T-
Mobile+L-OUK) for all Transmission Performance KPI on daily basis.
• Qatar telecom (Qatar) – Microwave Swap project of 265+ links from Huawei RTN to NSN FPMR Packet based
Ethernet solution. Equipment used - NSN FPMR, FPHub800 Series Equipment.
• MTS & Videocon Rollout(India)–New MW Network Planning for 800 + Links for New network.[Equipment
Worked With – NEC Microwave , Huawei RTN Series ]
• Aircel New Rollout launch – New MW Network planning for rollout of new operator with 2000 Links in UPE.
[Equipment Worked with – NEC Microwave , ZTE Indoor and Outdoor BTS]
• Vodafone Microwave Network Rollout- (India) – Running expansion rollout for Network [Equipment Worked
with-NEC Microwave, Flexi BTS & BSC.]
• Bharti Airtel (India) - Running expansion rollout for Network for 200link/month.[Equipment worked with –
Minilink Manager, RBS 2000 Series BTS, Ericsson Multiplexers like AXX, DXX.]
EMPLOYMENT DETAILS
Since Nov’14: Huawei Technologies, Bahrain, as Senior Microwave Planner – Network Technology Department
Project: - USF10&11 & Zain Reload MW Project, Saudi Arabia.
Roles &Responsibilities:-
• Presales Support for new project in bidding phase.
• Leading the Microwave Planning team for 2G/3G/LTE Sites for Rollout.
• Leading the MW Team for Link Budgeting, Frequency Analysis, and BW Calculation & Microwave Audit.
• Microwave BoQ Analysis & ordering for new sites.
• Customer Interface for approvals and meetings
• Support to Civil, RF Team for important decision.
Feb’2013 – Oct’14: Ericsson Global India Pvt Limited, India as Specialist – Design & Network Planning.
Project: - Transmission Planning, Operations& Performance for MBNL United Kingdom.
Roles &Responsibilities:-
• Transmission Performance profile for (MBNL) T-Mobile, 3UK, L-Ouk operators.
• Transmission performance report preparation and analysis for weather effected MW Links.
• Transmission performance report preparation and analysis for top worst 10 impacting sites for (2G/3G/ATM/LTE Sites)
each KPI in terms of degraded UAS, SES, Black Cells, Low Throughput, DCH FP, HSDPA FP,TWAMP etc.
• Extraction of reports from different tools for all 3 operators and compiling into one to make a concrete report.
• MW BOQ Preparation&MW Link design audit & Analysis.
• MW Network Performance Analysis on daily basis& resolution for issues like Rain fading, Fog fading for improvement
• MW Link Budget preparation, MW Link Capacity Planning& up gradation Planning.
• Feasibility study for new sites based on Transmission bandwidth availability
• MW Network topology re-design
• Network configuration validation Modulation, Tunneling, Rerouting
• MW Link parameters (TX Power, Polarization, etc.) optimization
• High level Topology Design& Routing Plan of MW Transport network
Mar’11 – Oct’12: NSN, Doha, Qatar as Senior MW TX Planning and Optimization Engg.
Roles &Responsibilities: - Transmission Planning, Operations& Performance for MBNL United Kingdom
Microwave Transmission Part
• Responsible for MW Swap project of Current Network of 265+ links of Qtel with NSN FPHub800 & FPMR.
• Primary interface and point of reference for the customer's technical and engineering staff inquiries.
• Microwave Transmission Network Planning of all 100+ links for LTE Bandwidth.
