SlideShare a Scribd company logo
1 of 9
Download to read offline
RESUME
Keith Alexander Vary
38 Spence Street Point Vernon
Hervey Bay
4655
DETAILS
Contact Numbers Home - (07) 41941885
Mobile - 0488941885
Email home - kvary@bigpond.net.au
Work Email- keith.vary@thebulliongroup.com.au
Date of Birth 18th
October 1956
Health Excellent, Current Coal Board Medical,
Resent clear drug test
Interests Fishing, Rugby league, Home renovation,
Gardening and anything with a motor.
Referees Michael Storch 0417789681- Owner operator
Mackay Safety
Peter Reilly 0428452698 - Past
Manager/Director of REB engineering.
Mark Horn (07)525841 - Manager DGH
Engineering
Qualifications
Diploma – BSB51407 Diploma of Project Management
TAE40110- Cert 4 in assessment & training.
WHS Certificate 4 (Core Module Functioning as a WHS Officer. WHS
elective module, construction)
Trade Certificate – Boilermaker
Computer skills - Microsoft Project, Basic Auto Cad, Power point,
Word, Excel, Internet & Email. I have also used systems such as MIMS
& SAP.
Licenses - Qld drivers license 28323584
CPCCOHS1001A – Work safely in Construction industry (White/Blue
card).
RIIRIS402A - Carry out Risk Management
RIIRIS601A – Establish and maintain risk management system
RIICOM301A – Communicate information
RIIRIS301B – Apply risk management.
RIIOHS301A – Conduct safety and health investigation.
RII09 - Standard 11 Induction
Defensive driving certificate.
Apollo root cause analysis.
Work History
1971 to 1975 Walkers Ltd Maryborough
Apprentice Boilermaker
Steel fabrication, Sugar mill components, Diesel locomotive components,
Plate rolling & pressing & Profile cutting.
1975 to 1981 King Turner Engineering Brisbane
Leading hand Boilermaker, Fabrication & erection of structural steel for
predominantly government projects. I was mostly based on site with a
team comprised of riggers, crane driver, Ta’s & boilermaker.
1981 to 1982 CRA Bougainville Copper
Leading hand material handling, working closely with the planning
department it was my duty to gather all the materials & components to
carry out the planned tasks.
1982 to 1985 Hornibrooks Bougainville
Workshop Manager of Island steel joint venture. Responsible for
supervision of workshop staff, safety in the workshop, quality control,
ordering of materials & consumables & estimating. This workshop
employed 100 men on three shifts, the operation covered general
fabrication, mining equipment rebuilds, concrete reinforcing steel, grit
blasting & painting yard.
1985 to 1990 Morex Meats Maryborough
Boilermaker / maintenance Fitter, Fabricated and erected new boiler
house, installed coal fired boiler and associated tanks and piping. Stayed
on to maintain plant & equipment.
1990 to 2005 REB Engineering Mackay
Started as Boilermaker completing numerous shutdowns on wash plants
and draglines at most of the mines in the Bowen basin.
In late 1991 I was sent to Gordinstone underground mine, here on
completion of construction in 1992 I was given the task to establish a
workshop to service the mining industry in the Emerald area.
I established and managed for eight years a very successful underground
conveyor installation & maintenance team this team successfully
completed 35 conveyor installations, 19 conveyor retractions, 18 tripper
drive installations, 4 dewatering station installations& many other minor
contracts the success of this team lead to REB gaining long term
underground contracts to supply belt maintenance, road works, pump
maintenance & outbye services to Crinum mine.
From here in 2003 I went on to project manage shutdowns on wash plants
& draglines including the construction of new ROM’s at Peak downs &
Goonyella as well as the erection of the 8750 dragline for Newlands coal.
During My time with REB I also worked as an estimator, relief manager
& project planner.
2005 to 2006 DGH Engineering
Project Manager, Capcoal Bundoora project - Assisted in design of
conveyor system from underground face to stockpile. Supervised the
salvage of equipment from Central Colliery. Organized the refurbishment
and upgrade of equipment. Supervised the installation of conveyor
equipment at the new Bundoora mine. This project included the
relocation of the 80 ton stacking conveyor gantry from Central to
Bundoora, for this task I wrote the scope, conducted the risk assessments,
organized & supervised all cranes and heavy transporters, organized the
design, fabrication and supervised the installation of the new support
