SlideShare a Scribd company logo
1 of 81
Download to read offline
Say no to Liquid Fuel/Gas ,Yes to Green
Power Generation and Power Distribution
EV Vehicle and Charger India Policy
• Ministry of Power Declare for EV Infra use of Power No
Licence in Require.
• Manual Building by LAW 2019 for EV
• CEA Declare EV Policy
• MNRE Declare EV Policy
• Capital and State Release EV Policy
• Smart City Releasing Tender for EV Policy
• Power Distribution Company Nodal Agency for EV Infra.
• 3KM in City EV Infra and Highway 25KM EV Infra
• 2KW-200KW EV Charger
• EV Infra Grid Supply ,Solar PV Power, High Energy Storage
Battery Systems and EV Charger (2KW up to 200KW)
• Subsidy for Electric Vehicle and Charger Infra up to 30%
EV Vehicle and Charging Standard
WE Should Know Our Electric Vehicle and Charging(1)
WE Should Know Our Electric Vehicle and Charging(2)
WE Should Know Our Electric Vehicle and Charging(3)
WE Should Know Our Electric Vehicle and Charging(4)
WE Should Know Our Electric Vehicle and Charging(5)
WE Should Know Our Electric Vehicle and Charging(6)
Electric Vehicle and Charging Time
Electrical Vehicle and Battery Vs Charging
EV Plug and Charging Standard(IEC)
CHAdeMO Protocol• CHAdeMO is a DC charging protocol currently enabling EV charging with power from 6kW to 400kW with 900kW in preparation. It follows 4 principles:
• SAFETY
• CHAdeMO mandates strictguidelines in designingchargers to guarantee electrical safety in any operatingconditions.
• FUTURE-PROOF
• CHAdeMO is SmartGrid-ready through its bi-directional chargingcapability.Itis also compatiblewith any local or optional functionsbeyond charging.
• EASE OF APPLICATION
• The protocol works with CAN communication,onboard communication network for all EVs,makingits integration with the rest of the car easy and reliable.
• UNIFORMITY
• CHAdeMO connector is identical acrossthe globe and is a stand-aloneplugthatcan be with or without an AC connector. Itsaves costs for EV makers and enables
cross-continental EVtravels.
• Battery protection
• The current is controlled by the vehicleECU. Fastcharger controls the output current accordingto the chargingcurrentrequest from the EV through CAN
communication on a real-timebasis. This mechanismallows for differentfastchargingbased on battery performance and usage environment. To do so,CHAdeMO
TECHNICAL DETAILS
• specifies therequirements for responseperformance, current ripple,voltageripple,and measurement accuracy of the current and voltage.
• Protection from electrical shock
• The isolation transformer insidethecharger separates the AC system at the input sideand the DC system at the output side,therefore, the output sideis a non-
earthed system and the electric shock can be avoided if an earth leakage faultoccurs on one of the DC lines.
• A leakagecurrent monitoringdevice is installed atthe DC sideas well as the AC sideand itshuts down input power to the charger as soon as leakagecurrentis
detected. The electrical shock protection in the DC-2 zone stipulated under IEC60479-1 was realized by combiningthe leakage current monitoringand immediate
automatic disconnection.
• Fail-safe of charging control
• In some cases,a malfunction may occur duringchargingatthe vehicleand charger monitor level. Two communication lines (CAN signal and Pilotsignal) fromthe
vehicleto the charger are in placeto send a signal in casea malfunction isdetected on the vehicleside.This way, chargingwill stop even if one communication lineis
broken.
• When the vehiclecoupler is dropped,the disconnection of the grounding wire and the pilotwirecauses each Pilotsignal to turn OFF, which puts a haltto the DC
output immediately, so that the electrical arcingstops.
• Interlock of connector
• Given that the control power is supplied to EV contactors via a charger,EV contactors never closeand there is zero voltage unless a vehiclecoupler is connected to the
vehicle.
• Pre-charge Automatic Safety Check is a test conducted before each chargeto check the circuitinsulation and theshortcircuitbetween the charger and EV contactors.
• Duringcharging,the vehiclecoupler is locked to the vehicleinletvia a mechanical latch,and the mechanical latch is locked by a electrical lock.Oncechargingis
completed, the electric lock is released after confirmingthe voltage on a vehicleconnector. If the voltage does not drop to a safety level,the lock will notbe released.
Electric Vehicles and Charging Infra
Electric Vehicle and Charging Infra
Know your Electric Vehicle
EV make Battery
Range km
(mi)
Wh/km (mi)
BMW i3
(2019) 42kWh
345km
(115) 165 (260)
GM Spark 21kWh
120km (75
) 175 (280)
Fiat 500e 24kWh 135km (85)180 (290)
Honda Fit 20kWh 112km (70)180 (290)
Nissan Leaf 30kWh
160km
(100) 190 (300)
Mitsubishi
MiEV 16kWh 85km (55) 190 (300)
Ford Focus 23kWh 110km (75)200 (320)
SmartED 16.5kWh 90km (55) 200 (320)
Mercedes B
28kWh
(31.5)* 136km (85)205 (330)
Tesla S 60 60kWh
275km
(170) 220 (350)
Tesla S 85 90kWh
360km
(225) 240 (380)
Tesla 3 75kw 496 (310) 151 (242)
Model Battery Charge Times Wh/km (mi)
Toyota Prius
4.4kWh Li-ion, 18km (11 miles) all-electric range
3h at 115VAC 15A; 165 (260)
PHEV 1.5h at 230VAC 15A 175 (280)
Chevy Volt
16kWh, Li-manganese/NMC, liquid cooled, 181kg
(400 lb), all electric range 64km (40 miles)
10h at 115VAC, 15A; 180 (290)
PHEV 4h at 230VAC, 15A 180 (290)
Mitsubishi iMiEV
16kWh; 88 cells, 4-cell modules; Li-ion; 109Wh/kg;
330V, range 128km (80 miles) 13h at 115VAC 15A; 190 (300)
Smart 16.5kWh; 18650 Li-ion, driv ing range 136km (85
miles)
8h at 115VAC, 15A; 200 (320)
Fortwo ED 3.5h at 230VAC, 15A 200 (320)
BMW i3 Since 2019: 42kWh, LMO/NMC, large 60A
prismatic cells, battery weighs ~270kg (595 lb)
driv ing range: EPA 246 (154 mi); NEDC 345km
(215 mi); WLTP 285 (178 mi)
11kW on-board AC charger; ~4h charge; 205 (330)
Curb 1,365kg 50kW DC charge; 30 min charge. 220 (350)
(3,000 lb) 240 (380)
Nissan Leaf*
30kWh; Li-manganese, 192 cells; air cooled; 272kg
(600 lb), driv ing range up to 250km (156 miles)
8h at 230VAC, 15A; 151 (242)
4h at 230VAC, 30A
Tesla S* 70kWh and 90kWh, 18650 NCA cells of 3.4Ah;
liquid cooled; 90kWh pack has 7,616 cells; battery
weighs 540kg (1,200 lb); S 85 has up to 424km
range (265 mi)
9h with 10kW charger; 120kW
Supercharger, 80% charge in 30 minCurb 2,100kg (4,630 lb)
Tesla 3 Since 2018, 75kWh battery , driv ing range 496km
(310 mi); 346hp engine, energy consumption
15kWh /100km (24kWh/mi)
11.5kW on-board AC charger; DC charge
30 minCurb 1,872 kg (4072 lb)
Chevy Bolt
60kWh; 288 cells in 96s3p f ormat, EPA driv ing rate
383km (238 miles); liquid cooled; 200hp electric
motor (150kW)
40h at 115VAC, 15A;
Curb 1,616kg; battery 440kg 10h at 230VAC, 30A
1h with 50kWh
Electric Car and Battery
• THE VITAL ROLE OF BATTERY DATA
• To recap: There is no doubt that EV batteries are the future.
However, batteries need proper management to operate
safely and efficiently.
• Today, that's handled via the Battery Management System
(BMS), acting as the "brain" of the battery". Due to the
importance, we've detailed the BMS below - but feel free to
skip it if you're already familiar with this.
EV Charging and Process
EV Charging Connectors and Charging Time
EV Charing ,Connectors & Communication
EV Car and Charging Connectors
EV Connectors Pin Configuration
• EV Charging modes
• Mode 1
This mode entails slow AC charging via a regular electrical socket. This is no communication between the vehicle and the charging point. It
is required to provide an earth wire to the EV and have an external means of protection against faults. In many countries, this form of
charging is considered to be unsafe and is illegal.
• Mode 2
This mode provides for slow AC charging from a regular electricity socket. In addition, the charging cable is equipped with an In-Cable
Control and Protection Device (IC-CPD), that is responsible for control, communication and protection (including residual current
protection).
• Mode 3
This mode entails both slow or semi-fast charging via a dedicated electrical socket for EV charging. The charger (or the charging station) has
an EV specific socket, generally corresponding to Type 1 or Type 2. A charging cable with an EV plug on both sides is used to connect the EV
to the charger. The charging station is responsible for the control, communication and protection of the charging process (including residual
current protection). This mode is commonly used for public charging stations and can facilitate integration with smart grids.
• Mode 4
Mode 4 uses a dedicated electrical socket for EV charging like Mode 3. The charger typically has a charging cable with an EV charging plug.
Mode 4 is specifically used forDC charging, which is recommended for fast charging of an electric vehicle. In the case of DC charging, the
AC/DC converter is located within the charging station. The control, communication and protection functions are built into the charging
station.
EV and Charging Policy
EV Charging and Grid Balance
EV Charging and Grid Balance
Power Infra and EV Charging
Surge Protection for all Equipments
Cable Duct and Artificial Earthing for EV
JMV EV Charging Product Range for All EV
JMV New Product for Solar PV Power Plant
JMV Product for Solar
JMV Specialisation
Thanks and Send inquiry
• Mahesh Chandra Manav
• Vice President
• JMV LPS LTD
• W 50 Sec 11 Noida 201301 U.P.
• 911204590000
• 919910398999
• manav@jmv.co.in
• www.jmv.co.in
• Design ,Manufacturing, Supply and Installationas
per Indian NBC2016 ,IEC 62305,IEEE80,NFC17012
Amendments in
Model Building Bye-Laws
(MBBL - 2016)
for
Electric Vehicle Charging Infrastructure
Town and Country Planning Organization
Ministry of Housing and Urban Affairs
Government of India
February, 2019
Preamble
To address the quantum of emissions from the "Transport" sector powered by fossil
fuels, "electric vehicle" is considered a viable option for short distance / inter-city trips
with adequate "charging stations" available. It is necessary to make provisions for
establishing Public Charging Stations (PCS) in the local areas including urban CBDs
for vehicle re-fuelling/ recharging.
Hence, amendments are required for addition of norms for charging Infrastructure
provisions in Development Control Regulations and enabling provisions for installing
"Charging Infrastructure" in the building premises and core urban areas of the cities.
Based on available charging technologies and their evolution, type of vehicles, the
types of chargers, indicating number of charging points required for setting up
adequate PCS within the local urban areas including the building premises of all
building types and with the long term vision of implementing 'electric mobility' during
the next 30 years, amendments are made in the relevant sections (Chapter 10) of the
Model Building Bye-laws, 2016.
Amendments to Model Building Bye-Laws, 2016
In Chapter 10: Sustainability and Green Provisions
After section 10.3 "Various Guidelines for Green Rating Systems".
Provision of "Electric Vehicle Charging Infrastructure" to be added at clause 10.4
10.4 Electric Vehicle Charging Infrastructure (EVCI):
Based on the occupancy pattern and the total parking provisions in the premises of
the various building types, charging infrastructures shall be provided only for EVs,
which is currently assumed to be 20% of all 'vehicle holding capacity'/'parking capacity'
at the premise.
Additionally, the building premise will have to have an additional power load,
equivalent to the power required for all charging points (in a PCS) to be operated
simultaneously, with a safety factor of 1.25 (refer Explanatory Note- Annexure Ill).
10.4.1 Residential Buildings (plotted house)
Table 1: Charging Infrastructure requirements for individual house/ self-use
Min. 1 SC and additional rovisions as er the owner individual.
Note:
• The charging infrastructure installed by a home owner shall be construed as a
Private Cl meant for self-use (non-commercial basis) as per the note at clause no 4
of the explanatory note at Annexure Ill.
10.4.2 All other buildings (including Group Housing)
Any PCS installed at Public/Private areas or building premises of any category that
caters to commercial mode of charging of EVs shall be deemed as a Public Charging
Station and shall have to install the minimum requirements of chargers as specified in
the Guidelines dated 14.12.2018 of Ministry of Power (refer Annexure IV for MoP
Guidelines. However, in order to provide sufficient charging points for the EV share in
all vehicles (refer clause 3 of the Explanatory Note- Annexure Ill), ratio of types of
chargers is recommended in the table below -
Table 2: Charging Infrastructure requirements for PCS (commercial use)
PCS service providers shall install additional number of kiosk/chargers beyond
the minimum specified requirements to meet the ratio of charging points as
rescribed below b the t e of vehicles .
Norms of Provisions for
charging points
Ws 3Ws 2Ws PV (Buses)
1 SC - each 3 EVs 1 SC - each 2 EVs 1 SC - each 2 EVs 1 FC - each 10 EVs
1 FC - each 1 OEVs
Note:
• Charging bays shall be planned currently at 20% capacity of all vehicles including
2Ws and PVs(cars)
• Open metering and on-spot payment options to be available for all users.
• Provision of FCB CS and BS shall not be mandatory, and will be at the discretion of
the service provider.
---------------- X X X -----------------
Abbreviations used:
2Ws
3Ws
4Ws
PVs
EV
SC
FC
PCS
MBBL
FCB CS
BS
Two wheelers
Three wheelers
Four wheelers/ PV(cars)
Passenger Vehicles
Electric Vehicle
Slow Charger/ Slow Charging (AC)
Fast Charger I Fast Charging (DC and a few AC ones)
Public Charging Stations
Model Building Bye-Laws, 2016
Fluid Cooled Battery Charging Station
Battery Swap
Annexure Ill
(MBBL 2016)
Explanatory Note
on
Electric Vehicle Charging Infrastructure
(For MBBL, 2016)
Town and Country Planning Organization
Ministry of Housing and Urban Affairs
Government of India
February, 2019
Abbreviations:
UNFCC
IPCC
GHG
2Ws
3Ws
4Ws
PVs
CVs
EV
EVSE
SC
FC
BS
PCS
PCI
Private Cl
MBBL
URDPFI
NSP
SP
United Nations Framework Convention on Climate Change
Intergovernmental Panel on Climate Change
Green House Gases
Two wheelers
Three wheelers
Four wheelers/ PV(cars)
Passenger Vehicles
Commercial Vehicles
Electric Vehicle
Electric Vehicle Supply Equipment
Slow Charger I Slow Charging (AC)
Fast Charger/ Fast Charging (DC and a few AC ones)
Battery Swap
Public Charging Stations
Public Charging Infrastructure
Private Charging Infrastructure
Model Building Bye-Laws, 2016
Urban and Regional Development Plan Formulation and
Implementation Guidelines, 2014
Network Service Provider (information network)
Service Provider
-2-
Contents
1. Rationale for EVCI establishment--------------------------------------------4
2. EV Ch a rgi ng Tech no Iogy--------------------------------------------------------5
3. 0 ptions for EV Cha rgi ng---------------------------------------------------------6
4. Charger Specifications and PCS lnfrastructure------------------------------7
5. Location of PCS/FCB CS in local area/Building Precincts------------------7
-3-
1. Rationale for EVCI establishment
Rapid urbanization coupled with adoption of mechanized transportation modes
has resulted in high emissions of Green House Gases that goes on to impact Global
warming. Unless, the global surface temperature rise is restricted to no more than 2°C
compared with pre-industrial levels, the IPCC has warned that the world will see
irreversible catastrophic climate change.
India being a signatory to the UNFCCC, has pledged for efforts to assess the
Greenhouse Gas Emissions (GHG) of anthropogenic origin and removal by sinks.
India's per capita emissions are still considered low at 1.9 tonnes (2013), but its total
emissions are next only to China and the US and is likely to overtake those of the EU
by 2019.
While comparing the Indian cities for their emission scores, Delhi is on top as the
biggest emitter at over 38 38 million tonnes of carbon dioxide equivalent overall
emissions, followed by Greater Mumbai at 22.7 million tonnes and Chennai at 22.1
million tonnes, Kolkata at 14.8million tonnes, Bangalore at 19.8million tonnes,
Hyderabad at 13.7 million tonnes and Ahmedabad at 9million tonnes were the other
cities whose emissions for the year were calculated sector wise.
As per the statistics of Transport Department (GNCTD), total number of vehicles in
Delhi is more than the combined total vehicles in Mumbai, Chennai and Kolkata. Delhi
has 85 private cars per 1000 population against the national average of 8 cars per
1000 population. In terms of CO2 emissions due to motor vehicles, Delhi emits about
12.4 million tonnes while the city of Bengaluru emits about 8.6 million tonnes.!"
Therefore, addressing the quantum of emissions from the "Transport" and "Domestic"
sector emerges to be the high priority subjects under the overarching umbrella of
"Climate change mitigation" as committed to the UNFCC.
Encouraging "Electric Vehicles" as a viable option for phased transportation in
terms of short and long distance trips with appropriate "Charging Infrastructure" is
therefore, the pre-condition for this paradigm shift/ phased migration to sustainable
transportation.
For this changes are required in Infrastructure provisions (at Regional and City
levels) and in Development Control Regulations (in terms of provisions therein) to
include the formulations of norms and standards for "Charging Infrastructure" in the
said Mater Plan Regulations and State Bye-Laws for adoption across the country
suiting local conditions.
-4-
2. EV Charging Technology
2.1 Electric Vehicle Supply Equipment (EVSE):
An EVSE is a wall mounted box that supplies electric energy for recharging of electric
vehicle batteries. Also EVSEs have a safety lock-out feature that does not allow current to flow
from the device until the plug is physically inserted into the car.
EVSEs can be customized with added features like:
• Authentication
• Integrated payment gateways
• Software for remote monitoring.
As electric vehicle charging technology continues to advance, several standards and
guidelines have become widely accepted across the industry. This section gives a brief
overview of charging infrastructure technology, standards, and terminology.
2.2 Different types of EVSE:
Charging speeds- Charging power, which determines the time required to charge a vehicle,
can vary by orders of magnitude across charge points, as shown in Table 1. A small household
outlet may charge as slowly as 1.2 kW, while the most advanced rapid charging stations can
charge at up to 350 kW. Charging infrastructure is broadly broken into three categories based
on speed: Level 1, Level 2, and direct current (DC) fast charging (sometimes referred to as
Level 3).
(Source: "Emerging Best Practices for Electric Vehicle Charging Infrastructure", Oct' 2017)
Private Charging
Charging batteries of privately owned cars through domestic charging points. Billing is
mostly part of home/domestic metering.
AC "Slow" Charging:
The home private chargers are generally used with 230V/15A single phase plug which can
deliver a maximum of up to about 2.5KW of power. The EVSE supplies AC current to the
vehicle's onboard charger which in turn converts the AC power to DC allowing the
battery to be charged.
Public Charging
For charging outside the home premises, electric power needs to be billed and payment
needs to be collected. The power drawn by these chargers may need to be managed from
time to time.
DC "Fast" Charging:
DC current is sent to the electric car's battery directly via the charge port. FC chargers (usually
50 KW or more) can supply 100 or more kilometers of range per hour of charging. The fast
chargers would generally be used as a top-up, rather than fully charging vehicles. These are
important for cab companies and corporate users who have a fleet of electric cars.
-5-
3. Options for EV Charging
There is an urgent need to offer flexible charging infrastructure for different vehicle
segments to drive adoption of EVs. Charging infrastructure is the most crucial enabler in the
entire EV value chain. The exploration of different charging models according to the local
conditions shall enable faster deployment of electric vehicles in the country.
EV share in all vehicles - It has been broadly projected that by the current rate of
adoption of EVs, about 15% of all vehicles in the country would be EVs by the year 2020.
Therefore, while assuming percentage composition of all proposed capacities in Public
facilities of vehicle holding capacity, the Metropolitan and 'Tier I' cities will be assumed to have
a higher percentage share of EVs, say 20% for now. The charging infrastructure prescriptions
in all urban development guidelines shall, therefore, be in consonance with the said
percentage.
Power Load sanction to premises - While adding these Charging Infrastructures to
the proposed set of building types of the Indian cities, enhanced Power Load shall have to
be had for each such building type by the Power DISCOMs, commensurate to the total
additional power requirement of simultaneous operation of all the prescribed charging points
in the premise. With further advancement of charging technologies and the enhanced capacity
of chargers to draw more power, it is advised that the load capacity assigned to each premise
should be kept with a safety factor of 1. 25 with a long-term vision of 30 years.
Table 1: EVs charging "modes" and 'availability'
!Vehicle type Slow Charging Fast Charging Public Cl
2 Wheelers y N Yes/Limited
3 Wheelers y N Yes/Limited
PVs (Cars) y y Yes
PVs (Buses) N y Yes
Table 2: Charging options for EV types (by ownership)
!Vehicle type Private Cl Public CS Predominant place of charging
2 Wheelers SC/BS SC Point of residence / Work
3 Wheelers SC/BS SC/BS Residence / Parking stations
PVs (Cars) SC/BS FC Residence/ Point of work/ other public places
PVs (Buses) - FC/BS Bus Terminals/Depots
Note:
• The option of Battery Swapping (BS) forprivately owned 2Ws and PV(Cars) is limited to Private Cl.
• For 3 Ws the BS is proposed to be made available in PCS, for faster recharge experience only
• For PV (Buses), Captive Fast charging infrastructure for 100% internal use for fleets may be adopted by
privately owned Depots/Garages.
Based on the above stated EV charging technologies available and the current trend of
evolving technologies of faster charging experience, the Ministry of Power has issued
Guidelines and Standards for setting up Charging Infrastructure for Electric Vehicles
[Ministry of Power (MoP) Guidelines dated 14.12.2018] for charging infrastructure to be
installed at every Public Charging Station (PCS). 'Connectivity regulations and Safety norms'
shall be defined by respective authorities such as Central Electric Authority/MoP for grid
access to such PCS / any other charging station/infrastructure.
-6-
4. Charger Specifications and PCS Infrastructure
Any installed PCS shall have one or more electric kiosk/boards with installation of all
charger models as prescribed in the Guidelines and Standards notified by Ministry of
Power, dated 14 December 2018 for "Charging Infrastructure for EVs" (at Annexure II),
with other necessary arrangements as deemed necessary.
Public Charging Station service providers shall be free to create charging hubs and to install
additional number of kiosk/chargers in addition to the minimum chargers prescribed vide the
MoP Guidelines, including options for installation of additional chargers, if required.
Note:
1. Minimum infrastructure requirements do not apply to Private Charging Points meant for self-use of
individual EV owners (non-commercial basis).
2. Captive charging infrastructure for 100% internal use for a company's own fleet will not be required to
install all type of chargers and to have NSP tie ups.
5. Location of PCS/ FCB CS in local area/ building precincts
In accordance with the Guidelines issued by the Ministry of Power (MoP), following
minimum standards with regard to density of I distance between PCS in local level facilities in
building premise/ urban precincts shall be followed as per provisions in the Model BBL-2016
1. At the Local levels (within the urban area):
• At least 1 Public Charging Station is to be available within a grid of 3Km x
3Km.
2. At the Building premise levels (for various building types)
• Private charging infrastructure (non-commercial use) for individuals.
• For all commercial modes of charging EVs, at least 1 PCS, as per minimum
specifications laid under MoP guidelines.
• Standalone Battery Swapping Stations may be added with the PCs.
-7-
A-n"r)ocWU.-Til.
CJ-·f; f6 i, 5-o "')
To,
No.12/2/2018-EV
