 ANALYSIS OF RATES
 RATES OF ITEM OF WORK DEPENDS ON THE FOLLOWING
CRITERIA
 WHAT IS ROAD WORKS
 LAYERS
 SCHEDULE RATES
 NUMERICAL
ANALYSIS OF RATES
 The determination of rate per unit of a particular item of work from the cost
of quantities of materials, the cost of labourers and other miscellaneous
expenses required for Its completion is known as analysis of rate.
 A reasonable profit, usually 10% For the contractor is also included in the
analysis of rate. Rates of materials are usually taken as the rates delivered at
the site of work and include cost at origin, cost of transport, railway freight if
any, taxes, etc. Cost of transportation is also added if the material is carried
from distant place, more than 8km(5miles).
Rates of item of work depends on the
following-
 Specifications of work and materials, quality of materials, proportion of
mortar, etc.
 Quantities of materials and their rates, number of different Types of labourer
and their rates.
 Location of site of work and its distances from the sources of materials and
the rate of transport, availability of water.
 Profits and miscellaneous and overhead expenses of contactor
 Overhead costs- Overhead costs include general office expenses, rents, taxes,
supervision and other costs which are indirect expenses and not productive
expenses on the job.
1)General overheads- Rent and taxes, Establishment (Office staff)
2)Job overheads- Supervision, Repairs, Workers insurance, Losses on advance
ROAD WORKS
 work done in constructing or repairing roads is known as road works
LAYERS
 Subgrade Earthwork (Embankment)
 Sub base (GSB)
 Base (WBM,WMM)
 Binder course
 Surface Course
 Typical cross section of a flexible
pavement
 Typical Cross section of Rigid pavement
SUBGRADE EARTHWORK
 subgrade is the native material underneath a constructed road, pavement
 It is also called formation level.
 The term can also refer to imported material that has been used to build an
embankment
SUB BASE (GSB)
 The granular subbase forms the lowest (bottom) layer of the
pavement structure, and acts as the principal foundation for the
subsequent road profile, provides drainage for the pavement
structure, and protects the structure from frost.
BASE COARSE
 The base course or basecourse in pavements is a
layer of material. It is located under the surface
layer consisting of the wearing course and
sometimes an extra binder course
 It has two methods
1. Water Bound Macadam. It is the layer of broken
stone aggregates bound together by stone dust or
filled by screening material and water applied
during construction and compacted by heavy
smoothed wheel roller.
2. Wet Mix Macadam laying method contains of laying
spreading and compacting of clean, crushed, well-
graded granular materials on a prepared Sub base.
BINDER COURSE
 a coarse aggregate bound with bitumen between the foundation and the
surface course of a pavement.
 Some of its types are
Dense Bituminous Macadam
Bituminous macadam
Bituminous concrete
Semi dense Bituminous Concrete
SURFACE COURSE
 Surface course or wearing course is the top most layer of flexible pavement
which has direct contact with the vehicular loads
DELHI SCHEDULE RATE VOL 2 (2018)
 0001 Hire charges of Coaltar Boiler 900 to 1400 litres day 800.00
 0002 Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper day 800.00
 0003 Hire charges of Diesel Road Roller - 8 to 10 tonne day 3000.00
 0101 Bhisti day 617.00
 0113 Chowkidar day 558.00
 0114 Beldar day 558.00
 0370 Coal (steam) quintal 440.00
 1179 Crushed stone 2.36 mm to 12.5 mm size cum 900.00
 1235 Diesel litre 73.50
 2903 Stone chippings/ screenings 4.75 mm nominal size cum 1400.00
 2904 Stone chippings/ screenings 150 micron nominal size cum 1400.00
 2910 Stone chippings/ screenings 12.5/ 13.2 mm nominal size cum 1150.00
 2911 Stone chippings/ screenings 10/ 11.2 mm nominal size cum 1150.00
 2916 Paving Asphalt VG 10 of approved quality tonne 24000.00
 0982 Coarse sand (zone III) cum 1350.00
 9999 Sundries L.S. 151.00
NUMERICALS
Particulars Qntty or Nos. Rate Cost
Rs. P
Materials-
Stone chips (grit) 20 mm (3/4") gauge @ 1.35 cum % sq m
Asphalt 80/100 @ 220 kg % sqm including 2.5%
wastage(transported to road side)
Labour-
Mazdoor(beldar) for brushing and cleaning road surface
Mazdoor(Beldar) for heating and spraying asphalt
Mazdoor(beldar) for roling and brushing chips
Hire of Tar boiler @6sq m per day (about9, kmm per day for
3.7m wide road)
Fuel Fireweood for heating asphalt @ 4 quintal per tonne of
asphalt (for coal take 2 q per tonne of asphalt)
Hire of roller @600sq m per day (including driver and fire man
or cleaner and coal/diesel)
Sundries, T and P, brushes, etc.
1.35cu m
0.22 tonne
4 nos.
4 nos.
0.5 nos.
8.5 nos.
1/6 day
0.88 q
1/6 day
Lump sum
1400.00 per cum
24000.00 per tonne
558 per day
800 per day
73.50 per q
3000.00 per day
150.80 L.S.
1890
5280
4743
135
64.68
500
150
Total 12087
1. Bituminous Painting or Surface Dressing First Coat- unit 1 sq m. Take 100 cu m
Particulars Qntty or
Nos.
Rate Cost
Rs. P
Material
