Topic –
Types of Pavement construction
procedure
SUBJECT- Highway Construction and Management : TE506
FACULTY GUIDE- Prof. Pinakin N. Patel
PREPARED BY:-
Bhavik A. Shah
Abhishek R. Shah
Bhavesh N. Parmar
Ravindra S. Lodh
CIVIL ENGG. DEPARTMENT
BIRLA VISHVAKARMA MAHAVIDYALAYA ENGG. COLLEGE
VALLABH VIDYANAGAR-388120
M.TECH - TRANSPORTATION ENGINEERING
(17TS809)
(17TS810)
(17TS811)
(17TS812)
Table Of Contents
ī‚´ Construction of continuously reinforced
ī‚´ Prestressed Pavement
ī‚´ Steel Fibre Reinforced (SFRC) Pavements
ī‚´ IRC, MOST, ACI specifications
ī‚´ Ferro cement
ī‚´ Ferro-fibro-Crete Pavement
ī‚´ Overlay construction
Construction Of Continuously Reinforced
ī‚´ Continuously reinforced concrete pavements (CRCP) is a type of concrete
pavement that does not require any transverse contraction joints.
ī‚´ Transverse cracks are expected in the slab, usually at intervals of 1.5 - 6 ft (0.5 - 1.8
m).
ī‚´ CRCP designs generally cost more than JPCP or JRCP designs initially due to
increased quantities of steel.
ī‚´ CRCP utilizes reinforcing steel to effectively eliminate transverse joints in favour of
very tightly maintained cracks.
ī‚´ Once CRCP roads are constructed they need not to be taken care of for the next
50-60 years.
ī‚´ The performance of continuously reinforced concrete pavement (CRCP)
constructed in 1995 that utilized recycled concrete aggregate (RCA) as both coarse
and fine aggregates.
CRCP Characteristics
ī‚´ No joints
ī‚´ Steel reinforcement bars
ī‚´ Numerous transverse cracks
ī‚´ History
ī‚´ First used in 1921
ī‚´ Experimental sections in the 1940’s
ī‚´ More than 28,000 miles in the USA
Why Continuously Reinforced Concrete
Pavements?
ī‚´ Smoothness
ī‚´ Low maintenance costs
ī‚´ No transverse joints
ī‚´ Thinner slab thickness relative to jointed concrete pavement
ī‚´ Long Life
CRCP Cross-Section
Aggregate Sub base Asphalt Concrete Base
Two-Layer SteelSingle Layer Steel
ī‚´
Longitudinal Steel Placement Concrete Placement
Soff-Cut “Joints”
CRCP Failure
ī‚´ Deterioration of transverse cracks (Spalling)
ī‚´ Punchouts
Performance Factors
ī‚´ Crack spacing
ī‚´ Crack width
ī‚´ Construction Time
ī‚´ Temperature / humidity / curing
ī‚´ Thermal contraction
ī‚´ Concrete materials
ī‚´ Cement content, aggregates, proportions
ī‚´ Drying shrinkage
Construction Issues
ī‚´ Concrete mix design
ī‚´ Concrete shrinkage
ī‚´ Lower zero stress temperature!
ī‚´ Mix temperature (water, aggregates)
ī‚´ Mix proportions (max. size aggregate)
ī‚´ Curing
ī‚´ Minimize climatic effects
ī‚´ Solar radiation, wind, evaporation
ī‚´ Base temperature (asphalt concrete)
Conclusion of CRCP
ī‚´ Compared to flexible pavement, CRCP gives additional design
life of at least 10 years.
ī‚´ The demerit of CRCP is its high initial cost & difficulty in
repair works required to be done if not constructed properly.
ī‚´ Joint less concrete pavement, CRCP offers excellent smooth
Riding surface for the vehicles that maximizes the comfort for
the passengers.
Prestressed Pavement
ī‚´ The pre application of a compressive stress to the concrete
greatly reduces the tensile stresses caused by traffic and thus
decrease the thickness of concrete required.
ī‚´ Has less probability of cracking and fewer transverse joints
and therefore results in less maintenance and longer
pavement life.
ī‚´ Used more frequently for airport pavements than for highway
pavements because the saving of thickness for airport
pavements is much greater than for highways.
PCP
Advantages of Prestressed Pavements
ī‚´ In conventional reinforced concrete pavements, permissible stresses for
both steel and concrete are limited to only a fraction of what would be
reasonable for either material by itself. Even with low steel stresses,
concrete cracks in tension zone due to shrinkage and load, before the
steel can develop its tensile force.
ī‚´ In prestressed concrete pavements, this incompatibility of the two
materials is overcome by stretching the steel to a high stress while it is
free to move independently of the concrete and then transferring this
force to the concrete by bond or end anchorage. The only limit of stretch
is the ultimate strength of each material, and the entire concrete section is
made available to resist the load.
ī‚´ The prestress gives the section a higher shear strength.
CONTâ€Ļ.
ī‚´ The number of joints is reduced, and this will contribute to savings in the
cost of joints, reduction in pumping, improvement in riding quality, and
lesser possibility of water entering the subgrade from the surface.
ī‚´ Since prestressed concrete pavements are thinner in section, there will be
savings in the cost of materials, and consequent reduction in transport
cost of materials. Prestressed concrete pavements have greater flexibility,
and therefore, adapt themselves to the uneven conditions of the subgrade
without causing any damage.
ī‚´ Due to thin sections, the stresses due to temperature gradient are not
appreciable.
CONTâ€Ļ
ī‚´ Due to its reduced self-weight and improved carrying capacity, it can be
used over poor subgrades.
ī‚´ The tensile strength of concrete is increased by the amount of prestress.
ī‚´ Prestressed slabs are especially suited for airport pavements. since long.
smooth, jointless slabs facilitate the take-off and landing of modern jet
planes.
ī‚´ In addition, the problem arising out of the materials in the joints getting
damaged due to the hot blast from present-day aircraft will be alleviated
to a great extent.
Some Drawbacks of PCP
ī‚´ The difficulty of repairing services beneath the slab, since if a trench is cut
across the Prestressed slab the whole of the prestressing in the vicinity of
the trench is lost; this is a matter of particular importance in the case of
urban roads.
ī‚´ The construction of the prestressed slabs require expert supervision by
experienced personnel
ī‚´ It poses certain constructional difficulties at bends and curves.
Steel Fibre Reinforced (SFRC) Pavements
ī‚´ Steel Fibre Reinforced Concrete (SFRC) is concrete containing dispersed
steel fibres.
ī‚´ The most significant influence of the incorporation of steel fibres in
concrete is to delay and control the tensile cracking of the composite
material. Concrete is a brittle material that will not carry loads under pure
bending when cracked.
ī‚´ By incorporating steel fibres the mechanical properties of the concrete is
changed resulting in significant load carrying capacity after the concrete
has cracked (Chen, 2004).
Steel Fibres
ī‚´ The typical diameter lies in the range of 0.25-0.75 mm hook end steel
fibres are being used in this project. Length of these fibres is 30 mm and
the aspect ratio of 55. Density of steel fibre is 7900 kg/cum.
Properties Improved by of STEEL FIBRES
ī‚´ Flexural Strength: Flexural bending strength can be increased of up to 3
times more compared to conventional concrete.
ī‚´ Fatigue Resistance: Almost 1 1/2 times increase in fatigue strength.
ī‚´ Impact Resistance: Greater resistance to damage in case of a heavy
impact.
ī‚´ Permeability: The material is less porous.
ī‚´ Abrasion Resistance: More effective composition against abrasion and
spalling.
ī‚´ Shrinkage: Shrinkage cracks can be eliminated.
ī‚´ Corrosion: Corrosion may affect the material but it will be limited in
certain areas
Properties of SRFC
ī‚´ The post-cracking strength of SFRC can be attributed to the crack controlling
mechanism provided by steel fibres. The steel fibres across the crack transmit some