column. This project went extremely well with zero incidents.
2006 to 2007 Thomas & Coffey
Field services manager, estimating, business development and site
supervision.
Managed Lake Lindsay mine raw water reticulation project consisting of
clearing route, installing trenching and install 22 kilometers of 200mm
poly water main, installation of pump station, raw water dam transfer
pumping system, tanks, truck wash bay, several creeks and roads had to
be crossed.
2007 to 2008 Continental Conveyors
Site manager at Cloud break mine overseeing the installation of reclaim
conveyor system that included installing 7500 ton/hr conveyor, 4 by 200
ton dump hoppers, 4 chain feeders, tilt slab manufacture and erection,
haul truck approach roads, apron slabs around hoppers built on stabilized
earth works and haul truck control traffic light system.
2008 Mackay Safety
Safety adviser. Implementation of Safety management plan for MEM
Rockhampton.
Facilitate BMA accreditation of Pioneer Drilling.
Development of BMA geological services Procedures.
2008 to 2010 - LUCAS group exploration drilling.
Queensland HSE&T Manager.
Development and implementation of procedures, facilitation of risk
assessments, induction of new starters, maintain compliance to BMA
contractor management system.
2010 to 2011 Wave engineering
Project management at Curragh mine – Pre planning, scheduling and
supervision of January 2011CHPP shut down & steaming coal stacker
upgrade.
Pre planning, scheduling and supervision of May 2011Bucket wheel re-
claimer upgrade.
Management of the installation and day to day running of 4 dozer traps to
allow the mine to load trains during the bucket wheel upgrade.
Curragh Bucket wheel
Dozer trap installation Curragh
2011 to 2012– Mackay Safety
Contracted to BMA Geological services as principle safety adviser for
their exploration drilling activities in the Bowen basin. Development of
site audit tools. Developed and implemented the traffic management
standard and traffic management tools. Completed audits on contractors
against the BMA contractor management system. Facilitated project
risk assessments.
2013 DGH engineering
Project manager for Marian sugar mill boiler 3 economizer installation.
Responsible for the daily running of all site activities, (Boilermakers,
Fitters, Riggers, tube welders) scheduling, planning and reporting.
2014 Universal services international
Project manager for Sunwater contract, removal of debris and general
clean-up of flood damaged infrastructure along the Burnett river
including the river barrage. Ned Churchward, Claude Wharton and Kirar
weirs. Responsible for the daily management of USI and subcontractor
work force, risk assessments and development of the safe work method
statements, ensuring compliance with the safety management plan,
planning and scheduling of work, ordering materials and approval of
invoices.
2014 DGH engineering
Installation of Mackay sugar’s import/export molasses facility comprising
the excavation and installation of all concrete foundations. The
excavation forming and concreting of the pump house pit (pit floor was 4
mtrs below ground level) The installation of the weigh bridge, molasses
trough, pumps and pipe work within the pump house and the installation
of 710 and 500 diameter poly pipe lines for the transfer of molasses from
trucks to storage bladder and from bladder to ship. Installation of the
pump house, approach and departure Roads, subsoil drainage, signs,
sump pumps, air and water reticulation and electrical conduits.
2014/2015 Hail creek mine
Site Supervisor/ Safety adviser for RIO (Orebody Knowledge Australia)
on the 2014 Hail Creek exploration program. This program was
completed Christmas 2014 having drilled 38 holes which included holes
for fault delineation, Coal quality cores, Vertical variability and plug
drilling On completion of the exploration program I was transferred
across to the Gas pilot program in January 2015 as field Supervisor/
Safety adviser/ Trainer this program included vertical and inseam drilling,
installation of well heads, well pumps, gas and water piping, tanks, flare
stacks & water transfer pumps.
You will find me to be safe hard working and dependable. I am easy to
get along with and fit easily into any team. I can work without
supervision and am always eager to achieve the company’s goals. I am
resourceful, respectful, punctual & keen to demonstrate my worth.

