Stayer bus 510 week 4 assignment 2 draftingshyaminfo102
stayer bus 510 week 4 assignment 2 drafting a basic proposal,stayer bus 510week 4,stayer bus 510week 4,stayer bus 510,stayer bus 510week 4 tutorial,stayer bus 510week 4 assignment,stayer bus 510week 4 help
Strayer cis 210 week 3 case study 1 building an access control systemsimonbaileyy
cis 210 week 3 case study 1 building an access control system 2 papers,strayer cis 210,cis 210,strayer cis 210 week 3 tutorial,cis 210 week 3 assignment,strayer cis 210 week 3 help
Stayer bus 510 week 4 assignment 2 draftingshyaminfo102
stayer bus 510 week 4 assignment 2 drafting a basic proposal,stayer bus 510week 4,stayer bus 510week 4,stayer bus 510,stayer bus 510week 4 tutorial,stayer bus 510week 4 assignment,stayer bus 510week 4 help
Strayer cis 210 week 3 case study 1 building an access control systemsimonbaileyy
cis 210 week 3 case study 1 building an access control system 2 papers,strayer cis 210,cis 210,strayer cis 210 week 3 tutorial,cis 210 week 3 assignment,strayer cis 210 week 3 help
For more course tutorials visit
www.tutorialrank.com
Project Deliverable 1: Project Plan Inception Due Week 2 and worth 50 points This assignment consists of two
For more course tutorials visit
www.newtonhelp.com
Project Deliverable 1: Project Plan Inception Due Week 2 and worth 50 points This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.You must submit both sections as separate files for the completion of this assignment. Label each .....
Project Deliverable 1 TemplateProject Plan InceptionProject Ba.docxbfingarjcmc
Project Deliverable 1 Template
Project Plan Inception
Project Background
. You have been made the Chief Information Officer and Chief Technology Officer (CIO / CTO) of an innovative e-Commerce start-up company that a venture capital group has funded. The CEO has given you sixty (60) days to deliver an information technology project plan in anticipation of the company locating to a new facility. Since this is a start-up company, there is currently no building or technology infrastructure to support the business. All information technology (hardware and software) must be implemented in either a hosted solution, on-site solution or a hybrid model. The CEO is expecting you to integrate different technologies from different partners and incorporate industry best practices in connection with the development of technological systems. The new facility is a two-story stand-alone building. The company currently consists of ten (10) employees with revenues of $5 million but is expected to grow to thirty (30) employees with revenue of $30 million over the next two (2) years.
This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.
You must submit both sections as separate files for the completion of this assignment.
Label each file name according to the section of the assignment
for which it is written. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.
Section 1.
Write a two to four (2-4) page original business requirements document for the project plan using the template provided.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format.
Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date.
The cover page and the reference page are not included in the required assignment page length
.
Label
each section of your paper according to the template below:
1.
Cover/Title Page
2.
Background information of the company.
3.
The type of business in which the company is involved.
4.
A description of the information systems that the company should have to support the business.
A.
Databases
B. System Analysis
C. Security
D. Networking
E. Computer Infrastructure
F. Human Computer Interactions
G. Web design
5.
Work Cited: At least two (2) quality resources in this assignment.
Section 2.
Use Microsoft Project or an open source alternative, such as Open Project, to:
Create a detailed Gantt chart or project plan (
summary and detailed
) template. The Gantt chart or project plan should:
Record all tasks, subtasks, resources, and time related to the project.
Outline the planning, analysis, design, and implem.
For more course tutorials visit
www.tutorialrank.com
Project Deliverable 1: Project Plan Inception Due Week 2 and worth 50 points This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.You must submit both sections as separate
Scope and Work Breakdown StructuresBased on the knowledge you ha.docxbagotjesusa
Scope and Work Breakdown Structures
Based on the knowledge you have gained through the readings in this module, answer the review questions listed below. These questions were chosen to demonstrate your understanding and help you assess your progress.
1. Explain the importance of the main processes performed during project integration management.
2. Discuss the importance of the scope and WBS in the project execution stage?
3. Using MS Project (or another software of your choice), produce a WBS for building a new house. Other software options:
• WBS Tool (Links to an external site.)Links to an external site. (free),
• WBS Schedule Pro (Links to an external site.)Links to an external site. (30-day trial)
When creating your WBS include the project summary and Task ID 0. Assume that the WBS Level 2 categories include managing the project, finding property, securing a loan, designing the entire home, building the entire home, and providing landscaping and external items, including a hot tub and swimming pool. Break at least two Level 2 items down to Level 4.
4. Describe the planning tasks performed as part of project time management and give an example of at least 3 outputs related to the scheduling effort.
