SlideShare a Scribd company logo
1 of 6
MOHAMMED SAHEEM
E-mail: Saheem.mohammed@gmail.com,mohammed.saheem@huawei.com
Mobile:00966582253455
OBJECTIVE
To obtain a career-oriented position in a professional progressive Organization where by
mutual growth and prosperity is underlined.
Skills:
 Excellent communication skills in written and spoken English
 Able to make decisions, act on own initiative and operate in a proactive way
 Good report writing skills, experience of making presentations to and attending meetings
with clients.
 Good planning and time management.
 Self-motivated and hard working.
 Capable to adopt with the ability to perform under pressure.
 Positive response to new challenges.
Academic Qualification:
 B.Tech “Bachelor in Electronics and Communication Engineering from Jawaharlal
Nehru Technological University Hyderabad, Andhra Pradesh, India, in the year 2010.
EMPLOYMENT HISTORY
HUAWEI (KSA) SURVEY & DESIGN
ENGINEER/PROJECT
COORDINATOR
MAY 2014-TILL DATE
Beijing Emirates International
Construction Company (KSA)
ELECTRICAL ENGINEER JULY 2013-APRIL 2014
Ericsson (KSA) IMPLEMENTATION,INTEGRATION
AND TROUBLESHOOT ENGINEER
NOV 2012-JUNE 2013
Transceiver technologies (INDIA) RF ENGINEER SEP 2010-AUG 2012
1. Professional Experience
 Project planning (long term project, huge scope, and many dependants for each case)
 Reviewing project plan on weekly basis, coordination with national team to synchronies
(through the proper channel) with senior management commitments.
 Synchronizing project obstacles / dependants with the regional customer representative
to justify team output.
 RF Survey (This survey decides the place for new cell site, height, tilt & Orientation of
GSM antenna).
 Accordingly deciding the Orientation of GSM Antenna, supporting sub contractors for
preparing Survey Report, Designing and floor plan according to the requirement.
 Coordination with sub contractors & Operator Companies.
 Ensure site reports (TSSR) are accurate, complete and timely submitted.
 Site Survey reports of complete ZAIN facilities are brought by the Survey engineers and
the Network Design is done based on the information provided by the technical site
survey reports (TSSR).
 Obtain the TSSR from subcontractors, complete analyses the TSSR for before submit the
customer.
 Make sure design resources have accurate, leveled schedules.
 Review the planned design as well as Design Changes activities.
 Ability to create new site design for provided scope by client and As-Built as well as
editing and updating as per the requirements.
 Helping customer/team for new proposal planning and designing as per the survey
result.
 Coordinating with direct to the client for design approval.
 Gather and distribute pertinent project information to team players.
 Control and support timely updating various data such as implementation of distribution
civil & Fiber as well as Feeder Fiber and Feeder Civil
 Responsible for Site Survey for ZAIN LTE Project & SWAP plan.
 Responsible for technical Support for the Implementation team and Follow-up.
 Responsible for Quality Audit of Integrated sites.
 Controlling and monitoring each activity related to sites. Maintaining regular
coordination between supervisors, site Engineers as well as client side (ZAIN).
 PAT(Preliminary Acceptance Test) of MW, BTS, VSWR, BER testing etc
 Preparing and supporting documents like As-Built document Civil and Fiber (PAT
Binders) for site handover.
 Providing accurate plans to site engineer in order to start implementation.
 Responsible for all kind of technical support and trainings, which include on job training
for new Engineers.
2. Professional Experience
Major Responsibilities:
 Coordinating with Departments such as (Architectural, Structural, Plumbing, and Hvac) in
electrical Designs & Installations.
 Reading all Electrical, Fire Alarm System and Emergency System drawings and
coordinating between these services in accordance with the structural and architectural
layout of the project
 Monitor and inspect the electrical works in the project site like installation of lighting &
small power, low current, grounding, & lightning protection.
