ESTIMATION
OF
BRIDGES AND AUTOMATION
BY
Er. K.J.Anand, AMIE, MBA, Consultant
Kjanand2001@rediffmail.com
A VALUABLE JOURNEY
Contact-9204783656
/mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations-
copy-150715041925-lva1-app6892-reupload.doc1
INDEX
Sr. No Chapter Page no
Introduction 2
A. Item Involved In Estimation 4
B. Estimate of Typical Bridge and Automation 14
C. Methodology for Estimate 15
D. Standard grade of concrete /steel for varios structure 16
E. Norms for Consumption of steel in kg/m3 of concrete 17
/mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations-
copy-150715041925-lva1-app6892-reupload.doc2
1. INTRODUCTION
Estimation of bridges is very important to find out the cost.Estimation of
Bridges is not only simple airthmatic calculation,but it needs concentrated
idea,imagination and also it involves trigonometrical calculations.
Estimation is varying on the basis of foundation.
commanly used foundation in india is as under.
I) Open foundation
II) Well foundation
III) Pile Foundatio
Estimation is also vary on the basis of superstructure.Commonly used
super structure in india is as under-
I) Solid slab
II) RCC T-beam girder
III) RCC Girder
IV) PSC Girder
V) Voided Girder/slab
VI) Steel Girder
VII) Cable stay
/mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations-
copy-150715041925-lva1-app6892-reupload.doc3
A. ITEMS INVOLVED IN ESTIMATION
Various items involved to estimate the bridges is attached here with except
cable stayed bridges. Commonoly Involved item is as under-
-lane divided Carriageway from - to - (Pkg. -I: km- to km -) of
VR/ODR/MDR/SH/NH-- in the State of –
ABSTRACT (Commonly used Item)
Item
No.
Description Unit
Total
Quantity
Rat
e
Amount
BRIDGES / UNDERPASSES / ROB'S
6.01 Earthwork in excavation of foundations
for structures complete as per drawings
and Technical Specifications Clause 304
including all leads and lifts.
Cum
(b) Providing and laying sand filling below
structure as per drawings and Technical
Specification Section Cum
6.02
Back filling behind abutments, wing
walls and return walls with selected
imported granular material of approved
quality, complete including all leads and
lifts as per drawings and Technical
Specifications Clause 305. Cum
6.03
Providing filter media behind
abutments, wing walls & return walls
with well packed material to specified
thickness with smaller size towards the
soil and bigger size towards the wall
complete with all leads and lifts as per
drawings and Technical Specifi Cum
6.04
Providing and laying plain cement
concrete, leveling course under the
bridge structure etc. including centering
and shuttering all complete but
excluding reinforcement as per
drawings and Technical Specification
Sections 1500, 1700 and 2100
(i) M-15 Grade in Levelling Course Cum
/mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations-
copy-150715041925-lva1-app6892-reupload.doc4
6.05
Providing and laying Reinforced
Cement Concrete in Foundation
complete excluding Reinforcement as
per Drawing and Technical
Specification Section 2100
M-35 Foundation Cum
6.06
Providing Bored cast-in-situ vertical
piles excluding steel reinforcement and
initial and routine tests complete as per
drawings and Technical Specification
Section 1100 and 1700
M-35 Grade concrete (1200mm dia) Lm.
6.07
Providing Reinforced cement concrete
in pile caps excluding steel
reinforcement complete as per drawings
and Technical Specification Section
1100, 1500 and 1700
M -35 Grade Cum
6.08
Supplying , fabricating and fixing in
position mild steel cutting edge with MS
anchoraches including welding, splicing
and making provisions for the fixing of
reinforcements of well curb as per
approved drawing and Technical
Specification Section 1200 and
T
6.09
Cement concrete for plain concrete/
Reinforced cement concrete complete
excluding reinforcement as per drawing
and Technical Specification Clauses
1200,1500 and 1700.
i) Well curb Cum
M-35 Grade
ii) Well steining Cum
M-35 Grade
iii) Well Cap Cum
M-35 Grade
iv) Intermediate plug Cum
M-25 Grade
/mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations-
copy-150715041925-lva1-app6892-reupload.doc5
v) Bottom plug Cum
M-25 Grade
6.10
Sinking of wells through all types of
soils (other than pneumatic method of
sinking) complete as per drawing and
Technical Specifications Clause 1200.
7.00 m dia well LM.
Depth upto 3.00m
Depth 3.00m to 10.00m
Depth 10.00m to 15.00m
Depth 15.00m to 20.00m
Depth 20.00m to 25.00m
Depth 25.00m to 30.00m
Depth 30.00m to 35.00m
8.00 m dia well Lm.
Depth upto 3.00m
Depth 3.00m to 10.00m
Depth 10.00m to 15.00m
Depth 15.00m to 20.00m
Depth 20.00m to 25.00m
Depth 25.00m to 30.00m
Depth 30.00m to 35.00m
9.0 m dia well Lm
Depth upto 3.00m
Depth 3.00m to 10.00m
Depth 10.00m to 15.00m
Depth 15.00m to 20.00m
Depth 20.00m to 25.00m
Depth 25.00m to 30.00m
Depth 30.00m to 35.00m
Depth 35.00m to 40.00m
Depth 40.00m to 45.00m
Depth 45.00m to 50.00m
6.11
Sand filling in wells as per drawings
and Technical Specifications Clause
1209. Cum
/mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations-
copy-150715041925-lva1-app6892-reupload.doc6
6.12
Plain Cement Concrete/ Reinforced
Cement Concrete for substructure
complete excluding reinforcement as
per drawings and Technical
Specifications Sections 1500, 1700 and
2200.
M-35 grade Cum
6.13
Providing and laying Reinforced
Cement Concrete in superstructure
complete excluding reinforcement as
per drawings and Technical
Specifications Section 1500, 1700 and
2300
M-35 RCC Slab Cum
M-35 RCC Beam
M-45 RCC Slab
M-45 RCC Beam
M-50 RCC Beam
M-50 RCC Slab
6.14
Prestressed cement concrete in
superstructure complete excluding
reinforcement as per drawings and
Technical Specifications Sections 1500,
1700, 1800 and 2300.
M - 50 PSC Girder Cum
M - 45 PSC Girder / T Beam /
Slab Cum
M - 50 T Beam / Slab Cum
M - 45 PSC Box Cum
M - 35 PSC Box Cum
6.15
Supplying and placing in position void
formers complete as per drawing and
Additional Technical Specifications
Clause A2
500 mm dia Lm
650 mm dia
6.16
