SlideShare a Scribd company logo
1 of 2
Javier Gómez García
4600 Westway Ave, McAllen, Tx
Cel: 956-890-1037
jonuli1505@gmail.com
SUMMARY
Bilingual: English / Spanish, Electronic Engineering degreed, with solid background in PCB manufacturing.
Well deep analysis failure reporting.
EDUCATION / TRAINING
Carrier Electronic Engineer, 1997
Instituto Tecnologico de Reynosa Certified Electronic Engineer, 2002
Siemens Prog & Maint Agile
Basic SAP Wave Solder Process
Autocad AirVac Repair Station
Lead Free Solder paste Router
Lean Manufacturing Conformal
TIMMS (SONY Programming sfw) X Ray Inspection
GREN BELT Stencil Desing
Transferring Leader (NY to Reynosa) (Fort Worth to Reynosa)
EXPERIENCE Work visa H1B
Air Solutions Heating & AC January/11 to present
Responsible to coordinate jobs on site, implement new software to calculate Manual J’s for residence AC
system, analyze mal functions boards, carry out infiltration test for residence to improve energy savings.
Use infrared gun to find leaks for lose energy on residences, install new systems AC system for residence to
improve the energy saving.
Motorola June /10 to Dic/10
Reynosa, Tamps.
Sr SMT Process Engineer.
Responsible to maintain running the SMT lines, keep our process without defects. Review the yield average
for all the models in the final assembly to know the defects that my customers find. Make any change in the
SMT process to fix the problem and improvements for the models, that include improve tools & operations
techniques.
Analyze the defects that our customers find as solder join, with die test performing as a first level analysis. If
the problem is regarding to the solder join under the component I use the X ray inspection to find missing
solder paste or short solder join or component damaged.
Motorola January/00 to April/09
Reynosa, Tamps.
Asist PCB Engineering Manager.
Responsible for all engineering aspects of PCB level, cash management, inventory control spare part.
Arrange and manage all the different shifts to support Production, control and maintain placement programs.
Support new technologies introduction, scheduling training to support team, implement lean manufacturing
in the current layout, improve PM program for all the equipments, coordinate run rates to have a Capacity
Model for scheduling. Introduce Lead Free process; re-design profiles according to the LF components, set
all the tools and materials for LF. Under my responsibilities there are 7 engineers and 5 technicians.
Accomplishments:
• Reduce Scrap from $192K to $45K for all PCBA
• Router analysis, calibration machine and new tools added
• Solder shorts under BGA elimination by new apertures on stencil. $20.5 K saved.
• Yield improvement from 95 to 98, PCBA actions taken.
• Re-design stencils.
• Re-design profiles for LF components.
• New pallets for Wave solder process.
• New pallets for conformal coating.
• Improve machines efficiency from 34 % to 55 %, on going.
• Reduce Change Over number
• Grouping setups families.
• Schedule only high placement models in new SMT lines
• Downtime improvement from 224 hrs to 100 hrs, on going.
• Review maintenance task for each machine
• High maintenance performance for lines with major DT.
• CO improvement from 25 sec to 15 sec
• Analysis operations to eliminate no-value operation
• Cascade CO.
• Define task per technician
• 5’s culture improve from 1.8 to 3.9 metric
Kimball 09/97 to 12/99
Reynosa, Tamps.
SMT Process Engineer
Responsible for maintain running the machines; establish a schedule maintenance for all the SMT
equipments. Improve the performance of the machines doing analysis for placement optimization, buy spare
parts to reach the goal of performance. Re-active machine without use for new models to run, coordinate
high maintenance for Fuji machines, coordinate transferring model from Jasper Indiana to Reynosa for new
products introduction. Give training to technicians on conformal and silicon machines dispensing and
profiles charts. Coordinate Temporally Change on production according to our customers. Under my
responsibility were 7 technicians.
• Introduce new Microsoft project (re-active CP VI, and GSP Fuji Machines)
• Introduce new GE project (Conformal Included)
Delnosa. 10/91 to 09/97
Reynosa, Tamps.
Product Engineer. Analysis CAR computer from GM. Define process to improve the lead time for
remanufacturing the Car Computers. Coordinate ramp up for new requirements, require tools and spare
parts to support the production, assign human resources for the process. Coordinate EC for new
introductions; validate each test to release to Production.

More Related Content

What's hot (19)

Madon CV shl2
Madon CV shl2Madon CV shl2
Madon CV shl2
 
vivekResume
vivekResumevivekResume
vivekResume
 
Praveen Kumar (Resume)
Praveen Kumar (Resume)Praveen Kumar (Resume)
Praveen Kumar (Resume)
 
CV_for_Ali Al Jarbou
CV_for_Ali Al JarbouCV_for_Ali Al Jarbou
CV_for_Ali Al Jarbou
 
Resume rahul iyer jan 2014 vietnam
Resume rahul iyer jan 2014 vietnamResume rahul iyer jan 2014 vietnam
Resume rahul iyer jan 2014 vietnam
 
HASSAN ALI CV1
HASSAN ALI CV1HASSAN ALI CV1
HASSAN ALI CV1
 
SAIFULLAH RESUME 261216
SAIFULLAH RESUME 261216SAIFULLAH RESUME 261216
SAIFULLAH RESUME 261216
 
Updated Umang resume
Updated Umang resumeUpdated Umang resume
Updated Umang resume
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
 
Mark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CVMark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CV
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Gorga Silalahi (CV)
Gorga Silalahi (CV)Gorga Silalahi (CV)
Gorga Silalahi (CV)
 
Machine _Operator Resume
Machine _Operator ResumeMachine _Operator Resume
Machine _Operator Resume
 
Winston Resume new
Winston Resume newWinston Resume new
Winston Resume new
 
Chazapis Commissioning: are you interested in?
Chazapis Commissioning: are you interested in?Chazapis Commissioning: are you interested in?
Chazapis Commissioning: are you interested in?
 