• BOQ design (pre-sales activity). Indoor & Outdoor BOQ finalization
• Link Budget Preparations, Frequency Planning, Interference Calculation, Network Optimization.
• Optimization of MW Hops to minimize the Dish Size as well as dependency of Critical Sites/Links.
• Hot & Cold Swap as per requirement of whole network on day to day basis.
• Arranging ATP of the links with customer Eng.
Dec’09 – Mar’11: Huawei Telecommunication India as Assistant Manager - PMO
Project: - MTS and Videocon new Operator Launch. Lucknow, UP .India
Roles &Responsibilities: -Implementation Manager for Videocon Network Launch & Project Manager for launch of MTS Networks in UP (E) Circle.
• Indoor & Outdoor BOQ finalization
• BoQ Planning and Ordering as per requirement of customer.
• Technical verification of the links planned by customer by coordinating for LOS Survey and link feasibility as per actual.
• Optimization of Current Network and Proposal of new rerouting of the links to minimize the path length if required.
• Optimization of MW Hops to minimize the Dish Size as well as dependency of Critical Sites/Links.
• Tracking of Site Survey, LOS Survey, Tower load study, Material Movement and other quality work.
• Project Management for MW Rollout for 2G/3G System of Huawei for VTL & MTS N/W.
• Tracking of Material and others accessories according to Rollout necessities from scratch till material reaches WH.
• Subcontractor and Warehouse management for smooth delivery & I&C of material for smooth N/W launch.
• Handling team of Installation,MW Alignment , Functionality test , E1/Ethernet Throughput test before AT.
• Weekly review with customers to get in Sync with their requirements and preparing internal team to meet the
commitment.
• Preparing weekly program report for corporate concerns.
• Meeting with all IP Subcons with customers and sharing the concerns of sites handed over to us.
• Analyzing DPR of Subcons and upgrading them to meet our targets.
PREVIOUS EXPERIENCE
Sep’08 - Dec’09: Dishnet Wireless limited as Senior Executive – Projects, Lucknow UP India.
Oct’07 - Sep’08: Nokia Siemens Networks as Engineer Projects TI , Meerut , UP India for Vodafone Project.
Sep’05 - Oct’07: For Ericsson India as Trainee Engineer Projects, Jaipur, UPE India for Bharti Airtel Project.
Professional Academic Certification
ECP-102- IP Technology – The Ericsson Certified Technology - IP exam covers the product-agnostic, fundamentals of IP
concepts and industry-standard technologies.
ECP-232- The Ericsson Certified Associate - Microwave Transmission exam certifies that the successful candidate has a
fundamental knowledge of microwave transmission technologies in a communications environment.
ECP-202- Ericsson Certified Associate - IP Networking (ECA-IPN)
PREVIOUS EXPERIENCE
• Course: - Bachelor of Technology – Specialization- EE from Uttar Pradesh Technical University , UP , India Year 2005
• Course: - 10+2 from Fatima Inter School, Gonda. CBSE Board. Year 98-99.
• Course: - 10thfrom Fatima Inter School, Gonda. CBSE Board. Year 96-97.
Personal Details.
Date of Birth – 21 Feb 1982
Nationality – Indian, Marital Status – Married
Address-H.No.17 New Khaira Colony .PO Burgeon .Dist. Gonda. UP. India .271001
Signature – Chandan Singh

