Aswan High Dam Reservoir management system
Noha Donia
ABSTRACT
The Aswan High Dam Reservoir management system was developed to simulate dam operation
under varying boundary conditions taking as example climate change and Millennium Dam
construction, and analyze the optimal operation rules of the reservoir taking into account a large
number of objectives, including hydropower production and water supply for irrigation purposes. The
developed system runs on Windows platforms and comprises three basic modules: a user-friendly
graphical interface managing all graphic features, a computational engine where all the algorithms
are implemented, and a database and files module managing hydrological and operational data. The
developed model was calibrated. The future hydrologic scenarios developed have been used to
assess the expected impacts of potential climate change (baseline and three periods with two global
emission scenarios) and the Millennium Dam. The new operation rules were used for scenarios
analysis. It was concluded that overall applying the new operation rules will decrease the percentage
of occurrence of minimum water levels. Also, the Millennium Dam will increase the percentage of
occurrence of minimum water levels. Finally, the period III (2070–2099) for the two global emission
scenarios is very critical for the dam operation.
Noha Donia
Environmental Engineering Department,
Institute of Environmental Studies and Researches,
6th Bostan Street,
Flat 503, Cairo,
Egypt
E-mail: ndonia@gmail.com
Key words | climate change, dam operation, decision support systems, operation rules,
scenario analysis, water resource management
INTRODUCTION
Successful integrated management of water supply systems
requires the effective use of Decision Support Systems
(DSS) able to support managers to make key decisions.
According to a structural definition (Sprague ; Reitsma
et al. ), a DSS can be defined as a computer-based
tool comprising three subsystems: the modeling subsystem,
the database subsystem and the user interface subsystem,
interconnected with each other. Numerous researchers
have developed computer-based DSS for the management
and operation of reservoirs and river systems (e.g.,
Simonovic & Savic ; DeGagne et al. ; Koutsoyian-
nis et al. ). Currently, the vast majority of reservoir
system planning and operation is undertaken using simu-
lation and optimization models (Lund & Guzman ).
To date, these have focused primarily on the physical
aspects of the system (Reitsma ). They are frequently
based on simple engineering principles for dam operation,
such as keeping reservoirs full for water supply or empty
for flood control. As such, they provide a great deal of flexi-
bility in the specification of system operations under various
flow, storage and demand conditions. Many rules are based
on largely empirical or experimental success, determined
either from actual operational performance, performance
in simulation studies or optimization results. These
experimentally-supported rules are common for large
multi-purpose projects.
Georgakakos () describes four scales at which DSS
can improve reservoir network management by improving
decision making:
• long term infrastructure planning and construction;
• interannual and seasonal operational decisions for over-
year storage and water contracts;
• 1–3 month operational decisions for dry period conserva-
tion or flood management; and
1491 © IWA Publishing 2013 Journal of Hydroinformatics | 15.4 | 2013
doi: 10.2166/hydro.2013.003
Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf
by guest
• daily releases for water allocation or hydropower oper-
ation. Decision support at the first scale is used in a
planning capacity, where the decisions are for changes
or improvements in infrastructure.
The operational decisions associated with the other
three scales are primarily reservoir release schedules. DSS
can help operators make releases which best meet the objec-
tives of the project: meeting user demands, suitable deficit
allocations during drought periods, and most importantly a
release schedule which appropriately balances the present
demands with the value of storage for future demands.
Climate change can have an impact on water resources
systems resulting in changes in both, the hydrologic cycle
and water availability (IPCC ). Since the magnitude of
local climate change depends on the rate of change of weather
conditions, precipitation and temperature, some regions have
already begun investigations into the potential impact on local
water systems, particularly in areas of multipurpose use of
water and reliance on water supply facilities such as reservoirs
(Wood et al. ; Hamlet & Lettenmaier ; Payne et al.
; Simonovic & Li ; Van Rheenen et al. ). In a
geographic region that, by its nature, depends on effective
management of the water resources by the storage reservoirs,
a study of potential climate change impacts on reservoir oper-
ation is justified. The reservoir not only provides water for
basic needs, but also stores the surplus of water during high
flow season to provide protection of downstream area from
flooding. Reservoir systems, designed and operated using his-
torical data, are unlikely to have management contingencies
for the effects of climate change. To fill that research gap,
scientific work is being done on the impact of climate
change with an attempt to define the risks associated with cur-
rent reservoir operation practices (Nemec & Schaake ;
Klemes ; Burn & Simonovic ; Yao & Georgakakos
). Brekke et al. () developed a risk assessment frame-
work and applied it to California’s Central Valley Project and
State Water Project systems. They used a total of 97 scenarios
based on emissions and General Circulation Models (GCMs)
provided by the Intergovernmental Panel on Climate Change
(IPCC). A weighting was assigned to each scenario, for risk-
based planning approach, to study how the risk outlined is
sensitive not only to selected climate scenarios but also to
analytical design choices such as weight projections. In
much of the existing and quite limited research only current
reservoir operating rules are used to determine how water sys-
tems will respond to climate change.
Many studies including the Aswan High Dam Reservoir
(AHDR) simulation and optimization models have been con-
ducted, but the availability of reliable data and economic and
human resources burdens the implementation of complex
models for the management of water (Alarcon & Marks
; WMP ; Guariso et al. ; Sadek & Aziz ; Soli-
man et al. ; Shafie et al. ). Also these studies have
taken into account a stationary climate that is increasingly
considered inadequate for sustainable water resources man-
agement. Few studies have taken into consideration climate
change impact on the Aswan High Dam (AHD) such as
Mobasher & Ostrowski () for reservoir systems, climatic
variability and the related hydrologic uncertainty are major
sources of vulnerability. This is especially true in West
Africa where the already high interannual variability is
exacerbated by trends associated with climate change (Dow
; Hellmuth et al. ). DSS can reduce these vulnerabil-
ities by improving water resource management in the face of
climate variability and change (Yao & Georgakakos ;
NRC ), including systems in Africa (McCartney ).
This study attempts to develop a DSS for managing the
AHDR operation for adaptation to climate change. The
system has several important characteristics. We develop a
tool of analysis that is easy to use and easily accepted by man-
agers who have little training in quantitative analysis, and
that corresponds as closely as possible to the way in which
water release decisions were made historically. Of course,
the overriding goal is to design decision rules that signifi-
cantly improve on previously practiced rules, especially in
the event of extreme hydrological conditions such as flooding
or drought and climate change scenarios. The manager can
easily use the DSS on a monthly basis, to quickly analyze
the impact of several different alternative courses of action
(such as water release schemes) on the relevant objectives
and other quantities of interest (such as electricity generation
and reservoir storage). The system is a scenario-driven
decision support tool for incorporating climate change into
new operating rules for the AHDR. Therefore, the DSS pro-
posed in this study can be used to determine reservoir
operation rules that adapt to new conditions whenever infor-
mation is available (for example updated GCM output).
1492 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013
Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf
by guest
CASE STUDY DESCRIPTION
Construction of the AHD on the River Nile in southern Egypt
began in 1960 and was completed in 1972. The dam is in fact
the core of all production in Egypt. It is the foundation upon
which the country’s contemporary industrial, agricultural and
economic revival depends. The intended purposes of the pro-
ject are irrigation, hydropower generation and flood control.
With regard to its relative economic importance, the dam
project has a unique position among the big irrigation projects
in the world. AHDR, known as Lake Nasser, is a reservoir
formed as a result of the construction of the AHD. It is located
on the border between Egypt and Sudan (see Figure 1).
The reservoir has a large annual carry-over capacity of
168.90 BCM (billion cubic meters) that corresponds to a lake
surface area of 6,540 km2
, length of 500 km and an average
width of 12 km. The ratio between storage capacity and the
corresponding surface area or the storage mean depth for the
Figure 1 | Location map of the reservoir, which represents one of the world’s largest artificial lakes (MWRI 2005).
1493 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013
Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf
by guest
AHD is 24.82 m. About 300 km of its length lies within the
Egyptian borders, while 200 km are within Sudanese territory.
The total storage capacity of the reservoir is allocated as fol-
lows: 90 BCM as live storage capacity between levels 147
and 175 m (meters above sea level, MASL), 31 BCM as dead
storage for sediment deposition, and 41 BCM as a flood con-
trol buffer between the levels of 175 and 182 m (MASL). The
reliable water supply from the AHDR is estimated as
55.5 BCM yr 1
, based on the average natural flow of
84 BCM yr 1
, reservoir evaporation losses of 10 BCM yr 1
and an allocation of 18.5 BCM yr 1
for the Sudan. The hydro-
electric power station consists of 12 units with a capacity of
175 MW each, i.e., a total capacity of 2,100 MW, producing
on average 7 billion kWh of energy annually. Each turbine is
under a head range of 60–76 m, while the water level in the
reservoir upstream of the turbines ranges between 175 m at
the beginning of the water year in August and 165 m or less
in the drought seasons. The height of the turbines is 108 m,
so the head on the turbines can be calculated as 175–108 ¼
67 m in the normal operation case for a corresponding range
of discharges between 270 and 345 m3
s 1
. Associated with
the generating units are emergency low-level outlets for releas-
ing water when downstream needs exceed the flows that can
be handled by the turbines (Abu-Zeid & El-Shibini ). The
design criteria for the AHDR are shown in Figure 2.
The reservoir satisfies the multiple roles of water conser-
vation, flood protection and hydropower generation. The
releases from the dam are designed to meet irrigation require-
ments, which vary markedly from one season to another and
hydropower is generated as a secondary benefit. In addition,
the reservoir is operated to control the annual flood by draw-
ing down the reservoir to a predetermined level on a specified
date each year. Additional constraints on the operation of the
reservoir are imposed by the need to limit the magnitude of
releases so as to avoid downstream degradation and/or hin-
drance to navigation. During low flood years, the water
released for different uses, in Egypt and Sudan, is reduced
according to a sliding scale in order to avoid reservoir empty-
ing. The amount of monthly releases, therefore, is determined
by the amount of the flood and essential requirements. The
reservoir reached its lowest storage level of 150.62 m in July
1988, but fortunately, the large flood of 1988–1989 allowed
the reservoir to rise again and reach a level of 168.82 m in
December 1988. In the 1990s, the reservoir continued to
rise until it reached the highest level of 181.60 m in
November 1999 (Sadek ).
Egypt’s water demand might rapidly increase due to the
population growth and the improvement of living standards
as well as to achieve the government policies in order to
reclaim new lands and to encourage development in the
industrial sector. The major water consuming sectors are
agriculture, municipalities and industries. On the other
hand yield supply related to rainfall and evaporation, and
subsequent changes of inflow into the reservoir must be
taken into consideration. These supply scenarios are sto-
chastic and vary year by year. Drivers are global warming
and related climate change which will determine these vari-
ables. The natural Nile flows are very sensitive to relatively
small changes in rainfall. Nile River discharge has a very
great variation due to the variety of the different character-
istics of the Nile basin. The Nile flood can be as high as
150 BCM yr 1
(1878–1879) and as low as 42 BCM yr 1
(1913–1914). Nile River floods can be classified according
to the following five categories (Sadek & Aziz ):
• Very low flood with an average flow of 52 BCM yr 1
;
• Low flood with an average flow of 70 BCM yr 1
;
• Average flood with an average flow of 92 BCM yr 1
;
• High flood with an average flow of 110 BCM yr 1
;
• Very high flood with an average flow exceeding
110 BCM yr 1
.
Studies of climate change impact on the Nile River show
that the basin is extremely sensitive to temperature and pre-
cipitation changes (Strzepek & Yates ). An increase of
Figure 2 | Design criteria for the AHD.
1494 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013
Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf
by guest
10% in average annual precipitation would lead to an aver-
age increase in annual flow of 40%. Similarly, a decrease in
10% in precipitation would lead to a reduction of the annual
flow of more than 50% (Ministry of Water Resources and
Irrigation ). Beyene et al. () assessed the potential
impacts of climate change on the hydrology and water
resources of the Nile River basin using a macroscale hydro-
logic model driven by 21st century simulations of
temperature and precipitation downscaled from runs of 11
GCMs and two global emissions scenarios (A2, correspond-
ing roughly to unconstrained growth in emissions, and B1,
corresponding to elimination of global emissions increases
by 2100) archived for the 2007 IPCC report. The results
show that, averaged across the multimodel ensembles, the
entire Nile basin is expected to increases in precipitation
early in the century (period I, 2010–2039), followed by
decreases later in the century (period II, 2040–2069 and
period III, 2070–2099) with the exception of the eastern-
most Ethiopian highlands which might experience increases
in summer precipitation by 2080–2100. Averaged over all
models and ensembles, annual streamflow at the AHD for
scenario A2 was predicted to increase to 111% of the
1950–1999 mean during 2010–2039, but then to decrease
to 92 and 84% of the 1950–1999 mean during 2040–2069
and 2070–2099, respectively. For scenario B1, the corre-
sponding numbers were 114% (increase) during 2010–
2039, and decreases to 93 and 87% of the 1950–1999
mean for 2040–2069 and 2070–2099, respectively.
Another varying boundary condition is the Grand Ethio-
pian Renaissance Dam (formerly known as Project X or the
Grand Millennium Dam) that Ethiopia announced in April
2011 over the Blue Nile (Figure 3). This huge dam will flood
1,680 km2
of forest in northwest Ethiopia, near the Sudan
border, and create a reservoir that is nearly twice as large as
Lake Tana, Ethiopia’s largest natural lake. While there are
no known studies about the dam’s impacts on the river’s
flow, filling such a huge reservoir (it will hold up to 67 BCM
of water, and likely take up to 7 years to reach capacity) will
certainly impact Egypt, which relies almost totally on the
Nile for its water supply. Climate change could increase the
project’s many risks. If it fills in 3 years (from 2014 to 2017),
it will save 21 BCM every year, so only 27 BCM will come
into Egypt instead of 48 BCM, in other words, a 21 BCM
decrease in Egypt and Sudan’s share. After completion of
the dam construction, and assuming that it operates only 10
pumps from 15 and that the capacity of each pump is
4.3 BCM then Egypt would receive only 43 BCM instead of
48 BCM, a loss of 5 BCM divided between the Egyptian and
Sudanese share (Zewde ; BCEOM ; Waterbury
; World Bank a,b; Berhane ).
Due to the enormous importance of the reservoir,
special and national consideration must be given to the
reservoir operation and development. Operation of the
AHDR might face different challenges in the 21st century
due to potential changes of the demand-supply conditions.
The management of the AHDR is one of the most important
issues related to water resources studies in Egypt. The devel-
oped model will be used to analyze future development of
water resources yield and demand, and related modifi-
cations of the infrastructure and operation. It is designed
as a comparative analysis tool. A base case is developed
and then alternative scenarios are created and compared
to this base case. Therefore, this paper objective is to
Figure 3 | Design of the new Millennium Dam of Ethiopia on the Nile River.
1495 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013
Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf
by guest
develop ‘easy to use’ computing tools in order to perform
these scenario analyses studies and to improve the manage-
ment of the High Aswan Dam Reservoir under climate
change.
ASWAN HIGH DAM RESERVOIR MANAGEMENT
SYSTEM (AHDRMS)
The developed management system is a computer-based tool
comprising three subsystems: the modeling subsystem, the
database subsystem and the user interface subsystem, inter-
connected with each other. Computer software was
developed, using Visual Basic, by the author and it is
named ‘Aswan High Dam Reservoir Management System
(AHDRMS)’. The capabilities of the developed system help
in understanding a given problem, explore the consequences
of different alternatives and facilitate sensitivity analyses.
One of the main objectives of this study was to determine
the possible scenarios of climate change and then incorpor-
ate this information into the system in order to determine
the impact that climate change is likely to have on the
natural availability of the water resources in the river basin.
The database subsystem
Figure 4 shows the input database of the developed software
and it contains the following modules.
Figure 4 | Aswan High Dam Reservoir management database subsystem.
1496 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013
Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf
by guest
Operation rules
This includes the top of the buffer, Toshka spill, max daily
release, minimum daily release, beginning of water year
storage and Aswan emergency spill zone.
The irrigation requirements
Irrigation demands downstream from the High Dam are
taken to be 55.5 BCM yr 1
(MWRI ). The monthly sche-
dule of demands is given in a table from the database in
terms of percentage of total annual demands, following the
monthly distributions.
The hydropower requirements
This includes the energy demand, tail water elevation, max
turbine flow, generating efficiency and working turbine
hour.
The monthly evaporation rates
The annual evaporation losses from the reservoir are divided
between the months, the highest evaporation rates from the
reservoir occur in May–October, while the lowest values
occur in the period December–February.
The modeling subsystem
In this study, the modeling subsystem is based upon a simu-
lation model that operates on the basic principle of water
balance accounting, where both the engineered and bio-
physical components of a water system are represented to
facilitate multi-stakeholder water management dialogue for
reservoir operations and hydropower generation, Typically
AHDRMS is applied by configuring the system to simulate
a recent ‘baseline’ year, for which the water availability
and demands can be confidently determined. The model is
then used to simulate alternative scenarios (i.e., plausible
futures based on ‘what if’ propositions) to assess the
impact of different development and management options.
This model is considered to be unique because it is devel-
oped based on mass balance hydrologic routing equations,
hydropower, discharges, and head relationships with special
conditions relating to the nature of the location and the
special complicated nature of the problem since the storage
volume can reach up to 162 BCM yr 1
with a length of
about 500 km and the existence of many types of outflows
(point and non-point outflows) at different locations. The
conceptual presentation of the modeling subsystem is
shown in Figure 5.
Input module
Inflow – Historical data were considered for water inflow
discharge input. These historical data are measured at
Dongla gauging station (750 km U.S. HAD) from 1971 to
2001 (NRI ). These data are used as input to the
simulation model as shown in Figure 6.
Sudan Abstraction – According to an agreement with
Egypt signed in 1959, Sudan’s share of the water available
from the Nile is 18.5 BCM yr 1
. This allocation is based
on an average natural inflow into the reservoir of 84 BCM
yr 1
(period 1900–1959) and an estimated 10 BCM yr 1
of
reservoir losses. However, the actual use of Nile water by
Sudan during the past period was about 14.5 BCM yr 1
(NWRP ). This module is based on the historical data
available for Sudan abstraction during different conditions
(Abdel-Latif & Mansour ). So we will include Sudan
intake in our model from Table 1.
El-Sheikh Zayed Canal – El-Sheikh Zayed Canal con-
veys water discharge from Lake Nasser to the newly
cultivated lands in the national project of El-Sheikh Zayed,
constructed 1998/1999. The huge pump station (on Lake
Nasser left bank) is used to elevate water from Lake
Nasser to the El-Sheikh Zayed Canal. The station has been
designed to have a maximum static lifting of about 52.5 m
to ensure its operation when the water level in Lake
Nasser reaches its lowest level of storage, which is 147 m
above (MASL). The designed maximum discharge of the
pumping station was estimated to be about 300 m3
s 1
(25
million m3
d 1
). The expected annual water discharges
from the lake into the canal are estimated to be 5 BCM
(El-Sammany ). The canal has a length of 60 km, bed
width of 30 m, side slopes with 2:1 gradient and is lined to
prevent seepage from the canal. Table 2 presents the
monthly intake of this project if it operates to its full
capacity.
1497 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013
Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf
by guest
Figure 5 | Aswan High Dam Reservoir management modeling subsystem.
Figure 6 | The annual water inflow of the historical data at Aswan 1971–2010.
Table 1 | Sudan’s monthly discharge
Month Aug. Sep. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May Jun. Jul. Total
Sudan FLOW (BCM) 1.81 2.01 2.62 2.18 2.03 1.67 1.11 1.03 0.69 0.69 0.97 1.67 18.5
1498 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013
Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf
by guest
Operation rules restriction module
This module monitors both the upstream water level and the
outflow downstream dam. The task of this module is to ensure
that the maximum water level upstream of the dam is not
exceeding the maximum limit during any time step and,
also, to avoid increasing of the outflow discharge downstream
of the dam higher than the safe limits if possible. Lake Nasser
operation policies were determined by the Ministry of Water
Resources and Irrigation (MWRI) according to different
restrictions to ensure dam safety and suitable water manage-
ment. These restrictions can be summarized as follows:
1. Maximum water level upstream of the AHD should not
exceed 182.00 m at any time.
2. The released discharge downstream of the dam should
not exceed the safe discharges to avoid damage to the
river bed, banks and hydraulic structures.
3. The water level at the beginning of the water year (August
1) should be kept, if possible, at 175 m to account for
coming floods. Any water in excess of this discharge pro-
gram is evenly distributed in the months with the lower
water requirements in such a way that the peak monthly
discharges during the peak summer months remain
unchanged. The months with the lowest requirements
receive a greater volume of the excess water in order
that all months in which any additional water is spilled
have the same total discharge.
4. Daily and monthly water released should be compatible
with water requirements. The monthly discharges from
the AHD follow a fixed pattern of releases.
5. The simulation model uses the sliding scale for reduction
which the MWRI suggested for coping with a series of
low floods. The reductions in withdrawals should come
into being if the reservoir content in the live storage zone
was less than 60 BCM on July 31. It is worth noting that
if there are successive high floods and the water level in
the lake exceeds 178 m, the excess water is diverted to a
free spillway and then to Toshka depressions. In more
emergency cases, when the flood capacity exceeds the
Toshka spillway capacity, the West Bank spillway operates
to ensure that the upstream reservoir elevation does not
exceed 183 m. When the level is not higher than 182 m,
the water will be stored in the Toshka depression with a
maximum discharge of 250 million m3
d 1
(Sadek ).
Simulation submodule
The AHDR simulation model has been conceptualized and
should perform the following operations:
1. Prepare the input data, which should include the inflow,
initial storage, evaporation, and water demands, beside
the operation rules of the reservoir. The initial storage
of the reservoir for the first month of the operation
period was assumed. The inflow at Dongola is discounted
by the losses and abstractions from Sudan and El-Sheikh
Zayed Canal on a monthly basis.
2. The demand will be calculated on a monthly basis based
upon the monthly irrigation water requirements and
should be neither more than the maximum nor less
than the minimum permissible flow of the river.
3. The difference between the inflow and the demand will
be calculated in order to obtain the new stored volume
(with reference to the volume of the previous month),
on a monthly basis.
4. Based on this new stored volume, the new surface area of
the lake and the new water elevation upstream of the
dam will be calculated (monthly average), based on the
available historical series of data and/or formulas pre-
sently used by the Nile Sector. The resulting storage
should be within the operation rules range and be neither
more than the design operation storage nor less than the
minimum operation storage of the reservoir. If it exceeds
the rule, then the computed storage and water level are
readjusted through readjusting the release.
5. The calculation of evaporation losses and seepage losses
will be operated based on the surface area and the water
Table 2 | El-Sheikh Zayed project’s monthly discharge
Month Aug. Sep. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May Jun. Jul. Total
Flow El-Sheikh Zayed (BCM) 0.625 0.412 0.345 0.313 0.248 0.248 0.312 0.437 0.423 0.534 0.689 0.695 5.28
1499 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013
Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf
by guest
level (monthly average), based again on available histori-
cal data and/or formulas used by the Nile Sector. The
calculation of flow to Toshka spillway and Aswan spill
was calculated based on operation rules restrictions.
6. Calculate the outflow from the power generating outlets,
(Qp), which should not exceed the capacity of the power
outlets. The minimum operation level represents the
minimum level for operating the power generators.
7. Repeat the respective steps for the following months.
The operation of a reservoir is described by the water
balance equation under various constraints concerning sto-
rage volume, outflow from the reservoir and water losses.
The water balance equation applied on a monthly basis
has the following form:
dS(t)
dt
¼
X
nin
i¼1
Qin,i
X
nout
j¼1
Qout,j (1)
S(t þ dt) ¼ St þ It Rt Levp Lseep Labs Qtosh
Qemg Qsouthvalley (2)
where S(tþdt): storage at time (t þ dt) (m3
); St: storage at time t
(month) (m3
); It: mean inflow to the storage in month t (m3
);
Rt: water discharged from the storage in month t downstream
the dam (m3
); Levp: mean evaporation from the storage reser-
voir in month t (m3
); Lseep: seepage losses from the storage
reservoir in month t (m3
); Labs: bank storage absorption
losses (m3
); Qtosh: water released from Toshka spillway in
month t (m3
); Qemg: water released from the emergency spill-
way in the dam in month t (m3
); Qsouthvalley: the water
demand for (South Valley) in month t (m3
).
Volume elevation (million m3
, m) empirical relation is
given by:
H ¼ 79:9734 þ 0:0369801V þ 8:87056ln V
ð Þ (3)
A ¼ 3, 164:28 þ 25:4914V þ 1, 092:92 ln V
ð Þ (4)
The constraint concerning storage volume Vt is:
Vmin < Vt < Vmax
where Vmin ¼ dead storage volume ¼ 31.60 BCM corre-
sponding to the minimum power pool level (147 m); and
Vmax ¼ maximum storage volume ¼ 162.30 BCM corre-
sponding to the maximum power pool level (182 m).
The mean monthly outflow discharge Qt during month t
must satisfy the constraint:
Qmin < Qt < Qmax
where Qmin ¼ minimum releases ¼ 3.2 BCM yr 1
; and
Qmax ¼ Maximum releases ¼7.5 BCM yr 1
.
Output module
Hydropower module – The general equation which presents
hydropower generation is a function of several factors such
as discharge through the turbines, water head on turbines,
the specific weight of water and the turbine’s efficiency.
The general equation is given by Eshra ():
P ¼
η γ Q H
1,000
(5)
where P ¼ generated electric power output in (kW),
Q ¼ water flow through the turbine (Discharge) in, m3
s 1
,
H ¼ net head of water in (m) (the difference in water level
between upstream and turbine downstream), η ¼ station
(turbine & generator) efficiency factor, and γ ¼ specific
weight of water (9,810 N m 3
).
Toshka and Aswan outflow computation module – The
Toshka spillway (260 km upstream HAD) is in the Western
desert, at the end of Toshka Khor with a width of 700 m
and a crest level of 178 m constructed 1998/1999. The spill-
way is an ungated canal without a regulator. Excavation
works started in 1978 and completed in 1982. It was con-
structed to release the excess water when water level
reaches 178.00 m (MASL). The excess water is discharged
to a natural depression located at the western side. This
flow will help in limiting the outflow behind the dam to
values ranging from 350 to 400 million m3
d 1
which are
the discharge values that cause no harm to the Nile bed.
The connecting canal from the spillway to the downstream
depression area has an inlet width of 500 m and an outlet
width of 275 m with a total length of 20.5 km. The outlet
1500 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013
Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf
by guest
weir of the canal has a crest level of 176.00 m and the canal
slope is 14.6 cm km 1
. The lowest level of the depression is
150 m (MASL) while the highest level is 190 m (MASL).
The surface area of the depression is about 6,000 km2
and it
can contain about 120 × 109
m3
(Ismail & Aziz ). This
module is based on the computations of the proposed project
outflow hydrograph. The following equation for Toshka
demands is used by Thompson ():
Q ¼ 19 (H 178)5=3
30:4=1,000
where H  178, otherwise 0
(6)
where Q ¼ Toshka spill (BCM/month) and H ¼ lake water
level (m). Toshka spill cannot exceed 6 BCM/month.
Aswan spill ¼ max release if H  182.6 m or S  162 BCM.
Losses computation module – The major Lake Nasser
losses are evaporation and seepage losses. They are both
incorporated in the model by this module. The MWRI
in Egypt for many years adopted the figure of 7.5 mm
d 1
as the annual mean evaporation which corresponds
to an evaporation rate of 2.70 m yr 1
(Whittington 
Guariso ). A later review of previous literature data
established a large range for evaporation from AHDR
between 1.7 and 2.9 m yr 1
. Based on water balance,
energy budget and modeling techniques, a narrower
range of 2.1–2.6 m yr 1
, with an average of 2.35 m yr 1
,
was calculated by Sadek et al. (). In a 2002 technical
report, based on the available data at the Nile Forecasting
Center in Cairo, it was estimated that the annual evapor-
ation from the AHDR varied between 12 and 12.6 BCM
yr 1
which correspond to an evaporation rate of 2.0–
2.1 m yr 1
(Delft Hydraulics ). Hassan et al. ()
computed the evaporation losses from the reservoir and
found that the yearly average of the daily evaporation
rate is 6.33 mm d 1
and the average volume of the
annual water lost by evaporation is about 12.5 BCM. In
this simulation analysis, evaporation is calculated monthly
as a function of the surface area of the AHDR and fixed
monthly coefficients as in Table 3, and is calculated by
the following equation (Mobasher  Ostrowski ):
Evaporation loss Levp m3

