1. Address: D3/121, Sushant Golf City, Sultanpur Road,
Lucknow, UP - 226030
Mobile: +91 9554957866/ 9918050200,
Email: psjohnson66@gmail.com, jps66@live.com
Johnson Samuel Perumkuzhiyil
Civil Engineering Professional
Profile: General Manager/ Senior Management Role in Construction Management
Working as Assistant General Manager- Golf & offers 29½ years experience in project management, including 3 years
international stint in Fiji, with a proven track record in construction of golf course & civil engineering projects for high
rise buildings, earthwork, & road construction
Key Traits & Core Competencies include…
Design Management & Review ~ Value Engineering ~ Risk Management ~ Project Cost Estimation/Valuation
~Landscaping~ Golf Course Layout ~ Cost Control ~ Master Planning ~ Project Execution & Management
Quality Driven ~ Time Management ~ Strong Work Ethics ~ Team Leadership
PROFILE OVERVIEW
Proven track in supervising golf course construction management project, with domain knowledge in planning
and execution of construction of all golf features as per USGA specifications including golf course drainage,
irrigation, & cart path
Demonstrated competency in review of drawings, contouring & survey work; ability to inspect and check site
Verifiable track record to execute landscaping with thorough knowledge of earthwork & use of heavy earthmoving
machines & equipment, with proficiency to use and operate survey instruments like total station.
Deep understanding of preparing daily work reports, schedules; hands on experience in quantity survey,
budgeting, billing; drive to prioritise on jobs to complete within the time limit.
Outstanding communication skills to coordinate with all level of internal or external management
PROFESSIONAL EXPERIENCE
Ansal Properties & Infrastructure Ltd., in their Hi-Tech city named Sushant Golf City, Lucknow
Assistant General Manager- Golf (April 2013 to date)
(Reporting to the Senior Vice President & having a direct reporting relationship with 120)
Senior Manager (April 2011- March 2013)
(Reported to the Vise President & led a team of 150)
Manager (Dec 2009- March 2011)
(Reported to the Senior General Manager & led a team of 150)
Responsibilities:
As Assistant General Manager- Golf, in charge of complete golf course construction and maintenance work including
design & execution of all civil & infrastructure work inside the golf course as per the defined Key Performance
Indices-
• Coordinate with various departments, agencies and consultants for adding better features like bunkers extra tees,
greens, landscaping, construction of cart path, drainage, irrigation, lake lining among others.
• Drive efforts to schedule projects & manage construction activity, including shaping and surveys.
• Liaise with stakeholders, conduct inspection of layout, & provide technical inputs on construction methodologies.
• Supervise overall golf course maintenance, manage all machineries, & suggest steps to streamline operations,
• Evaluate and make design revisions, review drawing, & suggest design changes as per site conditions,
• Prepare budget & track costing, and ensure cost control.
• Construction of Golf Course Maintenance Building of 8200 Sq. ft.
• Conduct quantity survey, BOQ & billing activities as per departmental requirements.
• Investigate conformance with quality norms, conduct quality audits, and prepare quality control reports
• Identify root cause of problems & resolve such problems arising on site from local villagers and labours to always
offer a better product offering to golfers and ensure their satisfaction.
• Conduct performance appraisals, check performance reports, & communicate with the higher management team.
Accomplishments:
• Received wholesome praise & appreciation from golfers for the design and construction of temporary holes to
make the golf course18 holes playable through innovative steps to overcome land availability problems.
• Made noteworthy contribution to manage the golf course with bare minimum maintenance cost without
compromising on a better quality playing course.
• Achieved remarkable success in the design of complete golf course surface & storm water drainage
• Initiated steps for manpower control for better productivity.
• Independently managed golf course to meet organisational objectives & in recognition rewarded with a high
2. trajectory growth path, with quick promotions from Manager to Senior Manager, and thereafter to Assistant
General Manager
Natadola Bay Resort Ltd., Fiji Islands
Head Surveyor- Golf Course (Jun 2006- Jul 2009)
(Reported to the Project Manager & led a team of 40)
Responsibilities:
As Head Surveyor- Golf Course, overseen golf course construction from initial to as-built, including earthwork
shaping, features construction, cart paths, & executed other civil work activities up to project handover as per the
specified Key Performance Matrices-
• Conducted survey checking from client side as well as prepared as-built drawings and signage
• Handled quantity survey, billing, & checked/ verified agency bills
• Assisted in drawing management & followed up with architects and construction team to review drawings.