More Related Content

What's hot

What's hot (20)

DILLIBABU CV
DILLIBABU CVDILLIBABU CV
DILLIBABU CV
 
CV MOHD. NAZRUL BIN ANUAR
CV MOHD. NAZRUL BIN ANUARCV MOHD. NAZRUL BIN ANUAR
CV MOHD. NAZRUL BIN ANUAR
 
Amjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15yAmjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15y
 
Senior_VoLTE_LTE_3G_CDMA_OjemeniUzoma
Senior_VoLTE_LTE_3G_CDMA_OjemeniUzomaSenior_VoLTE_LTE_3G_CDMA_OjemeniUzoma
Senior_VoLTE_LTE_3G_CDMA_OjemeniUzoma
 
Electrical Engineer -Nabeel Cv (1)
Electrical Engineer -Nabeel Cv (1)Electrical Engineer -Nabeel Cv (1)
Electrical Engineer -Nabeel Cv (1)
 
CV - Saif ul amIn-Mgmt
CV - Saif ul amIn-MgmtCV - Saif ul amIn-Mgmt
CV - Saif ul amIn-Mgmt
 
SUMIT_KUMAR
SUMIT_KUMARSUMIT_KUMAR
SUMIT_KUMAR
 
Dharmendra Arora
Dharmendra AroraDharmendra Arora
Dharmendra Arora
 
Usman khan Resume
Usman khan ResumeUsman khan Resume
Usman khan Resume
 
Pradeep Jain-Resume-2016
Pradeep Jain-Resume-2016Pradeep Jain-Resume-2016
Pradeep Jain-Resume-2016
 
Bhashker_sharma_CV
Bhashker_sharma_CVBhashker_sharma_CV
Bhashker_sharma_CV
 
Nawal Kishore
Nawal KishoreNawal Kishore
Nawal Kishore
 
Anoop_RF_
Anoop_RF_Anoop_RF_
Anoop_RF_
 
Niraj (RF)
Niraj (RF)Niraj (RF)
Niraj (RF)
 
RF_Govind_Dolare_CV
RF_Govind_Dolare_CVRF_Govind_Dolare_CV
RF_Govind_Dolare_CV
 
Resume Deepak Pandey Ericsson
Resume  Deepak Pandey EricssonResume  Deepak Pandey Ericsson
Resume Deepak Pandey Ericsson
 
AMIT MODI
AMIT MODIAMIT MODI
AMIT MODI
 
Resume Ganesh
Resume GaneshResume Ganesh
Resume Ganesh
 
Lemuelle L. Labadan_CV_2015
Lemuelle L. Labadan_CV_2015Lemuelle L. Labadan_CV_2015
Lemuelle L. Labadan_CV_2015
 
NeerajKumarGupta_CV
NeerajKumarGupta_CVNeerajKumarGupta_CV
NeerajKumarGupta_CV
 

Similar to Chandan Singh_22062015

Similar to Chandan Singh_22062015 (20)

arun kumar
arun kumararun kumar
arun kumar
 
Resume_Arvind_Srivastava
Resume_Arvind_SrivastavaResume_Arvind_Srivastava
Resume_Arvind_Srivastava
 
Resume_Arvind_Srivastava
Resume_Arvind_SrivastavaResume_Arvind_Srivastava
Resume_Arvind_Srivastava
 
Resume
ResumeResume
Resume
 
Attique Mahmood_CV
Attique Mahmood_CVAttique Mahmood_CV
Attique Mahmood_CV
 
Resume_Bivas Paul_1
Resume_Bivas Paul_1Resume_Bivas Paul_1
Resume_Bivas Paul_1
 
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECT
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECTCV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECT
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECT
 
Telecom Resume
Telecom ResumeTelecom Resume
Telecom Resume
 
Ananda Rao Resume 14.02.2016
Ananda Rao Resume 14.02.2016Ananda Rao Resume 14.02.2016
Ananda Rao Resume 14.02.2016
 
kunal vedpathak
kunal vedpathakkunal vedpathak
kunal vedpathak
 
KRISHNAN Resume
KRISHNAN ResumeKRISHNAN Resume
KRISHNAN Resume
 
Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta_CV15122015
Saibal Datta_CV15122015
 
CV_Sanjay Kanzariya
CV_Sanjay KanzariyaCV_Sanjay Kanzariya
CV_Sanjay Kanzariya
 
CV_Sanjay Kanzariya
CV_Sanjay KanzariyaCV_Sanjay Kanzariya
CV_Sanjay Kanzariya
 
Alaba Adedayo CV
Alaba Adedayo CVAlaba Adedayo CV
Alaba Adedayo CV
 
John Z Farhat Cv Sept 30th 2010 A
John Z Farhat Cv  Sept 30th 2010 AJohn Z Farhat Cv  Sept 30th 2010 A
John Z Farhat Cv Sept 30th 2010 A
 