Providing & fixing in position
thermomechanically treated (TMT) Fe
500 grade reinforcement bars in
foundations, substructures,
superstructure etc. complete as per
drawings and Technical Specifications
Section 1600 or as directed by Engineer. T
/mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations-
copy-150715041925-lva1-app6892-reupload.doc7
6.16
(b)
Providing Structural Steel for Girder
Confirming to IS:2063 T
6.17
Providing high tensile steel strands
including all accessories for stressing
and jacking operations and grouting etc.
complete as per drawings and Technical
Specifications Section - 1800.
T
6.18
Providing and laying in position 65mm
thick wearing course consisting of
50mm thick asphalitic concerete laid in
two layers of 25mm each over 15mm
thick mastic asphalt as per drawings and
Technical Specifications Section 500
Sqm
6.19
Providing and fixing drainage spouts as
per drawings and Technical
Specifications Clause 2705. Nr.
6.20
Supplying and fixing of bearings
complete as per drawings and Technical
Specifications Section 2000.
Elastomeric Bearings
Cucm
1
5
0
Tar Paper Bearing Sqm
POT cum PTFE bearings
a) Free Sliding POT Cum PTFE Nr.
120 T capacity vertical
130 T capacity vertical
144 T capacity vertical
200 T capacity vertical
203 T capacity vertical
225 T capacity vertical
170 T capacity vertical
192 T capacity vertical
240 T capacity vertical
242 T capacity vertical
380 T capacity vertical
430 T capacity vertical
b) Guided Sliding POT Cum PTFE Nr.
/mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations-
copy-150715041925-lva1-app6892-reupload.doc8
130 T Vertical
131 T Vertical
137 T Vertical
144 T Vertical
168 T Vertical
170 T Vertical
186 T Vertical
192 T Vertical
203T Vertical
204 T Vertical
225 T Vertical
240 T Vertical
242 T Vertical
275 T Vertical
430 T capacity vertical
c) POT Fixed Bearing
130 T Vertical Nr.
131 T Vertical
137 T Vertical
168 T Vertical
186 T Vertical
200 T Vertical
204 T Vertical
d) Metalic Guided
38 T capacity horizontal
80 T capacity horizontal
e) Pin Bearing
38 T capacity horizontal
160 T capacity horizontal
220 T capacity horizontal
6.21
Supplying and fixing of expansion
joints complete as per drawings and
Technical Specifications Section 2600.
Filler Type Lm
i) 40mm Strip seal type Lm
ii) 50mm Strip seal type Lm.
ii) 75mm Strip seal type Lm.
/mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations-
copy-150715041925-lva1-app6892-reupload.doc9
6.22
Reinforced Cement Concrete crash
barrier complete excluding
reinforcement as per drawings and
Technical Specifications Sections 1500,
1600, 1700, 2200 and Clause 2703 and
809.
M-40 Grade
Cum
6.23
Reinforced Cement Concrete railing
complete including reinforcement as per
drawings and Technical Speciffications
Section 1500, 1600, 1700 and 2700
M-30 Grade
Lm
6.24
Reinforced Cement Concrete in
approach slabs including reinforcement
complete as per drawings and Technical
Specifications Sections 1500, 1600,
1700 and Clause 2704.
M-30 grade Cum
6.25
Providing boulder apron complete as
per drawings and Technical
Specifications Section 2500. Cum
6.26
Providing and laying filter material
underneath stone boulder pitching on
slopes complete as per drawings and
Technical Specifications Section 2500.
Cum
6.27
Providing and laying stone boulder
pitching on slops complete as per
drawings and Technical Specification
Section 2500
Cum
6.28
Providing cement concrete flooring M-
15 for bed protection complete as per
drawings and Technical Specifications
Section 2500
M-15 Grade Cum
6.29
Providing cement concrete flooring M-
20 for bed protection complete as per
drawings and Technical Specifications
Section 2500
/mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations-
copy-150715041925-lva1-app6892-reupload.doc10
M-20 Grade Cum
6.30
Providing weep holes in abutments,
wing walls, retaining walls, return walls
etc. complete as per drawings and
Technical Specifications Clause 2706.
Nr.
6.31
Carry out confirmatory bores upto
required depths at each foundation
location of bridge complete in all
respects including testing as per
Technical Specifications Section of the
results as per IRC : 78-1981.
For Abutment Lm
Depth 0 to 10.00 m
Depth 10 - 20.00 m
Depth 20 - 30 m
Depth 30 - 40 m
Depth 40 - 50 m
Depth 50 - 60 m
6.32
Painting of Bridge no. and span
arrangement as per IRC 7: 1971
drawings and direction of the Engineer. Nr.
6.33
Providing and painting of flood gauge
on substructure in full height and 500
mm width as per the directions of the
Engineer. Lm
6.34
Carrying out initial Load tests both
Vertical and lateral on bored piles
including cost of installation, RCC
grade M-35 boring arranging
knetledge / anchor piles and all testing
equipments, accessories etc, complete
excluding reinforcement as per
drawings
Nr.
/mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations-
copy-150715041925-lva1-app6892-reupload.doc11
6.35
Providing exposed concrete surfaces of
the Bridge as per Specification with
approved protecting paint, compristing
of acrylic elastomeric coating system as
per IRC SP - 80.
Sqm
Repair and Rehabitation
#
#
#
#
#
#
#
#
#
#
#
#
1.0
General cleaning, removal of debris and
vegetable growth from and around the
bridge structure as per Technical
Specifications Clause 201
m2
2.0
Restoration of slopes and repairs of
stone pitching around abutments
complete and as per directions of the
Engineer & Technical Specification
Clause 2500
m3
3.0
Providing stone garlanding with wire
crated boulders around piers
m3
4.0
Repair of damaged concrete due to
spalling , honey combing, scaling,
leaching and exposed reinforcement by
epoxy concrete/epoxy injection in
superstructure as per Technical
specification section 2800 along with
bonding coat between new & old
concrete.
m3
5.0
Cleaning of substructure / superstructure
surface by sandblasting and applying
protective paint on all exposed honey
combed surfaces as per direction of the
Engineer.
m2
(a) On concrete surface m2
6.0
Cleaning exposed reinforcement by
sand blasting and treating with anti
