This document provides data to calculate the cost of excavating and backfilling 4 pits for pad footings and columns. It includes hourly excavation and backfill rates for different types of excavation work in sand, daily labor rates, and adjustments needed for sand excavation, compaction, profit, and overhead to determine the total cost and unit rate per cubic meter. Skilled labor is required for excavation taking longer than 3 hours per cubic meter.