Stone chips 12mm gauge @0.75 cu m % sq m
Asphalt 80/100 @120kg % sq m including 2 1/2 % of wastage
(transported to road side)
Labour
Mazdoor for heating and cleaning road surface
Mazdoor for brushing and spraying asphalt
Mazdoor for spreading stone chips
Mazdoor for rolling and brushing chips
TOTAL-
Hire of tar boiler @800 sq m per day
Fuel fire wood @ 4 quintal per tonne of asphalt
Hire of roller @ 800sq m per day
Sundries,brushes etc
0.75 cu m
0.22 tonne
2 nos.
1.5 nos.
1.5 nos.
0.5 nos.
5.5 nos.
1/8 day
0.48q
1/8 day
Lump sum
1150.00 per cum
24000.00 per
tonne
558 per day
800 per day
73.50 per q
3000.00 per day
150.80 L.S.
862.5
5280
3069
100
35.28
375
150
Total 9870
2. Bituminous Painting or Surface Dressing Second Coat – unit 100 cu m Take – 100 sq m.
Particulars Qntty or Nos. Rate Cost
Rs. P
Material
Tack coat-
Binder asphalt,shelmac @100kg % sqm +2 1/2 % of
wastage =102.50kg
Carpet-
Stone chips 12mm passing 20 mm mesh and retained on
10 mm mesh @ 1.8 cu m% sq m
Stone chips of 10 mm passing 12 mm mesh and retained
on 3 mm mesh @ 0.9 cu m % sqm
Binder asphalt , shelmac @56 kg per cu m of chips +2 1/2
% of wastage =155 kg
Sand for flushing,coarse sand @0.3 cu m % sqm
Labour
Mazdoor for brushing and cleaning surface
Mazdoor for heating and applying asphalt for tack coat
Mazdoor for heating,mixing and spreading asphalt chip
mix carpet
Mazdoor for flushing sand and rolling
TOTAL
Hire of tar boiler @500sqm per day
Fuel firewood @4 quintal per tonne of asphalt
Hire of roller @500sqm per day
Hire of mixer @500sqm per day
Sundries,brushes etc
0.1025 tonne
1.80 cu m
0.9 cu m
0.155 tonne
0.3 cu m
4 nos.
2 nos.
8 nos.
1no.
15nos.
1/5 day
1.5q
1/5 day
1/5 day
L.S.
24000 per tonne
1400.00 per cum
1150.00 per cum
24000 per tonne
1350.00 per cum
558 per day
800.00
73.50 per q
3000.00 per day
800.00 per day
150.80 L.S.
2460
2520
1035
3720
405
8370
160
110.25
600
160
150
Total 19700
3. 20 mm Thick Premix Chipping Carpet or Bituminous Road– unit 1 cu m Take – 100 sq m.
Particulars Qntty or Nos. Rate Cost
Rs. P
Material
Sand coarse @0.75 cu m
Binder asphalt,shelmac @ 128kg per cu m of sand +2 1/2 % of
wastage =98.4 kg
Labour
Labor for heating,mixing and applying seal coat
Roller,tar boiler,mixer and fuel may br on the basis of 1000 sq
m per day
Sundries etc
0.75 cu m
0.098 tonne
4 nos.
1/10
L.S.
1350.00 per cum
24000 per tonne
558 per day
3000.00 per day
150
1012
2352
2232
300
150
Total 6050
4. Seal Coat of Premic sand(coarse sand and Asphalt) – unit 1 sq m. Take – 100 sq m.
Particulars Qntty or Nos. Rate Cost
Rs. P
Material
Tack coat-
Binder asphalt,shelmac @100kg sqm + 2 1/2 % of
wastage
Premix carpet-
Stone chips 20mm and down @ 3 cu m% sqm
Binder asphalt,shelmac @64kg per cu m of chips + 2
1/2% of wastage=196.8 kg
Sand flushing,coarse sand @0.45 cu m %sqm
Labour
Mazdoor for brushing and cleaning surface
Mazdoor for heating and applying asphalt for tack coat
Mazdoor for heating,mixing and spreading asphalt chip
mix carpet
Mazdoor for flushing sand and rolling
TOTAL
Hire of tar boiler @500sqm per day
Fuel firewood @4 quintal per tonne of asphalt
Hire of roller @500sqm per day
Hire of mixer @500sqm per day
Sundries etc
1.1025 tonne
3.0cum
0.197 tonne
0.45 cu m
4 nos.
2nos.
8nos.
1nos.
15nos.
0.2 day
1.5 q
0.2 day
0.2 day
L.S.
24000 per tonne
1400 per cum
24000 per tonne
1350.00 per cum
558 per day
800.00
73.50 per q
3000.00 per day
800.00 per day
150.80 L.S.
+
26460
4200
4728
607.5
8370
160
110.25
600
160
150
5. 2.5cm (1”) Thick Premix Bituminous Road or Bituminous Macadam Road – unit 1 cu m
Total 41290
Particulars Qntty or Nos. Rate Cost
Rs. P
Mazdoor for preparation of surface to camber add
roughening existing surface
Mazdoor for mud walling
Mazdoor laying and hand picking ballast
Mazdoor for carrying ballast from stack
Mazdoor for rolling
Mazdoor for binding surface
Mazdoor for likh katai
Mazdoor for making and maintaining service roads
Total
Bhisti
Chaunkidar
Hire of roller
Coal
Sundries etc
12 nos.
6 nos.
18 nos.
16nos.
4nos.
4nos.
2nos.
4nos.
68 nos.
10nos.
2nos.
2 days
8.5 q
L.S.
558 per day
617.00 per day
558.00 per day
3000 per day
440 per q
150.80 L.S.
37944
6170
1116
6000
3740
150
Total 55120
6. Laying and Consolidation of Stone Macadam – unit 1 cu m. Take 100 cu m.
(225m length of 3.7m wide road, 12cm thick loose layer)
Particulars Qntty or Nos. Rate Cost
Rs. P
Mazdoor for preparation of surface with criss cross
marks to camber
Mazdoor for opening stocks and sorting kankar
Mazdoor for mud walling
Mazdoor for laying and packing kankar
Mazdoor for carrying kamkar from stack
Mazdoor for ramming kankar
Mazdoor for binding surface
Mazdoor for likh katai
Mazdoor for making and maintaining service road
TOTAL
Bhisti
Chaunkidar
Sundries etc
12 nos.
12nos.
6 nos.
12 nos.
12nos.
36nos.
2nos.
2nos.
4nos.
98 nos.
10nos.
2nos.
L.S.
558 per day
617.00 per day
558 per day
150.80 L.S.
54684
6170
1116
150
Total 62120
7. Laying and Consolidation of Kankar – unit 1 cu m. Take 100 cu m.
(225m length of 3.7m wide road, 12cm thick loose layer)