corrossive paint.
m2
7.0
Cleaning steel bearings by sand blasting
and treating with anti corrossive paint.
No.
/mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations-
copy-150715041925-lva1-app6892-reupload.doc12
8.0
Providing 65 mm thick AC wearing
coat alongwith providing profile
corrective course as per Technical
specifications
m2
9.0 Provide and fixing m
a.RCC handrails on existing road kerbs
as replacement of broken
railing/panels/parapets after required
repair and modification of kerb m
10.0
Modification of existing drainage spouts
OR providing new drainage spouts as
per Technical specification section
2700.
No.
a.Cleaning of Drainage Spout
11.0
Cleaning of Expansion gap for bridges
and providing filler material in the same
No.
12.0
Providing Strip seal expansion joint as
per Technical Specification.
m
13.0
Providing missing strip seal for Strip
seal expansion joint as per Technical
Specification.
m
14.0
Repair to damaged concrete in
abutmets, piers and wing walls etc.
No.
15.0
Providing Bridge Number Plate as per
Technical Specification.
No.
/mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations-
copy-150715041925-lva1-app6892-reupload.doc13
B. Estimate of Typical Bridges and Automation-
It is not easy task to reach a suitable automation ,but to reduce the time of
estimate,Here some typical estimate is prepared with excel
formulae(Automation technique) and categorised the bridges as under:-
1.Box cell structure Bridges (Ex-1,NH-73,80+683)
2.Open Foundation with Solid slab (Ex-2,NH-73,81+750)
3.Open Foundation with RCC Girder(Ex-3,NH-47,531.62)
4.Open foundation with Psc girder(Ex-4,NH-47,494.915)
5.Open foundation with PSC voided slab(Ex-5,NH-47,505.545)
6.Open foundation with RCC voided slab(Ex-5,NH-47,526.56)
7.Well foundation with RCC girder(Ex-6,NH-47,505.545)
8.Well Foundation with PSC girder(Ex-7,NH-47,480.115)
9.Well foundation with voided slab(Ex-8,NH-47,18+159)
10.Well foundation with steel Girder(Ex-9,NH-47,480.115)
11.Pile foundation with RCC/PSC girder(Ex-10,
12.pile foundation with PSC girder(Ex-11,NH-73,78/886)
13.Pile foundation with voided slab(Ex-12,NH-47,480.410)
14.Pile foundation with steel girder(Ex-13,NH-47,534+090)
15.Underpasses ,BOX(Ex-14,NH-173,179/285)
16.cattle underpass,Box(Ex-15,NH-173,179/285)
17.Pedestarian Underpass(Ex-16,NH-173,179/285)
18.ROB(with pile foundation)-(Ex-17,NH-73,88+690)
19.Flyover with pile foundation(Ex-18,NH-73,168+977)
20.Elevated Highway with pile(Ex-19,NH-47,468.87 to 470.560)
On the basis of this typical estimate,it is convenient to
estimate the all types of bridges Except(cable stayed),which is not included
in this typical estimate.
/mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations-
copy-150715041925-lva1-app6892-reupload.doc14
C. Methodology for estimate-
i)Each item have formulae.
ii)Fill the actual data as per drawing in Number,Length,Breadth and
Height.
iii)Result of all calculation with automatically reached.
Some separate sheet is also attached for particular structure such as:-
a. well curb/well
b. PSC/RCC Box Girder
c. PSC/RCC voided slab.
d. steel girder.
/mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations-
copy-150715041925-lva1-app6892-reupload.doc15
D.Standard grade of concrete/steel for various structure-
Grade of concrete generally based on the design of the structure,but
normally following grade of concrete is used for the following structure.-
1.Foundation-
a.Levelling -M-15
b.Foundation -M-35
2.Piles(bored in situ) M-35
3.Pile Cap M-35
4.Well Curb M-35
5.Well Steining M-35
6.Bottam/intermediate plug M-25
7.Substructure M-35
8.Super structure M-35
9.Crash barrier M-30
10.Bed protection M-15,M-20
Normally TMT Bar is used in concrete work and Fe-
500 is used for steel structure.
/mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations-
copy-150715041925-lva1-app6892-reupload.doc16
E. NORMS FOR CONSUMPTION ON OF STEEL IN kg/m3
OF CONCRETE-
particular As per
design
1st
study
Upto
zone-3
2nd
study
Upto
zone-3
3rd
study
Upto
zone-3
4th
study
Upto
zone
-5
Recom
For
Upto
zone-3
Recom.
Zone
4,5and
Snow
load
Present
practice
1.Super structure
i)Rcc solid slab 125 122 130 130 145 130
ii)Rcc voided slab 180 190 200 180 200 130
iii)Rcc T-beam slab 180 162 180 180 200 130
iv)RccBox 225 180 200 130
v)Psc voided slab 162/137 133/130 170/140 140 160/135 180/35 130/35
vi)psc T-beam slab 150/30 155/35 160/35 155/37 160/35 180/35 130/35
vii)Psc box/girder>40 146/28 155/35 160/49 155/55 180 160/50 160/50 130/40
2.Pier & pier cap
i)Wall type 65 80 194 80 100 90
ii)Circular/square 170 185 200 180 220 90
3.Abutment and wing
wall
i)wall type 130 130 190 130 190 90
4.Foundation
i)Open 60 80 100 90
ii)pile foundation 100 60/70 80 100 80
iii)pile cap 50 115 120 150 130
5.Well foundation –
pier/abutment
i)curb 90 92 90 90 75
ii)steining 30 37 30 50 30
iii)cap 100 170 110 185 120
6.Misc
Crash barrier
170 170 110 185 120
RE wall 100
Cutting edge(kg/m) 100 91 100 100 -
7.Box(underpas/subway)
/mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations-
copy-150715041925-lva1-app6892-reupload.doc17
Rate-
Generally rate should be calculated by standard data book,someitem market rate should also
be taken.
Standard data sheet is attached .
Methodology-
Fill the basic rate ,software is ready to calculate the all item .
Abstract of cost-
The cost of some project generally taken for east,west,south anr north for early and rough
calculation.Sheet is attached.
Summary and Findings-
To collection of all above data estimation of Bridge will become easy and convenient to the
new estimator to utilise this typical example and suitable excel software.major problem at the
time of estimation that suitable item should be forgotten.Above details will make easy to
estimate any type of bridges in proper manner and systematically.It will also reduce the
time.maximum output may be achieved to utilise this details and automation Techniques.
/mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations-
copy-150715041925-lva1-app6892-reupload.doc18