5. Consider Figure 5-20 (page 183 in your textbook) to answer the following questions. All duration estimates are in days, and the network proceeds from Node 1 to Node 9.
a. Draw an AOA network diagram representing the project. Put the node numbers in circles and draw arrows from node to node, labeling each arrow with the activity letter and estimated time. See example on page 164, Figure 5-13.
b. Identify all the paths on the network diagram and note how long they are.
c. What is the critical path for this project and how long is it?
d. What is the shortest possible time it will take to complete this project?
e. Examine the network diagram and activity schedule to analyze the critical path and float or slack for each activity. Why is it important to monitor the critical path throughout the project?
6. Identify the significant planning activities completed during project cost management. Compare and contrast a cost performance baseline and a cost estimate.
Use terminology from your readings and cite related references using current APA format, where applicable. For help with the format of references
Submission
Save your deliverable in a Word® document
Scope and Work Breakdown Structures
Based on the knowledge you have gained through the readings in this module, answer
the review questions listed below. These questions were chosen to demonstrate y
our
understanding and help you assess your progress.
1.
Explain the importance of the main processes performed during project
integration management.
2.
Discuss the importance of the scope and WBS in the pro
ject execution stage?
3.
Using MS Project (or another software of your choice), produce a WBS for
building a new house.
Other software options:
•
WBS Tool
(Links
to
an
exte.
For more course tutorials visit
www.newtonhelp.com
Project Deliverable 1: Project Plan Inception Due Week 2 and worth 50 points This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.You must submit both sections as separate files for the completion of this assignment. Label each .....
How to Split Bills in the Odoo 17 POS ModuleCeline George
Bills have a main role in point of sale procedure. It will help to track sales, handling payments and giving receipts to customers. Bill splitting also has an important role in POS. For example, If some friends come together for dinner and if they want to divide the bill then it is possible by POS bill splitting. This slide will show how to split bills in odoo 17 POS.
For more course tutorials visit
www.tutorialrank.com
Project Deliverable 1: Project Plan Inception Due Week 2 and worth 50 points This assignment consists of two
For more course tutorials visit
www.newtonhelp.com
Project Deliverable 1: Project Plan Inception Due Week 2 and worth 50 points This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.You must submit both sections as separate files for the completion of this assignment. Label each .....
Project Deliverable 1 TemplateProject Plan InceptionProject Ba.docxbfingarjcmc
Project Deliverable 1 Template
Project Plan Inception
Project Background
. You have been made the Chief Information Officer and Chief Technology Officer (CIO / CTO) of an innovative e-Commerce start-up company that a venture capital group has funded. The CEO has given you sixty (60) days to deliver an information technology project plan in anticipation of the company locating to a new facility. Since this is a start-up company, there is currently no building or technology infrastructure to support the business. All information technology (hardware and software) must be implemented in either a hosted solution, on-site solution or a hybrid model. The CEO is expecting you to integrate different technologies from different partners and incorporate industry best practices in connection with the development of technological systems. The new facility is a two-story stand-alone building. The company currently consists of ten (10) employees with revenues of $5 million but is expected to grow to thirty (30) employees with revenue of $30 million over the next two (2) years.
This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.
You must submit both sections as separate files for the completion of this assignment.
Label each file name according to the section of the assignment
for which it is written. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.
Section 1.
Write a two to four (2-4) page original business requirements document for the project plan using the template provided.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format.
Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date.
The cover page and the reference page are not included in the required assignment page length
.
Label
each section of your paper according to the template below:
1.
Cover/Title Page
2.
Background information of the company.
3.
The type of business in which the company is involved.
4.
A description of the information systems that the company should have to support the business.
A.
Databases
B. System Analysis
C. Security
D. Networking
E. Computer Infrastructure
F. Human Computer Interactions
G. Web design
5.
Work Cited: At least two (2) quality resources in this assignment.
Section 2.
Use Microsoft Project or an open source alternative, such as Open Project, to:
Create a detailed Gantt chart or project plan (
summary and detailed
) template. The Gantt chart or project plan should:
Record all tasks, subtasks, resources, and time related to the project.
Outline the planning, analysis, design, and implem.
For more course tutorials visit
www.tutorialrank.com
Project Deliverable 1: Project Plan Inception Due Week 2 and worth 50 points This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.You must submit both sections as separate
Scope and Work Breakdown StructuresBased on the knowledge you ha.docxbagotjesusa
Scope and Work Breakdown Structures
Based on the knowledge you have gained through the readings in this module, answer the review questions listed below. These questions were chosen to demonstrate your understanding and help you assess your progress.
1. Explain the importance of the main processes performed during project integration management.
2. Discuss the importance of the scope and WBS in the project execution stage?
3. Using MS Project (or another software of your choice), produce a WBS for building a new house. Other software options:
• WBS Tool (Links to an external site.)Links to an external site. (free),
• WBS Schedule Pro (Links to an external site.)Links to an external site. (30-day trial)
When creating your WBS include the project summary and Task ID 0. Assume that the WBS Level 2 categories include managing the project, finding property, securing a loan, designing the entire home, building the entire home, and providing landscaping and external items, including a hot tub and swimming pool. Break at least two Level 2 items down to Level 4.