¼ ((At þ Atþ1)=2) Ct1,000
(7)
where At ¼ reservoir area at beginning of month t (km2
),
At þ 1 ¼ reservoir area as at the end of month t (km2
), and
Ct ¼ evaporation coefficient pertaining to month t (mm).
For the seepage losses, the empirical regression func-
tions for seepage losses and water levels used for this part
are as follows (Eshra ):
Monthly seepage S ¼ 0:038 (H 110) (8)
where S ¼ the flow in BCM/month to the ground water in
Lake Nasser, and H ¼ the storage level in meters.
Outflow hydrograph generation module – The proposed
outflow hydrograph downstream the AHD is computed
using this module. The module computations are based on
the water requirements for different months, the restrictions
of the allowable maximum outflow downstream of the dam,
and the maximum allowed water levels upstream of the
dam. So the basic outflow hydrograph is composed from
the historical data and water demand and water discharges
and levels restrictions. Over the 30 years of simulation,
releases, reservoir elevations, power generation and spills
are tabulated on both a monthly and annual basis.
Optimization module
This consists of the specification of a pre-defined algorithm,
described for example, by a set of ‘if-then’ rules or a decision
matrix. These determine which control actions are to be taken
for each of the possible states of the system. To find an appropri-
ate set of rules, often a trial-and-error procedure is applied,
supported by appropriate simulation tools (Schutze et al. ).
Besides computational efficiency, this approach also has the
advantage of greater clarity in the decision-finding procedure.
A scenario analysis tool has been embedded into a DSS
that allows a choice of the best scenario between some
Table 3 | The monthly evaporation (m)
Month Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec. Total
Evap (m) 0.18 0.14 0.11 0.15 0.19 0.24 0.28 0.3 0.32 0.3 0.27 0.22 2.70
1501 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013
Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf
by guest
predefined possible scenarios for reservoir operation rules
modification for adaptation to climate change. The con-
trolled releases at the AHD give primary consideration to
two objectives: meeting downstream irrigation demands
and the maximization of electricity generated at the High
Dam power plant. The defined objectives cannot be met
with absolute certainty over the infinite future, due to lack
of knowledge of future Lake Nasser inflows. The objective
function utilized in this work takes the form:
Lt ¼
X
N
t¼1
Rt Tt
1
Tt
1
 2
þ
Tt
E GNt
GNt
!2
0
@
1
A (9)
where Lt ¼ losses incurred from irrigation deficits and power
generation deficits during time periods t (t ¼ 1, 2, …, 12),
Rt ¼ release (BCM), T1
t
¼ irrigation target for time period t
(BCM), TE
t
energy target for time period t (103
GWH/
month) and GNt
¼ energy generated for time period t (103
GWH/month).
The suggested new operation rules for optimum oper-
ation are based upon reductions in agricultural water use
and crop pattern changes during droughts, or application
of a rising scale to handle the large number of reservoir
excess releases due to high floods.
The interactive process and the user interface
subsystem
The AHDRMS interface was designed using the Visual Basic
programming language. It was designed to be used interactively
through message boxes that pop up according to user clicks.
Initially, the user enters the database including the reservoir
operation rules, irrigation requirements, power requirements
and the monthly evaporation rates. Second, the user clicks on
simulation to run the model and to choose the optimum oper-
ation rule. The calculated reservoir storage, water level,
release, hydropower and evaporation are shown in tables and
graphically as shown in Figures 7 and 8.
Figure 7 | Input screen of the Aswan High Dam Reservoir management system.
1502 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013
Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf
by guest
Suggested scenarios
The climate change scenarios generated by Beyene’s study
(Beyene et al. ) will be used as a multiplier to the histori-
cal natural series (1971–2001) to the model for simulating
future inflows to the reservoir. First, the future hydrologic
scenarios developed have been used to assess the expected
impacts to potential climate change and basin development
scenarios. The operation policies which were determined by
the MWRI were used for the scenarios analysis in the simu-
lation model of the AHDR. Second, the proposed operation
rules were used to control these impacts for optimum oper-
ation of the reservoir in the case of climate change to satisfy
the preset objective function of minimum irrigation deficit
and maximum power production. Finally, the effect of the
Millennium Dam will be included in this scenario in
addition to climate change. The assessment results are sum-
marized relative to the following criteria: water supply
releases; reservoir level variations; hydropower production;
and evaporation losses.
MODEL RESULTS AND ANALYSIS
Model calibration
The developed model was calibrated using actual measure-
ments. The calibration was performed to study the effect of
numerical approximation on model results. The calibration
is also required to determine the accuracy of losses, seepage
and evaporation estimations. All months through years from
1971 to 2001 were measured and calculated, and were used
for calibration. Figure 9 shows the calibration result for these
years. It can be concluded that the calibration process for
water levels upstream of the AHD show close relationships
between the model computed results and the actual readings.
Figure 8 | Output screen of the Aswan High Dam Reservoir management system.
1503 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013
Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf
by guest
For different years the maximum difference between com-
puted and measured water levels did not exceed 4 m or 2%
error which is acceptable.
Optimum operation rules versus historical operation
By applying the model to 2 years of high flood period
(1998–1999) and inspecting the difference in initial storage,
final storage, hydropower, release and water level by apply-
ing the new operation rules. The objective to increase the
hydropower and get use of the excess water surplus by
using the new operation rule the hydropower increases to
5%. By applying the model to 10 year drought period
(1979–1988) and inspecting the difference in initial storage,
final storage, hydropower, release and water level by apply-
ing the new operation rules. The level of U.S. High Dam
had dropped from 173.03 m in August 1979 to 150.62 m
in July 1988, and about 72.8 BCM were taken from reser-
voir to fulfill the irrigation requirements. This amount
represents almost 1.3% of the yearly consumption of
Egypt, which is 55.5 BCM.
This emphasizes the need to apply new operation rules
to the reservoir in order to cope with such drought periods.
Therefore, by using the suggested new operation rules of the
developed system, the level of U.S. High Dam had dropped
from 173.03 m in August 1979 to 153 m in July 1988 and
about to 68 BCM were taken from the reservoir to fulfill
the irrigation requirements and is less compared with the
case of applying the traditional operation rules of the
reservoir.
Future scenarios for reservoir operation
The future hydrologic scenarios developed have been used
to assess the expected impacts of potential climate change
(baseline and three periods with two global emission scen-
arios A2 (B1)) and Millennium Dam effect. The new
operation rules suggested were used for the scenarios analy-
sis in the simulation model of the AHDR.
The following sections are an executive summary of the
assessment results. The presentation focuses on annual aver-
age quantities including water supply releases, reservoir
level variations, hydropower production and evaporation
losses in the four different scenarios:
Scenario 1 – climate change without the Millennium Dam
effect with current operation rules;
Scenario 2 – climate change without the Millennium Dam
effect with new operation rules;
Scenario 3 – climate change with the Millennium Dam
effect with new operation rules;
Scenario 4 – climate change with the Millennium Dam
effect with new operation rules.
Figure 9 | The calibration result for years from 8/1971 to 8/2001.
1504 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013
Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf
by guest
Effect on level variations
Tables 4, 5, 6 and 7 represent a summary characterization of
variation in the reservoir level, this analysis represents the
water level limits and corresponding percentage of occur-
rence for all climate scenarios.
Without the Millennium Dam, the percentage of occur-
rence of water level greater than the highest level of the
AHDR occurring only in period I (2010–2039) for the two
global emission scenarios, A2 and B1, are 3.5 and 6.1%,
respectively, compared with the baseline percentage 5.7%.
In case of the new operation rules, the percentage of occur-
rence of water level greater than the highest level of the
AHDR occurring only in period I (2010–2039) for the two
global emission scenarios are 3.2 and 5.6%, respectively,
compared with the baseline percentage 5.2%. This means
the application of the new operation rules reduce the per-
centage of occurrence of highest level of the AHDR which
is very beneficial in high flood periods.
Without the Millennium Dam, the percentage of occur-
rence of water level lower than the minimum level from the
AHDR for period II (2040–2069), and period III (2070–
2099) for the two global emission scenarios A2(B1) are
14.4% (16.7%) and 29.3% (24.2%), respectively. In the case
of the new operation rules the percentage of occurrence of
water level lower than the minimum level from the AHDR
for period II (2040–2069) is 14% for global emission scenario
A1, and for period III (2070–2099) with the two global emis-
sion scenarios, A2 and B1, are 27.9 and 21.7%, respectively.
This means the application of new operation rules reduces
the percentage of occurrence of the lowest level of the
AHDR which is very beneficial in low flood periods.
With the Millennium Dam, the percentages of occur-
rence of water level lower than the minimum level from
the AHDR for the three periods (period I (2010–2039),
period II (2040–2069), and period III (2070–2099)) and
the two global emission scenarios A2(B1) are 9.9% (0),
13.9% (0) and 62.6% (44.7%), respectively, compared with
the baseline percentage 4%. This means the building of the
Millennium Dam increases the percentage of occurrence
Table 4 | Level variation characteristics in the AHDR in the case of current operation rules
without the Millennium Dam
2010–2039 2040–2069 2070–2099
Level Baseline A2 B1 A2 B1 A2 B1
% % % % % % %
181 5.7 3.5 6.1 0 0 0 0
178 13.5 19.9 30.6 2.5 2.5 0 0
175 26.2 44.4 52.2 4.7 4.7 0 0
160 95.6 99.5 100 53.3 55.6 22.9 30.6
150 0 0 0 14.4 16.7 29.3 24.2
Table 5 | Level variation characteristics in the AHDR in the case of new operation rules
without the Millennium Dam
2010–2039 2040–2069 2070–2099
Level Baseline A2 B1 A2 B1 A2 B1
% % % % % % %
181 5.2 3.2 5.6 0 5.6 0 0
178 13.9 19.9 30.3 2.5 30.3 0 0
175 25.9 44.6 55.8 5.3 55.8 0 0
160 99.2 99.5 100 54.9 100 23.4 40.8
150 0 0 0 14 0 27.9 21.7
Table 6 | Level variation characteristics in the AHDR in the case of current operation rules
with the Millennium Dam
2010–2039 2040–2069 2070–2099
Level Baseline A2 B1 A2 B1 A2 B1
% % % % % % %
181 0 0 12.5 3.1 12.5 0 0
178 0 6.5 33.1 12.5 33 0 0
175 1.6 17.5 52.8 20 52.8 0 0
160 75.8 60.9 100 58.9 100 3.3 24.2
150 4 9.9 0 13.9 0 62.6 44.7
Table 7 | Level variation characteristics in the AHDR in the case of new operation rules
with the Millennium Dam
2010–2039 2040–2069 2070–2099
Level Baseline A2 B1 A2 B1 A2 B1
% % % % % % %
181 0 0 12.5 3.1 12.5 0 0
178 0 8.1 33.6 14.5 33.6 0 0
175 0.8 20.2 54.2 23.4 54.2 0 0
160 83.6 62.4 100 61.8 100 7.8 45
150 1.9 9.7 0 10 0 49.4 31.67
1505 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013
Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf
by guest
of lowest level of the AHDR which is very critical in dam
operation. In the case of the new operation rules, the percen-
tage of occurrence of water level lower than the minimum
level from the AHDR for the three periods (period I
(2010–2039), period II (2040–2069), and period III (2070–
2099)) and the two global emission scenarios A2(B1) are
9.7% (0), 10% (0) and 49.4% (31.67%), respectively, com-
pared with the baseline percentage 1.9% which is better
than with current operation rules.
Effect on release variations
Figure 10 shows the Predicted Mean Annual Release from
AHDR in the four cases. In general without the Millennium
Dam, the mean annual withdrawals from the AHDR for the
three periods (period I (2010–2039), period II (2040–2069),
and period III (2070–2099)) and two global emission scenarios
A2(B1) are 54.8 (55), 47.4 (48) and 43.4 (44.7) BCM, respect-
ively, compared with the baseline release of 53.5 BCM.
Egypt’s average annual withdrawal from the AHDR is
expected to increase due to climate change by 1.30 BCM
early in the 21st century (2010–2039). However, Egypt might
suffer significant shortfalls relative to historical average
releases from the AHDR reaches of 7 and 10 BCM by mid
(2040–2069) and late (2070–2099) century, respectively.
In the case of the new operation rules, the mean annual
withdrawals from the AHDR for the three periods (period I
(2010–2039), period II (2040–2069), and period III (2070–
2099)) and two global emission scenarios A2(B1) are 53.9
(54.8), 46 (46.7) and 42.7 (44.1) BCM, respectively, com-
pared with the baseline release of 52.5 BCM. Egypt’s
average annual withdrawal from the AHDR is expected to
increase due to climate change by 1.30 BCM early in the
21st century (2010–2039). Therefore, the application of
new operation rules causes a slight improvement in water
release.
With the Millennium Dam, the mean annual withdra-
wals from the AHDR for the three periods (period I
(2010–2039), period II (2040–2069), and period III (2070–
2099)) and two global emission scenarios A2(B1) are 49.8
(47.9), 46 (49.6) and 42 (44.9) BCM, respectively, compared
with the baseline release of 50.4 BCM. Egypt might suffer
shortfalls relative to historical average releases from the
AHDR reaches of 4 and 8 BCM by mid (2040–2069) and
late (2070–2099) century, respectively.
In the case of the new operation rules, in general with
the Millennium Dam, the mean annual withdrawals from
the AHDR for the three periods (period I (2010–2039),
period II (2040–2069), and period III (2070–2099)) and
two global emission scenarios A2(B1) are 47.9 (55.3),
44.96 (48) and 41 (43.7) BCM, respectively, compared with
the baseline release of 48.9 BCM. Therefore, the application
of the new operation rules causes improvement in water
release from the AHDR.
Figure 10 | Predicted mean annual release from AHD.
1506 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013
Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf
by guest
Effect on evaporation variations
Without the Millennium Dam, the mean annual evaporation
losses from the AHDR for the three periods (period I (2010–
2039), period II (2040–2069), and period III (2070–2099))
and two global emission scenarios A2(B1) are 12.2 (13), 7.2
(7.5) and 5.1 (5.7) BCM, respectively, compared with the base-
line release of 9.8 BCM. In the case of the new operation rules,
the mean annual withdrawal from the AHDR for the three
periods (period I (2010–2039), period II (2040–2069), and
period III (2070–2099)) and two global emission scenarios
A2(B1) are 12.3 (13), 7.3 (7.9) and 5.2 (6.3) BCM, respectively,
compared with the baseline release of 9.8 BCM (Figure 11).
With the Millennium Dam, the mean annual evaporation
losses from the AHDR for the three periods (period I (2010–