More Related Content

What's hot

Material required for different items of civil building works
Material required for different items of civil  building worksMaterial required for different items of civil  building works
Material required for different items of civil building worksALI HYDER GADHI
 
Estimation And Costing Of A Building
Estimation And Costing Of A Building Estimation And Costing Of A Building
Estimation And Costing Of A Building shahidibn hussain
 
Mode of measurement, rules for deduction of plastering & brickwork
Mode of measurement, rules for deduction of plastering & brickworkMode of measurement, rules for deduction of plastering & brickwork
Mode of measurement, rules for deduction of plastering & brickworkAshwiniChaudhari13
 
Road construction in Civil engineering
Road construction in Civil engineeringRoad construction in Civil engineering
Road construction in Civil engineeringKailash Chander
 
Detailed specifications
Detailed specificationsDetailed specifications
Detailed specificationsSimran Vats
 
Quality control of concrete
Quality control of concreteQuality control of concrete
Quality control of concreteGaurang Kakadiya
 
Unit 1.civil engineering materials
Unit 1.civil engineering materialsUnit 1.civil engineering materials
Unit 1.civil engineering materialsChirag Bhanagale
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITYTHUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITYSSudhaVelan
 
Schedule of Rates
Schedule of RatesSchedule of Rates
Schedule of RatesRaj Shah
 
1.PILE FOUNDATION (ACE) 2160601 GTU
1.PILE FOUNDATION (ACE) 2160601 GTU1.PILE FOUNDATION (ACE) 2160601 GTU
1.PILE FOUNDATION (ACE) 2160601 GTUVATSAL PATEL
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil EngineeringQuantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil EngineeringAabid Ansar
 

What's hot (20)

Material required for different items of civil building works
Material required for different items of civil  building worksMaterial required for different items of civil  building works
Material required for different items of civil building works
 
rate analysis
rate analysisrate analysis
rate analysis
 
Estimating & Costing - I
Estimating & Costing - IEstimating & Costing - I
Estimating & Costing - I
 
Estimation And Costing Of A Building
Estimation And Costing Of A Building Estimation And Costing Of A Building
Estimation And Costing Of A Building
 
Mode of measurement, rules for deduction of plastering & brickwork
Mode of measurement, rules for deduction of plastering & brickworkMode of measurement, rules for deduction of plastering & brickwork
Mode of measurement, rules for deduction of plastering & brickwork
 
Road construction in Civil engineering
Road construction in Civil engineeringRoad construction in Civil engineering
Road construction in Civil engineering
 
Detailed specifications
Detailed specificationsDetailed specifications
Detailed specifications
 
Quality control of concrete
Quality control of concreteQuality control of concrete
Quality control of concrete
 
Valuation
ValuationValuation
Valuation
 
Unit 1.civil engineering materials
Unit 1.civil engineering materialsUnit 1.civil engineering materials
Unit 1.civil engineering materials
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
ESTIMATING AND COSTING
ESTIMATING AND COSTINGESTIMATING AND COSTING
ESTIMATING AND COSTING
 
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITYTHUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
 
Rigid pavements
Rigid pavements Rigid pavements
Rigid pavements
 
Schedule of Rates
Schedule of RatesSchedule of Rates
Schedule of Rates
 
Estimating and-costing
Estimating and-costingEstimating and-costing
Estimating and-costing
 
1.PILE FOUNDATION (ACE) 2160601 GTU
1.PILE FOUNDATION (ACE) 2160601 GTU1.PILE FOUNDATION (ACE) 2160601 GTU
1.PILE FOUNDATION (ACE) 2160601 GTU
 
Analysis of rates
Analysis of ratesAnalysis of rates
Analysis of rates
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil EngineeringQuantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
 

Similar to Rate analysis road work in Estimation & Rate Analyisis

FLY ASH BRICK PRODUCTION
FLY ASH BRICK PRODUCTIONFLY ASH BRICK PRODUCTION
FLY ASH BRICK PRODUCTIONConsultonmic
 
crri_csir_odisha new tech JULY 2022.pptx
crri_csir_odisha new tech JULY 2022.pptxcrri_csir_odisha new tech JULY 2022.pptx
crri_csir_odisha new tech JULY 2022.pptxRipanJena
 
Project Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, OmanProject Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, OmanDavid H Moloney
 
EXPERIMENTAL STUDY ON REPLACING FINE AGGREGATE IN MORTAR WITH CONSTRUCTION AN...
EXPERIMENTAL STUDY ON REPLACING FINE AGGREGATE IN MORTAR WITH CONSTRUCTION AN...EXPERIMENTAL STUDY ON REPLACING FINE AGGREGATE IN MORTAR WITH CONSTRUCTION AN...
EXPERIMENTAL STUDY ON REPLACING FINE AGGREGATE IN MORTAR WITH CONSTRUCTION AN...IRJET Journal
 
New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxQAQCGCC
 
cement industry program development
cement industry program developmentcement industry program development
cement industry program developmentHyder Ali Larik
 
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdfSahiwal 1-2023.pdf
Sahiwal 1-2023.pdfAwaisSohail7
 
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD hitendra pendam
 
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...Roshan Kumar Patel
 
Silica Processing Plant and Pure silica extracting
Silica Processing Plant and Pure silica extractingSilica Processing Plant and Pure silica extracting
Silica Processing Plant and Pure silica extractingLiGary3
 
Construction Presentations 2019
Construction Presentations 2019Construction Presentations 2019
Construction Presentations 2019David H Moloney
 
MRS 2nd Bi use calcualte AnnualDG Khan-2017.pdf
MRS 2nd Bi use calcualte AnnualDG Khan-2017.pdfMRS 2nd Bi use calcualte AnnualDG Khan-2017.pdf
MRS 2nd Bi use calcualte AnnualDG Khan-2017.pdfRashidIqbal804223
 
80623277 cost-estimator
80623277 cost-estimator80623277 cost-estimator
80623277 cost-estimatorimaduddin91
 
