Reata Wash Flood Control Study, Scottsdale, AZ
I served as the Water Resource Engineer on behalf of ASLD, providing project review and technical
assistance during the project study phase. I provided technical knowledge of existing drainage,
public utilities, mitigation monitoring and permitting requirements. This purpose of this project is to
identify and recommend flood control measures that will reduce flood risks to residents, property and
public infrastructure within the Reata Wash floodplain. Utilized MS Project and Hec-RAS and Hec-
HMS
Construction Cost: N/A
Duration: N/A
Client: ASLD
Title/Role: Water Resource Engineer (ASLD)
Desert Ridge Development, Phoenix, AZ
I served as the Water Resource Engineer for this vacant tract of land located in North Phoenix/North
Scottsdale. This land is a master-planned community comprised of 5,700 acres, currently managed
by ASLD. I provided technical knowledge of existing drainage, public utilities, mitigation monitoring
and permitting requirements. Utilized MS Project and Hec-RAS and Hec-HMS
Construction Cost: N/A
Duration: N/A
Client: ASLD
Title/Role: Water Resource Engineer (ASLD)
Chemehuevi Wastewater Expansion Project, Lake Havasu City, AZ
Recently, I served as the Resident Engineer and Project Manager for a multi-million dollar sanitary
sewer expansion district in Lake Havasu City, Arizona. This required overall project management
and administration, engineering and inspection staff coordination and management, site construction
management and administration, construction pay quantities, resident interaction, federal and state
wage program administration and sanitary sewer testing / permitting through ADEQ. Utilized MS
Project.
Construction Cost: $10.5M
Duration: 365 days
Client: City of Lake Havasu, AZ
Title/Role: Resident Engineer (Atkins Global)
Hankinson Ethanol Plant Site Improvements, Hankinson, ND
A recent assignment provided the opportunity for me to design, assemble and complete plans for the
grading/drainage (Phase I) and the utilities/roadways (Phase II) for a proposed ethanol plant located
in SE North Dakota. The successful plans and subsequent construction management solidified
possibilities that future sites would be granted to MEI. Utilized MS Project and Microstation V8.
Construction Cost: $3.5M
Duration: 185 days
Client: Fagen Engineering, Inc.
Title/Role: Design Engineer / Construction Manager (Municipal Engineering)
PAGE 2
City of Newfolden Wastewater Improvements, Newfolden, MN
I served a Lead Design Engineer and Construction Manager for the total replacement and expansion
of the entire wastewater piping system for the City of Newfolden. This further involved the
replacement of several outdated pumping stations and pressure piping. The pumping system was
with remote SCADA controls for ease of operation and monitoring. Utilized Microstation V8 and MS
Project.
Construction Cost: $1.75M
Duration:185 days
Client: City of Newfolden, MN
Title/Role: Design Engineer / Construction Manager (Floan-Sanders)
City of Warren Wastewater Pump Stations, Warren, MN
The entire wastewater pumping system was replaced, along with the necessary pressure piping
system. All pump stations were equipped with remote SCADA controls and monitoring stations. I
served a lead design engineer and construction manager during the entire construction phase and
startup. Utilized Microstation V8 and MS Project.
Construction Cost: $10.5M
Duration: 365 days
Client: City of Warren, MN
Title/Role: Design Engineer / Construction Manager (Floan-Sanders)
City of Minot Conference Center, Minot, ND
I served as project superintendent for this project, working with the contractor. This was the first
opportunity to work on the construction side of a project, versus the design and engineering side.
This project provided valuable construction experience, working directly with the contractor and
construction team. Utilized MS Project and Microstation V8.
Construction Cost: $4.75M
Duration: 160 days
Client: Minot, ND Park District
Title/Role: Construction Superintendent (Floan-Sanders)
Maricopa County Storm Water Diversion Project, Maricopa County, AZ
I have served as the Design Engineer for numerous public projects that involved environmental
hydrology issues in order to resolve the repeated overflow of a drain way that flowed through an
established residential neighborhood utilizing a series of retention and detention ponds. This was
completed utilizing a storm sewer design program named Hec-RAS as developed by the US Army
Corp of Engineers. We were able to provide the necessary combination of retention and detention for
the given storm water flows to prevent flooding of the downstream floodway or drain way that was in
direct contact with the residential homes. Utilized Hec-RAS, MS Project and AutoCAD throughout
project duration.
Construction Cost: $850K
Duration: 120 days
Client: Maricopa County, AZ
Title/Role: Design Engineer (Civiltec)
PAGE 3
Buckeye Residential Development, Buckeye, AZ
In 2007, a large scale residential land development project provided an excellent opportunity to work
with the design standards and governing agencies of Maricopa County and the State of Arizona. I
served as the Project Manager and Designer for this project, providing many design solutions and
calculations for drainage and storm sewer retention, drainage pipe capacity, sanitary sewer piping,
water main pipe capacity, fire flow coverage, roadway capacity and structural pavement designs.
Utilized MS Project as project management software.
Construction Cost: $8.25M
Duration: 285 days
Client: City of Buckeye, AZ
Title/Role: Design Engineer (Pentacor)
Argyle Wastewater Treatment Plant, Argyle, MN
I served as a design engineer with a team of technical personnel in the design and construction
management of this facility. This facility provided treatment for turbidity, phosphorous removal and
disinfection. The design capacity of the facility was approximately 1.5 Mgpd. Utilized Microstation
V8 for plan design.
Construction Cost: N/A
Duration: 185 days
Client: City of Argyle, MN
Title/Role: Design Engineer (Floan-Sanders)

