3600 S/S
1200 1200
3600 S/S
12001200600
A
B
A
B
600
1790
1790
2170
2170
198119811981
198119811981
1200 1200
1200 1200 12001200600600
C
1981198119811981
19811485198119811981
1981
1981
720
1 1
2
2 3 C
2170
2170
1790
1790
1200
990
2700 S/S 720 S/S
3600S/S
3600S/S
720
6
3
600 900 600
2170
1790
148514851485
1790
1790
1200
1200 1200
720 S/S
Not checked for erection
Status
Preliminary For discussion
!
RMD Kwikform
Registered Company RMD Kwikform Ltd.
A Member of Interserve Plc.
Middle East
www.rmdkwikform.com
Conditions
Amendments
Rev By Auth Date
Drawing Description
Reviewed byDrawn by
Designed by
Scale A1
Drawing Number
-
1:
Revision
Scale A3 1: Date
- - -
NTS
NTS
ADL/LOM
TL
JFD
07.04.15
STEEL SHUTTER
STATION EDGE PIER-STEM PLAN & SECTION
RIYADH METRO LINE 3
ARRIYADH NEW MOBILITY
KPR006320 13 29 100 01 C
PIER STEAM (ELEVATION 1-1)
SECTION A-A (SHOWING KWIKSTAGE SUPPORT)
SECTION B-B (SHOWING KWIKSTAGE WORKING PLATFORM)
Application Notes : Wall Formwork
Concrete Pressure
Maximum Concrete Pressure not to exceed : kN/m287
900
1000
1500
2000
1200 1800 2400
1470 1470 2170 2560
1790 1790 2170 2730
2170 2170 2560 3030
Bay width
Liftheight
1470
Bracing Chart and Detail
Kwikstage Propping - Loading Data
55.0kN
40.0kN
27.5kN
K/Stage U-Head to S/Slim Soldier Connection Det.
S/Slim Soldier to S/Slim Soldier Connection Detail
Detail of Superslim Soldier to Handrail Connection
Falsework Stability
Customer Drawing Reference
RMDK Drawing Reference
S/Slim Soldier End to End Connection Detail
S/Slim Soldier to Strut Adaptor Connection Detail
Plan Legend
A
B
C
DD
C
2400
2400
2400
2400
2400
2400
2400
2400
1200
1200
1200
1200
1200
1200
1200 1200
1200 1200
1200 1200
1200 1200
600 600
600
Brace
Brace
Brace
Brace
Brace
Brace
600
Brace
Brace Brace
Brace
1200
1200
1200
1200
1200
1200
Brace
Brace
1200
1200
1200
1500 Tube
2000Tube
Brace
Brace
Brace
6
900
900
900
1200
Brace
900
600 900 600
600 900 600
600 900 600
2000Tube
2000Tube
2000Tube
Brace
Brace
Brace
Brace
1200
1200
1200
Brace
Brace
Brace
900
900
900
1200
Brace
900
600 900 600
600 900 600
600 900 600
1500 Tube
1500 Tube1500 Tube
Brace
Brace
Brace
Brace
Brace
Brace
3600 S/S
1200
1200
3600 S/S
1200
1200
1800
1200
1200
1790
2170
2560
2170
600
198119811981
198119811981
198119811981
19811981
1200
1200 1200
1800
12001981
1981
1485
6
1981
1981
1800
1200
1800
1200
1800
1200
720
720 S/S2700 S/S
2170
2170
1790
1790
990
900
900
900
900
900
900
2170
1790
148514851485
990148514851485
2
2
3
3
1 1
2500 Tube
2500 Tube
1500Tube
720 S/S
720
Not checked for erection
Status
Preliminary For discussion
!
RMD Kwikform
Registered Company RMD Kwikform Ltd.
A Member of Interserve Plc.
Middle East
www.rmdkwikform.com
Conditions
Amendments
Rev By Auth Date
PIER STEM (ELEVATION 2-2)
SECTION C-C (SHOWING STEM WORKING PLATFORM)
SECTION D-D (SHOWING KWIKSTAGE SUPPORT)
900
1000
1500
2000
1200 1800 2400
1470 1470 2170 2560
1790 1790 2170 2730
2170 2170 2560 3030
Bay width
Liftheight
1470
Bracing Chart and Detail
Kwikstage Propping - Loading Data
55.0kN
40.0kN
27.5kN
K/Stage U-Head to S/Slim Soldier Connection Det.
S/Slim Soldier to S/Slim Soldier Connection Detail
80
Lift Height Safe Working Load
1500
60
2000
Detail of Superslim Soldier to Handrail Connection
Customer Drawing Reference
RMDK Drawing Reference
S/Slim Soldier End to End Connection Detail
S/Slim Soldier to Strut Adaptor Connection Detail
Application Notes : Wall Formwork
Concrete Pressure
Maximum Concrete Pressure not to exceed : kN/m287
Falsework Stability
STARTING PANEL ELEVATION
SCAFFOLD BOARD CLAMP
A
B
Drawing Description
Reviewed byDrawn by
Designed by
Scale A1
Drawing Number
-
1:
Revision
Scale A3 1: Date
- - -
NTS
NTS
ADL/LOM
TL
JFD
07.04.15
STEEL SHUTTER
STATION EDGE PIER-STEM PLAN & SECTION
RIYADH METRO LINE 3
ARRIYADH NEW MOBILITY
KPR006320 13 29 100 02 C
C
3600 S/S3600 S/S
EE
3600 S/S3600 S/S
1800
1790
2170
600
1981
1981
C 6