Manufacturing of fly-ash brick
Manufacturing of fly-ash brickManufacturing of fly-ash brick
Manufacturing of fly-ash brickBasitali Nevarekar
 
Project presentation on flexible pavement by Harshit Prakash Garg
Project presentation on flexible pavement by Harshit Prakash GargProject presentation on flexible pavement by Harshit Prakash Garg
Project presentation on flexible pavement by Harshit Prakash Gargharshit315
 
Total cost 50000pcs for Auto bricks plant hoffman kiln by cbecl
Total cost 50000pcs for Auto bricks plant hoffman kiln  by cbeclTotal cost 50000pcs for Auto bricks plant hoffman kiln  by cbecl
Total cost 50000pcs for Auto bricks plant hoffman kiln by cbeclAlibaba Construction Ltd.
 

Similar to Rate analysis road work in Estimation & Rate Analyisis (20)

FLY ASH BRICK PRODUCTION
FLY ASH BRICK PRODUCTIONFLY ASH BRICK PRODUCTION
FLY ASH BRICK PRODUCTION
 
crri_csir_odisha new tech JULY 2022.pptx
crri_csir_odisha new tech JULY 2022.pptxcrri_csir_odisha new tech JULY 2022.pptx
crri_csir_odisha new tech JULY 2022.pptx
 
ASPHALT AND ASPHALT RECYCLING BY ENGR ONOJA
ASPHALT AND ASPHALT RECYCLING  BY ENGR ONOJAASPHALT AND ASPHALT RECYCLING  BY ENGR ONOJA
ASPHALT AND ASPHALT RECYCLING BY ENGR ONOJA
 
Construction materials
Construction materialsConstruction materials
Construction materials
 
Project Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, OmanProject Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, Oman
 
Kabaddi
KabaddiKabaddi
Kabaddi
 
EXPERIMENTAL STUDY ON REPLACING FINE AGGREGATE IN MORTAR WITH CONSTRUCTION AN...
EXPERIMENTAL STUDY ON REPLACING FINE AGGREGATE IN MORTAR WITH CONSTRUCTION AN...EXPERIMENTAL STUDY ON REPLACING FINE AGGREGATE IN MORTAR WITH CONSTRUCTION AN...
EXPERIMENTAL STUDY ON REPLACING FINE AGGREGATE IN MORTAR WITH CONSTRUCTION AN...
 
New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptx
 
cement industry program development
cement industry program developmentcement industry program development
cement industry program development
 
EQS - RATE ANALYSIS.pdf
EQS -  RATE ANALYSIS.pdfEQS -  RATE ANALYSIS.pdf
EQS - RATE ANALYSIS.pdf
 
Sahiwal 1-2023.pdf
Sahiwal 1-2023.pdfSahiwal 1-2023.pdf
Sahiwal 1-2023.pdf
 
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
 
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
 
Silica Processing Plant and Pure silica extracting
Silica Processing Plant and Pure silica extractingSilica Processing Plant and Pure silica extracting
Silica Processing Plant and Pure silica extracting
 
Construction Presentations 2019
Construction Presentations 2019Construction Presentations 2019
Construction Presentations 2019
 
MRS 2nd Bi use calcualte AnnualDG Khan-2017.pdf
MRS 2nd Bi use calcualte AnnualDG Khan-2017.pdfMRS 2nd Bi use calcualte AnnualDG Khan-2017.pdf
MRS 2nd Bi use calcualte AnnualDG Khan-2017.pdf
 
80623277 cost-estimator
80623277 cost-estimator80623277 cost-estimator
80623277 cost-estimator
 
Manufacturing of fly-ash brick
Manufacturing of fly-ash brickManufacturing of fly-ash brick
Manufacturing of fly-ash brick
 
Project presentation on flexible pavement by Harshit Prakash Garg
Project presentation on flexible pavement by Harshit Prakash GargProject presentation on flexible pavement by Harshit Prakash Garg
Project presentation on flexible pavement by Harshit Prakash Garg
 
Total cost 50000pcs for Auto bricks plant hoffman kiln by cbecl
Total cost 50000pcs for Auto bricks plant hoffman kiln  by cbeclTotal cost 50000pcs for Auto bricks plant hoffman kiln  by cbecl
Total cost 50000pcs for Auto bricks plant hoffman kiln by cbecl
 

More from Japtyesh Singh

DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOIL
DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOILDETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOIL
DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOILJaptyesh Singh
 