of the tensile stresses across the crack while steel fibres at the tip of the crack resist
the growth of these cracks.
ī‚´ The ability of the steel fibres to resist crack propagation is primarily dependent on
the bond between the concrete and the fibres as well as the fibre distribution
(spacing and orientation).
Advantages of SFRC
ī‚´ Fast and perfect mixable fibres and High performance and
crack resistance
ī‚´ Optimize costs with lower fibre dosages
ī‚´ Steel fibres reinforced concrete against impact forces, thereby
improving the toughness characteristics of hardened
concrete.
Drawbacks of SRFC
ī‚´ Great reduction in workability.
ī‚´ High Cost of Material.
ī‚´ Generally they do not increase the flexural strength of concrete, and so cannot
replace the moment resisting reinforcement.
Specifications
ī‚´ WHAT IS SPECIFICATION??
ī‚´ A detailed description of the design and materials used to make
something.
ī‚´ A specification is often a type of technical standard.
ī‚´ WHY??
ī‚´ Specifications are a means of ensuring equipment and installation
compliance with governing standards such as IRC, ASTM, ACI, FAA, and
AASTHO to name just a few.
Specifications for construction procedure
of pavements.
ī‚´ IRC – Indian Road Congress
ī‚´ ACI – American Concrete Institute
ī‚´ MORTH – Ministry of Road Transport and Highways
IRC
ī‚´ IRC 015 - Standard Specifications and Code of Practice for Construction of
Concrete Roads (Fourth Revision)
ī‚´ IRC 043 - Recommended Practice for Tools, Equipment and Appliances for
Concrete Pavement Construction
ī‚´ IRC 063 - Tentative Guidelines for the Use of Low Grade Aggregates and Soil
Aggregates Mixtures in Road Pavement Construction
ī‚´ IRC 072 - Recommended Practice for Use and Upkeep of Equipment, Tools
and Appliances for Bituminous Pavement Construction
ī‚´ IRC 088 - Recommended Practice for Lime Flyash Stabilised Soil Base/Sub-
Base in Pavement Construction
ī‚´ IRC SP 046 - Guidelines for Design and Construction of Fibre Reinforced
Concrete for Pavements (First Revision)
ī‚´ IRC SP 062 - Guidelines for the Design and Construction of Cement Concrete Pavement
for Low Volume Roads (First Revision)
IRC – 015
CONSTRUCTION Of RCC Pavement
ī‚´ Fully Mechanised Construction
ī‚´ The batching plant shall include minimum four bins, weighing hoppers, and scales
for the fine aggregate and for each size of coarse aggregate. If cement is used in
bulk, a separate scale for cement shall be included. The weighing hoppers shall be
properly sealed and vented to preclude dust during operation. Approved safety
devices shall be provided and maintained for the protection of all personnel
engaged in plant operation, inspection and testing. The batch plant shall be
equipped with a suitable non-resettable batch counter which will correctly indicate
the number of batches proportioned
CONTâ€Ļ
ī‚´ Batching by weight only is recommended. However, if batching by volume is
permitted, as a special case, separate measuring boxes shall be provided for the
different aggregates. The boxes shall be of strong construction provided with
handles for convenient lifting and loading into the mixer. They shall be of such size
that it should be possible to measure out the requisite quantity and capable of
being lifted by two men.
ī‚´ Each box shall be provided with a straight edge of required length for striking off
after filling. If so directed by the Engineer, improved facilities, such as, tipping
boxes of accurate capacity working on run-out rails arranged for direct delivery
into the hopper of the mixer shall be provided by the construction agency. In
volume batching, suitable allowance shall be made for the bulking of fine
aggregate due to the presence of water. For this purpose, the bulking shall be
determined as per relevant Indian Standard Specification.
Mixers
ī‚´ Mixers shall fre pan type, reversible type with single or twin shaft or any other mixer
capable of combining the aggregates, cement, water and admixtures into a thoroughly
mixed and uniform mass within the specific mixing period, and of discharging the
mixture, without segregation. In twin shaft mixer, mixing time is normally very low
(about 6 cubic materials may be mixed in 20-30 seconds). Facility i.e hydrometers for
the measurement of the density of the admixtures shall be available at site.
ī‚´ Each stationary mixer shall be equipped with an approved timing device which will
automatically lock the discharge lever when the drum has been charged and release it
at the end of the mixing period. The device shall be equipped with a bell or other
suitable warning device adjusted to give a clearly audible signal each time the lock is
released. In case of failure of the timing device, the mixer may be used for the balance
of the day while it is being repaired, provided that each batch is mixed for 90 seconds or
as per the manufacturer's recommendation. The mixer shall be equipped with a suitable
non-resettable batch counter which shall correctly indicate the number of batches
mixed.
Placing of concrete
ī‚´ Concrete mixed in central mixing plant shall be transported to the site without
delay and the concrete which has been mixed too long before laying will be
rejected and shall be removed from the site.
ī‚´ The total time taken from the addition of the water to the mix, until the completion
of the surface finishing and texturing shall not exceed 120 minutes when concrete
temperature is less than 25°C and 1 00 minutes when the concrete temperature is
between 25°C to 30°C. Trucks/Tippers delivering concrete shall not run directly on
plastic sheet nor shall they run on completed slabs until after 28 days of placing of
concrete.
Construction by slip form paver
ī‚´ The slip form paving train shall consist of power machine which spreads, compacts
and finishes the concrete in a continuous operation. The slip form paving machine
shall compact the concrete by internal vibration and shape it between the side
forms with either a conforming plate or by vibrating and oscillating finishing
beams.
ī‚´ The concrete shall be deposited without segregation in front of slip form paver
across the whole width and to a height which at all times is in excess of the
required surcharge. The deposited concrete shall be struck off to the necessary
average and differential surcharge by means of the strike off plate or a screw auger
device extending across the whole width of the slab. The equipment for striking off
the concrete shall be capable of being rapidly adjusted for changes of the average
and differential surcharge necessitated by change in slab thickness or cross fall.
Other Process
ī‚´ Texturing
ī‚´ Curing
ī‚´ Also Clause for Semi-Mechanised and Labour-Oriented
Construction Technique
ī‚´ Quality Control.
ACI
ī‚´ ACI defines an ACI reference specification as a standardized mandatory-language
document prescribing materials, dimensions, and workmanship, incorporated by
reference in Contract Documents, with information in the Mandatory Requirements
Checklist required to be provided in the Project Specification.
ī‚´ A reference specification provides most of the detailed construction requirements
that the Architect/Engineer (A/E) must convey to the Contractor.
ī‚´ Specifications related to Concrete
Ferro - Cement
ī‚´ Ferro cement is a form of reinforced concrete using
closely spaced multiple layers of mesh and/or small