12001200
2700 S/S 720 S/S
1485
720
1800
S/S
1790
1981
1200
1485
1485
2170
720 720
1981198119811981198119811485148514851981
19811981198119811981198114851485148514851981
120012006001200 1200 600
120012006001200 1200 600
2170
2170
2170
2170
2170
2170
19811981198119811981198114851485148514851981
1981198119811981198119811485148514851981
1200 1200
1200 1200
2170
2170
2170
2170
2170
2170
990
990
1790
1470
1790
1470
14701470
1485
900
900
900
900
900
600 900 600
600 900 600
600 900 600
2170
2170
2170
1790
1470
2000
Tube 2000
Tube
Not checked for erection
Status
Preliminary For discussion
!
RMD Kwikform
Registered Company RMD Kwikform Ltd.
A Member of Interserve Plc.
Middle East
www.rmdkwikform.com
Conditions
Amendments
Rev By Auth Date
PIER CROWN (ELEVATION 1-1)
SECTION E-E (SHOWING CROWN PLATFORM)
PIER CROWN (ELEVATION 3-3)TYPICAL STAIR CASE ELEVATION
STAIR CASE UNIT (ALUMINUM VERSION)
Application Notes : Wall Formwork
Concrete Pressure
Maximum Concrete Pressure not to exceed : kN/m287
Falsework Stability
A
B
Drawing Description
Reviewed byDrawn by
Designed by
Scale A1
Drawing Number
-
1:
Revision
Scale A3 1: Date
- - -
NTS
NTS
ADL/LOM
TL
JFD
07.04.15
STEEL SHUTTER
STATION EDGE PIER-CROWN DETAIL
RIYADH METRO LINE 3
ARRIYADH NEW MOBILITY
KPR006320 13 29 100 03 C
C
600
1200
Brace
1800
1200
Brace
1800
600
1200
600 600
1200
900
1800
1800
900
900
1200
2170
1790
25002000300020003000
19811981198119811981
19811981198119811981
1200
2170
900
1790
2 2
1
1
1200 1200
A A
B B
1800600
C
1790
1790
2560
2170
C
1200
720
2170
2170
198119811485148514851485
Not checked for erection
Status
Preliminary For discussion
!
RMD Kwikform
Registered Company RMD Kwikform Ltd.
A Member of Interserve Plc.
Middle East
www.rmdkwikform.com
Conditions
A
Amendments
Rev By Auth Date
Drawing Description
Reviewed byDrawn by
Designed by
Scale A1
Drawing Number
-
1:
Revision
Scale A3 1: Date
- - -
NTS
NTS
NCC
TL
JD
--
Pier Stem-Steel Panel, K/Stage Access-Sheet 1 of 2
Central Station Piers
Package-2, Line-3, Riyadh Metro
Ar Riyadh New Mobility
KPR006320 14 29 100 01 C
PIER STEM ELEVATION 2-2
Kwikstage Propping - Loading Data
55.0kN
40.0kN
27.5kN
K/Stage U-Head to S/Slim Soldier Connection Det. S/Slim Soldier to S/Slim Soldier Connection DetailS/Slim Soldier End to End Connection Detail
S/Slim Soldier to Strut Adaptor Connection Detail
Detail of Superslim Soldier to Handrail Connection
Customer Drawing Reference
Falsework Stability
PLAN A-A (SHOWING KWIKSTAGE SUPPORT LAYOUT)
PLAN B-B
Product Notes : Kwikstage Access / Kwikstair
RMDK Drawing Reference
(SHOWING KWIKSTAGE WORKING PLATFORM SUPPORT )
PLAN C-C
(SHOWING TOP WORKING PLATFORM)
!
Note:
All dimensions and elevations
to be confirmed by Customer
!
All bolt holes on steel panels
to be used with specified bolts
Denotes s/slim prop assembly location
Application Notes : Wall Formwork
Concrete Pressure
Maximum Concrete Pressure not to exceed : kN/m287.0
Pier Stem Elevation 1-1 - Showing Kicker Panel
B
C
3
3
1200
B B
2170
1790
2170
19811981
1200
2170
900
19811981
1981198119811981198119811981
1485148514851485
1790
3000300030003000
3000300030003000
540
180
1800 S/S 900 S/S 540
1800 S/S 900 S/S 540
3600S/S2700S/S
3600S/S2700S/S
2700 S/S
1800S/S
2700 S/S
180
Not checked for erection
Status
Preliminary For discussion
!
RMD Kwikform
Registered Company RMD Kwikform Ltd.
A Member of Interserve Plc.
Middle East
www.rmdkwikform.com
Conditions
A
Amendments
Rev By Auth Date
Kwikstage Propping - Loading Data
55.0kN
40.0kN
27.5kN
K/Stage U-Head to S/Slim Soldier Connection Det.
S/Slim Soldier to S/Slim Soldier Connection DetailS/Slim Soldier End to End Connection DetailS/Slim Soldier to Strut Adaptor Connection Detail Detail of Superslim Soldier to Handrail Connection
Customer Drawing Reference
Falsework Stability
Product Notes : Kwikstage Access / Kwikstair
RMDK Drawing Reference
PIER STEM (ELEVATION 3-3) - FIRST POUR