More Related Content

What's hot

Completed projects july 2010 sept 2011
Completed projects july 2010 sept 2011Completed projects july 2010 sept 2011
Completed projects july 2010 sept 2011cmogsc
 
Basebuilt Examples
Basebuilt ExamplesBasebuilt Examples
Basebuilt Examplesbousdahl
 
Sunil Kumar Final
Sunil Kumar FinalSunil Kumar Final
Sunil Kumar FinalSunil Kumar
 
I-635 Specifications
I-635 SpecificationsI-635 Specifications
I-635 Specifications
montyb1976
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
Mohamad Safarudin
 
Building Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems ProjectsBuilding Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems Projects
McKenney's Inc
 
Silicon Valley/San Jose Contractor of the Year Award
Silicon Valley/San Jose Contractor of the Year AwardSilicon Valley/San Jose Contractor of the Year Award
Silicon Valley/San Jose Contractor of the Year Award
Maribel Castillo
 
A Better Outcome by Design
A Better Outcome by DesignA Better Outcome by Design
A Better Outcome by Design
McKenney's Inc
 
Linked In Presentation
Linked In PresentationLinked In Presentation
Linked In Presentation
Coreslab Structures (ARIZ) Inc.
 
City of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter ProjectCity of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter Project
City of Salina
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
Mohamad Safarudin
 
Scott M Tidwell Resume word document 030415
Scott M Tidwell Resume word document 030415Scott M Tidwell Resume word document 030415
Scott M Tidwell Resume word document 030415Scott M. Tidwell, Sr.
 

What's hot (20)

Completed projects july 2010 sept 2011
Completed projects july 2010 sept 2011Completed projects july 2010 sept 2011
Completed projects july 2010 sept 2011
 
Basebuilt Examples
Basebuilt ExamplesBasebuilt Examples
Basebuilt Examples
 
AS_CV
AS_CVAS_CV
AS_CV
 
Sunil Kumar Final
Sunil Kumar FinalSunil Kumar Final
Sunil Kumar Final
 
I-635 Specifications
I-635 SpecificationsI-635 Specifications
I-635 Specifications
 
MRITYUNJOY_MAJUMDAR-_CV
MRITYUNJOY_MAJUMDAR-_CVMRITYUNJOY_MAJUMDAR-_CV
MRITYUNJOY_MAJUMDAR-_CV
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
 
Presentation-Nilantha
Presentation-NilanthaPresentation-Nilantha
Presentation-Nilantha
 
Long Resume
Long ResumeLong Resume
Long Resume
 
Building Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems ProjectsBuilding Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems Projects
 
Eschenburg Resume 1
Eschenburg  Resume 1Eschenburg  Resume 1
Eschenburg Resume 1
 
Silicon Valley/San Jose Contractor of the Year Award
Silicon Valley/San Jose Contractor of the Year AwardSilicon Valley/San Jose Contractor of the Year Award
Silicon Valley/San Jose Contractor of the Year Award
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
A Better Outcome by Design
A Better Outcome by DesignA Better Outcome by Design
A Better Outcome by Design
 
Linked In Presentation
Linked In PresentationLinked In Presentation
Linked In Presentation
 
AAMIR - PROFILE
AAMIR - PROFILEAAMIR - PROFILE
AAMIR - PROFILE
 
City of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter ProjectCity of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter Project
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 
Scott M Tidwell Resume word document 030415
Scott M Tidwell Resume word document 030415Scott M Tidwell Resume word document 030415
Scott M Tidwell Resume word document 030415
 