Drainage in Irrigation Engineering
Drainage in Irrigation EngineeringDrainage in Irrigation Engineering
Drainage in Irrigation EngineeringJaptyesh Singh
 
Issues In Indian Commerce
Issues In Indian CommerceIssues In Indian Commerce
Issues In Indian CommerceJaptyesh Singh
 
Mathematics Euclid's Geometry - My School PPT Project
Mathematics Euclid's Geometry - My School PPT ProjectMathematics Euclid's Geometry - My School PPT Project
Mathematics Euclid's Geometry - My School PPT ProjectJaptyesh Singh
 

More from Japtyesh Singh (6)

DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOIL
DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOILDETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOIL
DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOIL
 
Drainage in Irrigation Engineering
Drainage in Irrigation EngineeringDrainage in Irrigation Engineering
Drainage in Irrigation Engineering
 
Tiles
TilesTiles
Tiles
 
Population explosion
Population explosionPopulation explosion
Population explosion
 
Issues In Indian Commerce
Issues In Indian CommerceIssues In Indian Commerce
Issues In Indian Commerce
 
Mathematics Euclid's Geometry - My School PPT Project
Mathematics Euclid's Geometry - My School PPT ProjectMathematics Euclid's Geometry - My School PPT Project
Mathematics Euclid's Geometry - My School PPT Project
 

Recently uploaded

Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
MICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxMICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxabhijeetpadhi001
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
MICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxMICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptx
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 

