What differentiates Project Phase, Project Teams and
Construction Phase?
Project Phase
• The term Project Phase refers to a collection of activities within a
project. Each project phase is goal-oriented and ends at a milestone.
Reaching these milestones means the project progresses. Each phase
can be divided into sub-phases.
Project Team
• Generally, the Project Team consists of you - the building owner; an
architect; an engineer; an interior designer; and a contractor.
Depending on the size and scope of the project, other professionals
may be called in as needed (cost estimators, landscape architects,
construction managers, etc.) Within the Malaysian Building
Construction context, the Architect is the leader.
• Construction Team?
Construction Phase
• Construction Phase has a list of steps and stages from ground
breaking stage until testing and commissioning stage of any building
project. The steps and stages have its own hierarchy and order to
ensure the construction goes smoothly and according to the plan.
What are the 5 stages of a project phase?
Five stages of project phase
•Initiation
•Planning
•Execution
•Monitoring And Control
•Closure
Stages in Project Phase
According to the Scale of Minimum Fees (SOMF 2010) the basic
services that may be provided by the architectural consultancy practice
shall be for any or all of the following phases:
• (a) Schematic Design Phase;
• (b) Design Development Phase;
• (c) Contract Documentation Phase;
• (d) Contract Implementation and Management Phase;
• (e) Final Completion Phase.
Project Stages
Upon completion of each phase - Percentage of total fee payable
• Schematic Design Phase - 15%
• Design Development Phase - 30%
• Contract Documentation Phase - 25%
• Contract Implementation and Management Phase - 25%
• Final Completion Phase - 5%
Schematic Design Phase
The Basic Services that may be provided by the architectural
consultancy practice under the Schematic Design Phase shall be any or
all of the following:
• (a) taking the client's instructions and analyzing the project brief;
• (b) preparing preliminary conceptual sketch proposals to interpret
the project brief;
Schematic Design Phase (Cont.)
• (c) developing the preliminary conceptual sketch proposals into
sketch designs to a stage sufficient to enable an application to be
made for planning approval or approval in principle as required under
any relevant laws;
• (d) preparing preliminary estimates of the probable construction
costs based on the current area, volume or other unit costs;
• (e) where applicable, preparing and submitting drawings and other
necessary documents to the relevant approving authorities for either
town planning approval or approval in principle as required under any
relevant laws.
Design Development Phase
The Basic Services that may be provided by the architectural
consultancy practice under the Design Development Phase shall be any
or all of the following:
• (a) upon approval of the sketch designs by either the relevant
approving authority or the client, developing schematic design
drawings to a stage to enable other consultants to commence their
detailed design work;
• (b) preparing working drawings and submitting the same together
with all the necessary particulars to the relevant approving
authorities to obtain building approval;
Design Development Phase (Cont.)
• (c) updating the preliminary estimates of construction costs and
submitting the same to the client for his approval;
• (d) updating the project planning and implementation schedule and
submitting the same to the client for his approval.
Contract Documentation Phase
The Basic Services that may be provided by the architectural
consultancy practice under the Contract Documentation Phase shall be
any or all of the following:
• (a) upon approval by the client of the updated preliminary estimates
of construction costs and the project planning and implementation
schedule, preparing and finalizing detailed drawings and other
particulars necessary to the stage of completion sufficient to enable
bills of quantities to be prepared;
• (b) in collaboration with other consultants, preparing all documents
necessary for obtaining competitive tenders for the works;
Contract Documentation Phase (Cont.)
• (c) inviting, on behalf of the client, tenders for the works or
collaborating with other consultants engaged by the client to do so;
• (d) evaluating the results of the tenders and submitting a report and
recommendation to the client;
• (e) awarding the contract on behalf of the client;
• (f) preparing the building contract documents, either alone or in
collaboration with other consultants appointed by the client, for
signature between the client and the contractor.
Contract Implementation and Management
Phase
The Basic Services that may be provided by the architectural
consultancy practice under the Contract Implementation and
Management Phase shall be any or all of the following:
• (a) performing all functions and duties of the architectural
consultancy practice under the terms and conditions of the building
contract;
• (b) advising the client on the site staff required for the project and
estimating the cost and duration of their employment;
Contract Implementation and Management
Phase (Cont.)
• (c) providing information and issuing instructions to the contractor as
required under the terms and conditions of the building contract to
enable the contractor to proceed with the works;
• (d) examining the works programme submitted by the contractor and
to be satisfied that the works can reasonably be completed within the
contract period;
• (e) inspecting the works at periodic intervals so as to ensure that the
works are being executed in accordance with the building contract
and to issue a certificate of practical completion.
Final Completion Phase
The Basic Services that may be provided by the architectural
consultancy practice under the Final Completion Phase shall be any or
all of the following:
• (a) issuing a certificate of completion and compliance for building
after being satisfied that the building is fit and safe for occupancy;
• (b) certifying as-built drawings and submitting maintenance manuals
together with all warranties to the client;
• (c) issuing a certificate of making good defects after being satisfied
that all defects to the building have 'been rectified; (d) preparing final
accounts for the contract and issuing a final certificate of payment to
the contractor.
Who are the project team members?
The Project Team
• The construction of a building
involves many people: Architects;
Designers; Engineers;
Contractors; Sub-Contractors all
working together to meet the
needs of the Client.
• Anyone else?
Project Team Members
Schematic Design Phase
• Land Surveyor,
• SI Consultant,
• Architect,
• Civil Engineer,
• Structure Engineer,
• Mechanical Engineer,
• Electrical Engineer,
• Landscape Architect,
• Interior Designer.
Project Team Members
Design Development Phase
• Architect,
• Civil Engineer,
• Structure Engineer,
• Mechanical Engineer,
• Electrical Engineer,
• Quantity Surveyor,
• Landscape Architect,
• Interior Designer.
Project Team Members
Contract Documentation Phase
• Architect,
• Civil Engineer,
• Structure Engineer,
• Mechanical Engineer,
• Electrical Engineer,
• Quantity Surveyor.
Construction Team Members
Contract Implementation and Management Phase
• Architect,
• Resident Architect,
• Clerk of Works (COW),
• Civil Engineer,
• Structure Engineer,
• Resident Engineer,
• Mechanical Engineer,
• Electrical Engineer,
• Main Contractor
• Sub-Contractor
• Suppliers
• Labourers
A clerk of works inspects the workmanship, quality and safety
of work on construction sites and reports back to senior
managers and clients.
A clerk of work conducts regular site inspections and checks
that building plans are being followed correctly.
Check that work is being carried out to the correct
specifications and legal, safety and environmental standards.
Final Completion Phase
• Architect,
• Civil Engineer,
• Structure Engineer,
• Mechanical Engineer,
• Electrical Engineer,
• Contractor
• BOMBA
• ???
Construction Team Members
Certificate of Completion and Compliance
(CCC)
What are the stages involved in a building
construction?
1. Transferring Info from Drawing to Site
Stages in Construction
2. Site Preparation, Leveling and Setting Out
Survey, security and prepare necessary equipment.
3. Excavation
Earthwork for foundation and ground beam, prepare concreting and building material to site
2. Foundation
Piling, ground beams, waterproofing membrane
Concreting the columns, remove the formworks
and soil filling
5. Sub-structure
All ground beams and structure for super structure works
6. Super Structure-post and beams
All columns and beams above ground
7. Walls
Infill brick work and partition.
8. Second Floor Construction
9. Roofs
Roof beams,
roof-pitch, flat or
special type.
10. Internal finishes
Plastering, tiling and paintings
11. Tiling and painting works
Decorative paint, special paint or no-paint at all.
12.Completion.
Checking all completed work, testing and commissioning, handover to client/user.
Thank You!