2039), period II (2040–2069), and period III (2070–2099))
and two global emission scenarios A2(B1) are 14 (16.5), 11.5
(15.5) and 7.3 (10.7) BCM, respectively, compared with the
baseline release of 8.4 BCM. In the case of the new operation
rules, the mean annual withdrawal from the AHDR for the
three periods (period I (2010–2039), period II (2040–2069),
and period III (2070–2099)) and two global emission scenarios
A2(B1) are 8.4 (13.2), 6.7 (8.8) and 3.6 (4.9) BCM, respectively,
compared with the baseline release of 8.9 BCM (Figure 11).
Effect on hydropower variations
Without the Millennium Dam, the mean annual hydro-
power generated from the AHDR for the three periods
(period I (2010–2039), period II (2040–2069), and period
III (2070–2099)) and two global emission scenarios A2
(B1) are 9,614 (9,875.8), 6,501 (6,773.6) and 5,094.5
(5,553.8) GWh, respectively, compared with the baseline
release of 8,842 GWh. It means Egypt will suffer from a
26.5% (23.4%) decrease in power generated during period
II (2040–2069), and a 42.3% (37.2%) decrease in period
III (2070–2099) and a 8.74% (11.7%) increase in period I.
In the case of the new operation rules, the mean annual
hydropower generated from the AHDR for the three periods
(period I (2010–2039), period II (2040–2069), and period III
(2070–2099)) and the two global emission scenarios A2(B1)
are 7,380.5 (10,003.2), 6,257.7 (7,416.4) and 4,135.3
(5,192.4) GWh, respectively, compared with the baseline
release of 8,914 GWh. It means Egypt will suffer from a
27.9% (24.5%) decrease in power generated during period
II (2040–2069), and from a 44.2% (36.3%) decrease in
power generated period III (2070–2099) and from a 6.6%
(11%) increase in power generated in period I.
With the Millennium Dam, the mean annual hydro-
power generated from the AHDR for the three periods
(period I (2010–2039), period II (2040–2069), and period
III (2070–2099)) and the two global emission scenarios A2
(B1) are 7,380.5 (10,003.2), 6,257.7 (7,416.4) and 4,135.3
(5,192.8) GWh, respectively, compared to the baseline
release of 7,521.7 GWh. It means Egypt will suffer from a
16.8% (32.9%) decrease in power generated during period
II (2040–2069), and a 45.2% (30.9%) decrease in period
III (2070–2099) and a 1.9% (32.9%) increase in period I.
Figure 11 | Predicted mean annual evaporation losses from AHD.
1507 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013
Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf
by guest
In the case of the new operation rules, the mean annual
withdrawal from the AHDR for the three periods (period I
(2010–2039), period II (2040–2069), and period III (2070–
2099)) and the two global emission scenarios A2(B1) are
7,175.8 (10,110.1), 6,095.1 (7,362) and 4,199.5 (5,624.5)
GWh, respectively, compared with the baseline release of
7,517.9 GWh (Figure 12). It means that Egypt will suffer
from a 18.9% (2%) decrease in power generated during
period II (2040–2069), and 44% (25%) decrease in power
generated during period III (2070–2099) and 4.6% (34.5%)
increase in power generated during period I.
CONCLUSION
This paper introduces a user-friendly DSS for reservoir
management, which was shown to yield accurate operating
rules for the AHDR, integrates the various model com-
ponents effectively, and provides a reliable and user-
friendly decision aid. The major contribution of our flexible
AHDRMS is that it enables a scenario analysis that cap-
tures the decision maker’s judgments, facilitating a
flexible decision process. Depending on the decision situ-
ation and expertise available, it is possible to use simple
simulation methods, as we did in our application, or
sophisticated optimization methods. The participation in
the decision process is not limited to reservoir operators,
and many parties – such as administrators and politicians
– can be involved in the decision making process as well.
The future hydrologic scenarios developed have been
used to assess the expected impacts to potential climate
change and Millennium Dam development scenarios. The
operation policies which were determined by the MWRI
were used for the scenarios analysis in the simulation
model of the developed AHDR Management Model.
In the simulation experiment, it can be concluded that
overall applying the new operation rules will decrease the
percentage of occurrence of minimum water levels. Also,
the Millennium Dam will increase the percentage of occur-
rence of minimum water levels. In addition, the period III
(2070–2099) with the two global emission scenarios A2
(B1) is very critical for the dam operation as there is the
highest percentage of decrease of water level below the mini-
mum level, as well as the highest decrease in water release,
evaporation losses and hydropower generated. Also, in the
case of global emission (B1 for periods I and II), there is
an increase in water release, evaporation losses and hydro-
power generated compared with the baseline. Hence, our
basic AHDR Management Model can be generalized to a
wider class of reservoir management problems.
Figure 12 | Predicted mean annual release from AHD.
1508 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013
Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf
by guest
As climate change in coordination with water conserva-
tion projects can impact on Nile water availability, the
assessments carried out demonstrate that management
models are necessary to assess the potential benefits of
future development and management strategies that might
mitigate adverse effects. The developed AHDRMS has pro-
duced meaningful results that can now be incorporated in
water management and policy-making considerations. It is
hoped that the results of these assessments will lead to be
more informed AHDR strategies for future development,
adaptive management, and risk assessment. The results
from this study would provide an objective basis for decision
makers to weight scenario outcomes.
REFERENCES
Abdel-Latif, M.  Mansour, Y.  Effect of change of discharges
at Dongola station due to sedimentation on the water losses
from Nasser Lake. Nile Basin. Water Science  Engineering
Journal 4, 86–98.
Abu-Zeid, M. A.  El-Shibini, F. Z.  Egypt’s Aswan high dam.
Water Resources Development 13, 209–217.
Alarcon, L. F.  Marks, D. H.  A stochastic dynamic
programming algorithm for the operation of the Aswan High
Dam. Tech. Report no. 246, Department of Civil Engineering,
MIT, Ralph M. Parsons Laboratory for Water Resources and
Hydrodynamics, Cambridge, Massachusetts.
BCEOM  Abay River Basin Integrated Development Master
Plan Project. Report to Ministry of Water Resources, The
Federal Democratic Republic of Ethiopia.
Berhane, D.  Quick Facts on the Grand Millennium Dam,
Ethiopia. http://danielberhane.wordpress.com/2011/04/11/
quick-facts-on-the-grand-millennium-damethiopia/.
Beyene, T., Lettenmaier, D. P.  Kabat, P.  Hydrologic
impacts of climate change on the Nile river basin:
implications of the 2007 IPCC climate scenarios. Climatic
Change Journal 100, 433–461, Springer Science, The
Netherlands.
Brekke, L. D., Maurer, E. P., Anderson, J. D., Dettinger, M. D.,
Townsley, E. S., Harrison, A.  Pruitt, T.  Assessing
reservoir operations risk under climate change. Water
Resour. Res. 45, W04411.
Burn, H. D.  Simonovic, S. P.  Sensitivity of reservoir
operation performance to climatic change. Water Resources
Management 10, 463–478.
DeGagne, M. P. J., Douglas, G. G., Hudson, H. R.  Simonovic, S. P.
 A decision support system for the analysis and use of stage-
discharge rating curves. Journal of Hydrology 184, 225–241.
Delft Hydraulics  Inception Report: Lake Nasser Flood and
Drought Control Project. Prepared in association with
COINS Hull University  Royal Haskoning WREM for
Ministry of Water Resources  Irrigation Nile Forecasting
Center. Cairo, Egypt.
Dow, K.  Vulnerability Profile of West Africa. Poverty and
Vulnerability Programme, Stockholm Environment Institute
(SEI), UK.
Dumont, H. J.  The Nile: Origin, Environments, Limnology
and Human Use, Vol 89. Springer, The Netherlands.
El-Sammany, M. S.  Design of Lake Nasser Environmental
Monitoring System. Faculty of Engineering, Cairo University,
Egypt.
Eshra, N. M. A.  Modeling and Economical Optimization for
Operation of Aswan High Dam Power Station and Mubarak
Pump Station. PhD Thesis, Faculty of Engineering, Cairo
University, Egypt.
Georgakakos, A.  Decision-support systems for integrated
water resources management with an application to the Nile
Basin. In: Topics on System Analysis and Integrated Water
Resources Management (A. Castelletti  R. Soncini-Sessa,
eds), Elsevier, The Netherlands.
Guariso, G., Haynes, E. K., Whittington, D.  Younis, M. 
A real-time management model for the Aswan high dam with
policy implications. Geographical Analysis 13, 4.
Hamlet, A. F.  Lettenmaier, D. P.  Effects of climate change
on hydrology and water resources in the Columbia River
Basin. Journal of the American Water Resources Association
35, 1597–1623.
Hassan, R., Hekal, N.  Mansor, N.  Evaporation Reduction
from Lake Nasser Using New Environmentally Safe
Techniques. Eleventh International Water Technology
Conference, IWTC11 Sharm El-Sheikh, Egypt.
Hellmuth, M. E., Moorhead, A., Thomson, M. C.  Williams, J.
(eds)  Climate Risk Management in Africa: Learning from
Practice. International Research Institute for Climate and
Society (IRI), Columbia University, New York, USA.
IPCC  Summary for policymakers. Climate change 2007: the
physical science basis. Contribution of the working group I to
the fourth assessment report of the Intergovernmental Panel
on Climate Change. Cambridge University Press, Cambridge.
Ismail, S. S.  Aziz, M.  Toshka Spillway Barrages Stability
Analysis. Ninth International Water Technology Conference,
IWTC9, Sharm El-Sheikh, Egypt.
Klemes, V.  Sensitivity of Water Resource Systems to Climate
Variations. World climate application programme WCP-98,
World Meteorological Organization, Geneva, Switzerland.
Koutsoyiannis, D., Efstratiadis, A.  Karavokiros, G.  A
decision support tool for the management of multi-reservoir
systems. Journal of the American Water Resources
Association 38, 945–958.
Lund, J. R.  Guzman, J.  Derived operating rules for
reservoirs in series or in parallel. Journal of Water Resources
Planning and Management 143, 143–153.
Ministry of Water Resources and Irrigation (MWRI)  Water
for the Future, National Water Resources Plan 2017 (NWRP).
Cairo, Egypt.
1509 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013
Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf
by guest
Mobasher, A.  Ostrowski, M.  An Assessment of Reservoir
Operation Sensitivity to Climate Changes – The Case Study of
Lake Nasser. Section of Engineering Hydrology and Water
Management, Institute of Hydraulic and Water Resources
Engineering, Darmstadt University of Technology,
Darmstadt, Germany.
McCartney, M. P.  Decision Support Systems for Large Dam
Planning and Operation in Africa. Working Paper 119.
International Water Management Institute, Colombo, Sri Lanka.
Nemec, J.  Schaake, J.  Sensitivity of water resource systems to
climate variations. Hydrological Sciences Journal 27, 327–343.
NRC (National Research Council)  Research and networks
for decision support in the NOAA sectoral applications
research program. In: Panel on Design Issues for the NOAA
Sector Applications Research Program (H. M. Ingram  P. C.
Stern, eds). National Research Council, UK.
NRI  Nile Research Institute Database. Nile Research
Institute, NWRC, Cairo, Egypt.
NWRP  National Water Resources Plan for Egypt – 2017.
Ministry of Water, Resources and Irrigation, Planning Sector,
Cairo, Egypt.
Payne, J. T., Wood, A. W., Hamlet, A. F., Palmer, R. N. 
Lettenmaier, D. P.  Mitigating the effects of climate
change on the water resources of the Columbia River basin.
Climate Change 62, 233–256.
Ragab, R.  Prudhomme, C.  Climate change and water
resources management in arid and semi-arid regions:
prospective and challenges for the 21st century. Biosystems
Engineering 81, 3–34.
Reitsma, R. F.  Structure and support of water-resources
management and decision making. Journal of Hydrology
177, 253–268.
Reitsma, R. F., Zagona, E. A., Chapra, S. C.  Strzepek, K. M. 
Decision support systems for water resources management
In: Water Resources Handbook (L. W. Mays, ed.). McGraw-
Hill, New York, pp. 1–35.
Sadek, N. S.  Lake Nasser Flood Analysis. Ph.D. Thesis,
Irrigation and Hydraulics Department, Faculty of
Engineering, Ain Shams University, Cairo, Egypt.
Sadek, N.  Aziz, M.  Water Flood Management of Lake
Nasser After the New Toshka Barrages Construction. Ninth
International Water Technology Conference, IWTC9, Sharm
El-Sheikh, Egypt.
Sadek, M. F., Shahin, M. M.  Stiger, C. J.  Evaporation from
the reservoir of the Aswan High Dam, a new comparison of
relevant methods with limited data. Theoretical and Applied
Climatology 56, 56–66.
Schutze, M., Butler, D., Beck, B.  Verworn, H. R.  Criteria for
assessment of the operational potential of the urban wastewater
system. Water Science and Technology 45 (3), 141e148.
Shafie, A., Noureldin, A. E., Taha, M. R.  Basri, H.  Neural
network model for Nile River inflow forecasting based on
correlation analysis of historical inflow data. Asian Network
for Scientific Information. Journal of Applied Sciences 8,
4487–4499.
Simonovic, S. P.  Li, L.  Sensitivity of the red river basin
flood protection system to climate variability and change.
Water Resources Management 18, 89–110.
Simonovic, S. P.  Savic, D. A.  Intelligent decision support
and reservoir management and operations. ASCE Journal of
Computing in Civil Engineering 3, 367–385.
Soliman, M. M., Gad, M. A.  El-Moustafa, A. M. 
Hydrological Model for the High Aswan Dam Reservoir
Management. International Symposium on Environmental
Hydrology, ASCE-EGS.
Sprague, R.  A framework for the development of decision
support systems. In: Decision Support Systems (W. House,
ed.). Petrocelli Books, New York.
Strzepek, K. M.  Yates, D. N.  Responses and thresholds of
the egyptian economy to climate change impacts on the
water resources of the Nile River. Climatic Change 46,
339–356.
Thompson, K. O.  Agricultural vs Hydropower Tradeoffs in the
Operation of the Aswan High Dam. Published Masters
Thesis, Massachusetts Institute of Technology, Cambridge,
Massachusetts.
Van Rheenen, N. T., Wood, A. W., Palmer, R. N.  Lettenmaier,
D. P.  Potential implications of PCM climate change
scenarios for Sacramento–San Joaquin river basin hydrology
and water resources. Climate Change 62, 257–281.
Water Master Plan (WMP)  Hydrological Simulation of Lake
Nasser Vol. 1, Analysis and Results. Technical Report 14 of
the Water Master Plan. Prepared for the Ministry of Water
Resources and Irrigation, Cairo, Egypt.
Waterbury, J.  The Nile Basin National Determinants of
Collective Action. University Press, London, 211 pp.
Whittington, D.  Guariso, G.  Water Management Models in
Practice: A Case Study of Aswan High Dam, Elsevier,
The Netherlands.
Wood, A. W., Lettenmaier, D. P.  Palmer, R. N.  Assessing
climate change implications for water resources planning.
Climate Change 37, 203–228.
World Bank a Ethiopia Managing Water Resources Growth,
A World Bank Water Resources AssistanceStrategy for
Ethiopia. Agriculture and Rural Development Department,
World Bank, Washington, DC, 91 pp.
World Bank b Implementation Completion Report (# 35573)
for Energy II project. World Bank, Washington, DC.
Yao, H.  Georgakakos, A. P.  Nile Decision Support Tool
River Simulation and Management. Georgia Water
Resources Institute (GWRI), Atlanta.
Zewde Gebre Sellasie Dejazmatch  The Nile Question: 1955–
1964. The Ethiopian Perspective, Conference, Tel Aviv
University, Israel.
First received 30 December 2012; accepted in revised form 13 March 2013. Available online 4 May 2013
1510 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013
Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf
by guest

