Toyota Supplier Support
Center
TOYOTA PRODUCTION SYSTEMS
• Integrated System
– Technical
– Managerial
– Philosophy
– Human Development
Forms the ORGANIZATION CULTURE
Kiichiro Toyoda’s Philosophy
• Used this philosophy to compete with Ford and
other automobile manufacturers
• Compete with large volume
manufacturers in price, quality and
availability to satisfy customer needs
while producing in small quantities with
limited capital expenditure
Toyota Philosophy
• Customer First
• People are the most valuable resources
• Kaizen
• Shop Floor Focus
Toyota Philosophy
 Eliminate Waste / Muda of overproduction
Pace of production = Pace of sales
 Efficiency is gauged by the ability of a plant to
meet exact customer requirements with the
least amount of resources
Toyota Philosophy
• KAIZEN is about people:
By knowing they are adding value for
customer
By having a safe work environment
By utilizing their creativity
By developing themselves
Toyota GOAL
• HIGHEST QUALITY
• LOWEST COST
• SHORTEST LEAD TIME
Toyota Production System (TPS)
• Influenced by:
– Business Needs
– Company Philosophy
TPS
• Foundation is STABILITY
• STABILITY is dependant on 4 M’s
• Man
• Machine
• Material
• Method
TPS
• Problems impacting stable production:
•Equipment
•Defects
•Rework
•Shortage
•Absenteeism
•Morale
TPS
• Tradition Approach to solve problems
• Maintain large inventories
• Add more shifts or work overtime
• Purchase more equipment
TPS
• TPS Approach to solve problems
• Expose and attack problems
• Seek out Root cause of problems
• Fix problems 1 by 1
• Do not pass defective part on - inspect at the
process and fix
• Quality feedback immediate
• Defects are visible at the source
TPS
• Build Quality:
• Make abnormalities easy to notice
• Call for help
• Take quick action to fix so
– Prevent building defect
– Do not pass defect
• Separate Man’s work and Machine’s work
• Identify man’s work separately from Machine’s
work
TPS
• Plan production based on TAKT TIME
TAKT TIME =
Total Available Production Time per day
Total Production Requirements per day
TPS
• ALWAYS :
Pace of production = Pace of sales
TPS
• Always have Standardized Work:
• Most efficient work flow maintaining
– Safety
– Quality
– Quantity
– Cost
• Main consideration on human movement
• Should change when
– Production Requirements change
– Improved operation method is identified
TPS
• All relevant work site information is available at
each jobsite through three worksheets
1. Production capacity Sheet
2. Standardized work combination table
– Indicates flow of human work within a process
– Specifies exact time requirement for each work step
– Job design based in takt time
– Useful for problem identification in relationship between
man and machine
TPS
3. Standardized work chart
– Illustrates the work sequence and process layout
– Indicates takt time and standard in process stock
– Useful as a method of work site management
Note: Examples of the three documents are attached with the
presentation
Problems while implementing TPS
• Human Mindset
– Same way for 30 years
– People fear losing jobs
– Teams are not effective
– How to motivate “kaizen”
effort
– Why must we change
– Manpower has no discipline
– Why must I do
standardized work if I can
do faster my way
• Misconceptions
– TPS only makes me work
harder
– Long distances between
supplier and manufacturer
– No Money
– Just another program
– Equipment not capable
Problems while implementing TPS
• Leadership/management
– What to do with people
“kaizened” out
– Large lot sizes, lower costs
– Run machine for 24 hours
– No support from top mgmt
– Top mgmt often changes
• Business Environment
– Unlevel customer orders
– Many customers, not all
advocate TPS
– Many different job
classifications
– Piece rate system
– Many products, one day
turnaround
– Union won’t go along with
TPS
KAIZEN
• Points of motion Kaizen
• Hard Work
– Bending
– Reaching
• Waiting
– Waiting time in front of machine
• Walking
– Eliminate or reduce
KAIZEN
• Operator work while walking
• Hand movements
– Wide hand movements
– Muda hand movements
– Hands waiting?
• Material Flow
– Work being carried on a straight and level path
– Part direction change
• Eye Movements
– Operator Checking?