More Related Content

Similar to Construction Stages and Construction Teams

Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
Process capital project
Process capital projectProcess capital project
Process capital projectcookcountyblog
 
Resume of Wael Fareed- Architect
Resume of Wael Fareed- Architect Resume of Wael Fareed- Architect
Resume of Wael Fareed- Architect wael hassan
 
qsqs-141129025329-conversion-gate01.pdf
qsqs-141129025329-conversion-gate01.pdfqsqs-141129025329-conversion-gate01.pdf
qsqs-141129025329-conversion-gate01.pdfrivenhau
 
The role of an Architect
The role of an ArchitectThe role of an Architect
The role of an ArchitectClara Lee
 
Quantity Surveyor presentation
Quantity Surveyor presentationQuantity Surveyor presentation
Quantity Surveyor presentationcynfang Fong
 
Qsqs 141129025329-conversion-gate01
Qsqs 141129025329-conversion-gate01Qsqs 141129025329-conversion-gate01
Qsqs 141129025329-conversion-gate01rivenhau
 
Qsqs 141129025329-conversion-gate01121212
Qsqs 141129025329-conversion-gate01121212Qsqs 141129025329-conversion-gate01121212
Qsqs 141129025329-conversion-gate01121212rivenhau
 
Qsqs 141129025329-conversion-gate01
Qsqs 141129025329-conversion-gate01Qsqs 141129025329-conversion-gate01
Qsqs 141129025329-conversion-gate01limziahuei
 
Qs(ici&itd) (1)
Qs(ici&itd) (1)Qs(ici&itd) (1)
Qs(ici&itd) (1)Js Cheok
 

Similar to Construction Stages and Construction Teams (20)

130125.PROCESS DIAGRAM
130125.PROCESS DIAGRAM130125.PROCESS DIAGRAM
130125.PROCESS DIAGRAM
 
Construction process
Construction processConstruction process
Construction process
 
The Architecture Profession
The Architecture ProfessionThe Architecture Profession
The Architecture Profession
 
C4 - Scope of Work.pdf
C4 - Scope of Work.pdfC4 - Scope of Work.pdf
C4 - Scope of Work.pdf
 
Process capital project
Process capital projectProcess capital project
Process capital project
 
Resume of Wael Fareed- Architect
Resume of Wael Fareed- Architect Resume of Wael Fareed- Architect
Resume of Wael Fareed- Architect
 
CV-Kunwar Aftab Ahmad Khan-29Oct2015
CV-Kunwar Aftab Ahmad Khan-29Oct2015CV-Kunwar Aftab Ahmad Khan-29Oct2015
CV-Kunwar Aftab Ahmad Khan-29Oct2015
 
qsqs-141129025329-conversion-gate01.pdf
qsqs-141129025329-conversion-gate01.pdfqsqs-141129025329-conversion-gate01.pdf
qsqs-141129025329-conversion-gate01.pdf
 
QS.pdf
QS.pdfQS.pdf
QS.pdf
 
The role of an Architect
The role of an ArchitectThe role of an Architect
The role of an Architect
 
Quantity Surveyor presentation
Quantity Surveyor presentationQuantity Surveyor presentation
Quantity Surveyor presentation
 
Qsqs 141129025329-conversion-gate01
Qsqs 141129025329-conversion-gate01Qsqs 141129025329-conversion-gate01
Qsqs 141129025329-conversion-gate01
 
Qs
QsQs
Qs
 
Qsqs 141129025329-conversion-gate01121212
Qsqs 141129025329-conversion-gate01121212Qsqs 141129025329-conversion-gate01121212
Qsqs 141129025329-conversion-gate01121212
 
Qsqs 141129025329-conversion-gate01
Qsqs 141129025329-conversion-gate01Qsqs 141129025329-conversion-gate01
Qsqs 141129025329-conversion-gate01
 
Quality plan
Quality planQuality plan
Quality plan
 
Qsx
QsxQsx
Qsx
 
Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)
 
QSS
QSSQSS
QSS
 
Qs(ici&itd) (1)
Qs(ici&itd) (1)Qs(ici&itd) (1)
Qs(ici&itd) (1)
 

More from MOHDFIRRDHAUSBINMOHD

Kick-Off Meeting Habibiyyah (FINAL).pdf
Kick-Off Meeting Habibiyyah (FINAL).pdfKick-Off Meeting Habibiyyah (FINAL).pdf
Kick-Off Meeting Habibiyyah (FINAL).pdfMOHDFIRRDHAUSBINMOHD
 
Sustainable Design Strategies Lecture (10.4.23).pdf
Sustainable Design Strategies Lecture (10.4.23).pdfSustainable Design Strategies Lecture (10.4.23).pdf
Sustainable Design Strategies Lecture (10.4.23).pdfMOHDFIRRDHAUSBINMOHD
 
BIA3004 Sustainable Design Lecture (10.4.23).pdf
BIA3004 Sustainable Design Lecture (10.4.23).pdfBIA3004 Sustainable Design Lecture (10.4.23).pdf
BIA3004 Sustainable Design Lecture (10.4.23).pdfMOHDFIRRDHAUSBINMOHD
 
Sustainable Design : Ventilation & Daylighting
Sustainable Design : Ventilation & DaylightingSustainable Design : Ventilation & Daylighting
Sustainable Design : Ventilation & DaylightingMOHDFIRRDHAUSBINMOHD
 

More from MOHDFIRRDHAUSBINMOHD (6)

Kick-Off Meeting Habibiyyah (FINAL).pdf
Kick-Off Meeting Habibiyyah (FINAL).pdfKick-Off Meeting Habibiyyah (FINAL).pdf
Kick-Off Meeting Habibiyyah (FINAL).pdf
 