More Related Content

Similar to Aswan High Dam Reservoir Management System

Climate change and hydrological modeling.pptx
Climate change and hydrological modeling.pptxClimate change and hydrological modeling.pptx
Climate change and hydrological modeling.pptxtameneaDemissie
 
IRWP Seasonal Storage Project Water Reuse System Storage Model
IRWP Seasonal Storage Project Water Reuse System Storage ModelIRWP Seasonal Storage Project Water Reuse System Storage Model
IRWP Seasonal Storage Project Water Reuse System Storage ModelAhmad Mousa
 
An Integrative Decision Support System for Managing Water Resources under Inc...
An Integrative Decision Support System for Managing Water Resources under Inc...An Integrative Decision Support System for Managing Water Resources under Inc...
An Integrative Decision Support System for Managing Water Resources under Inc...National Institute of Food and Agriculture
 
Optimization of reservoir operation using neuro fuzzy techniques
Optimization of reservoir operation using neuro fuzzy techniquesOptimization of reservoir operation using neuro fuzzy techniques
Optimization of reservoir operation using neuro fuzzy techniquesIAEME Publication
 
AGEDI Climate Change Brochure low res
AGEDI Climate Change Brochure low resAGEDI Climate Change Brochure low res
AGEDI Climate Change Brochure low resJane C. Glavan
 
Is stationarity dead whither water management
Is stationarity dead whither water managementIs stationarity dead whither water management
Is stationarity dead whither water managementDhiraj Gyawali
 
Use of Storage Water in a Hydroelectric System
Use of Storage Water in a Hydroelectric SystemUse of Storage Water in a Hydroelectric System
Use of Storage Water in a Hydroelectric SystemIOSR Journals
 
Mass and Flow duration curves
Mass and Flow duration curvesMass and Flow duration curves
Mass and Flow duration curvesVignesh Sekar
 
Capstone Presentation
Capstone PresentationCapstone Presentation
Capstone PresentationMattieRourk
 
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMSRainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMSAnkit Balyan MBA, B.Tech.
 
Capstone presentation final
Capstone presentation finalCapstone presentation final
Capstone presentation finalMattieRourk
 

Similar to Aswan High Dam Reservoir Management System (20)

Water and Productivity Impacts for the NBDC
Water and Productivity Impacts for the NBDCWater and Productivity Impacts for the NBDC
Water and Productivity Impacts for the NBDC
 
Climate change and hydrological modeling.pptx
Climate change and hydrological modeling.pptxClimate change and hydrological modeling.pptx
Climate change and hydrological modeling.pptx
 
SDP120116f
SDP120116fSDP120116f
SDP120116f
 
IRWP Seasonal Storage Project Water Reuse System Storage Model
IRWP Seasonal Storage Project Water Reuse System Storage ModelIRWP Seasonal Storage Project Water Reuse System Storage Model
IRWP Seasonal Storage Project Water Reuse System Storage Model
 
An Integrative Decision Support System for Managing Water Resources under Inc...
An Integrative Decision Support System for Managing Water Resources under Inc...An Integrative Decision Support System for Managing Water Resources under Inc...
An Integrative Decision Support System for Managing Water Resources under Inc...
 
Optimization of reservoir operation using neuro fuzzy techniques
Optimization of reservoir operation using neuro fuzzy techniquesOptimization of reservoir operation using neuro fuzzy techniques
Optimization of reservoir operation using neuro fuzzy techniques
 
AGEDI Climate Change Brochure low res
AGEDI Climate Change Brochure low resAGEDI Climate Change Brochure low res
AGEDI Climate Change Brochure low res
 
Is stationarity dead whither water management
Is stationarity dead whither water managementIs stationarity dead whither water management
Is stationarity dead whither water management
 
IAS_SRF_Project_2015
IAS_SRF_Project_2015IAS_SRF_Project_2015
IAS_SRF_Project_2015
 
Use of Storage Water in a Hydroelectric System
Use of Storage Water in a Hydroelectric SystemUse of Storage Water in a Hydroelectric System
Use of Storage Water in a Hydroelectric System
 
2004 jh cypruspp
2004 jh cypruspp2004 jh cypruspp
2004 jh cypruspp
 
Brusli n
Brusli nBrusli n
Brusli n
 
Mass and Flow duration curves
Mass and Flow duration curvesMass and Flow duration curves
Mass and Flow duration curves
 
Final Capstone Presentation
Final Capstone PresentationFinal Capstone Presentation
Final Capstone Presentation
 
Capstone Presentation
Capstone PresentationCapstone Presentation
Capstone Presentation
 
Swat model
Swat model Swat model
Swat model
 
Ocean Modelling
Ocean ModellingOcean Modelling
Ocean Modelling
 
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMSRainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
 
Capstone Final Powerpoint
Capstone Final PowerpointCapstone Final Powerpoint
Capstone Final Powerpoint
 
Capstone presentation final
Capstone presentation finalCapstone presentation final
Capstone presentation final
 

More from Luisa Polanco

PPT - How To Write A Conclusion Paragraph PowerPoint Presentation, Fr
PPT - How To Write A Conclusion Paragraph PowerPoint Presentation, FrPPT - How To Write A Conclusion Paragraph PowerPoint Presentation, Fr
PPT - How To Write A Conclusion Paragraph PowerPoint Presentation, FrLuisa Polanco
 
Benefits Of Reading Essay For Upsr. Original Papers Ben
Benefits Of Reading Essay For Upsr. Original Papers BenBenefits Of Reading Essay For Upsr. Original Papers Ben
Benefits Of Reading Essay For Upsr. Original Papers BenLuisa Polanco
 
How To Write An Essay Cover Page. Online assignment writing service.
How To Write An Essay Cover Page. Online assignment writing service.How To Write An Essay Cover Page. Online assignment writing service.
How To Write An Essay Cover Page. Online assignment writing service.Luisa Polanco
 
College Essays About Influence. Online assignment writing service.
College Essays About Influence. Online assignment writing service.College Essays About Influence. Online assignment writing service.
College Essays About Influence. Online assignment writing service.Luisa Polanco
 
Research Title Examples Qualitative Pdf Qualitativ
Research Title Examples Qualitative Pdf QualitativResearch Title Examples Qualitative Pdf Qualitativ
Research Title Examples Qualitative Pdf QualitativLuisa Polanco
 
PPT - Research Paper Writing Service From MyAssignmenthelp.Com
PPT - Research Paper Writing Service From MyAssignmenthelp.ComPPT - Research Paper Writing Service From MyAssignmenthelp.Com
PPT - Research Paper Writing Service From MyAssignmenthelp.ComLuisa Polanco
 
How To Start An Essay - Makena. Online assignment writing service.
How To Start An Essay - Makena. Online assignment writing service.How To Start An Essay - Makena. Online assignment writing service.
How To Start An Essay - Makena. Online assignment writing service.Luisa Polanco
 