 Involves in planning, layout and basic design of the project. This will include prioritizing
work and ordering of materials.
 Attends construction Coordination and technical meetings.
 Monitors safety around the construction site.
 Supervises the progress of the project and preparing daily and weekly progress report.
 Ensuring quality of all finishing items.
 Preparing as built drawing.
 Handed over the project to all related authorities.
 Rectifying the problems at the time of site implementation.
 Testing the cables after installation completed.
 Prepare necessary paperwork for the completion of work and get it authorized by the
client after their inspection.
 Develop good relationship with the coordinates, subordinates and prepare periodical
reports on the progress of work.
Types of Projects Executed:
 48 SCHOOL PROJECT JIZAN.
3. Professional Experience
Major Responsibilities:
 Installation and Configuring of Ericsson 2G, 4G Cabinets RBS 6201, 6102, 6101, RUG
2202, 2206 DUG 20 01, DUL 20 01.Conduct site survey and prepare Technical Site Survey
Report.
 Installation, commissioning, integration, testing and troubleshooting of Ericsson BTS
6000 series for Globe Alterra Ph. 1A and 1B project (swap-out & new site).
 Migration and cut-over of Ericsson BTS 6201 for swap-out and new site.
 Perform VSWR and DTF on feeders and antenna system using Anritsu, Bird site master
before and after the swap-out.
 Troubleshooting alarms issues of site using OMT software.
 Creating and configuring of IDB in DUG and, Assigning of alarms on site.
 Simulation test of external alarm for shelter.
 Administrate and analyze network faults.
 Provide technical assistance and coordination with field engineer for troubleshooting
 Generate trouble ticket and reports.
 Updates, regularly, all concern departments for trouble restoration.
4. Professional Experience
Major Responsibilities:
 I have more than one years of industrial experience in the telecom field. I have
hands on experience in supervising of installation and commissioning of Ericsson
and Nokia (BTS and Microwave) Maintenance of GSM cell sites (including BTS
faults, Microwave faults).
 Having good command over Radio network planning and Transmission network
planning for 2G and 3G Mobile technologies.
 Highly competent RF Engineer & Optimization Field in 2G/3G with extensive
experience administering contacts for major projects in the engineering field.
 Expertise includes managing pre-award contract management with an emphasis
on prequalification and RF, Site Survey, Transmission Survey, Optimization &
worst cell analysis.
 Handling a project as RF survey and Optimization to Transceiver Technologies
India, for DoCoMo.
 Hard optimization if required to fine tune the service area e.g. antenna height
reduction, tilting & azimuths change in order to meet predicted performance.
 Site Survey (This Site survey decide the place for new cell site, height, tilt &
Orientation of GSM antenna)
 Locating the Nominal using GPS, Noting present Signal Strength using Net
Monitor, Taking Snap shots of Surrounding area of selected options, Using Map
Info checking the surrounding sites, Collecting Grids as much as possible,
inserting them in Map Grid, getting the distance & Angle, Accordingly deciding
the Orientation of GSM Antenna, Preparing RND Survey Report, Have done RF
Survey for both Capacity Offload and Coverage Sites.
 Log files analysis and troubleshooting for coverage and quality issues.
 EDGE/GPRS performance testing, optimization and feature implementation.
 Conducting DT of newly integrated MACRO/MICRO sites for design verification,
hardware issues, sector and or band swapping.
 After performing DT of newly integrated site, the report is sent along with
recommendations using MapInfo and TEMS Route Analysis to Cell Planning to
ensure good coverage, quality, healthy frequency & neighbor plan & healthy
hardware.
 Customer complaints Resolution.
 To find cause of handover failures, blocked calls, dropped calls & abnormal
network behaviors.
PERSONAL INFORMATION:
Nationality: Indian
Birth date: 14 April 1988
Gender: Male
Marital Status: Single
Iqama: Transferable
SAHEEM CV