Government of India
Ministry of Power
Shram Shakti Bhawan, Rafi Marg,
New Delhi, the 14th December, 2018
1. The Secretaries of all the Ministries/Departments of Government of India.
2. The Chief Secretaries of the States/U'Is,
Sub: Charging Infrastructure for Electric Vehicles - Guidelines and Standards -reg.
Sir/Madam,
Government of India have undertaken multiple initiatives to promote manufacturing
and adoption of electric vehicles in India. With support of the Government, electric vehicles
have started penetrating in the Indian market. However, availability of adequate Charging
Infrastructure is one of the key requirements for accelerated adoption of electric vehicles in
India. It is proposed to encourage this by laying down an enabling framework.
Obiectives
• To enable faster adoption of electric vehicles in India by ensuring safe, reliable,
accessible and affordable Charging Infrastructure and eco-systern
• To promote affordable tariff chargeable from EV owners and Charging Station
Operators/Owners
• To generate employment/income opportunities for small entrepreneurs
• To proactively support creation of EV Charging Infrastructure in the initial phase and
eventually create market for EV Charging business
• To encourage preparedness of Electrical Distribution System to adopt EV Charging
Infrastructure.
In light olthe above, it has been decided as follows:
l. Private charging at residences/ offices shall be permitted. DISCOMs may facilitate
the same.
2. Setting up of Public Charging Stations (PCS) shall be a de-licensed activity and any
individual/entity is free to set up public charging stations, provided that, such
stations meet the technical as well as performance standards and protocols laid down
below as well as any further norms/standards/specifications laid down by Ministry
of Power and Central Electricity Authority from time to time.
1
2.1 Any person seeking to set up a Public Charging Station may apply for connectivity
and he shall be provided connectivity on priority by the Distribution Company
licensee to supply power in the area.
Any Charging Station/ Chain of Charging Stations may also obtain electricity from
any generation company through open access.
3.
J. l
Public Charging Infrastructure (PCl)· Minimum Requirements:
Every Public Charging Station (PCS) shall have the following minimum
infrastructure:
I. An exclusive transformer with all related ubstation equipment including
safety appliance.
33/l l KV line/cables with associated equipment including as needed for line
termination/metering etc.
Appropriate civil works.
Adequate space for Charging and entry/exit of vehicles.
Current international standards that arc prevalent and used by most vehicle
manufacturers internationally are CCS and CHadeMO. Hence, Public
Charging Stations shall have, one or more electric kiosk/boards with
installation of all the charger models as follows:
11.
111.
JV.
v.
I
No. of Charging
Charger Type Charger Connectors*
Rated Points/No. of
I
Voltage (V) Connector guns
!---·--···--
(CG) __..._...__
CCS (min 50 kW) 200-1000 1/1 CG
______.._____
Fast CHAdeMO (min 50 kW) 200-1000 111 CG
Type-2 AC (min 22 kW) 380-480 1/1 CG
Bharat DC-00 I ( 15 kW) 72-200 1/1 CG
--·-·-·-··--·····
Slow/Moderate 3/3 CG of
Bharat AC-001 (JO kW) _30
3.3 kW each
··---~-- ..
"In addition, any other fast/slow/moderate charger as per approved BIS standards
whenever notified.
'
..VI. The kiosk/board may have options for installation or additional chargers if
required.
The Public Charging Station Providers are free to create Charging Hubs and to
install additional number of Kiosk/Chargers in addition to the minimum
number of chargers prescribed above.
Tie up with at least one online Network Service Providers (NSPs) to enable
advance remote/online booking of charging slots by EV owners. Such o.nline
information Lo EV owners should also include information regarding location.
types and numbers of chargers installed/availableetc.
Share charging station data with appropriate DISCOM and to maintain
appropriate protocols as prescribed by such DISCOM for this purpose. CEA
shall have access to this database. ~...... -~
Appropriate public amenities. -,
2
Vil.
viii.
IX.
x.
xi. Where, in addition to the above, fast charging facility is also planned to be
provided at the PCS by the PCI provider, the following additional
infrastructure must be provided:
a. Appropriate Liquid Cooled cables if High Speed Charging Facility for
onboard charging of Fluid Cooled Batteries (FCBs) is also planned.
b. Appropriate Climate Control Equipment for Fast Charging of Batteries to
be used for swapping (i.c. not onboard)
3.2 Every Public Charging Station (PCS) shall be operational only after inspection and
clearance as communicated bv a suitable clearance certificate, bv the concerned, '
electrical inspectors/technical personnel designated specifically by the respective
DISCOM for this purpose. DJSCOMs may also empanel one or more third party
authorized technical agencies for this purpose.
3.3 Electric Vehicle Service Equipment (EVSE) shall be type tested by an appropriate
reputed authority.
3.4 The above minimum infrastructure requirements do not apply to Private Charging
Points meant for self-use of individual EV owners (non-commercial basis).
3.5 Captive charging infrastructure for 100% internal use for a company's own/leased
fleet for its own use will not be required to install all type of chargers and to have
NSP tie ups.
3.6 Public Charging Station can al o have the option to add Standalone battery swapping
facilities in addition to the above mandatory facilities. provided space/other
conditions permit.
4. Public charging Infrastructure (PCI) fo.r long distance EVs and/or
heavy duty EVs:
4.1 Public charging stations for long distance EVs and/or heavy duty EVs (like trucks,
busses etc.) shall have the following minimum requirements:
1. At least two chargers of minimum 100 kW (with 200-1000 V) each of
different specification (CCS & Chaderno) and with single connector gun each
in addition to the minimum charging infrastructure requirements as mandated
for Public Charging Stations in para 3.
ii. Appropriate Liquid Cooled Cables for high speed charging facility for onboard
charging of Fluid Cooled Batteries (currently available in some long range
EVs).
iii. In addition to 4.1 (i) and (ii) above, the Fast Charging Stations (FCS) for Long
Distance EVs and/or Heavy Duty EVs may also have the option of swapping
facilities tor batteries for meeting the charging requirements as per para 3 and
para 4.1 (i)&(ii) above. .It is notable that Fluid Cooled Batteries (FCBs) are
generally necessary for Fast Charging I Long Distance use of EVs and/or for
Heavy Duty Vehicles like buses/trucks etc. FCBs will have higher charging
rate and longer life.
4.2 Such Fast Charging Stations (FCS)which are meant only for 100% in house/captive
utilisation, for example buses of a company, would be free to decide the charging
specifications as per requirement for its in- house company EVs.
3
5. Location of Public Charging Stations:
5.1 ln case of Public Charging Stations, the following minimum requirements are laid
down with regard to density/distance between two charging points:
1. At least one Charging Station should be available in a grid of 3 Km X 3 Km.
Further, one Charging Station be set up at every 25 Km on both sides of
highways/roads,
11. For long range EVs {like long range SUVs) and heavy duty EVs like
buses/trucks etc., there should be at least one Fast Charging Station with
Charging Infrastructure Specifications as per para4. J at every 100 Kms, one on
each side of the highways/road located preferably within/alongside the stations
laid in para3 above. Within cities, such charging facilities for heavy duty EVs
shall be located within Transport Nagars, bus depots. Moreover, swapping
facilities are also not mandatory within cities for Buses/trucks.
5.2 Additional public charging stations shall be set up in any area only after meeting the
above requirements.
5.3 The above density/distance requirements shall be used by the concerned state/UT
Governments/their Agencies for the twin purposes of arrangement of land in any
manner for public charging stations as well a. for priority in installation of
distribution network including transformers/feeders etc. This shall be done in all
cases including where no central/state subsidy is provided.
5.4 The appropriate Governments (Central/Srate/UTs) may also give priority to existing
retail outlets (ROs) of Oil Marketing Companies (OMCs) for installation of Public
EV Charging Stations (in compliance with safety norms including 'firewalls' etc.) to
meet the requirements as laid above. Further, within such ROs, Company Owned
and Company Operated (COCO) ROs may be given higher preference.
5.5 Any deviation from above norms shall be admissible only after specific approval of
State Nodal Agency in consultation with the Central Nodal Agency.
6. Database of Public EV Charging Stations:
Central Electricity Authority (CEA) shall create and maintain a national online
database of all the Public Charging Stations through DISCOMs. Appropriate
protocols shall be notified by DISCOMs for this purpose which shall be mandatorily
complied by the PCS/BCS. This database shall have restricted access as finalised
between CEA and Ministry of Power.
7. Tariff for supply of electricity to EV Public Charging Stations:
7. l The tariff for supply of electricity to EV Public Charging Station shall be determined
by the appropriate commission, provided however that the tariff shall not be more
than the average cost of supply plus 15 (fifteen) percent.
7.2 The tariff applicable for domestic consumption shall be applicable for domestic
charging.
8. Service charges at PCS/BCS:
8.1 Charging of EVs is a service as already clarified by Ministry of Power vide letter
No. 23i08/2018-R&Rdated 13.04.2018. ~(
~'- ~lo~
4
8.2 The State Nodal Agency shall fix the ceiling of the Service Charges to be charged by
the Public Charging Stations.
9. Priority for Rollout of EV Public Charging Infrastructure:
After extensive consultations with State Governments and different
Department/Agencies of Central Government, phasing as follows arc laid down as
national priority for rollout ofEV Public Charging Infrastructure:
9.1 Phase l (1-3 Years):
All Mega Cities with population of 4 million plus as per census 2011, all existing
expressways connected to these Mega Cities & important Highways connected with
each of these Mega Cities shall be taken up for coverage. A I ist of these Mega Cities
and existing connected expressways is attached at Annexure 1.
9.2 Phase Il (3-5 Years):
Big cities like State Capitals, Ur headquarters shall be covered for distributed and
demonstrative effect Further, important Highways connected with each of these
Mega Cities shall be taken up for coverage.
9.3 The above priorities for phasing of rollout shall be kept in mind by all concerned,
including, different agencies of Central/State Governments while framing of further
policies/guidelines for Public Charging Infrastructure ofEvs, including for declaring
further incentives/subsidies for such infrastructure and for such other purposes.
lO. Implementation Mechanism for Rollout:
1 O. l Ministry of Power shall designate a Central Nodal Agency for the rollout, AH
relevant agencies including Central electricity Authority (CEA) shall provide
necessary support to this nodal agency.
10.2 Every State Government shall nominate a Nodal Agency for that State for setting up
charging infrastructure. The State DISCOM shall generally be the Nodal Agency for
such purposes. However, State Government shall be free to select a Central/State
Public Sector Undertaking (PSU) including Urban Local Bodies (ULBs), Urban/Area
Development Authorities etc. as its Nodal Agency.
1 L Selection of Implementation Agency for Rollout:
l 1.1 The Central Nodal Agency shall finalize the cities and expressways/highways to be
finally taken up from the above phasing, in consultation with the respective State
Governments.
l I .2 An Implementation Agency shall be selected by the respective State Nodal Agency
and shall be entrusted with responsibility of installation, operation and maintenance
of PCS/FCS/BCS/BSF for designated period as per parameters laid down in this
document and as entrusted by the concerned Nodal Agency. The Implementation
Agency can be an Aggregator as mutually decided between Central and State Nodal
Agencies. However, they can also decide to choose different PCS/FCS providers for
bundled packages or for individual locations as mutually decided. Further,
whenever bundled packages are carved for bidding, such packages shall necessarily
include atleast one identified expressway/highway or part ~icare:
cohesive regional package; the selected identified cities may be divided into one or
more parts as necessary for such purposes.
11.3 Where Implementing Agency is selected by bidding. all bidding shall be conducted
by the State Nodal Agency.
11.4 There shall be an upper cap on the Service Charges declared by the State Nodal
Agency as per para 8.2 above. Subsidy, if admissible from Central/State
governments, shall be suitably factored in such calculations of Upper Cap/Bid
Variable.
This issues with the approval of Hon'ble Minister of State {IC) for Power and New &
Renewable Energy.
(Anoop ingh Hislit)
Under Secretary to the Govt. of India
Tel:23766236
EmaiJ:anoopsingh.bisht@nic.in
Copy to:
· l. Prime Ministers Office/Cabinet Secretariat.
2. CEO, NITI Aayog
3. The Secretaries of the CERC/State Commissions/JERCs.
(Anoop i:b-~lUnder Secretary to the Govt. of India
Tel:23766236
Email:anoopsingh.bisht@nic.in
6
Copy for information to:
1. PS to MoS (IC) for Power and NRE
2. PPS to Secretary (Power)
3. PPS to Addl Secretary (SNS)
4. PPS to Joint Secretary (Thermal), MoP
5. PPS to Director (U:MPP }, MoP
(A:4~Under Secretary to the Govt. of India
Tel:23766236
.EmaiJ:anoopsingh.bisht(a),uic.in
7
I. List of 4 million plus cities (as per census 201 I}
l 1 Mumbai
·---
2 Delhi
'"··--·..----3 Bangalore
...
4 Hyderabad ----,
I5 Ahmedabad
·-·6 Chennai
.........
7 Kolkata
8 Surat
- - ·--·····
9 Punc
i
II. List of corridors
[T I Mumbai-Pune Exprcss·;,;;:--
~-ihmedabad-Vadodara Expre;,._v_ay_· --l
3 Delhi-Agra Yamuna Expressway
4 Delhi-Jaipur
5 Bengaluru-Mysore
Beugaluru-Chennai
7 Surat-Mumbai Expressway
-·-· ...
8 Agra - Lucknow Expressway
--
9 Eastern Peripheral Expressway
10 Delhi-Agra NH2 Expressway
I
It Hyderabad ORR expressway I
12 5 connected highways to each megacity
Annexure 1
8
Amendments in
Urban and Regional Development Plans
Formulation and Implementation Guidelines
(URDPFI - 2014)
for
Electric Vehicle Charging Infrastructure
Town and Country Planning Organisation
Ministry of Housing and Urban Affairs
Government of India
February, 2019
Preamble
To encourage "Electric Vehicles" as a viable option for long distance trips/ inter
regional trips with adequate "charging stations", it is necessary to make provisions for
establishing Public Charging Stations (PCS) in the regional facilities for re-
fuelling/recharging of vehicles.
Hence, amendments are required for addition of norms for charging
Infrastructure provisions in Development Control Regulations and provide "Charging
Infrastructure" in the City Mater Plans / Regional Plans.
Based on available charging technologies and their evolution, type of vehicles,
the types of chargers indicating number of charging points required for setting up
adequate PCS as regional facilities and with the long term vision of implementing
'electric mobility' during the next 30 years, amendments are made Under Chapter 8:
Infrastructure Planning, at section 8.4.7 "Distribution Services", Table 8.57 -
"Norms for Distribution Services" of URDPFI Guidelines, 2014 (Volume I) as detailed
in clause 3 of this document.
2. Existing provision in Urban and Regional Development Plans Formulation and
Implementation Guidelines (URDPFI, 2014)
Chapter 8: Infrastructure Planning (Volume I of URDPFI Guidelines 2014)
At section 8.4.7 "Distribution Services",
Table 8.57 - "Norms for Distribution Services"
Sr.
Population
Land Area Requirement
No.
Category served per Other Control
unit
Type of facility
Area
re uirement
1.
Petrol/Diesel filling and
Service Centre
Permitted in: i. Only filling station 30m x 17m • Shall not be located
on road having Right
Central District of Way less than
ii. Filling cum service 36m x 30m 30m.
Sub central district station
• Special cases in old
District centres 45 X 36m city areas may be
iii. Filling cum service considered based on
Community Centres (Only station cum workshop the approval by
Filling Station) statutory authorities.
18m x 15m
Residential & industrial iv. Filling station only for
• Shall be approved by
Use Zone in Urban Areas two and three wheelers
the explosive/ fire
Along National and State
department.
Highways
Villages identified as
growth centres
Freight Complex
Proposed major roads
Police/security forces
services (for captive use
only) (MPD, pg 125)
2. Compressed Natural
Gas (CNG)/filling centre
Permitted in: CNG mother station 1080 sqm • Shall not be located
(Including building
on road having Right
All use zones (except in (36m x 30m) of Way less than
Regional Parks and component - control
30m.
Developed District Parks) room/office/dispensing
room/store, pantry and
W.C.) • Shall be approved by
Along National and State the explosive/fire
Highways department.
Villages identified as
growth centres
Freight Complex
Proposed major roads
3. LPG 40,000 to Capacity = 500 cylinders or 520 sqm . The major concern for
Godown/GasGodown 50,000 8000 kg of LPG
(26m x 20m)
its storage and
distribution is the
Area (inclusive of guard
location, which shall
room)
be away from the
residential areas and
shall have open
spaces all around as
per the Explosive
Rules.
4. Milk Distribution 5000 Areas inclusive of service 150sqm
area
3. Amendments to URDPFI Guidelines 2014:- Necessary provisions for EV Charging have
been incorporated at Sr. No. 1 and Sr. No. 3 of table 8.57. The revised table will be as
under:
Table 8.57 - "Norms for Distribution Services":
Sr. No. Category Population Land Area requirement Other controls
served per unit
Type of Facility Area required
1. Petrol/Diesel fillinq/EV charging* and service centre
Permitted in: i. Only filling station 30mx17m Shall not be
located on road
Central District
having Right of
Sub central ii. Filling cum service 36m x 30m Way less than
district station 30m.
District centres iii. Filling cum service 45 X 36m Special cases in
station cum workshop old city areas may
Community be considered
Centres (Only based on the
Filling Station) iv. Filling station only 18m x 15m approval by
for two and three statutory
Residential & wheelers authorities.
industrial Use
Zone in Urban Shall be approved
!Areas
v. Public Charging Min.13.5m x
by the explosive/
fire department.
!Along National Station (PCS) 5.5m
and State (minimum
Charging station
Highways requirement as per
and all equipment
MoP guidelines)
layout with
!Villages identified respect to nearest
as growth centres dispensing unit
Freight Complex vi. FCB CS Min.15m x 7m
(DU)/fuel tank to
1 ccs be as per PESO
1 CHAdeMO rules.
Proposed major
roads
Equipped with
Police/security
CCE and LCC, as
"'orces services vii. Battery Swapping Earmarking area required in
(for captive use Station (optional) for "battery addition to
only) (MPD, pg fitting" requirements of
125)
PCS.
Optional addition to
PCS by the SP
2 Compressed Natural Gas (CNG)lfillinq centre
Permitted in: CNG mother station 1080 sqm Shall not be
(Including building located on road
!All use zones component - control (36m x 30m) having Right of
(except in Regional room/office/dispensing Way less than
Parks and room/store, pantry and 30m.
Developed District WC.)
Parks)
Shall be approved
!Along National and by the explosive/
State Highways fire department
Villages identified
as growth centres
Freight Complex
Proposed major
roads
Sr. No. Category Population Land Area requirement Other controls
served per unit
Type of Facility Area required
3. Standalone Public Charging Stations (PCS)
A Public Charging Every 25 Kms, both PCS with charger ratio Additional area Equipped with
Stations sides along the (minimum as per total CCE and LCC, as
highways/roads requirements of PCS, parking capacity may be required
as per MoP) - at the for fast charging.
1 FC for every 10 EVs Restaurants
1 SC for every 3 EVs /Eateries.
B Fast Charging Every 100 Kms, both At least 2 chargers Min.15m x 7m May be coupled
facility / FCB CS sides along the 1 CCC type with the PCS at
(for Long highways/roads 1 CHAdeMO type item A above,
Distance & Heavy (min 100KW each) with CCE and
DutyEVs) LCC.
C Battery Swapping Optional provisions Standalone Min May be coupled
Station as per MoP 5.5m x 2.75m with PCS at item
Guidelines. Provided along with A or FCB CS at
FBC charging Stations item B above.
4 LPG Go down/ 40,000 to 50,000 Capacity = 500 cylinders The major concern
Gas Go down or 8000 kg of LPG for its storage and
distribution is the
Area (inclusive of guard 520 sqm location, which shall
room) (26m x 20m) be away from the
residential areas and
shall have open
spaces all around as
per the Explosive
Rules
5 Milk Distribution 5000 Areas inclusive of service 150 sqm ---
area
* A detailed explanation is given at Appendix 'P' - "Explanatory Note on EVCI" and Appendix 'Q' -
"Guidelines issued by Ministry of Power on EVCI, dated 14.12.2018" (in Volume IIA & 118).
Notes:
• Super Kerosene Oil/Light Diesel Oil storage for industrial uses shall be given
separately.
• Large petrol/diesel storage centers to be located outside city limits.
• To be organized by a service provider for connection and metering, available 24x7for
all users.
• Provision of FCB CS & BS shall not be mandatory, and will be at the discretion of the
service provider.
• Size recommended for FCB CS is subject to variance as per technical specifications
of the SP.
• Fuel filling stations (including COCO outlets) shall conform to specifications and
safety norms as per the amendment in Petroleum Rules or, PESO Act and obtain
clearances as maybe necessary from the 'Competent Authority ', for adding PCS to
Retail outlets/ Fuel filling stations.
For Standalone PCS:
• The ratio ofprovision of charging points (FC/SC) with respect to total parking
capacity will be considered for only 20% (i.e. 20% of total parking capacity will be
considered EVs & ratio will be applied on them)
• Land a/location is preferably to be contiguous/in close proximity to commercial land
of the Mid-way Restaurant.
• "General Conditions of Siting" of Standalone PCS shall follow clause 4.1-4.4 of
/RC: 12 (latest revision) except for the distance between stations which shall be as
per the Guidelines issued by MoP, dated Dec, 2018.
Abbreviations used:
2Ws
3Ws
4Ws
PVs
CVs
EV
SC
FC
BS
PCS
URDPFI
- Two wheelers
- Three wheelers
- Four wheelers/ PV(cars)
- Passenger Vehicles
- Commercial Vehicles
- Electric Vehicle
- Slow Charger/ Slow Charging (AC)
- Fast Charger/ Fast Charging (DC and a few AC ones)
- Battery Swap
- Public Charging Stations
- Urban and Regional Development Plans Formulation and Implementation
Guidelines, 2014
CCS - Combined Charging System
CHAdeMO - A DC Fast charging standard
FCB CS - Fluid Cooled Battery Charging Station
CCE - Climate Control Equipment
LCC - Liquid Cooled Cables
NSP - Network Service Provider (information network)
SP - Service Provider
----------------- X X X -----------------
Appendix P
(URDPI Guidelines Vol llA and II 8)
Explanatory Note
on
Electric Vehicle Charging Infrastructure
(For URDPFI Guidelines 2014)
Town and Country Planning Organization
Ministry of Housing and Urban Affairs
Government of India
February, 2019
Abbreviations:
UNFCC
IPCC
GHG
2Ws
3Ws
4Ws
PVs
CVs
EV
EVSE
SC
FC
BS
PCS
PCI
Private Cl
MBBL
URDPFI
NSP
SP
United Nations Framework Convention on Climate Change
Intergovernmental Panel on Climate Change
Green House Gases
Two wheelers
Three wheelers
Four wheelers/ PV(cars)
Passenger Vehicles
Commercial Vehicles
Electric Vehicle
Electric Vehicle Supply Equipment
Slow Charger I Slow Charging (AC)
Fast Charger I Fast Charging (DC and a few AC ones)
Battery Swap
Public Charging Stations
Public Charging Infrastructure
Private Charging Infrastructure
Model Building Bye-Laws, 2016
Urban and Regional Development Plans Formulation and
Implementation Guidelines, 2014
Network Service Provider (information network)
Service Provider
-2 -
Contents
1 . RationaIe for EVCI establish ment---------------------------------------------------------4