diameter rods completely infiltrated with, or encapsulated
inmotor.
Typical Cross Section Of Ferro cement
Materials Used In Ferro Cement
ī‚´Cement mortar mix
ī‚´Skeleton steel
ī‚´Steel mesh reinforcement or Fibre-reinforced
polymeric meshes
Properties Of Ferro Cement
ī‚´ It is a very durable, cheap and versatile material.
ī‚´ Low w/c ratio produces an impermeable structures
ī‚´ less shrinkage, and low weight.
ī‚´ high tensile strength and stiffness
ī‚´ better impact and punching shear resistance
ī‚´ undergo large deformations before cracking or high
deflections
Process Of Ferro-cement Construction
ī‚´Fabricating the skeletal framing system
ī‚´Applying rods and meshes
ī‚´Plastering
ī‚´Curing
Cost Effectiveness
ī‚´ Depends on type economic system and applications.
ī‚´ Relative cost of labour.
ī‚´ Doesn’t need heavy plant or machinery.
ī‚´ Low cost construction materials are used.
Applications
ī‚´ Floors And Roofs
ī‚´ Waterproofing
ī‚´ Transport System
ī‚´ Agriculture Structures
ī‚´ Fire resistant structures
ī‚´ Soil stabilization
ī‚´ Man hole covers
ī‚´ Wall cupboards
ī‚´ pipes
Advantages Of Ferro-Cement:
ī‚´ 20% savings on materials and cost
ī‚´ Suitability for pre-casting
ī‚´ Flexibility in cutting, drilling and jointing
ī‚´ Very appropriate for developing countries, labor intensive
ī‚´ Good impermeability
ī‚´ Fabricated into any desired shape.
ī‚´ Ease of construction, low weight andlong lifetime.
ī‚´ Better resistance against earthquake.
Disadvantages of Ferro-Cement:
ī‚´ Corrosion of the reinforcing materials dueto the incomplete coverage of metal by
mortar.
ī‚´ It is difficult to fasten to Ferro-cement with bolts, screws, welding and nail etc.
ī‚´ Large no of labors required.
ī‚´ Cost of semi-skilled and unskilled labors is high.
ī‚´ Tying rods and mesh together is especially tedious and time consuming.
ī‚´ Low ductility
ī‚´ Susceptibility to stress rupture failure
ī‚´ It can be punctured by collision with pointed objects.
Ferro-fibro-Crete Pavement
ī‚´ The concept of ferro-fibrocrete is best illustrated by reference to a beam (Figure 1).
The higher tensile strength and superior crack control properties of ferro-fibrocrete
(consisting of Ferro cement strengthened with mesh, regular reinforcing bars, and
random fibres) are most advantageously used in the bottom-most fibres of the
beam. Hence it is logical to provide a thin ferro-fibrocrete ribbon to serve as the
tension flange.
ī‚´ Taking advantage of the ferro-fibrocrete in the tension flange, with its higher
tension strength and superior crack-control quality, the prestressing force to be
used can be considerably reduced.
Potential Applications of
Ferro-Fibrocrete
ī‚´ Prestressed ferro-fibrocrete beams conforming to class 2 and class 3
groups.
ī‚´ Water-retaining structures wherein ferro-fibrocrete will chiefly be in hoop-
tension.
ī‚´ Hybrid structures such as long-span thin hanging ribbons of ferro-
fibrocrete in which the structure acts as a beam-cable and is subjected to
both tension and bending
Types of Overlays and Their Functions
ī‚´ Purposes of Overlay:
ī‚´ To correct surface deficiencies, such as:
ī‚´To improve skid resistance
ī‚´To enhance appearance
ī‚´To reduce surface roughness
ī‚´To improve surface drainage
ī‚´To retard climate-related deterioration (such as hardening of asphalt
surface)
ī‚´ To improve structural capacity.
Types of Overlay
ī‚´ Asphalt overlays on asphalt pavement
ī‚´ Asphalt overlays on PCC pavement
ī‚´ Porous asphalt friction course on PCC pavement
ī‚´ Unbonded PCC overlay on PCC pavement
ī‚´ Partially bonded PCC overlay on PCC pavement
ī‚´ Bonded PCC overlay on PCC pavement
ī‚´ Unbonded PCC overlay on asphalt pavement
ī‚´ Bonded PCC overlay on asphalt pavement
Asphalt overlays on asphalt pavement
ī‚´ Advantages:
ī‚´ To add load carrying capacity.
ī‚´ To remove deteriorated surface (if milling is done before overlay.)
ī‚´ Disadvantages:
ī‚´ If overlay is put on cracked pavement without milling, reflective
cracking will occur.
ī‚´ If the problem is due to inadequate mixture (e.g. rutting due to an
inadequate mixture), overlaying with the same mixture will not solve
the problem.
Asphalt overlays on PCC pavement
ī‚´ Advantages:
ī‚´ Less expensive than concrete overlay.
ī‚´ Disadvantages:
ī‚´ Reflective cracking from joints and existing cracks in concrete
pavement will occur.
Care Taken While Overlaying
ī‚´ Rutting on an existing asphalt pavement to be overlaid. Pavement needs
to be adequately milled to remove ruts before overlay.
CONTâ€Ļ
ī‚´ Severe alligator cracking on existing asphalt pavement.
ī‚´ The cracked layer needs to be milled off before overlay to prevent
reflective cracking.
CONTâ€Ļ
ī‚´ Low-temperature cracking on existing pavement. Pavement may not need
any repair before overlay.
CONTâ€Ļ
ī‚´ Milling of asphalt pavement surface before overlay.
Partially bonded PCC overlay on PCC
pavement
ī‚´ Advantages:
ī‚´ Better structural capacity as compared with the unbonded PCC overlay.
ī‚´ Disadvantages:
ī‚´ If the existing PCC pavement had load transfer problem at the joint, the
overlay will try to carry the full load across the joint to the adjacent slab. Since
these overlays are relatively thin and not designed to take the full load, it will
cause the partially bonded overlay to crack.
ī‚´ Existing pavement needs to be repaired to eliminate all cracks before overlay.
Bonded PCC overlay on PCC pavement
ī‚´ Advantages:.
ī‚´ Better structural capacity as compared with unbonded or partially
bonded PCC overlay.
ī‚´ Disadvantages:
ī‚´ Existing PCC pavement needs to be repaired to eliminate all cracks
before overlay.
ī‚´ Not suitable if there are problems with joint load transfer in the
existing PCC pavement
Unbonded PCC overlay on asphalt pavement
ī‚´ Advantages:
ī‚´ PCC is stronger than asphalt concrete to resist rutting or cracking due
to high pressures from tires.
ī‚´ Disadvantages:
ī‚´ Thick overlay is needed. The required overlay thickness is about the
same as that for a new concrete pavement.
Bonded PCC Overlay on Asphalt Pavement
ī‚´ Advantages:
ī‚´ Thinner overlay can be used, compared with unbonded PCC overlay.
ī‚´ PCC is stronger than AC to resist high pressures from tires.
ī‚´ Disadvantages:
ī‚´ The existing asphalt pavement needs to be uncracked.
ī‚´ The PCC needs to be well bonded to the asphalt concrete for the
composite pavement to be effective.
Cracked concrete slab needs to be repaired before
bonded or partially bonded PCC overlay
Cracked concrete slab corner needs to be repaired
before bonded or partially bonded PCC overlay.
Cost of overlay as a function of % area patched
before overlay
Steps in Design of Overlays
ī‚´ Measurement and estimation of the strength of the existing pavement
ī‚´ Design life of overlaid pavement
ī‚´ Estimation of the traffic to be carried by the overlaid pavement
ī‚´ Determination of the thickness and the type of overlay
References
ī‚´ IRC 015 - STANDARD SPECIFICATIONS AND CODE OF PRACTICE FOR
CONSTRUCTION OF CONCRETE ROADS.
ī‚´ STEEL FIBRE REINFORCED CONCRETE FOR ROAD PAVEMENT
APPLICATIONS by W A ELSAIGH, E P KEARSLEY and J M ROBBERTS -
University of Pretoria
ī‚´ Prestressed concrete pavements, by S. C. Goyal and Shri Prakash - Indian
Concrete Journal, Vol. 42, No.9, Sept. 1968
ī‚´ https://www.slideshare.net/amoldpawar9/session-ii-pavements
THANK YOU For Bearing.
Bhavik A. Shah (17TS809)
Abhishek R. Shah (17TS810)
Bhavesh N. Parmar (17TS811)
Ravindra S. Lodh (17TS812)