Slk m india
Slk m indiaSlk m india
Slk m india
 

Viewers also liked

V3 sherry stern resume [11316]
V3 sherry stern resume [11316]V3 sherry stern resume [11316]
V3 sherry stern resume [11316]
sherry stern
 
TREVOR HANKINS Resume 4-19-16
TREVOR HANKINS Resume 4-19-16TREVOR HANKINS Resume 4-19-16
TREVOR HANKINS Resume 4-19-16Trevor Hankins
 
Adam Santoro Resume
Adam Santoro ResumeAdam Santoro Resume
Adam Santoro Resume
Adam Santoro
 
Resume-Regnier Updated 4-13-16
Resume-Regnier Updated 4-13-16Resume-Regnier Updated 4-13-16
Resume-Regnier Updated 4-13-16Jesse Regnier
 
Sherry Mattingly Summer 2016 resume
Sherry Mattingly Summer 2016 resumeSherry Mattingly Summer 2016 resume
Sherry Mattingly Summer 2016 resume
Sherry Mattingly
 
Jennifer Kaman Pharmaceutical Resume 12-16
Jennifer Kaman Pharmaceutical Resume 12-16Jennifer Kaman Pharmaceutical Resume 12-16
Jennifer Kaman Pharmaceutical Resume 12-16Jennifer Kaman
 
Sean Resume #2
Sean Resume #2Sean Resume #2
Sean Resume #2Sean Jones
 
Patricia A Vamos - 2016 Resume - General
Patricia A Vamos - 2016 Resume - GeneralPatricia A Vamos - 2016 Resume - General
Patricia A Vamos - 2016 Resume - GeneralPatricia A. Vamos
 
PJ Lizotte Resume 11.2016
PJ Lizotte Resume 11.2016PJ Lizotte Resume 11.2016
PJ Lizotte Resume 11.2016Phillip Lizotte
 

Viewers also liked (14)

V3 sherry stern resume [11316]
V3 sherry stern resume [11316]V3 sherry stern resume [11316]
V3 sherry stern resume [11316]
 
Chris Weipert Resume 2016
Chris Weipert Resume 2016Chris Weipert Resume 2016
Chris Weipert Resume 2016
 
TREVOR HANKINS Resume 4-19-16
TREVOR HANKINS Resume 4-19-16TREVOR HANKINS Resume 4-19-16
TREVOR HANKINS Resume 4-19-16
 
Merrill resume Word
Merrill resume WordMerrill resume Word
Merrill resume Word
 
Adam Santoro Resume
Adam Santoro ResumeAdam Santoro Resume
Adam Santoro Resume
 
Shane Resume
Shane ResumeShane Resume
Shane Resume
 
Resume_Kylie Stiens
Resume_Kylie StiensResume_Kylie Stiens
Resume_Kylie Stiens
 
Resume-Regnier Updated 4-13-16
Resume-Regnier Updated 4-13-16Resume-Regnier Updated 4-13-16
Resume-Regnier Updated 4-13-16
 
Sherry Mattingly Summer 2016 resume
Sherry Mattingly Summer 2016 resumeSherry Mattingly Summer 2016 resume
Sherry Mattingly Summer 2016 resume
 
Jennifer Kaman Pharmaceutical Resume 12-16
Jennifer Kaman Pharmaceutical Resume 12-16Jennifer Kaman Pharmaceutical Resume 12-16
Jennifer Kaman Pharmaceutical Resume 12-16
 
Sean Resume #2
Sean Resume #2Sean Resume #2
Sean Resume #2
 
Patricia A Vamos - 2016 Resume - General
Patricia A Vamos - 2016 Resume - GeneralPatricia A Vamos - 2016 Resume - General
Patricia A Vamos - 2016 Resume - General
 
Nita's Resume #1
Nita's Resume #1Nita's Resume #1
Nita's Resume #1
 
PJ Lizotte Resume 11.2016
PJ Lizotte Resume 11.2016PJ Lizotte Resume 11.2016
PJ Lizotte Resume 11.2016
 

Similar to Project list

AMIR PIA_Resume_7-16
AMIR PIA_Resume_7-16AMIR PIA_Resume_7-16
AMIR PIA_Resume_7-16Amir pia
 
K Horner_RESUME_20161103
K Horner_RESUME_20161103K Horner_RESUME_20161103
K Horner_RESUME_20161103Kenneth Horner
 
