PPMM PROJECT FORENSIC ANALYSIS
AND
PROCESS DEVELOPMENT
26 January, 2013
THE STANDARD PROJECT PROCESS
CONFIDENTIAL	
  
MATERIAL	
  
SUMMARY & PROGRAM
2
PPMM’s role as owner/user and not professional designer/contractor should
not hinder its comprehension of the phases of design services, expectations of
deliverables and right to review and approval. This slide deck Introduces the
services of architectural design and the process of design-bid-build.
The program is the term used to define the required functions of the
project. It should include estimated square footage of each usage
type and any other elements that achieve the project goals. Note:
This is generally provided by the Owner to the Architect.
PROGRAM
SCHEMATIC
DESIGN
DESIGN
DEVELOPMENT
CONTRACT
DOCUMENTS
CONSTRUCTION
ADMINISTRATION
BIDDING
SERVICES
CONFIDENTIAL	
  
MATERIAL	
  
SCHEMATIC DESIGN
3
During schematic design, an architect commonly develops study drawings,
documents, or other media that illustrate the concepts of the design and
include spatial relationships, scale, and form for the owner to review.
Schematic design also is the research phase of the project, when zoning
requirements or jurisdictional restrictions are discovered and addressed.
This phase produces a final schematic design, to which PPMM agrees after
consultation and discussions with the architect. Costs are estimated based on
overall project volume. The design then moves forward to the design
development phase.
Deliverables: Schematic design often produces a site plan, floor
plan(s), sections, an elevation, and other illustrative materials;
computer images, renderings, or models. Typically the drawings
include overall dimensions, and a construction cost is estimated.
Note: The contract may actually spell out what is to be delivered.
CONFIDENTIAL	
  
MATERIAL	
  
DESIGN DEVELOPMENT
4
Design development (DD) services use the initial design documents from the
schematic phase and take them one step further. This phase lays out
mechanical, electrical, plumbing, structural, and architectural details.
Typically referred to as DD, this phase results in drawings that often specify
design elements such as material types and location of windows and doors.
Any additional level of detail provided in the DD phase is determined by
PPMM’s request and the project requirements. The DD phase ends with a
formal presentation to, and approval by, PPMM.
Deliverables: Design development often produces floor plans,
sections, and elevations with full dimensions as well as a refined
construction cost. Drawings typically include door and window
details and outline material specifications.
CONFIDENTIAL	
  
MATERIAL	
  
CONTRACT DOCUMENTS
5
The next phase is contract documents (CDs). Once PPMM and architect are
satisfied with the documents produced during DD, the architect moves
forward and produces drawings with greater detail. These drawings typically
include specifications for construction details and materials. Once CDs are
satisfactorily produced, the architect sends them to contractors for pricing or
bidding.
The level of detail in CDs may vary depending on the owner’s preference. If
the CD set is not 100-percent complete, this is noted on the CD set when it is
sent out for bid. This phase results in the contractors’ final estimate of project
costs.
Deliverables: The construction document phase produces a set of
drawings that include all pertinent information required for the
contractor to price and build the project.
CONFIDENTIAL	
  
MATERIAL	
  
BID PHASE SERVICES
6
The bid document set often includes an advertisement for bids, instructions to
bidders, the bid form, bid documents, the owner-contractor agreement,
labor and material payment bond, and any other sections necessary for
successful price bids. For some projects that have unique aspects or complex
requirements, the architect and PPMM may elect to have a pre-bid meeting
for potential contractors.
After bid sets are distributed, both PPMM and architect wait for bids to come
in. PPMM, with the help of the architect, evaluate the bids and select a
winning bid. Any negotiation with the bidder of price or project scope, if
necessary, should be done before the contract for construction is signed.
The final step is to award the contract to the selected bidder with a formal
letter of intent to allow construction to begin.
Deliverables: The final deliverable is a construction contract. Once
this document is signed, project construction can begin
CONFIDENTIAL	
  