More Related Content

What's hot

Principles and design concepts of reinforced soil walls
Principles and design concepts of reinforced soil wallsPrinciples and design concepts of reinforced soil walls
Principles and design concepts of reinforced soil wallsPrakash Ravindran
 
Dense Bituminous macadam
Dense Bituminous macadamDense Bituminous macadam
Dense Bituminous macadampradip dangar
 
Pavement design
Pavement designPavement design
Pavement designGarvit Goyal
 
Soil stabilisation
Soil stabilisation Soil stabilisation
Soil stabilisation pradip dangar
 
Pavements PPT
 Pavements PPT  Pavements PPT
Pavements PPT Amol Pawar
 
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESHPRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESHImrul Quesh
 
BITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROADBITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROADkumawat123
 
distress of concrete
distress of concretedistress of concrete
distress of concretekamariya keyur
 
Flexible pavement presentation
Flexible pavement presentationFlexible pavement presentation
Flexible pavement presentationPawan Kumar
 
Reinforced Earth Wall RE wall
Reinforced Earth Wall RE wallReinforced Earth Wall RE wall
Reinforced Earth Wall RE wallAmir nazir paray
 
Group index method
Group index methodGroup index method
Group index methodUsama Aslam
 
Reinforced earth walls
Reinforced earth wallsReinforced earth walls
Reinforced earth wallsRaju Sabarish
 
Design of flexible pavement
Design of flexible pavementDesign of flexible pavement
Design of flexible pavementBhavik A Shah
 
Bituminous road construction
Bituminous road constructionBituminous road construction
Bituminous road constructionAnitha Jacob
 
Ground improvement technique
Ground improvement techniqueGround improvement technique
Ground improvement techniqueSatish Kambaliya
 
Reinforced earth & its application
Reinforced earth & its applicationReinforced earth & its application
Reinforced earth & its applicationBudarapu Venkat Pranay
 

What's hot (20)

Principles and design concepts of reinforced soil walls
Principles and design concepts of reinforced soil wallsPrinciples and design concepts of reinforced soil walls
Principles and design concepts of reinforced soil walls
 
Pavement
PavementPavement
Pavement
 
Dense Bituminous macadam
Dense Bituminous macadamDense Bituminous macadam
Dense Bituminous macadam
 
Pavement design
Pavement designPavement design
Pavement design
 
Soil stabilisation
Soil stabilisation Soil stabilisation
Soil stabilisation
 
Pavement
PavementPavement
Pavement
 
Pavements PPT
 Pavements PPT  Pavements PPT
Pavements PPT
 
Well foundation
Well foundationWell foundation
Well foundation
 
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESHPRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
 
BITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROADBITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROAD
 
distress of concrete
distress of concretedistress of concrete
distress of concrete
 
Flexible pavement presentation
Flexible pavement presentationFlexible pavement presentation
Flexible pavement presentation
 
Reinforced Earth Wall RE wall
Reinforced Earth Wall RE wallReinforced Earth Wall RE wall
Reinforced Earth Wall RE wall
 
Group index method
Group index methodGroup index method
Group index method
 
Reinforced earth walls
Reinforced earth wallsReinforced earth walls
Reinforced earth walls
 
Design of flexible pavement
Design of flexible pavementDesign of flexible pavement
Design of flexible pavement
 
Bituminous road construction
Bituminous road constructionBituminous road construction
Bituminous road construction
 
Ground improvement technique
Ground improvement techniqueGround improvement technique
Ground improvement technique
 
Pdce
PdcePdce
Pdce
 
Reinforced earth & its application
Reinforced earth & its applicationReinforced earth & its application
Reinforced earth & its application
 

Similar to Types of pavement construction procedure

Continuously reinforced concrete pavement seminar ppt by chandramohan lodha
Continuously reinforced concrete pavement seminar ppt by chandramohan lodhaContinuously reinforced concrete pavement seminar ppt by chandramohan lodha
Continuously reinforced concrete pavement seminar ppt by chandramohan lodhaChandra Mohan Lodha
 
Steel fibre reinforced_concrete
Steel fibre reinforced_concreteSteel fibre reinforced_concrete
Steel fibre reinforced_concretesiddharth sid
 
Composite material
Composite materialComposite material
Composite materialsnookala
 
Experimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabExperimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabIRJET Journal
 
Composite construction by Er. SURESH RAO
Composite construction by Er. SURESH RAOComposite construction by Er. SURESH RAO
Composite construction by Er. SURESH RAOAjit Sabnis
 
Ferrocement beams and columns with x shaped shear reinforcement and stirrups
Ferrocement beams and columns with x shaped shear reinforcement and stirrupsFerrocement beams and columns with x shaped shear reinforcement and stirrups
Ferrocement beams and columns with x shaped shear reinforcement and stirrupsIAEME Publication
 
Ceramic coating and frp coating on pavement reinforcement
Ceramic coating and frp coating on pavement reinforcementCeramic coating and frp coating on pavement reinforcement
Ceramic coating and frp coating on pavement reinforcementDhrubajyoti Majumdar
 
Pt slab design philosophy with slides and pictures showing benefit
Pt slab design philosophy  with slides and pictures showing benefitPt slab design philosophy  with slides and pictures showing benefit
Pt slab design philosophy with slides and pictures showing benefitPerwez Ahmad
 
Analysis and Design of PSC post te girder
Analysis and Design of PSC post te girderAnalysis and Design of PSC post te girder
Analysis and Design of PSC post te girderJesikaLalwani
 
Analysis and Design of Post tensioned girder
Analysis and Design of Post tensioned girderAnalysis and Design of Post tensioned girder
Analysis and Design of Post tensioned girderJesikaLalwani
 
compositestructure31-38.pdf
compositestructure31-38.pdfcompositestructure31-38.pdf
compositestructure31-38.pdfPrakashM970621
 
Steel fibers vs steel mesh in concrete reinforcement
Steel fibers vs steel mesh in concrete reinforcementSteel fibers vs steel mesh in concrete reinforcement
Steel fibers vs steel mesh in concrete reinforcementBekaert
 
A Review Study on Effect of Steel Fibre and Marble Dust with Strength of Pave...
A Review Study on Effect of Steel Fibre and Marble Dust with Strength of Pave...A Review Study on Effect of Steel Fibre and Marble Dust with Strength of Pave...
A Review Study on Effect of Steel Fibre and Marble Dust with Strength of Pave...ijtsrd
 
To investigate combined influence of steel fiber and silicafume on high stren...
To investigate combined influence of steel fiber and silicafume on high stren...To investigate combined influence of steel fiber and silicafume on high stren...
To investigate combined influence of steel fiber and silicafume on high stren...IAEME Publication
 
TO INVESTIGATE COMBINED INFLUENCE OF STEEL FIBER AND SILICAFUME ON HIGH STREN...
TO INVESTIGATE COMBINED INFLUENCE OF STEEL FIBER AND SILICAFUME ON HIGH STREN...TO INVESTIGATE COMBINED INFLUENCE OF STEEL FIBER AND SILICAFUME ON HIGH STREN...
TO INVESTIGATE COMBINED INFLUENCE OF STEEL FIBER AND SILICAFUME ON HIGH STREN...IAEME Publication
 
Reinforcement concrete and properties of matrial
Reinforcement concrete and properties of matrial Reinforcement concrete and properties of matrial
Reinforcement concrete and properties of matrial VIKAS4210607
 
Experimental investigation on effect of shear connector in light weight concrete
Experimental investigation on effect of shear connector in light weight concreteExperimental investigation on effect of shear connector in light weight concrete
Experimental investigation on effect of shear connector in light weight concreteIAEME Publication
 

Similar to Types of pavement construction procedure (20)