• Coordinated with IMG and other agencies for project execution.
• Conducted weekly review meetings & reported to higher management and Project Management agency
Accomplishments:
• Initiated steps to improve productivity in project execution despite operating in a new overseas culture.
• A key member of the project team assigned to construct the prestigious International Championship Golf Course,
designed by world No. 1 golf champion Vijay Singh & IMG, that has since become famous in the golf circuit in the
pacific region.
• Played a major part in benchmarking performance to industry best practices & completing the golf course in
record time of 2 years, despite incurring myriad problems from villagers, hard rock, heavy rain, & marshy land.
• Instrumental in effective utilization of resources to maximize the output during construction phase.
• Effectively leveraged domain expertise to use high tech earthwork equipments, rain bird irrigation systems,
Jacobsen grass mowing equipments, Trimble GPS, & software application tools Total Station, AutoCAD, MS
Project
Sahara India Commercial Corporation Ltd., Aamby Valley City, Lonavla, Maharashtra
Surveyor- Golf course (Oct 1996- May 2006)
(Reported to the Project Manager & led a team of 100)
Responsibilities:
As Surveyor- Golf course, was in charge of earthwork, shaped construction of championship golf course, and
developed a world class hill city in an area of over 15000 acres as per the set Key Performance Indicators-
• Interfaced with Architects & consultants dealt with the golf construction management team to assist in required
drawing reviews.
• Undertaken quantity survey, with quantity assessment for earthwork, & prepared monthly project billing.
• Controlled earthwork & shaping using high tech earthwork equipments- TORO Irrigation Systems, Jacobsen
Grass mowing equipments, & Trimble GPS.
• Managed detail surveying in infrastructure, with accountability for total survey work from initial to as-built
layout.
• Controlled drawing management including preparation of as-built drawings and signage
• Conducted rate analysis, estimated & analyzed costs, as well as engaged in budgeting.
Accomplishments:
• Made decisive career transition into golf course construction & ably developed domain expertise in construction
and shaping of golf course features.
• Instrumental in successfully completing the International Championship Golf Course designed by M/s David
Hemstock Associates and PGADC.
• Mastered the use of latest survey instrument total station & auto plotter software in survey work as well as
rapidly learned application of MS Office, AutoCAD, & MS Project in a professional corporate environment.
Mayuresh Group, New Mumbai
Site In-charge (March 1994 - Sep 1996)
(Reported to the Chief Engineer & led a team of 150)
Surveyor (Sep 1992- Feb 1994)
(Reported to the Chief Engineer & led a team of 10)
Responsibilities:
As Site In-charge, managed site with full authority, supervised staff & spearheaded efforts to construct - Mayuresh
Chambers, a prestigious high rise commercial tower project as per the Key Performance Parameters-
• Involved in quantity survey, invoice checking, billing, & material management
3. • Totally controlled building project including quantity assessments, and quality control
As Surveyor, steered Initial site survey and contouring, build layouts & set outs for start up of building setting out for
construction activity for 17 nos. housing projects in Nerul CBD in Navi Mumbai as per the set Key Performance
Objectives-
• Handled plot demarcation, building setting out, & build center line demarcation, construction of site offices and
stores.
• Dealt with different agencies, including Architects and RCC Consultants, & revised drawings
• Supervised project scheduling and ensured timely completion as per schedule
Accomplishments:
• Selected by the management to coordinate Belle Vista tower project, and deftly speeded up work for 3 months, to
complete 17 slabs within this short time duration which was a great achievement.
• Played a pivotal role to start challenge commercial tower project work & effectively completed plinth just before
rains in early June which was duly recognised by the chairman and felicitated with a special gift for the
extraordinary efforts.
• Made significant contribution to successfully complete structural work upto 13th floor, 11 meter projection in 9th
floor, & finishing work upto 10th floor within 2 years on fast track mode & received appreciation for the speed &
quality of work.
Narmada Commercial Enterprises, Pvt. Ltd., Navi Mumbai
Site In-charge (Oct 1990- Aug 1992)
(Reported to the Chief Engineer & led a team of 30)
Responsibilities:
As Site Engineer, involved in site management, conducted initial site survey, road alignment, & prepared cross & L-
sections as per the specified Key Performance Indicators-
• Made decisions on all machinery management, controlled machinery arrangements & resolved problems onsite.