MATERIAL	
  
CONTRACT ADMINISTRATION
7
Contract administration (CA) services are rendered at PPMM’S discretion and
are outlined in the owner-architect construction agreement. Different owner-
architect-contractor agreements require different levels of services on the
architect’s part. CA services begin with the initial contract for construction
and terminate when the final payment is issued.
The architect’s core responsibility during this phase is to help the contractor to
build the project as specified in the CDs as approved by the owner.
Questions may arise on site that require the architect to develop
architectural sketches: drawings issued after construction documents have
been released that offer additional clarification to finish the project properly.
Different situations may require the architect to issue a Change in Services to
complete the project.
Deliverables: A successfully built and contracted project.
CONFIDENTIAL	
  
MATERIAL	
  
RECOMMENDED A/E SCOPE
8
For traditional Design-Bid-Build projects, the following expectations are
suggested to be included by PPMM in any Owner/Architect Agreement (an AIA
Document), other contract or PO type as preferred.
PHASE BY DELIVERABLES
PROGRAMMING PPMM List of functions, rough square footage, special needs, standard
palette, project contacts and required timeline.
SCHEMATICS AE/PPMM To be formally approved by PPMM: Floor plan(s), site plan, +/-
20% cost estimate, and modeling/elevations as needed.
DESIGN DEVELOPMENT A/E PPMM To be formally approved by PPMM: Floor plans, sections,
elevations, and +/- 10% estimate.
CONTRACT DOCUMENTS A/E Set of drawings to obtain all permits and allow competitive
Contractor bidding.
BID PHASE A/E Create and distribute bid documents, conduct tours, answer
Contractor questions, receive bids, analyze and recommend
results to PPMM. Help with construction contract and clarifying
any issues or negotiation issues prior to construction.
CONTRACT ADMINISTRATION A/E As per AIA Owner/Architect Agreement including processing,
analyzing and presenting any COs and reviewing submittals
as applications for payment by the Contractor.

More Related Content

What's hot

Project scope statement template v2.3
Project scope statement template v2.3Project scope statement template v2.3
Project scope statement template v2.3Aditya Pandey
 
Construction Project Process Flow
Construction Project Process FlowConstruction Project Process Flow
Construction Project Process FlowRajasekar M
 
The NEW Role of the AIA's Digital Practice Documents
The NEW Role of the AIA's Digital Practice DocumentsThe NEW Role of the AIA's Digital Practice Documents
The NEW Role of the AIA's Digital Practice DocumentsJeremy Baker
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviromentjuwes
 
Architect-Led Design-Build: a PRACTICAL business plan
Architect-Led Design-Build:  a PRACTICAL business planArchitect-Led Design-Build:  a PRACTICAL business plan
Architect-Led Design-Build: a PRACTICAL business planJeremy Baker
 
The AIA's NEW Sustainable Projects Exhibit, E204-2017
The AIA's NEW Sustainable Projects Exhibit, E204-2017The AIA's NEW Sustainable Projects Exhibit, E204-2017
The AIA's NEW Sustainable Projects Exhibit, E204-2017Jeremy Baker
 
Lecture slides4; Construction Project Planning
Lecture slides4; Construction Project PlanningLecture slides4; Construction Project Planning
Lecture slides4; Construction Project PlanningJB Nartey
 
J.S. Daniel presentation on planning
J.S. Daniel presentation on planningJ.S. Daniel presentation on planning
J.S. Daniel presentation on planningJ.S. Daniel
 
Project Scope Managemen Final Megat
Project Scope Managemen Final MegatProject Scope Managemen Final Megat
Project Scope Managemen Final Megatmegat zainurul anuar
 
NEC4: Evolution of the ECC by "Ben Walker - NEC4 Contract Drafter, CEO for CE...
NEC4: Evolution of the ECC by "Ben Walker - NEC4 Contract Drafter, CEO for CE...NEC4: Evolution of the ECC by "Ben Walker - NEC4 Contract Drafter, CEO for CE...
NEC4: Evolution of the ECC by "Ben Walker - NEC4 Contract Drafter, CEO for CE...Project Controls Expo
 
NEC4 overview: key changes and impacts - London, September 2017
NEC4 overview: key changes and impacts - London, September 2017NEC4 overview: key changes and impacts - London, September 2017
NEC4 overview: key changes and impacts - London, September 2017Browne Jacobson LLP
 