Continuously reinforced concrete pavement seminar ppt by chandramohan lodha
Continuously reinforced concrete pavement seminar ppt by chandramohan lodhaContinuously reinforced concrete pavement seminar ppt by chandramohan lodha
Continuously reinforced concrete pavement seminar ppt by chandramohan lodha
 
Steel fibre reinforced_concrete
Steel fibre reinforced_concreteSteel fibre reinforced_concrete
Steel fibre reinforced_concrete
 
Composite material
Composite materialComposite material
Composite material
 
Experimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabExperimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor Slab
 
Composite construction by Er. SURESH RAO
Composite construction by Er. SURESH RAOComposite construction by Er. SURESH RAO
Composite construction by Er. SURESH RAO
 
Ferrocement beams and columns with x shaped shear reinforcement and stirrups
Ferrocement beams and columns with x shaped shear reinforcement and stirrupsFerrocement beams and columns with x shaped shear reinforcement and stirrups
Ferrocement beams and columns with x shaped shear reinforcement and stirrups
 
Ceramic coating and frp coating on pavement reinforcement
Ceramic coating and frp coating on pavement reinforcementCeramic coating and frp coating on pavement reinforcement
Ceramic coating and frp coating on pavement reinforcement
 
Pt slab design philosophy with slides and pictures showing benefit
Pt slab design philosophy  with slides and pictures showing benefitPt slab design philosophy  with slides and pictures showing benefit
Pt slab design philosophy with slides and pictures showing benefit
 
Analysis and Design of PSC post te girder
Analysis and Design of PSC post te girderAnalysis and Design of PSC post te girder
Analysis and Design of PSC post te girder
 
Analysis and Design of Post tensioned girder
Analysis and Design of Post tensioned girderAnalysis and Design of Post tensioned girder
Analysis and Design of Post tensioned girder
 
compositestructure31-38.pdf
compositestructure31-38.pdfcompositestructure31-38.pdf
compositestructure31-38.pdf
 
RCC
RCCRCC
RCC
 
Steel fibers vs steel mesh in concrete reinforcement
Steel fibers vs steel mesh in concrete reinforcementSteel fibers vs steel mesh in concrete reinforcement
Steel fibers vs steel mesh in concrete reinforcement
 
A Review Study on Effect of Steel Fibre and Marble Dust with Strength of Pave...
A Review Study on Effect of Steel Fibre and Marble Dust with Strength of Pave...A Review Study on Effect of Steel Fibre and Marble Dust with Strength of Pave...
A Review Study on Effect of Steel Fibre and Marble Dust with Strength of Pave...
 
Concrete Technology.pdf
Concrete Technology.pdfConcrete Technology.pdf
Concrete Technology.pdf
 
To investigate combined influence of steel fiber and silicafume on high stren...
To investigate combined influence of steel fiber and silicafume on high stren...To investigate combined influence of steel fiber and silicafume on high stren...
To investigate combined influence of steel fiber and silicafume on high stren...
 
TO INVESTIGATE COMBINED INFLUENCE OF STEEL FIBER AND SILICAFUME ON HIGH STREN...
TO INVESTIGATE COMBINED INFLUENCE OF STEEL FIBER AND SILICAFUME ON HIGH STREN...TO INVESTIGATE COMBINED INFLUENCE OF STEEL FIBER AND SILICAFUME ON HIGH STREN...
TO INVESTIGATE COMBINED INFLUENCE OF STEEL FIBER AND SILICAFUME ON HIGH STREN...
 
Reinforcement concrete and properties of matrial
Reinforcement concrete and properties of matrial Reinforcement concrete and properties of matrial
Reinforcement concrete and properties of matrial
 
Light weight concrete
Light weight concreteLight weight concrete
Light weight concrete
 
Experimental investigation on effect of shear connector in light weight concrete
Experimental investigation on effect of shear connector in light weight concreteExperimental investigation on effect of shear connector in light weight concrete
Experimental investigation on effect of shear connector in light weight concrete
 

More from Bhavik A Shah

The battle against corruption starts from within
The battle against corruption starts from withinThe battle against corruption starts from within
The battle against corruption starts from withinBhavik A Shah
 
Swachchhta shapath
Swachchhta shapathSwachchhta shapath
Swachchhta shapathBhavik A Shah
 
Slope deflection method
Slope deflection methodSlope deflection method
Slope deflection methodBhavik A Shah
 
Purpose of Valuation
Purpose of ValuationPurpose of Valuation
Purpose of ValuationBhavik A Shah
 
Development of Sonpari village Under the Scheme of Smart Village
Development of Sonpari village Under the Scheme of Smart VillageDevelopment of Sonpari village Under the Scheme of Smart Village
Development of Sonpari village Under the Scheme of Smart VillageBhavik A Shah
 
Monetary Policy
Monetary PolicyMonetary Policy
Monetary PolicyBhavik A Shah
 
Moment Distribution Method
Moment Distribution MethodMoment Distribution Method
Moment Distribution MethodBhavik A Shah
 
Matrix methods
Matrix methodsMatrix methods
Matrix methodsBhavik A Shah
 
Indeterminate frame by using energy principle
Indeterminate frame by using energy principleIndeterminate frame by using energy principle
Indeterminate frame by using energy principleBhavik A Shah
 
Hardened concrete
Hardened concreteHardened concrete
Hardened concreteBhavik A Shah
 
Survey required
Survey requiredSurvey required
Survey requiredBhavik A Shah
 
The Water act 1947
The Water act 1947The Water act 1947
The Water act 1947Bhavik A Shah
 
Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineeringBhavik A Shah
 
Flood management
Flood managementFlood management
Flood managementBhavik A Shah
 
Geographic information system
Geographic information system Geographic information system
Geographic information system Bhavik A Shah
 
Strain measurement
Strain measurementStrain measurement
Strain measurementBhavik A Shah
 
Food chains and food Webs
Food chains and food WebsFood chains and food Webs
Food chains and food WebsBhavik A Shah
 

More from Bhavik A Shah (20)

The battle against corruption starts from within
The battle against corruption starts from withinThe battle against corruption starts from within
The battle against corruption starts from within
 
Swachchhta shapath
Swachchhta shapathSwachchhta shapath
Swachchhta shapath
 
Smart city
Smart citySmart city
Smart city
 
Slope deflection method
Slope deflection methodSlope deflection method
Slope deflection method
 
Purpose of Valuation
Purpose of ValuationPurpose of Valuation
Purpose of Valuation
 
Development of Sonpari village Under the Scheme of Smart Village
Development of Sonpari village Under the Scheme of Smart VillageDevelopment of Sonpari village Under the Scheme of Smart Village
Development of Sonpari village Under the Scheme of Smart Village
 
Orientation
OrientationOrientation
Orientation
 
Monetary Policy
Monetary PolicyMonetary Policy
Monetary Policy
 
Moment Distribution Method
Moment Distribution MethodMoment Distribution Method
Moment Distribution Method
 
Matrix methods
Matrix methodsMatrix methods
Matrix methods
 
Interpolation
InterpolationInterpolation
Interpolation
 
Indeterminate frame by using energy principle
Indeterminate frame by using energy principleIndeterminate frame by using energy principle
Indeterminate frame by using energy principle
 
Hardened concrete
Hardened concreteHardened concrete
Hardened concrete
 
Survey required
Survey requiredSurvey required
Survey required
 
The Water act 1947
The Water act 1947The Water act 1947
The Water act 1947
 
Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineering
 
Flood management
Flood managementFlood management
Flood management
 
Geographic information system
Geographic information system Geographic information system
Geographic information system
 
Strain measurement
Strain measurementStrain measurement
Strain measurement
 
Food chains and food Webs
Food chains and food WebsFood chains and food Webs
Food chains and food Webs
 

