SlideShare a Scribd company logo
1 of 31
HYDROLOGY
Second Term, Final Year
B.E. Civil Engineering
Presented by.
Engineer Ghulam Shabir Solangi
Estimation
of
Peak / Flood Discharge
Peak discharges occur in the rivers in the rainfall season.
Estimation methods:
1) Physical conditions of the past floods
2) Flood discharge formulae
3) Flood frequency studies
4) Unit hydrograph
(1) Physical Conditions of the Past Floods
To know the maximum water level attained in the past 35 years.
 Past flood marks on ancient monuments, etc., along river banks are located.
 Old persons in the villages situated on the bank of the river
The cross-section pertaining to the highest flood marks can be drawn.
Obtain from the cross-section:
Water flow area (A)
Wetted perimeter (P)
Hydraulic mean depth / hydraulic radius (R)
By leveling to u/s and d/s of the cross-section site, S can be determined.
Using above parameters velocity of flow (V) is computed by Manning’s or
Chezy's equation.
Using Continuity Equation, flood discharge can be calculated.
Procedure is repeated at several watermarks, to get consistent results.
(2) Flood Discharge Formulae
First Approach
The general form of the empirical formulae
Q = CAn
where
Q = flood discharge, A = catchment area, C = flood coefficient
and n = flood index
Both C and n depend upon various factors, like
Size, Shape, Location and Topography of catchment
Intensity, Duration and Distribution pattern of the storm
(continued)
Depending upon the above factors flood discharge formula
for each region is developed.
Following are few examples of regional based flood
discharge formulae.
Dicken’s Formula: For various parts of India.
Ryve’s Formula: Madras (India)
Inglis formula: Former Bombay
presidency (India)
Nawab Jang Bahadur formula: Hyderabad state (India)
Fanning’s formula: American catchments
Creager formula: American catchments
Mayer’s formula: American catchments
Second Approach
This includes formulae of the same form as the first approach, i.e.
Q = CAn
but here A refers to cross sectional area of the water way.
Example: Talbot formula.
Third Approach
This includes the formulae of the type:
A
S
AciQ =
where
i = expected average rainfall
S = average slope of the watershed
Examples:
Burkli-Ziegler formula and
McMath formula
Fourth Approach: Fuller’s formula
where
Peak 24-hr flood with a frequency of T years
A = Catchment area (km2
)
Cf = Fuller’s constant = 0.18 – 1.88
Derived for U.S.A catchments.
[ ]TACQ fTp
log8.018.0
+=
=pT
Q
Fifth Approach: Rational Formula
It is characterized by:
consideration of the entire drainage area as a single unit,
estimation of flow at the most downstream point only,
the assumption that rainfall is uniformly distributed over the drainage
area.
The Rational Formula reads:
Where
Qp= Peak runoff rate [m³/sec], C = Runoff coefficient
I = Rainfall intensity [mm/hr], A = Drainage area [km²]
The Rational Formula follows the assumption that:
the predicted peak discharge has the same probability of occurrence
(return period) as the used rainfall intensity (I),
the runoff coefficient (C) is constant during the rain storm, and
the recession time is equal to the time of rise.
AIC0.28=pQ
Sixth Approach: Modified Rational Formula
In the modified version of the Rational Formula, a storage
coefficient is included to account for a recession time larger than
the time the hydrograph takes to rise. The Modified Rational
Formula reads:
Where
Cs= Storage coefficient
The peak flood discharge in a catchment is reached when all parts
of the watershed are contributing to the outflow, i.e. at the time of
concentration:
……………… Kirpich/Ramser formula
Where
tc= Time of concentration [min]
L= Length of main river [m]
S= Longitudinal or Distance weighted channel slope
AICC0.28 s=pQ
385.077.0
0195.0 −
= SLtc
(3) Flood Frequency Studies
Probability concepts are used to study the probable variations in flow
so that the design can be completed based on a calculated risk.
Flood Frequency
Likelihood of flood being equaled or exceeded.
A 10% frequency means that the flood has 10 out of 100
chances of being equaled or exceeded.
Recurrence Interval (Tr)
Number of years in which a flood can be expected (equaled or
exceeded) once.
Gumbel's Method
This method is useful for obtaining values of flood discharges for a high recurrence
interval.
If Q1, Q2……… Qn comprise a series of extreme values of floods, the
probability of occurrence of a value equal to or less than Q is given by
(1)
(2)
(3)
Qf = value of flood discharge having highest frequency, and is given as:
(4)
Qav = average value of discharge
(5)
(6)
The recurrence interval in years (Tr) for the discharge Q is given by
