4. Remove trees and
undergrowth, rough grading
by moving the dirt around to
establish areas.
Digging equipment is used
to dig holes for foundations
or basement if needed.
5. As interface between
the house and earth.
Support all weights.
First floor rests on and
needs waterproofing
and drainage.
Connected to the
municipal sewer and
water pipes and laid
into the house.
6. • Framing includes the windows and
exterior doors.
• Considered done after trimming and
siding.
• Lastly, back out framing which includes
partition walls, pillars and soffits for
cabinets.
Mobility for subs working
inside without using ladder.