PLAN B-B
RAPIDSHOR STAIR UNIT (ALUMINUM VERSION)
Product Notes : Rapidshor
!
Note:
All dimensions and elevations
to be confirmed by Customer
!
All bolt holes on steel panels
to be used with specified bolts
Application Notes : Wall Formwork
Concrete Pressure
Maximum Concrete Pressure not to exceed : kN/m287.0
DENOTES S/SLIM PROP ASSEMBLY LOCATION
PLAN B-B (SHOWING PRIMARY BEAM)
B
C
Drawing Description
Reviewed byDrawn by
Designed by
Scale A1
Drawing Number
-
1:
Revision
Scale A3 1: Date
- - -
NTS
NTS
NCC
TL
JD
--
Pier Stem-Steel Panel, K/Stage Access-Sheet 2 of 2
Central Station Piers
Package-2, Line-3, Riyadh Metro
Ar Riyadh New Mobility
KPR006320 14 29 100 02 C
44
D D
1200
2170
2170
1790
1470
1200
2170
2170
1790
1470
E E
19811981198119811981198119811981
1485148514851485
1485
6003500 Tube
3500 Tube
3500 Tube
3500 Tube
150030003000300030003000300030003000
150030003000300030003000300030003000
900
Not checked for erection
Status
Preliminary For discussion
!
RMD Kwikform
Registered Company RMD Kwikform Ltd.
A Member of Interserve Plc.
Middle East
www.rmdkwikform.com
Conditions
A
Amendments
Rev By Auth Date
Kwikstage Propping - Loading Data
55.0kN
40.0kN
27.5kN
K/Stage U-Head to S/Slim Soldier Connection Det. S/Slim Soldier to S/Slim Soldier Connection DetailS/Slim Soldier End to End Connection Detail
S/Slim Soldier to Strut Adaptor Connection Detail
Detail of Superslim Soldier to Handrail Connection
Customer Drawing Reference
Falsework Stability
Product Notes : Kwikstage Access / Kwikstair
RMDK Drawing Reference
CORBEL (ELEVATION 4-4) - SECOND POUR
PLAN D-D
(SHOWING KWIKSTAGE WORKING PLATFORM SUPPORT )
PLAN E-E
(SHOWING TOP WORKING PLATFORM)
Product Notes : Rapidshor
!
Note:
All dimensions and elevations
to be confirmed by Customer
!
All bolt holes on steel panels
to be used with specified bolts
DENOTES TURNBUCKLE LOCATION
Application Notes : Wall Formwork
Concrete Pressure
Maximum Concrete Pressure not to exceed : kN/m245
B
C
Drawing Description
Reviewed byDrawn by
Designed by
Scale A1
Drawing Number
-
1:
Revision
Scale A3 1: Date
- - -
NTS
NTS
NCC
TL
JD
--
Corbel-Steel Panel, Kwikstage Access
Central Station Piers
Package-2, Line-3, Riyadh Metro
Ar Riyadh New Mobility
KPR006320 14 29 100 03 C
15001500
G G
E F
2170
2170
1200 1200
2170
2170
1790
1470
1790
4500 Tube
1981198119811981198119811981198119819901485148514851485
600
3500 Tube
3500 Tube
3500 Tube
3500 Tube
1470
30003000300030003000300030003000
1500150030003000300030003000300030003000
900
4500 Tube
4500 Tube
5
5
Not checked for erection
Status
Preliminary For discussion
!
RMD Kwikform
Registered Company RMD Kwikform Ltd.
A Member of Interserve Plc.
Middle East
www.rmdkwikform.com
Conditions
A
Amendments
Rev By Auth Date
Kwikstage Propping - Loading Data
55.0kN
40.0kN
27.5kN
K/Stage U-Head to S/Slim Soldier Connection Det. S/Slim Soldier to S/Slim Soldier Connection DetailS/Slim Soldier End to End Connection Detail
S/Slim Soldier to Strut Adaptor Connection Detail
Detail of Superslim Soldier to Handrail Connection
Customer Drawing Reference
Falsework Stability
Product Notes : Kwikstage Access / Kwikstair
RMDK Drawing Reference
PIER CROWN (ELEVATION 5-5) - THIRD POUR
PLAN F-F
(SHOWING KWIKSTAGE WORKING PLATFORM SUPPORT )
PLAN G-G
(SHOWING TOP WORKING PLATFORM)
Product Notes : Rapidshor
!
Note:
All dimensions and elevations
to be confirmed by Customer
!
All bolt holes on steel panels
to be used with specified bolts
DENOTES S/SLIM PROP ASSEMBLY LOCATION
Application Notes : Wall Formwork
Concrete Pressure
Maximum Concrete Pressure not to exceed : kN/m266
B
C
Drawing Description
Reviewed byDrawn by
Designed by
Scale A1
Drawing Number
-
1:
Revision
Scale A3 1: Date
- - -
NTS
NTS
NCC
TL
JD
--
Crown- Steel Panel, Kwikstage Access
Central Station Piers
Package-2, Line-3, Riyadh Metro
Ar Riyadh New Mobility
KPR006320 14 29 100 04 C