Pushpendra_Dhama_CV
Pushpendra_Dhama_CVPushpendra_Dhama_CV
Pushpendra_Dhama_CV
 
CV-Trivinder
CV-TrivinderCV-Trivinder
CV-Trivinder
 
Devesh CV
Devesh CVDevesh CV
Devesh CV
 
AlaaEldin-Ahmed CV
AlaaEldin-Ahmed CVAlaaEldin-Ahmed CV
AlaaEldin-Ahmed CV
 

Chandan Singh_22062015

  • 1. CHANDAN SINGH Contact: +966 66533133821(Saudi) +97334465928(Bahrain) +919044436934(India) E-Mail: chandan21282@gmail.com Seeking Senior Level assignments in Microwave Planning, Project Management, Microwave Network Transmission Optimization, and Rollout & Integration Support with a reputed organization. PROFILE SUMMARY • An astute and dynamic professional with 10 years of experience in Microwave Network planning & optimization, Project management & Optimization. • Hands-on experience on Microwave Planning , Frequency planning , Interference Calculation , BoQ Analysis and ordering , Managing Microwave transmission network in MS environment Presales Support for MW Projects , Network performance audits, quality and capacity optimization, parameter planning, network feature planning, network statistics analysis, troubleshooting and performance management PROJECT DETAILS • STC / Zain Project- Riyadh Saudi Arabia – Ongoing Project –MW Planning and Design for STC and Zain Projects. Also Presales Support for next bidding of STC for USF12&13 Project. • MBNL- Ryder Project, United Kingdom –Transmission Performance and Optimization for MBNL-UK (EE+3UK+T- Mobile+L-OUK) for all Transmission Performance KPI on daily basis. • Qatar telecom (Qatar) – Microwave Swap project of 265+ links from Huawei RTN to NSN FPMR Packet based Ethernet solution. Equipment used - NSN FPMR, FPHub800 Series Equipment. • MTS & Videocon Rollout(India)–New MW Network Planning for 800 + Links for New network.[Equipment Worked With – NEC Microwave , Huawei RTN Series ] • Aircel New Rollout launch – New MW Network planning for rollout of new operator with 2000 Links in UPE. [Equipment Worked with – NEC Microwave , ZTE Indoor and Outdoor BTS] • Vodafone Microwave Network Rollout- (India) – Running expansion rollout for Network [Equipment Worked with-NEC Microwave, Flexi BTS & BSC.] • Bharti Airtel (India) - Running expansion rollout for Network for 200link/month.[Equipment worked with – Minilink Manager, RBS 2000 Series BTS, Ericsson Multiplexers like AXX, DXX.] EMPLOYMENT DETAILS Since Nov’14: Huawei Technologies, Bahrain, as Senior Microwave Planner – Network Technology Department Project: - USF10&11 & Zain Reload MW Project, Saudi Arabia. Roles &Responsibilities:- • Presales Support for new project in bidding phase. • Leading the Microwave Planning team for 2G/3G/LTE Sites for Rollout. • Leading the MW Team for Link Budgeting, Frequency Analysis, and BW Calculation & Microwave Audit. • Microwave BoQ Analysis & ordering for new sites. • Customer Interface for approvals and meetings • Support to Civil, RF Team for important decision. Feb’2013 – Oct’14: Ericsson Global India Pvt Limited, India as Specialist – Design & Network Planning. Project: - Transmission Planning, Operations& Performance for MBNL United Kingdom. Roles &Responsibilities:- • Transmission Performance profile for (MBNL) T-Mobile, 3UK, L-Ouk operators. • Transmission performance report preparation and analysis for weather effected MW Links. • Transmission performance report preparation and analysis for top worst 10 impacting sites for (2G/3G/ATM/LTE Sites) each KPI in terms of degraded UAS, SES, Black Cells, Low Throughput, DCH FP, HSDPA FP,TWAMP etc. • Extraction of reports from different tools for all 3 operators and compiling into one to make a concrete report. • MW BOQ Preparation&MW Link design audit & Analysis. • MW Network Performance Analysis on daily basis& resolution for issues like Rain fading, Fog fading for improvement • MW Link Budget preparation, MW Link Capacity Planning& up gradation Planning. • Feasibility study for new sites based on Transmission bandwidth availability • MW Network topology re-design