2. EV Charging Tech nology--------------------------------------------------------------------5
3. 0ptions for EV Charg ing---------------------------------------------------------------------6
4. Charging Specifications and PCS lnfrastructure---------------------------------------7
-3-
1. Rationale for EVCI establishment
Rapid urbanization coupled with adoption of mechanized transportation modes
has resulted in high emissions of Green House Gases that goes on to impact Global
warming. Unless, the global surface temperature rise is restricted to no more than 2°C
compared with pre-industrial levels, the IPCC has warned that the world will see
irreversible catastrophic climate change.
India being a signatory to the UNFCCC, has pledged for efforts to assess the
Greenhouse Gas Emissions (GHG) of anthropogenic origin and removal by sinks.
India's per capita emissions are still considered low at 1.9 tonnes (2013), but its total
emissions are next only to China and the US and is likely to overtake those of the EU
by 2019.
While comparing the Indian cities for their emission scores, Delhi is on top as the
biggest emitter at over 38 38 million tonnes of carbon dioxide equivalent overall
emissions, followed by Greater Mumbai at 22.7 million tonnes and Chennai at 22.1
million tonnes, Kolkata at 14.8million tonnes, Bangalore at 19.8million tonnes,
Hyderabad at 13.7 million tonnes and Ahmedabad at 9million tonnes were the other
cities whose emissions for the year were calculated sector wise.
As per the statistics of Transport Department (GNCTD), total number of vehicles in
Delhi is more than the combined total vehicles in Mumbai, Chennai and Kolkata. Delhi
has 85 private cars per 1000 population against the national average of 8 cars per
1000 population. In terms of CO2 emissions due to motor vehicles, Delhi emits about
12.4 million tonnes while the city of Bengaluru emits about 8.6 million tonnes.!"
Therefore, addressing the quantum of emissions from the "Transport" and
"Domestic" sector emerges to be the high priority subjects under the overarching
umbrella of "Climate change mitigation" as committed to the UNFCC.
Encouraging "Electric Vehicles" as a viable option for phased transportation in
terms of short and long distance trips with appropriate "Charging Infrastructure" is
therefore, the pre-condition for this paradigm shift/ phased migration to sustainable
transportation.
For this changes are required in Infrastructure provisions (at Regional and City
levels) and in Development Control Regulations (in terms of provisions therein) to
include the formulations of norms and standards for "Charging Infrastructure" in the
said Mater Plan Regulations and State Bye-Laws for adoption across the country
suiting local conditions.
-4-
2. EV Charging Technology
2.1 Electric Vehicle Supply Equipment (EVSE):
An EVSE is a wall mounted box that supplies electric energy for recharging of electric
vehicle batteries. Also EVSEs have a safety lock-out feature that does not allow current to flow
from the device until the plug is physically inserted into the car.
EVSEs can be customized with added features like:
• Authentication
• Integrated payment gateways
• Software for remote monitoring.
As electric vehicle charging technology continues to advance, several standards and
guidelines have become widely accepted across the industry. This section gives a brief
overview of charging infrastructure technology, standards, and terminology.
2.2 Different types of EVSE:
Charging speeds- Charging power, which determines the time required to charge a vehicle,
can vary by orders of magnitude across charge points, as shown in Table 1. A small household
outlet may charge as slowly as 1.2 kW, while the most advanced rapid charging stations can
charge at up to 350 kW. Charging infrastructure is broadly broken into three categories based
on speed: Level 1, Level 2, and direct current (DC) fast charging (sometimes referred to as
Level 3).
(Source: "Emerging Best Practices for Electric Vehicle Charging Infrastructure", Oct' 2017)
Private Charging
Charging batteries of privately owned cars through domestic charging points. Billing is
mostly part of home/domestic metering.
AC "Slow" Charging:
The home private chargers are generally used with 230V/15A single phase plug which can
deliver a maximum of up to about 2.5KW of power. The EVSE supplies AC current to the
vehicle's onboard charger which in turn converts the AC power to DC allowing the
battery to be charged.
Public Charging
For charging outside the home premises, electric power needs to be billed and payment
needs to be collected. The power drawn by these chargers may need to be managed from
time to time.
DC "Fast" Charging:
DC current is sent to the electric car's battery directly via the charge port. FC chargers (usually
50 KW or more) can supply 100 or more kilometers of range per hour of charging. The fast
chargers would generally be used as a top-up, rather than fully charging vehicles. These are
important for cab companies and corporate users who have a fleet of electric cars.
-5-
3. Options for EV Charging
There is an urgent need to offer flexible charging infrastructure for different vehicle
segments to drive adoption of EVs. Charging infrastructure is the most crucial enabler in the
entire EV value chain. The exploration of different charging models according to the local
conditions shall enable faster deployment of electric vehicles in the country.
EV share in all vehicles - It has been broadly projected that by the current rate of
adoption of EVs, about 15% of all vehicles in the country would be EVs by the year 2020.
Therefore, while assuming percentage composition of all proposed capacities in Public
facilities of vehicle holding capacity, the Metropolitan and 'Tier I' cities will be assumed to have
a higher percentage share of EVs, say 20% for now. The charging infrastructure prescriptions
in all urban development guidelines shall, therefore, be in consonance with the said
percentage.
Power Load sanction to premises - While adding these Charging Infrastructures to
the proposed set of building types of the Indian cities, enhanced Power Load shali have to
be had for each such building type by the Power 0/SCOMs, commensurate to the total
additional power requirement of simultaneous operation of all the prescribed charging points
in the premise. With further advancement of charging technologies and the enhanced capacity
of chargers to draw more power, it is advised that the load capacity assigned to each premise
should be kept with a safety factor of 1. 25 with a long-term vision of 30 years.
Table 1: EVs charging "modes" and 'availability'
Vehicle type Slow Charging Fast Charging Public Cl
2 Wheelers y N Yes/Limited
3 Wheelers y N Yes/Limited
PVs (Cars) y y Yes
PVs (Buses) N y Yes
Table 2: Charging options for EV types (by ownership)
Vehicle type Private Cl Public CS Predominant place of charging
2 Wheelers SC/BS SC Point of residence/ Work
3 Wheelers SC/BS SC/BS Residence / Parking stations
PVs (Cars) SC/BS FC Residence / Point of work / other public places
PVs (Buses) - FC/BS Bus Terminals/Depots
Note:
• The option of Battery Swapping (BS) forprivately owned 2Ws and PV(Cars) is limited to Private Cl.
• For 3 Ws the BS is proposed to be made available in PCS, for faster recharge experience only
• For PV (Buses), Captive Fast charging infrastructure for 100% internal use for fleets may be adopted by
privately owned Depots/Garages.
Based on the above stated EV charging technologies available and the current trend of
evolving technologies of faster charging experience, the Ministry of Power has issued
Guidelines and Standards for setting up Charging Infrastructure for Electric Vehicles
[Ministry of Power (MoP) Guidelines dated 14.12.2018] for charging infrastructure to be
installed at every Public Charging Station (PCS). 'Connectivity regulations and Safety norms'
shall be defined by respective authorities such as Central Electric Authority/MoP for grid
access to such PCS / any other charging station/infrastructure.
-6-
._
4. Charger Specifications and PCS Infrastructure
Any installed PCS shall have one or more electric kiosk/boards with installation of all
charger models as prescribed in the Guidelines and Standards notified by Ministry of
Power (MoP}, dated 14 December 2018 for "Charging Infrastructure for EVs" (at
Annexure I/), with other necessary arrangements as deemed necessary.
Public Charging Station service providers shall be free to create charging hubs and to install
additional number of kiosk/chargers in addition to the minimum chargers prescribed vide the
MoP Guidelines, including options for installation of additional chargers, if required.
Note:
• Minimum infrastructure requirements do not apply to Private Charging Points meant
for self-use of individual EV owners (non-commercial basis).
• Captive charging infrastructure for 100% internal use for a company's own fleet will
not be required to install all type of chargers and to have NSP tie ups.
5. Regional location of PCS/ FCB Charging Stations
In accordance with the Guidelines issued by the Ministry of Power, following minimum
standards with regard to density of/ distance between PCS in regional level facilities shall be
followed as and regulated by the URDPFI Guidelines-
1. Along Highways and inter-city corridors:
• At every 25 Kms on both sides of highways/roads, at least 1 PCS is to be set
up.
• At every 100 Kms on both sides of highways/roads, at least 1 Fast
Charging/FCB Charging Station as per specifications. (may be coupled with
PCS)
• Standalone Battery Swapping Stations may be added with the PCS.
2. In Regional level Industrial SEZs / other Industrial Parks/Estates
• Land for at least 1 PCS is to be reserved within a grid of 10 Km x 10 Km of the
designated industrial area/park/estates.
-7-
At>~~
(UP. b pF.I' Gpwd.e..l).'ku1 Vdf. !t A ~Jl.!.J
To,
No.12/2/2018-EV
Government of India
Ministry of Power
Shram Shakri Bhawan, Rafi Marg,
New Delhi, the 14
111
December, 2018
l. The Secretaries of all the Ministries/Departments of Government of India.
2. The Chief Secretaries of the States/U'Is,
Sub: Charging Infrastructure for Electric Vehicles - Guidelines and Standards -reg.
Sir/Madam,
Government of India have undertaken multiple initiatives to promote manufacturing
and adoption of electric vehicles in India. With support of the Government, electric vehicles
have started penetrating in the Indian market. However, availability of adequate Charging
Infrastructure is one of the key requirements for accelerated adoption of electric vehicles in
India. It is proposed to encourage this by laying down an enabling framework.
Obiectives
• To enable faster adoption of electric vehicles in India by ensuring safe, reliable,
accessible and affordable Charging Infrastructure and eco-system
• To promote affordable tariff chargeable from EV owners and Charging Station
Operators/Owners
• To generate employment/income opportunities for small entrepreneurs
• To proactively support creation of EV Charging Infrastructure in the initial phase and
eventually create market for EV Charging business
• To encourage preparedness of Electrical Distribution System to adopt EV Charging
Infrastructure.
In light of'tlte llbove, it has been decided as follows:
1. Private charging at residences/ offices shall be permitted. D1SC0Ms may facilitate
the same.
Setting up of Public Charging Stations (PCS) shall be a de-licensed activity and any
individual/entity is free to set up public charging stations, provided that, such
stations meet the technical as well as performance standards and protocols laid down
below as well as any further norms/standards/specifications laid down by Ministry
of Power and Central Electricity Authority from time 10 time.
~~
1
2.
2.1 Any person seeking to set up a Public Charging Station may apply for connectivity
and he shall be provided connectivity on priority by the Distribution Company
licensee to supply power in the area.
2.2 Any Charging Station/ Chain of Charging Stations may also obtain electricity from
any generation company through open access.
3. Public Charging Infrastructure (PCI)- Minimum Requirements:
3.1 Every Public Charging Station (PCS) shall have the following minimum
infrastructure:
I. An exclusive transformer with all related substation equipment including
safety appliance.
33/11 KV line/cables with associated equipment including as needed for line
termination/metering etc.
Appropriate civil works.
Adequate space for Charging and entry/exit of vehicles.
Current international standards that are prevalent and used by most vehicle
manufacturers internationally are CCS and CHadeMO. Hence, Public
Charging Stations shall have, one or more electric kiosk/boards with
installation ofall the charger models as follows:
ii.
ILL
iv.
V.
~
·~--
i No. of Charging
Charger Type
I
Charger Connectors=
Rated Points/No. of
Voltage (V) Connector guns
I
I (CG)~------·-·
I CCS (min 50 kW) 200-1000 1/1 co
-~--- -·····------------
)
Fast f __CI·IAdeMO (min 50 kW) 200-1000 J/1 CG
··-
I , Type-2 AC (min 22 kW) 380-480 1/lCG
I Slow/Moderate
i . .. .. ...
~DC-001 (15 kW) 72-200 1/1 co
-----·····-··-··-··-·······-··
··-3/3 CG of
j Bharat AC-00l (10 kV) 230
3.3 kW each
*In addition, any other fast/slow/moderate charger as per approved BIS standards
whenever notified. .~¥--·-
viii.
VI. The kiosk/board may have options for installation of additional chargers if
required.
The Public Charging Station Providers are free to create Charging Hubs and to
install additional number of Kiosk/Chargers in addition to the minimum
number of chargers prescribed above.
Tie up with at least one online Network Service Providers (NSPs) to enable
advance remote/online booking of charging slots by EV owners. Such online
information to EV owners should also include information regarding location.
types and numbers of chargers instal led/availableetc.
Share charging station data with appropriate DISCOM and to maintain
appropriate protocols as prescribed by such DISCOM for this purpose. CEA
shall have access to this database. ~- .
Appropriate public amenities, . ( .
d" .ti~ 2
vii.
!X.
X.
xi. Where, in addition to the above, fast charging facility is also planned to be
provided at the PCS by the PCI provider, the following additional
infrastructure must be provided:
a. Appropriate Liquid Cooled cables if High Speed Charging Facility for
onboard charging of Fluid Cooled Batteries (FCBs) is also planned.
b. Appropriate Climate Control Equipment for Fast Charging of Batteries to
be used for swapping (i.c, not onboard)
3.2 Every Public Charging Station (PCS) shall be operational only after inspection and
clearance as communicated by a suitable clearance certificate, by the concerned
electrical inspectors/technical personnel designated specifically by the respective
DISCOM for this purpose. DISCOMs may also empanel one or more third party
authorized technical agencies tor this purpose.
3.3 Electric Vehicle Service Equipment (EVSE) shall be type tested by an appropriate
reputed authority.
3.4 The above minimum infrastructure requirements do not apply to Private Charging
Points meant for self-use of individual EV owners (non-commercial basis).
3.5 Captive charging infrastructure for 100% internal use for a company's own/leased
fleet for its own use will not be required to install all type of chargers and to have
NSP tie ups.
3.6 Public Charging Station can also have the option to add Standalone battery swapping
facilities in addition to the above mandatory facilities. provided space/other
conditions permit.
4. Public charging Infrastructure (PCI) for long distance EVs and/or
heavy duty EVs:
4.1 Public charging stations for long distance EVs and/or heavy duty EVs (like trucks,
busses etc.) shall have the following minimum requirements:
i. At least two chargers of minimum 100 kW (with 200-1000 V) each of
different specification (CCS & Chaderno) and with single connector gun each
in addition to the minimum charging infrastructure requirements as mandated
for Public Charging Stations in para 3.
11. Appropriate Liquid Cooled Cables for high speed charging facility for on board
charging of Fluid Cooled Batteries (currently available in some long range
EVs).
iii. In addition to 4.1 (i) and (ii) above, the fast Charging Stations (FCS) for Long
Distance EVs and/or Heavy Duty EVs may also have the option of swapping
facilities tor batteries for meeting the charging requirements as per para 3 and
para 4.l(i)&(ii) above. Jt is notable that Fluid Cooled Batteries (FCBs) are
generally necessary for Fast Charging I Long Distance use of EVs and/or for
Heavy Duty Vehicles like buses/trucks etc. FCBs will have higher charging
rate and longer life.
4.2 Such Fast Charging Stations (FCS)which are meant only for l 00% in house/captive
utilisation, for example buses of a company, would be free to decide the charging
specifications as per requirement for its in- house company EYs.
3
5. Location of Public Charging Stations:
5.1 In case of Public Charging Stations, the following minimum requirements are laid
down with regard to density/distance between two charging points:
i. At least one Charging Station should be available in a grid of 3 Km X 3 Km.
Further, one Charging Station be set up at every 25 Km on both sides of
highways/roads.
11. For long range Evs (like long range SUVs) and heavy duty EVs like
buses/trucks etc., there should be at least one Fast Charging Station with
Charging Infrastructure Specifications as per para4. J at every 100 Kms, one on
each side of the highways/road located preferably within/alongside the stations
laid in para3 above. Within cities, such charging facilities for heavy duty EVs
shall be located within Transport Nagars, bus depots. Moreover, swapping
facilities are also not mandatory within cities for Buses/trucks.
5.2 Additional public charging stations shall be set up in any area only after meeting the
above requirements.
5.3 The above density/distance requirements shall be used by the concerned state/UT
Governments/their Agencies for the twin purposes of arrangement of land in any
manner for public charging stations as well as for priority in installation of
distribution network including transformers/feeders etc. This shall be done in all
cases including where no central/state subsidy is provided.
5.4 The appropriate Governments (Central/State/U'Is) may also give priority to existing
retail outlets (ROs) of Oil Marketing Companies (OMCs) for installation of Public
EV Charging Stations (in compliance with safety norms including 'firewalls' etc.) to
meet the requirements as laid above. Further, within such R.Os, Company Owned
and Company Operated (COCO) ROs may be given higher preference.
5.5 Any deviation from above norms shall be admissible only after specific approval of
State Nodal Agency in consultation with the Central Nodal Agency.
6. Database of Public EV Charging Stations:
Central Electricity Authority (CEA) shall create and maintain a national online
database of all the Public Charging Stations through DISCOivls. Appropriate
protocols shall be notified by DISCOMs for this purpose which shall be mandatorily
complied by the PCS/BCS. This database shall have restricted access as finalised
between CEA and Ministry of Power.
7. Tariff for supply of electricity to EV Public Charging Stations:
7.1 The tariff for supply of electricity to EV Public Charging Station shall be determined
by the appropriate commission, provided however that the tariff shall not be more
than the average cost of supply plus 1 5 (fifteen) percent.
7.2 The tariff applicable for domestic consumption shall be applicable for domestic
charging.
8. Service charges at PCS/BCS:
8.1 Charging of EVs is a service as already clarified by Ministry of Power vide letter
No. 2Ji08/2018-R&R dated 13.04.2018. ~(
~~lt.~ 4
8.2 The State Nodal Agency shall fix the ceiling of the Service Charges to be charged by
the Public Charging Stations.
9. Priority for Rollout of EV Public Charging Infrastructure:
After extensive consultations with State Governments and different
Department/Agencies of Central Government, phasing as follows are laid down as
national priority for rollout of EV Public Charging Infrastructure:
9.1 Phase I (l-3 Years):
All Mega Cities with population of 4 million plus as per census 2011, all existing
expressways connected to these Mega Cities & important Highways connected with
each of these Mega Cities shall be taken up for coverage. A list of these Mega Cities
and existing connected expressways is attached at Annexure I.
9.2 Phase U (3-5 Years):
Big cities like State Capitals, UT headquarters shall be covered for distributed and
demonstrative effect. Further, important Highways connected with each of these
Mega Cities shall be taken up for coverage.
9.3 The above priorities for phasing of rollout hall be kept in mind by all concerned,
including, different agencies of Central/State Governments while framing of further
policies/guidelines for Public Charging Infrastructure of EVs, including for declaring
further incentives/subsidies for such infrastructure and for such other purposes.
10. Implementation Mechanism for Rollout:
10. J Ministry of Power shall designate a Central Nodal Agency for the rollout. AH
relevant agencies including Central electricity Authority (CEA) shall provide
necessary support to this nodal agency.
10.2 Every State Government shall nominate a Nodal Agency for that State for setting up
charging infrastructure. The St.ate DISCOM shall generally be the Nodal Agency for
such purposes. However, State Government shall be free to select a Central/State
Public Sector Undertaking (PSU) including Urban Local Bodies (ULBs). Urban/Area
Development Authorities etc. as its Nodal Agency.
11.. Selection of Implementation Agency for Rolloutr
11. l The Central Nodal Agency shall finalize the cities and expressways/highways to be
finally taken up from the above phasing. in consultation with the respective State
Governments.
l l .2 An Implementation Agency shall be selected by the respective State Nodal Agency
and shall be entrusted with responsibility of installation, operation and maintenance
of PCS/FCS/BCS/BSF for designated period as per parameters laid down in this
document and as entrusted by the concerned Nodal Agency. The Implementation
Agency can be an Aggregator as mutually decided between Central and State Nodal
Agencies. However, they can also decide to choose different PCS/FCS providers for
bundled packages or for individual locations as mutually decided. Further,
whenever bundled packages are carved for bidding, such packages shall necessarily
include atleast one identified expressway/highway or part thereof IJ prepare a
~J.ik__ s
cohesive regional package; the selected identified cities may be divided into one or
more parts as necessary for such purposes.
I I .3 Where Implementing Agency is selected by bidding. all bidding shall be conducted
by the State Nodal Agency.
11.4 There shatI be an upper cap on the Service Charges declared by the State Nodal
Agency as per para 8.2 above. Subsidy, if admissible from Central/State
governments. shall be suitably factored in such calculations of Upper Cap/Bid
Variable.
This issues with the approval of Hou'ble Minister of State (IC) for Power and New &
Renewable Energy.
(Anoop 'in~ t~Under Secretary to the Govt. of India
TcJ:23766236
Email:anoopsingh.bisht@nic.in
Copy to:
1. Prime Ministers Office/Cabinet Secretariat.
2. CEO, NlTI Aayog
3. The Secretaries of the CERC/State Commissions/JERCs.
"' -f. n(Anoop ins h B~~
Under Secretary to the Govt. of India
Tel:23766236
Email:anoopsingb.bisht@nic.in
6
Copy for information to:
L PS to MoS (IC) for Power and NRE
2. PPS to Secretary (Power)
3. PPS to Addi. Secretary (SNS)
4. PPS to Joint Secretary (Thermal), MoP
5. PPS to Director (UMPP ), MoP
(A~~
Under Secretary to the Govt. of India
Tel:23766236
Email:anoopsingb.bisht(a),uic.in
7
I. List of 4 miJlion plus cities (as per census 20.11)
! 1 I Mumbai 1
!
l
-----··! --2 i Delhi
·~---·-· --
3 Bangalore
-·
4 Hyderabad
I15 I Ahmedabad
I
6 i -·- l
Chennai I
I .......... h..H,
7
I
Kolkata!
8 Surat
--·--
9 Punc
I'---• !
II. List of corridors
c·-t-, Mumbai-Pune Express;,-~y
l 2 Ahmed_3-~ad-Vadodara Expressway
3 Delhi-Agra Yamuna Expressway
4 Delhi-Jaipur
5 Bengaluru-Mysorc
6 Bengaluru-Chennai
,.....--. i
7
I
Surat-Mumbai Expressway
8 Agra - Lucknow Expressway
---·-·
9 Eastern Peripheral Expressway
10 Delhi-Agra NH2 Expressway
I
··-----J
11 Hyderabad ORR expressway !
;---t---·--··--·--····---·--·-·-----------------;
j 12 5 connected highways to each megacity
Annexure l
8