4. Describe the planning tasks performed as part of project time management and give an example of at least 3 outputs related to the scheduling effort.
5. Consider Figure 5-20 (page 183 in your textbook) to answer the following questions. All duration estimates are in days, and the network proceeds from Node 1 to Node 9.
a. Draw an AOA network diagram representing the project. Put the node numbers in circles and draw arrows from node to node, labeling each arrow with the activity letter and estimated time. See example on page 164, Figure 5-13.
b. Identify all the paths on the network diagram and note how long they are.
c. What is the critical path for this project and how long is it?
d. What is the shortest possible time it will take to complete this project?
e. Examine the network diagram and activity schedule to analyze the critical path and float or slack for each activity. Why is it important to monitor the critical path throughout the project?
6. Identify the significant planning activities completed during project cost management. Compare and contrast a cost performance baseline and a cost estimate.
Use terminology from your readings and cite related references using current APA format, where applicable. For help with the format of references
Submission
Save your deliverable in a Word® document
Scope and Work Breakdown Structures
Based on the knowledge you have gained through the readings in this module, answer
the review questions listed below. These questions were chosen to demonstrate y
our
understanding and help you assess your progress.
1.
Explain the importance of the main processes performed during project
integration management.
2.
Discuss the importance of the scope and WBS in the pro
ject execution stage?
3.
Using MS Project (or another software of your choice), produce a WBS for
building a new house.
Other software options:
•
WBS Tool
(Links
to
an
exte.
For more course tutorials visit
www.newtonhelp.com
Project Deliverable 1: Project Plan Inception Due Week 2 and worth 50 points This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.You must submit both sections as separate files for the completion of this assignment. Label each .....
How to Split Bills in the Odoo 17 POS ModuleCeline George
Bills have a main role in point of sale procedure. It will help to track sales, handling payments and giving receipts to customers. Bill splitting also has an important role in POS. For example, If some friends come together for dinner and if they want to divide the bill then it is possible by POS bill splitting. This slide will show how to split bills in odoo 17 POS.
We all have good and bad thoughts from time to time and situation to situation. We are bombarded daily with spiraling thoughts(both negative and positive) creating all-consuming feel , making us difficult to manage with associated suffering. Good thoughts are like our Mob Signal (Positive thought) amidst noise(negative thought) in the atmosphere. Negative thoughts like noise outweigh positive thoughts. These thoughts often create unwanted confusion, trouble, stress and frustration in our mind as well as chaos in our physical world. Negative thoughts are also known as “distorted thinking”.
Operation “Blue Star” is the only event in the history of Independent India where the state went into war with its own people. Even after about 40 years it is not clear if it was culmination of states anger over people of the region, a political game of power or start of dictatorial chapter in the democratic setup.
The people of Punjab felt alienated from main stream due to denial of their just demands during a long democratic struggle since independence. As it happen all over the word, it led to militant struggle with great loss of lives of military, police and civilian personnel. Killing of Indira Gandhi and massacre of innocent Sikhs in Delhi and other India cities was also associated with this movement.
The French Revolution, which began in 1789, was a period of radical social and political upheaval in France. It marked the decline of absolute monarchies, the rise of secular and democratic republics, and the eventual rise of Napoleon Bonaparte. This revolutionary period is crucial in understanding the transition from feudalism to modernity in Europe.
For more information, visit-www.vavaclasses.com
Read| The latest issue of The Challenger is here! We are thrilled to announce that our school paper has qualified for the NATIONAL SCHOOLS PRESS CONFERENCE (NSPC) 2024. Thank you for your unwavering support and trust. Dive into the stories that made us stand out!
The Indian economy is classified into different sectors to simplify the analysis and understanding of economic activities. For Class 10, it's essential to grasp the sectors of the Indian economy, understand their characteristics, and recognize their importance. This guide will provide detailed notes on the Sectors of the Indian Economy Class 10, using specific long-tail keywords to enhance comprehension.
For more information, visit-www.vavaclasses.com
The Roman Empire A Historical Colossus.pdfkaushalkr1407
The Roman Empire, a vast and enduring power, stands as one of history's most remarkable civilizations, leaving an indelible imprint on the world. It emerged from the Roman Republic, transitioning into an imperial powerhouse under the leadership of Augustus Caesar in 27 BCE. This transformation marked the beginning of an era defined by unprecedented territorial expansion, architectural marvels, and profound cultural influence.