More Related Content

What's hot (19)

Bala electl engineer-cv
Bala electl engineer-cvBala electl engineer-cv
Bala electl engineer-cv
 
ELV Engineer
ELV EngineerELV Engineer
ELV Engineer
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
RAJ PATIL
RAJ PATILRAJ PATIL
RAJ PATIL
 
deFluiter Resume Final 122914b
deFluiter Resume Final 122914bdeFluiter Resume Final 122914b
deFluiter Resume Final 122914b
 
ELV Project Manager CV
ELV Project Manager CVELV Project Manager CV
ELV Project Manager CV
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Project engineer(cv)
Project engineer(cv)Project engineer(cv)
Project engineer(cv)
 
Resume (cv) Naeem Ahmad ELV Engineer
Resume (cv) Naeem Ahmad ELV EngineerResume (cv) Naeem Ahmad ELV Engineer
Resume (cv) Naeem Ahmad ELV Engineer
 
Elv project engineer
Elv project engineerElv project engineer
Elv project engineer
 
Khaled Daher-CV
Khaled Daher-CVKhaled Daher-CV
Khaled Daher-CV
 
Kiran -cv
Kiran -cvKiran -cv
Kiran -cv
 
CV - ELV ENGINEER
CV - ELV ENGINEERCV - ELV ENGINEER
CV - ELV ENGINEER
 
Khalid -cv_electrical_engineer (1)
Khalid  -cv_electrical_engineer (1)Khalid  -cv_electrical_engineer (1)
Khalid -cv_electrical_engineer (1)
 
Resume_sdy-4-1
Resume_sdy-4-1Resume_sdy-4-1
Resume_sdy-4-1
 
m.berna.resume-draft-2.1
m.berna.resume-draft-2.1m.berna.resume-draft-2.1
m.berna.resume-draft-2.1
 
ELV ENGINEER RESUME
ELV ENGINEER RESUMEELV ENGINEER RESUME
ELV ENGINEER RESUME
 
Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer
 
Obaidullah_CV
Obaidullah_CVObaidullah_CV
Obaidullah_CV
 

Viewers also liked

Formación de usuarios def.pptx1
Formación de usuarios def.pptx1Formación de usuarios def.pptx1
Formación de usuarios def.pptx1Maria Lopez
 
Customer Review For Actin β Monoclonal Antibody (STJ10024)
Customer Review For Actin β Monoclonal Antibody (STJ10024)Customer Review For Actin β Monoclonal Antibody (STJ10024)
Customer Review For Actin β Monoclonal Antibody (STJ10024)St John's Laboratory Ltd
 
Expresar sentimientos
Expresar sentimientosExpresar sentimientos
Expresar sentimientosadjnt1979
 
For against composition
For  against compositionFor  against composition
For against compositionpvillacanas
 
Yougo magazine-2012-3-londyn-przewodnik
Yougo magazine-2012-3-londyn-przewodnikYougo magazine-2012-3-londyn-przewodnik
Yougo magazine-2012-3-londyn-przewodnikMariusz
 
Subjuntivo deseos
Subjuntivo deseosSubjuntivo deseos
Subjuntivo deseosspanisch
 
Western Blot Antibody Customer Review for Anti-RUNX1 Polyclonal Antibody (STJ...
Western Blot Antibody Customer Review for Anti-RUNX1 Polyclonal Antibody (STJ...Western Blot Antibody Customer Review for Anti-RUNX1 Polyclonal Antibody (STJ...
Western Blot Antibody Customer Review for Anti-RUNX1 Polyclonal Antibody (STJ...St John's Laboratory Ltd
 
Open Data and Agriculture (Kenya)
Open Data and Agriculture (Kenya)Open Data and Agriculture (Kenya)
Open Data and Agriculture (Kenya)godanSec
 
Two Phase Method- Linear Programming
Two Phase Method- Linear ProgrammingTwo Phase Method- Linear Programming
Two Phase Method- Linear ProgrammingManas Lad
 
