November 2014 – Present
Project Engineer at SKP – Samir Khairallah & Partners
Project: Kempinski Summerland Hotel and Resort
• Review and understand all project contract documents (drawings, shop drawings,
composite coordinate service shop drawings, specifications, contract documents etc.);
coordinate with other site architects and engineers before construction activities
commence.
• Notify the Resident Engineer of any discrepancies identified against contract
documents in order for corrective action to be taken.
• Assist in resolving any issues raised by contractors (e.g. requirements for time
extensions, change order requests, variations etc.); make recommendations to the
Resident Engineer as appropriate.
• Review related items within the contractor’s construction schedule (CCS) in
coordination with the Planning Engineer (e.g. shop drawing submittal log,
procurement schedule, and material submittal log etc.) prior to its approval by the
Resident Engineer.
• Review related construction materials, technical data and material and finishes samples
submitted by contractors; ensure compliance against ministerial requirements and
technical specifications.
• Attend various inspections to ensure that material/samples, mock-ups, testing, etc. as
per the contract document.
• Ensure the maintaining of onsite quality control (e.g. through thorough testing of
materials and verifying of materials, adequate storage of materials, contractor’s
submittal of written undertakings, warranty and protection of installed systems etc.)
• Review "mock ups" and "progress work" against contract documents; make
commentaries and recommendations to the Resident Engineer as required.
• Attend meetings (e.g. progress meetings, coordination and specially called meetings
with clients etc.) as and when required.
• Contribute in the snagging procedure after substantial completion of construction
activities have ended; ensure that a snag list is prepared based on defective/outstanding
works for the contractor to rectify, repair and complete for re-inspection.
May 2014 – 0ctober 2014
Architect at Cutrite S.a.l. - Lebanon.
Page 1
2. As a full timer Architect, I am reporting to the project manager. I contribute in the design of
the project at first and then as a second step I deal with the subcontractors and prepare the
team required to run the project. On site supervisor, managing quality control and ensure good
productivity of labors.
Key Achievements
• Running 2 projects simultaneously across the territory.
• Designing the project and presenting it to the client.
• Managing labors/shifts, inspecting technical implementation and running quality
control.
Key Responsibilities
• Ensure compliance with the set budget.
• Negotiating prices/deals with suppliers.
• Quality/ Installation control.
March 2007 – January 2014
Assistant Project Manager, khayrallah group kitchen industry - Lebanon.
As a part timer, and during my studies, I was reporting to the Project Manager and covering
the Lebanese market region. I have the ability to work under pressure with tight budgets and
timescales. Main Role is managing on site projects/staff and quality control issues.
Key Achievements
• Running 4 projects simultaneously (average value of 2 million AED) across the
territory.
• Increasing net profit by 2 % through early delivery rebate (EDR) clause achievement.
• Managing 40 labors/shifts, inspecting technical implementation and running quality
control.
Key Responsibilities
• Maintaining project net profit at maximum level.
• Negotiating prices/deals with suppliers.
July 2011– September 2011
Intern at Ardoise, (Construction Company) - Lebanon.
Key Responsibilities
• On-site supervisor of Ardoise II project, early finishing phase painting & tiling and
finishing phase kitchen installation and cabinets/vanity etc.
• On-site supervisor of Yarze residential project, closure phase, electrical and
mechanical works.
Education
February 2014: Notre Dame University (NDU), Zouk Mosbeh, Lebanon
Bachelor's degree in Architecture
GPA: 2.60 / 4.0
June 2007: College St Joseph Antoura, Antoura, Lebanon
Page 2
3. High school or equivalent, Economics and Sociology
- Received the diploma of distinction upon graduation.
Skills
Skill Skill Level Years of Experience Last Used
Microsoft Office
(Word, PowerPoint, Excel)
Intermediate More than 5 years 1 month or less
AutoCAD
3dmax
Revit for architecture
20*20
Expert
Intermediate
Intermediate
Intermediate
More than 3 years
More than 1 year
More than 1 year
More than 1 year
1 month or less
6 months or less
6 months or less
6 months or less
Languages
Arabic (native), English (spoken/written), French (spoken/written).
Workshops & Conferences
April 2009: Attended the workshop of four elements of architecture
Greece.
Page 3