More Related Content

What's hot

RRozek Project List 9 20 15
RRozek Project List 9 20 15RRozek Project List 9 20 15
RRozek Project List 9 20 15Roman Rozek
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 SunocoKarl Keller
 
TerryBarwickResume20thJan2015
TerryBarwickResume20thJan2015TerryBarwickResume20thJan2015
TerryBarwickResume20thJan2015Terry Barwick
 
BABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTILBABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTILBabu K
 
Current Public Resume
Current Public ResumeCurrent Public Resume
Current Public ResumeLee Riopel
 
2010 Visual Resume - Robert Tonn
2010 Visual Resume - Robert Tonn2010 Visual Resume - Robert Tonn
2010 Visual Resume - Robert Tonnroberttonn
 
UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15ADAM DUKE
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Robert Dimanawa
 
Chandler Geoff 2016 cv
Chandler Geoff 2016 cvChandler Geoff 2016 cv
Chandler Geoff 2016 cvGeoff Chandler
 
John Keenan - Resume
John Keenan - ResumeJohn Keenan - Resume
John Keenan - ResumeJohn Keenan
 
Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager ResumeJack Dickerson
 
Gagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightGagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightPatrice Gagnon
 
CV Peter Storey Construction Lead-Manager
CV Peter Storey Construction Lead-ManagerCV Peter Storey Construction Lead-Manager
CV Peter Storey Construction Lead-ManagerPeter Storey
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull
 

What's hot (20)

RRozek Project List 9 20 15
RRozek Project List 9 20 15RRozek Project List 9 20 15
RRozek Project List 9 20 15
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 Sunoco
 
TerryBarwickResume20thJan2015
TerryBarwickResume20thJan2015TerryBarwickResume20thJan2015
TerryBarwickResume20thJan2015
 
BABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTILBABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTIL
 
Resume 1
Resume 1 Resume 1
Resume 1
 
Current Public Resume
Current Public ResumeCurrent Public Resume
Current Public Resume
 
2010 Visual Resume - Robert Tonn
2010 Visual Resume - Robert Tonn2010 Visual Resume - Robert Tonn
2010 Visual Resume - Robert Tonn
 
JOEY_STEPHENSON_(R1136)
JOEY_STEPHENSON_(R1136)JOEY_STEPHENSON_(R1136)
JOEY_STEPHENSON_(R1136)
 
CV 3
CV 3CV 3
CV 3
 
UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
sharndencv
sharndencvsharndencv
sharndencv
 
Linkedin
LinkedinLinkedin
Linkedin
 
Chandler Geoff 2016 cv
Chandler Geoff 2016 cvChandler Geoff 2016 cv
Chandler Geoff 2016 cv
 
John Keenan - Resume
John Keenan - ResumeJohn Keenan - Resume
John Keenan - Resume
 
Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager Resume
 
RailWorks-Today-April-2016-L
RailWorks-Today-April-2016-LRailWorks-Today-April-2016-L
RailWorks-Today-April-2016-L
 
Gagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightGagnon Patrice new CV3 light
Gagnon Patrice new CV3 light
 
CV Peter Storey Construction Lead-Manager
CV Peter Storey Construction Lead-ManagerCV Peter Storey Construction Lead-Manager
CV Peter Storey Construction Lead-Manager
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012
 

Similar to Experienced Project Manager Seeks New Opportunity

Similar to Experienced Project Manager Seeks New Opportunity (20)

Resume for andy mitchell current
Resume for andy mitchell   currentResume for andy mitchell   current
Resume for andy mitchell current
 
Andrew Dennis Cooper CV 1 (4)
Andrew Dennis Cooper CV 1 (4)Andrew Dennis Cooper CV 1 (4)
Andrew Dennis Cooper CV 1 (4)
 
Resume New updated August
Resume New updated August Resume New updated August
Resume New updated August
 
CV timothy o'donoghue 2016
CV timothy o'donoghue 2016CV timothy o'donoghue 2016
CV timothy o'donoghue 2016
 
Simon Murphy CV
Simon Murphy CVSimon Murphy CV
Simon Murphy CV
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 
Geoff Day Mechanical CV
Geoff Day Mechanical CVGeoff Day Mechanical CV
Geoff Day Mechanical CV
 
Sunil-CV-Latest
Sunil-CV-LatestSunil-CV-Latest
Sunil-CV-Latest
 
Resume mark shuttleworth
Resume mark shuttleworthResume mark shuttleworth
Resume mark shuttleworth
 
Resume Mark Shuttleworth
Resume Mark ShuttleworthResume Mark Shuttleworth
Resume Mark Shuttleworth
 
LATEST SHORT CV 2015
LATEST SHORT CV 2015LATEST SHORT CV 2015
LATEST SHORT CV 2015
 
LATEST SHORT CV 2015
LATEST SHORT CV 2015LATEST SHORT CV 2015
LATEST SHORT CV 2015
 
SRKCan_MRoyle_July_2016
SRKCan_MRoyle_July_2016SRKCan_MRoyle_July_2016
SRKCan_MRoyle_July_2016
 