10 reasons to invest in france en
10 reasons to invest in france   en10 reasons to invest in france   en
10 reasons to invest in france enRomain KERAVAL
 
Zigurds Zaķis – “Par pastmarkām un pieredzēm”
Zigurds Zaķis – “Par pastmarkām un pieredzēm”Zigurds Zaķis – “Par pastmarkām un pieredzēm”
Zigurds Zaķis – “Par pastmarkām un pieredzēm”nacionalaidentitate
 
Latvijas kultūras vēstures aspekti topošajā Latvijas Nacionālās bibliotēkas G...
Latvijas kultūras vēstures aspekti topošajāLatvijas Nacionālās bibliotēkas G...Latvijas kultūras vēstures aspekti topošajāLatvijas Nacionālās bibliotēkas G...
Latvijas kultūras vēstures aspekti topošajā Latvijas Nacionālās bibliotēkas G...nacionalaidentitate
 
Ultimate qualities of a content strategist and designer
Ultimate qualities of a content strategist and designerUltimate qualities of a content strategist and designer
Ultimate qualities of a content strategist and designerElle Geraghty
 

Viewers also liked (19)

Presentation psda
Presentation psdaPresentation psda
Presentation psda
 
Ecology
EcologyEcology
Ecology
 
Formación de usuarios def.pptx1
Formación de usuarios def.pptx1Formación de usuarios def.pptx1
Formación de usuarios def.pptx1
 
Customer Review For Actin β Monoclonal Antibody (STJ10024)
Customer Review For Actin β Monoclonal Antibody (STJ10024)Customer Review For Actin β Monoclonal Antibody (STJ10024)
Customer Review For Actin β Monoclonal Antibody (STJ10024)
 
Interview language
Interview languageInterview language
Interview language
 
Expresar sentimientos
Expresar sentimientosExpresar sentimientos
Expresar sentimientos
 
For against composition
For  against compositionFor  against composition
For against composition
 
Aula equação de niosh
Aula equação de nioshAula equação de niosh
Aula equação de niosh
 
Yougo magazine-2012-3-londyn-przewodnik
Yougo magazine-2012-3-londyn-przewodnikYougo magazine-2012-3-londyn-przewodnik
Yougo magazine-2012-3-londyn-przewodnik
 
Cat.dcs.cmms.servlet6
Cat.dcs.cmms.servlet6Cat.dcs.cmms.servlet6
Cat.dcs.cmms.servlet6
 
Subjuntivo deseos
Subjuntivo deseosSubjuntivo deseos
Subjuntivo deseos
 
Western Blot Antibody Customer Review for Anti-RUNX1 Polyclonal Antibody (STJ...
Western Blot Antibody Customer Review for Anti-RUNX1 Polyclonal Antibody (STJ...Western Blot Antibody Customer Review for Anti-RUNX1 Polyclonal Antibody (STJ...
Western Blot Antibody Customer Review for Anti-RUNX1 Polyclonal Antibody (STJ...
 
Open Data and Agriculture (Kenya)
Open Data and Agriculture (Kenya)Open Data and Agriculture (Kenya)
Open Data and Agriculture (Kenya)
 
Two Phase Method- Linear Programming
Two Phase Method- Linear ProgrammingTwo Phase Method- Linear Programming
Two Phase Method- Linear Programming
 
JOEY_STEPHENSON_(R1136)
JOEY_STEPHENSON_(R1136)JOEY_STEPHENSON_(R1136)
JOEY_STEPHENSON_(R1136)
 
10 reasons to invest in france en
10 reasons to invest in france   en10 reasons to invest in france   en
10 reasons to invest in france en
 
Zigurds Zaķis – “Par pastmarkām un pieredzēm”
Zigurds Zaķis – “Par pastmarkām un pieredzēm”Zigurds Zaķis – “Par pastmarkām un pieredzēm”
Zigurds Zaķis – “Par pastmarkām un pieredzēm”
 
Latvijas kultūras vēstures aspekti topošajā Latvijas Nacionālās bibliotēkas G...
Latvijas kultūras vēstures aspekti topošajāLatvijas Nacionālās bibliotēkas G...Latvijas kultūras vēstures aspekti topošajāLatvijas Nacionālās bibliotēkas G...
Latvijas kultūras vēstures aspekti topošajā Latvijas Nacionālās bibliotēkas G...
 