(7)
z
eP −
=
y
ez −
=
)( fQQay −=
xavf QQ σ45.0−=
N
QQQQQQ avnavav
x
∑ −++−+−
=
22
2
2
1 )(..........)()(
σ
r
1
T =
1-P
x
a
σ
28.1
=
Example
With the data given in following table estimate the probability
that the annual maximum discharge Q on the Guadalupe River
will exceed 50,000 cfs at least once during the next three years.
Annual maximum discharges of the Guadalupe River near Victoria,
Texas, 1935-1978, in cfs
Year 1930 1940 1950 1960 1970
0 55900 13300 23700 9190
1 58000 12300 55800 9740
2 56000 28400 10800 58500
3 7710 11600 4100 33100
4 12300 8560 5720 25200
5 38500 22000 4950 15000 30200
6 179000 17900 1730 9790 14100
7 17200 46000 25300 70000 54500
8 25400 6970 58300 44300 12700
9 4940 20600 10100 15200
Solution:
From 1935 to 1978 discharge of 50,000 cfs exceeds 9 times as
shown in the table.
First exceedence occurred in 1936
Last exceedence occurred in 1977
Difference b/w first and last exceedences = 1977-1936 = 41
years
For 9 exceedences there will be 8 recurrence intervals.
Therefore, Average Recurrence Interval, T = 41/8 = 5.125
years
Probability of occurrence of an event in any observation, p =
1/T
Therefore, probability that discharge will equal or exceed
50,000 cfs, p ≈ 1/5.125 = 0.195
P(Qmax ≥ Q at least once in N years) = 1 - (1 - p)N
Therefore,
Probability that maximum discharge will equal or exceed
50,000 cfs at least once in 3 years = 1 - (1 - 0.195)3
= 0.48
= 48%
Exceeedence
Year
Reccurence
Interval
(years)
1936
4
1940
1
1941
1
1942
16
1958
3
1961
6
1967
5
1972
5
1977
Example # 2 [E-5]
(4) Unit Hydrograph Method
Hydrograph
It is a graph showing variations of discharge with time at a particular
point of a stream.
Rainfall Excess or Effective Rainfall
It is the rainfall that is neither retained on land surface nor filtered to the
soil.
Unit Hydrograph
“It is a type of hydrograph that represents 1 cm or 1 inch of
a runoff from rainfall of some unit duration”.
e.g. if a unit hydrograph results from a 3 hour unit rainfall
duration it is known as 3-hour unit hydrograph.
In other words:
“a hydrograph produced by surface runoff from a storm
lasting for 3-hours and yielding a rainfall excess of 1 cm
spread on the entire basin”.
Preparing a unit hydrograph from an isolated
storm
First of all, the runoff rates (in cm/hr) resulted from the given storm
is plotted against time (in hours), so as to obtain Direct Runoff
Hydrograph (DRH).
The total area (D) contained within this hydrograph is calculated
by a planimeter or by simpsons rule, etc. This will represent
nothing but the volume of runoff in cm depth of water on the basin.
The ordinates of this hydrograph (ABC) are divided by D so as to
obtain the ordinates of a unit hydrograph AB’C.
For example, suppose the area ABC is 3 cm depth of water, then
the ordinates of unit hydrograph can be obtained by dividing the
ordinates of storm hydrograph by 3.
 The final step is to assign an effective storm duration from the study of
the rainfall records. Periods of low rainfall at the beginning and end of
storm are omitted if they do not contribute substantially to the RUNOFF.
 In the fig. the duration of rainfall is 15 hours, but still it can be assumed to
have an effective duration equal to 8 hours. In this way, the number of
durations can be reduced, and the various storms of different durations can
be assigned the same unit duration . Unit storms are therefore not the
storms of same durations. But they are the storms of the like durations.
Problem
In a typical 4 hr. storm producing 5 cm of run off from a basin, the flow
in the stream are as follow:
Time Flow
(hours) (cumecs)
0 0.000
2 1.200
4 4.050
6 6.750
8 5.670
12 3.375
16 1.350
20 0.000
(a) Plot the unit hydrograph of runoff for this storm.
(b) Estimate, as accurately as possible, the peak flow and the time of its
occurrence, in a flood created by an 8 hours storm, which produces 2.5 cm
of effective rainfall during the 1st
four hours & 3.75 cm of effective rainfall
during the 2nd
four hours. Assume the base flow to be negligible.
T
(hr)
Ordinate of
strom
hydrograph
of 5 cm
Ordinate of
unit hydrograph
of 1 cm
Ordinate of 1st
4 hr
hydrograph
producing
2.5 cm rain
Ordinate of 2nd
4 hr
hydrograph
producing 3.75
cm rain
Total 8 hr
hydrograph
ordinates in
Cumecs
(1) (2) (3) = (2) / 5 (4) = (3) * 2.5 (5) = (3) * 3.75 (6) = (4) + (5)
0 0 0 0 -- 0
2 1.22 0.24 0.61 -- 0.61
4 4.05 0.81 2.02 0 2.02
6 6.75 1.35 3.37 0.90 4.27
8 5.67 1.15 2.83 3.03 5.86
10 -- -- 2.26 5.06 7.32
12 3.375 0.68 1.69 4.31 6.00
16 1.35 0.27 0.67 2.55 3.32
20 0 0 0 1.01 1.01
24 -- -- -- 0 0
SolutionSolution
Hydrology (Estimation of peak flood discharge)
Hydrology (Estimation of peak flood discharge)