Ben Mullins Resume
Ben Mullins ResumeBen Mullins Resume
Ben Mullins Resume
 
MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
 
PAUL NEWBY RESUME 2015 May
PAUL NEWBY RESUME 2015 MayPAUL NEWBY RESUME 2015 May
PAUL NEWBY RESUME 2015 May
 
chris's CV
chris's CVchris's CV
chris's CV
 
Phillips Howard
Phillips HowardPhillips Howard
Phillips Howard
 
Surajit cv.doc
Surajit cv.docSurajit cv.doc
Surajit cv.doc
 
Resume Murali 1
Resume Murali 1 Resume Murali 1
Resume Murali 1
 

Experienced Project Manager Seeks New Opportunity

  • 1. RESUME Keith Alexander Vary 38 Spence Street Point Vernon Hervey Bay 4655
  • 2. DETAILS Contact Numbers Home - (07) 41941885 Mobile - 0488941885 Email home - kvary@bigpond.net.au Work Email- keith.vary@thebulliongroup.com.au Date of Birth 18th October 1956 Health Excellent, Current Coal Board Medical, Resent clear drug test Interests Fishing, Rugby league, Home renovation, Gardening and anything with a motor. Referees Michael Storch 0417789681- Owner operator Mackay Safety Peter Reilly 0428452698 - Past Manager/Director of REB engineering. Mark Horn (07)525841 - Manager DGH Engineering Qualifications Diploma – BSB51407 Diploma of Project Management TAE40110- Cert 4 in assessment & training. WHS Certificate 4 (Core Module Functioning as a WHS Officer. WHS elective module, construction) Trade Certificate – Boilermaker Computer skills - Microsoft Project, Basic Auto Cad, Power point, Word, Excel, Internet & Email. I have also used systems such as MIMS & SAP. Licenses - Qld drivers license 28323584 CPCCOHS1001A – Work safely in Construction industry (White/Blue card). RIIRIS402A - Carry out Risk Management RIIRIS601A – Establish and maintain risk management system RIICOM301A – Communicate information RIIRIS301B – Apply risk management. RIIOHS301A – Conduct safety and health investigation. RII09 - Standard 11 Induction Defensive driving certificate. Apollo root cause analysis.
  • 3. Work History 1971 to 1975 Walkers Ltd Maryborough Apprentice Boilermaker Steel fabrication, Sugar mill components, Diesel locomotive components, Plate rolling & pressing & Profile cutting. 1975 to 1981 King Turner Engineering Brisbane Leading hand Boilermaker, Fabrication & erection of structural steel for predominantly government projects. I was mostly based on site with a team comprised of riggers, crane driver, Ta’s & boilermaker. 1981 to 1982 CRA Bougainville Copper Leading hand material handling, working closely with the planning department it was my duty to gather all the materials & components to carry out the planned tasks. 1982 to 1985 Hornibrooks Bougainville Workshop Manager of Island steel joint venture. Responsible for supervision of workshop staff, safety in the workshop, quality control, ordering of materials & consumables & estimating. This workshop employed 100 men on three shifts, the operation covered general fabrication, mining equipment rebuilds, concrete reinforcing steel, grit blasting & painting yard. 1985 to 1990 Morex Meats Maryborough Boilermaker / maintenance Fitter, Fabricated and erected new boiler house, installed coal fired boiler and associated tanks and piping. Stayed on to maintain plant & equipment. 1990 to 2005 REB Engineering Mackay Started as Boilermaker completing numerous shutdowns on wash plants and draglines at most of the mines in the Bowen basin. In late 1991 I was sent to Gordinstone underground mine, here on completion of construction in 1992 I was given the task to establish a workshop to service the mining industry in the Emerald area. I established and managed for eight years a very successful underground conveyor installation & maintenance team this team successfully completed 35 conveyor installations, 19 conveyor retractions, 18 tripper drive installations, 4 dewatering station installations& many other minor contracts the success of this team lead to REB gaining long term underground contracts to supply belt maintenance, road works, pump maintenance & outbye services to Crinum mine. From here in 2003 I went on to project manage shutdowns on wash plants & draglines including the construction of new ROM’s at Peak downs & Goonyella as well as the erection of the 8750 dragline for Newlands coal.