Ultimate qualities of a content strategist and designer
Ultimate qualities of a content strategist and designerUltimate qualities of a content strategist and designer
Ultimate qualities of a content strategist and designer
 

Similar to SAHEEM CV

Sanjer Jilani (CV)(1)
Sanjer Jilani (CV)(1)Sanjer Jilani (CV)(1)
Sanjer Jilani (CV)(1)sanjer jilani
 
Eng Mutaz Ahmed Ali (Senior Project Manager Resume)
Eng Mutaz Ahmed Ali (Senior Project  Manager Resume)Eng Mutaz Ahmed Ali (Senior Project  Manager Resume)
Eng Mutaz Ahmed Ali (Senior Project Manager Resume)???? ???? ??? ???? osman
 
Ankit Tomar_Resume
Ankit Tomar_ResumeAnkit Tomar_Resume
Ankit Tomar_ResumeAnkit Tomar
 
Amjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15yAmjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15yMasood Dar
 
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECT
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECTCV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECT
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECTNarendra Rawat
 
Esrar Alam Transmission Engineer
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission EngineerEsrar Khan
 
Adnan Kamal Dabban CV
Adnan Kamal Dabban CV Adnan Kamal Dabban CV
Adnan Kamal Dabban CV Adnan Dabban
 
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Ali Omar
 

Similar to SAHEEM CV (20)

Resume_Mohammad Shahadat Hossain
Resume_Mohammad Shahadat HossainResume_Mohammad Shahadat Hossain
Resume_Mohammad Shahadat Hossain
 
Jayabalan cv
Jayabalan  cvJayabalan  cv
Jayabalan cv
 
Bashir_cv
Bashir_cvBashir_cv
Bashir_cv
 
Sanjer Jilani (CV)(1)
Sanjer Jilani (CV)(1)Sanjer Jilani (CV)(1)
Sanjer Jilani (CV)(1)
 
Eng Mutaz Ahmed Ali (Senior Project Manager Resume)
Eng Mutaz Ahmed Ali (Senior Project  Manager Resume)Eng Mutaz Ahmed Ali (Senior Project  Manager Resume)
Eng Mutaz Ahmed Ali (Senior Project Manager Resume)
 
Rizwan Ahmad (f)
Rizwan Ahmad (f)Rizwan Ahmad (f)
Rizwan Ahmad (f)
 
Ankit Tomar_Resume
Ankit Tomar_ResumeAnkit Tomar_Resume
Ankit Tomar_Resume
 
Amjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15yAmjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15y
 
CV@SAGAR1
CV@SAGAR1CV@SAGAR1
CV@SAGAR1
 
ADEEL SHAHZAD Resume
ADEEL SHAHZAD ResumeADEEL SHAHZAD Resume
ADEEL SHAHZAD Resume
 
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECT
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECTCV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECT
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECT
 
JADE SANTOS CV
JADE SANTOS CVJADE SANTOS CV
JADE SANTOS CV
 
Esrar Alam Transmission Engineer
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission Engineer
 
DILLIBABU CV
DILLIBABU CVDILLIBABU CV
DILLIBABU CV
 
CV_PM_Mohammed Fazal Imran
CV_PM_Mohammed Fazal ImranCV_PM_Mohammed Fazal Imran
CV_PM_Mohammed Fazal Imran
 