More Related Content

What's hot

Industrial training report of construction of the residential building
Industrial training report of construction of the residential buildingIndustrial training report of construction of the residential building
Industrial training report of construction of the residential buildingsuraj jha
 
Rigid pavement distress
Rigid pavement distress Rigid pavement distress
Rigid pavement distress Ankit Sarkar
 
Software training report on AutoCAD and Staad Pro. Civil Engineering
Software training report on AutoCAD and Staad Pro. Civil EngineeringSoftware training report on AutoCAD and Staad Pro. Civil Engineering
Software training report on AutoCAD and Staad Pro. Civil EngineeringJAPJEETSINGH13
 
Rail and Road Over Rail Bridge
Rail and Road Over Rail BridgeRail and Road Over Rail Bridge
Rail and Road Over Rail BridgeKorutla Harish
 
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORTROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORTssuser5fea8f
 
Training Report on Bridge Construction
Training Report on Bridge ConstructionTraining Report on Bridge Construction
Training Report on Bridge ConstructionMAHAVIR MEENA
 
Expansion joints in bridge
Expansion joints in bridgeExpansion joints in bridge
Expansion joints in bridgeDivya Vishnoi
 
Types of pavement construction procedure
Types of pavement construction procedureTypes of pavement construction procedure
Types of pavement construction procedureBhavik A Shah
 
HIGH FLOOD LEVEL BRIDGE CONSTRUCTION
HIGH FLOOD LEVEL BRIDGE CONSTRUCTIONHIGH FLOOD LEVEL BRIDGE CONSTRUCTION
HIGH FLOOD LEVEL BRIDGE CONSTRUCTIONTEJPRAKASH KUMAWAT
 
Different types of rail failures
Different types of rail failuresDifferent types of rail failures
Different types of rail failuresSunil Kumar Meena
 
PPT On Bridge Construction
PPT On Bridge ConstructionPPT On Bridge Construction
PPT On Bridge ConstructionRobin Nirwal
 
Reinforced Cement Concrete and Bar Bending Schedule
Reinforced Cement Concrete and Bar Bending ScheduleReinforced Cement Concrete and Bar Bending Schedule
Reinforced Cement Concrete and Bar Bending ScheduleKailash Chander
 
Training project report NHAI by Amit Kumar
Training project report NHAI by Amit KumarTraining project report NHAI by Amit Kumar
Training project report NHAI by Amit KumarAmitKumar7069
 
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTSatyam Anand
 
Construction of a New Railway Track
Construction of a New  Railway TrackConstruction of a New  Railway Track
Construction of a New Railway TrackArbaz Kazi
 
PAVEMENT DESIGN (Group 9)
PAVEMENT DESIGN (Group 9)PAVEMENT DESIGN (Group 9)
PAVEMENT DESIGN (Group 9)eddie fonte
 
Training report - RCC Bridge
Training report - RCC BridgeTraining report - RCC Bridge
Training report - RCC BridgePRASUNMANI
 

What's hot (20)

Industrial training report of construction of the residential building
Industrial training report of construction of the residential buildingIndustrial training report of construction of the residential building
Industrial training report of construction of the residential building
 
Bearings in bridges
Bearings in bridgesBearings in bridges
Bearings in bridges
 
Rigid pavement distress
Rigid pavement distress Rigid pavement distress
Rigid pavement distress
 
Software training report on AutoCAD and Staad Pro. Civil Engineering
Software training report on AutoCAD and Staad Pro. Civil EngineeringSoftware training report on AutoCAD and Staad Pro. Civil Engineering
Software training report on AutoCAD and Staad Pro. Civil Engineering
 
Rail and Road Over Rail Bridge
Rail and Road Over Rail BridgeRail and Road Over Rail Bridge
Rail and Road Over Rail Bridge
 
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORTROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
 
Training Report on Bridge Construction
Training Report on Bridge ConstructionTraining Report on Bridge Construction
Training Report on Bridge Construction
 
Failures in rigid pavement
Failures in rigid pavementFailures in rigid pavement
Failures in rigid pavement
 
Box culvert
Box culvertBox culvert
Box culvert
 
Expansion joints in bridge
Expansion joints in bridgeExpansion joints in bridge
Expansion joints in bridge
 
Types of pavement construction procedure
Types of pavement construction procedureTypes of pavement construction procedure
Types of pavement construction procedure
 
HIGH FLOOD LEVEL BRIDGE CONSTRUCTION
HIGH FLOOD LEVEL BRIDGE CONSTRUCTIONHIGH FLOOD LEVEL BRIDGE CONSTRUCTION
HIGH FLOOD LEVEL BRIDGE CONSTRUCTION
 
Different types of rail failures
Different types of rail failuresDifferent types of rail failures
Different types of rail failures
 
PPT On Bridge Construction
PPT On Bridge ConstructionPPT On Bridge Construction
PPT On Bridge Construction
 
Reinforced Cement Concrete and Bar Bending Schedule
Reinforced Cement Concrete and Bar Bending ScheduleReinforced Cement Concrete and Bar Bending Schedule
Reinforced Cement Concrete and Bar Bending Schedule
 
Training project report NHAI by Amit Kumar
Training project report NHAI by Amit KumarTraining project report NHAI by Amit Kumar
Training project report NHAI by Amit Kumar
 
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
 
Construction of a New Railway Track
Construction of a New  Railway TrackConstruction of a New  Railway Track
Construction of a New Railway Track
 
PAVEMENT DESIGN (Group 9)
PAVEMENT DESIGN (Group 9)PAVEMENT DESIGN (Group 9)
PAVEMENT DESIGN (Group 9)
 
Training report - RCC Bridge
Training report - RCC BridgeTraining report - RCC Bridge
Training report - RCC Bridge
 

Similar to Estimation of bridges and automations copy

PDR Presentation
PDR PresentationPDR Presentation
PDR PresentationNate Pham
 
Presentation on track works
Presentation on track  worksPresentation on track  works
Presentation on track worksVijay Raj
 
Appendix 8.1 - Station Pier Formwork Drawings
Appendix 8.1 - Station Pier Formwork DrawingsAppendix 8.1 - Station Pier Formwork Drawings
Appendix 8.1 - Station Pier Formwork Drawingsimteyaz ali
 
Brief Study about Prestressed Steel Concrete Composite Girder
Brief Study about Prestressed Steel Concrete Composite GirderBrief Study about Prestressed Steel Concrete Composite Girder
Brief Study about Prestressed Steel Concrete Composite GirderRohit kumar Mittal
 
Irs concrete bridge code
Irs concrete bridge codeIrs concrete bridge code
Irs concrete bridge codeAjay Kumar
 
Design of Elevated Viaduct.pptx
Design of Elevated Viaduct.pptxDesign of Elevated Viaduct.pptx
Design of Elevated Viaduct.pptxAman Khandelwal
 
Retaining Structure Design, Professional Engineering Report
Retaining Structure Design, Professional Engineering ReportRetaining Structure Design, Professional Engineering Report
Retaining Structure Design, Professional Engineering ReportJoshua Yu
 
IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...
IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...
IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...IRJET Journal
 
CE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptxCE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptxSaketChandra4
 
Photovoltaic Training - Session 2 - Construction and Start-Up
Photovoltaic Training - Session 2 - Construction and Start-UpPhotovoltaic Training - Session 2 - Construction and Start-Up
Photovoltaic Training - Session 2 - Construction and Start-UpLeonardo ENERGY
 
Ananth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_SampleAnanth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_SampleAnanth K.Samy
 
Sean Mason CV 2016
Sean Mason  CV  2016Sean Mason  CV  2016
Sean Mason CV 2016Sean Mason
 
Fabrication Gate Valve ckb presentation
Fabrication Gate Valve ckb presentationFabrication Gate Valve ckb presentation
Fabrication Gate Valve ckb presentationckbgroup
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0C
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0CSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0C
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0CSunit Dhingra
 

Similar to Estimation of bridges and automations copy (20)