What's hot (20)

Project scope statement template v2.3
Project scope statement template v2.3Project scope statement template v2.3
Project scope statement template v2.3
 
ACH 231 Lecture 07 (Contract Documents) Part 1
ACH 231 Lecture 07 (Contract Documents) Part 1ACH 231 Lecture 07 (Contract Documents) Part 1
ACH 231 Lecture 07 (Contract Documents) Part 1
 
Construction Project Process Flow
Construction Project Process FlowConstruction Project Process Flow
Construction Project Process Flow
 
The NEW Role of the AIA's Digital Practice Documents
The NEW Role of the AIA's Digital Practice DocumentsThe NEW Role of the AIA's Digital Practice Documents
The NEW Role of the AIA's Digital Practice Documents
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviroment
 
Architect-Led Design-Build: a PRACTICAL business plan
Architect-Led Design-Build:  a PRACTICAL business planArchitect-Led Design-Build:  a PRACTICAL business plan
Architect-Led Design-Build: a PRACTICAL business plan
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 
The AIA's NEW Sustainable Projects Exhibit, E204-2017
The AIA's NEW Sustainable Projects Exhibit, E204-2017The AIA's NEW Sustainable Projects Exhibit, E204-2017
The AIA's NEW Sustainable Projects Exhibit, E204-2017
 
Lecture slides4; Construction Project Planning
Lecture slides4; Construction Project PlanningLecture slides4; Construction Project Planning
Lecture slides4; Construction Project Planning
 
J.S. Daniel presentation on planning
J.S. Daniel presentation on planningJ.S. Daniel presentation on planning
J.S. Daniel presentation on planning
 
Building services planning manual 2007
Building services planning manual 2007Building services planning manual 2007
Building services planning manual 2007
 
Project Scope Managemen Final Megat
Project Scope Managemen Final MegatProject Scope Managemen Final Megat
Project Scope Managemen Final Megat
 
Chapter 5- Contract Management
Chapter 5- Contract ManagementChapter 5- Contract Management
Chapter 5- Contract Management
 
COE
COECOE
COE
 
NEC4: Evolution of the ECC by "Ben Walker - NEC4 Contract Drafter, CEO for CE...
NEC4: Evolution of the ECC by "Ben Walker - NEC4 Contract Drafter, CEO for CE...NEC4: Evolution of the ECC by "Ben Walker - NEC4 Contract Drafter, CEO for CE...
NEC4: Evolution of the ECC by "Ben Walker - NEC4 Contract Drafter, CEO for CE...
 
ACH 231 Lecture 07 (Contract Documents) Part 2
ACH 231 Lecture 07 (Contract Documents) Part 2ACH 231 Lecture 07 (Contract Documents) Part 2
ACH 231 Lecture 07 (Contract Documents) Part 2
 
113 2 pdri
113 2 pdri113 2 pdri
113 2 pdri
 
NEC4 overview: key changes and impacts - London, September 2017
NEC4 overview: key changes and impacts - London, September 2017NEC4 overview: key changes and impacts - London, September 2017
NEC4 overview: key changes and impacts - London, September 2017
 
Project management
Project managementProject management
Project management
 
EC Barnes-CV
EC Barnes-CVEC Barnes-CV
EC Barnes-CV
 

Viewers also liked

CL PROJECT 3 PROGRESSION
CL PROJECT 3 PROGRESSIONCL PROJECT 3 PROGRESSION
CL PROJECT 3 PROGRESSIONLin Hui
 
The Essentials of Community Building by Mack Fogelson
The Essentials of Community Building by Mack FogelsonThe Essentials of Community Building by Mack Fogelson
The Essentials of Community Building by Mack FogelsonMackenzie Fogelson
 
Lecture 2 - Site Analysis - Commercial-Institutional Interiors VDIS10009
Lecture 2 - Site Analysis - Commercial-Institutional Interiors VDIS10009Lecture 2 - Site Analysis - Commercial-Institutional Interiors VDIS10009
Lecture 2 - Site Analysis - Commercial-Institutional Interiors VDIS10009Virtu Institute
 