More Related Content

What's hot (20)

Precipitation and its estimation
Precipitation and its estimationPrecipitation and its estimation
Precipitation and its estimation
 
Presentation aboout flood routing
Presentation aboout flood routingPresentation aboout flood routing
Presentation aboout flood routing
 
Reservoir Planning
Reservoir PlanningReservoir Planning
Reservoir Planning
 
Flood frequency analysis
Flood frequency analysisFlood frequency analysis
Flood frequency analysis
 
5 Reservoir Planning
5 Reservoir Planning5 Reservoir Planning
5 Reservoir Planning
 
4 runoff and floods
4 runoff and floods4 runoff and floods
4 runoff and floods
 
Module 2 ch-1 heytograph and hydrology analysis
Module 2 ch-1 heytograph and hydrology analysisModule 2 ch-1 heytograph and hydrology analysis
Module 2 ch-1 heytograph and hydrology analysis
 
Reservoir Planning
Reservoir PlanningReservoir Planning
Reservoir Planning
 
Hydrology introduction ( catchment area)
Hydrology introduction ( catchment area)Hydrology introduction ( catchment area)
Hydrology introduction ( catchment area)
 
Flood frequency analyses
Flood frequency analysesFlood frequency analyses
Flood frequency analyses
 
Engineering Hydrology
Engineering HydrologyEngineering Hydrology
Engineering Hydrology
 
Rating curve design,practice and problems
Rating curve design,practice and problemsRating curve design,practice and problems
Rating curve design,practice and problems
 
Unit hydrograph
Unit hydrographUnit hydrograph
Unit hydrograph
 
150860106006 54 55_62
150860106006 54 55_62150860106006 54 55_62
150860106006 54 55_62
 
Hydrology ( computation of average rainfall )
Hydrology ( computation of average rainfall )Hydrology ( computation of average rainfall )
Hydrology ( computation of average rainfall )
 
7 routing
7 routing7 routing
7 routing
 
1. reservoirs unit !
1. reservoirs   unit !1. reservoirs   unit !
1. reservoirs unit !
 