Rate analysis road work in Estimation & Rate Analyisis

  • 1. RATE ANALYSIS OF ROAD WORK JAPTYESH SINGH JASPAL(CO18229) SARTHAK PUNJ(CO18248) in ESTIMATION & RATE ANALYSIS Submitted to: MOHAMMAD SAKIB PERWEZ KHAN SIR
  • 2. INDEX  ANALYSIS OF RATES  RATES OF ITEM OF WORK DEPENDS ON THE FOLLOWING CRITERIA  WHAT IS ROAD WORKS  LAYERS  SCHEDULE RATES  NUMERICAL
  • 3. ANALYSIS OF RATES  The determination of rate per unit of a particular item of work from the cost of quantities of materials, the cost of labourers and other miscellaneous expenses required for Its completion is known as analysis of rate.  A reasonable profit, usually 10% For the contractor is also included in the analysis of rate. Rates of materials are usually taken as the rates delivered at the site of work and include cost at origin, cost of transport, railway freight if any, taxes, etc. Cost of transportation is also added if the material is carried from distant place, more than 8km(5miles).
  • 4. Rates of item of work depends on the following-  Specifications of work and materials, quality of materials, proportion of mortar, etc.  Quantities of materials and their rates, number of different Types of labourer and their rates.  Location of site of work and its distances from the sources of materials and the rate of transport, availability of water.  Profits and miscellaneous and overhead expenses of contactor  Overhead costs- Overhead costs include general office expenses, rents, taxes, supervision and other costs which are indirect expenses and not productive expenses on the job. 1)General overheads- Rent and taxes, Establishment (Office staff) 2)Job overheads- Supervision, Repairs, Workers insurance, Losses on advance
  • 5. ROAD WORKS  work done in constructing or repairing roads is known as road works LAYERS  Subgrade Earthwork (Embankment)  Sub base (GSB)  Base (WBM,WMM)  Binder course  Surface Course
  • 6.  Typical cross section of a flexible pavement  Typical Cross section of Rigid pavement
  • 7. SUBGRADE EARTHWORK  subgrade is the native material underneath a constructed road, pavement  It is also called formation level.  The term can also refer to imported material that has been used to build an embankment
  • 8. SUB BASE (GSB)  The granular subbase forms the lowest (bottom) layer of the pavement structure, and acts as the principal foundation for the subsequent road profile, provides drainage for the pavement structure, and protects the structure from frost.
  • 9. BASE COARSE  The base course or basecourse in pavements is a layer of material. It is located under the surface layer consisting of the wearing course and sometimes an extra binder course  It has two methods 1. Water Bound Macadam. It is the layer of broken stone aggregates bound together by stone dust or filled by screening material and water applied during construction and compacted by heavy smoothed wheel roller. 2. Wet Mix Macadam laying method contains of laying spreading and compacting of clean, crushed, well- graded granular materials on a prepared Sub base.
  • 10. BINDER COURSE  a coarse aggregate bound with bitumen between the foundation and the surface course of a pavement.  Some of its types are Dense Bituminous Macadam Bituminous macadam Bituminous concrete Semi dense Bituminous Concrete
  • 11. SURFACE COURSE  Surface course or wearing course is the top most layer of flexible pavement which has direct contact with the vehicular loads