Site analysis-example
Site analysis-exampleSite analysis-example
Site analysis-exampleAnu PA
 

Viewers also liked (8)

Nahwu isim kana
Nahwu isim kanaNahwu isim kana
Nahwu isim kana
 
CL PROJECT 3 PROGRESSION
CL PROJECT 3 PROGRESSIONCL PROJECT 3 PROGRESSION
CL PROJECT 3 PROGRESSION
 
SITE ANALYSIS
SITE ANALYSIS SITE ANALYSIS
SITE ANALYSIS
 
Herbal Healings Pp
Herbal Healings PpHerbal Healings Pp
Herbal Healings Pp
 
The Essentials of Community Building by Mack Fogelson
The Essentials of Community Building by Mack FogelsonThe Essentials of Community Building by Mack Fogelson
The Essentials of Community Building by Mack Fogelson
 
The Sound's Guide to Writing a concept
The Sound's Guide to Writing a concept The Sound's Guide to Writing a concept
The Sound's Guide to Writing a concept
 
Lecture 2 - Site Analysis - Commercial-Institutional Interiors VDIS10009
Lecture 2 - Site Analysis - Commercial-Institutional Interiors VDIS10009Lecture 2 - Site Analysis - Commercial-Institutional Interiors VDIS10009
Lecture 2 - Site Analysis - Commercial-Institutional Interiors VDIS10009
 
Site analysis-example
Site analysis-exampleSite analysis-example
Site analysis-example
 

Similar to 130125.PROCESS DIAGRAM

PP1 Project 1 Project implementation
PP1 Project 1 Project implementationPP1 Project 1 Project implementation
PP1 Project 1 Project implementationTeo Kean Hui
 
03 Architectural Job Phases
03 Architectural Job Phases03 Architectural Job Phases
03 Architectural Job PhasesDouglas Vail
 
7 Design Phases in Architectural Design Process
7 Design Phases in Architectural Design Process7 Design Phases in Architectural Design Process
7 Design Phases in Architectural Design Processarananeust
 
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdfCCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdfChassyTesoro1
 
Design-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful OutcomesDesign-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful OutcomesMcCarthy Holdings, Inc.
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008AYM1979
 
professional services and value engeneering
professional services and value engeneeringprofessional services and value engeneering
professional services and value engeneeringAbdo Jamous El Jamous
 
Project Phase, Project Teams & Construction Phase.pdf
Project Phase, Project Teams & Construction Phase.pdfProject Phase, Project Teams & Construction Phase.pdf
Project Phase, Project Teams & Construction Phase.pdfMOHDFIRRDHAUSBINMOHD
 
The Importance Of The Construction Submittal Process
The Importance Of The Construction Submittal ProcessThe Importance Of The Construction Submittal Process
The Importance Of The Construction Submittal ProcessSafe Rise
 
PPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slidePPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slideSithick Mohamed .
 
Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
Construction Stages and Construction Teams
Construction Stages and Construction TeamsConstruction Stages and Construction Teams
Construction Stages and Construction TeamsMOHDFIRRDHAUSBINMOHD
 
Pmp t09 project_execution_plan_rev_a
Pmp t09 project_execution_plan_rev_aPmp t09 project_execution_plan_rev_a
Pmp t09 project_execution_plan_rev_aForbes Chanakira
 
Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkDaniel Ross
 
glossary-of-construction-terms.pdf
glossary-of-construction-terms.pdfglossary-of-construction-terms.pdf
glossary-of-construction-terms.pdfCarlStevenAtencio
 

Similar to 130125.PROCESS DIAGRAM (20)

PP1 Project 1 Project implementation
PP1 Project 1 Project implementationPP1 Project 1 Project implementation
PP1 Project 1 Project implementation
 
03 Architectural Job Phases
03 Architectural Job Phases03 Architectural Job Phases
03 Architectural Job Phases
 
7 Design Phases in Architectural Design Process
7 Design Phases in Architectural Design Process7 Design Phases in Architectural Design Process
7 Design Phases in Architectural Design Process
 
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdfCCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
 