More Related Content

What's hot

Wireless charging of electric vehicles
Wireless charging of electric vehiclesWireless charging of electric vehicles
Wireless charging of electric vehiclesObul Naidu
 
IRJET- Dynamic Wireless Electric Vehicle Charging System
IRJET-  	  Dynamic Wireless Electric Vehicle Charging SystemIRJET-  	  Dynamic Wireless Electric Vehicle Charging System
IRJET- Dynamic Wireless Electric Vehicle Charging SystemIRJET Journal
 
Module 1: Electric vehicle Technology for VTU - by Dr. C V Mohan
Module 1: Electric vehicle Technology  for VTU - by Dr. C V MohanModule 1: Electric vehicle Technology  for VTU - by Dr. C V Mohan
Module 1: Electric vehicle Technology for VTU - by Dr. C V MohanDrCVMOHAN
 
Current status of the electric car
Current status of the electric carCurrent status of the electric car
Current status of the electric carvladtempest5
 
Dynamic charging latest developments
Dynamic charging latest developmentsDynamic charging latest developments
Dynamic charging latest developmentsBill St. Arnaud
 
IRJET - Wireless Charging Station for Electric Vehicle
IRJET - Wireless Charging Station for Electric Vehicle IRJET - Wireless Charging Station for Electric Vehicle
IRJET - Wireless Charging Station for Electric Vehicle IRJET Journal
 
DEVELOPING AN EV CHARGING STATION: A TECHNICAL AND REGULATORY OVERVIEW
DEVELOPING AN EV CHARGING STATION: A TECHNICAL AND REGULATORY OVERVIEWDEVELOPING AN EV CHARGING STATION: A TECHNICAL AND REGULATORY OVERVIEW
DEVELOPING AN EV CHARGING STATION: A TECHNICAL AND REGULATORY OVERVIEWDesignTeam8
 
Module 3 electric propulsion electric vehicle technology ppt
Module 3 electric propulsion   electric vehicle technology pptModule 3 electric propulsion   electric vehicle technology ppt
Module 3 electric propulsion electric vehicle technology pptDrCVMOHAN
 
Electric vehicles (1)
Electric vehicles (1)Electric vehicles (1)
Electric vehicles (1)WasimAbdulla1
 
Seminar Report on Smart charging strategy for an electric vehicle fleet to r...
Seminar Report  on Smart charging strategy for an electric vehicle fleet to r...Seminar Report  on Smart charging strategy for an electric vehicle fleet to r...
Seminar Report on Smart charging strategy for an electric vehicle fleet to r...Arpit Kurel
 
Dynamic charging (on the move) of
Dynamic charging (on the move) ofDynamic charging (on the move) of
Dynamic charging (on the move) ofBill St. Arnaud
 
Electric vehicles.pptx
Electric vehicles.pptxElectric vehicles.pptx
Electric vehicles.pptxJagrati
 
A review on fast wireless charging methods for Electric Vehicles.
A review on fast wireless charging methods for Electric Vehicles.A review on fast wireless charging methods for Electric Vehicles.
A review on fast wireless charging methods for Electric Vehicles.IRJET Journal
 
Design & Development of Energy management strategies for the improvement of f...
Design & Development of Energy management strategies for the improvement of f...Design & Development of Energy management strategies for the improvement of f...
Design & Development of Energy management strategies for the improvement of f...Saiifi Haider
 
Ev solve presentation
Ev solve presentationEv solve presentation
Ev solve presentationEVSolve
 
Fundamentals of electric and hybrid vehicles
Fundamentals of electric and hybrid vehiclesFundamentals of electric and hybrid vehicles
Fundamentals of electric and hybrid vehiclesA Reddy
 
Microgrids, Electric Vehicles and Wireless Charging
Microgrids, Electric Vehicles and Wireless ChargingMicrogrids, Electric Vehicles and Wireless Charging
Microgrids, Electric Vehicles and Wireless ChargingJeffrey Funk
 

What's hot (20)

phev
phevphev
phev
 
Wireless charging of electric vehicles
Wireless charging of electric vehiclesWireless charging of electric vehicles
Wireless charging of electric vehicles
 
IRJET- Dynamic Wireless Electric Vehicle Charging System
IRJET-  	  Dynamic Wireless Electric Vehicle Charging SystemIRJET-  	  Dynamic Wireless Electric Vehicle Charging System
IRJET- Dynamic Wireless Electric Vehicle Charging System
 
Module 1: Electric vehicle Technology for VTU - by Dr. C V Mohan
Module 1: Electric vehicle Technology  for VTU - by Dr. C V MohanModule 1: Electric vehicle Technology  for VTU - by Dr. C V Mohan
Module 1: Electric vehicle Technology for VTU - by Dr. C V Mohan
 
Current status of the electric car
Current status of the electric carCurrent status of the electric car
Current status of the electric car
 
Dynamic charging latest developments
Dynamic charging latest developmentsDynamic charging latest developments
Dynamic charging latest developments
 
IRJET - Wireless Charging Station for Electric Vehicle
IRJET - Wireless Charging Station for Electric Vehicle IRJET - Wireless Charging Station for Electric Vehicle
IRJET - Wireless Charging Station for Electric Vehicle
 
DEVELOPING AN EV CHARGING STATION: A TECHNICAL AND REGULATORY OVERVIEW
DEVELOPING AN EV CHARGING STATION: A TECHNICAL AND REGULATORY OVERVIEWDEVELOPING AN EV CHARGING STATION: A TECHNICAL AND REGULATORY OVERVIEW
DEVELOPING AN EV CHARGING STATION: A TECHNICAL AND REGULATORY OVERVIEW
 
Module 3 electric propulsion electric vehicle technology ppt
Module 3 electric propulsion   electric vehicle technology pptModule 3 electric propulsion   electric vehicle technology ppt
Module 3 electric propulsion electric vehicle technology ppt
 
Electric vehicles (1)
Electric vehicles (1)Electric vehicles (1)
Electric vehicles (1)
 
Seminar Report on Smart charging strategy for an electric vehicle fleet to r...
Seminar Report  on Smart charging strategy for an electric vehicle fleet to r...Seminar Report  on Smart charging strategy for an electric vehicle fleet to r...
Seminar Report on Smart charging strategy for an electric vehicle fleet to r...
 
Dynamic charging (on the move) of
Dynamic charging (on the move) ofDynamic charging (on the move) of
Dynamic charging (on the move) of
 
Electric vehicles.pptx
Electric vehicles.pptxElectric vehicles.pptx
Electric vehicles.pptx
 
A review on fast wireless charging methods for Electric Vehicles.
A review on fast wireless charging methods for Electric Vehicles.A review on fast wireless charging methods for Electric Vehicles.
A review on fast wireless charging methods for Electric Vehicles.
 
Battery modelling
Battery modellingBattery modelling
Battery modelling
 
Design & Development of Energy management strategies for the improvement of f...
Design & Development of Energy management strategies for the improvement of f...Design & Development of Energy management strategies for the improvement of f...
Design & Development of Energy management strategies for the improvement of f...
 