BIA1021 LECTURE NOTES.pdf
BIA1021 LECTURE NOTES.pdfBIA1021 LECTURE NOTES.pdf
BIA1021 LECTURE NOTES.pdf
 
Sustainable Design Strategies Lecture (10.4.23).pdf
Sustainable Design Strategies Lecture (10.4.23).pdfSustainable Design Strategies Lecture (10.4.23).pdf
Sustainable Design Strategies Lecture (10.4.23).pdf
 
Practical Training Flow Chart.pdf
Practical Training Flow Chart.pdfPractical Training Flow Chart.pdf
Practical Training Flow Chart.pdf
 
BIA3004 Sustainable Design Lecture (10.4.23).pdf
BIA3004 Sustainable Design Lecture (10.4.23).pdfBIA3004 Sustainable Design Lecture (10.4.23).pdf
BIA3004 Sustainable Design Lecture (10.4.23).pdf
 
Sustainable Design : Ventilation & Daylighting
Sustainable Design : Ventilation & DaylightingSustainable Design : Ventilation & Daylighting
Sustainable Design : Ventilation & Daylighting
 

Recently uploaded

AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.arsicmarija21
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........LeaCamillePacle
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayMakMakNepo
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxLigayaBacuel1
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 

Recently uploaded (20)

AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up Friday
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptx
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 