SOR DWS 2010
SOR DWS 2010SOR DWS 2010
SOR DWS 2010
 
Training PPT
Training PPTTraining PPT
Training PPT
 
PDR Presentation
PDR PresentationPDR Presentation
PDR Presentation
 
Presentation on track works
Presentation on track  worksPresentation on track  works
Presentation on track works
 
Appendix 8.1 - Station Pier Formwork Drawings
Appendix 8.1 - Station Pier Formwork DrawingsAppendix 8.1 - Station Pier Formwork Drawings
Appendix 8.1 - Station Pier Formwork Drawings
 
Brief Study about Prestressed Steel Concrete Composite Girder
Brief Study about Prestressed Steel Concrete Composite GirderBrief Study about Prestressed Steel Concrete Composite Girder
Brief Study about Prestressed Steel Concrete Composite Girder
 
Munger ganga bridge
Munger ganga bridgeMunger ganga bridge
Munger ganga bridge
 
RMS BTD List.pdf
RMS BTD List.pdfRMS BTD List.pdf
RMS BTD List.pdf
 
200832154 brosur-spun-pile-wika-2011
200832154 brosur-spun-pile-wika-2011200832154 brosur-spun-pile-wika-2011
200832154 brosur-spun-pile-wika-2011
 
Irs concrete bridge code
Irs concrete bridge codeIrs concrete bridge code
Irs concrete bridge code
 
Design of Elevated Viaduct.pptx
Design of Elevated Viaduct.pptxDesign of Elevated Viaduct.pptx
Design of Elevated Viaduct.pptx
 
Listado aci
Listado aciListado aci
Listado aci
 
Retaining Structure Design, Professional Engineering Report
Retaining Structure Design, Professional Engineering ReportRetaining Structure Design, Professional Engineering Report
Retaining Structure Design, Professional Engineering Report
 
IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...
IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...
IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...
 
CE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptxCE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptx
 
Photovoltaic Training - Session 2 - Construction and Start-Up
Photovoltaic Training - Session 2 - Construction and Start-UpPhotovoltaic Training - Session 2 - Construction and Start-Up
Photovoltaic Training - Session 2 - Construction and Start-Up
 
Ananth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_SampleAnanth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_Sample
 
Sean Mason CV 2016
Sean Mason  CV  2016Sean Mason  CV  2016
Sean Mason CV 2016
 
Fabrication Gate Valve ckb presentation
Fabrication Gate Valve ckb presentationFabrication Gate Valve ckb presentation
Fabrication Gate Valve ckb presentation
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0C
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0CSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0C
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0C
 

More from kjanand

Final planning for plastic road by kjanand
Final planning for plastic road by kjanand   Final planning for plastic road by kjanand
Final planning for plastic road by kjanand kjanand
 
Plastic road by kjanand
Plastic road by kjanand Plastic road by kjanand
Plastic road by kjanand kjanand
 
Acchedin_Muslim women
Acchedin_Muslim womenAcchedin_Muslim women
Acchedin_Muslim womenkjanand
 
Model of new reservation system
Model of new reservation systemModel of new reservation system
Model of new reservation systemkjanand
 
Effective ways to improve quality & control population
Effective ways to improve quality & control populationEffective ways to improve quality & control population
Effective ways to improve quality & control populationkjanand
 
Ayodhya issue ram temple
Ayodhya issue ram templeAyodhya issue ram temple
Ayodhya issue ram templekjanand
 
New year 2016
New year 2016New year 2016
New year 2016kjanand
 
Gst bill 2015
Gst bill 2015Gst bill 2015
Gst bill 2015kjanand
 
Public issue
Public issuePublic issue
Public issuekjanand
 
Requirement of People
Requirement of PeopleRequirement of People
Requirement of Peoplekjanand
 
Abolish cash black money in 3 days
Abolish cash black money in 3 daysAbolish cash black money in 3 days
Abolish cash black money in 3 dayskjanand
 
Decide tractor required or ox
Decide tractor required or oxDecide tractor required or ox
Decide tractor required or oxkjanand
 
A way of achhe din
A way of achhe dinA way of achhe din
A way of achhe dinkjanand
 
(A way of achhe din)profession of education,engineering,medical should be val...
(A way of achhe din)profession of education,engineering,medical should be val...(A way of achhe din)profession of education,engineering,medical should be val...
(A way of achhe din)profession of education,engineering,medical should be val...kjanand
 
Qap ,checklist and responsibility
Qap ,checklist and responsibilityQap ,checklist and responsibility
Qap ,checklist and responsibilitykjanand
 
Ten things
Ten thingsTen things
Ten thingskjanand
 
Bridges.basic
Bridges.basicBridges.basic
Bridges.basickjanand
 
Land bill must be such as
Land bill must be such asLand bill must be such as
Land bill must be such askjanand
 
Smart city a valuable journey final
Smart city a valuable journey  finalSmart city a valuable journey  final
Smart city a valuable journey finalkjanand
 
Strategy & Approach
 Strategy & Approach  Strategy & Approach
Strategy & Approach kjanand
 

More from kjanand (20)

Final planning for plastic road by kjanand
Final planning for plastic road by kjanand   Final planning for plastic road by kjanand
Final planning for plastic road by kjanand
 
Plastic road by kjanand
Plastic road by kjanand Plastic road by kjanand
Plastic road by kjanand
 
Acchedin_Muslim women
Acchedin_Muslim womenAcchedin_Muslim women
Acchedin_Muslim women
 
Model of new reservation system
Model of new reservation systemModel of new reservation system
Model of new reservation system
 
Effective ways to improve quality & control population
Effective ways to improve quality & control populationEffective ways to improve quality & control population
Effective ways to improve quality & control population
 
Ayodhya issue ram temple
Ayodhya issue ram templeAyodhya issue ram temple
Ayodhya issue ram temple
 
New year 2016
New year 2016New year 2016
New year 2016
 
Gst bill 2015
Gst bill 2015Gst bill 2015
Gst bill 2015
 
Public issue
Public issuePublic issue
Public issue
 
Requirement of People
Requirement of PeopleRequirement of People
Requirement of People
 
Abolish cash black money in 3 days
Abolish cash black money in 3 daysAbolish cash black money in 3 days
Abolish cash black money in 3 days
 
Decide tractor required or ox
Decide tractor required or oxDecide tractor required or ox
Decide tractor required or ox
 
A way of achhe din
A way of achhe dinA way of achhe din
A way of achhe din
 
(A way of achhe din)profession of education,engineering,medical should be val...
(A way of achhe din)profession of education,engineering,medical should be val...(A way of achhe din)profession of education,engineering,medical should be val...
(A way of achhe din)profession of education,engineering,medical should be val...
 