Ev solve presentation
Ev solve presentationEv solve presentation
Ev solve presentation
 
Fundamentals of electric and hybrid vehicles
Fundamentals of electric and hybrid vehiclesFundamentals of electric and hybrid vehicles
Fundamentals of electric and hybrid vehicles
 
Electric Vehicles
Electric VehiclesElectric Vehicles
Electric Vehicles
 
Microgrids, Electric Vehicles and Wireless Charging
Microgrids, Electric Vehicles and Wireless ChargingMicrogrids, Electric Vehicles and Wireless Charging
Microgrids, Electric Vehicles and Wireless Charging
 

Similar to Electric vehicles and charging infra Know you Safety First

Now Enough we Require Carbon Free and Silent Road Transportation
Now Enough we Require Carbon Free and Silent Road TransportationNow Enough we Require Carbon Free and Silent Road Transportation
Now Enough we Require Carbon Free and Silent Road TransportationMahesh Chandra Manav
 
Wireless Power Transfer for Electric Cars
Wireless Power Transfer for Electric CarsWireless Power Transfer for Electric Cars
Wireless Power Transfer for Electric CarsIRJET Journal
 
Wireless Power Transfer for Electric Cars
Wireless Power Transfer for Electric CarsWireless Power Transfer for Electric Cars
Wireless Power Transfer for Electric CarsIRJET Journal
 
UCT Electrical Vehicle Infrastructure
UCT Electrical Vehicle InfrastructureUCT Electrical Vehicle Infrastructure
UCT Electrical Vehicle InfrastructureThe IOT Academy
 
Servotech - Electric Vehicle Charging Station (1).pptx
Servotech - Electric Vehicle Charging Station (1).pptxServotech - Electric Vehicle Charging Station (1).pptx
Servotech - Electric Vehicle Charging Station (1).pptxServotech Power Systems LTD
 
Kas jāzina par elektroauto uzlādi?
Kas jāzina par elektroauto uzlādi?Kas jāzina par elektroauto uzlādi?
Kas jāzina par elektroauto uzlādi?Elektrumlv
 
electric vehicle infrastructure
electric vehicle infrastructureelectric vehicle infrastructure
electric vehicle infrastructureRajesh Bishnoi
 
Transformational EV Charging Facilities v1.2.pdf
Transformational EV Charging Facilities v1.2.pdfTransformational EV Charging Facilities v1.2.pdf
Transformational EV Charging Facilities v1.2.pdfRezaEsfandi1
 
Wireless charging of Electric Vehicles (IEEE Paper 2017)
Wireless charging of Electric Vehicles (IEEE Paper 2017)Wireless charging of Electric Vehicles (IEEE Paper 2017)
Wireless charging of Electric Vehicles (IEEE Paper 2017)Georget Eldhose
 
Stark project smart electrical car
Stark project smart electrical carStark project smart electrical car
Stark project smart electrical carConnecting Point
 
A Comprehensive Review of Electric Vehicle Charging Station Topologies
A Comprehensive Review of Electric Vehicle Charging Station TopologiesA Comprehensive Review of Electric Vehicle Charging Station Topologies
A Comprehensive Review of Electric Vehicle Charging Station TopologiesIRJET Journal
 
Welcome all to travel green and carbon free road use electric vehicles on road
Welcome all to travel green and carbon free road use electric vehicles on roadWelcome all to travel green and carbon free road use electric vehicles on road
Welcome all to travel green and carbon free road use electric vehicles on roadMahesh Chandra Manav
 
Types of charging stations.pptx
Types of charging stations.pptxTypes of charging stations.pptx
Types of charging stations.pptxAsvParthasarathi
 
Adaptive Charging Network, Peter Viethaler
Adaptive Charging Network, Peter ViethalerAdaptive Charging Network, Peter Viethaler
Adaptive Charging Network, Peter ViethalerForth
 
DC Fast Charger and Battery Management System for Electric Vehicles
DC Fast Charger and Battery Management System for Electric VehiclesDC Fast Charger and Battery Management System for Electric Vehicles
DC Fast Charger and Battery Management System for Electric VehiclesIJSRED
 
Electric Vehicles.pptx
Electric Vehicles.pptxElectric Vehicles.pptx
Electric Vehicles.pptxPorselvi T
 
Charging in electric vehicles(ev)
Charging  in electric vehicles(ev)Charging  in electric vehicles(ev)
Charging in electric vehicles(ev)UrmilasSrinivasan
 
REVIEW ON: ENERGY STORAGE MANAGEMENT IN MICROGRID BY USING VEHICLE TO GRID TE...
REVIEW ON: ENERGY STORAGE MANAGEMENT IN MICROGRID BY USING VEHICLE TO GRID TE...REVIEW ON: ENERGY STORAGE MANAGEMENT IN MICROGRID BY USING VEHICLE TO GRID TE...
REVIEW ON: ENERGY STORAGE MANAGEMENT IN MICROGRID BY USING VEHICLE TO GRID TE...IRJET Journal
 
Ev charge controller (ccs2) for electric vehicle market
Ev charge controller (ccs2) for electric vehicle marketEv charge controller (ccs2) for electric vehicle market
Ev charge controller (ccs2) for electric vehicle marketKaty Slemon
 

Similar to Electric vehicles and charging infra Know you Safety First (20)

Now Enough we Require Carbon Free and Silent Road Transportation
Now Enough we Require Carbon Free and Silent Road TransportationNow Enough we Require Carbon Free and Silent Road Transportation
Now Enough we Require Carbon Free and Silent Road Transportation
 
Wireless Power Transfer for Electric Cars
Wireless Power Transfer for Electric CarsWireless Power Transfer for Electric Cars
Wireless Power Transfer for Electric Cars
 
Wireless Power Transfer for Electric Cars
Wireless Power Transfer for Electric CarsWireless Power Transfer for Electric Cars
Wireless Power Transfer for Electric Cars
 
UCT Electrical Vehicle Infrastructure
UCT Electrical Vehicle InfrastructureUCT Electrical Vehicle Infrastructure
UCT Electrical Vehicle Infrastructure
 
Servotech - Electric Vehicle Charging Station (1).pptx
Servotech - Electric Vehicle Charging Station (1).pptxServotech - Electric Vehicle Charging Station (1).pptx
Servotech - Electric Vehicle Charging Station (1).pptx
 
Kas jāzina par elektroauto uzlādi?
Kas jāzina par elektroauto uzlādi?Kas jāzina par elektroauto uzlādi?
Kas jāzina par elektroauto uzlādi?
 
electric vehicle infrastructure
electric vehicle infrastructureelectric vehicle infrastructure
electric vehicle infrastructure
 
Transformational EV Charging Facilities v1.2.pdf
Transformational EV Charging Facilities v1.2.pdfTransformational EV Charging Facilities v1.2.pdf
Transformational EV Charging Facilities v1.2.pdf
 
Wireless charging of Electric Vehicles (IEEE Paper 2017)
Wireless charging of Electric Vehicles (IEEE Paper 2017)Wireless charging of Electric Vehicles (IEEE Paper 2017)
Wireless charging of Electric Vehicles (IEEE Paper 2017)
 
Stark project smart electrical car
Stark project smart electrical carStark project smart electrical car
Stark project smart electrical car
 
A Comprehensive Review of Electric Vehicle Charging Station Topologies
A Comprehensive Review of Electric Vehicle Charging Station TopologiesA Comprehensive Review of Electric Vehicle Charging Station Topologies
A Comprehensive Review of Electric Vehicle Charging Station Topologies
 
Welcome all to travel green and carbon free road use electric vehicles on road
Welcome all to travel green and carbon free road use electric vehicles on roadWelcome all to travel green and carbon free road use electric vehicles on road
Welcome all to travel green and carbon free road use electric vehicles on road
 
Types of charging stations.pptx
Types of charging stations.pptxTypes of charging stations.pptx
Types of charging stations.pptx
 
Adaptive Charging Network, Peter Viethaler
Adaptive Charging Network, Peter ViethalerAdaptive Charging Network, Peter Viethaler
Adaptive Charging Network, Peter Viethaler
 
DC Fast Charger and Battery Management System for Electric Vehicles
DC Fast Charger and Battery Management System for Electric VehiclesDC Fast Charger and Battery Management System for Electric Vehicles
DC Fast Charger and Battery Management System for Electric Vehicles
 
Electric Vehicles.pptx
Electric Vehicles.pptxElectric Vehicles.pptx
Electric Vehicles.pptx
 
Electrical trends
Electrical trendsElectrical trends
Electrical trends
 
Charging in electric vehicles(ev)
Charging  in electric vehicles(ev)Charging  in electric vehicles(ev)
Charging in electric vehicles(ev)
 
REVIEW ON: ENERGY STORAGE MANAGEMENT IN MICROGRID BY USING VEHICLE TO GRID TE...
REVIEW ON: ENERGY STORAGE MANAGEMENT IN MICROGRID BY USING VEHICLE TO GRID TE...REVIEW ON: ENERGY STORAGE MANAGEMENT IN MICROGRID BY USING VEHICLE TO GRID TE...
REVIEW ON: ENERGY STORAGE MANAGEMENT IN MICROGRID BY USING VEHICLE TO GRID TE...
 
Ev charge controller (ccs2) for electric vehicle market
Ev charge controller (ccs2) for electric vehicle marketEv charge controller (ccs2) for electric vehicle market
Ev charge controller (ccs2) for electric vehicle market
 

More from Mahesh Chandra Manav

The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...Mahesh Chandra Manav
 
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdfBuilding Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdfMahesh Chandra Manav
 
Indian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periortyIndian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periortyMahesh Chandra Manav
 
National green building code 2021 india kaya kool hey hum by link vue system
National green building code 2021 india  kaya kool hey hum by link vue systemNational green building code 2021 india  kaya kool hey hum by link vue system
National green building code 2021 india kaya kool hey hum by link vue systemMahesh Chandra Manav
 
Lightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety firstLightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety firstMahesh Chandra Manav
 
Electric vehicle charging information. by linkvue system
Electric vehicle charging   information. by linkvue systemElectric vehicle charging   information. by linkvue system
Electric vehicle charging information. by linkvue systemMahesh Chandra Manav
 
Solar power and our application (2)
Solar power and our application (2)Solar power and our application (2)
Solar power and our application (2)Mahesh Chandra Manav
 
Link vue system and solar pv power plant protection
Link vue system and solar pv power plant protectionLink vue system and solar pv power plant protection
Link vue system and solar pv power plant protectionMahesh Chandra Manav
 
Electrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and TerminationElectrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and TerminationMahesh Chandra Manav
 
High speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vueHigh speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vueMahesh Chandra Manav
 
Presentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue systemPresentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue systemMahesh Chandra Manav
 
Building management system from link vue system
Building management system  from link vue systemBuilding management system  from link vue system
Building management system from link vue systemMahesh Chandra Manav
 
Safe you and your team from corona virus 2021 by link vue system
Safe you and your team from corona virus 2021 by link vue  systemSafe you and your team from corona virus 2021 by link vue  system
Safe you and your team from corona virus 2021 by link vue systemMahesh Chandra Manav
 
Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)Mahesh Chandra Manav
 
A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021Mahesh Chandra Manav
 
India great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicleIndia great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicleMahesh Chandra Manav
 
Plug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link VuePlug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link VueMahesh Chandra Manav
 
Platform touch voltage protection membrane system and other railways buildin...
Platform touch voltage protection membrane system  and other railways buildin...Platform touch voltage protection membrane system  and other railways buildin...
Platform touch voltage protection membrane system and other railways buildin...Mahesh Chandra Manav
 
Aaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man WalkingAaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man WalkingMahesh Chandra Manav
 

More from Mahesh Chandra Manav (20)

The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
 
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdfBuilding Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
 
Indian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periortyIndian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periorty
 
National green building code 2021 india kaya kool hey hum by link vue system
National green building code 2021 india  kaya kool hey hum by link vue systemNational green building code 2021 india  kaya kool hey hum by link vue system
National green building code 2021 india kaya kool hey hum by link vue system
 
Lightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety firstLightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety first
 
Electric vehicle charging information. by linkvue system
Electric vehicle charging   information. by linkvue systemElectric vehicle charging   information. by linkvue system
Electric vehicle charging information. by linkvue system
 
Solar power and our application (2)
Solar power and our application (2)Solar power and our application (2)
Solar power and our application (2)
 
Link vue system and solar pv power plant protection
Link vue system and solar pv power plant protectionLink vue system and solar pv power plant protection
Link vue system and solar pv power plant protection
 
Electrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and TerminationElectrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and Termination
 
High speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vueHigh speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vue
 
Presentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue systemPresentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue system
 
Building management system from link vue system
Building management system  from link vue systemBuilding management system  from link vue system
Building management system from link vue system
 
Safe you and your team from corona virus 2021 by link vue system
Safe you and your team from corona virus 2021 by link vue  systemSafe you and your team from corona virus 2021 by link vue  system
Safe you and your team from corona virus 2021 by link vue system
 
Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)
 
War is not a Solution
War is not a SolutionWar is not a Solution
War is not a Solution
 
A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021
 
India great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicleIndia great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicle
 
Plug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link VuePlug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link Vue
 
Platform touch voltage protection membrane system and other railways buildin...
Platform touch voltage protection membrane system  and other railways buildin...Platform touch voltage protection membrane system  and other railways buildin...
Platform touch voltage protection membrane system and other railways buildin...
 
Aaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man WalkingAaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man Walking
 

Recently uploaded

internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 

Recently uploaded (20)

internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 

Electric vehicles and charging infra Know you Safety First

  • 1. Say no to Liquid Fuel/Gas ,Yes to Green
  • 2. Power Generation and Power Distribution
  • 3. EV Vehicle and Charger India Policy • Ministry of Power Declare for EV Infra use of Power No Licence in Require. • Manual Building by LAW 2019 for EV • CEA Declare EV Policy • MNRE Declare EV Policy • Capital and State Release EV Policy • Smart City Releasing Tender for EV Policy • Power Distribution Company Nodal Agency for EV Infra. • 3KM in City EV Infra and Highway 25KM EV Infra • 2KW-200KW EV Charger • EV Infra Grid Supply ,Solar PV Power, High Energy Storage Battery Systems and EV Charger (2KW up to 200KW) • Subsidy for Electric Vehicle and Charger Infra up to 30%
  • 4. EV Vehicle and Charging Standard
  • 5.
  • 6.
  • 7.
  • 8. WE Should Know Our Electric Vehicle and Charging(1)
  • 9. WE Should Know Our Electric Vehicle and Charging(2)
  • 10. WE Should Know Our Electric Vehicle and Charging(3)
  • 11. WE Should Know Our Electric Vehicle and Charging(4)
  • 12. WE Should Know Our Electric Vehicle and Charging(5)
  • 13. WE Should Know Our Electric Vehicle and Charging(6)
  • 14. Electric Vehicle and Charging Time
  • 15. Electrical Vehicle and Battery Vs Charging
  • 16. EV Plug and Charging Standard(IEC)
  • 17. CHAdeMO Protocol• CHAdeMO is a DC charging protocol currently enabling EV charging with power from 6kW to 400kW with 900kW in preparation. It follows 4 principles: • SAFETY • CHAdeMO mandates strictguidelines in designingchargers to guarantee electrical safety in any operatingconditions. • FUTURE-PROOF • CHAdeMO is SmartGrid-ready through its bi-directional chargingcapability.Itis also compatiblewith any local or optional functionsbeyond charging. • EASE OF APPLICATION • The protocol works with CAN communication,onboard communication network for all EVs,makingits integration with the rest of the car easy and reliable. • UNIFORMITY • CHAdeMO connector is identical acrossthe globe and is a stand-aloneplugthatcan be with or without an AC connector. Itsaves costs for EV makers and enables cross-continental EVtravels. • Battery protection • The current is controlled by the vehicleECU. Fastcharger controls the output current accordingto the chargingcurrentrequest from the EV through CAN communication on a real-timebasis. This mechanismallows for differentfastchargingbased on battery performance and usage environment. To do so,CHAdeMO TECHNICAL DETAILS • specifies therequirements for responseperformance, current ripple,voltageripple,and measurement accuracy of the current and voltage. • Protection from electrical shock • The isolation transformer insidethecharger separates the AC system at the input sideand the DC system at the output side,therefore, the output sideis a non- earthed system and the electric shock can be avoided if an earth leakage faultoccurs on one of the DC lines. • A leakagecurrent monitoringdevice is installed atthe DC sideas well as the AC sideand itshuts down input power to the charger as soon as leakagecurrentis detected. The electrical shock protection in the DC-2 zone stipulated under IEC60479-1 was realized by combiningthe leakage current monitoringand immediate automatic disconnection. • Fail-safe of charging control • In some cases,a malfunction may occur duringchargingatthe vehicleand charger monitor level. Two communication lines (CAN signal and Pilotsignal) fromthe vehicleto the charger are in placeto send a signal in casea malfunction isdetected on the vehicleside.This way, chargingwill stop even if one communication lineis broken. • When the vehiclecoupler is dropped,the disconnection of the grounding wire and the pilotwirecauses each Pilotsignal to turn OFF, which puts a haltto the DC output immediately, so that the electrical arcingstops. • Interlock of connector • Given that the control power is supplied to EV contactors via a charger,EV contactors never closeand there is zero voltage unless a vehiclecoupler is connected to the vehicle. • Pre-charge Automatic Safety Check is a test conducted before each chargeto check the circuitinsulation and theshortcircuitbetween the charger and EV contactors. • Duringcharging,the vehiclecoupler is locked to the vehicleinletvia a mechanical latch,and the mechanical latch is locked by a electrical lock.Oncechargingis completed, the electric lock is released after confirmingthe voltage on a vehicleconnector. If the voltage does not drop to a safety level,the lock will notbe released.
  • 18.
  • 19. Electric Vehicles and Charging Infra
  • 20.
  • 21. Electric Vehicle and Charging Infra
  • 22. Know your Electric Vehicle EV make Battery Range km (mi) Wh/km (mi) BMW i3 (2019) 42kWh 345km (115) 165 (260) GM Spark 21kWh 120km (75 ) 175 (280) Fiat 500e 24kWh 135km (85)180 (290) Honda Fit 20kWh 112km (70)180 (290) Nissan Leaf 30kWh 160km (100) 190 (300) Mitsubishi MiEV 16kWh 85km (55) 190 (300) Ford Focus 23kWh 110km (75)200 (320) SmartED 16.5kWh 90km (55) 200 (320) Mercedes B 28kWh (31.5)* 136km (85)205 (330) Tesla S 60 60kWh 275km (170) 220 (350) Tesla S 85 90kWh 360km (225) 240 (380) Tesla 3 75kw 496 (310) 151 (242) Model Battery Charge Times Wh/km (mi) Toyota Prius 4.4kWh Li-ion, 18km (11 miles) all-electric range 3h at 115VAC 15A; 165 (260) PHEV 1.5h at 230VAC 15A 175 (280) Chevy Volt 16kWh, Li-manganese/NMC, liquid cooled, 181kg (400 lb), all electric range 64km (40 miles) 10h at 115VAC, 15A; 180 (290) PHEV 4h at 230VAC, 15A 180 (290) Mitsubishi iMiEV 16kWh; 88 cells, 4-cell modules; Li-ion; 109Wh/kg; 330V, range 128km (80 miles) 13h at 115VAC 15A; 190 (300) Smart 16.5kWh; 18650 Li-ion, driv ing range 136km (85 miles) 8h at 115VAC, 15A; 200 (320) Fortwo ED 3.5h at 230VAC, 15A 200 (320) BMW i3 Since 2019: 42kWh, LMO/NMC, large 60A prismatic cells, battery weighs ~270kg (595 lb) driv ing range: EPA 246 (154 mi); NEDC 345km (215 mi); WLTP 285 (178 mi) 11kW on-board AC charger; ~4h charge; 205 (330) Curb 1,365kg 50kW DC charge; 30 min charge. 220 (350) (3,000 lb) 240 (380) Nissan Leaf* 30kWh; Li-manganese, 192 cells; air cooled; 272kg (600 lb), driv ing range up to 250km (156 miles) 8h at 230VAC, 15A; 151 (242) 4h at 230VAC, 30A Tesla S* 70kWh and 90kWh, 18650 NCA cells of 3.4Ah; liquid cooled; 90kWh pack has 7,616 cells; battery weighs 540kg (1,200 lb); S 85 has up to 424km range (265 mi) 9h with 10kW charger; 120kW Supercharger, 80% charge in 30 minCurb 2,100kg (4,630 lb) Tesla 3 Since 2018, 75kWh battery , driv ing range 496km (310 mi); 346hp engine, energy consumption 15kWh /100km (24kWh/mi) 11.5kW on-board AC charger; DC charge 30 minCurb 1,872 kg (4072 lb) Chevy Bolt 60kWh; 288 cells in 96s3p f ormat, EPA driv ing rate 383km (238 miles); liquid cooled; 200hp electric motor (150kW) 40h at 115VAC, 15A; Curb 1,616kg; battery 440kg 10h at 230VAC, 30A 1h with 50kWh
  • 23. Electric Car and Battery • THE VITAL ROLE OF BATTERY DATA • To recap: There is no doubt that EV batteries are the future. However, batteries need proper management to operate safely and efficiently. • Today, that's handled via the Battery Management System (BMS), acting as the "brain" of the battery". Due to the importance, we've detailed the BMS below - but feel free to skip it if you're already familiar with this.
  • 24. EV Charging and Process
  • 25. EV Charging Connectors and Charging Time
  • 26. EV Charing ,Connectors & Communication
  • 27. EV Car and Charging Connectors
  • 28. EV Connectors Pin Configuration • EV Charging modes • Mode 1 This mode entails slow AC charging via a regular electrical socket. This is no communication between the vehicle and the charging point. It is required to provide an earth wire to the EV and have an external means of protection against faults. In many countries, this form of charging is considered to be unsafe and is illegal. • Mode 2 This mode provides for slow AC charging from a regular electricity socket. In addition, the charging cable is equipped with an In-Cable Control and Protection Device (IC-CPD), that is responsible for control, communication and protection (including residual current protection). • Mode 3 This mode entails both slow or semi-fast charging via a dedicated electrical socket for EV charging. The charger (or the charging station) has an EV specific socket, generally corresponding to Type 1 or Type 2. A charging cable with an EV plug on both sides is used to connect the EV to the charger. The charging station is responsible for the control, communication and protection of the charging process (including residual current protection). This mode is commonly used for public charging stations and can facilitate integration with smart grids. • Mode 4 Mode 4 uses a dedicated electrical socket for EV charging like Mode 3. The charger typically has a charging cable with an EV charging plug. Mode 4 is specifically used forDC charging, which is recommended for fast charging of an electric vehicle. In the case of DC charging, the AC/DC converter is located within the charging station. The control, communication and protection functions are built into the charging station.
  • 29. EV and Charging Policy
  • 30. EV Charging and Grid Balance
  • 31. EV Charging and Grid Balance
  • 32. Power Infra and EV Charging
  • 33.
  • 34.
  • 35. Surge Protection for all Equipments
  • 36. Cable Duct and Artificial Earthing for EV
  • 37. JMV EV Charging Product Range for All EV
  • 38. JMV New Product for Solar PV Power Plant
  • 41. Thanks and Send inquiry • Mahesh Chandra Manav • Vice President • JMV LPS LTD • W 50 Sec 11 Noida 201301 U.P. • 911204590000 • 919910398999 • manav@jmv.co.in • www.jmv.co.in • Design ,Manufacturing, Supply and Installationas per Indian NBC2016 ,IEC 62305,IEEE80,NFC17012
  • 42. Amendments in Model Building Bye-Laws (MBBL - 2016) for Electric Vehicle Charging Infrastructure Town and Country Planning Organization Ministry of Housing and Urban Affairs Government of India February, 2019
  • 43. Preamble To address the quantum of emissions from the "Transport" sector powered by fossil fuels, "electric vehicle" is considered a viable option for short distance / inter-city trips with adequate "charging stations" available. It is necessary to make provisions for establishing Public Charging Stations (PCS) in the local areas including urban CBDs for vehicle re-fuelling/ recharging. Hence, amendments are required for addition of norms for charging Infrastructure provisions in Development Control Regulations and enabling provisions for installing "Charging Infrastructure" in the building premises and core urban areas of the cities. Based on available charging technologies and their evolution, type of vehicles, the types of chargers, indicating number of charging points required for setting up adequate PCS within the local urban areas including the building premises of all building types and with the long term vision of implementing 'electric mobility' during the next 30 years, amendments are made in the relevant sections (Chapter 10) of the Model Building Bye-laws, 2016.
  • 44. Amendments to Model Building Bye-Laws, 2016 In Chapter 10: Sustainability and Green Provisions After section 10.3 "Various Guidelines for Green Rating Systems". Provision of "Electric Vehicle Charging Infrastructure" to be added at clause 10.4 10.4 Electric Vehicle Charging Infrastructure (EVCI): Based on the occupancy pattern and the total parking provisions in the premises of the various building types, charging infrastructures shall be provided only for EVs, which is currently assumed to be 20% of all 'vehicle holding capacity'/'parking capacity' at the premise. Additionally, the building premise will have to have an additional power load, equivalent to the power required for all charging points (in a PCS) to be operated simultaneously, with a safety factor of 1.25 (refer Explanatory Note- Annexure Ill). 10.4.1 Residential Buildings (plotted house) Table 1: Charging Infrastructure requirements for individual house/ self-use Min. 1 SC and additional rovisions as er the owner individual. Note: • The charging infrastructure installed by a home owner shall be construed as a Private Cl meant for self-use (non-commercial basis) as per the note at clause no 4 of the explanatory note at Annexure Ill. 10.4.2 All other buildings (including Group Housing) Any PCS installed at Public/Private areas or building premises of any category that caters to commercial mode of charging of EVs shall be deemed as a Public Charging Station and shall have to install the minimum requirements of chargers as specified in the Guidelines dated 14.12.2018 of Ministry of Power (refer Annexure IV for MoP Guidelines. However, in order to provide sufficient charging points for the EV share in all vehicles (refer clause 3 of the Explanatory Note- Annexure Ill), ratio of types of chargers is recommended in the table below - Table 2: Charging Infrastructure requirements for PCS (commercial use) PCS service providers shall install additional number of kiosk/chargers beyond the minimum specified requirements to meet the ratio of charging points as rescribed below b the t e of vehicles . Norms of Provisions for charging points Ws 3Ws 2Ws PV (Buses) 1 SC - each 3 EVs 1 SC - each 2 EVs 1 SC - each 2 EVs 1 FC - each 10 EVs 1 FC - each 1 OEVs Note: • Charging bays shall be planned currently at 20% capacity of all vehicles including 2Ws and PVs(cars) • Open metering and on-spot payment options to be available for all users. • Provision of FCB CS and BS shall not be mandatory, and will be at the discretion of the service provider. ---------------- X X X -----------------
  • 45. Abbreviations used: 2Ws 3Ws 4Ws PVs EV SC FC PCS MBBL FCB CS BS Two wheelers Three wheelers Four wheelers/ PV(cars) Passenger Vehicles Electric Vehicle Slow Charger/ Slow Charging (AC) Fast Charger I Fast Charging (DC and a few AC ones) Public Charging Stations Model Building Bye-Laws, 2016 Fluid Cooled Battery Charging Station Battery Swap
  • 46. Annexure Ill (MBBL 2016) Explanatory Note on Electric Vehicle Charging Infrastructure (For MBBL, 2016) Town and Country Planning Organization Ministry of Housing and Urban Affairs Government of India February, 2019
  • 47. Abbreviations: UNFCC IPCC GHG 2Ws 3Ws 4Ws PVs CVs EV EVSE SC FC BS PCS PCI Private Cl MBBL URDPFI NSP SP United Nations Framework Convention on Climate Change Intergovernmental Panel on Climate Change Green House Gases Two wheelers Three wheelers Four wheelers/ PV(cars) Passenger Vehicles Commercial Vehicles Electric Vehicle Electric Vehicle Supply Equipment Slow Charger I Slow Charging (AC) Fast Charger/ Fast Charging (DC and a few AC ones) Battery Swap Public Charging Stations Public Charging Infrastructure Private Charging Infrastructure Model Building Bye-Laws, 2016 Urban and Regional Development Plan Formulation and Implementation Guidelines, 2014 Network Service Provider (information network) Service Provider -2-
  • 48. Contents 1. Rationale for EVCI establishment--------------------------------------------4 2. EV Ch a rgi ng Tech no Iogy--------------------------------------------------------5 3. 0 ptions for EV Cha rgi ng---------------------------------------------------------6 4. Charger Specifications and PCS lnfrastructure------------------------------7 5. Location of PCS/FCB CS in local area/Building Precincts------------------7 -3-
  • 49. 1. Rationale for EVCI establishment Rapid urbanization coupled with adoption of mechanized transportation modes has resulted in high emissions of Green House Gases that goes on to impact Global warming. Unless, the global surface temperature rise is restricted to no more than 2°C compared with pre-industrial levels, the IPCC has warned that the world will see irreversible catastrophic climate change. India being a signatory to the UNFCCC, has pledged for efforts to assess the Greenhouse Gas Emissions (GHG) of anthropogenic origin and removal by sinks. India's per capita emissions are still considered low at 1.9 tonnes (2013), but its total emissions are next only to China and the US and is likely to overtake those of the EU by 2019. While comparing the Indian cities for their emission scores, Delhi is on top as the biggest emitter at over 38 38 million tonnes of carbon dioxide equivalent overall emissions, followed by Greater Mumbai at 22.7 million tonnes and Chennai at 22.1 million tonnes, Kolkata at 14.8million tonnes, Bangalore at 19.8million tonnes, Hyderabad at 13.7 million tonnes and Ahmedabad at 9million tonnes were the other cities whose emissions for the year were calculated sector wise. As per the statistics of Transport Department (GNCTD), total number of vehicles in Delhi is more than the combined total vehicles in Mumbai, Chennai and Kolkata. Delhi has 85 private cars per 1000 population against the national average of 8 cars per 1000 population. In terms of CO2 emissions due to motor vehicles, Delhi emits about 12.4 million tonnes while the city of Bengaluru emits about 8.6 million tonnes.!" Therefore, addressing the quantum of emissions from the "Transport" and "Domestic" sector emerges to be the high priority subjects under the overarching umbrella of "Climate change mitigation" as committed to the UNFCC. Encouraging "Electric Vehicles" as a viable option for phased transportation in terms of short and long distance trips with appropriate "Charging Infrastructure" is therefore, the pre-condition for this paradigm shift/ phased migration to sustainable transportation. For this changes are required in Infrastructure provisions (at Regional and City levels) and in Development Control Regulations (in terms of provisions therein) to include the formulations of norms and standards for "Charging Infrastructure" in the said Mater Plan Regulations and State Bye-Laws for adoption across the country suiting local conditions. -4-
  • 50. 2. EV Charging Technology 2.1 Electric Vehicle Supply Equipment (EVSE): An EVSE is a wall mounted box that supplies electric energy for recharging of electric vehicle batteries. Also EVSEs have a safety lock-out feature that does not allow current to flow from the device until the plug is physically inserted into the car. EVSEs can be customized with added features like: • Authentication • Integrated payment gateways • Software for remote monitoring. As electric vehicle charging technology continues to advance, several standards and guidelines have become widely accepted across the industry. This section gives a brief overview of charging infrastructure technology, standards, and terminology. 2.2 Different types of EVSE: Charging speeds- Charging power, which determines the time required to charge a vehicle, can vary by orders of magnitude across charge points, as shown in Table 1. A small household outlet may charge as slowly as 1.2 kW, while the most advanced rapid charging stations can charge at up to 350 kW. Charging infrastructure is broadly broken into three categories based on speed: Level 1, Level 2, and direct current (DC) fast charging (sometimes referred to as Level 3). (Source: "Emerging Best Practices for Electric Vehicle Charging Infrastructure", Oct' 2017) Private Charging Charging batteries of privately owned cars through domestic charging points. Billing is mostly part of home/domestic metering. AC "Slow" Charging: The home private chargers are generally used with 230V/15A single phase plug which can deliver a maximum of up to about 2.5KW of power. The EVSE supplies AC current to the vehicle's onboard charger which in turn converts the AC power to DC allowing the battery to be charged. Public Charging For charging outside the home premises, electric power needs to be billed and payment needs to be collected. The power drawn by these chargers may need to be managed from time to time. DC "Fast" Charging: DC current is sent to the electric car's battery directly via the charge port. FC chargers (usually 50 KW or more) can supply 100 or more kilometers of range per hour of charging. The fast chargers would generally be used as a top-up, rather than fully charging vehicles. These are important for cab companies and corporate users who have a fleet of electric cars. -5-
  • 51. 3. Options for EV Charging There is an urgent need to offer flexible charging infrastructure for different vehicle segments to drive adoption of EVs. Charging infrastructure is the most crucial enabler in the entire EV value chain. The exploration of different charging models according to the local conditions shall enable faster deployment of electric vehicles in the country. EV share in all vehicles - It has been broadly projected that by the current rate of adoption of EVs, about 15% of all vehicles in the country would be EVs by the year 2020. Therefore, while assuming percentage composition of all proposed capacities in Public facilities of vehicle holding capacity, the Metropolitan and 'Tier I' cities will be assumed to have a higher percentage share of EVs, say 20% for now. The charging infrastructure prescriptions in all urban development guidelines shall, therefore, be in consonance with the said percentage. Power Load sanction to premises - While adding these Charging Infrastructures to the proposed set of building types of the Indian cities, enhanced Power Load shall have to be had for each such building type by the Power DISCOMs, commensurate to the total additional power requirement of simultaneous operation of all the prescribed charging points in the premise. With further advancement of charging technologies and the enhanced capacity of chargers to draw more power, it is advised that the load capacity assigned to each premise should be kept with a safety factor of 1. 25 with a long-term vision of 30 years. Table 1: EVs charging "modes" and 'availability' !Vehicle type Slow Charging Fast Charging Public Cl 2 Wheelers y N Yes/Limited 3 Wheelers y N Yes/Limited PVs (Cars) y y Yes PVs (Buses) N y Yes Table 2: Charging options for EV types (by ownership) !Vehicle type Private Cl Public CS Predominant place of charging 2 Wheelers SC/BS SC Point of residence / Work 3 Wheelers SC/BS SC/BS Residence / Parking stations PVs (Cars) SC/BS FC Residence/ Point of work/ other public places PVs (Buses) - FC/BS Bus Terminals/Depots Note: • The option of Battery Swapping (BS) forprivately owned 2Ws and PV(Cars) is limited to Private Cl. • For 3 Ws the BS is proposed to be made available in PCS, for faster recharge experience only • For PV (Buses), Captive Fast charging infrastructure for 100% internal use for fleets may be adopted by privately owned Depots/Garages. Based on the above stated EV charging technologies available and the current trend of evolving technologies of faster charging experience, the Ministry of Power has issued Guidelines and Standards for setting up Charging Infrastructure for Electric Vehicles [Ministry of Power (MoP) Guidelines dated 14.12.2018] for charging infrastructure to be installed at every Public Charging Station (PCS). 'Connectivity regulations and Safety norms' shall be defined by respective authorities such as Central Electric Authority/MoP for grid access to such PCS / any other charging station/infrastructure. -6-
  • 52. 4. Charger Specifications and PCS Infrastructure Any installed PCS shall have one or more electric kiosk/boards with installation of all charger models as prescribed in the Guidelines and Standards notified by Ministry of Power, dated 14 December 2018 for "Charging Infrastructure for EVs" (at Annexure II), with other necessary arrangements as deemed necessary. Public Charging Station service providers shall be free to create charging hubs and to install additional number of kiosk/chargers in addition to the minimum chargers prescribed vide the MoP Guidelines, including options for installation of additional chargers, if required. Note: 1. Minimum infrastructure requirements do not apply to Private Charging Points meant for self-use of individual EV owners (non-commercial basis). 2. Captive charging infrastructure for 100% internal use for a company's own fleet will not be required to install all type of chargers and to have NSP tie ups. 5. Location of PCS/ FCB CS in local area/ building precincts In accordance with the Guidelines issued by the Ministry of Power (MoP), following minimum standards with regard to density of I distance between PCS in local level facilities in building premise/ urban precincts shall be followed as per provisions in the Model BBL-2016 1. At the Local levels (within the urban area): • At least 1 Public Charging Station is to be available within a grid of 3Km x 3Km. 2. At the Building premise levels (for various building types) • Private charging infrastructure (non-commercial use) for individuals. • For all commercial modes of charging EVs, at least 1 PCS, as per minimum specifications laid under MoP guidelines. • Standalone Battery Swapping Stations may be added with the PCs. -7-