Argument Essays Academic Essays General Essays
Argument Essays Academic Essays General EssaysArgument Essays Academic Essays General Essays
Argument Essays Academic Essays General EssaysLuisa Polanco
 
Issue Analysis Essay Example - Facebookthesis.
Issue Analysis Essay Example - Facebookthesis.Issue Analysis Essay Example - Facebookthesis.
Issue Analysis Essay Example - Facebookthesis.Luisa Polanco
 
Business Paper Essay About Colle. Online assignment writing service.
Business Paper Essay About Colle. Online assignment writing service.Business Paper Essay About Colle. Online assignment writing service.
Business Paper Essay About Colle. Online assignment writing service.Luisa Polanco
 
Writing Paper Set By Molly Mae Notonthehighstreet.C
Writing Paper Set By Molly Mae  Notonthehighstreet.CWriting Paper Set By Molly Mae  Notonthehighstreet.C
Writing Paper Set By Molly Mae Notonthehighstreet.CLuisa Polanco
 
Pre Writing Worksheet Bilingual Practice Page Pre. Online assignment writing ...
Pre Writing Worksheet Bilingual Practice Page Pre. Online assignment writing ...Pre Writing Worksheet Bilingual Practice Page Pre. Online assignment writing ...
Pre Writing Worksheet Bilingual Practice Page Pre. Online assignment writing ...Luisa Polanco
 
40 Free Divorce Papers Printable Templatelab - 40 F
40 Free Divorce Papers Printable Templatelab - 40 F40 Free Divorce Papers Printable Templatelab - 40 F
40 Free Divorce Papers Printable Templatelab - 40 FLuisa Polanco
 
Apa College Paper Format Apa Format 6Th Ed For Ac
Apa College Paper Format  Apa Format 6Th Ed For AcApa College Paper Format  Apa Format 6Th Ed For Ac
Apa College Paper Format Apa Format 6Th Ed For AcLuisa Polanco
 
Dialogue Personal Essay 005 Example. Online assignment writing service.
Dialogue Personal Essay  005 Example. Online assignment writing service.Dialogue Personal Essay  005 Example. Online assignment writing service.
Dialogue Personal Essay 005 Example. Online assignment writing service.Luisa Polanco
 
Opinion Essay A2 B2 Sample - Essay A Simple O
Opinion Essay A2 B2 Sample - Essay A Simple OOpinion Essay A2 B2 Sample - Essay A Simple O
Opinion Essay A2 B2 Sample - Essay A Simple OLuisa Polanco
 
10 Steps In Writing The Re. Online assignment writing service.
10 Steps In Writing The Re. Online assignment writing service.10 Steps In Writing The Re. Online assignment writing service.
10 Steps In Writing The Re. Online assignment writing service.Luisa Polanco
 
Three Paragraph Essay- A Step By Step Guide To Writing TpT
Three Paragraph Essay- A Step By Step Guide To Writing  TpTThree Paragraph Essay- A Step By Step Guide To Writing  TpT
Three Paragraph Essay- A Step By Step Guide To Writing TpTLuisa Polanco
 
Essays On The Freedom Riders - Mfawriting608.Web.Fc2.Com
Essays On The Freedom Riders - Mfawriting608.Web.Fc2.ComEssays On The Freedom Riders - Mfawriting608.Web.Fc2.Com
Essays On The Freedom Riders - Mfawriting608.Web.Fc2.ComLuisa Polanco
 
Concluding A Research Paper Get Top Grade.
Concluding A Research Paper Get Top Grade.Concluding A Research Paper Get Top Grade.
Concluding A Research Paper Get Top Grade.Luisa Polanco
 

More from Luisa Polanco (20)

PPT - How To Write A Conclusion Paragraph PowerPoint Presentation, Fr
PPT - How To Write A Conclusion Paragraph PowerPoint Presentation, FrPPT - How To Write A Conclusion Paragraph PowerPoint Presentation, Fr
PPT - How To Write A Conclusion Paragraph PowerPoint Presentation, Fr
 
Benefits Of Reading Essay For Upsr. Original Papers Ben
Benefits Of Reading Essay For Upsr. Original Papers BenBenefits Of Reading Essay For Upsr. Original Papers Ben
Benefits Of Reading Essay For Upsr. Original Papers Ben
 
How To Write An Essay Cover Page. Online assignment writing service.
How To Write An Essay Cover Page. Online assignment writing service.How To Write An Essay Cover Page. Online assignment writing service.
How To Write An Essay Cover Page. Online assignment writing service.
 
College Essays About Influence. Online assignment writing service.
College Essays About Influence. Online assignment writing service.College Essays About Influence. Online assignment writing service.
College Essays About Influence. Online assignment writing service.
 
Research Title Examples Qualitative Pdf Qualitativ
Research Title Examples Qualitative Pdf QualitativResearch Title Examples Qualitative Pdf Qualitativ
Research Title Examples Qualitative Pdf Qualitativ
 
PPT - Research Paper Writing Service From MyAssignmenthelp.Com
PPT - Research Paper Writing Service From MyAssignmenthelp.ComPPT - Research Paper Writing Service From MyAssignmenthelp.Com
PPT - Research Paper Writing Service From MyAssignmenthelp.Com
 
How To Start An Essay - Makena. Online assignment writing service.
How To Start An Essay - Makena. Online assignment writing service.How To Start An Essay - Makena. Online assignment writing service.
How To Start An Essay - Makena. Online assignment writing service.
 
Argument Essays Academic Essays General Essays
Argument Essays Academic Essays General EssaysArgument Essays Academic Essays General Essays
Argument Essays Academic Essays General Essays
 
Issue Analysis Essay Example - Facebookthesis.
Issue Analysis Essay Example - Facebookthesis.Issue Analysis Essay Example - Facebookthesis.
Issue Analysis Essay Example - Facebookthesis.
 
Business Paper Essay About Colle. Online assignment writing service.
Business Paper Essay About Colle. Online assignment writing service.Business Paper Essay About Colle. Online assignment writing service.
Business Paper Essay About Colle. Online assignment writing service.
 
Writing Paper Set By Molly Mae Notonthehighstreet.C
Writing Paper Set By Molly Mae  Notonthehighstreet.CWriting Paper Set By Molly Mae  Notonthehighstreet.C
Writing Paper Set By Molly Mae Notonthehighstreet.C
 
Pre Writing Worksheet Bilingual Practice Page Pre. Online assignment writing ...
Pre Writing Worksheet Bilingual Practice Page Pre. Online assignment writing ...Pre Writing Worksheet Bilingual Practice Page Pre. Online assignment writing ...
Pre Writing Worksheet Bilingual Practice Page Pre. Online assignment writing ...
 
40 Free Divorce Papers Printable Templatelab - 40 F
40 Free Divorce Papers Printable Templatelab - 40 F40 Free Divorce Papers Printable Templatelab - 40 F
40 Free Divorce Papers Printable Templatelab - 40 F
 
Apa College Paper Format Apa Format 6Th Ed For Ac
Apa College Paper Format  Apa Format 6Th Ed For AcApa College Paper Format  Apa Format 6Th Ed For Ac
Apa College Paper Format Apa Format 6Th Ed For Ac
 
Dialogue Personal Essay 005 Example. Online assignment writing service.
Dialogue Personal Essay  005 Example. Online assignment writing service.Dialogue Personal Essay  005 Example. Online assignment writing service.
Dialogue Personal Essay 005 Example. Online assignment writing service.
 
Opinion Essay A2 B2 Sample - Essay A Simple O
Opinion Essay A2 B2 Sample - Essay A Simple OOpinion Essay A2 B2 Sample - Essay A Simple O
Opinion Essay A2 B2 Sample - Essay A Simple O
 
10 Steps In Writing The Re. Online assignment writing service.
10 Steps In Writing The Re. Online assignment writing service.10 Steps In Writing The Re. Online assignment writing service.
10 Steps In Writing The Re. Online assignment writing service.
 
Three Paragraph Essay- A Step By Step Guide To Writing TpT
Three Paragraph Essay- A Step By Step Guide To Writing  TpTThree Paragraph Essay- A Step By Step Guide To Writing  TpT
Three Paragraph Essay- A Step By Step Guide To Writing TpT
 
Essays On The Freedom Riders - Mfawriting608.Web.Fc2.Com
Essays On The Freedom Riders - Mfawriting608.Web.Fc2.ComEssays On The Freedom Riders - Mfawriting608.Web.Fc2.Com
Essays On The Freedom Riders - Mfawriting608.Web.Fc2.Com
 
Concluding A Research Paper Get Top Grade.
Concluding A Research Paper Get Top Grade.Concluding A Research Paper Get Top Grade.
Concluding A Research Paper Get Top Grade.
 

Recently uploaded

MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupJonathanParaisoCruz
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxUnboundStockton
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 

Recently uploaded (20)

MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized Group
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docx
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 