Resume pe civil
Resume pe civilResume pe civil
Resume pe civil
Kim D. Scattarella
 
Resume_Koziol_Environmental Civil Engr
Resume_Koziol_Environmental Civil EngrResume_Koziol_Environmental Civil Engr
Resume_Koziol_Environmental Civil EngrDaniel Koziol
 
Projects(Nov 17 2010)
Projects(Nov 17 2010)Projects(Nov 17 2010)
Projects(Nov 17 2010)Ora Berman
 
Cover Letter & Resume
Cover Letter & ResumeCover Letter & Resume
Cover Letter & ResumeRichard Rask
 
Michael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-naMichael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-naMichael Barbera
 
Scott resume
Scott resumeScott resume
Scott resume
Scott Williams
 
Donald J resume Word 2 copy
Donald J resume Word 2 copyDonald J resume Word 2 copy
Donald J resume Word 2 copydon rawson
 
7 2016 l-janney_la_resume
7 2016 l-janney_la_resume7 2016 l-janney_la_resume
7 2016 l-janney_la_resume
Louise Janney
 
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Adam Berry
 

Similar to Project list (20)

Scott_Molstad 8
Scott_Molstad 8Scott_Molstad 8
Scott_Molstad 8
 
CLARK PE RESUME
CLARK PE RESUMECLARK PE RESUME
CLARK PE RESUME
 
AMIR PIA_Resume_7-16
AMIR PIA_Resume_7-16AMIR PIA_Resume_7-16
AMIR PIA_Resume_7-16
 
K Horner_RESUME_20161103
K Horner_RESUME_20161103K Horner_RESUME_20161103
K Horner_RESUME_20161103
 
Resume pe civil
Resume pe civilResume pe civil
Resume pe civil
 
Resume.Brian Murphree
Resume.Brian MurphreeResume.Brian Murphree
Resume.Brian Murphree
 
Resume_Koziol_Environmental Civil Engr
Resume_Koziol_Environmental Civil EngrResume_Koziol_Environmental Civil Engr
Resume_Koziol_Environmental Civil Engr
 
Projects(Nov 17 2010)
Projects(Nov 17 2010)Projects(Nov 17 2010)
Projects(Nov 17 2010)
 
Resume-Vrsalovich 2015
Resume-Vrsalovich 2015Resume-Vrsalovich 2015
Resume-Vrsalovich 2015
 
Cover Letter & Resume
Cover Letter & ResumeCover Letter & Resume
Cover Letter & Resume
 
Michael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-naMichael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-na
 
Scott resume
Scott resumeScott resume
Scott resume
 
resume_2015
resume_2015resume_2015
resume_2015
 
Donald J resume Word 2 copy
Donald J resume Word 2 copyDonald J resume Word 2 copy
Donald J resume Word 2 copy
 
NA
NANA
NA
 
Portfolio
PortfolioPortfolio
Portfolio
 
Resume of Eng.Ali
Resume of  Eng.AliResume of  Eng.Ali
Resume of Eng.Ali
 
7 2016 l-janney_la_resume
7 2016 l-janney_la_resume7 2016 l-janney_la_resume
7 2016 l-janney_la_resume
 