  • 53. A-n"r)ocWU.-Til. CJ-·f; f6 i, 5-o "') To, No.12/2/2018-EV Government of India Ministry of Power Shram Shakti Bhawan, Rafi Marg, New Delhi, the 14th December, 2018 1. The Secretaries of all the Ministries/Departments of Government of India. 2. The Chief Secretaries of the States/U'Is, Sub: Charging Infrastructure for Electric Vehicles - Guidelines and Standards -reg. Sir/Madam, Government of India have undertaken multiple initiatives to promote manufacturing and adoption of electric vehicles in India. With support of the Government, electric vehicles have started penetrating in the Indian market. However, availability of adequate Charging Infrastructure is one of the key requirements for accelerated adoption of electric vehicles in India. It is proposed to encourage this by laying down an enabling framework. Obiectives • To enable faster adoption of electric vehicles in India by ensuring safe, reliable, accessible and affordable Charging Infrastructure and eco-systern • To promote affordable tariff chargeable from EV owners and Charging Station Operators/Owners • To generate employment/income opportunities for small entrepreneurs • To proactively support creation of EV Charging Infrastructure in the initial phase and eventually create market for EV Charging business • To encourage preparedness of Electrical Distribution System to adopt EV Charging Infrastructure. In light olthe above, it has been decided as follows: l. Private charging at residences/ offices shall be permitted. DISCOMs may facilitate the same. 2. Setting up of Public Charging Stations (PCS) shall be a de-licensed activity and any individual/entity is free to set up public charging stations, provided that, such stations meet the technical as well as performance standards and protocols laid down below as well as any further norms/standards/specifications laid down by Ministry of Power and Central Electricity Authority from time to time. 1
  • 54. 2.1 Any person seeking to set up a Public Charging Station may apply for connectivity and he shall be provided connectivity on priority by the Distribution Company licensee to supply power in the area. Any Charging Station/ Chain of Charging Stations may also obtain electricity from any generation company through open access. 3. J. l Public Charging Infrastructure (PCl)· Minimum Requirements: Every Public Charging Station (PCS) shall have the following minimum infrastructure: I. An exclusive transformer with all related ubstation equipment including safety appliance. 33/l l KV line/cables with associated equipment including as needed for line termination/metering etc. Appropriate civil works. Adequate space for Charging and entry/exit of vehicles. Current international standards that arc prevalent and used by most vehicle manufacturers internationally are CCS and CHadeMO. Hence, Public Charging Stations shall have, one or more electric kiosk/boards with installation of all the charger models as follows: 11. 111. JV. v. I No. of Charging Charger Type Charger Connectors* Rated Points/No. of I Voltage (V) Connector guns !---·--···-- (CG) __..._...__ CCS (min 50 kW) 200-1000 1/1 CG ______.._____ Fast CHAdeMO (min 50 kW) 200-1000 111 CG Type-2 AC (min 22 kW) 380-480 1/1 CG Bharat DC-00 I ( 15 kW) 72-200 1/1 CG --·-·-·-··--····· Slow/Moderate 3/3 CG of Bharat AC-001 (JO kW) _30 3.3 kW each ··---~-- .. "In addition, any other fast/slow/moderate charger as per approved BIS standards whenever notified. ' ..VI. The kiosk/board may have options for installation or additional chargers if required. The Public Charging Station Providers are free to create Charging Hubs and to install additional number of Kiosk/Chargers in addition to the minimum number of chargers prescribed above. Tie up with at least one online Network Service Providers (NSPs) to enable advance remote/online booking of charging slots by EV owners. Such o.nline information Lo EV owners should also include information regarding location. types and numbers of chargers installed/availableetc. Share charging station data with appropriate DISCOM and to maintain appropriate protocols as prescribed by such DISCOM for this purpose. CEA shall have access to this database. ~...... -~ Appropriate public amenities. -, 2 Vil. viii. IX. x.
  • 55. xi. Where, in addition to the above, fast charging facility is also planned to be provided at the PCS by the PCI provider, the following additional infrastructure must be provided: a. Appropriate Liquid Cooled cables if High Speed Charging Facility for onboard charging of Fluid Cooled Batteries (FCBs) is also planned. b. Appropriate Climate Control Equipment for Fast Charging of Batteries to be used for swapping (i.c. not onboard) 3.2 Every Public Charging Station (PCS) shall be operational only after inspection and clearance as communicated bv a suitable clearance certificate, bv the concerned, ' electrical inspectors/technical personnel designated specifically by the respective DISCOM for this purpose. DJSCOMs may also empanel one or more third party authorized technical agencies for this purpose. 3.3 Electric Vehicle Service Equipment (EVSE) shall be type tested by an appropriate reputed authority. 3.4 The above minimum infrastructure requirements do not apply to Private Charging Points meant for self-use of individual EV owners (non-commercial basis). 3.5 Captive charging infrastructure for 100% internal use for a company's own/leased fleet for its own use will not be required to install all type of chargers and to have NSP tie ups. 3.6 Public Charging Station can al o have the option to add Standalone battery swapping facilities in addition to the above mandatory facilities. provided space/other conditions permit. 4. Public charging Infrastructure (PCI) fo.r long distance EVs and/or heavy duty EVs: 4.1 Public charging stations for long distance EVs and/or heavy duty EVs (like trucks, busses etc.) shall have the following minimum requirements: 1. At least two chargers of minimum 100 kW (with 200-1000 V) each of different specification (CCS & Chaderno) and with single connector gun each in addition to the minimum charging infrastructure requirements as mandated for Public Charging Stations in para 3. ii. Appropriate Liquid Cooled Cables for high speed charging facility for onboard charging of Fluid Cooled Batteries (currently available in some long range EVs). iii. In addition to 4.1 (i) and (ii) above, the Fast Charging Stations (FCS) for Long Distance EVs and/or Heavy Duty EVs may also have the option of swapping facilities tor batteries for meeting the charging requirements as per para 3 and para 4.1 (i)&(ii) above. .It is notable that Fluid Cooled Batteries (FCBs) are generally necessary for Fast Charging I Long Distance use of EVs and/or for Heavy Duty Vehicles like buses/trucks etc. FCBs will have higher charging rate and longer life. 4.2 Such Fast Charging Stations (FCS)which are meant only for 100% in house/captive utilisation, for example buses of a company, would be free to decide the charging specifications as per requirement for its in- house company EVs. 3
  • 56. 5. Location of Public Charging Stations: 5.1 ln case of Public Charging Stations, the following minimum requirements are laid down with regard to density/distance between two charging points: 1. At least one Charging Station should be available in a grid of 3 Km X 3 Km. Further, one Charging Station be set up at every 25 Km on both sides of highways/roads, 11. For long range EVs {like long range SUVs) and heavy duty EVs like buses/trucks etc., there should be at least one Fast Charging Station with Charging Infrastructure Specifications as per para4. J at every 100 Kms, one on each side of the highways/road located preferably within/alongside the stations laid in para3 above. Within cities, such charging facilities for heavy duty EVs shall be located within Transport Nagars, bus depots. Moreover, swapping facilities are also not mandatory within cities for Buses/trucks. 5.2 Additional public charging stations shall be set up in any area only after meeting the above requirements. 5.3 The above density/distance requirements shall be used by the concerned state/UT Governments/their Agencies for the twin purposes of arrangement of land in any manner for public charging stations as well a. for priority in installation of distribution network including transformers/feeders etc. This shall be done in all cases including where no central/state subsidy is provided. 5.4 The appropriate Governments (Central/Srate/UTs) may also give priority to existing retail outlets (ROs) of Oil Marketing Companies (OMCs) for installation of Public EV Charging Stations (in compliance with safety norms including 'firewalls' etc.) to meet the requirements as laid above. Further, within such ROs, Company Owned and Company Operated (COCO) ROs may be given higher preference. 5.5 Any deviation from above norms shall be admissible only after specific approval of State Nodal Agency in consultation with the Central Nodal Agency. 6. Database of Public EV Charging Stations: Central Electricity Authority (CEA) shall create and maintain a national online database of all the Public Charging Stations through DISCOMs. Appropriate protocols shall be notified by DISCOMs for this purpose which shall be mandatorily complied by the PCS/BCS. This database shall have restricted access as finalised between CEA and Ministry of Power. 7. Tariff for supply of electricity to EV Public Charging Stations: 7. l The tariff for supply of electricity to EV Public Charging Station shall be determined by the appropriate commission, provided however that the tariff shall not be more than the average cost of supply plus 15 (fifteen) percent. 7.2 The tariff applicable for domestic consumption shall be applicable for domestic charging. 8. Service charges at PCS/BCS: 8.1 Charging of EVs is a service as already clarified by Ministry of Power vide letter No. 23i08/2018-R&Rdated 13.04.2018. ~( ~'- ~lo~ 4
  • 57. 8.2 The State Nodal Agency shall fix the ceiling of the Service Charges to be charged by the Public Charging Stations. 9. Priority for Rollout of EV Public Charging Infrastructure: After extensive consultations with State Governments and different Department/Agencies of Central Government, phasing as follows arc laid down as national priority for rollout ofEV Public Charging Infrastructure: 9.1 Phase l (1-3 Years): All Mega Cities with population of 4 million plus as per census 2011, all existing expressways connected to these Mega Cities & important Highways connected with each of these Mega Cities shall be taken up for coverage. A I ist of these Mega Cities and existing connected expressways is attached at Annexure 1. 9.2 Phase Il (3-5 Years): Big cities like State Capitals, Ur headquarters shall be covered for distributed and demonstrative effect Further, important Highways connected with each of these Mega Cities shall be taken up for coverage. 9.3 The above priorities for phasing of rollout shall be kept in mind by all concerned, including, different agencies of Central/State Governments while framing of further policies/guidelines for Public Charging Infrastructure ofEvs, including for declaring further incentives/subsidies for such infrastructure and for such other purposes. lO. Implementation Mechanism for Rollout: 1 O. l Ministry of Power shall designate a Central Nodal Agency for the rollout, AH relevant agencies including Central electricity Authority (CEA) shall provide necessary support to this nodal agency. 10.2 Every State Government shall nominate a Nodal Agency for that State for setting up charging infrastructure. The State DISCOM shall generally be the Nodal Agency for such purposes. However, State Government shall be free to select a Central/State Public Sector Undertaking (PSU) including Urban Local Bodies (ULBs), Urban/Area Development Authorities etc. as its Nodal Agency. 1 L Selection of Implementation Agency for Rollout: l 1.1 The Central Nodal Agency shall finalize the cities and expressways/highways to be finally taken up from the above phasing, in consultation with the respective State Governments. l I .2 An Implementation Agency shall be selected by the respective State Nodal Agency and shall be entrusted with responsibility of installation, operation and maintenance of PCS/FCS/BCS/BSF for designated period as per parameters laid down in this document and as entrusted by the concerned Nodal Agency. The Implementation Agency can be an Aggregator as mutually decided between Central and State Nodal Agencies. However, they can also decide to choose different PCS/FCS providers for bundled packages or for individual locations as mutually decided. Further, whenever bundled packages are carved for bidding, such packages shall necessarily include atleast one identified expressway/highway or part ~icare:
  • 58. cohesive regional package; the selected identified cities may be divided into one or more parts as necessary for such purposes. 11.3 Where Implementing Agency is selected by bidding. all bidding shall be conducted by the State Nodal Agency. 11.4 There shall be an upper cap on the Service Charges declared by the State Nodal Agency as per para 8.2 above. Subsidy, if admissible from Central/State governments, shall be suitably factored in such calculations of Upper Cap/Bid Variable. This issues with the approval of Hon'ble Minister of State {IC) for Power and New & Renewable Energy. (Anoop ingh Hislit) Under Secretary to the Govt. of India Tel:23766236 EmaiJ:anoopsingh.bisht@nic.in Copy to: · l. Prime Ministers Office/Cabinet Secretariat. 2. CEO, NITI Aayog 3. The Secretaries of the CERC/State Commissions/JERCs. (Anoop i:b-~lUnder Secretary to the Govt. of India Tel:23766236 Email:anoopsingh.bisht@nic.in 6
  • 59. Copy for information to: 1. PS to MoS (IC) for Power and NRE 2. PPS to Secretary (Power) 3. PPS to Addl Secretary (SNS) 4. PPS to Joint Secretary (Thermal), MoP 5. PPS to Director (U:MPP }, MoP (A:4~Under Secretary to the Govt. of India Tel:23766236 .EmaiJ:anoopsingh.bisht(a),uic.in 7
  • 60. I. List of 4 million plus cities (as per census 201 I} l 1 Mumbai ·--- 2 Delhi '"··--·..----3 Bangalore ... 4 Hyderabad ----, I5 Ahmedabad ·-·6 Chennai ......... 7 Kolkata 8 Surat - - ·--····· 9 Punc i II. List of corridors [T I Mumbai-Pune Exprcss·;,;;:-- ~-ihmedabad-Vadodara Expre;,._v_ay_· --l 3 Delhi-Agra Yamuna Expressway 4 Delhi-Jaipur 5 Bengaluru-Mysore Beugaluru-Chennai 7 Surat-Mumbai Expressway -·-· ... 8 Agra - Lucknow Expressway -- 9 Eastern Peripheral Expressway 10 Delhi-Agra NH2 Expressway I It Hyderabad ORR expressway I 12 5 connected highways to each megacity Annexure 1 8
  • 61. Amendments in Urban and Regional Development Plans Formulation and Implementation Guidelines (URDPFI - 2014) for Electric Vehicle Charging Infrastructure Town and Country Planning Organisation Ministry of Housing and Urban Affairs Government of India February, 2019
  • 62. Preamble To encourage "Electric Vehicles" as a viable option for long distance trips/ inter regional trips with adequate "charging stations", it is necessary to make provisions for establishing Public Charging Stations (PCS) in the regional facilities for re- fuelling/recharging of vehicles. Hence, amendments are required for addition of norms for charging Infrastructure provisions in Development Control Regulations and provide "Charging Infrastructure" in the City Mater Plans / Regional Plans. Based on available charging technologies and their evolution, type of vehicles, the types of chargers indicating number of charging points required for setting up adequate PCS as regional facilities and with the long term vision of implementing 'electric mobility' during the next 30 years, amendments are made Under Chapter 8: Infrastructure Planning, at section 8.4.7 "Distribution Services", Table 8.57 - "Norms for Distribution Services" of URDPFI Guidelines, 2014 (Volume I) as detailed in clause 3 of this document.
  • 63. 2. Existing provision in Urban and Regional Development Plans Formulation and Implementation Guidelines (URDPFI, 2014) Chapter 8: Infrastructure Planning (Volume I of URDPFI Guidelines 2014) At section 8.4.7 "Distribution Services", Table 8.57 - "Norms for Distribution Services" Sr. Population Land Area Requirement No. Category served per Other Control unit Type of facility Area re uirement 1. Petrol/Diesel filling and Service Centre Permitted in: i. Only filling station 30m x 17m • Shall not be located on road having Right Central District of Way less than ii. Filling cum service 36m x 30m 30m. Sub central district station • Special cases in old District centres 45 X 36m city areas may be iii. Filling cum service considered based on Community Centres (Only station cum workshop the approval by Filling Station) statutory authorities. 18m x 15m Residential & industrial iv. Filling station only for • Shall be approved by Use Zone in Urban Areas two and three wheelers the explosive/ fire Along National and State department. Highways Villages identified as growth centres Freight Complex Proposed major roads Police/security forces services (for captive use only) (MPD, pg 125) 2. Compressed Natural Gas (CNG)/filling centre Permitted in: CNG mother station 1080 sqm • Shall not be located (Including building on road having Right All use zones (except in (36m x 30m) of Way less than Regional Parks and component - control 30m. Developed District Parks) room/office/dispensing room/store, pantry and W.C.) • Shall be approved by Along National and State the explosive/fire Highways department. Villages identified as growth centres Freight Complex Proposed major roads 3. LPG 40,000 to Capacity = 500 cylinders or 520 sqm . The major concern for Godown/GasGodown 50,000 8000 kg of LPG (26m x 20m) its storage and distribution is the Area (inclusive of guard location, which shall room) be away from the residential areas and shall have open spaces all around as per the Explosive Rules. 4. Milk Distribution 5000 Areas inclusive of service 150sqm area
  • 64. 3. Amendments to URDPFI Guidelines 2014:- Necessary provisions for EV Charging have been incorporated at Sr. No. 1 and Sr. No. 3 of table 8.57. The revised table will be as under: Table 8.57 - "Norms for Distribution Services": Sr. No. Category Population Land Area requirement Other controls served per unit Type of Facility Area required 1. Petrol/Diesel fillinq/EV charging* and service centre Permitted in: i. Only filling station 30mx17m Shall not be located on road Central District having Right of Sub central ii. Filling cum service 36m x 30m Way less than district station 30m. District centres iii. Filling cum service 45 X 36m Special cases in station cum workshop old city areas may Community be considered Centres (Only based on the Filling Station) iv. Filling station only 18m x 15m approval by for two and three statutory Residential & wheelers authorities. industrial Use Zone in Urban Shall be approved !Areas v. Public Charging Min.13.5m x by the explosive/ fire department. !Along National Station (PCS) 5.5m and State (minimum Charging station Highways requirement as per and all equipment MoP guidelines) layout with !Villages identified respect to nearest as growth centres dispensing unit Freight Complex vi. FCB CS Min.15m x 7m (DU)/fuel tank to 1 ccs be as per PESO 1 CHAdeMO rules. Proposed major roads Equipped with Police/security CCE and LCC, as "'orces services vii. Battery Swapping Earmarking area required in (for captive use Station (optional) for "battery addition to only) (MPD, pg fitting" requirements of 125) PCS. Optional addition to PCS by the SP 2 Compressed Natural Gas (CNG)lfillinq centre Permitted in: CNG mother station 1080 sqm Shall not be (Including building located on road !All use zones component - control (36m x 30m) having Right of (except in Regional room/office/dispensing Way less than Parks and room/store, pantry and 30m. Developed District WC.) Parks) Shall be approved !Along National and by the explosive/ State Highways fire department Villages identified as growth centres Freight Complex Proposed major roads
  • 65. Sr. No. Category Population Land Area requirement Other controls served per unit Type of Facility Area required 3. Standalone Public Charging Stations (PCS) A Public Charging Every 25 Kms, both PCS with charger ratio Additional area Equipped with Stations sides along the (minimum as per total CCE and LCC, as highways/roads requirements of PCS, parking capacity may be required as per MoP) - at the for fast charging. 1 FC for every 10 EVs Restaurants 1 SC for every 3 EVs /Eateries. B Fast Charging Every 100 Kms, both At least 2 chargers Min.15m x 7m May be coupled facility / FCB CS sides along the 1 CCC type with the PCS at (for Long highways/roads 1 CHAdeMO type item A above, Distance & Heavy (min 100KW each) with CCE and DutyEVs) LCC. C Battery Swapping Optional provisions Standalone Min May be coupled Station as per MoP 5.5m x 2.75m with PCS at item Guidelines. Provided along with A or FCB CS at FBC charging Stations item B above. 4 LPG Go down/ 40,000 to 50,000 Capacity = 500 cylinders The major concern Gas Go down or 8000 kg of LPG for its storage and distribution is the Area (inclusive of guard 520 sqm location, which shall room) (26m x 20m) be away from the residential areas and shall have open spaces all around as per the Explosive Rules 5 Milk Distribution 5000 Areas inclusive of service 150 sqm --- area * A detailed explanation is given at Appendix 'P' - "Explanatory Note on EVCI" and Appendix 'Q' - "Guidelines issued by Ministry of Power on EVCI, dated 14.12.2018" (in Volume IIA & 118). Notes: • Super Kerosene Oil/Light Diesel Oil storage for industrial uses shall be given separately. • Large petrol/diesel storage centers to be located outside city limits. • To be organized by a service provider for connection and metering, available 24x7for all users. • Provision of FCB CS & BS shall not be mandatory, and will be at the discretion of the service provider. • Size recommended for FCB CS is subject to variance as per technical specifications of the SP. • Fuel filling stations (including COCO outlets) shall conform to specifications and safety norms as per the amendment in Petroleum Rules or, PESO Act and obtain clearances as maybe necessary from the 'Competent Authority ', for adding PCS to Retail outlets/ Fuel filling stations. For Standalone PCS: • The ratio ofprovision of charging points (FC/SC) with respect to total parking capacity will be considered for only 20% (i.e. 20% of total parking capacity will be considered EVs & ratio will be applied on them) • Land a/location is preferably to be contiguous/in close proximity to commercial land of the Mid-way Restaurant. • "General Conditions of Siting" of Standalone PCS shall follow clause 4.1-4.4 of /RC: 12 (latest revision) except for the distance between stations which shall be as per the Guidelines issued by MoP, dated Dec, 2018.
  • 66. Abbreviations used: 2Ws 3Ws 4Ws PVs CVs EV SC FC BS PCS URDPFI - Two wheelers - Three wheelers - Four wheelers/ PV(cars) - Passenger Vehicles - Commercial Vehicles - Electric Vehicle - Slow Charger/ Slow Charging (AC) - Fast Charger/ Fast Charging (DC and a few AC ones) - Battery Swap - Public Charging Stations - Urban and Regional Development Plans Formulation and Implementation Guidelines, 2014 CCS - Combined Charging System CHAdeMO - A DC Fast charging standard FCB CS - Fluid Cooled Battery Charging Station CCE - Climate Control Equipment LCC - Liquid Cooled Cables NSP - Network Service Provider (information network) SP - Service Provider ----------------- X X X -----------------
  • 67. Appendix P (URDPI Guidelines Vol llA and II 8) Explanatory Note on Electric Vehicle Charging Infrastructure (For URDPFI Guidelines 2014) Town and Country Planning Organization Ministry of Housing and Urban Affairs Government of India February, 2019
  • 68. Abbreviations: UNFCC IPCC GHG 2Ws 3Ws 4Ws PVs CVs EV EVSE SC FC BS PCS PCI Private Cl MBBL URDPFI NSP SP United Nations Framework Convention on Climate Change Intergovernmental Panel on Climate Change Green House Gases Two wheelers Three wheelers Four wheelers/ PV(cars) Passenger Vehicles Commercial Vehicles Electric Vehicle Electric Vehicle Supply Equipment Slow Charger I Slow Charging (AC) Fast Charger I Fast Charging (DC and a few AC ones) Battery Swap Public Charging Stations Public Charging Infrastructure Private Charging Infrastructure Model Building Bye-Laws, 2016 Urban and Regional Development Plans Formulation and Implementation Guidelines, 2014 Network Service Provider (information network) Service Provider -2 -