  • 4. During My time with REB I also worked as an estimator, relief manager & project planner. 2005 to 2006 DGH Engineering Project Manager, Capcoal Bundoora project - Assisted in design of conveyor system from underground face to stockpile. Supervised the salvage of equipment from Central Colliery. Organized the refurbishment and upgrade of equipment. Supervised the installation of conveyor equipment at the new Bundoora mine. This project included the relocation of the 80 ton stacking conveyor gantry from Central to Bundoora, for this task I wrote the scope, conducted the risk assessments, organized & supervised all cranes and heavy transporters, organized the design, fabrication and supervised the installation of the new support column. This project went extremely well with zero incidents. 2006 to 2007 Thomas & Coffey Field services manager, estimating, business development and site supervision. Managed Lake Lindsay mine raw water reticulation project consisting of clearing route, installing trenching and install 22 kilometers of 200mm poly water main, installation of pump station, raw water dam transfer pumping system, tanks, truck wash bay, several creeks and roads had to be crossed. 2007 to 2008 Continental Conveyors Site manager at Cloud break mine overseeing the installation of reclaim conveyor system that included installing 7500 ton/hr conveyor, 4 by 200 ton dump hoppers, 4 chain feeders, tilt slab manufacture and erection, haul truck approach roads, apron slabs around hoppers built on stabilized earth works and haul truck control traffic light system.
  • 5. 2008 Mackay Safety Safety adviser. Implementation of Safety management plan for MEM Rockhampton. Facilitate BMA accreditation of Pioneer Drilling. Development of BMA geological services Procedures. 2008 to 2010 - LUCAS group exploration drilling. Queensland HSE&T Manager. Development and implementation of procedures, facilitation of risk assessments, induction of new starters, maintain compliance to BMA contractor management system. 2010 to 2011 Wave engineering Project management at Curragh mine – Pre planning, scheduling and supervision of January 2011CHPP shut down & steaming coal stacker upgrade. Pre planning, scheduling and supervision of May 2011Bucket wheel re- claimer upgrade. Management of the installation and day to day running of 4 dozer traps to allow the mine to load trains during the bucket wheel upgrade. Curragh Bucket wheel
  • 6. Dozer trap installation Curragh 2011 to 2012– Mackay Safety Contracted to BMA Geological services as principle safety adviser for their exploration drilling activities in the Bowen basin. Development of site audit tools. Developed and implemented the traffic management standard and traffic management tools. Completed audits on contractors against the BMA contractor management system. Facilitated project risk assessments.
  • 7. 2013 DGH engineering Project manager for Marian sugar mill boiler 3 economizer installation. Responsible for the daily running of all site activities, (Boilermakers, Fitters, Riggers, tube welders) scheduling, planning and reporting. 2014 Universal services international Project manager for Sunwater contract, removal of debris and general clean-up of flood damaged infrastructure along the Burnett river including the river barrage. Ned Churchward, Claude Wharton and Kirar weirs. Responsible for the daily management of USI and subcontractor work force, risk assessments and development of the safe work method statements, ensuring compliance with the safety management plan, planning and scheduling of work, ordering materials and approval of invoices.
  • 8. 2014 DGH engineering Installation of Mackay sugar’s import/export molasses facility comprising the excavation and installation of all concrete foundations. The excavation forming and concreting of the pump house pit (pit floor was 4 mtrs below ground level) The installation of the weigh bridge, molasses trough, pumps and pipe work within the pump house and the installation of 710 and 500 diameter poly pipe lines for the transfer of molasses from trucks to storage bladder and from bladder to ship. Installation of the pump house, approach and departure Roads, subsoil drainage, signs, sump pumps, air and water reticulation and electrical conduits. 2014/2015 Hail creek mine Site Supervisor/ Safety adviser for RIO (Orebody Knowledge Australia) on the 2014 Hail Creek exploration program. This program was completed Christmas 2014 having drilled 38 holes which included holes for fault delineation, Coal quality cores, Vertical variability and plug drilling On completion of the exploration program I was transferred across to the Gas pilot program in January 2015 as field Supervisor/ Safety adviser/ Trainer this program included vertical and inseam drilling, installation of well heads, well pumps, gas and water piping, tanks, flare stacks & water transfer pumps.
  • 9. You will find me to be safe hard working and dependable. I am easy to get along with and fit easily into any team. I can work without supervision and am always eager to achieve the company’s goals. I am resourceful, respectful, punctual & keen to demonstrate my worth.