More Related Content

What's hot

My project work(analysis and design of g+3 building)
My project work(analysis and design of g+3 building)My project work(analysis and design of g+3 building)
My project work(analysis and design of g+3 building)Abhilash Chandra Dey
 
Summer Internship Presentation on "CONSTRUCTION OF PERMANENT CAMPUS FOR INDIA...
Summer Internship Presentation on "CONSTRUCTION OF PERMANENT CAMPUS FOR INDIA...Summer Internship Presentation on "CONSTRUCTION OF PERMANENT CAMPUS FOR INDIA...
Summer Internship Presentation on "CONSTRUCTION OF PERMANENT CAMPUS FOR INDIA...Yogesh Gunasekaran
 
Estimation and costing of a commercial building
Estimation and costing of a commercial buildingEstimation and costing of a commercial building
Estimation and costing of a commercial buildinglckr117
 
Computer aided analysis_and_design_of_multi-storeyed_buildings
Computer aided analysis_and_design_of_multi-storeyed_buildingsComputer aided analysis_and_design_of_multi-storeyed_buildings
Computer aided analysis_and_design_of_multi-storeyed_buildingsV.m. Rajan
 
Construction of metro station
Construction of metro stationConstruction of metro station
Construction of metro stationAmit Kumar Tiwari
 
Analysis of g+3 rcc storied building
Analysis of g+3 rcc storied buildingAnalysis of g+3 rcc storied building
Analysis of g+3 rcc storied buildingTarun kumar
 
Construction management
Construction managementConstruction management
Construction managementvhjadhav
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantitiesBt Lee
 
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
AN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTIONAN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTION
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTIONAbhishek Singh
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training pptSumit Singh
 
PROJECT ON Construction of a multistory building POWER POINT PRESENTATION
PROJECT ON Construction of a multistory building POWER POINT PRESENTATIONPROJECT ON Construction of a multistory building POWER POINT PRESENTATION
PROJECT ON Construction of a multistory building POWER POINT PRESENTATIONROHITASH ROJ
 
Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...Shabaz Khan
 
Single stage design and build method & construction project management
Single stage design and build method & construction project managementSingle stage design and build method & construction project management
Single stage design and build method & construction project managementJohn Constance
 

What's hot (20)

My project work(analysis and design of g+3 building)
My project work(analysis and design of g+3 building)My project work(analysis and design of g+3 building)
My project work(analysis and design of g+3 building)
 
Summer Internship Presentation on "CONSTRUCTION OF PERMANENT CAMPUS FOR INDIA...
Summer Internship Presentation on "CONSTRUCTION OF PERMANENT CAMPUS FOR INDIA...Summer Internship Presentation on "CONSTRUCTION OF PERMANENT CAMPUS FOR INDIA...
Summer Internship Presentation on "CONSTRUCTION OF PERMANENT CAMPUS FOR INDIA...
 
Estimation and costing of a commercial building
Estimation and costing of a commercial buildingEstimation and costing of a commercial building
Estimation and costing of a commercial building
 
Computer aided analysis_and_design_of_multi-storeyed_buildings
Computer aided analysis_and_design_of_multi-storeyed_buildingsComputer aided analysis_and_design_of_multi-storeyed_buildings
Computer aided analysis_and_design_of_multi-storeyed_buildings
 
Construction of metro station
Construction of metro stationConstruction of metro station
Construction of metro station
 
Analysis of g+3 rcc storied building
Analysis of g+3 rcc storied buildingAnalysis of g+3 rcc storied building
Analysis of g+3 rcc storied building
 
Conquas
ConquasConquas
Conquas
 
Construction management
Construction managementConstruction management
Construction management
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantities
 
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
AN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTIONAN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTION
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training ppt
 
Road construction report
Road construction reportRoad construction report
Road construction report
 
UNDERPASS DESIGN
UNDERPASS DESIGNUNDERPASS DESIGN
UNDERPASS DESIGN
 
5.1 quantity take-off
5.1 quantity take-off5.1 quantity take-off
5.1 quantity take-off
 
multi storey buidling
multi storey buidlingmulti storey buidling
multi storey buidling
 
PROJECT ON Construction of a multistory building POWER POINT PRESENTATION
PROJECT ON Construction of a multistory building POWER POINT PRESENTATIONPROJECT ON Construction of a multistory building POWER POINT PRESENTATION
PROJECT ON Construction of a multistory building POWER POINT PRESENTATION
 
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
 
Boq piling works
Boq   piling worksBoq   piling works
Boq piling works
 
Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...
 