  • 69. Contents 1 . RationaIe for EVCI establish ment---------------------------------------------------------4 2. EV Charging Tech nology--------------------------------------------------------------------5 3. 0ptions for EV Charg ing---------------------------------------------------------------------6 4. Charging Specifications and PCS lnfrastructure---------------------------------------7 -3-
  • 70. 1. Rationale for EVCI establishment Rapid urbanization coupled with adoption of mechanized transportation modes has resulted in high emissions of Green House Gases that goes on to impact Global warming. Unless, the global surface temperature rise is restricted to no more than 2°C compared with pre-industrial levels, the IPCC has warned that the world will see irreversible catastrophic climate change. India being a signatory to the UNFCCC, has pledged for efforts to assess the Greenhouse Gas Emissions (GHG) of anthropogenic origin and removal by sinks. India's per capita emissions are still considered low at 1.9 tonnes (2013), but its total emissions are next only to China and the US and is likely to overtake those of the EU by 2019. While comparing the Indian cities for their emission scores, Delhi is on top as the biggest emitter at over 38 38 million tonnes of carbon dioxide equivalent overall emissions, followed by Greater Mumbai at 22.7 million tonnes and Chennai at 22.1 million tonnes, Kolkata at 14.8million tonnes, Bangalore at 19.8million tonnes, Hyderabad at 13.7 million tonnes and Ahmedabad at 9million tonnes were the other cities whose emissions for the year were calculated sector wise. As per the statistics of Transport Department (GNCTD), total number of vehicles in Delhi is more than the combined total vehicles in Mumbai, Chennai and Kolkata. Delhi has 85 private cars per 1000 population against the national average of 8 cars per 1000 population. In terms of CO2 emissions due to motor vehicles, Delhi emits about 12.4 million tonnes while the city of Bengaluru emits about 8.6 million tonnes.!" Therefore, addressing the quantum of emissions from the "Transport" and "Domestic" sector emerges to be the high priority subjects under the overarching umbrella of "Climate change mitigation" as committed to the UNFCC. Encouraging "Electric Vehicles" as a viable option for phased transportation in terms of short and long distance trips with appropriate "Charging Infrastructure" is therefore, the pre-condition for this paradigm shift/ phased migration to sustainable transportation. For this changes are required in Infrastructure provisions (at Regional and City levels) and in Development Control Regulations (in terms of provisions therein) to include the formulations of norms and standards for "Charging Infrastructure" in the said Mater Plan Regulations and State Bye-Laws for adoption across the country suiting local conditions. -4-
  • 71. 2. EV Charging Technology 2.1 Electric Vehicle Supply Equipment (EVSE): An EVSE is a wall mounted box that supplies electric energy for recharging of electric vehicle batteries. Also EVSEs have a safety lock-out feature that does not allow current to flow from the device until the plug is physically inserted into the car. EVSEs can be customized with added features like: • Authentication • Integrated payment gateways • Software for remote monitoring. As electric vehicle charging technology continues to advance, several standards and guidelines have become widely accepted across the industry. This section gives a brief overview of charging infrastructure technology, standards, and terminology. 2.2 Different types of EVSE: Charging speeds- Charging power, which determines the time required to charge a vehicle, can vary by orders of magnitude across charge points, as shown in Table 1. A small household outlet may charge as slowly as 1.2 kW, while the most advanced rapid charging stations can charge at up to 350 kW. Charging infrastructure is broadly broken into three categories based on speed: Level 1, Level 2, and direct current (DC) fast charging (sometimes referred to as Level 3). (Source: "Emerging Best Practices for Electric Vehicle Charging Infrastructure", Oct' 2017) Private Charging Charging batteries of privately owned cars through domestic charging points. Billing is mostly part of home/domestic metering. AC "Slow" Charging: The home private chargers are generally used with 230V/15A single phase plug which can deliver a maximum of up to about 2.5KW of power. The EVSE supplies AC current to the vehicle's onboard charger which in turn converts the AC power to DC allowing the battery to be charged. Public Charging For charging outside the home premises, electric power needs to be billed and payment needs to be collected. The power drawn by these chargers may need to be managed from time to time. DC "Fast" Charging: DC current is sent to the electric car's battery directly via the charge port. FC chargers (usually 50 KW or more) can supply 100 or more kilometers of range per hour of charging. The fast chargers would generally be used as a top-up, rather than fully charging vehicles. These are important for cab companies and corporate users who have a fleet of electric cars. -5-
  • 72. 3. Options for EV Charging There is an urgent need to offer flexible charging infrastructure for different vehicle segments to drive adoption of EVs. Charging infrastructure is the most crucial enabler in the entire EV value chain. The exploration of different charging models according to the local conditions shall enable faster deployment of electric vehicles in the country. EV share in all vehicles - It has been broadly projected that by the current rate of adoption of EVs, about 15% of all vehicles in the country would be EVs by the year 2020. Therefore, while assuming percentage composition of all proposed capacities in Public facilities of vehicle holding capacity, the Metropolitan and 'Tier I' cities will be assumed to have a higher percentage share of EVs, say 20% for now. The charging infrastructure prescriptions in all urban development guidelines shall, therefore, be in consonance with the said percentage. Power Load sanction to premises - While adding these Charging Infrastructures to the proposed set of building types of the Indian cities, enhanced Power Load shali have to be had for each such building type by the Power 0/SCOMs, commensurate to the total additional power requirement of simultaneous operation of all the prescribed charging points in the premise. With further advancement of charging technologies and the enhanced capacity of chargers to draw more power, it is advised that the load capacity assigned to each premise should be kept with a safety factor of 1. 25 with a long-term vision of 30 years. Table 1: EVs charging "modes" and 'availability' Vehicle type Slow Charging Fast Charging Public Cl 2 Wheelers y N Yes/Limited 3 Wheelers y N Yes/Limited PVs (Cars) y y Yes PVs (Buses) N y Yes Table 2: Charging options for EV types (by ownership) Vehicle type Private Cl Public CS Predominant place of charging 2 Wheelers SC/BS SC Point of residence/ Work 3 Wheelers SC/BS SC/BS Residence / Parking stations PVs (Cars) SC/BS FC Residence / Point of work / other public places PVs (Buses) - FC/BS Bus Terminals/Depots Note: • The option of Battery Swapping (BS) forprivately owned 2Ws and PV(Cars) is limited to Private Cl. • For 3 Ws the BS is proposed to be made available in PCS, for faster recharge experience only • For PV (Buses), Captive Fast charging infrastructure for 100% internal use for fleets may be adopted by privately owned Depots/Garages. Based on the above stated EV charging technologies available and the current trend of evolving technologies of faster charging experience, the Ministry of Power has issued Guidelines and Standards for setting up Charging Infrastructure for Electric Vehicles [Ministry of Power (MoP) Guidelines dated 14.12.2018] for charging infrastructure to be installed at every Public Charging Station (PCS). 'Connectivity regulations and Safety norms' shall be defined by respective authorities such as Central Electric Authority/MoP for grid access to such PCS / any other charging station/infrastructure. -6-
  • 73. ._ 4. Charger Specifications and PCS Infrastructure Any installed PCS shall have one or more electric kiosk/boards with installation of all charger models as prescribed in the Guidelines and Standards notified by Ministry of Power (MoP}, dated 14 December 2018 for "Charging Infrastructure for EVs" (at Annexure I/), with other necessary arrangements as deemed necessary. Public Charging Station service providers shall be free to create charging hubs and to install additional number of kiosk/chargers in addition to the minimum chargers prescribed vide the MoP Guidelines, including options for installation of additional chargers, if required. Note: • Minimum infrastructure requirements do not apply to Private Charging Points meant for self-use of individual EV owners (non-commercial basis). • Captive charging infrastructure for 100% internal use for a company's own fleet will not be required to install all type of chargers and to have NSP tie ups. 5. Regional location of PCS/ FCB Charging Stations In accordance with the Guidelines issued by the Ministry of Power, following minimum standards with regard to density of/ distance between PCS in regional level facilities shall be followed as and regulated by the URDPFI Guidelines- 1. Along Highways and inter-city corridors: • At every 25 Kms on both sides of highways/roads, at least 1 PCS is to be set up. • At every 100 Kms on both sides of highways/roads, at least 1 Fast Charging/FCB Charging Station as per specifications. (may be coupled with PCS) • Standalone Battery Swapping Stations may be added with the PCS. 2. In Regional level Industrial SEZs / other Industrial Parks/Estates • Land for at least 1 PCS is to be reserved within a grid of 10 Km x 10 Km of the designated industrial area/park/estates. -7-
  • 74. At>~~ (UP. b pF.I' Gpwd.e..l).'ku1 Vdf. !t A ~Jl.!.J To, No.12/2/2018-EV Government of India Ministry of Power Shram Shakri Bhawan, Rafi Marg, New Delhi, the 14 111 December, 2018 l. The Secretaries of all the Ministries/Departments of Government of India. 2. The Chief Secretaries of the States/U'Is, Sub: Charging Infrastructure for Electric Vehicles - Guidelines and Standards -reg. Sir/Madam, Government of India have undertaken multiple initiatives to promote manufacturing and adoption of electric vehicles in India. With support of the Government, electric vehicles have started penetrating in the Indian market. However, availability of adequate Charging Infrastructure is one of the key requirements for accelerated adoption of electric vehicles in India. It is proposed to encourage this by laying down an enabling framework. Obiectives • To enable faster adoption of electric vehicles in India by ensuring safe, reliable, accessible and affordable Charging Infrastructure and eco-system • To promote affordable tariff chargeable from EV owners and Charging Station Operators/Owners • To generate employment/income opportunities for small entrepreneurs • To proactively support creation of EV Charging Infrastructure in the initial phase and eventually create market for EV Charging business • To encourage preparedness of Electrical Distribution System to adopt EV Charging Infrastructure. In light of'tlte llbove, it has been decided as follows: 1. Private charging at residences/ offices shall be permitted. D1SC0Ms may facilitate the same. Setting up of Public Charging Stations (PCS) shall be a de-licensed activity and any individual/entity is free to set up public charging stations, provided that, such stations meet the technical as well as performance standards and protocols laid down below as well as any further norms/standards/specifications laid down by Ministry of Power and Central Electricity Authority from time 10 time. ~~ 1 2.
  • 75. 2.1 Any person seeking to set up a Public Charging Station may apply for connectivity and he shall be provided connectivity on priority by the Distribution Company licensee to supply power in the area. 2.2 Any Charging Station/ Chain of Charging Stations may also obtain electricity from any generation company through open access. 3. Public Charging Infrastructure (PCI)- Minimum Requirements: 3.1 Every Public Charging Station (PCS) shall have the following minimum infrastructure: I. An exclusive transformer with all related substation equipment including safety appliance. 33/11 KV line/cables with associated equipment including as needed for line termination/metering etc. Appropriate civil works. Adequate space for Charging and entry/exit of vehicles. Current international standards that are prevalent and used by most vehicle manufacturers internationally are CCS and CHadeMO. Hence, Public Charging Stations shall have, one or more electric kiosk/boards with installation ofall the charger models as follows: ii. ILL iv. V. ~ ·~-- i No. of Charging Charger Type I Charger Connectors= Rated Points/No. of Voltage (V) Connector guns I I (CG)~------·-· I CCS (min 50 kW) 200-1000 1/1 co -~--- -·····------------ ) Fast f __CI·IAdeMO (min 50 kW) 200-1000 J/1 CG ··- I , Type-2 AC (min 22 kW) 380-480 1/lCG I Slow/Moderate i . .. .. ... ~DC-001 (15 kW) 72-200 1/1 co -----·····-··-··-··-·······-·· ··-3/3 CG of j Bharat AC-00l (10 kV) 230 3.3 kW each *In addition, any other fast/slow/moderate charger as per approved BIS standards whenever notified. .~¥--·- viii. VI. The kiosk/board may have options for installation of additional chargers if required. The Public Charging Station Providers are free to create Charging Hubs and to install additional number of Kiosk/Chargers in addition to the minimum number of chargers prescribed above. Tie up with at least one online Network Service Providers (NSPs) to enable advance remote/online booking of charging slots by EV owners. Such online information to EV owners should also include information regarding location. types and numbers of chargers instal led/availableetc. Share charging station data with appropriate DISCOM and to maintain appropriate protocols as prescribed by such DISCOM for this purpose. CEA shall have access to this database. ~- . Appropriate public amenities, . ( . d" .ti~ 2 vii. !X. X.
  • 76. xi. Where, in addition to the above, fast charging facility is also planned to be provided at the PCS by the PCI provider, the following additional infrastructure must be provided: a. Appropriate Liquid Cooled cables if High Speed Charging Facility for onboard charging of Fluid Cooled Batteries (FCBs) is also planned. b. Appropriate Climate Control Equipment for Fast Charging of Batteries to be used for swapping (i.c, not onboard) 3.2 Every Public Charging Station (PCS) shall be operational only after inspection and clearance as communicated by a suitable clearance certificate, by the concerned electrical inspectors/technical personnel designated specifically by the respective DISCOM for this purpose. DISCOMs may also empanel one or more third party authorized technical agencies tor this purpose. 3.3 Electric Vehicle Service Equipment (EVSE) shall be type tested by an appropriate reputed authority. 3.4 The above minimum infrastructure requirements do not apply to Private Charging Points meant for self-use of individual EV owners (non-commercial basis). 3.5 Captive charging infrastructure for 100% internal use for a company's own/leased fleet for its own use will not be required to install all type of chargers and to have NSP tie ups. 3.6 Public Charging Station can also have the option to add Standalone battery swapping facilities in addition to the above mandatory facilities. provided space/other conditions permit. 4. Public charging Infrastructure (PCI) for long distance EVs and/or heavy duty EVs: 4.1 Public charging stations for long distance EVs and/or heavy duty EVs (like trucks, busses etc.) shall have the following minimum requirements: i. At least two chargers of minimum 100 kW (with 200-1000 V) each of different specification (CCS & Chaderno) and with single connector gun each in addition to the minimum charging infrastructure requirements as mandated for Public Charging Stations in para 3. 11. Appropriate Liquid Cooled Cables for high speed charging facility for on board charging of Fluid Cooled Batteries (currently available in some long range EVs). iii. In addition to 4.1 (i) and (ii) above, the fast Charging Stations (FCS) for Long Distance EVs and/or Heavy Duty EVs may also have the option of swapping facilities tor batteries for meeting the charging requirements as per para 3 and para 4.l(i)&(ii) above. Jt is notable that Fluid Cooled Batteries (FCBs) are generally necessary for Fast Charging I Long Distance use of EVs and/or for Heavy Duty Vehicles like buses/trucks etc. FCBs will have higher charging rate and longer life. 4.2 Such Fast Charging Stations (FCS)which are meant only for l 00% in house/captive utilisation, for example buses of a company, would be free to decide the charging specifications as per requirement for its in- house company EYs. 3
  • 77. 5. Location of Public Charging Stations: 5.1 In case of Public Charging Stations, the following minimum requirements are laid down with regard to density/distance between two charging points: i. At least one Charging Station should be available in a grid of 3 Km X 3 Km. Further, one Charging Station be set up at every 25 Km on both sides of highways/roads. 11. For long range Evs (like long range SUVs) and heavy duty EVs like buses/trucks etc., there should be at least one Fast Charging Station with Charging Infrastructure Specifications as per para4. J at every 100 Kms, one on each side of the highways/road located preferably within/alongside the stations laid in para3 above. Within cities, such charging facilities for heavy duty EVs shall be located within Transport Nagars, bus depots. Moreover, swapping facilities are also not mandatory within cities for Buses/trucks. 5.2 Additional public charging stations shall be set up in any area only after meeting the above requirements. 5.3 The above density/distance requirements shall be used by the concerned state/UT Governments/their Agencies for the twin purposes of arrangement of land in any manner for public charging stations as well as for priority in installation of distribution network including transformers/feeders etc. This shall be done in all cases including where no central/state subsidy is provided. 5.4 The appropriate Governments (Central/State/U'Is) may also give priority to existing retail outlets (ROs) of Oil Marketing Companies (OMCs) for installation of Public EV Charging Stations (in compliance with safety norms including 'firewalls' etc.) to meet the requirements as laid above. Further, within such R.Os, Company Owned and Company Operated (COCO) ROs may be given higher preference. 5.5 Any deviation from above norms shall be admissible only after specific approval of State Nodal Agency in consultation with the Central Nodal Agency. 6. Database of Public EV Charging Stations: Central Electricity Authority (CEA) shall create and maintain a national online database of all the Public Charging Stations through DISCOivls. Appropriate protocols shall be notified by DISCOMs for this purpose which shall be mandatorily complied by the PCS/BCS. This database shall have restricted access as finalised between CEA and Ministry of Power. 7. Tariff for supply of electricity to EV Public Charging Stations: 7.1 The tariff for supply of electricity to EV Public Charging Station shall be determined by the appropriate commission, provided however that the tariff shall not be more than the average cost of supply plus 1 5 (fifteen) percent. 7.2 The tariff applicable for domestic consumption shall be applicable for domestic charging. 8. Service charges at PCS/BCS: 8.1 Charging of EVs is a service as already clarified by Ministry of Power vide letter No. 2Ji08/2018-R&R dated 13.04.2018. ~( ~~lt.~ 4
  • 78. 8.2 The State Nodal Agency shall fix the ceiling of the Service Charges to be charged by the Public Charging Stations. 9. Priority for Rollout of EV Public Charging Infrastructure: After extensive consultations with State Governments and different Department/Agencies of Central Government, phasing as follows are laid down as national priority for rollout of EV Public Charging Infrastructure: 9.1 Phase I (l-3 Years): All Mega Cities with population of 4 million plus as per census 2011, all existing expressways connected to these Mega Cities & important Highways connected with each of these Mega Cities shall be taken up for coverage. A list of these Mega Cities and existing connected expressways is attached at Annexure I. 9.2 Phase U (3-5 Years): Big cities like State Capitals, UT headquarters shall be covered for distributed and demonstrative effect. Further, important Highways connected with each of these Mega Cities shall be taken up for coverage. 9.3 The above priorities for phasing of rollout hall be kept in mind by all concerned, including, different agencies of Central/State Governments while framing of further policies/guidelines for Public Charging Infrastructure of EVs, including for declaring further incentives/subsidies for such infrastructure and for such other purposes. 10. Implementation Mechanism for Rollout: 10. J Ministry of Power shall designate a Central Nodal Agency for the rollout. AH relevant agencies including Central electricity Authority (CEA) shall provide necessary support to this nodal agency. 10.2 Every State Government shall nominate a Nodal Agency for that State for setting up charging infrastructure. The St.ate DISCOM shall generally be the Nodal Agency for such purposes. However, State Government shall be free to select a Central/State Public Sector Undertaking (PSU) including Urban Local Bodies (ULBs). Urban/Area Development Authorities etc. as its Nodal Agency. 11.. Selection of Implementation Agency for Rolloutr 11. l The Central Nodal Agency shall finalize the cities and expressways/highways to be finally taken up from the above phasing. in consultation with the respective State Governments. l l .2 An Implementation Agency shall be selected by the respective State Nodal Agency and shall be entrusted with responsibility of installation, operation and maintenance of PCS/FCS/BCS/BSF for designated period as per parameters laid down in this document and as entrusted by the concerned Nodal Agency. The Implementation Agency can be an Aggregator as mutually decided between Central and State Nodal Agencies. However, they can also decide to choose different PCS/FCS providers for bundled packages or for individual locations as mutually decided. Further, whenever bundled packages are carved for bidding, such packages shall necessarily include atleast one identified expressway/highway or part thereof IJ prepare a ~J.ik__ s
  • 79. cohesive regional package; the selected identified cities may be divided into one or more parts as necessary for such purposes. I I .3 Where Implementing Agency is selected by bidding. all bidding shall be conducted by the State Nodal Agency. 11.4 There shatI be an upper cap on the Service Charges declared by the State Nodal Agency as per para 8.2 above. Subsidy, if admissible from Central/State governments. shall be suitably factored in such calculations of Upper Cap/Bid Variable. This issues with the approval of Hou'ble Minister of State (IC) for Power and New & Renewable Energy. (Anoop 'in~ t~Under Secretary to the Govt. of India TcJ:23766236 Email:anoopsingh.bisht@nic.in Copy to: 1. Prime Ministers Office/Cabinet Secretariat. 2. CEO, NlTI Aayog 3. The Secretaries of the CERC/State Commissions/JERCs. "' -f. n(Anoop ins h B~~ Under Secretary to the Govt. of India Tel:23766236 Email:anoopsingb.bisht@nic.in 6
  • 80. Copy for information to: L PS to MoS (IC) for Power and NRE 2. PPS to Secretary (Power) 3. PPS to Addi. Secretary (SNS) 4. PPS to Joint Secretary (Thermal), MoP 5. PPS to Director (UMPP ), MoP (A~~ Under Secretary to the Govt. of India Tel:23766236 Email:anoopsingb.bisht(a),uic.in 7
  • 81. I. List of 4 miJlion plus cities (as per census 20.11) ! 1 I Mumbai 1 ! l -----··! --2 i Delhi ·~---·-· -- 3 Bangalore -· 4 Hyderabad I15 I Ahmedabad I 6 i -·- l Chennai I I .......... h..H, 7 I Kolkata! 8 Surat --·-- 9 Punc I'---• ! II. List of corridors c·-t-, Mumbai-Pune Express;,-~y l 2 Ahmed_3-~ad-Vadodara Expressway 3 Delhi-Agra Yamuna Expressway 4 Delhi-Jaipur 5 Bengaluru-Mysorc 6 Bengaluru-Chennai ,.....--. i 7 I Surat-Mumbai Expressway 8 Agra - Lucknow Expressway ---·-· 9 Eastern Peripheral Expressway 10 Delhi-Agra NH2 Expressway I ··-----J 11 Hyderabad ORR expressway ! ;---t---·--··--·--····---·--·-·-----------------; j 12 5 connected highways to each megacity Annexure l 8