CV Shabbir 1
CV Shabbir 1CV Shabbir 1
CV Shabbir 1
 
Nawal Kishore
Nawal KishoreNawal Kishore
Nawal Kishore
 
priyank _cv
priyank _cvpriyank _cv
priyank _cv
 
Adnan Kamal Dabban CV
Adnan Kamal Dabban CV Adnan Kamal Dabban CV
Adnan Kamal Dabban CV
 
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
 

SAHEEM CV

  • 1. MOHAMMED SAHEEM E-mail: Saheem.mohammed@gmail.com,mohammed.saheem@huawei.com Mobile:00966582253455 OBJECTIVE To obtain a career-oriented position in a professional progressive Organization where by mutual growth and prosperity is underlined. Skills:  Excellent communication skills in written and spoken English  Able to make decisions, act on own initiative and operate in a proactive way  Good report writing skills, experience of making presentations to and attending meetings with clients.  Good planning and time management.  Self-motivated and hard working.  Capable to adopt with the ability to perform under pressure.  Positive response to new challenges. Academic Qualification:  B.Tech “Bachelor in Electronics and Communication Engineering from Jawaharlal Nehru Technological University Hyderabad, Andhra Pradesh, India, in the year 2010. EMPLOYMENT HISTORY HUAWEI (KSA) SURVEY & DESIGN ENGINEER/PROJECT COORDINATOR MAY 2014-TILL DATE Beijing Emirates International Construction Company (KSA) ELECTRICAL ENGINEER JULY 2013-APRIL 2014 Ericsson (KSA) IMPLEMENTATION,INTEGRATION AND TROUBLESHOOT ENGINEER NOV 2012-JUNE 2013 Transceiver technologies (INDIA) RF ENGINEER SEP 2010-AUG 2012
  • 2. 1. Professional Experience  Project planning (long term project, huge scope, and many dependants for each case)  Reviewing project plan on weekly basis, coordination with national team to synchronies (through the proper channel) with senior management commitments.  Synchronizing project obstacles / dependants with the regional customer representative to justify team output.  RF Survey (This survey decides the place for new cell site, height, tilt & Orientation of GSM antenna).  Accordingly deciding the Orientation of GSM Antenna, supporting sub contractors for preparing Survey Report, Designing and floor plan according to the requirement.  Coordination with sub contractors & Operator Companies.  Ensure site reports (TSSR) are accurate, complete and timely submitted.  Site Survey reports of complete ZAIN facilities are brought by the Survey engineers and the Network Design is done based on the information provided by the technical site survey reports (TSSR).  Obtain the TSSR from subcontractors, complete analyses the TSSR for before submit the customer.  Make sure design resources have accurate, leveled schedules.  Review the planned design as well as Design Changes activities.  Ability to create new site design for provided scope by client and As-Built as well as editing and updating as per the requirements.  Helping customer/team for new proposal planning and designing as per the survey result.  Coordinating with direct to the client for design approval.  Gather and distribute pertinent project information to team players.  Control and support timely updating various data such as implementation of distribution civil & Fiber as well as Feeder Fiber and Feeder Civil  Responsible for Site Survey for ZAIN LTE Project & SWAP plan.  Responsible for technical Support for the Implementation team and Follow-up.  Responsible for Quality Audit of Integrated sites.  Controlling and monitoring each activity related to sites. Maintaining regular coordination between supervisors, site Engineers as well as client side (ZAIN).  PAT(Preliminary Acceptance Test) of MW, BTS, VSWR, BER testing etc  Preparing and supporting documents like As-Built document Civil and Fiber (PAT Binders) for site handover.  Providing accurate plans to site engineer in order to start implementation.  Responsible for all kind of technical support and trainings, which include on job training for new Engineers.