Aswan High Dam Reservoir Management System

  • 1. Aswan High Dam Reservoir management system Noha Donia ABSTRACT The Aswan High Dam Reservoir management system was developed to simulate dam operation under varying boundary conditions taking as example climate change and Millennium Dam construction, and analyze the optimal operation rules of the reservoir taking into account a large number of objectives, including hydropower production and water supply for irrigation purposes. The developed system runs on Windows platforms and comprises three basic modules: a user-friendly graphical interface managing all graphic features, a computational engine where all the algorithms are implemented, and a database and files module managing hydrological and operational data. The developed model was calibrated. The future hydrologic scenarios developed have been used to assess the expected impacts of potential climate change (baseline and three periods with two global emission scenarios) and the Millennium Dam. The new operation rules were used for scenarios analysis. It was concluded that overall applying the new operation rules will decrease the percentage of occurrence of minimum water levels. Also, the Millennium Dam will increase the percentage of occurrence of minimum water levels. Finally, the period III (2070–2099) for the two global emission scenarios is very critical for the dam operation. Noha Donia Environmental Engineering Department, Institute of Environmental Studies and Researches, 6th Bostan Street, Flat 503, Cairo, Egypt E-mail: ndonia@gmail.com Key words | climate change, dam operation, decision support systems, operation rules, scenario analysis, water resource management INTRODUCTION Successful integrated management of water supply systems requires the effective use of Decision Support Systems (DSS) able to support managers to make key decisions. According to a structural definition (Sprague ; Reitsma et al. ), a DSS can be defined as a computer-based tool comprising three subsystems: the modeling subsystem, the database subsystem and the user interface subsystem, interconnected with each other. Numerous researchers have developed computer-based DSS for the management and operation of reservoirs and river systems (e.g., Simonovic & Savic ; DeGagne et al. ; Koutsoyian- nis et al. ). Currently, the vast majority of reservoir system planning and operation is undertaken using simu- lation and optimization models (Lund & Guzman ). To date, these have focused primarily on the physical aspects of the system (Reitsma ). They are frequently based on simple engineering principles for dam operation, such as keeping reservoirs full for water supply or empty for flood control. As such, they provide a great deal of flexi- bility in the specification of system operations under various flow, storage and demand conditions. Many rules are based on largely empirical or experimental success, determined either from actual operational performance, performance in simulation studies or optimization results. These experimentally-supported rules are common for large multi-purpose projects. Georgakakos () describes four scales at which DSS can improve reservoir network management by improving decision making: • long term infrastructure planning and construction; • interannual and seasonal operational decisions for over- year storage and water contracts; • 1–3 month operational decisions for dry period conserva- tion or flood management; and 1491 © IWA Publishing 2013 Journal of Hydroinformatics | 15.4 | 2013 doi: 10.2166/hydro.2013.003 Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf by guest
  • 2. • daily releases for water allocation or hydropower oper- ation. Decision support at the first scale is used in a planning capacity, where the decisions are for changes or improvements in infrastructure. The operational decisions associated with the other three scales are primarily reservoir release schedules. DSS can help operators make releases which best meet the objec- tives of the project: meeting user demands, suitable deficit allocations during drought periods, and most importantly a release schedule which appropriately balances the present demands with the value of storage for future demands. Climate change can have an impact on water resources systems resulting in changes in both, the hydrologic cycle and water availability (IPCC ). Since the magnitude of local climate change depends on the rate of change of weather conditions, precipitation and temperature, some regions have already begun investigations into the potential impact on local water systems, particularly in areas of multipurpose use of water and reliance on water supply facilities such as reservoirs (Wood et al. ; Hamlet & Lettenmaier ; Payne et al. ; Simonovic & Li ; Van Rheenen et al. ). In a geographic region that, by its nature, depends on effective management of the water resources by the storage reservoirs, a study of potential climate change impacts on reservoir oper- ation is justified. The reservoir not only provides water for basic needs, but also stores the surplus of water during high flow season to provide protection of downstream area from flooding. Reservoir systems, designed and operated using his- torical data, are unlikely to have management contingencies for the effects of climate change. To fill that research gap, scientific work is being done on the impact of climate change with an attempt to define the risks associated with cur- rent reservoir operation practices (Nemec & Schaake ; Klemes ; Burn & Simonovic ; Yao & Georgakakos ). Brekke et al. () developed a risk assessment frame- work and applied it to California’s Central Valley Project and State Water Project systems. They used a total of 97 scenarios based on emissions and General Circulation Models (GCMs) provided by the Intergovernmental Panel on Climate Change (IPCC). A weighting was assigned to each scenario, for risk- based planning approach, to study how the risk outlined is sensitive not only to selected climate scenarios but also to analytical design choices such as weight projections. In much of the existing and quite limited research only current reservoir operating rules are used to determine how water sys- tems will respond to climate change. Many studies including the Aswan High Dam Reservoir (AHDR) simulation and optimization models have been con- ducted, but the availability of reliable data and economic and human resources burdens the implementation of complex models for the management of water (Alarcon & Marks ; WMP ; Guariso et al. ; Sadek & Aziz ; Soli- man et al. ; Shafie et al. ). Also these studies have taken into account a stationary climate that is increasingly considered inadequate for sustainable water resources man- agement. Few studies have taken into consideration climate change impact on the Aswan High Dam (AHD) such as Mobasher & Ostrowski () for reservoir systems, climatic variability and the related hydrologic uncertainty are major sources of vulnerability. This is especially true in West Africa where the already high interannual variability is exacerbated by trends associated with climate change (Dow ; Hellmuth et al. ). DSS can reduce these vulnerabil- ities by improving water resource management in the face of climate variability and change (Yao & Georgakakos ; NRC ), including systems in Africa (McCartney ). This study attempts to develop a DSS for managing the AHDR operation for adaptation to climate change. The system has several important characteristics. We develop a tool of analysis that is easy to use and easily accepted by man- agers who have little training in quantitative analysis, and that corresponds as closely as possible to the way in which water release decisions were made historically. Of course, the overriding goal is to design decision rules that signifi- cantly improve on previously practiced rules, especially in the event of extreme hydrological conditions such as flooding or drought and climate change scenarios. The manager can easily use the DSS on a monthly basis, to quickly analyze the impact of several different alternative courses of action (such as water release schemes) on the relevant objectives and other quantities of interest (such as electricity generation and reservoir storage). The system is a scenario-driven decision support tool for incorporating climate change into new operating rules for the AHDR. Therefore, the DSS pro- posed in this study can be used to determine reservoir operation rules that adapt to new conditions whenever infor- mation is available (for example updated GCM output). 1492 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013 Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf by guest
  • 3. CASE STUDY DESCRIPTION Construction of the AHD on the River Nile in southern Egypt began in 1960 and was completed in 1972. The dam is in fact the core of all production in Egypt. It is the foundation upon which the country’s contemporary industrial, agricultural and economic revival depends. The intended purposes of the pro- ject are irrigation, hydropower generation and flood control. With regard to its relative economic importance, the dam project has a unique position among the big irrigation projects in the world. AHDR, known as Lake Nasser, is a reservoir formed as a result of the construction of the AHD. It is located on the border between Egypt and Sudan (see Figure 1). The reservoir has a large annual carry-over capacity of 168.90 BCM (billion cubic meters) that corresponds to a lake surface area of 6,540 km2 , length of 500 km and an average width of 12 km. The ratio between storage capacity and the corresponding surface area or the storage mean depth for the Figure 1 | Location map of the reservoir, which represents one of the world’s largest artificial lakes (MWRI 2005). 1493 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013 Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf by guest
  • 4. AHD is 24.82 m. About 300 km of its length lies within the Egyptian borders, while 200 km are within Sudanese territory. The total storage capacity of the reservoir is allocated as fol- lows: 90 BCM as live storage capacity between levels 147 and 175 m (meters above sea level, MASL), 31 BCM as dead storage for sediment deposition, and 41 BCM as a flood con- trol buffer between the levels of 175 and 182 m (MASL). The reliable water supply from the AHDR is estimated as 55.5 BCM yr 1 , based on the average natural flow of 84 BCM yr 1 , reservoir evaporation losses of 10 BCM yr 1 and an allocation of 18.5 BCM yr 1 for the Sudan. The hydro- electric power station consists of 12 units with a capacity of 175 MW each, i.e., a total capacity of 2,100 MW, producing on average 7 billion kWh of energy annually. Each turbine is under a head range of 60–76 m, while the water level in the reservoir upstream of the turbines ranges between 175 m at the beginning of the water year in August and 165 m or less in the drought seasons. The height of the turbines is 108 m, so the head on the turbines can be calculated as 175–108 ¼ 67 m in the normal operation case for a corresponding range of discharges between 270 and 345 m3 s 1 . Associated with the generating units are emergency low-level outlets for releas- ing water when downstream needs exceed the flows that can be handled by the turbines (Abu-Zeid & El-Shibini ). The design criteria for the AHDR are shown in Figure 2. The reservoir satisfies the multiple roles of water conser- vation, flood protection and hydropower generation. The releases from the dam are designed to meet irrigation require- ments, which vary markedly from one season to another and hydropower is generated as a secondary benefit. In addition, the reservoir is operated to control the annual flood by draw- ing down the reservoir to a predetermined level on a specified date each year. Additional constraints on the operation of the reservoir are imposed by the need to limit the magnitude of releases so as to avoid downstream degradation and/or hin- drance to navigation. During low flood years, the water released for different uses, in Egypt and Sudan, is reduced according to a sliding scale in order to avoid reservoir empty- ing. The amount of monthly releases, therefore, is determined by the amount of the flood and essential requirements. The reservoir reached its lowest storage level of 150.62 m in July 1988, but fortunately, the large flood of 1988–1989 allowed the reservoir to rise again and reach a level of 168.82 m in December 1988. In the 1990s, the reservoir continued to rise until it reached the highest level of 181.60 m in November 1999 (Sadek ). Egypt’s water demand might rapidly increase due to the population growth and the improvement of living standards as well as to achieve the government policies in order to reclaim new lands and to encourage development in the industrial sector. The major water consuming sectors are agriculture, municipalities and industries. On the other hand yield supply related to rainfall and evaporation, and subsequent changes of inflow into the reservoir must be taken into consideration. These supply scenarios are sto- chastic and vary year by year. Drivers are global warming and related climate change which will determine these vari- ables. The natural Nile flows are very sensitive to relatively small changes in rainfall. Nile River discharge has a very great variation due to the variety of the different character- istics of the Nile basin. The Nile flood can be as high as 150 BCM yr 1 (1878–1879) and as low as 42 BCM yr 1 (1913–1914). Nile River floods can be classified according to the following five categories (Sadek & Aziz ): • Very low flood with an average flow of 52 BCM yr 1 ; • Low flood with an average flow of 70 BCM yr 1 ; • Average flood with an average flow of 92 BCM yr 1 ; • High flood with an average flow of 110 BCM yr 1 ; • Very high flood with an average flow exceeding 110 BCM yr 1 . Studies of climate change impact on the Nile River show that the basin is extremely sensitive to temperature and pre- cipitation changes (Strzepek & Yates ). An increase of Figure 2 | Design criteria for the AHD. 1494 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013 Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf by guest
  • 5. 10% in average annual precipitation would lead to an aver- age increase in annual flow of 40%. Similarly, a decrease in 10% in precipitation would lead to a reduction of the annual flow of more than 50% (Ministry of Water Resources and Irrigation ). Beyene et al. () assessed the potential impacts of climate change on the hydrology and water resources of the Nile River basin using a macroscale hydro- logic model driven by 21st century simulations of temperature and precipitation downscaled from runs of 11 GCMs and two global emissions scenarios (A2, correspond- ing roughly to unconstrained growth in emissions, and B1, corresponding to elimination of global emissions increases by 2100) archived for the 2007 IPCC report. The results show that, averaged across the multimodel ensembles, the entire Nile basin is expected to increases in precipitation early in the century (period I, 2010–2039), followed by decreases later in the century (period II, 2040–2069 and period III, 2070–2099) with the exception of the eastern- most Ethiopian highlands which might experience increases in summer precipitation by 2080–2100. Averaged over all models and ensembles, annual streamflow at the AHD for scenario A2 was predicted to increase to 111% of the 1950–1999 mean during 2010–2039, but then to decrease to 92 and 84% of the 1950–1999 mean during 2040–2069 and 2070–2099, respectively. For scenario B1, the corre- sponding numbers were 114% (increase) during 2010– 2039, and decreases to 93 and 87% of the 1950–1999 mean for 2040–2069 and 2070–2099, respectively. Another varying boundary condition is the Grand Ethio- pian Renaissance Dam (formerly known as Project X or the Grand Millennium Dam) that Ethiopia announced in April 2011 over the Blue Nile (Figure 3). This huge dam will flood 1,680 km2 of forest in northwest Ethiopia, near the Sudan border, and create a reservoir that is nearly twice as large as Lake Tana, Ethiopia’s largest natural lake. While there are no known studies about the dam’s impacts on the river’s flow, filling such a huge reservoir (it will hold up to 67 BCM of water, and likely take up to 7 years to reach capacity) will certainly impact Egypt, which relies almost totally on the Nile for its water supply. Climate change could increase the project’s many risks. If it fills in 3 years (from 2014 to 2017), it will save 21 BCM every year, so only 27 BCM will come into Egypt instead of 48 BCM, in other words, a 21 BCM decrease in Egypt and Sudan’s share. After completion of the dam construction, and assuming that it operates only 10 pumps from 15 and that the capacity of each pump is 4.3 BCM then Egypt would receive only 43 BCM instead of 48 BCM, a loss of 5 BCM divided between the Egyptian and Sudanese share (Zewde ; BCEOM ; Waterbury ; World Bank a,b; Berhane ). Due to the enormous importance of the reservoir, special and national consideration must be given to the reservoir operation and development. Operation of the AHDR might face different challenges in the 21st century due to potential changes of the demand-supply conditions. The management of the AHDR is one of the most important issues related to water resources studies in Egypt. The devel- oped model will be used to analyze future development of water resources yield and demand, and related modifi- cations of the infrastructure and operation. It is designed as a comparative analysis tool. A base case is developed and then alternative scenarios are created and compared to this base case. Therefore, this paper objective is to Figure 3 | Design of the new Millennium Dam of Ethiopia on the Nile River. 1495 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013 Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf by guest
  • 6. develop ‘easy to use’ computing tools in order to perform these scenario analyses studies and to improve the manage- ment of the High Aswan Dam Reservoir under climate change. ASWAN HIGH DAM RESERVOIR MANAGEMENT SYSTEM (AHDRMS) The developed management system is a computer-based tool comprising three subsystems: the modeling subsystem, the database subsystem and the user interface subsystem, inter- connected with each other. Computer software was developed, using Visual Basic, by the author and it is named ‘Aswan High Dam Reservoir Management System (AHDRMS)’. The capabilities of the developed system help in understanding a given problem, explore the consequences of different alternatives and facilitate sensitivity analyses. One of the main objectives of this study was to determine the possible scenarios of climate change and then incorpor- ate this information into the system in order to determine the impact that climate change is likely to have on the natural availability of the water resources in the river basin. The database subsystem Figure 4 shows the input database of the developed software and it contains the following modules. Figure 4 | Aswan High Dam Reservoir management database subsystem. 1496 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013 Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf by guest
  • 7. Operation rules This includes the top of the buffer, Toshka spill, max daily release, minimum daily release, beginning of water year storage and Aswan emergency spill zone. The irrigation requirements Irrigation demands downstream from the High Dam are taken to be 55.5 BCM yr 1 (MWRI ). The monthly sche- dule of demands is given in a table from the database in terms of percentage of total annual demands, following the monthly distributions. The hydropower requirements This includes the energy demand, tail water elevation, max turbine flow, generating efficiency and working turbine hour. The monthly evaporation rates The annual evaporation losses from the reservoir are divided between the months, the highest evaporation rates from the reservoir occur in May–October, while the lowest values occur in the period December–February. The modeling subsystem In this study, the modeling subsystem is based upon a simu- lation model that operates on the basic principle of water balance accounting, where both the engineered and bio- physical components of a water system are represented to facilitate multi-stakeholder water management dialogue for reservoir operations and hydropower generation, Typically AHDRMS is applied by configuring the system to simulate a recent ‘baseline’ year, for which the water availability and demands can be confidently determined. The model is then used to simulate alternative scenarios (i.e., plausible futures based on ‘what if’ propositions) to assess the impact of different development and management options. This model is considered to be unique because it is devel- oped based on mass balance hydrologic routing equations, hydropower, discharges, and head relationships with special conditions relating to the nature of the location and the special complicated nature of the problem since the storage volume can reach up to 162 BCM yr 1 with a length of about 500 km and the existence of many types of outflows (point and non-point outflows) at different locations. The conceptual presentation of the modeling subsystem is shown in Figure 5. Input module Inflow – Historical data were considered for water inflow discharge input. These historical data are measured at Dongla gauging station (750 km U.S. HAD) from 1971 to 2001 (NRI ). These data are used as input to the simulation model as shown in Figure 6. Sudan Abstraction – According to an agreement with Egypt signed in 1959, Sudan’s share of the water available from the Nile is 18.5 BCM yr 1 . This allocation is based on an average natural inflow into the reservoir of 84 BCM yr 1 (period 1900–1959) and an estimated 10 BCM yr 1 of reservoir losses. However, the actual use of Nile water by Sudan during the past period was about 14.5 BCM yr 1 (NWRP ). This module is based on the historical data available for Sudan abstraction during different conditions (Abdel-Latif & Mansour ). So we will include Sudan intake in our model from Table 1. El-Sheikh Zayed Canal – El-Sheikh Zayed Canal con- veys water discharge from Lake Nasser to the newly cultivated lands in the national project of El-Sheikh Zayed, constructed 1998/1999. The huge pump station (on Lake Nasser left bank) is used to elevate water from Lake Nasser to the El-Sheikh Zayed Canal. The station has been designed to have a maximum static lifting of about 52.5 m to ensure its operation when the water level in Lake Nasser reaches its lowest level of storage, which is 147 m above (MASL). The designed maximum discharge of the pumping station was estimated to be about 300 m3 s 1 (25 million m3 d 1 ). The expected annual water discharges from the lake into the canal are estimated to be 5 BCM (El-Sammany ). The canal has a length of 60 km, bed width of 30 m, side slopes with 2:1 gradient and is lined to prevent seepage from the canal. Table 2 presents the monthly intake of this project if it operates to its full capacity. 1497 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013 Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf by guest