Qap ,checklist and responsibility
Qap ,checklist and responsibilityQap ,checklist and responsibility
Qap ,checklist and responsibility
 
Ten things
Ten thingsTen things
Ten things
 
Bridges.basic
Bridges.basicBridges.basic
Bridges.basic
 
Land bill must be such as
Land bill must be such asLand bill must be such as
Land bill must be such as
 
Smart city a valuable journey final
Smart city a valuable journey  finalSmart city a valuable journey  final
Smart city a valuable journey final
 
Strategy & Approach
 Strategy & Approach  Strategy & Approach
Strategy & Approach
 

Recently uploaded

办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一Fi L
 
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Narsimha murthy
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVAAnastasiya Kudinova
 
306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social MediaD SSS
 
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)jennyeacort
 
Kindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpKindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpmainac1
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Sitegalleryaagency
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case StudySophia Viganò
 
Call Girls Bapu Nagar 7397865700 Ridhima Hire Me Full Night
Call Girls Bapu Nagar 7397865700 Ridhima Hire Me Full NightCall Girls Bapu Nagar 7397865700 Ridhima Hire Me Full Night
Call Girls Bapu Nagar 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`dajasot375
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一Fi L
 
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai DouxDubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Douxkojalkojal131
 
Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdfvaibhavkanaujia
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryWilliamVickery6
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsCharles Obaleagbon
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝soniya singh
 

Recently uploaded (20)

办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
 
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
 
306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media
 
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
 
Kindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpKindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUp
 
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Site
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case Study
 
Call Girls Bapu Nagar 7397865700 Ridhima Hire Me Full Night
Call Girls Bapu Nagar 7397865700 Ridhima Hire Me Full NightCall Girls Bapu Nagar 7397865700 Ridhima Hire Me Full Night
Call Girls Bapu Nagar 7397865700 Ridhima Hire Me Full Night
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
 
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai DouxDubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
 
Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdf
 
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonCheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William Vickery
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past Questions
 