Single stage design and build method & construction project management
Single stage design and build method & construction project managementSingle stage design and build method & construction project management
Single stage design and build method & construction project management
 

Similar to Appendix 8.1 - Station Pier Formwork Drawings

Ananth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_SampleAnanth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_SampleAnanth K.Samy
 
BOQ - 945.23 Rev.00 - Warehouse - Colombia.pdf
BOQ - 945.23 Rev.00 - Warehouse - Colombia.pdfBOQ - 945.23 Rev.00 - Warehouse - Colombia.pdf
BOQ - 945.23 Rev.00 - Warehouse - Colombia.pdfEduardoFarfan14
 
Estimation of bridges and automations copy
Estimation of bridges and automations   copyEstimation of bridges and automations   copy
Estimation of bridges and automations copykjanand
 
viewNitPdf_3777461.pdf
viewNitPdf_3777461.pdfviewNitPdf_3777461.pdf
viewNitPdf_3777461.pdfDivyanshTotla
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0C
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0CSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0C
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0CSunit Dhingra
 
Design Proposal for a Single and Double Span Bridge using Cost Analysis
Design Proposal for a Single and Double Span Bridge using Cost AnalysisDesign Proposal for a Single and Double Span Bridge using Cost Analysis
Design Proposal for a Single and Double Span Bridge using Cost AnalysisMichael Masi, Jr. Eng.
 
Amaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan DesignAmaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan DesignKathleenFaithMamuad
 
PDR Presentation
PDR PresentationPDR Presentation
PDR PresentationNate Pham
 
Electric Wire Rope Hoist Manufacturers in Ahmedabad
Electric Wire Rope Hoist Manufacturers in AhmedabadElectric Wire Rope Hoist Manufacturers in Ahmedabad
Electric Wire Rope Hoist Manufacturers in AhmedabadTechno Industries
 
C Tap Copper Connectors & Crimps - Bright Surface Finish
C Tap Copper Connectors & Crimps - Bright Surface Finish C Tap Copper Connectors & Crimps - Bright Surface Finish
C Tap Copper Connectors & Crimps - Bright Surface Finish Thorne & Derrick International
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITH
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITHSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITH
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITHSunit Dhingra
 
Red Reedbuck Bush Lodge
Red Reedbuck Bush LodgeRed Reedbuck Bush Lodge
Red Reedbuck Bush LodgeGrant Hepburn
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSunit Dhingra
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITASAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITASunit Dhingra
 

Similar to Appendix 8.1 - Station Pier Formwork Drawings (20)

ARC2
ARC2ARC2
ARC2
 
Ananth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_SampleAnanth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_Sample
 
BOQ - 945.23 Rev.00 - Warehouse - Colombia.pdf
BOQ - 945.23 Rev.00 - Warehouse - Colombia.pdfBOQ - 945.23 Rev.00 - Warehouse - Colombia.pdf
BOQ - 945.23 Rev.00 - Warehouse - Colombia.pdf
 
Sld for pmcc
Sld for pmccSld for pmcc
Sld for pmcc
 
Estimation of bridges and automations copy
Estimation of bridges and automations   copyEstimation of bridges and automations   copy
Estimation of bridges and automations copy
 
viewNitPdf_3777461.pdf
viewNitPdf_3777461.pdfviewNitPdf_3777461.pdf
viewNitPdf_3777461.pdf
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0C
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0CSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0C
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0C
 
Design Proposal for a Single and Double Span Bridge using Cost Analysis
Design Proposal for a Single and Double Span Bridge using Cost AnalysisDesign Proposal for a Single and Double Span Bridge using Cost Analysis
Design Proposal for a Single and Double Span Bridge using Cost Analysis
 
Amaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan DesignAmaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan Design
 
PDR Presentation
PDR PresentationPDR Presentation
PDR Presentation
 
Electric Wire Rope Hoist Manufacturers in Ahmedabad
Electric Wire Rope Hoist Manufacturers in AhmedabadElectric Wire Rope Hoist Manufacturers in Ahmedabad
Electric Wire Rope Hoist Manufacturers in Ahmedabad
 
ProcContSite
ProcContSiteProcContSite
ProcContSite
 
Cembre C Tap Crimp Connectors
Cembre C Tap Crimp ConnectorsCembre C Tap Crimp Connectors
Cembre C Tap Crimp Connectors
 
Cembre C Tap Copper Connectors & Crimps - Tin Plated
Cembre C Tap Copper Connectors & Crimps - Tin Plated Cembre C Tap Copper Connectors & Crimps - Tin Plated
Cembre C Tap Copper Connectors & Crimps - Tin Plated
 
C Tap Copper Connectors & Crimps - Bright Surface Finish
C Tap Copper Connectors & Crimps - Bright Surface Finish C Tap Copper Connectors & Crimps - Bright Surface Finish
C Tap Copper Connectors & Crimps - Bright Surface Finish
 
PV Array
PV ArrayPV Array
PV Array
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITH
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITHSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITH
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CREITH
 