Water surface profiles
Water surface profilesWater surface profiles
Water surface profiles
 
Energy dissipators
Energy dissipatorsEnergy dissipators
Energy dissipators
 
Lacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation Engineering
 

Similar to Hydrology (Estimation of peak flood discharge)

5-Runoff computation (2).ppt
5-Runoff computation (2).ppt5-Runoff computation (2).ppt
5-Runoff computation (2).pptJohnAyele
 
Surface Water Hydrology
Surface Water HydrologySurface Water Hydrology
Surface Water HydrologyShaira Lucero
 
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptx
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptxNEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptx
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptxASHISHGOUTAM6
 
Sachpazis: Geomorphological investigation of the drainage networks and calcul...
Sachpazis: Geomorphological investigation of the drainage networks and calcul...Sachpazis: Geomorphological investigation of the drainage networks and calcul...
Sachpazis: Geomorphological investigation of the drainage networks and calcul...Dr.Costas Sachpazis
 
HYDROGRAPH AND HYDROLOGICAL ANALYSIS.ppt
HYDROGRAPH AND HYDROLOGICAL ANALYSIS.pptHYDROGRAPH AND HYDROLOGICAL ANALYSIS.ppt
HYDROGRAPH AND HYDROLOGICAL ANALYSIS.pptpayal_vinitshah
 
Tutorial 10 qgis_3.4_fiusac
Tutorial 10 qgis_3.4_fiusacTutorial 10 qgis_3.4_fiusac
Tutorial 10 qgis_3.4_fiusacWalter Bardales
 
HIE-Module 3 (1).pptx
HIE-Module 3 (1).pptxHIE-Module 3 (1).pptx
HIE-Module 3 (1).pptxVortexBolthe
 
2011 liongson-modeling studies flood control dams-professorial chair lecture
2011 liongson-modeling studies flood control dams-professorial chair lecture2011 liongson-modeling studies flood control dams-professorial chair lecture
2011 liongson-modeling studies flood control dams-professorial chair lectureleony1948
 
07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagementimaduddin91
 
UnitHydrograph.pptx
UnitHydrograph.pptxUnitHydrograph.pptx
UnitHydrograph.pptxssuserdf29f0
 
Class lecture on Hydrology by Rabindra Ranjan saha Lecture 10
Class lecture on Hydrology by Rabindra Ranjan saha Lecture 10Class lecture on Hydrology by Rabindra Ranjan saha Lecture 10
Class lecture on Hydrology by Rabindra Ranjan saha Lecture 10World University of Bangladesh
 

Similar to Hydrology (Estimation of peak flood discharge) (20)

5-Runoff computation (2).ppt
5-Runoff computation (2).ppt5-Runoff computation (2).ppt
5-Runoff computation (2).ppt
 
runoff.pdf
runoff.pdfrunoff.pdf
runoff.pdf
 
2012 pe review__hyd_
2012 pe review__hyd_2012 pe review__hyd_
2012 pe review__hyd_
 
Hydrology ( Hydro graph )
Hydrology ( Hydro graph )Hydrology ( Hydro graph )
Hydrology ( Hydro graph )
 
WATERSHED CATCHMENT.pptx
WATERSHED CATCHMENT.pptxWATERSHED CATCHMENT.pptx
WATERSHED CATCHMENT.pptx
 
Surface Water Hydrology
Surface Water HydrologySurface Water Hydrology
Surface Water Hydrology
 
C-039.pdf
C-039.pdfC-039.pdf
C-039.pdf
 
RP-BRIDGE HYDRAULICS.pptx
RP-BRIDGE HYDRAULICS.pptxRP-BRIDGE HYDRAULICS.pptx
RP-BRIDGE HYDRAULICS.pptx
 
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptx
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptxNEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptx
NEW HYDRO DESIGN OF MINOR BRIDGE OF RIVER .pptx
 
WATERSHED CATCHMENT.pdf
WATERSHED CATCHMENT.pdfWATERSHED CATCHMENT.pdf
WATERSHED CATCHMENT.pdf
 
Sachpazis: Geomorphological investigation of the drainage networks and calcul...
Sachpazis: Geomorphological investigation of the drainage networks and calcul...Sachpazis: Geomorphological investigation of the drainage networks and calcul...
Sachpazis: Geomorphological investigation of the drainage networks and calcul...
 