  • 8. Figure 5 | Aswan High Dam Reservoir management modeling subsystem. Figure 6 | The annual water inflow of the historical data at Aswan 1971–2010. Table 1 | Sudan’s monthly discharge Month Aug. Sep. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May Jun. Jul. Total Sudan FLOW (BCM) 1.81 2.01 2.62 2.18 2.03 1.67 1.11 1.03 0.69 0.69 0.97 1.67 18.5 1498 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013 Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf by guest
  • 9. Operation rules restriction module This module monitors both the upstream water level and the outflow downstream dam. The task of this module is to ensure that the maximum water level upstream of the dam is not exceeding the maximum limit during any time step and, also, to avoid increasing of the outflow discharge downstream of the dam higher than the safe limits if possible. Lake Nasser operation policies were determined by the Ministry of Water Resources and Irrigation (MWRI) according to different restrictions to ensure dam safety and suitable water manage- ment. These restrictions can be summarized as follows: 1. Maximum water level upstream of the AHD should not exceed 182.00 m at any time. 2. The released discharge downstream of the dam should not exceed the safe discharges to avoid damage to the river bed, banks and hydraulic structures. 3. The water level at the beginning of the water year (August 1) should be kept, if possible, at 175 m to account for coming floods. Any water in excess of this discharge pro- gram is evenly distributed in the months with the lower water requirements in such a way that the peak monthly discharges during the peak summer months remain unchanged. The months with the lowest requirements receive a greater volume of the excess water in order that all months in which any additional water is spilled have the same total discharge. 4. Daily and monthly water released should be compatible with water requirements. The monthly discharges from the AHD follow a fixed pattern of releases. 5. The simulation model uses the sliding scale for reduction which the MWRI suggested for coping with a series of low floods. The reductions in withdrawals should come into being if the reservoir content in the live storage zone was less than 60 BCM on July 31. It is worth noting that if there are successive high floods and the water level in the lake exceeds 178 m, the excess water is diverted to a free spillway and then to Toshka depressions. In more emergency cases, when the flood capacity exceeds the Toshka spillway capacity, the West Bank spillway operates to ensure that the upstream reservoir elevation does not exceed 183 m. When the level is not higher than 182 m, the water will be stored in the Toshka depression with a maximum discharge of 250 million m3 d 1 (Sadek ). Simulation submodule The AHDR simulation model has been conceptualized and should perform the following operations: 1. Prepare the input data, which should include the inflow, initial storage, evaporation, and water demands, beside the operation rules of the reservoir. The initial storage of the reservoir for the first month of the operation period was assumed. The inflow at Dongola is discounted by the losses and abstractions from Sudan and El-Sheikh Zayed Canal on a monthly basis. 2. The demand will be calculated on a monthly basis based upon the monthly irrigation water requirements and should be neither more than the maximum nor less than the minimum permissible flow of the river. 3. The difference between the inflow and the demand will be calculated in order to obtain the new stored volume (with reference to the volume of the previous month), on a monthly basis. 4. Based on this new stored volume, the new surface area of the lake and the new water elevation upstream of the dam will be calculated (monthly average), based on the available historical series of data and/or formulas pre- sently used by the Nile Sector. The resulting storage should be within the operation rules range and be neither more than the design operation storage nor less than the minimum operation storage of the reservoir. If it exceeds the rule, then the computed storage and water level are readjusted through readjusting the release. 5. The calculation of evaporation losses and seepage losses will be operated based on the surface area and the water Table 2 | El-Sheikh Zayed project’s monthly discharge Month Aug. Sep. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May Jun. Jul. Total Flow El-Sheikh Zayed (BCM) 0.625 0.412 0.345 0.313 0.248 0.248 0.312 0.437 0.423 0.534 0.689 0.695 5.28 1499 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013 Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf by guest
  • 10. level (monthly average), based again on available histori- cal data and/or formulas used by the Nile Sector. The calculation of flow to Toshka spillway and Aswan spill was calculated based on operation rules restrictions. 6. Calculate the outflow from the power generating outlets, (Qp), which should not exceed the capacity of the power outlets. The minimum operation level represents the minimum level for operating the power generators. 7. Repeat the respective steps for the following months. The operation of a reservoir is described by the water balance equation under various constraints concerning sto- rage volume, outflow from the reservoir and water losses. The water balance equation applied on a monthly basis has the following form: dS(t) dt ¼ X nin i¼1 Qin,i X nout j¼1 Qout,j (1) S(t þ dt) ¼ St þ It Rt Levp Lseep Labs Qtosh Qemg Qsouthvalley (2) where S(tþdt): storage at time (t þ dt) (m3 ); St: storage at time t (month) (m3 ); It: mean inflow to the storage in month t (m3 ); Rt: water discharged from the storage in month t downstream the dam (m3 ); Levp: mean evaporation from the storage reser- voir in month t (m3 ); Lseep: seepage losses from the storage reservoir in month t (m3 ); Labs: bank storage absorption losses (m3 ); Qtosh: water released from Toshka spillway in month t (m3 ); Qemg: water released from the emergency spill- way in the dam in month t (m3 ); Qsouthvalley: the water demand for (South Valley) in month t (m3 ). Volume elevation (million m3 , m) empirical relation is given by: H ¼ 79:9734 þ 0:0369801V þ 8:87056ln V ð Þ (3) A ¼ 3, 164:28 þ 25:4914V þ 1, 092:92 ln V ð Þ (4) The constraint concerning storage volume Vt is: Vmin < Vt < Vmax where Vmin ¼ dead storage volume ¼ 31.60 BCM corre- sponding to the minimum power pool level (147 m); and Vmax ¼ maximum storage volume ¼ 162.30 BCM corre- sponding to the maximum power pool level (182 m). The mean monthly outflow discharge Qt during month t must satisfy the constraint: Qmin < Qt < Qmax where Qmin ¼ minimum releases ¼ 3.2 BCM yr 1 ; and Qmax ¼ Maximum releases ¼7.5 BCM yr 1 . Output module Hydropower module – The general equation which presents hydropower generation is a function of several factors such as discharge through the turbines, water head on turbines, the specific weight of water and the turbine’s efficiency. The general equation is given by Eshra (): P ¼ η γ Q H 1,000 (5) where P ¼ generated electric power output in (kW), Q ¼ water flow through the turbine (Discharge) in, m3 s 1 , H ¼ net head of water in (m) (the difference in water level between upstream and turbine downstream), η ¼ station (turbine & generator) efficiency factor, and γ ¼ specific weight of water (9,810 N m 3 ). Toshka and Aswan outflow computation module – The Toshka spillway (260 km upstream HAD) is in the Western desert, at the end of Toshka Khor with a width of 700 m and a crest level of 178 m constructed 1998/1999. The spill- way is an ungated canal without a regulator. Excavation works started in 1978 and completed in 1982. It was con- structed to release the excess water when water level reaches 178.00 m (MASL). The excess water is discharged to a natural depression located at the western side. This flow will help in limiting the outflow behind the dam to values ranging from 350 to 400 million m3 d 1 which are the discharge values that cause no harm to the Nile bed. The connecting canal from the spillway to the downstream depression area has an inlet width of 500 m and an outlet width of 275 m with a total length of 20.5 km. The outlet 1500 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013 Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf by guest
  • 11. weir of the canal has a crest level of 176.00 m and the canal slope is 14.6 cm km 1 . The lowest level of the depression is 150 m (MASL) while the highest level is 190 m (MASL). The surface area of the depression is about 6,000 km2 and it can contain about 120 × 109 m3 (Ismail & Aziz ). This module is based on the computations of the proposed project outflow hydrograph. The following equation for Toshka demands is used by Thompson (): Q ¼ 19 (H 178)5=3 30:4=1,000 where H 178, otherwise 0 (6) where Q ¼ Toshka spill (BCM/month) and H ¼ lake water level (m). Toshka spill cannot exceed 6 BCM/month. Aswan spill ¼ max release if H 182.6 m or S 162 BCM. Losses computation module – The major Lake Nasser losses are evaporation and seepage losses. They are both incorporated in the model by this module. The MWRI in Egypt for many years adopted the figure of 7.5 mm d 1 as the annual mean evaporation which corresponds to an evaporation rate of 2.70 m yr 1 (Whittington Guariso ). A later review of previous literature data established a large range for evaporation from AHDR between 1.7 and 2.9 m yr 1 . Based on water balance, energy budget and modeling techniques, a narrower range of 2.1–2.6 m yr 1 , with an average of 2.35 m yr 1 , was calculated by Sadek et al. (). In a 2002 technical report, based on the available data at the Nile Forecasting Center in Cairo, it was estimated that the annual evapor- ation from the AHDR varied between 12 and 12.6 BCM yr 1 which correspond to an evaporation rate of 2.0– 2.1 m yr 1 (Delft Hydraulics ). Hassan et al. () computed the evaporation losses from the reservoir and found that the yearly average of the daily evaporation rate is 6.33 mm d 1 and the average volume of the annual water lost by evaporation is about 12.5 BCM. In this simulation analysis, evaporation is calculated monthly as a function of the surface area of the AHDR and fixed monthly coefficients as in Table 3, and is calculated by the following equation (Mobasher Ostrowski ): Evaporation loss Levp m3 ¼ ((At þ Atþ1)=2) Ct1,000 (7) where At ¼ reservoir area at beginning of month t (km2 ), At þ 1 ¼ reservoir area as at the end of month t (km2 ), and Ct ¼ evaporation coefficient pertaining to month t (mm). For the seepage losses, the empirical regression func- tions for seepage losses and water levels used for this part are as follows (Eshra ): Monthly seepage S ¼ 0:038 (H 110) (8) where S ¼ the flow in BCM/month to the ground water in Lake Nasser, and H ¼ the storage level in meters. Outflow hydrograph generation module – The proposed outflow hydrograph downstream the AHD is computed using this module. The module computations are based on the water requirements for different months, the restrictions of the allowable maximum outflow downstream of the dam, and the maximum allowed water levels upstream of the dam. So the basic outflow hydrograph is composed from the historical data and water demand and water discharges and levels restrictions. Over the 30 years of simulation, releases, reservoir elevations, power generation and spills are tabulated on both a monthly and annual basis. Optimization module This consists of the specification of a pre-defined algorithm, described for example, by a set of ‘if-then’ rules or a decision matrix. These determine which control actions are to be taken for each of the possible states of the system. To find an appropri- ate set of rules, often a trial-and-error procedure is applied, supported by appropriate simulation tools (Schutze et al. ). Besides computational efficiency, this approach also has the advantage of greater clarity in the decision-finding procedure. A scenario analysis tool has been embedded into a DSS that allows a choice of the best scenario between some Table 3 | The monthly evaporation (m) Month Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec. Total Evap (m) 0.18 0.14 0.11 0.15 0.19 0.24 0.28 0.3 0.32 0.3 0.27 0.22 2.70 1501 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013 Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf by guest
  • 12. predefined possible scenarios for reservoir operation rules modification for adaptation to climate change. The con- trolled releases at the AHD give primary consideration to two objectives: meeting downstream irrigation demands and the maximization of electricity generated at the High Dam power plant. The defined objectives cannot be met with absolute certainty over the infinite future, due to lack of knowledge of future Lake Nasser inflows. The objective function utilized in this work takes the form: Lt ¼ X N t¼1 Rt Tt 1 Tt 1 2 þ Tt E GNt GNt !2 0 @ 1 A (9) where Lt ¼ losses incurred from irrigation deficits and power generation deficits during time periods t (t ¼ 1, 2, …, 12), Rt ¼ release (BCM), T1 t ¼ irrigation target for time period t (BCM), TE t energy target for time period t (103 GWH/ month) and GNt ¼ energy generated for time period t (103 GWH/month). The suggested new operation rules for optimum oper- ation are based upon reductions in agricultural water use and crop pattern changes during droughts, or application of a rising scale to handle the large number of reservoir excess releases due to high floods. The interactive process and the user interface subsystem The AHDRMS interface was designed using the Visual Basic programming language. It was designed to be used interactively through message boxes that pop up according to user clicks. Initially, the user enters the database including the reservoir operation rules, irrigation requirements, power requirements and the monthly evaporation rates. Second, the user clicks on simulation to run the model and to choose the optimum oper- ation rule. The calculated reservoir storage, water level, release, hydropower and evaporation are shown in tables and graphically as shown in Figures 7 and 8. Figure 7 | Input screen of the Aswan High Dam Reservoir management system. 1502 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013 Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf by guest
  • 13. Suggested scenarios The climate change scenarios generated by Beyene’s study (Beyene et al. ) will be used as a multiplier to the histori- cal natural series (1971–2001) to the model for simulating future inflows to the reservoir. First, the future hydrologic scenarios developed have been used to assess the expected impacts to potential climate change and basin development scenarios. The operation policies which were determined by the MWRI were used for the scenarios analysis in the simu- lation model of the AHDR. Second, the proposed operation rules were used to control these impacts for optimum oper- ation of the reservoir in the case of climate change to satisfy the preset objective function of minimum irrigation deficit and maximum power production. Finally, the effect of the Millennium Dam will be included in this scenario in addition to climate change. The assessment results are sum- marized relative to the following criteria: water supply releases; reservoir level variations; hydropower production; and evaporation losses. MODEL RESULTS AND ANALYSIS Model calibration The developed model was calibrated using actual measure- ments. The calibration was performed to study the effect of numerical approximation on model results. The calibration is also required to determine the accuracy of losses, seepage and evaporation estimations. All months through years from 1971 to 2001 were measured and calculated, and were used for calibration. Figure 9 shows the calibration result for these years. It can be concluded that the calibration process for water levels upstream of the AHD show close relationships between the model computed results and the actual readings. Figure 8 | Output screen of the Aswan High Dam Reservoir management system. 1503 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013 Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf by guest
  • 14. For different years the maximum difference between com- puted and measured water levels did not exceed 4 m or 2% error which is acceptable. Optimum operation rules versus historical operation By applying the model to 2 years of high flood period (1998–1999) and inspecting the difference in initial storage, final storage, hydropower, release and water level by apply- ing the new operation rules. The objective to increase the hydropower and get use of the excess water surplus by using the new operation rule the hydropower increases to 5%. By applying the model to 10 year drought period (1979–1988) and inspecting the difference in initial storage, final storage, hydropower, release and water level by apply- ing the new operation rules. The level of U.S. High Dam had dropped from 173.03 m in August 1979 to 150.62 m in July 1988, and about 72.8 BCM were taken from reser- voir to fulfill the irrigation requirements. This amount represents almost 1.3% of the yearly consumption of Egypt, which is 55.5 BCM. This emphasizes the need to apply new operation rules to the reservoir in order to cope with such drought periods. Therefore, by using the suggested new operation rules of the developed system, the level of U.S. High Dam had dropped from 173.03 m in August 1979 to 153 m in July 1988 and about to 68 BCM were taken from the reservoir to fulfill the irrigation requirements and is less compared with the case of applying the traditional operation rules of the reservoir. Future scenarios for reservoir operation The future hydrologic scenarios developed have been used to assess the expected impacts of potential climate change (baseline and three periods with two global emission scen- arios A2 (B1)) and Millennium Dam effect. The new operation rules suggested were used for the scenarios analy- sis in the simulation model of the AHDR. The following sections are an executive summary of the assessment results. The presentation focuses on annual aver- age quantities including water supply releases, reservoir level variations, hydropower production and evaporation losses in the four different scenarios: Scenario 1 – climate change without the Millennium Dam effect with current operation rules; Scenario 2 – climate change without the Millennium Dam effect with new operation rules; Scenario 3 – climate change with the Millennium Dam effect with new operation rules; Scenario 4 – climate change with the Millennium Dam effect with new operation rules. Figure 9 | The calibration result for years from 8/1971 to 8/2001. 1504 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013 Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf by guest