Recently uploaded

Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEslot gacor bisa pakai pulsa
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 

Recently uploaded (20)

Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 

Types of pavement construction procedure

  • 1. Topic – Types of Pavement construction procedure SUBJECT- Highway Construction and Management : TE506 FACULTY GUIDE- Prof. Pinakin N. Patel PREPARED BY:- Bhavik A. Shah Abhishek R. Shah Bhavesh N. Parmar Ravindra S. Lodh CIVIL ENGG. DEPARTMENT BIRLA VISHVAKARMA MAHAVIDYALAYA ENGG. COLLEGE VALLABH VIDYANAGAR-388120 M.TECH - TRANSPORTATION ENGINEERING (17TS809) (17TS810) (17TS811) (17TS812)
  • 2. Table Of Contents ī‚´ Construction of continuously reinforced ī‚´ Prestressed Pavement ī‚´ Steel Fibre Reinforced (SFRC) Pavements ī‚´ IRC, MOST, ACI specifications ī‚´ Ferro cement ī‚´ Ferro-fibro-Crete Pavement ī‚´ Overlay construction
  • 3. Construction Of Continuously Reinforced ī‚´ Continuously reinforced concrete pavements (CRCP) is a type of concrete pavement that does not require any transverse contraction joints. ī‚´ Transverse cracks are expected in the slab, usually at intervals of 1.5 - 6 ft (0.5 - 1.8 m). ī‚´ CRCP designs generally cost more than JPCP or JRCP designs initially due to increased quantities of steel. ī‚´ CRCP utilizes reinforcing steel to effectively eliminate transverse joints in favour of very tightly maintained cracks. ī‚´ Once CRCP roads are constructed they need not to be taken care of for the next 50-60 years. ī‚´ The performance of continuously reinforced concrete pavement (CRCP) constructed in 1995 that utilized recycled concrete aggregate (RCA) as both coarse and fine aggregates.
  • 4. CRCP Characteristics ī‚´ No joints ī‚´ Steel reinforcement bars ī‚´ Numerous transverse cracks ī‚´ History ī‚´ First used in 1921 ī‚´ Experimental sections in the 1940’s ī‚´ More than 28,000 miles in the USA
  • 5. Why Continuously Reinforced Concrete Pavements? ī‚´ Smoothness ī‚´ Low maintenance costs ī‚´ No transverse joints ī‚´ Thinner slab thickness relative to jointed concrete pavement ī‚´ Long Life
  • 7. Aggregate Sub base Asphalt Concrete Base
  • 10.
  • 12. CRCP Failure ī‚´ Deterioration of transverse cracks (Spalling) ī‚´ Punchouts
  • 13. Performance Factors ī‚´ Crack spacing ī‚´ Crack width ī‚´ Construction Time ī‚´ Temperature / humidity / curing ī‚´ Thermal contraction ī‚´ Concrete materials ī‚´ Cement content, aggregates, proportions ī‚´ Drying shrinkage
  • 14. Construction Issues ī‚´ Concrete mix design ī‚´ Concrete shrinkage ī‚´ Lower zero stress temperature! ī‚´ Mix temperature (water, aggregates) ī‚´ Mix proportions (max. size aggregate) ī‚´ Curing ī‚´ Minimize climatic effects ī‚´ Solar radiation, wind, evaporation ī‚´ Base temperature (asphalt concrete)
  • 15. Conclusion of CRCP ī‚´ Compared to flexible pavement, CRCP gives additional design life of at least 10 years. ī‚´ The demerit of CRCP is its high initial cost & difficulty in repair works required to be done if not constructed properly. ī‚´ Joint less concrete pavement, CRCP offers excellent smooth Riding surface for the vehicles that maximizes the comfort for the passengers.
  • 16. Prestressed Pavement ī‚´ The pre application of a compressive stress to the concrete greatly reduces the tensile stresses caused by traffic and thus decrease the thickness of concrete required. ī‚´ Has less probability of cracking and fewer transverse joints and therefore results in less maintenance and longer pavement life. ī‚´ Used more frequently for airport pavements than for highway pavements because the saving of thickness for airport pavements is much greater than for highways.
  • 17. PCP
  • 18. Advantages of Prestressed Pavements ī‚´ In conventional reinforced concrete pavements, permissible stresses for both steel and concrete are limited to only a fraction of what would be reasonable for either material by itself. Even with low steel stresses, concrete cracks in tension zone due to shrinkage and load, before the steel can develop its tensile force. ī‚´ In prestressed concrete pavements, this incompatibility of the two materials is overcome by stretching the steel to a high stress while it is free to move independently of the concrete and then transferring this force to the concrete by bond or end anchorage. The only limit of stretch is the ultimate strength of each material, and the entire concrete section is made available to resist the load. ī‚´ The prestress gives the section a higher shear strength.
  • 19. CONTâ€Ļ. ī‚´ The number of joints is reduced, and this will contribute to savings in the cost of joints, reduction in pumping, improvement in riding quality, and lesser possibility of water entering the subgrade from the surface. ī‚´ Since prestressed concrete pavements are thinner in section, there will be savings in the cost of materials, and consequent reduction in transport cost of materials. Prestressed concrete pavements have greater flexibility, and therefore, adapt themselves to the uneven conditions of the subgrade without causing any damage. ī‚´ Due to thin sections, the stresses due to temperature gradient are not appreciable.
  • 20. CONTâ€Ļ ī‚´ Due to its reduced self-weight and improved carrying capacity, it can be used over poor subgrades. ī‚´ The tensile strength of concrete is increased by the amount of prestress. ī‚´ Prestressed slabs are especially suited for airport pavements. since long. smooth, jointless slabs facilitate the take-off and landing of modern jet planes. ī‚´ In addition, the problem arising out of the materials in the joints getting damaged due to the hot blast from present-day aircraft will be alleviated to a great extent.
  • 21. Some Drawbacks of PCP ī‚´ The difficulty of repairing services beneath the slab, since if a trench is cut across the Prestressed slab the whole of the prestressing in the vicinity of the trench is lost; this is a matter of particular importance in the case of urban roads. ī‚´ The construction of the prestressed slabs require expert supervision by experienced personnel ī‚´ It poses certain constructional difficulties at bends and curves.
  • 22.
  • 23. Steel Fibre Reinforced (SFRC) Pavements ī‚´ Steel Fibre Reinforced Concrete (SFRC) is concrete containing dispersed steel fibres. ī‚´ The most significant influence of the incorporation of steel fibres in concrete is to delay and control the tensile cracking of the composite material. Concrete is a brittle material that will not carry loads under pure bending when cracked. ī‚´ By incorporating steel fibres the mechanical properties of the concrete is changed resulting in significant load carrying capacity after the concrete has cracked (Chen, 2004).
  • 24. Steel Fibres ī‚´ The typical diameter lies in the range of 0.25-0.75 mm hook end steel fibres are being used in this project. Length of these fibres is 30 mm and the aspect ratio of 55. Density of steel fibre is 7900 kg/cum.
  • 25. Properties Improved by of STEEL FIBRES ī‚´ Flexural Strength: Flexural bending strength can be increased of up to 3 times more compared to conventional concrete. ī‚´ Fatigue Resistance: Almost 1 1/2 times increase in fatigue strength. ī‚´ Impact Resistance: Greater resistance to damage in case of a heavy impact. ī‚´ Permeability: The material is less porous. ī‚´ Abrasion Resistance: More effective composition against abrasion and spalling. ī‚´ Shrinkage: Shrinkage cracks can be eliminated. ī‚´ Corrosion: Corrosion may affect the material but it will be limited in certain areas