More Related Content

What's hot

Just in time - Accounting Theory (ACT - 412) Presentation Sonia ma'am
Just in time - Accounting Theory (ACT - 412) Presentation Sonia ma'amJust in time - Accounting Theory (ACT - 412) Presentation Sonia ma'am
Just in time - Accounting Theory (ACT - 412) Presentation Sonia ma'am
Md. Moazzem Hossain
 
Supply Chain Mgmt Jit
Supply Chain Mgmt JitSupply Chain Mgmt Jit
Supply Chain Mgmt Jit
ajithsrc
 
Just in time
Just in timeJust in time
Just in time
yashpalsg
 
Just in time in supply chain management &
Just in time in supply chain management &Just in time in supply chain management &
Just in time in supply chain management &
ganessh04
 
just in time management
just in time managementjust in time management
just in time management
umesh yadav
 
Jit (us), kanban, lean
Jit (us), kanban, leanJit (us), kanban, lean
Jit (us), kanban, lean
Nishit Patel
 

What's hot (20)

Just In Time (JIT)
Just In Time (JIT)Just In Time (JIT)
Just In Time (JIT)
 
Toyota Presentation
Toyota PresentationToyota Presentation
Toyota Presentation
 
Just in time - Accounting Theory (ACT - 412) Presentation Sonia ma'am
Just in time - Accounting Theory (ACT - 412) Presentation Sonia ma'amJust in time - Accounting Theory (ACT - 412) Presentation Sonia ma'am
Just in time - Accounting Theory (ACT - 412) Presentation Sonia ma'am
 
Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing ppt
 
Supply Chain Mgmt Jit
Supply Chain Mgmt JitSupply Chain Mgmt Jit
Supply Chain Mgmt Jit
 
Just in time
Just in timeJust in time
Just in time
 
Toyota's jit revolution ppt
Toyota's jit revolution pptToyota's jit revolution ppt
Toyota's jit revolution ppt
 
Just in time
Just in timeJust in time
Just in time
 
Just in time
Just in timeJust in time
Just in time
 
JIT for manufacturing ppt
JIT for manufacturing pptJIT for manufacturing ppt
JIT for manufacturing ppt
 
JIT- JUST IN TIME PPT
JIT- JUST IN TIME PPTJIT- JUST IN TIME PPT
JIT- JUST IN TIME PPT
 
Lean Production
Lean ProductionLean Production
Lean Production
 
Just In Time
Just In TimeJust In Time
Just In Time
 
Just in time
Just in timeJust in time
Just in time
 
Just in time
Just in timeJust in time
Just in time
 
Just in time in supply chain management &
Just in time in supply chain management &Just in time in supply chain management &
Just in time in supply chain management &
 
Just in time
Just in timeJust in time
Just in time
 
just in time management
just in time managementjust in time management
just in time management
 
Jit (us), kanban, lean
Jit (us), kanban, leanJit (us), kanban, lean
Jit (us), kanban, lean
 
Jit In Toyota
Jit In ToyotaJit In Toyota
Jit In Toyota
 

Similar to Tps

Lean Operations Intro - Matrikulasi (std).ppt
Lean Operations Intro - Matrikulasi (std).pptLean Operations Intro - Matrikulasi (std).ppt
Lean Operations Intro - Matrikulasi (std).ppt
SyarahRizkia1
 
lean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accountslean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accounts
SabaKhalid48
 
Seven wastes
Seven wastesSeven wastes
Seven wastes
fa99
 
Lean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.pptLean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.ppt
rahul368457
 

Similar to Tps (20)

Lean Operations Intro - Matrikulasi (std).ppt
Lean Operations Intro - Matrikulasi (std).pptLean Operations Intro - Matrikulasi (std).ppt
Lean Operations Intro - Matrikulasi (std).ppt
 