HYDROGRAPH AND HYDROLOGICAL ANALYSIS.ppt
HYDROGRAPH AND HYDROLOGICAL ANALYSIS.pptHYDROGRAPH AND HYDROLOGICAL ANALYSIS.ppt
HYDROGRAPH AND HYDROLOGICAL ANALYSIS.ppt
 
Tutorial 10 qgis_3.4_fiusac
Tutorial 10 qgis_3.4_fiusacTutorial 10 qgis_3.4_fiusac
Tutorial 10 qgis_3.4_fiusac
 
HIE-Module 3 (1).pptx
HIE-Module 3 (1).pptxHIE-Module 3 (1).pptx
HIE-Module 3 (1).pptx
 
2011 liongson-modeling studies flood control dams-professorial chair lecture
2011 liongson-modeling studies flood control dams-professorial chair lecture2011 liongson-modeling studies flood control dams-professorial chair lecture
2011 liongson-modeling studies flood control dams-professorial chair lecture
 
Stream flow
Stream flow Stream flow
Stream flow
 
L7 hydrograph
L7 hydrographL7 hydrograph
L7 hydrograph
 
07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement
 
UnitHydrograph.pptx
UnitHydrograph.pptxUnitHydrograph.pptx
UnitHydrograph.pptx
 
Class lecture on Hydrology by Rabindra Ranjan saha Lecture 10
Class lecture on Hydrology by Rabindra Ranjan saha Lecture 10Class lecture on Hydrology by Rabindra Ranjan saha Lecture 10
Class lecture on Hydrology by Rabindra Ranjan saha Lecture 10
 

More from Latif Hyder Wadho

Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control  Internal Checking Internal Auditing - Auditing By LATiFHRWInternal Control  Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRWLatif Hyder Wadho
 
Supply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRWSupply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRWLatif Hyder Wadho
 
SPSC CCE 2013 Pcs past papers
SPSC  CCE 2013 Pcs past papersSPSC  CCE 2013 Pcs past papers
SPSC CCE 2013 Pcs past papersLatif Hyder Wadho
 
SPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening testSPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening testLatif Hyder Wadho
 
Why is english as a global language
Why is english as a global languageWhy is english as a global language
Why is english as a global languageLatif Hyder Wadho
 
Introduction to Geo technical Engineering 2
 Introduction to Geo technical Engineering 2 Introduction to Geo technical Engineering 2
Introduction to Geo technical Engineering 2Latif Hyder Wadho
 
Introdction to Geo technical Engineering
Introdction to Geo technical EngineeringIntrodction to Geo technical Engineering
Introdction to Geo technical EngineeringLatif Hyder Wadho
 
Sub surface exploration part 2
Sub surface exploration part 2Sub surface exploration part 2
Sub surface exploration part 2Latif Hyder Wadho
 
Problems on piles and deep footing
Problems on piles and deep footingProblems on piles and deep footing
Problems on piles and deep footingLatif Hyder Wadho
 
Load carrying capacity of piles
Load carrying capacity of pilesLoad carrying capacity of piles
Load carrying capacity of pilesLatif Hyder Wadho
 
Subsurface exploration (part-3)
Subsurface exploration (part-3)Subsurface exploration (part-3)
Subsurface exploration (part-3)Latif Hyder Wadho
 
Sub surface exploration (part-1)
Sub surface exploration (part-1)Sub surface exploration (part-1)
Sub surface exploration (part-1)Latif Hyder Wadho
 
Introduction to Foundation Engineering
Introduction to Foundation EngineeringIntroduction to Foundation Engineering
Introduction to Foundation EngineeringLatif Hyder Wadho
 