  • 12. DELHI SCHEDULE RATE VOL 2 (2018)  0001 Hire charges of Coaltar Boiler 900 to 1400 litres day 800.00  0002 Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper day 800.00  0003 Hire charges of Diesel Road Roller - 8 to 10 tonne day 3000.00  0101 Bhisti day 617.00  0113 Chowkidar day 558.00  0114 Beldar day 558.00  0370 Coal (steam) quintal 440.00  1179 Crushed stone 2.36 mm to 12.5 mm size cum 900.00  1235 Diesel litre 73.50  2903 Stone chippings/ screenings 4.75 mm nominal size cum 1400.00  2904 Stone chippings/ screenings 150 micron nominal size cum 1400.00  2910 Stone chippings/ screenings 12.5/ 13.2 mm nominal size cum 1150.00  2911 Stone chippings/ screenings 10/ 11.2 mm nominal size cum 1150.00  2916 Paving Asphalt VG 10 of approved quality tonne 24000.00  0982 Coarse sand (zone III) cum 1350.00  9999 Sundries L.S. 151.00
  • 14. Particulars Qntty or Nos. Rate Cost Rs. P Materials- Stone chips (grit) 20 mm (3/4") gauge @ 1.35 cum % sq m Asphalt 80/100 @ 220 kg % sqm including 2.5% wastage(transported to road side) Labour- Mazdoor(beldar) for brushing and cleaning road surface Mazdoor(Beldar) for heating and spraying asphalt Mazdoor(beldar) for roling and brushing chips Hire of Tar boiler @6sq m per day (about9, kmm per day for 3.7m wide road) Fuel Fireweood for heating asphalt @ 4 quintal per tonne of asphalt (for coal take 2 q per tonne of asphalt) Hire of roller @600sq m per day (including driver and fire man or cleaner and coal/diesel) Sundries, T and P, brushes, etc. 1.35cu m 0.22 tonne 4 nos. 4 nos. 0.5 nos. 8.5 nos. 1/6 day 0.88 q 1/6 day Lump sum 1400.00 per cum 24000.00 per tonne 558 per day 800 per day 73.50 per q 3000.00 per day 150.80 L.S. 1890 5280 4743 135 64.68 500 150 Total 12087 1. Bituminous Painting or Surface Dressing First Coat- unit 1 sq m. Take 100 cu m
  • 15. Particulars Qntty or Nos. Rate Cost Rs. P Material Stone chips 12mm gauge @0.75 cu m % sq m Asphalt 80/100 @120kg % sq m including 2 1/2 % of wastage (transported to road side) Labour Mazdoor for heating and cleaning road surface Mazdoor for brushing and spraying asphalt Mazdoor for spreading stone chips Mazdoor for rolling and brushing chips TOTAL- Hire of tar boiler @800 sq m per day Fuel fire wood @ 4 quintal per tonne of asphalt Hire of roller @ 800sq m per day Sundries,brushes etc 0.75 cu m 0.22 tonne 2 nos. 1.5 nos. 1.5 nos. 0.5 nos. 5.5 nos. 1/8 day 0.48q 1/8 day Lump sum 1150.00 per cum 24000.00 per tonne 558 per day 800 per day 73.50 per q 3000.00 per day 150.80 L.S. 862.5 5280 3069 100 35.28 375 150 Total 9870 2. Bituminous Painting or Surface Dressing Second Coat – unit 100 cu m Take – 100 sq m.
  • 16. Particulars Qntty or Nos. Rate Cost Rs. P Material Tack coat- Binder asphalt,shelmac @100kg % sqm +2 1/2 % of wastage =102.50kg Carpet- Stone chips 12mm passing 20 mm mesh and retained on 10 mm mesh @ 1.8 cu m% sq m Stone chips of 10 mm passing 12 mm mesh and retained on 3 mm mesh @ 0.9 cu m % sqm Binder asphalt , shelmac @56 kg per cu m of chips +2 1/2 % of wastage =155 kg Sand for flushing,coarse sand @0.3 cu m % sqm Labour Mazdoor for brushing and cleaning surface Mazdoor for heating and applying asphalt for tack coat Mazdoor for heating,mixing and spreading asphalt chip mix carpet Mazdoor for flushing sand and rolling TOTAL Hire of tar boiler @500sqm per day Fuel firewood @4 quintal per tonne of asphalt Hire of roller @500sqm per day Hire of mixer @500sqm per day Sundries,brushes etc 0.1025 tonne 1.80 cu m 0.9 cu m 0.155 tonne 0.3 cu m 4 nos. 2 nos. 8 nos. 1no. 15nos. 1/5 day 1.5q 1/5 day 1/5 day L.S. 24000 per tonne 1400.00 per cum 1150.00 per cum 24000 per tonne 1350.00 per cum 558 per day 800.00 73.50 per q 3000.00 per day 800.00 per day 150.80 L.S. 2460 2520 1035 3720 405 8370 160 110.25 600 160 150 Total 19700 3. 20 mm Thick Premix Chipping Carpet or Bituminous Road– unit 1 cu m Take – 100 sq m.