Red Reedbuck Bush Lodge
Red Reedbuck Bush LodgeRed Reedbuck Bush Lodge
Red Reedbuck Bush Lodge
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITASAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
 

Appendix 8.1 - Station Pier Formwork Drawings

  • 1. 3600 S/S 1200 1200 3600 S/S 12001200600 A B A B 600 1790 1790 2170 2170 198119811981 198119811981 1200 1200 1200 1200 12001200600600 C 1981198119811981 19811485198119811981 1981 1981 720 1 1 2 2 3 C 2170 2170 1790 1790 1200 990 2700 S/S 720 S/S 3600S/S 3600S/S 720 6 3 600 900 600 2170 1790 148514851485 1790 1790 1200 1200 1200 720 S/S Not checked for erection Status Preliminary For discussion ! RMD Kwikform Registered Company RMD Kwikform Ltd. A Member of Interserve Plc. Middle East www.rmdkwikform.com Conditions Amendments Rev By Auth Date Drawing Description Reviewed byDrawn by Designed by Scale A1 Drawing Number - 1: Revision Scale A3 1: Date - - - NTS NTS ADL/LOM TL JFD 07.04.15 STEEL SHUTTER STATION EDGE PIER-STEM PLAN & SECTION RIYADH METRO LINE 3 ARRIYADH NEW MOBILITY KPR006320 13 29 100 01 C PIER STEAM (ELEVATION 1-1) SECTION A-A (SHOWING KWIKSTAGE SUPPORT) SECTION B-B (SHOWING KWIKSTAGE WORKING PLATFORM) Application Notes : Wall Formwork Concrete Pressure Maximum Concrete Pressure not to exceed : kN/m287 900 1000 1500 2000 1200 1800 2400 1470 1470 2170 2560 1790 1790 2170 2730 2170 2170 2560 3030 Bay width Liftheight 1470 Bracing Chart and Detail Kwikstage Propping - Loading Data 55.0kN 40.0kN 27.5kN K/Stage U-Head to S/Slim Soldier Connection Det. S/Slim Soldier to S/Slim Soldier Connection Detail Detail of Superslim Soldier to Handrail Connection Falsework Stability Customer Drawing Reference RMDK Drawing Reference S/Slim Soldier End to End Connection Detail S/Slim Soldier to Strut Adaptor Connection Detail Plan Legend A B C
  • 2. DD C 2400 2400 2400 2400 2400 2400 2400 2400 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 600 600 600 Brace Brace Brace Brace Brace Brace 600 Brace Brace Brace Brace 1200 1200 1200 1200 1200 1200 Brace Brace 1200 1200 1200 1500 Tube 2000Tube Brace Brace Brace 6 900 900 900 1200 Brace 900 600 900 600 600 900 600 600 900 600 2000Tube 2000Tube 2000Tube Brace Brace Brace Brace 1200 1200 1200 Brace Brace Brace 900 900 900 1200 Brace 900 600 900 600 600 900 600 600 900 600 1500 Tube 1500 Tube1500 Tube Brace Brace Brace Brace Brace Brace 3600 S/S 1200 1200 3600 S/S 1200 1200 1800 1200 1200 1790 2170 2560 2170 600 198119811981 198119811981 198119811981 19811981 1200 1200 1200 1800 12001981 1981 1485 6 1981 1981 1800 1200 1800 1200 1800 1200 720 720 S/S2700 S/S 2170 2170 1790 1790 990 900 900 900 900 900 900 2170 1790 148514851485 990148514851485 2 2 3 3 1 1 2500 Tube 2500 Tube 1500Tube 720 S/S 720 Not checked for erection Status Preliminary For discussion ! RMD Kwikform Registered Company RMD Kwikform Ltd. A Member of Interserve Plc. Middle East www.rmdkwikform.com Conditions Amendments Rev By Auth Date PIER STEM (ELEVATION 2-2) SECTION C-C (SHOWING STEM WORKING PLATFORM) SECTION D-D (SHOWING KWIKSTAGE SUPPORT) 900 1000 1500 2000 1200 1800 2400 1470 1470 2170 2560 1790 1790 2170 2730 2170 2170 2560 3030 Bay width Liftheight 1470 Bracing Chart and Detail Kwikstage Propping - Loading Data 55.0kN 40.0kN 27.5kN K/Stage U-Head to S/Slim Soldier Connection Det. S/Slim Soldier to S/Slim Soldier Connection Detail 80 Lift Height Safe Working Load 1500 60 2000 Detail of Superslim Soldier to Handrail Connection Customer Drawing Reference RMDK Drawing Reference S/Slim Soldier End to End Connection Detail S/Slim Soldier to Strut Adaptor Connection Detail Application Notes : Wall Formwork Concrete Pressure Maximum Concrete Pressure not to exceed : kN/m287 Falsework Stability STARTING PANEL ELEVATION SCAFFOLD BOARD CLAMP A B Drawing Description Reviewed byDrawn by Designed by Scale A1 Drawing Number - 1: Revision Scale A3 1: Date - - - NTS NTS ADL/LOM TL JFD 07.04.15 STEEL SHUTTER STATION EDGE PIER-STEM PLAN & SECTION RIYADH METRO LINE 3 ARRIYADH NEW MOBILITY KPR006320 13 29 100 02 C C