Construction Stages and Construction Teams

  • 1. What differentiates Project Phase, Project Teams and Construction Phase?
  • 2. Project Phase • The term Project Phase refers to a collection of activities within a project. Each project phase is goal-oriented and ends at a milestone. Reaching these milestones means the project progresses. Each phase can be divided into sub-phases.
  • 3. Project Team • Generally, the Project Team consists of you - the building owner; an architect; an engineer; an interior designer; and a contractor. Depending on the size and scope of the project, other professionals may be called in as needed (cost estimators, landscape architects, construction managers, etc.) Within the Malaysian Building Construction context, the Architect is the leader. • Construction Team?
  • 4. Construction Phase • Construction Phase has a list of steps and stages from ground breaking stage until testing and commissioning stage of any building project. The steps and stages have its own hierarchy and order to ensure the construction goes smoothly and according to the plan.
  • 5. What are the 5 stages of a project phase?
  • 6. Five stages of project phase •Initiation •Planning •Execution •Monitoring And Control •Closure
  • 7. Stages in Project Phase According to the Scale of Minimum Fees (SOMF 2010) the basic services that may be provided by the architectural consultancy practice shall be for any or all of the following phases: • (a) Schematic Design Phase; • (b) Design Development Phase; • (c) Contract Documentation Phase; • (d) Contract Implementation and Management Phase; • (e) Final Completion Phase.
  • 8. Project Stages Upon completion of each phase - Percentage of total fee payable • Schematic Design Phase - 15% • Design Development Phase - 30% • Contract Documentation Phase - 25% • Contract Implementation and Management Phase - 25% • Final Completion Phase - 5%
  • 9. Schematic Design Phase The Basic Services that may be provided by the architectural consultancy practice under the Schematic Design Phase shall be any or all of the following: • (a) taking the client's instructions and analyzing the project brief; • (b) preparing preliminary conceptual sketch proposals to interpret the project brief;
  • 10. Schematic Design Phase (Cont.) • (c) developing the preliminary conceptual sketch proposals into sketch designs to a stage sufficient to enable an application to be made for planning approval or approval in principle as required under any relevant laws; • (d) preparing preliminary estimates of the probable construction costs based on the current area, volume or other unit costs; • (e) where applicable, preparing and submitting drawings and other necessary documents to the relevant approving authorities for either town planning approval or approval in principle as required under any relevant laws.
  • 11. Design Development Phase The Basic Services that may be provided by the architectural consultancy practice under the Design Development Phase shall be any or all of the following: • (a) upon approval of the sketch designs by either the relevant approving authority or the client, developing schematic design drawings to a stage to enable other consultants to commence their detailed design work; • (b) preparing working drawings and submitting the same together with all the necessary particulars to the relevant approving authorities to obtain building approval;
  • 12. Design Development Phase (Cont.) • (c) updating the preliminary estimates of construction costs and submitting the same to the client for his approval; • (d) updating the project planning and implementation schedule and submitting the same to the client for his approval.
  • 13. Contract Documentation Phase The Basic Services that may be provided by the architectural consultancy practice under the Contract Documentation Phase shall be any or all of the following: • (a) upon approval by the client of the updated preliminary estimates of construction costs and the project planning and implementation schedule, preparing and finalizing detailed drawings and other particulars necessary to the stage of completion sufficient to enable bills of quantities to be prepared; • (b) in collaboration with other consultants, preparing all documents necessary for obtaining competitive tenders for the works;
  • 14. Contract Documentation Phase (Cont.) • (c) inviting, on behalf of the client, tenders for the works or collaborating with other consultants engaged by the client to do so; • (d) evaluating the results of the tenders and submitting a report and recommendation to the client; • (e) awarding the contract on behalf of the client; • (f) preparing the building contract documents, either alone or in collaboration with other consultants appointed by the client, for signature between the client and the contractor.