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
 

Estimation of bridges and automations copy

  • 1. ESTIMATION OF BRIDGES AND AUTOMATION BY Er. K.J.Anand, AMIE, MBA, Consultant Kjanand2001@rediffmail.com A VALUABLE JOURNEY Contact-9204783656 /mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations- copy-150715041925-lva1-app6892-reupload.doc1
  • 2. INDEX Sr. No Chapter Page no Introduction 2 A. Item Involved In Estimation 4 B. Estimate of Typical Bridge and Automation 14 C. Methodology for Estimate 15 D. Standard grade of concrete /steel for varios structure 16 E. Norms for Consumption of steel in kg/m3 of concrete 17 /mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations- copy-150715041925-lva1-app6892-reupload.doc2
  • 3. 1. INTRODUCTION Estimation of bridges is very important to find out the cost.Estimation of Bridges is not only simple airthmatic calculation,but it needs concentrated idea,imagination and also it involves trigonometrical calculations. Estimation is varying on the basis of foundation. commanly used foundation in india is as under. I) Open foundation II) Well foundation III) Pile Foundatio Estimation is also vary on the basis of superstructure.Commonly used super structure in india is as under- I) Solid slab II) RCC T-beam girder III) RCC Girder IV) PSC Girder V) Voided Girder/slab VI) Steel Girder VII) Cable stay /mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations- copy-150715041925-lva1-app6892-reupload.doc3
  • 4. A. ITEMS INVOLVED IN ESTIMATION Various items involved to estimate the bridges is attached here with except cable stayed bridges. Commonoly Involved item is as under- -lane divided Carriageway from - to - (Pkg. -I: km- to km -) of VR/ODR/MDR/SH/NH-- in the State of – ABSTRACT (Commonly used Item) Item No. Description Unit Total Quantity Rat e Amount BRIDGES / UNDERPASSES / ROB'S 6.01 Earthwork in excavation of foundations for structures complete as per drawings and Technical Specifications Clause 304 including all leads and lifts. Cum (b) Providing and laying sand filling below structure as per drawings and Technical Specification Section Cum 6.02 Back filling behind abutments, wing walls and return walls with selected imported granular material of approved quality, complete including all leads and lifts as per drawings and Technical Specifications Clause 305. Cum 6.03 Providing filter media behind abutments, wing walls & return walls with well packed material to specified thickness with smaller size towards the soil and bigger size towards the wall complete with all leads and lifts as per drawings and Technical Specifi Cum 6.04 Providing and laying plain cement concrete, leveling course under the bridge structure etc. including centering and shuttering all complete but excluding reinforcement as per drawings and Technical Specification Sections 1500, 1700 and 2100 (i) M-15 Grade in Levelling Course Cum /mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations- copy-150715041925-lva1-app6892-reupload.doc4
  • 5. 6.05 Providing and laying Reinforced Cement Concrete in Foundation complete excluding Reinforcement as per Drawing and Technical Specification Section 2100 M-35 Foundation Cum 6.06 Providing Bored cast-in-situ vertical piles excluding steel reinforcement and initial and routine tests complete as per drawings and Technical Specification Section 1100 and 1700 M-35 Grade concrete (1200mm dia) Lm. 6.07 Providing Reinforced cement concrete in pile caps excluding steel reinforcement complete as per drawings and Technical Specification Section 1100, 1500 and 1700 M -35 Grade Cum 6.08 Supplying , fabricating and fixing in position mild steel cutting edge with MS anchoraches including welding, splicing and making provisions for the fixing of reinforcements of well curb as per approved drawing and Technical Specification Section 1200 and T 6.09 Cement concrete for plain concrete/ Reinforced cement concrete complete excluding reinforcement as per drawing and Technical Specification Clauses 1200,1500 and 1700. i) Well curb Cum M-35 Grade ii) Well steining Cum M-35 Grade iii) Well Cap Cum M-35 Grade iv) Intermediate plug Cum M-25 Grade /mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations- copy-150715041925-lva1-app6892-reupload.doc5
  • 6. v) Bottom plug Cum M-25 Grade 6.10 Sinking of wells through all types of soils (other than pneumatic method of sinking) complete as per drawing and Technical Specifications Clause 1200. 7.00 m dia well LM. Depth upto 3.00m Depth 3.00m to 10.00m Depth 10.00m to 15.00m Depth 15.00m to 20.00m Depth 20.00m to 25.00m Depth 25.00m to 30.00m Depth 30.00m to 35.00m 8.00 m dia well Lm. Depth upto 3.00m Depth 3.00m to 10.00m Depth 10.00m to 15.00m Depth 15.00m to 20.00m Depth 20.00m to 25.00m Depth 25.00m to 30.00m Depth 30.00m to 35.00m 9.0 m dia well Lm Depth upto 3.00m Depth 3.00m to 10.00m Depth 10.00m to 15.00m Depth 15.00m to 20.00m Depth 20.00m to 25.00m Depth 25.00m to 30.00m Depth 30.00m to 35.00m Depth 35.00m to 40.00m Depth 40.00m to 45.00m Depth 45.00m to 50.00m 6.11 Sand filling in wells as per drawings and Technical Specifications Clause 1209. Cum /mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations- copy-150715041925-lva1-app6892-reupload.doc6
  • 7. 6.12 Plain Cement Concrete/ Reinforced Cement Concrete for substructure complete excluding reinforcement as per drawings and Technical Specifications Sections 1500, 1700 and 2200. M-35 grade Cum 6.13 Providing and laying Reinforced Cement Concrete in superstructure complete excluding reinforcement as per drawings and Technical Specifications Section 1500, 1700 and 2300 M-35 RCC Slab Cum M-35 RCC Beam M-45 RCC Slab M-45 RCC Beam M-50 RCC Beam M-50 RCC Slab 6.14 Prestressed cement concrete in superstructure complete excluding reinforcement as per drawings and Technical Specifications Sections 1500, 1700, 1800 and 2300. M - 50 PSC Girder Cum M - 45 PSC Girder / T Beam / Slab Cum M - 50 T Beam / Slab Cum M - 45 PSC Box Cum M - 35 PSC Box Cum 6.15 Supplying and placing in position void formers complete as per drawing and Additional Technical Specifications Clause A2 500 mm dia Lm 650 mm dia 6.16 Providing & fixing in position thermomechanically treated (TMT) Fe 500 grade reinforcement bars in foundations, substructures, superstructure etc. complete as per drawings and Technical Specifications Section 1600 or as directed by Engineer. T /mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations- copy-150715041925-lva1-app6892-reupload.doc7
  • 8. 6.16 (b) Providing Structural Steel for Girder Confirming to IS:2063 T 6.17 Providing high tensile steel strands including all accessories for stressing and jacking operations and grouting etc. complete as per drawings and Technical Specifications Section - 1800. T 6.18 Providing and laying in position 65mm thick wearing course consisting of 50mm thick asphalitic concerete laid in two layers of 25mm each over 15mm thick mastic asphalt as per drawings and Technical Specifications Section 500 Sqm 6.19 Providing and fixing drainage spouts as per drawings and Technical Specifications Clause 2705. Nr. 6.20 Supplying and fixing of bearings complete as per drawings and Technical Specifications Section 2000. Elastomeric Bearings Cucm 1 5 0 Tar Paper Bearing Sqm POT cum PTFE bearings a) Free Sliding POT Cum PTFE Nr. 120 T capacity vertical 130 T capacity vertical 144 T capacity vertical 200 T capacity vertical 203 T capacity vertical 225 T capacity vertical 170 T capacity vertical 192 T capacity vertical 240 T capacity vertical 242 T capacity vertical 380 T capacity vertical 430 T capacity vertical b) Guided Sliding POT Cum PTFE Nr. /mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations- copy-150715041925-lva1-app6892-reupload.doc8
  • 9. 130 T Vertical 131 T Vertical 137 T Vertical 144 T Vertical 168 T Vertical 170 T Vertical 186 T Vertical 192 T Vertical 203T Vertical 204 T Vertical 225 T Vertical 240 T Vertical 242 T Vertical 275 T Vertical 430 T capacity vertical c) POT Fixed Bearing 130 T Vertical Nr. 131 T Vertical 137 T Vertical 168 T Vertical 186 T Vertical 200 T Vertical 204 T Vertical d) Metalic Guided 38 T capacity horizontal 80 T capacity horizontal e) Pin Bearing 38 T capacity horizontal 160 T capacity horizontal 220 T capacity horizontal 6.21 Supplying and fixing of expansion joints complete as per drawings and Technical Specifications Section 2600. Filler Type Lm i) 40mm Strip seal type Lm ii) 50mm Strip seal type Lm. ii) 75mm Strip seal type Lm. /mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations- copy-150715041925-lva1-app6892-reupload.doc9