Bokath Resume
Bokath ResumeBokath Resume
Bokath Resume
 
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
 

Project list

  • 1. PAGE 1 SSccootttt RR.. MMoollssttaadd,, PPEE 3295 S. Tatum Lane Phone: 218.230.8108 (M) Gilbert, Arizona 85297 Email: smolstad@earthlink.net PROJECTS LIST: Below, I have listed several highlight projects that I was instrumental in the successful completion thereof. I served in a variety of roles throughout the procurement, design and construction management. Reata Wash Flood Control Study, Scottsdale, AZ I served as the Water Resource Engineer on behalf of ASLD, providing project review and technical assistance during the project study phase. I provided technical knowledge of existing drainage, public utilities, mitigation monitoring and permitting requirements. This purpose of this project is to identify and recommend flood control measures that will reduce flood risks to residents, property and public infrastructure within the Reata Wash floodplain. Utilized MS Project and Hec-RAS and Hec- HMS Construction Cost: N/A Duration: N/A Client: ASLD Title/Role: Water Resource Engineer (ASLD) Desert Ridge Development, Phoenix, AZ I served as the Water Resource Engineer for this vacant tract of land located in North Phoenix/North Scottsdale. This land is a master-planned community comprised of 5,700 acres, currently managed by ASLD. I provided technical knowledge of existing drainage, public utilities, mitigation monitoring and permitting requirements. Utilized MS Project and Hec-RAS and Hec-HMS Construction Cost: N/A Duration: N/A Client: ASLD Title/Role: Water Resource Engineer (ASLD) Chemehuevi Wastewater Expansion Project, Lake Havasu City, AZ Recently, I served as the Resident Engineer and Project Manager for a multi-million dollar sanitary sewer expansion district in Lake Havasu City, Arizona. This required overall project management and administration, engineering and inspection staff coordination and management, site construction management and administration, construction pay quantities, resident interaction, federal and state wage program administration and sanitary sewer testing / permitting through ADEQ. Utilized MS Project. Construction Cost: $10.5M Duration: 365 days Client: City of Lake Havasu, AZ Title/Role: Resident Engineer (Atkins Global) Hankinson Ethanol Plant Site Improvements, Hankinson, ND A recent assignment provided the opportunity for me to design, assemble and complete plans for the grading/drainage (Phase I) and the utilities/roadways (Phase II) for a proposed ethanol plant located in SE North Dakota. The successful plans and subsequent construction management solidified possibilities that future sites would be granted to MEI. Utilized MS Project and Microstation V8. Construction Cost: $3.5M Duration: 185 days Client: Fagen Engineering, Inc. Title/Role: Design Engineer / Construction Manager (Municipal Engineering)
  • 2. PAGE 2 City of Newfolden Wastewater Improvements, Newfolden, MN I served a Lead Design Engineer and Construction Manager for the total replacement and expansion of the entire wastewater piping system for the City of Newfolden. This further involved the replacement of several outdated pumping stations and pressure piping. The pumping system was with remote SCADA controls for ease of operation and monitoring. Utilized Microstation V8 and MS Project. Construction Cost: $1.75M Duration:185 days Client: City of Newfolden, MN Title/Role: Design Engineer / Construction Manager (Floan-Sanders) City of Warren Wastewater Pump Stations, Warren, MN The entire wastewater pumping system was replaced, along with the necessary pressure piping system. All pump stations were equipped with remote SCADA controls and monitoring stations. I served a lead design engineer and construction manager during the entire construction phase and startup. Utilized Microstation V8 and MS Project. Construction Cost: $10.5M Duration: 365 days Client: City of Warren, MN Title/Role: Design Engineer / Construction Manager (Floan-Sanders) City of Minot Conference Center, Minot, ND I served as project superintendent for this project, working with the contractor. This was the first opportunity to work on the construction side of a project, versus the design and engineering side. This project provided valuable construction experience, working directly with the contractor and construction team. Utilized MS Project and Microstation V8. Construction Cost: $4.75M Duration: 160 days Client: Minot, ND Park District Title/Role: Construction Superintendent (Floan-Sanders) Maricopa County Storm Water Diversion Project, Maricopa County, AZ I have served as the Design Engineer for numerous public projects that involved environmental hydrology issues in order to resolve the repeated overflow of a drain way that flowed through an established residential neighborhood utilizing a series of retention and detention ponds. This was completed utilizing a storm sewer design program named Hec-RAS as developed by the US Army Corp of Engineers. We were able to provide the necessary combination of retention and detention for the given storm water flows to prevent flooding of the downstream floodway or drain way that was in direct contact with the residential homes. Utilized Hec-RAS, MS Project and AutoCAD throughout project duration. Construction Cost: $850K Duration: 120 days Client: Maricopa County, AZ Title/Role: Design Engineer (Civiltec)
  • 3. PAGE 3 Buckeye Residential Development, Buckeye, AZ In 2007, a large scale residential land development project provided an excellent opportunity to work with the design standards and governing agencies of Maricopa County and the State of Arizona. I served as the Project Manager and Designer for this project, providing many design solutions and calculations for drainage and storm sewer retention, drainage pipe capacity, sanitary sewer piping, water main pipe capacity, fire flow coverage, roadway capacity and structural pavement designs. Utilized MS Project as project management software. Construction Cost: $8.25M Duration: 285 days Client: City of Buckeye, AZ Title/Role: Design Engineer (Pentacor) Argyle Wastewater Treatment Plant, Argyle, MN I served as a design engineer with a team of technical personnel in the design and construction management of this facility. This facility provided treatment for turbidity, phosphorous removal and disinfection. The design capacity of the facility was approximately 1.5 Mgpd. Utilized Microstation V8 for plan design. Construction Cost: N/A Duration: 185 days Client: City of Argyle, MN Title/Role: Design Engineer (Floan-Sanders)