Lean basics
Lean basicsLean basics
Lean basics
 
lean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accountslean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accounts
 
T0 yota ps
T0 yota psT0 yota ps
T0 yota ps
 
TOYOTA PS
TOYOTA PSTOYOTA PS
TOYOTA PS
 
BASIC OF TOYOTA PRODUCTION SYSTEM
BASIC OF TOYOTA PRODUCTION SYSTEMBASIC OF TOYOTA PRODUCTION SYSTEM
BASIC OF TOYOTA PRODUCTION SYSTEM
 
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh AroraJIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
 
Lean-TAREQ.pptx
Lean-TAREQ.pptxLean-TAREQ.pptx
Lean-TAREQ.pptx
 
12 TPS.pptx
12 TPS.pptx12 TPS.pptx
12 TPS.pptx
 
Just in Time
Just in TimeJust in Time
Just in Time
 
Presentation on Lean Manufacturing and waste elimination
Presentation on Lean Manufacturing and waste eliminationPresentation on Lean Manufacturing and waste elimination
Presentation on Lean Manufacturing and waste elimination
 
introduction_module1.pptx
introduction_module1.pptxintroduction_module1.pptx
introduction_module1.pptx
 
OM1 e06 (1).pptx
OM1 e06 (1).pptxOM1 e06 (1).pptx
OM1 e06 (1).pptx
 
Lean six sigma 3d
Lean six sigma 3dLean six sigma 3d
Lean six sigma 3d
 
Manufacturing process
Manufacturing processManufacturing process
Manufacturing process
 
Lean
LeanLean
Lean
 
10. just in-time
10. just in-time10. just in-time
10. just in-time
 
Seven wastes
Seven wastesSeven wastes
Seven wastes
 
Ch9 Jit
Ch9 JitCh9 Jit
Ch9 Jit
 
Lean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.pptLean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.ppt
 

More from Jitesh Gaurav (20)

What i es do iie iab v2
What i es do iie iab v2What i es do iie iab v2
What i es do iie iab v2
 
Weld material
Weld materialWeld material
Weld material
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Spi link
Spi linkSpi link
Spi link
 
6 Sigma - Chapter3
6 Sigma - Chapter36 Sigma - Chapter3
6 Sigma - Chapter3
 
6 Sigma - Chapter2
6 Sigma - Chapter26 Sigma - Chapter2
6 Sigma - Chapter2
 
6 Sigma - Chapter1
6 Sigma - Chapter16 Sigma - Chapter1
6 Sigma - Chapter1
 
6 Sigma - Chapter8
6 Sigma - Chapter86 Sigma - Chapter8
6 Sigma - Chapter8
 
6 Sigma - Chapter7
6 Sigma - Chapter76 Sigma - Chapter7
6 Sigma - Chapter7
 
6 Sigma - Chapter6
6 Sigma - Chapter66 Sigma - Chapter6
6 Sigma - Chapter6
 
6 Sigma - Chapter5
6 Sigma - Chapter56 Sigma - Chapter5
6 Sigma - Chapter5
 
6 Sigma - Chapter4
6 Sigma - Chapter46 Sigma - Chapter4
6 Sigma - Chapter4
 
Pattern production
Pattern productionPattern production
Pattern production
 
smed
smedsmed
smed
 
Methods of kaizen
Methods of kaizenMethods of kaizen
Methods of kaizen
 
Dfmea rating
Dfmea ratingDfmea rating
Dfmea rating
 
Qip
QipQip
Qip
 
Rodebaugh sixsigma[1]
Rodebaugh sixsigma[1]Rodebaugh sixsigma[1]
Rodebaugh sixsigma[1]
 
Tqm
TqmTqm
Tqm
 
Tpm+basics
Tpm+basicsTpm+basics
Tpm+basics
 

Recently uploaded

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Recently uploaded (20)