More from Latif Hyder Wadho (20)

Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control  Internal Checking Internal Auditing - Auditing By LATiFHRWInternal Control  Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
 
Supply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRWSupply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRW
 
Surveying and Leveling
Surveying and LevelingSurveying and Leveling
Surveying and Leveling
 
Energy crisis in Pakistan
Energy crisis in PakistanEnergy crisis in Pakistan
Energy crisis in Pakistan
 
SPSC PCS Syllabus cce 2018
SPSC PCS Syllabus cce 2018SPSC PCS Syllabus cce 2018
SPSC PCS Syllabus cce 2018
 
SPSC CCE 2013 Pcs past papers
SPSC  CCE 2013 Pcs past papersSPSC  CCE 2013 Pcs past papers
SPSC CCE 2013 Pcs past papers
 
SPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening testSPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening test
 
Engineering drawing
Engineering drawingEngineering drawing
Engineering drawing
 
Why is english as a global language
Why is english as a global languageWhy is english as a global language
Why is english as a global language
 
Bricks
BricksBricks
Bricks
 
Introduction to Geo technical Engineering 2
 Introduction to Geo technical Engineering 2 Introduction to Geo technical Engineering 2
Introduction to Geo technical Engineering 2
 
Introdction to Geo technical Engineering
Introdction to Geo technical EngineeringIntrodction to Geo technical Engineering
Introdction to Geo technical Engineering
 
Sub surface exploration part 2
Sub surface exploration part 2Sub surface exploration part 2
Sub surface exploration part 2
 
Problems on piles and deep footing
Problems on piles and deep footingProblems on piles and deep footing
Problems on piles and deep footing
 
Load carrying capacity of piles
Load carrying capacity of pilesLoad carrying capacity of piles
Load carrying capacity of piles
 
Settlement of piles
Settlement of pilesSettlement of piles
Settlement of piles
 
Plate load test
Plate load testPlate load test
Plate load test
 
Subsurface exploration (part-3)
Subsurface exploration (part-3)Subsurface exploration (part-3)
Subsurface exploration (part-3)
 
Sub surface exploration (part-1)
Sub surface exploration (part-1)Sub surface exploration (part-1)
Sub surface exploration (part-1)
 
Introduction to Foundation Engineering
Introduction to Foundation EngineeringIntroduction to Foundation Engineering
Introduction to Foundation Engineering
 

Recently uploaded

Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Hydrology (Estimation of peak flood discharge)