  • 2. • Network configuration validation Modulation, Tunneling, Rerouting • MW Link parameters (TX Power, Polarization, etc.) optimization • High level Topology Design& Routing Plan of MW Transport network Mar’11 – Oct’12: NSN, Doha, Qatar as Senior MW TX Planning and Optimization Engg. Roles &Responsibilities: - Transmission Planning, Operations& Performance for MBNL United Kingdom Microwave Transmission Part • Responsible for MW Swap project of Current Network of 265+ links of Qtel with NSN FPHub800 & FPMR. • Primary interface and point of reference for the customer's technical and engineering staff inquiries. • Microwave Transmission Network Planning of all 100+ links for LTE Bandwidth. • BOQ design (pre-sales activity). Indoor & Outdoor BOQ finalization • Link Budget Preparations, Frequency Planning, Interference Calculation, Network Optimization. • Optimization of MW Hops to minimize the Dish Size as well as dependency of Critical Sites/Links. • Hot & Cold Swap as per requirement of whole network on day to day basis. • Arranging ATP of the links with customer Eng. Dec’09 – Mar’11: Huawei Telecommunication India as Assistant Manager - PMO Project: - MTS and Videocon new Operator Launch. Lucknow, UP .India Roles &Responsibilities: -Implementation Manager for Videocon Network Launch & Project Manager for launch of MTS Networks in UP (E) Circle. • Indoor & Outdoor BOQ finalization • BoQ Planning and Ordering as per requirement of customer. • Technical verification of the links planned by customer by coordinating for LOS Survey and link feasibility as per actual. • Optimization of Current Network and Proposal of new rerouting of the links to minimize the path length if required. • Optimization of MW Hops to minimize the Dish Size as well as dependency of Critical Sites/Links. • Tracking of Site Survey, LOS Survey, Tower load study, Material Movement and other quality work. • Project Management for MW Rollout for 2G/3G System of Huawei for VTL & MTS N/W. • Tracking of Material and others accessories according to Rollout necessities from scratch till material reaches WH. • Subcontractor and Warehouse management for smooth delivery & I&C of material for smooth N/W launch. • Handling team of Installation,MW Alignment , Functionality test , E1/Ethernet Throughput test before AT. • Weekly review with customers to get in Sync with their requirements and preparing internal team to meet the commitment. • Preparing weekly program report for corporate concerns. • Meeting with all IP Subcons with customers and sharing the concerns of sites handed over to us. • Analyzing DPR of Subcons and upgrading them to meet our targets. PREVIOUS EXPERIENCE Sep’08 - Dec’09: Dishnet Wireless limited as Senior Executive – Projects, Lucknow UP India. Oct’07 - Sep’08: Nokia Siemens Networks as Engineer Projects TI , Meerut , UP India for Vodafone Project. Sep’05 - Oct’07: For Ericsson India as Trainee Engineer Projects, Jaipur, UPE India for Bharti Airtel Project. Professional Academic Certification ECP-102- IP Technology – The Ericsson Certified Technology - IP exam covers the product-agnostic, fundamentals of IP concepts and industry-standard technologies. ECP-232- The Ericsson Certified Associate - Microwave Transmission exam certifies that the successful candidate has a fundamental knowledge of microwave transmission technologies in a communications environment. ECP-202- Ericsson Certified Associate - IP Networking (ECA-IPN) PREVIOUS EXPERIENCE • Course: - Bachelor of Technology – Specialization- EE from Uttar Pradesh Technical University , UP , India Year 2005 • Course: - 10+2 from Fatima Inter School, Gonda. CBSE Board. Year 98-99. • Course: - 10thfrom Fatima Inter School, Gonda. CBSE Board. Year 96-97. Personal Details. Date of Birth – 21 Feb 1982 Nationality – Indian, Marital Status – Married Address-H.No.17 New Khaira Colony .PO Burgeon .Dist. Gonda. UP. India .271001 Signature – Chandan Singh