  • 15. Effect on level variations Tables 4, 5, 6 and 7 represent a summary characterization of variation in the reservoir level, this analysis represents the water level limits and corresponding percentage of occur- rence for all climate scenarios. Without the Millennium Dam, the percentage of occur- rence of water level greater than the highest level of the AHDR occurring only in period I (2010–2039) for the two global emission scenarios, A2 and B1, are 3.5 and 6.1%, respectively, compared with the baseline percentage 5.7%. In case of the new operation rules, the percentage of occur- rence of water level greater than the highest level of the AHDR occurring only in period I (2010–2039) for the two global emission scenarios are 3.2 and 5.6%, respectively, compared with the baseline percentage 5.2%. This means the application of the new operation rules reduce the per- centage of occurrence of highest level of the AHDR which is very beneficial in high flood periods. Without the Millennium Dam, the percentage of occur- rence of water level lower than the minimum level from the AHDR for period II (2040–2069), and period III (2070– 2099) for the two global emission scenarios A2(B1) are 14.4% (16.7%) and 29.3% (24.2%), respectively. In the case of the new operation rules the percentage of occurrence of water level lower than the minimum level from the AHDR for period II (2040–2069) is 14% for global emission scenario A1, and for period III (2070–2099) with the two global emis- sion scenarios, A2 and B1, are 27.9 and 21.7%, respectively. This means the application of new operation rules reduces the percentage of occurrence of the lowest level of the AHDR which is very beneficial in low flood periods. With the Millennium Dam, the percentages of occur- rence of water level lower than the minimum level from the AHDR for the three periods (period I (2010–2039), period II (2040–2069), and period III (2070–2099)) and the two global emission scenarios A2(B1) are 9.9% (0), 13.9% (0) and 62.6% (44.7%), respectively, compared with the baseline percentage 4%. This means the building of the Millennium Dam increases the percentage of occurrence Table 4 | Level variation characteristics in the AHDR in the case of current operation rules without the Millennium Dam 2010–2039 2040–2069 2070–2099 Level Baseline A2 B1 A2 B1 A2 B1 % % % % % % % 181 5.7 3.5 6.1 0 0 0 0 178 13.5 19.9 30.6 2.5 2.5 0 0 175 26.2 44.4 52.2 4.7 4.7 0 0 160 95.6 99.5 100 53.3 55.6 22.9 30.6 150 0 0 0 14.4 16.7 29.3 24.2 Table 5 | Level variation characteristics in the AHDR in the case of new operation rules without the Millennium Dam 2010–2039 2040–2069 2070–2099 Level Baseline A2 B1 A2 B1 A2 B1 % % % % % % % 181 5.2 3.2 5.6 0 5.6 0 0 178 13.9 19.9 30.3 2.5 30.3 0 0 175 25.9 44.6 55.8 5.3 55.8 0 0 160 99.2 99.5 100 54.9 100 23.4 40.8 150 0 0 0 14 0 27.9 21.7 Table 6 | Level variation characteristics in the AHDR in the case of current operation rules with the Millennium Dam 2010–2039 2040–2069 2070–2099 Level Baseline A2 B1 A2 B1 A2 B1 % % % % % % % 181 0 0 12.5 3.1 12.5 0 0 178 0 6.5 33.1 12.5 33 0 0 175 1.6 17.5 52.8 20 52.8 0 0 160 75.8 60.9 100 58.9 100 3.3 24.2 150 4 9.9 0 13.9 0 62.6 44.7 Table 7 | Level variation characteristics in the AHDR in the case of new operation rules with the Millennium Dam 2010–2039 2040–2069 2070–2099 Level Baseline A2 B1 A2 B1 A2 B1 % % % % % % % 181 0 0 12.5 3.1 12.5 0 0 178 0 8.1 33.6 14.5 33.6 0 0 175 0.8 20.2 54.2 23.4 54.2 0 0 160 83.6 62.4 100 61.8 100 7.8 45 150 1.9 9.7 0 10 0 49.4 31.67 1505 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013 Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf by guest
  • 16. of lowest level of the AHDR which is very critical in dam operation. In the case of the new operation rules, the percen- tage of occurrence of water level lower than the minimum level from the AHDR for the three periods (period I (2010–2039), period II (2040–2069), and period III (2070– 2099)) and the two global emission scenarios A2(B1) are 9.7% (0), 10% (0) and 49.4% (31.67%), respectively, com- pared with the baseline percentage 1.9% which is better than with current operation rules. Effect on release variations Figure 10 shows the Predicted Mean Annual Release from AHDR in the four cases. In general without the Millennium Dam, the mean annual withdrawals from the AHDR for the three periods (period I (2010–2039), period II (2040–2069), and period III (2070–2099)) and two global emission scenarios A2(B1) are 54.8 (55), 47.4 (48) and 43.4 (44.7) BCM, respect- ively, compared with the baseline release of 53.5 BCM. Egypt’s average annual withdrawal from the AHDR is expected to increase due to climate change by 1.30 BCM early in the 21st century (2010–2039). However, Egypt might suffer significant shortfalls relative to historical average releases from the AHDR reaches of 7 and 10 BCM by mid (2040–2069) and late (2070–2099) century, respectively. In the case of the new operation rules, the mean annual withdrawals from the AHDR for the three periods (period I (2010–2039), period II (2040–2069), and period III (2070– 2099)) and two global emission scenarios A2(B1) are 53.9 (54.8), 46 (46.7) and 42.7 (44.1) BCM, respectively, com- pared with the baseline release of 52.5 BCM. Egypt’s average annual withdrawal from the AHDR is expected to increase due to climate change by 1.30 BCM early in the 21st century (2010–2039). Therefore, the application of new operation rules causes a slight improvement in water release. With the Millennium Dam, the mean annual withdra- wals from the AHDR for the three periods (period I (2010–2039), period II (2040–2069), and period III (2070– 2099)) and two global emission scenarios A2(B1) are 49.8 (47.9), 46 (49.6) and 42 (44.9) BCM, respectively, compared with the baseline release of 50.4 BCM. Egypt might suffer shortfalls relative to historical average releases from the AHDR reaches of 4 and 8 BCM by mid (2040–2069) and late (2070–2099) century, respectively. In the case of the new operation rules, in general with the Millennium Dam, the mean annual withdrawals from the AHDR for the three periods (period I (2010–2039), period II (2040–2069), and period III (2070–2099)) and two global emission scenarios A2(B1) are 47.9 (55.3), 44.96 (48) and 41 (43.7) BCM, respectively, compared with the baseline release of 48.9 BCM. Therefore, the application of the new operation rules causes improvement in water release from the AHDR. Figure 10 | Predicted mean annual release from AHD. 1506 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013 Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf by guest
  • 17. Effect on evaporation variations Without the Millennium Dam, the mean annual evaporation losses from the AHDR for the three periods (period I (2010– 2039), period II (2040–2069), and period III (2070–2099)) and two global emission scenarios A2(B1) are 12.2 (13), 7.2 (7.5) and 5.1 (5.7) BCM, respectively, compared with the base- line release of 9.8 BCM. In the case of the new operation rules, the mean annual withdrawal from the AHDR for the three periods (period I (2010–2039), period II (2040–2069), and period III (2070–2099)) and two global emission scenarios A2(B1) are 12.3 (13), 7.3 (7.9) and 5.2 (6.3) BCM, respectively, compared with the baseline release of 9.8 BCM (Figure 11). With the Millennium Dam, the mean annual evaporation losses from the AHDR for the three periods (period I (2010– 2039), period II (2040–2069), and period III (2070–2099)) and two global emission scenarios A2(B1) are 14 (16.5), 11.5 (15.5) and 7.3 (10.7) BCM, respectively, compared with the baseline release of 8.4 BCM. In the case of the new operation rules, the mean annual withdrawal from the AHDR for the three periods (period I (2010–2039), period II (2040–2069), and period III (2070–2099)) and two global emission scenarios A2(B1) are 8.4 (13.2), 6.7 (8.8) and 3.6 (4.9) BCM, respectively, compared with the baseline release of 8.9 BCM (Figure 11). Effect on hydropower variations Without the Millennium Dam, the mean annual hydro- power generated from the AHDR for the three periods (period I (2010–2039), period II (2040–2069), and period III (2070–2099)) and two global emission scenarios A2 (B1) are 9,614 (9,875.8), 6,501 (6,773.6) and 5,094.5 (5,553.8) GWh, respectively, compared with the baseline release of 8,842 GWh. It means Egypt will suffer from a 26.5% (23.4%) decrease in power generated during period II (2040–2069), and a 42.3% (37.2%) decrease in period III (2070–2099) and a 8.74% (11.7%) increase in period I. In the case of the new operation rules, the mean annual hydropower generated from the AHDR for the three periods (period I (2010–2039), period II (2040–2069), and period III (2070–2099)) and the two global emission scenarios A2(B1) are 7,380.5 (10,003.2), 6,257.7 (7,416.4) and 4,135.3 (5,192.4) GWh, respectively, compared with the baseline release of 8,914 GWh. It means Egypt will suffer from a 27.9% (24.5%) decrease in power generated during period II (2040–2069), and from a 44.2% (36.3%) decrease in power generated period III (2070–2099) and from a 6.6% (11%) increase in power generated in period I. With the Millennium Dam, the mean annual hydro- power generated from the AHDR for the three periods (period I (2010–2039), period II (2040–2069), and period III (2070–2099)) and the two global emission scenarios A2 (B1) are 7,380.5 (10,003.2), 6,257.7 (7,416.4) and 4,135.3 (5,192.8) GWh, respectively, compared to the baseline release of 7,521.7 GWh. It means Egypt will suffer from a 16.8% (32.9%) decrease in power generated during period II (2040–2069), and a 45.2% (30.9%) decrease in period III (2070–2099) and a 1.9% (32.9%) increase in period I. Figure 11 | Predicted mean annual evaporation losses from AHD. 1507 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013 Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf by guest
  • 18. In the case of the new operation rules, the mean annual withdrawal from the AHDR for the three periods (period I (2010–2039), period II (2040–2069), and period III (2070– 2099)) and the two global emission scenarios A2(B1) are 7,175.8 (10,110.1), 6,095.1 (7,362) and 4,199.5 (5,624.5) GWh, respectively, compared with the baseline release of 7,517.9 GWh (Figure 12). It means that Egypt will suffer from a 18.9% (2%) decrease in power generated during period II (2040–2069), and 44% (25%) decrease in power generated during period III (2070–2099) and 4.6% (34.5%) increase in power generated during period I. CONCLUSION This paper introduces a user-friendly DSS for reservoir management, which was shown to yield accurate operating rules for the AHDR, integrates the various model com- ponents effectively, and provides a reliable and user- friendly decision aid. The major contribution of our flexible AHDRMS is that it enables a scenario analysis that cap- tures the decision maker’s judgments, facilitating a flexible decision process. Depending on the decision situ- ation and expertise available, it is possible to use simple simulation methods, as we did in our application, or sophisticated optimization methods. The participation in the decision process is not limited to reservoir operators, and many parties – such as administrators and politicians – can be involved in the decision making process as well. The future hydrologic scenarios developed have been used to assess the expected impacts to potential climate change and Millennium Dam development scenarios. The operation policies which were determined by the MWRI were used for the scenarios analysis in the simulation model of the developed AHDR Management Model. In the simulation experiment, it can be concluded that overall applying the new operation rules will decrease the percentage of occurrence of minimum water levels. Also, the Millennium Dam will increase the percentage of occur- rence of minimum water levels. In addition, the period III (2070–2099) with the two global emission scenarios A2 (B1) is very critical for the dam operation as there is the highest percentage of decrease of water level below the mini- mum level, as well as the highest decrease in water release, evaporation losses and hydropower generated. Also, in the case of global emission (B1 for periods I and II), there is an increase in water release, evaporation losses and hydro- power generated compared with the baseline. Hence, our basic AHDR Management Model can be generalized to a wider class of reservoir management problems. Figure 12 | Predicted mean annual release from AHD. 1508 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013 Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf by guest
  • 19. As climate change in coordination with water conserva- tion projects can impact on Nile water availability, the assessments carried out demonstrate that management models are necessary to assess the potential benefits of future development and management strategies that might mitigate adverse effects. The developed AHDRMS has pro- duced meaningful results that can now be incorporated in water management and policy-making considerations. It is hoped that the results of these assessments will lead to be more informed AHDR strategies for future development, adaptive management, and risk assessment. The results from this study would provide an objective basis for decision makers to weight scenario outcomes. REFERENCES Abdel-Latif, M. Mansour, Y.  Effect of change of discharges at Dongola station due to sedimentation on the water losses from Nasser Lake. Nile Basin. Water Science Engineering Journal 4, 86–98. Abu-Zeid, M. A. El-Shibini, F. Z.  Egypt’s Aswan high dam. Water Resources Development 13, 209–217. Alarcon, L. F. Marks, D. H.  A stochastic dynamic programming algorithm for the operation of the Aswan High Dam. Tech. Report no. 246, Department of Civil Engineering, MIT, Ralph M. Parsons Laboratory for Water Resources and Hydrodynamics, Cambridge, Massachusetts. BCEOM  Abay River Basin Integrated Development Master Plan Project. Report to Ministry of Water Resources, The Federal Democratic Republic of Ethiopia. Berhane, D.  Quick Facts on the Grand Millennium Dam, Ethiopia. http://danielberhane.wordpress.com/2011/04/11/ quick-facts-on-the-grand-millennium-damethiopia/. Beyene, T., Lettenmaier, D. P. Kabat, P.  Hydrologic impacts of climate change on the Nile river basin: implications of the 2007 IPCC climate scenarios. Climatic Change Journal 100, 433–461, Springer Science, The Netherlands. Brekke, L. D., Maurer, E. P., Anderson, J. D., Dettinger, M. D., Townsley, E. S., Harrison, A. Pruitt, T.  Assessing reservoir operations risk under climate change. Water Resour. Res. 45, W04411. Burn, H. D. Simonovic, S. P.  Sensitivity of reservoir operation performance to climatic change. Water Resources Management 10, 463–478. DeGagne, M. P. J., Douglas, G. G., Hudson, H. R. Simonovic, S. P.  A decision support system for the analysis and use of stage- discharge rating curves. Journal of Hydrology 184, 225–241. Delft Hydraulics  Inception Report: Lake Nasser Flood and Drought Control Project. Prepared in association with COINS Hull University Royal Haskoning WREM for Ministry of Water Resources Irrigation Nile Forecasting Center. Cairo, Egypt. Dow, K.  Vulnerability Profile of West Africa. Poverty and Vulnerability Programme, Stockholm Environment Institute (SEI), UK. Dumont, H. J.  The Nile: Origin, Environments, Limnology and Human Use, Vol 89. Springer, The Netherlands. El-Sammany, M. S.  Design of Lake Nasser Environmental Monitoring System. Faculty of Engineering, Cairo University, Egypt. Eshra, N. M. A.  Modeling and Economical Optimization for Operation of Aswan High Dam Power Station and Mubarak Pump Station. PhD Thesis, Faculty of Engineering, Cairo University, Egypt. Georgakakos, A.  Decision-support systems for integrated water resources management with an application to the Nile Basin. In: Topics on System Analysis and Integrated Water Resources Management (A. Castelletti R. Soncini-Sessa, eds), Elsevier, The Netherlands. Guariso, G., Haynes, E. K., Whittington, D. Younis, M.  A real-time management model for the Aswan high dam with policy implications. Geographical Analysis 13, 4. Hamlet, A. F. Lettenmaier, D. P.  Effects of climate change on hydrology and water resources in the Columbia River Basin. Journal of the American Water Resources Association 35, 1597–1623. Hassan, R., Hekal, N. Mansor, N.  Evaporation Reduction from Lake Nasser Using New Environmentally Safe Techniques. Eleventh International Water Technology Conference, IWTC11 Sharm El-Sheikh, Egypt. Hellmuth, M. E., Moorhead, A., Thomson, M. C. Williams, J. (eds)  Climate Risk Management in Africa: Learning from Practice. International Research Institute for Climate and Society (IRI), Columbia University, New York, USA. IPCC  Summary for policymakers. Climate change 2007: the physical science basis. Contribution of the working group I to the fourth assessment report of the Intergovernmental Panel on Climate Change. Cambridge University Press, Cambridge. Ismail, S. S. Aziz, M.  Toshka Spillway Barrages Stability Analysis. Ninth International Water Technology Conference, IWTC9, Sharm El-Sheikh, Egypt. Klemes, V.  Sensitivity of Water Resource Systems to Climate Variations. World climate application programme WCP-98, World Meteorological Organization, Geneva, Switzerland. Koutsoyiannis, D., Efstratiadis, A. Karavokiros, G.  A decision support tool for the management of multi-reservoir systems. Journal of the American Water Resources Association 38, 945–958. Lund, J. R. Guzman, J.  Derived operating rules for reservoirs in series or in parallel. Journal of Water Resources Planning and Management 143, 143–153. Ministry of Water Resources and Irrigation (MWRI)  Water for the Future, National Water Resources Plan 2017 (NWRP). Cairo, Egypt. 1509 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013 Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf by guest
  • 20. Mobasher, A. Ostrowski, M.  An Assessment of Reservoir Operation Sensitivity to Climate Changes – The Case Study of Lake Nasser. Section of Engineering Hydrology and Water Management, Institute of Hydraulic and Water Resources Engineering, Darmstadt University of Technology, Darmstadt, Germany. McCartney, M. P.  Decision Support Systems for Large Dam Planning and Operation in Africa. Working Paper 119. International Water Management Institute, Colombo, Sri Lanka. Nemec, J. Schaake, J.  Sensitivity of water resource systems to climate variations. Hydrological Sciences Journal 27, 327–343. NRC (National Research Council)  Research and networks for decision support in the NOAA sectoral applications research program. In: Panel on Design Issues for the NOAA Sector Applications Research Program (H. M. Ingram P. C. Stern, eds). National Research Council, UK. NRI  Nile Research Institute Database. Nile Research Institute, NWRC, Cairo, Egypt. NWRP  National Water Resources Plan for Egypt – 2017. Ministry of Water, Resources and Irrigation, Planning Sector, Cairo, Egypt. Payne, J. T., Wood, A. W., Hamlet, A. F., Palmer, R. N. Lettenmaier, D. P.  Mitigating the effects of climate change on the water resources of the Columbia River basin. Climate Change 62, 233–256. Ragab, R. Prudhomme, C.  Climate change and water resources management in arid and semi-arid regions: prospective and challenges for the 21st century. Biosystems Engineering 81, 3–34. Reitsma, R. F.  Structure and support of water-resources management and decision making. Journal of Hydrology 177, 253–268. Reitsma, R. F., Zagona, E. A., Chapra, S. C. Strzepek, K. M.  Decision support systems for water resources management In: Water Resources Handbook (L. W. Mays, ed.). McGraw- Hill, New York, pp. 1–35. Sadek, N. S.  Lake Nasser Flood Analysis. Ph.D. Thesis, Irrigation and Hydraulics Department, Faculty of Engineering, Ain Shams University, Cairo, Egypt. Sadek, N. Aziz, M.  Water Flood Management of Lake Nasser After the New Toshka Barrages Construction. Ninth International Water Technology Conference, IWTC9, Sharm El-Sheikh, Egypt. Sadek, M. F., Shahin, M. M. Stiger, C. J.  Evaporation from the reservoir of the Aswan High Dam, a new comparison of relevant methods with limited data. Theoretical and Applied Climatology 56, 56–66. Schutze, M., Butler, D., Beck, B. Verworn, H. R.  Criteria for assessment of the operational potential of the urban wastewater system. Water Science and Technology 45 (3), 141e148. Shafie, A., Noureldin, A. E., Taha, M. R. Basri, H.  Neural network model for Nile River inflow forecasting based on correlation analysis of historical inflow data. Asian Network for Scientific Information. Journal of Applied Sciences 8, 4487–4499. Simonovic, S. P. Li, L.  Sensitivity of the red river basin flood protection system to climate variability and change. Water Resources Management 18, 89–110. Simonovic, S. P. Savic, D. A.  Intelligent decision support and reservoir management and operations. ASCE Journal of Computing in Civil Engineering 3, 367–385. Soliman, M. M., Gad, M. A. El-Moustafa, A. M.  Hydrological Model for the High Aswan Dam Reservoir Management. International Symposium on Environmental Hydrology, ASCE-EGS. Sprague, R.  A framework for the development of decision support systems. In: Decision Support Systems (W. House, ed.). Petrocelli Books, New York. Strzepek, K. M. Yates, D. N.  Responses and thresholds of the egyptian economy to climate change impacts on the water resources of the Nile River. Climatic Change 46, 339–356. Thompson, K. O.  Agricultural vs Hydropower Tradeoffs in the Operation of the Aswan High Dam. Published Masters Thesis, Massachusetts Institute of Technology, Cambridge, Massachusetts. Van Rheenen, N. T., Wood, A. W., Palmer, R. N. Lettenmaier, D. P.  Potential implications of PCM climate change scenarios for Sacramento–San Joaquin river basin hydrology and water resources. Climate Change 62, 257–281. Water Master Plan (WMP)  Hydrological Simulation of Lake Nasser Vol. 1, Analysis and Results. Technical Report 14 of the Water Master Plan. Prepared for the Ministry of Water Resources and Irrigation, Cairo, Egypt. Waterbury, J.  The Nile Basin National Determinants of Collective Action. University Press, London, 211 pp. Whittington, D. Guariso, G.  Water Management Models in Practice: A Case Study of Aswan High Dam, Elsevier, The Netherlands. Wood, A. W., Lettenmaier, D. P. Palmer, R. N.  Assessing climate change implications for water resources planning. Climate Change 37, 203–228. World Bank a Ethiopia Managing Water Resources Growth, A World Bank Water Resources AssistanceStrategy for Ethiopia. Agriculture and Rural Development Department, World Bank, Washington, DC, 91 pp. World Bank b Implementation Completion Report (# 35573) for Energy II project. World Bank, Washington, DC. Yao, H. Georgakakos, A. P.  Nile Decision Support Tool River Simulation and Management. Georgia Water Resources Institute (GWRI), Atlanta. Zewde Gebre Sellasie Dejazmatch  The Nile Question: 1955– 1964. The Ethiopian Perspective, Conference, Tel Aviv University, Israel. First received 30 December 2012; accepted in revised form 13 March 2013. Available online 4 May 2013 1510 N. Donia | Aswan High Dam Reservoir management system Journal of Hydroinformatics | 15.4 | 2013 Downloaded from https://iwaponline.com/jh/article-pdf/15/4/1491/387205/1491.pdf by guest