  • 10. 6.22 Reinforced Cement Concrete crash barrier complete excluding reinforcement as per drawings and Technical Specifications Sections 1500, 1600, 1700, 2200 and Clause 2703 and 809. M-40 Grade Cum 6.23 Reinforced Cement Concrete railing complete including reinforcement as per drawings and Technical Speciffications Section 1500, 1600, 1700 and 2700 M-30 Grade Lm 6.24 Reinforced Cement Concrete in approach slabs including reinforcement complete as per drawings and Technical Specifications Sections 1500, 1600, 1700 and Clause 2704. M-30 grade Cum 6.25 Providing boulder apron complete as per drawings and Technical Specifications Section 2500. Cum 6.26 Providing and laying filter material underneath stone boulder pitching on slopes complete as per drawings and Technical Specifications Section 2500. Cum 6.27 Providing and laying stone boulder pitching on slops complete as per drawings and Technical Specification Section 2500 Cum 6.28 Providing cement concrete flooring M- 15 for bed protection complete as per drawings and Technical Specifications Section 2500 M-15 Grade Cum 6.29 Providing cement concrete flooring M- 20 for bed protection complete as per drawings and Technical Specifications Section 2500 /mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations- copy-150715041925-lva1-app6892-reupload.doc10
  • 11. M-20 Grade Cum 6.30 Providing weep holes in abutments, wing walls, retaining walls, return walls etc. complete as per drawings and Technical Specifications Clause 2706. Nr. 6.31 Carry out confirmatory bores upto required depths at each foundation location of bridge complete in all respects including testing as per Technical Specifications Section of the results as per IRC : 78-1981. For Abutment Lm Depth 0 to 10.00 m Depth 10 - 20.00 m Depth 20 - 30 m Depth 30 - 40 m Depth 40 - 50 m Depth 50 - 60 m 6.32 Painting of Bridge no. and span arrangement as per IRC 7: 1971 drawings and direction of the Engineer. Nr. 6.33 Providing and painting of flood gauge on substructure in full height and 500 mm width as per the directions of the Engineer. Lm 6.34 Carrying out initial Load tests both Vertical and lateral on bored piles including cost of installation, RCC grade M-35 boring arranging knetledge / anchor piles and all testing equipments, accessories etc, complete excluding reinforcement as per drawings Nr. /mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations- copy-150715041925-lva1-app6892-reupload.doc11
  • 12. 6.35 Providing exposed concrete surfaces of the Bridge as per Specification with approved protecting paint, compristing of acrylic elastomeric coating system as per IRC SP - 80. Sqm Repair and Rehabitation # # # # # # # # # # # # 1.0 General cleaning, removal of debris and vegetable growth from and around the bridge structure as per Technical Specifications Clause 201 m2 2.0 Restoration of slopes and repairs of stone pitching around abutments complete and as per directions of the Engineer & Technical Specification Clause 2500 m3 3.0 Providing stone garlanding with wire crated boulders around piers m3 4.0 Repair of damaged concrete due to spalling , honey combing, scaling, leaching and exposed reinforcement by epoxy concrete/epoxy injection in superstructure as per Technical specification section 2800 along with bonding coat between new & old concrete. m3 5.0 Cleaning of substructure / superstructure surface by sandblasting and applying protective paint on all exposed honey combed surfaces as per direction of the Engineer. m2 (a) On concrete surface m2 6.0 Cleaning exposed reinforcement by sand blasting and treating with anti corrossive paint. m2 7.0 Cleaning steel bearings by sand blasting and treating with anti corrossive paint. No. /mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations- copy-150715041925-lva1-app6892-reupload.doc12
  • 13. 8.0 Providing 65 mm thick AC wearing coat alongwith providing profile corrective course as per Technical specifications m2 9.0 Provide and fixing m a.RCC handrails on existing road kerbs as replacement of broken railing/panels/parapets after required repair and modification of kerb m 10.0 Modification of existing drainage spouts OR providing new drainage spouts as per Technical specification section 2700. No. a.Cleaning of Drainage Spout 11.0 Cleaning of Expansion gap for bridges and providing filler material in the same No. 12.0 Providing Strip seal expansion joint as per Technical Specification. m 13.0 Providing missing strip seal for Strip seal expansion joint as per Technical Specification. m 14.0 Repair to damaged concrete in abutmets, piers and wing walls etc. No. 15.0 Providing Bridge Number Plate as per Technical Specification. No. /mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations- copy-150715041925-lva1-app6892-reupload.doc13
  • 14. B. Estimate of Typical Bridges and Automation- It is not easy task to reach a suitable automation ,but to reduce the time of estimate,Here some typical estimate is prepared with excel formulae(Automation technique) and categorised the bridges as under:- 1.Box cell structure Bridges (Ex-1,NH-73,80+683) 2.Open Foundation with Solid slab (Ex-2,NH-73,81+750) 3.Open Foundation with RCC Girder(Ex-3,NH-47,531.62) 4.Open foundation with Psc girder(Ex-4,NH-47,494.915) 5.Open foundation with PSC voided slab(Ex-5,NH-47,505.545) 6.Open foundation with RCC voided slab(Ex-5,NH-47,526.56) 7.Well foundation with RCC girder(Ex-6,NH-47,505.545) 8.Well Foundation with PSC girder(Ex-7,NH-47,480.115) 9.Well foundation with voided slab(Ex-8,NH-47,18+159) 10.Well foundation with steel Girder(Ex-9,NH-47,480.115) 11.Pile foundation with RCC/PSC girder(Ex-10, 12.pile foundation with PSC girder(Ex-11,NH-73,78/886) 13.Pile foundation with voided slab(Ex-12,NH-47,480.410) 14.Pile foundation with steel girder(Ex-13,NH-47,534+090) 15.Underpasses ,BOX(Ex-14,NH-173,179/285) 16.cattle underpass,Box(Ex-15,NH-173,179/285) 17.Pedestarian Underpass(Ex-16,NH-173,179/285) 18.ROB(with pile foundation)-(Ex-17,NH-73,88+690) 19.Flyover with pile foundation(Ex-18,NH-73,168+977) 20.Elevated Highway with pile(Ex-19,NH-47,468.87 to 470.560) On the basis of this typical estimate,it is convenient to estimate the all types of bridges Except(cable stayed),which is not included in this typical estimate. /mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations- copy-150715041925-lva1-app6892-reupload.doc14
  • 15. C. Methodology for estimate- i)Each item have formulae. ii)Fill the actual data as per drawing in Number,Length,Breadth and Height. iii)Result of all calculation with automatically reached. Some separate sheet is also attached for particular structure such as:- a. well curb/well b. PSC/RCC Box Girder c. PSC/RCC voided slab. d. steel girder. /mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations- copy-150715041925-lva1-app6892-reupload.doc15
  • 16. D.Standard grade of concrete/steel for various structure- Grade of concrete generally based on the design of the structure,but normally following grade of concrete is used for the following structure.- 1.Foundation- a.Levelling -M-15 b.Foundation -M-35 2.Piles(bored in situ) M-35 3.Pile Cap M-35 4.Well Curb M-35 5.Well Steining M-35 6.Bottam/intermediate plug M-25 7.Substructure M-35 8.Super structure M-35 9.Crash barrier M-30 10.Bed protection M-15,M-20 Normally TMT Bar is used in concrete work and Fe- 500 is used for steel structure. /mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations- copy-150715041925-lva1-app6892-reupload.doc16
  • 17. E. NORMS FOR CONSUMPTION ON OF STEEL IN kg/m3 OF CONCRETE- particular As per design 1st study Upto zone-3 2nd study Upto zone-3 3rd study Upto zone-3 4th study Upto zone -5 Recom For Upto zone-3 Recom. Zone 4,5and Snow load Present practice 1.Super structure i)Rcc solid slab 125 122 130 130 145 130 ii)Rcc voided slab 180 190 200 180 200 130 iii)Rcc T-beam slab 180 162 180 180 200 130 iv)RccBox 225 180 200 130 v)Psc voided slab 162/137 133/130 170/140 140 160/135 180/35 130/35 vi)psc T-beam slab 150/30 155/35 160/35 155/37 160/35 180/35 130/35 vii)Psc box/girder>40 146/28 155/35 160/49 155/55 180 160/50 160/50 130/40 2.Pier & pier cap i)Wall type 65 80 194 80 100 90 ii)Circular/square 170 185 200 180 220 90 3.Abutment and wing wall i)wall type 130 130 190 130 190 90 4.Foundation i)Open 60 80 100 90 ii)pile foundation 100 60/70 80 100 80 iii)pile cap 50 115 120 150 130 5.Well foundation – pier/abutment i)curb 90 92 90 90 75 ii)steining 30 37 30 50 30 iii)cap 100 170 110 185 120 6.Misc Crash barrier 170 170 110 185 120 RE wall 100 Cutting edge(kg/m) 100 91 100 100 - 7.Box(underpas/subway) /mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations- copy-150715041925-lva1-app6892-reupload.doc17
  • 18. Rate- Generally rate should be calculated by standard data book,someitem market rate should also be taken. Standard data sheet is attached . Methodology- Fill the basic rate ,software is ready to calculate the all item . Abstract of cost- The cost of some project generally taken for east,west,south anr north for early and rough calculation.Sheet is attached. Summary and Findings- To collection of all above data estimation of Bridge will become easy and convenient to the new estimator to utilise this typical example and suitable excel software.major problem at the time of estimation that suitable item should be forgotten.Above details will make easy to estimate any type of bridges in proper manner and systematically.It will also reduce the time.maximum output may be achieved to utilise this details and automation Techniques. /mnt/temp/unoconv/20150715043605_8d40c7ca38057cc61b2d87919539931f76468739/estimationofbridgesandautomations- copy-150715041925-lva1-app6892-reupload.doc18