  • 1.
  • 2. HYDROLOGY Second Term, Final Year B.E. Civil Engineering Presented by. Engineer Ghulam Shabir Solangi
  • 4. Peak discharges occur in the rivers in the rainfall season. Estimation methods: 1) Physical conditions of the past floods 2) Flood discharge formulae 3) Flood frequency studies 4) Unit hydrograph
  • 5. (1) Physical Conditions of the Past Floods To know the maximum water level attained in the past 35 years.  Past flood marks on ancient monuments, etc., along river banks are located.  Old persons in the villages situated on the bank of the river The cross-section pertaining to the highest flood marks can be drawn. Obtain from the cross-section: Water flow area (A) Wetted perimeter (P) Hydraulic mean depth / hydraulic radius (R) By leveling to u/s and d/s of the cross-section site, S can be determined. Using above parameters velocity of flow (V) is computed by Manning’s or Chezy's equation. Using Continuity Equation, flood discharge can be calculated. Procedure is repeated at several watermarks, to get consistent results.
  • 7. First Approach The general form of the empirical formulae Q = CAn where Q = flood discharge, A = catchment area, C = flood coefficient and n = flood index Both C and n depend upon various factors, like Size, Shape, Location and Topography of catchment Intensity, Duration and Distribution pattern of the storm (continued)
  • 8. Depending upon the above factors flood discharge formula for each region is developed. Following are few examples of regional based flood discharge formulae. Dicken’s Formula: For various parts of India. Ryve’s Formula: Madras (India) Inglis formula: Former Bombay presidency (India) Nawab Jang Bahadur formula: Hyderabad state (India) Fanning’s formula: American catchments Creager formula: American catchments Mayer’s formula: American catchments
  • 9. Second Approach This includes formulae of the same form as the first approach, i.e. Q = CAn but here A refers to cross sectional area of the water way. Example: Talbot formula.
  • 10. Third Approach This includes the formulae of the type: A S AciQ = where i = expected average rainfall S = average slope of the watershed Examples: Burkli-Ziegler formula and McMath formula
  • 11. Fourth Approach: Fuller’s formula where Peak 24-hr flood with a frequency of T years A = Catchment area (km2 ) Cf = Fuller’s constant = 0.18 – 1.88 Derived for U.S.A catchments. [ ]TACQ fTp log8.018.0 += =pT Q
  • 12. Fifth Approach: Rational Formula It is characterized by: consideration of the entire drainage area as a single unit, estimation of flow at the most downstream point only, the assumption that rainfall is uniformly distributed over the drainage area. The Rational Formula reads: Where Qp= Peak runoff rate [m³/sec], C = Runoff coefficient I = Rainfall intensity [mm/hr], A = Drainage area [km²] The Rational Formula follows the assumption that: the predicted peak discharge has the same probability of occurrence (return period) as the used rainfall intensity (I), the runoff coefficient (C) is constant during the rain storm, and the recession time is equal to the time of rise. AIC0.28=pQ
  • 13.
  • 14. Sixth Approach: Modified Rational Formula In the modified version of the Rational Formula, a storage coefficient is included to account for a recession time larger than the time the hydrograph takes to rise. The Modified Rational Formula reads: Where Cs= Storage coefficient The peak flood discharge in a catchment is reached when all parts of the watershed are contributing to the outflow, i.e. at the time of concentration: ……………… Kirpich/Ramser formula Where tc= Time of concentration [min] L= Length of main river [m] S= Longitudinal or Distance weighted channel slope AICC0.28 s=pQ 385.077.0 0195.0 − = SLtc
  • 16. Probability concepts are used to study the probable variations in flow so that the design can be completed based on a calculated risk. Flood Frequency Likelihood of flood being equaled or exceeded. A 10% frequency means that the flood has 10 out of 100 chances of being equaled or exceeded. Recurrence Interval (Tr) Number of years in which a flood can be expected (equaled or exceeded) once.
  • 17. Gumbel's Method This method is useful for obtaining values of flood discharges for a high recurrence interval. If Q1, Q2……… Qn comprise a series of extreme values of floods, the probability of occurrence of a value equal to or less than Q is given by (1) (2) (3) Qf = value of flood discharge having highest frequency, and is given as: (4) Qav = average value of discharge (5) (6) The recurrence interval in years (Tr) for the discharge Q is given by (7) z eP − = y ez − = )( fQQay −= xavf QQ σ45.0−= N QQQQQQ avnavav x ∑ −++−+− = 22 2 2 1 )(..........)()( σ r 1 T = 1-P x a σ 28.1 =