  • 15. Contract Implementation and Management Phase The Basic Services that may be provided by the architectural consultancy practice under the Contract Implementation and Management Phase shall be any or all of the following: • (a) performing all functions and duties of the architectural consultancy practice under the terms and conditions of the building contract; • (b) advising the client on the site staff required for the project and estimating the cost and duration of their employment;
  • 16. Contract Implementation and Management Phase (Cont.) • (c) providing information and issuing instructions to the contractor as required under the terms and conditions of the building contract to enable the contractor to proceed with the works; • (d) examining the works programme submitted by the contractor and to be satisfied that the works can reasonably be completed within the contract period; • (e) inspecting the works at periodic intervals so as to ensure that the works are being executed in accordance with the building contract and to issue a certificate of practical completion.
  • 17. Final Completion Phase The Basic Services that may be provided by the architectural consultancy practice under the Final Completion Phase shall be any or all of the following: • (a) issuing a certificate of completion and compliance for building after being satisfied that the building is fit and safe for occupancy; • (b) certifying as-built drawings and submitting maintenance manuals together with all warranties to the client; • (c) issuing a certificate of making good defects after being satisfied that all defects to the building have 'been rectified; (d) preparing final accounts for the contract and issuing a final certificate of payment to the contractor.
  • 18. Who are the project team members?
  • 19. The Project Team • The construction of a building involves many people: Architects; Designers; Engineers; Contractors; Sub-Contractors all working together to meet the needs of the Client. • Anyone else?
  • 20. Project Team Members Schematic Design Phase • Land Surveyor, • SI Consultant, • Architect, • Civil Engineer, • Structure Engineer, • Mechanical Engineer, • Electrical Engineer, • Landscape Architect, • Interior Designer.
  • 21. Project Team Members Design Development Phase • Architect, • Civil Engineer, • Structure Engineer, • Mechanical Engineer, • Electrical Engineer, • Quantity Surveyor, • Landscape Architect, • Interior Designer.
  • 22. Project Team Members Contract Documentation Phase • Architect, • Civil Engineer, • Structure Engineer, • Mechanical Engineer, • Electrical Engineer, • Quantity Surveyor.
  • 23. Construction Team Members Contract Implementation and Management Phase • Architect, • Resident Architect, • Clerk of Works (COW), • Civil Engineer, • Structure Engineer, • Resident Engineer, • Mechanical Engineer, • Electrical Engineer, • Main Contractor • Sub-Contractor • Suppliers • Labourers A clerk of works inspects the workmanship, quality and safety of work on construction sites and reports back to senior managers and clients. A clerk of work conducts regular site inspections and checks that building plans are being followed correctly. Check that work is being carried out to the correct specifications and legal, safety and environmental standards.
  • 24. Final Completion Phase • Architect, • Civil Engineer, • Structure Engineer, • Mechanical Engineer, • Electrical Engineer, • Contractor • BOMBA • ??? Construction Team Members
  • 25. Certificate of Completion and Compliance (CCC)
  • 26. What are the stages involved in a building construction?
  • 27. 1. Transferring Info from Drawing to Site
  • 29. 2. Site Preparation, Leveling and Setting Out Survey, security and prepare necessary equipment.
  • 30. 3. Excavation Earthwork for foundation and ground beam, prepare concreting and building material to site
  • 31. 2. Foundation Piling, ground beams, waterproofing membrane
  • 32. Concreting the columns, remove the formworks and soil filling
  • 33. 5. Sub-structure All ground beams and structure for super structure works
  • 34. 6. Super Structure-post and beams All columns and beams above ground
  • 35. 7. Walls Infill brick work and partition.
  • 36. 8. Second Floor Construction
  • 37. 9. Roofs Roof beams, roof-pitch, flat or special type.
  • 38. 10. Internal finishes Plastering, tiling and paintings
  • 39. 11. Tiling and painting works Decorative paint, special paint or no-paint at all.
  • 40. 12.Completion. Checking all completed work, testing and commissioning, handover to client/user.