Bus 519 assignment 3 risk workshop and risk register
1. BUS 519 Assignment 3 – Risk
Workshop and Risk Register
Click Link Below To Buy:
http://hwcampus.com/shop/bus-519/bus-519-assignment-3-risk-workshop-and-risk-register/
Or Visit www.hwcampus.com
Product Description
BUS 519 Assignment 3 – Risk Workshop and Risk Register
Write an eight to ten (8-10) pages paper Risk Workshop and Risk Register Component
paper in which you:
1. Identify the required pre-workshop activities.
2. Prepare a risk workshop agenda based on Figure B-8, Sample Agenda for a First
Risk Assessment / Two – Day Risk Workshop (Appendix B of the Hillson and Simon
text). Include suggested time intervals for each activity and justify why each agenda
item is relevant for this case.
3. Determine the top five (5) threats in a risk register following Figure B-
11, Sample Simplified Risk Register Format (Appendix B of the Hillson and Simon
text). Include information from the case for each threat.
4. Justify the assignment of probability and impacts for each threat identified in
criterion number 3 of this assignment.
2. 5. Document the top three (3) opportunities in a risk register following Figure B-11,
Sample Simplified Risk Register Format (Appendix B of the Hillson and Simon text).
Include information from the case for each opportunity.
6. Justify the assignment of probability and impacts for each opportunity identified
in criterion number 5 of this assignment.
1. Use at least two (2) quality resources in this assignment.
Note: Wikipedia and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size 12), with one-inch
margins on all sides.
Include a cover page containing the title of the assignment, the student’s name,
the professor’s name, the course title, and the date. The cover page and the
reference page are not included in the required assignment page length.