  • 26. Properties of SRFC ī‚´ The post-cracking strength of SFRC can be attributed to the crack controlling mechanism provided by steel fibres. The steel fibres across the crack transmit some of the tensile stresses across the crack while steel fibres at the tip of the crack resist the growth of these cracks. ī‚´ The ability of the steel fibres to resist crack propagation is primarily dependent on the bond between the concrete and the fibres as well as the fibre distribution (spacing and orientation).
  • 27. Advantages of SFRC ī‚´ Fast and perfect mixable fibres and High performance and crack resistance ī‚´ Optimize costs with lower fibre dosages ī‚´ Steel fibres reinforced concrete against impact forces, thereby improving the toughness characteristics of hardened concrete.
  • 28. Drawbacks of SRFC ī‚´ Great reduction in workability. ī‚´ High Cost of Material. ī‚´ Generally they do not increase the flexural strength of concrete, and so cannot replace the moment resisting reinforcement.
  • 29. Specifications ī‚´ WHAT IS SPECIFICATION?? ī‚´ A detailed description of the design and materials used to make something. ī‚´ A specification is often a type of technical standard. ī‚´ WHY?? ī‚´ Specifications are a means of ensuring equipment and installation compliance with governing standards such as IRC, ASTM, ACI, FAA, and AASTHO to name just a few.
  • 30. Specifications for construction procedure of pavements. ī‚´ IRC – Indian Road Congress ī‚´ ACI – American Concrete Institute ī‚´ MORTH – Ministry of Road Transport and Highways
  • 31. IRC ī‚´ IRC 015 - Standard Specifications and Code of Practice for Construction of Concrete Roads (Fourth Revision) ī‚´ IRC 043 - Recommended Practice for Tools, Equipment and Appliances for Concrete Pavement Construction ī‚´ IRC 063 - Tentative Guidelines for the Use of Low Grade Aggregates and Soil Aggregates Mixtures in Road Pavement Construction ī‚´ IRC 072 - Recommended Practice for Use and Upkeep of Equipment, Tools and Appliances for Bituminous Pavement Construction ī‚´ IRC 088 - Recommended Practice for Lime Flyash Stabilised Soil Base/Sub- Base in Pavement Construction ī‚´ IRC SP 046 - Guidelines for Design and Construction of Fibre Reinforced Concrete for Pavements (First Revision) ī‚´ IRC SP 062 - Guidelines for the Design and Construction of Cement Concrete Pavement for Low Volume Roads (First Revision)
  • 33. CONSTRUCTION Of RCC Pavement ī‚´ Fully Mechanised Construction ī‚´ The batching plant shall include minimum four bins, weighing hoppers, and scales for the fine aggregate and for each size of coarse aggregate. If cement is used in bulk, a separate scale for cement shall be included. The weighing hoppers shall be properly sealed and vented to preclude dust during operation. Approved safety devices shall be provided and maintained for the protection of all personnel engaged in plant operation, inspection and testing. The batch plant shall be equipped with a suitable non-resettable batch counter which will correctly indicate the number of batches proportioned
  • 34. CONTâ€Ļ ī‚´ Batching by weight only is recommended. However, if batching by volume is permitted, as a special case, separate measuring boxes shall be provided for the different aggregates. The boxes shall be of strong construction provided with handles for convenient lifting and loading into the mixer. They shall be of such size that it should be possible to measure out the requisite quantity and capable of being lifted by two men. ī‚´ Each box shall be provided with a straight edge of required length for striking off after filling. If so directed by the Engineer, improved facilities, such as, tipping boxes of accurate capacity working on run-out rails arranged for direct delivery into the hopper of the mixer shall be provided by the construction agency. In volume batching, suitable allowance shall be made for the bulking of fine aggregate due to the presence of water. For this purpose, the bulking shall be determined as per relevant Indian Standard Specification.
  • 35. Mixers ī‚´ Mixers shall fre pan type, reversible type with single or twin shaft or any other mixer capable of combining the aggregates, cement, water and admixtures into a thoroughly mixed and uniform mass within the specific mixing period, and of discharging the mixture, without segregation. In twin shaft mixer, mixing time is normally very low (about 6 cubic materials may be mixed in 20-30 seconds). Facility i.e hydrometers for the measurement of the density of the admixtures shall be available at site. ī‚´ Each stationary mixer shall be equipped with an approved timing device which will automatically lock the discharge lever when the drum has been charged and release it at the end of the mixing period. The device shall be equipped with a bell or other suitable warning device adjusted to give a clearly audible signal each time the lock is released. In case of failure of the timing device, the mixer may be used for the balance of the day while it is being repaired, provided that each batch is mixed for 90 seconds or as per the manufacturer's recommendation. The mixer shall be equipped with a suitable non-resettable batch counter which shall correctly indicate the number of batches mixed.
  • 36. Placing of concrete ī‚´ Concrete mixed in central mixing plant shall be transported to the site without delay and the concrete which has been mixed too long before laying will be rejected and shall be removed from the site. ī‚´ The total time taken from the addition of the water to the mix, until the completion of the surface finishing and texturing shall not exceed 120 minutes when concrete temperature is less than 25°C and 1 00 minutes when the concrete temperature is between 25°C to 30°C. Trucks/Tippers delivering concrete shall not run directly on plastic sheet nor shall they run on completed slabs until after 28 days of placing of concrete.
  • 37. Construction by slip form paver ī‚´ The slip form paving train shall consist of power machine which spreads, compacts and finishes the concrete in a continuous operation. The slip form paving machine shall compact the concrete by internal vibration and shape it between the side forms with either a conforming plate or by vibrating and oscillating finishing beams. ī‚´ The concrete shall be deposited without segregation in front of slip form paver across the whole width and to a height which at all times is in excess of the required surcharge. The deposited concrete shall be struck off to the necessary average and differential surcharge by means of the strike off plate or a screw auger device extending across the whole width of the slab. The equipment for striking off the concrete shall be capable of being rapidly adjusted for changes of the average and differential surcharge necessitated by change in slab thickness or cross fall.
  • 38. Other Process ī‚´ Texturing ī‚´ Curing ī‚´ Also Clause for Semi-Mechanised and Labour-Oriented Construction Technique ī‚´ Quality Control.
  • 39. ACI ī‚´ ACI defines an ACI reference specification as a standardized mandatory-language document prescribing materials, dimensions, and workmanship, incorporated by reference in Contract Documents, with information in the Mandatory Requirements Checklist required to be provided in the Project Specification. ī‚´ A reference specification provides most of the detailed construction requirements that the Architect/Engineer (A/E) must convey to the Contractor. ī‚´ Specifications related to Concrete
  • 40. Ferro - Cement ī‚´ Ferro cement is a form of reinforced concrete using closely spaced multiple layers of mesh and/or small diameter rods completely infiltrated with, or encapsulated inmotor.
  • 41. Typical Cross Section Of Ferro cement