Design-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful OutcomesDesign-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful Outcomes
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
professional services and value engeneering
professional services and value engeneeringprofessional services and value engeneering
professional services and value engeneering
 
Project Phase, Project Teams & Construction Phase.pdf
Project Phase, Project Teams & Construction Phase.pdfProject Phase, Project Teams & Construction Phase.pdf
Project Phase, Project Teams & Construction Phase.pdf
 
The Importance Of The Construction Submittal Process
The Importance Of The Construction Submittal ProcessThe Importance Of The Construction Submittal Process
The Importance Of The Construction Submittal Process
 
PPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slidePPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slide
 
Construction process
Construction processConstruction process
Construction process
 
PM Services
PM ServicesPM Services
PM Services
 
Construction Stages and Construction Teams
Construction Stages and Construction TeamsConstruction Stages and Construction Teams
Construction Stages and Construction Teams
 
ARCOINTR
ARCOINTRARCOINTR
ARCOINTR
 
Pmp t09 project_execution_plan_rev_a
Pmp t09 project_execution_plan_rev_aPmp t09 project_execution_plan_rev_a
Pmp t09 project_execution_plan_rev_a
 
Real estate investment
Real estate investmentReal estate investment
Real estate investment
 
Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction Work
 
Comprehensive Guide to SD, DD, CD in Construction Projects
Comprehensive Guide to SD, DD, CD in Construction ProjectsComprehensive Guide to SD, DD, CD in Construction Projects
Comprehensive Guide to SD, DD, CD in Construction Projects
 
glossary-of-construction-terms.pdf
glossary-of-construction-terms.pdfglossary-of-construction-terms.pdf
glossary-of-construction-terms.pdf
 
Phases of a Project
Phases of a ProjectPhases of a Project
Phases of a Project
 

More from Jim E Kelly AIA

More from Jim E Kelly AIA (8)

150131.RESUME
150131.RESUME150131.RESUME
150131.RESUME
 
131118
131118131118
131118
 
130519.kelly commentary
130519.kelly commentary 130519.kelly commentary
130519.kelly commentary
 