• Handled quantity survey, billing, setout of curve and day to day survey & earthwork
• Installed culverts and drainages as well as undertaken quality checks.
• Conducted survey work, checked, & prepared as-builts
• Attended periodic client meetings and reported to CIDCO authorities
• Undertaken quantity surveys & prepared billing with focus on tracking daily expenses and controlling costs.
• Prepared performance reports and submitted to the seniors.
Accomplishments:
• Made noteworthy contribution to improve work efficiency through better time management and received
appreciation from the company’s Managing Director who highlighted all achievements that proved to be strength
for the company.
Honesty Construction Company, Mumbai
Site Engineer (Oct 1987- Sep 1990)
(Reported to the Site in Charge & led a team of 50)
Responsibilities:
As Site In-charge, overseen site management including initial site survey, quantity survey, billing, and conducted
quality checks of roads in different stages as per the Key Result Areas-
• Prepared road sections & checked levels and measurements
• Worked on heavy earthmoving equipments
• Coordinated road layout, curve setting, alignment setting, and completed other survey works
• Conducted rate analysis and engaged in tender filling
• Prepared & submitted progress reports to the senior management.
Navodaya Constructions, Mumbai
Site Supervisor (Dec 1986- Sep 1987)
(Reported to the Site in Charge & led a team of 100)
Responsibilities:
As Site Supervisor, managed site activity, including survey, layout, and set out; labour control, quantity survey,
materials management, & checked material bills
4. PROJECTS HANDLED IN BRIEF
Ansal Properties & Infrastructure Ltd.
Project: Construct 18 hole International Championship Golf Course, designed by M/s Martin Hawtree, UK in Sushant
Golf City, Lucknow, contract value INR 46 Cr.
Project Scope: Golf course with all modern amenities in 3500 acre high tech township, using high tech earthwork
equipment, TORO Irrigation Systems, TORO Grass mowing equipments, Trimble GPS & Total Station, AutoCAD, MS
Project
Natadola Bay Resort Ltd., Fiji Islands
Project: Construct championship golf course, designed by the famous golfer Vijay Singh, IMG for Client: Natadola Bay
Resort, a sister concern of Fiji National Provident Fund, with contract value of FD 2.5 Cr.
Project Scope: Construct golf course & related structures, over 300 acres wide Golf Resort No.1 in Fiji Island connected
with Intercontinental Beach Resorts on Fiji’s Natadole beach with adjoining mountain side
Sahara India Commercial Corporation Ltd.
Project: Construct International Championship Golf Course, Aamby Valley City, Lonavla, contract value INR 36 Cr.
Project Scope: Build golf course & related structures, in a first of its kind project in India, spread over 15000 acres Hill
City with all modern amenities in the midst of the beautiful western ghats
Mayuresh Group, New Mumbai
Project: Construct 13 storey, approx. 100000 Sqft. commercial tower- Mayuresh Chambers, contract value INR 20 Cr.
Project Scope: Tower with ground floor parking, first floor podium with 5 independent villas; front & sides glass
curtain walls; M20 & M25 concrete, modern scaffolding system; & from 9th
floor building projected to front, 10.76 m. on
3 circular columns
Project: 17 other housing projects in Navi Mumbai
Honesty Construction Company, Mumbai
Project: Construction of National Highway 4B connecting NH4 to Jawaharlal Nehru Port, Navi Mumbai
Narmada Commercial Enterprises, Pvt. Ltd., Navi Mumbai
Project: Earthwork at reclamation projects under CIDCO in New Mumbai
Navodaya Constructions, Mumbai
Project: Construction of internal roads in Shanti Nagar, Mira Road, Thane District, Maharashtra
EDUCATIONAL CREDENTIALS
• Diploma in Civil Engineering, Kerala State Board of Technical Education, 1st class (1986)
PERSONAL DETAILS
• Date of Birth : 30th
May 1966
• Language Proficiency: English, Hindi, Tamil, Marathi, & Malayalam
• Computer Literacy : MS Office (Excel, Power point, Word), AutoCAD, MS Project, Total Station & Auto Plotter
(Survey Software)
• Nationality : Indian
• Passport Details : L7252881, valid till 17th
Feb 2024
~ References Available Upon Request ~