  • 42. Materials Used In Ferro Cement ī‚´Cement mortar mix ī‚´Skeleton steel ī‚´Steel mesh reinforcement or Fibre-reinforced polymeric meshes
  • 43. Properties Of Ferro Cement ī‚´ It is a very durable, cheap and versatile material. ī‚´ Low w/c ratio produces an impermeable structures ī‚´ less shrinkage, and low weight. ī‚´ high tensile strength and stiffness ī‚´ better impact and punching shear resistance ī‚´ undergo large deformations before cracking or high deflections
  • 44. Process Of Ferro-cement Construction ī‚´Fabricating the skeletal framing system ī‚´Applying rods and meshes ī‚´Plastering ī‚´Curing
  • 45. Cost Effectiveness ī‚´ Depends on type economic system and applications. ī‚´ Relative cost of labour. ī‚´ Doesn’t need heavy plant or machinery. ī‚´ Low cost construction materials are used.
  • 46. Applications ī‚´ Floors And Roofs ī‚´ Waterproofing ī‚´ Transport System ī‚´ Agriculture Structures ī‚´ Fire resistant structures ī‚´ Soil stabilization ī‚´ Man hole covers ī‚´ Wall cupboards ī‚´ pipes
  • 47. Advantages Of Ferro-Cement: ī‚´ 20% savings on materials and cost ī‚´ Suitability for pre-casting ī‚´ Flexibility in cutting, drilling and jointing ī‚´ Very appropriate for developing countries, labor intensive ī‚´ Good impermeability ī‚´ Fabricated into any desired shape. ī‚´ Ease of construction, low weight andlong lifetime. ī‚´ Better resistance against earthquake.
  • 48. Disadvantages of Ferro-Cement: ī‚´ Corrosion of the reinforcing materials dueto the incomplete coverage of metal by mortar. ī‚´ It is difficult to fasten to Ferro-cement with bolts, screws, welding and nail etc. ī‚´ Large no of labors required. ī‚´ Cost of semi-skilled and unskilled labors is high. ī‚´ Tying rods and mesh together is especially tedious and time consuming. ī‚´ Low ductility ī‚´ Susceptibility to stress rupture failure ī‚´ It can be punctured by collision with pointed objects.
  • 49. Ferro-fibro-Crete Pavement ī‚´ The concept of ferro-fibrocrete is best illustrated by reference to a beam (Figure 1). The higher tensile strength and superior crack control properties of ferro-fibrocrete (consisting of Ferro cement strengthened with mesh, regular reinforcing bars, and random fibres) are most advantageously used in the bottom-most fibres of the beam. Hence it is logical to provide a thin ferro-fibrocrete ribbon to serve as the tension flange. ī‚´ Taking advantage of the ferro-fibrocrete in the tension flange, with its higher tension strength and superior crack-control quality, the prestressing force to be used can be considerably reduced.
  • 50. Potential Applications of Ferro-Fibrocrete ī‚´ Prestressed ferro-fibrocrete beams conforming to class 2 and class 3 groups. ī‚´ Water-retaining structures wherein ferro-fibrocrete will chiefly be in hoop- tension. ī‚´ Hybrid structures such as long-span thin hanging ribbons of ferro- fibrocrete in which the structure acts as a beam-cable and is subjected to both tension and bending
  • 51. Types of Overlays and Their Functions ī‚´ Purposes of Overlay: ī‚´ To correct surface deficiencies, such as: ī‚´To improve skid resistance ī‚´To enhance appearance ī‚´To reduce surface roughness ī‚´To improve surface drainage ī‚´To retard climate-related deterioration (such as hardening of asphalt surface) ī‚´ To improve structural capacity.
  • 52. Types of Overlay ī‚´ Asphalt overlays on asphalt pavement ī‚´ Asphalt overlays on PCC pavement ī‚´ Porous asphalt friction course on PCC pavement ī‚´ Unbonded PCC overlay on PCC pavement ī‚´ Partially bonded PCC overlay on PCC pavement ī‚´ Bonded PCC overlay on PCC pavement ī‚´ Unbonded PCC overlay on asphalt pavement ī‚´ Bonded PCC overlay on asphalt pavement
  • 53. Asphalt overlays on asphalt pavement ī‚´ Advantages: ī‚´ To add load carrying capacity. ī‚´ To remove deteriorated surface (if milling is done before overlay.) ī‚´ Disadvantages: ī‚´ If overlay is put on cracked pavement without milling, reflective cracking will occur. ī‚´ If the problem is due to inadequate mixture (e.g. rutting due to an inadequate mixture), overlaying with the same mixture will not solve the problem.
  • 54. Asphalt overlays on PCC pavement ī‚´ Advantages: ī‚´ Less expensive than concrete overlay. ī‚´ Disadvantages: ī‚´ Reflective cracking from joints and existing cracks in concrete pavement will occur.
  • 55. Care Taken While Overlaying ī‚´ Rutting on an existing asphalt pavement to be overlaid. Pavement needs to be adequately milled to remove ruts before overlay.
  • 56. CONTâ€Ļ ī‚´ Severe alligator cracking on existing asphalt pavement. ī‚´ The cracked layer needs to be milled off before overlay to prevent reflective cracking.
  • 57. CONTâ€Ļ ī‚´ Low-temperature cracking on existing pavement. Pavement may not need any repair before overlay.
  • 58. CONTâ€Ļ ī‚´ Milling of asphalt pavement surface before overlay.
  • 59. Partially bonded PCC overlay on PCC pavement ī‚´ Advantages: ī‚´ Better structural capacity as compared with the unbonded PCC overlay. ī‚´ Disadvantages: ī‚´ If the existing PCC pavement had load transfer problem at the joint, the overlay will try to carry the full load across the joint to the adjacent slab. Since these overlays are relatively thin and not designed to take the full load, it will cause the partially bonded overlay to crack. ī‚´ Existing pavement needs to be repaired to eliminate all cracks before overlay.
  • 60. Bonded PCC overlay on PCC pavement ī‚´ Advantages:. ī‚´ Better structural capacity as compared with unbonded or partially bonded PCC overlay. ī‚´ Disadvantages: ī‚´ Existing PCC pavement needs to be repaired to eliminate all cracks before overlay. ī‚´ Not suitable if there are problems with joint load transfer in the existing PCC pavement
  • 61. Unbonded PCC overlay on asphalt pavement ī‚´ Advantages: ī‚´ PCC is stronger than asphalt concrete to resist rutting or cracking due to high pressures from tires. ī‚´ Disadvantages: ī‚´ Thick overlay is needed. The required overlay thickness is about the same as that for a new concrete pavement.
  • 62. Bonded PCC Overlay on Asphalt Pavement ī‚´ Advantages: ī‚´ Thinner overlay can be used, compared with unbonded PCC overlay. ī‚´ PCC is stronger than AC to resist high pressures from tires. ī‚´ Disadvantages: ī‚´ The existing asphalt pavement needs to be uncracked. ī‚´ The PCC needs to be well bonded to the asphalt concrete for the composite pavement to be effective.
  • 63. Cracked concrete slab needs to be repaired before bonded or partially bonded PCC overlay
  • 64. Cracked concrete slab corner needs to be repaired before bonded or partially bonded PCC overlay.
  • 65. Cost of overlay as a function of % area patched before overlay
  • 66. Steps in Design of Overlays ī‚´ Measurement and estimation of the strength of the existing pavement ī‚´ Design life of overlaid pavement ī‚´ Estimation of the traffic to be carried by the overlaid pavement ī‚´ Determination of the thickness and the type of overlay
  • 67.
  • 68.
  • 69. References ī‚´ IRC 015 - STANDARD SPECIFICATIONS AND CODE OF PRACTICE FOR CONSTRUCTION OF CONCRETE ROADS. ī‚´ STEEL FIBRE REINFORCED CONCRETE FOR ROAD PAVEMENT APPLICATIONS by W A ELSAIGH, E P KEARSLEY and J M ROBBERTS - University of Pretoria ī‚´ Prestressed concrete pavements, by S. C. Goyal and Shri Prakash - Indian Concrete Journal, Vol. 42, No.9, Sept. 1968 ī‚´ https://www.slideshare.net/amoldpawar9/session-ii-pavements
  • 70. THANK YOU For Bearing. Bhavik A. Shah (17TS809) Abhishek R. Shah (17TS810) Bhavesh N. Parmar (17TS811) Ravindra S. Lodh (17TS812)

Editor's Notes

  1. Stresses!
  2. Precast!
  3. Historical Backgroundâ€Ļ
  4. Drawbacks!
  5. Marine Rural – bio Gas Plant
  6. Overlay!
  7. Dams!! Airports !! Tunnel Lining