150107.SLA BIRTH
150107.SLA BIRTH150107.SLA BIRTH
150107.SLA BIRTH
 
150107.PROCESS BIRTH
150107.PROCESS BIRTH150107.PROCESS BIRTH
150107.PROCESS BIRTH
 
150131A
150131A150131A
150131A
 
141206.KELLY COMMENTARY
141206.KELLY COMMENTARY141206.KELLY COMMENTARY
141206.KELLY COMMENTARY
 
PDF141119
PDF141119PDF141119
PDF141119
 

130125.PROCESS DIAGRAM

  • 1. CONFIDENTIAL   MATERIAL   PPMM PROJECT FORENSIC ANALYSIS AND PROCESS DEVELOPMENT 26 January, 2013 THE STANDARD PROJECT PROCESS
  • 2. CONFIDENTIAL   MATERIAL   SUMMARY & PROGRAM 2 PPMM’s role as owner/user and not professional designer/contractor should not hinder its comprehension of the phases of design services, expectations of deliverables and right to review and approval. This slide deck Introduces the services of architectural design and the process of design-bid-build. The program is the term used to define the required functions of the project. It should include estimated square footage of each usage type and any other elements that achieve the project goals. Note: This is generally provided by the Owner to the Architect. PROGRAM SCHEMATIC DESIGN DESIGN DEVELOPMENT CONTRACT DOCUMENTS CONSTRUCTION ADMINISTRATION BIDDING SERVICES
  • 3. CONFIDENTIAL   MATERIAL   SCHEMATIC DESIGN 3 During schematic design, an architect commonly develops study drawings, documents, or other media that illustrate the concepts of the design and include spatial relationships, scale, and form for the owner to review. Schematic design also is the research phase of the project, when zoning requirements or jurisdictional restrictions are discovered and addressed. This phase produces a final schematic design, to which PPMM agrees after consultation and discussions with the architect. Costs are estimated based on overall project volume. The design then moves forward to the design development phase. Deliverables: Schematic design often produces a site plan, floor plan(s), sections, an elevation, and other illustrative materials; computer images, renderings, or models. Typically the drawings include overall dimensions, and a construction cost is estimated. Note: The contract may actually spell out what is to be delivered.
  • 4. CONFIDENTIAL   MATERIAL   DESIGN DEVELOPMENT 4 Design development (DD) services use the initial design documents from the schematic phase and take them one step further. This phase lays out mechanical, electrical, plumbing, structural, and architectural details. Typically referred to as DD, this phase results in drawings that often specify design elements such as material types and location of windows and doors. Any additional level of detail provided in the DD phase is determined by PPMM’s request and the project requirements. The DD phase ends with a formal presentation to, and approval by, PPMM. Deliverables: Design development often produces floor plans, sections, and elevations with full dimensions as well as a refined construction cost. Drawings typically include door and window details and outline material specifications.
  • 5. CONFIDENTIAL   MATERIAL   CONTRACT DOCUMENTS 5 The next phase is contract documents (CDs). Once PPMM and architect are satisfied with the documents produced during DD, the architect moves forward and produces drawings with greater detail. These drawings typically include specifications for construction details and materials. Once CDs are satisfactorily produced, the architect sends them to contractors for pricing or bidding. The level of detail in CDs may vary depending on the owner’s preference. If the CD set is not 100-percent complete, this is noted on the CD set when it is sent out for bid. This phase results in the contractors’ final estimate of project costs. Deliverables: The construction document phase produces a set of drawings that include all pertinent information required for the contractor to price and build the project.
  • 6. CONFIDENTIAL   MATERIAL   BID PHASE SERVICES 6 The bid document set often includes an advertisement for bids, instructions to bidders, the bid form, bid documents, the owner-contractor agreement, labor and material payment bond, and any other sections necessary for successful price bids. For some projects that have unique aspects or complex requirements, the architect and PPMM may elect to have a pre-bid meeting for potential contractors. After bid sets are distributed, both PPMM and architect wait for bids to come in. PPMM, with the help of the architect, evaluate the bids and select a winning bid. Any negotiation with the bidder of price or project scope, if necessary, should be done before the contract for construction is signed. The final step is to award the contract to the selected bidder with a formal letter of intent to allow construction to begin. Deliverables: The final deliverable is a construction contract. Once this document is signed, project construction can begin
  • 7. CONFIDENTIAL   MATERIAL   CONTRACT ADMINISTRATION 7 Contract administration (CA) services are rendered at PPMM’S discretion and are outlined in the owner-architect construction agreement. Different owner- architect-contractor agreements require different levels of services on the architect’s part. CA services begin with the initial contract for construction and terminate when the final payment is issued. The architect’s core responsibility during this phase is to help the contractor to build the project as specified in the CDs as approved by the owner. Questions may arise on site that require the architect to develop architectural sketches: drawings issued after construction documents have been released that offer additional clarification to finish the project properly. Different situations may require the architect to issue a Change in Services to complete the project. Deliverables: A successfully built and contracted project.
  • 8. CONFIDENTIAL   MATERIAL   RECOMMENDED A/E SCOPE 8 For traditional Design-Bid-Build projects, the following expectations are suggested to be included by PPMM in any Owner/Architect Agreement (an AIA Document), other contract or PO type as preferred. PHASE BY DELIVERABLES PROGRAMMING PPMM List of functions, rough square footage, special needs, standard palette, project contacts and required timeline. SCHEMATICS AE/PPMM To be formally approved by PPMM: Floor plan(s), site plan, +/- 20% cost estimate, and modeling/elevations as needed. DESIGN DEVELOPMENT A/E PPMM To be formally approved by PPMM: Floor plans, sections, elevations, and +/- 10% estimate. CONTRACT DOCUMENTS A/E Set of drawings to obtain all permits and allow competitive Contractor bidding. BID PHASE A/E Create and distribute bid documents, conduct tours, answer Contractor questions, receive bids, analyze and recommend results to PPMM. Help with construction contract and clarifying any issues or negotiation issues prior to construction. CONTRACT ADMINISTRATION A/E As per AIA Owner/Architect Agreement including processing, analyzing and presenting any COs and reviewing submittals as applications for payment by the Contractor.