  • 3. 3600 S/S3600 S/S EE 3600 S/S3600 S/S 1800 1790 2170 600 1981 1981 C 6 12001200 2700 S/S 720 S/S 1485 720 1800 S/S 1790 1981 1200 1485 1485 2170 720 720 1981198119811981198119811485148514851981 19811981198119811981198114851485148514851981 120012006001200 1200 600 120012006001200 1200 600 2170 2170 2170 2170 2170 2170 19811981198119811981198114851485148514851981 1981198119811981198119811485148514851981 1200 1200 1200 1200 2170 2170 2170 2170 2170 2170 990 990 1790 1470 1790 1470 14701470 1485 900 900 900 900 900 600 900 600 600 900 600 600 900 600 2170 2170 2170 1790 1470 2000 Tube 2000 Tube Not checked for erection Status Preliminary For discussion ! RMD Kwikform Registered Company RMD Kwikform Ltd. A Member of Interserve Plc. Middle East www.rmdkwikform.com Conditions Amendments Rev By Auth Date PIER CROWN (ELEVATION 1-1) SECTION E-E (SHOWING CROWN PLATFORM) PIER CROWN (ELEVATION 3-3)TYPICAL STAIR CASE ELEVATION STAIR CASE UNIT (ALUMINUM VERSION) Application Notes : Wall Formwork Concrete Pressure Maximum Concrete Pressure not to exceed : kN/m287 Falsework Stability A B Drawing Description Reviewed byDrawn by Designed by Scale A1 Drawing Number - 1: Revision Scale A3 1: Date - - - NTS NTS ADL/LOM TL JFD 07.04.15 STEEL SHUTTER STATION EDGE PIER-CROWN DETAIL RIYADH METRO LINE 3 ARRIYADH NEW MOBILITY KPR006320 13 29 100 03 C C
  • 4. 600 1200 Brace 1800 1200 Brace 1800 600 1200 600 600 1200 900 1800 1800 900 900 1200 2170 1790 25002000300020003000 19811981198119811981 19811981198119811981 1200 2170 900 1790 2 2 1 1 1200 1200 A A B B 1800600 C 1790 1790 2560 2170 C 1200 720 2170 2170 198119811485148514851485 Not checked for erection Status Preliminary For discussion ! RMD Kwikform Registered Company RMD Kwikform Ltd. A Member of Interserve Plc. Middle East www.rmdkwikform.com Conditions A Amendments Rev By Auth Date Drawing Description Reviewed byDrawn by Designed by Scale A1 Drawing Number - 1: Revision Scale A3 1: Date - - - NTS NTS NCC TL JD -- Pier Stem-Steel Panel, K/Stage Access-Sheet 1 of 2 Central Station Piers Package-2, Line-3, Riyadh Metro Ar Riyadh New Mobility KPR006320 14 29 100 01 C PIER STEM ELEVATION 2-2 Kwikstage Propping - Loading Data 55.0kN 40.0kN 27.5kN K/Stage U-Head to S/Slim Soldier Connection Det. S/Slim Soldier to S/Slim Soldier Connection DetailS/Slim Soldier End to End Connection Detail S/Slim Soldier to Strut Adaptor Connection Detail Detail of Superslim Soldier to Handrail Connection Customer Drawing Reference Falsework Stability PLAN A-A (SHOWING KWIKSTAGE SUPPORT LAYOUT) PLAN B-B Product Notes : Kwikstage Access / Kwikstair RMDK Drawing Reference (SHOWING KWIKSTAGE WORKING PLATFORM SUPPORT ) PLAN C-C (SHOWING TOP WORKING PLATFORM) ! Note: All dimensions and elevations to be confirmed by Customer ! All bolt holes on steel panels to be used with specified bolts Denotes s/slim prop assembly location Application Notes : Wall Formwork Concrete Pressure Maximum Concrete Pressure not to exceed : kN/m287.0 Pier Stem Elevation 1-1 - Showing Kicker Panel B C
  • 5. 3 3 1200 B B 2170 1790 2170 19811981 1200 2170 900 19811981 1981198119811981198119811981 1485148514851485 1790 3000300030003000 3000300030003000 540 180 1800 S/S 900 S/S 540 1800 S/S 900 S/S 540 3600S/S2700S/S 3600S/S2700S/S 2700 S/S 1800S/S 2700 S/S 180 Not checked for erection Status Preliminary For discussion ! RMD Kwikform Registered Company RMD Kwikform Ltd. A Member of Interserve Plc. Middle East www.rmdkwikform.com Conditions A Amendments Rev By Auth Date Kwikstage Propping - Loading Data 55.0kN 40.0kN 27.5kN K/Stage U-Head to S/Slim Soldier Connection Det. S/Slim Soldier to S/Slim Soldier Connection DetailS/Slim Soldier End to End Connection DetailS/Slim Soldier to Strut Adaptor Connection Detail Detail of Superslim Soldier to Handrail Connection Customer Drawing Reference Falsework Stability Product