  • 3. 2. Professional Experience Major Responsibilities:  Coordinating with Departments such as (Architectural, Structural, Plumbing, and Hvac) in electrical Designs & Installations.  Reading all Electrical, Fire Alarm System and Emergency System drawings and coordinating between these services in accordance with the structural and architectural layout of the project  Monitor and inspect the electrical works in the project site like installation of lighting & small power, low current, grounding, & lightning protection.  Involves in planning, layout and basic design of the project. This will include prioritizing work and ordering of materials.  Attends construction Coordination and technical meetings.  Monitors safety around the construction site.  Supervises the progress of the project and preparing daily and weekly progress report.  Ensuring quality of all finishing items.  Preparing as built drawing.  Handed over the project to all related authorities.  Rectifying the problems at the time of site implementation.  Testing the cables after installation completed.  Prepare necessary paperwork for the completion of work and get it authorized by the client after their inspection.  Develop good relationship with the coordinates, subordinates and prepare periodical reports on the progress of work. Types of Projects Executed:  48 SCHOOL PROJECT JIZAN.
  • 4. 3. Professional Experience Major Responsibilities:  Installation and Configuring of Ericsson 2G, 4G Cabinets RBS 6201, 6102, 6101, RUG 2202, 2206 DUG 20 01, DUL 20 01.Conduct site survey and prepare Technical Site Survey Report.  Installation, commissioning, integration, testing and troubleshooting of Ericsson BTS 6000 series for Globe Alterra Ph. 1A and 1B project (swap-out & new site).  Migration and cut-over of Ericsson BTS 6201 for swap-out and new site.  Perform VSWR and DTF on feeders and antenna system using Anritsu, Bird site master before and after the swap-out.  Troubleshooting alarms issues of site using OMT software.  Creating and configuring of IDB in DUG and, Assigning of alarms on site.  Simulation test of external alarm for shelter.  Administrate and analyze network faults.  Provide technical assistance and coordination with field engineer for troubleshooting  Generate trouble ticket and reports.  Updates, regularly, all concern departments for trouble restoration. 4. Professional Experience Major Responsibilities:  I have more than one years of industrial experience in the telecom field. I have hands on experience in supervising of installation and commissioning of Ericsson and Nokia (BTS and Microwave) Maintenance of GSM cell sites (including BTS faults, Microwave faults).  Having good command over Radio network planning and Transmission network planning for 2G and 3G Mobile technologies.
  • 5.  Highly competent RF Engineer & Optimization Field in 2G/3G with extensive experience administering contacts for major projects in the engineering field.  Expertise includes managing pre-award contract management with an emphasis on prequalification and RF, Site Survey, Transmission Survey, Optimization & worst cell analysis.  Handling a project as RF survey and Optimization to Transceiver Technologies India, for DoCoMo.  Hard optimization if required to fine tune the service area e.g. antenna height reduction, tilting & azimuths change in order to meet predicted performance.  Site Survey (This Site survey decide the place for new cell site, height, tilt & Orientation of GSM antenna)  Locating the Nominal using GPS, Noting present Signal Strength using Net Monitor, Taking Snap shots of Surrounding area of selected options, Using Map Info checking the surrounding sites, Collecting Grids as much as possible, inserting them in Map Grid, getting the distance & Angle, Accordingly deciding the Orientation of GSM Antenna, Preparing RND Survey Report, Have done RF Survey for both Capacity Offload and Coverage Sites.  Log files analysis and troubleshooting for coverage and quality issues.  EDGE/GPRS performance testing, optimization and feature implementation.  Conducting DT of newly integrated MACRO/MICRO sites for design verification, hardware issues, sector and or band swapping.  After performing DT of newly integrated site, the report is sent along with recommendations using MapInfo and TEMS Route Analysis to Cell Planning to ensure good coverage, quality, healthy frequency & neighbor plan & healthy hardware.  Customer complaints Resolution.  To find cause of handover failures, blocked calls, dropped calls & abnormal network behaviors. PERSONAL INFORMATION: Nationality: Indian Birth date: 14 April 1988 Gender: Male Marital Status: Single Iqama: Transferable