  • 18.
  • 19. Example With the data given in following table estimate the probability that the annual maximum discharge Q on the Guadalupe River will exceed 50,000 cfs at least once during the next three years. Annual maximum discharges of the Guadalupe River near Victoria, Texas, 1935-1978, in cfs Year 1930 1940 1950 1960 1970 0 55900 13300 23700 9190 1 58000 12300 55800 9740 2 56000 28400 10800 58500 3 7710 11600 4100 33100 4 12300 8560 5720 25200 5 38500 22000 4950 15000 30200 6 179000 17900 1730 9790 14100 7 17200 46000 25300 70000 54500 8 25400 6970 58300 44300 12700 9 4940 20600 10100 15200
  • 20. Solution: From 1935 to 1978 discharge of 50,000 cfs exceeds 9 times as shown in the table. First exceedence occurred in 1936 Last exceedence occurred in 1977 Difference b/w first and last exceedences = 1977-1936 = 41 years For 9 exceedences there will be 8 recurrence intervals. Therefore, Average Recurrence Interval, T = 41/8 = 5.125 years Probability of occurrence of an event in any observation, p = 1/T Therefore, probability that discharge will equal or exceed 50,000 cfs, p ≈ 1/5.125 = 0.195 P(Qmax ≥ Q at least once in N years) = 1 - (1 - p)N Therefore, Probability that maximum discharge will equal or exceed 50,000 cfs at least once in 3 years = 1 - (1 - 0.195)3 = 0.48 = 48% Exceeedence Year Reccurence Interval (years) 1936 4 1940 1 1941 1 1942 16 1958 3 1961 6 1967 5 1972 5 1977
  • 21. Example # 2 [E-5]
  • 23. Hydrograph It is a graph showing variations of discharge with time at a particular point of a stream. Rainfall Excess or Effective Rainfall It is the rainfall that is neither retained on land surface nor filtered to the soil.
  • 24. Unit Hydrograph “It is a type of hydrograph that represents 1 cm or 1 inch of a runoff from rainfall of some unit duration”. e.g. if a unit hydrograph results from a 3 hour unit rainfall duration it is known as 3-hour unit hydrograph. In other words: “a hydrograph produced by surface runoff from a storm lasting for 3-hours and yielding a rainfall excess of 1 cm spread on the entire basin”.
  • 25. Preparing a unit hydrograph from an isolated storm First of all, the runoff rates (in cm/hr) resulted from the given storm is plotted against time (in hours), so as to obtain Direct Runoff Hydrograph (DRH). The total area (D) contained within this hydrograph is calculated by a planimeter or by simpsons rule, etc. This will represent nothing but the volume of runoff in cm depth of water on the basin. The ordinates of this hydrograph (ABC) are divided by D so as to obtain the ordinates of a unit hydrograph AB’C. For example, suppose the area ABC is 3 cm depth of water, then the ordinates of unit hydrograph can be obtained by dividing the ordinates of storm hydrograph by 3.
  • 26.
  • 27.  The final step is to assign an effective storm duration from the study of the rainfall records. Periods of low rainfall at the beginning and end of storm are omitted if they do not contribute substantially to the RUNOFF.  In the fig. the duration of rainfall is 15 hours, but still it can be assumed to have an effective duration equal to 8 hours. In this way, the number of durations can be reduced, and the various storms of different durations can be assigned the same unit duration . Unit storms are therefore not the storms of same durations. But they are the storms of the like durations.
  • 28. Problem In a typical 4 hr. storm producing 5 cm of run off from a basin, the flow in the stream are as follow: Time Flow (hours) (cumecs) 0 0.000 2 1.200 4 4.050 6 6.750 8 5.670 12 3.375 16 1.350 20 0.000 (a) Plot the unit hydrograph of runoff for this storm. (b) Estimate, as accurately as possible, the peak flow and the time of its occurrence, in a flood created by an 8 hours storm, which produces 2.5 cm of effective rainfall during the 1st four hours & 3.75 cm of effective rainfall during the 2nd four hours. Assume the base flow to be negligible.
  • 29. T (hr) Ordinate of strom hydrograph of 5 cm Ordinate of unit hydrograph of 1 cm Ordinate of 1st 4 hr hydrograph producing 2.5 cm rain Ordinate of 2nd 4 hr hydrograph producing 3.75 cm rain Total 8 hr hydrograph ordinates in Cumecs (1) (2) (3) = (2) / 5 (4) = (3) * 2.5 (5) = (3) * 3.75 (6) = (4) + (5) 0 0 0 0 -- 0 2 1.22 0.24 0.61 -- 0.61 4 4.05 0.81 2.02 0 2.02 6 6.75 1.35 3.37 0.90 4.27 8 5.67 1.15 2.83 3.03 5.86 10 -- -- 2.26 5.06 7.32 12 3.375 0.68 1.69 4.31 6.00 16 1.35 0.27 0.67 2.55 3.32 20 0 0 0 1.01 1.01 24 -- -- -- 0 0 SolutionSolution