  • 17. Particulars Qntty or Nos. Rate Cost Rs. P Material Sand coarse @0.75 cu m Binder asphalt,shelmac @ 128kg per cu m of sand +2 1/2 % of wastage =98.4 kg Labour Labor for heating,mixing and applying seal coat Roller,tar boiler,mixer and fuel may br on the basis of 1000 sq m per day Sundries etc 0.75 cu m 0.098 tonne 4 nos. 1/10 L.S. 1350.00 per cum 24000 per tonne 558 per day 3000.00 per day 150 1012 2352 2232 300 150 Total 6050 4. Seal Coat of Premic sand(coarse sand and Asphalt) – unit 1 sq m. Take – 100 sq m.
  • 18. Particulars Qntty or Nos. Rate Cost Rs. P Material Tack coat- Binder asphalt,shelmac @100kg sqm + 2 1/2 % of wastage Premix carpet- Stone chips 20mm and down @ 3 cu m% sqm Binder asphalt,shelmac @64kg per cu m of chips + 2 1/2% of wastage=196.8 kg Sand flushing,coarse sand @0.45 cu m %sqm Labour Mazdoor for brushing and cleaning surface Mazdoor for heating and applying asphalt for tack coat Mazdoor for heating,mixing and spreading asphalt chip mix carpet Mazdoor for flushing sand and rolling TOTAL Hire of tar boiler @500sqm per day Fuel firewood @4 quintal per tonne of asphalt Hire of roller @500sqm per day Hire of mixer @500sqm per day Sundries etc 1.1025 tonne 3.0cum 0.197 tonne 0.45 cu m 4 nos. 2nos. 8nos. 1nos. 15nos. 0.2 day 1.5 q 0.2 day 0.2 day L.S. 24000 per tonne 1400 per cum 24000 per tonne 1350.00 per cum 558 per day 800.00 73.50 per q 3000.00 per day 800.00 per day 150.80 L.S. + 26460 4200 4728 607.5 8370 160 110.25 600 160 150 5. 2.5cm (1”) Thick Premix Bituminous Road or Bituminous Macadam Road – unit 1 cu m Total 41290
  • 19. Particulars Qntty or Nos. Rate Cost Rs. P Mazdoor for preparation of surface to camber add roughening existing surface Mazdoor for mud walling Mazdoor laying and hand picking ballast Mazdoor for carrying ballast from stack Mazdoor for rolling Mazdoor for binding surface Mazdoor for likh katai Mazdoor for making and maintaining service roads Total Bhisti Chaunkidar Hire of roller Coal Sundries etc 12 nos. 6 nos. 18 nos. 16nos. 4nos. 4nos. 2nos. 4nos. 68 nos. 10nos. 2nos. 2 days 8.5 q L.S. 558 per day 617.00 per day 558.00 per day 3000 per day 440 per q 150.80 L.S. 37944 6170 1116 6000 3740 150 Total 55120 6. Laying and Consolidation of Stone Macadam – unit 1 cu m. Take 100 cu m. (225m length of 3.7m wide road, 12cm thick loose layer)
  • 20. Particulars Qntty or Nos. Rate Cost Rs. P Mazdoor for preparation of surface with criss cross marks to camber Mazdoor for opening stocks and sorting kankar Mazdoor for mud walling Mazdoor for laying and packing kankar Mazdoor for carrying kamkar from stack Mazdoor for ramming kankar Mazdoor for binding surface Mazdoor for likh katai Mazdoor for making and maintaining service road TOTAL Bhisti Chaunkidar Sundries etc 12 nos. 12nos. 6 nos. 12 nos. 12nos. 36nos. 2nos. 2nos. 4nos. 98 nos. 10nos. 2nos. L.S. 558 per day 617.00 per day 558 per day 150.80 L.S. 54684 6170 1116 150 Total 62120 7. Laying and Consolidation of Kankar – unit 1 cu m. Take 100 cu m. (225m length of 3.7m wide road, 12cm thick loose layer)