Notes : Kwikstage Access / Kwikstair RMDK Drawing Reference PIER STEM (ELEVATION 3-3) - FIRST POUR PLAN B-B RAPIDSHOR STAIR UNIT (ALUMINUM VERSION) Product Notes : Rapidshor ! Note: All dimensions and elevations to be confirmed by Customer ! All bolt holes on steel panels to be used with specified bolts Application Notes : Wall Formwork Concrete Pressure Maximum Concrete Pressure not to exceed : kN/m287.0 DENOTES S/SLIM PROP ASSEMBLY LOCATION PLAN B-B (SHOWING PRIMARY BEAM) B C Drawing Description Reviewed byDrawn by Designed by Scale A1 Drawing Number - 1: Revision Scale A3 1: Date - - - NTS NTS NCC TL JD -- Pier Stem-Steel Panel, K/Stage Access-Sheet 2 of 2 Central Station Piers Package-2, Line-3, Riyadh Metro Ar Riyadh New Mobility KPR006320 14 29 100 02 C
  • 6. 44 D D 1200 2170 2170 1790 1470 1200 2170 2170 1790 1470 E E 19811981198119811981198119811981 1485148514851485 1485 6003500 Tube 3500 Tube 3500 Tube 3500 Tube 150030003000300030003000300030003000 150030003000300030003000300030003000 900 Not checked for erection Status Preliminary For discussion ! RMD Kwikform Registered Company RMD Kwikform Ltd. A Member of Interserve Plc. Middle East www.rmdkwikform.com Conditions A Amendments Rev By Auth Date Kwikstage Propping - Loading Data 55.0kN 40.0kN 27.5kN K/Stage U-Head to S/Slim Soldier Connection Det. S/Slim Soldier to S/Slim Soldier Connection DetailS/Slim Soldier End to End Connection Detail S/Slim Soldier to Strut Adaptor Connection Detail Detail of Superslim Soldier to Handrail Connection Customer Drawing Reference Falsework Stability Product Notes : Kwikstage Access / Kwikstair RMDK Drawing Reference CORBEL (ELEVATION 4-4) - SECOND POUR PLAN D-D (SHOWING KWIKSTAGE WORKING PLATFORM SUPPORT ) PLAN E-E (SHOWING TOP WORKING PLATFORM) Product Notes : Rapidshor ! Note: All dimensions and elevations to be confirmed by Customer ! All bolt holes on steel panels to be used with specified bolts DENOTES TURNBUCKLE LOCATION Application Notes : Wall Formwork Concrete Pressure Maximum Concrete Pressure not to exceed : kN/m245 B C Drawing Description Reviewed byDrawn by Designed by Scale A1 Drawing Number - 1: Revision Scale A3 1: Date - - - NTS NTS NCC TL JD -- Corbel-Steel Panel, Kwikstage Access Central Station Piers Package-2, Line-3, Riyadh Metro Ar Riyadh New Mobility KPR006320 14 29 100 03 C
  • 7. 15001500 G G E F 2170 2170 1200 1200 2170 2170 1790 1470 1790 4500 Tube 1981198119811981198119811981198119819901485148514851485 600 3500 Tube 3500 Tube 3500 Tube 3500 Tube 1470 30003000300030003000300030003000 1500150030003000300030003000300030003000 900 4500 Tube 4500 Tube 5 5 Not checked for erection Status Preliminary For discussion ! RMD Kwikform Registered Company RMD Kwikform Ltd. A Member of Interserve Plc. Middle East www.rmdkwikform.com Conditions A Amendments Rev By Auth Date Kwikstage Propping - Loading Data 55.0kN 40.0kN 27.5kN K/Stage U-Head to S/Slim Soldier Connection Det. S/Slim Soldier to S/Slim Soldier Connection DetailS/Slim Soldier End to End Connection Detail S/Slim Soldier to Strut Adaptor Connection Detail Detail of Superslim Soldier to Handrail Connection Customer Drawing Reference Falsework Stability Product Notes : Kwikstage Access / Kwikstair RMDK Drawing Reference PIER CROWN (ELEVATION 5-5) - THIRD POUR PLAN F-F (SHOWING KWIKSTAGE WORKING PLATFORM SUPPORT ) PLAN G-G (SHOWING TOP WORKING PLATFORM) Product Notes : Rapidshor ! Note: All dimensions and elevations to be confirmed by Customer ! All bolt holes on steel panels to be used with specified bolts DENOTES S/SLIM PROP ASSEMBLY LOCATION Application Notes : Wall Formwork Concrete Pressure Maximum Concrete Pressure not to exceed : kN/m266 B C Drawing Description Reviewed byDrawn by Designed by Scale A1 Drawing Number - 1: Revision Scale A3 1: Date - - - NTS NTS NCC TL JD -- Crown- Steel Panel, Kwikstage Access Central Station Piers Package-2, Line-3, Riyadh Metro Ar Riyadh New Mobility KPR006320 14 29 100 04 C