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 

Tps

  • 2. TOYOTA PRODUCTION SYSTEMS • Integrated System – Technical – Managerial – Philosophy – Human Development Forms the ORGANIZATION CULTURE
  • 3. Kiichiro Toyoda’s Philosophy • Used this philosophy to compete with Ford and other automobile manufacturers • Compete with large volume manufacturers in price, quality and availability to satisfy customer needs while producing in small quantities with limited capital expenditure
  • 4. Toyota Philosophy • Customer First • People are the most valuable resources • Kaizen • Shop Floor Focus
  • 5. Toyota Philosophy  Eliminate Waste / Muda of overproduction Pace of production = Pace of sales  Efficiency is gauged by the ability of a plant to meet exact customer requirements with the least amount of resources
  • 6. Toyota Philosophy • KAIZEN is about people: By knowing they are adding value for customer By having a safe work environment By utilizing their creativity By developing themselves
  • 7. Toyota GOAL • HIGHEST QUALITY • LOWEST COST • SHORTEST LEAD TIME
  • 8. Toyota Production System (TPS) • Influenced by: – Business Needs – Company Philosophy
  • 9. TPS • Foundation is STABILITY • STABILITY is dependant on 4 M’s • Man • Machine • Material • Method
  • 10. TPS • Problems impacting stable production: •Equipment •Defects •Rework •Shortage •Absenteeism •Morale
  • 11. TPS • Tradition Approach to solve problems • Maintain large inventories • Add more shifts or work overtime • Purchase more equipment
  • 12. TPS • TPS Approach to solve problems • Expose and attack problems • Seek out Root cause of problems • Fix problems 1 by 1 • Do not pass defective part on - inspect at the process and fix • Quality feedback immediate • Defects are visible at the source
  • 13. TPS • Build Quality: • Make abnormalities easy to notice • Call for help • Take quick action to fix so – Prevent building defect – Do not pass defect • Separate Man’s work and Machine’s work • Identify man’s work separately from Machine’s work
  • 14. TPS • Plan production based on TAKT TIME TAKT TIME = Total Available Production Time per day Total Production Requirements per day
  • 15. TPS • ALWAYS : Pace of production = Pace of sales
  • 16. TPS • Always have Standardized Work: • Most efficient work flow maintaining – Safety – Quality – Quantity – Cost • Main consideration on human movement • Should change when – Production Requirements change – Improved operation method is identified
  • 17. TPS • All relevant work site information is available at each jobsite through three worksheets 1. Production capacity Sheet 2. Standardized work combination table – Indicates flow of human work within a process – Specifies exact time requirement for each work step – Job design based in takt time – Useful for problem identification in relationship between man and machine
  • 18. TPS 3. Standardized work chart – Illustrates the work sequence and process layout – Indicates takt time and standard in process stock – Useful as a method of work site management Note: Examples of the three documents are attached with the presentation
  • 19. Problems while implementing TPS • Human Mindset – Same way for 30 years – People fear losing jobs – Teams are not effective – How to motivate “kaizen” effort – Why must we change – Manpower has no discipline – Why must I do standardized work if I can do faster my way • Misconceptions – TPS only makes me work harder – Long distances between supplier and manufacturer – No Money – Just another program – Equipment not capable
  • 20. Problems while implementing TPS • Leadership/management – What to do with people “kaizened” out – Large lot sizes, lower costs – Run machine for 24 hours – No support from top mgmt – Top mgmt often changes • Business Environment – Unlevel customer orders – Many customers, not all advocate TPS – Many different job classifications – Piece rate system – Many products, one day turnaround – Union won’t go along with TPS
  • 21. KAIZEN • Points of motion Kaizen • Hard Work – Bending – Reaching • Waiting – Waiting time in front of machine • Walking – Eliminate or reduce
  • 22. KAIZEN • Operator work while walking • Hand movements – Wide hand movements – Muda hand movements – Hands waiting? • Material Flow – Work being carried on a straight and level path – Part direction change • Eye Movements – Operator Checking?