The empire's roots lie in the city of Rome, founded, according to legend, by Romulus in 753 BCE. Over centuries, Rome evolved from a small settlement to a formidable republic, characterized by a complex political system with elected officials and checks on power. However, internal strife, class conflicts, and military ambitions paved the way for the end of the Republic. Julius Caesar’s dictatorship and subsequent assassination in 44 BCE created a power vacuum, leading to a civil war. Octavian, later Augustus, emerged victorious, heralding the Roman Empire’s birth.
Under Augustus, the empire experienced the Pax Romana, a 200-year period of relative peace and stability. Augustus reformed the military, established efficient administrative systems, and initiated grand construction projects. The empire's borders expanded, encompassing territories from Britain to Egypt and from Spain to the Euphrates. Roman legions, renowned for their discipline and engineering prowess, secured and maintained these vast territories, building roads, fortifications, and cities that facilitated control and integration.
The Roman Empire’s society was hierarchical, with a rigid class system. At the top were the patricians, wealthy elites who held significant political power. Below them were the plebeians, free citizens with limited political influence, and the vast numbers of slaves who formed the backbone of the economy. The family unit was central, governed by the paterfamilias, the male head who held absolute authority.
Culturally, the Romans were eclectic, absorbing and adapting elements from the civilizations they encountered, particularly the Greeks. Roman art, literature, and philosophy reflected this synthesis, creating a rich cultural tapestry. Latin, the Roman language, became the lingua franca of the Western world, influencing numerous modern languages.
Roman architecture and engineering achievements were monumental. They perfected the arch, vault, and dome, constructing enduring structures like the Colosseum, Pantheon, and aqueducts. These engineering marvels not only showcased Roman ingenuity but also served practical purposes, from public entertainment to water supply.
The Art Pastor's Guide to Sabbath | Steve ThomasonSteve Thomason
What is the purpose of the Sabbath Law in the Torah. It is interesting to compare how the context of the law shifts from Exodus to Deuteronomy. Who gets to rest, and why?
Unit 8 - Information and Communication Technology (Paper I).pdfThiyagu K
This slides describes the basic concepts of ICT, basics of Email, Emerging Technology and Digital Initiatives in Education. This presentations aligns with the UGC Paper I syllabus.
Ethnobotany and Ethnopharmacology:
Ethnobotany in herbal drug evaluation,
Impact of Ethnobotany in traditional medicine,
New development in herbals,
Bio-prospecting tools for drug discovery,
Role of Ethnopharmacology in drug evaluation,
Reverse Pharmacology.
1. BUS 517 Week 3 Assignment 1 Project Proposal
For more classes visit
www.snaptutorial.com
BUS 517 Week 3 Assignment 1 Project Proposal
**********************************************************
BUS 517 Week 7 Assignment 2 Project Initiation
and Planning
For more classes visit
www.snaptutorial.com
Assignment 2: Project Initiation and Planning
Due Week 7 and worth 250 points
2. Assignment Overview – In assignment 1 you have defined the objectives
of the project in terms of a problem which it solves or an opportunity
which it capitalizes on. You have also created a scope statement (or
Statement of Work) which outlines the basic components of the project.
It is now the time to discuss the process of creating a Charter, have it
approved by the sponsor/client, and with charter in hand start the
planning process. First a Work Breakdown Structure (WBS) is created
followed by a project plan/network.
Write an 8-10 page paper in which you will:
Discuss the value of a project charter and, based on your research,
include an outline of the components which you deem necessary for
your project. Note: You do not need to write a charter.
Specify the stakeholders for the project, and analyze the position of each
for the project, in terms of their influence, as well as their attitude
towards the project (i.e., positive, neutral, or negative).
Create a WBS for your project using a proper format (MS Word, MS
Excel, Visio, or any other applicable format) to depict WBS graphically
(see the example in p. 110). Alternatively, you may use a coded format
using MS Word (see example in p. 115. The example is in MS Project
format but the same could be done in MS Word).
Create a project plan/network using a proper format (MS Word, MS
Excel, or any other applicable format) to depict the project network
(example in p. 173). Be sure that all typical components on a project
network are included, and critical path is properly depicted.
Document the main assumptions & exclusions (taken from scope
statement), dependencies, risks, and any other major issues of the
project. Select the top three (3) important risks of the project, and
suggest approaches to address those risks. Hint: mitigation, avoidance,
acceptance or transfer.
3. Use at least three (3) quality resources in this assignment.Note:
Wikipedia and similar Websites do not qualify as quality resources.
Format your assignment according to the following formatting
requirements:
Typed, double spaced, using Arial font (size 12), with one-inch margins
on all sides.
Include a cover page containing the title of the assignment, the student’s
name, the professor’s name, the course title, and the date. The cover
page is not included in the required page length.
Include a reference page. Citations and references must follow APA
format. The reference page is not included in the required page length
**********************************************************