Detailed resume
Detailed resumeDetailed resume
Detailed resume
 
Instrument commissioning engineer
Instrument commissioning engineerInstrument commissioning engineer
Instrument commissioning engineer
 
Resume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerResume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineer
 
Resume
ResumeResume
Resume
 

Viewers also liked

Prem Mathavan CV
Prem Mathavan CVPrem Mathavan CV
Prem Mathavan CVPrem Anand
 
Gary F. Keith (4 SEP 2014)
Gary F. Keith (4 SEP 2014)Gary F. Keith (4 SEP 2014)
Gary F. Keith (4 SEP 2014)Gary Keith, PMP
 
Greg Page Resume- Jan16
Greg Page Resume- Jan16Greg Page Resume- Jan16
Greg Page Resume- Jan16Greg Page
 
bryan-j.-reinbolt-resume
bryan-j.-reinbolt-resumebryan-j.-reinbolt-resume
bryan-j.-reinbolt-resumeBryan Reinbolt
 
Andrew Phillips Resume July 2016
Andrew Phillips Resume July  2016Andrew Phillips Resume July  2016
Andrew Phillips Resume July 2016parsigma
 
Загальний список загиблих на Донбасі російських військовослужбовців і найманців
Загальний список загиблих на Донбасі російських військовослужбовців і найманцівЗагальний список загиблих на Донбасі російських військовослужбовців і найманців
Загальний список загиблих на Донбасі російських військовослужбовців і найманцівtsnua
 

Viewers also liked (15)

Morrison resume
Morrison resumeMorrison resume
Morrison resume
 
PEDDINTI TARAKESAM
PEDDINTI TARAKESAMPEDDINTI TARAKESAM
PEDDINTI TARAKESAM
 
Vinay_CV
Vinay_CVVinay_CV
Vinay_CV
 
Prem Mathavan CV
Prem Mathavan CVPrem Mathavan CV
Prem Mathavan CV
 
Gary F. Keith (4 SEP 2014)
Gary F. Keith (4 SEP 2014)Gary F. Keith (4 SEP 2014)
Gary F. Keith (4 SEP 2014)
 
Shree duth awasthi_cv
Shree duth awasthi_cvShree duth awasthi_cv
Shree duth awasthi_cv
 
Chen_CV
Chen_CVChen_CV
Chen_CV
 
John Resume 2015
John Resume 2015John Resume 2015
John Resume 2015
 
Greg Page Resume- Jan16
Greg Page Resume- Jan16Greg Page Resume- Jan16
Greg Page Resume- Jan16
 
bryan-j.-reinbolt-resume
bryan-j.-reinbolt-resumebryan-j.-reinbolt-resume
bryan-j.-reinbolt-resume
 
Surbhi Bhatnagar Resume
Surbhi Bhatnagar ResumeSurbhi Bhatnagar Resume
Surbhi Bhatnagar Resume
 
Resume adhikari
Resume adhikariResume adhikari
Resume adhikari
 
Andrew Phillips Resume July 2016
Andrew Phillips Resume July  2016Andrew Phillips Resume July  2016
Andrew Phillips Resume July 2016
 
Nareshkumar_CV
Nareshkumar_CVNareshkumar_CV
Nareshkumar_CV
 
Загальний список загиблих на Донбасі російських військовослужбовців і найманців
Загальний список загиблих на Донбасі російських військовослужбовців і найманцівЗагальний список загиблих на Донбасі російських військовослужбовців і найманців
Загальний список загиблих на Донбасі російських військовослужбовців і найманців
 

Similar to Bilingual Engineer Resume Summary

Similar to Bilingual Engineer Resume Summary (20)

RESUMEJILH33016
RESUMEJILH33016RESUMEJILH33016
RESUMEJILH33016
 
Ruben Renteria - Resume Nov. 11. 2015
Ruben Renteria - Resume Nov. 11. 2015Ruben Renteria - Resume Nov. 11. 2015
Ruben Renteria - Resume Nov. 11. 2015
 
Gary giblock resume 2 21-17
Gary giblock resume 2 21-17Gary giblock resume 2 21-17
Gary giblock resume 2 21-17
 
Kenneth probst resume 2016
Kenneth probst resume 2016Kenneth probst resume 2016
Kenneth probst resume 2016
 
Manufacturing Engineer
Manufacturing EngineerManufacturing Engineer
Manufacturing Engineer
 
Fernando_Bastida_Today2
Fernando_Bastida_Today2Fernando_Bastida_Today2
Fernando_Bastida_Today2
 
Rakesh burman resume
Rakesh burman resume Rakesh burman resume
Rakesh burman resume
 
JAS Resume
JAS ResumeJAS Resume
JAS Resume
 
Daniel Velazquez G
Daniel Velazquez GDaniel Velazquez G
Daniel Velazquez G
 
Civitano_resume_2017
Civitano_resume_2017Civitano_resume_2017
Civitano_resume_2017
 
Resume 2.0
Resume 2.0Resume 2.0
Resume 2.0
 
CV
CVCV
CV
 
Michael E Burns Resume
Michael E Burns ResumeMichael E Burns Resume
Michael E Burns Resume
 
Suresh Resume
Suresh ResumeSuresh Resume
Suresh Resume
 
resume(Cheah Yaw Wah)
resume(Cheah Yaw Wah)resume(Cheah Yaw Wah)
resume(Cheah Yaw Wah)
 
John Setty Resume Rev2
John Setty Resume Rev2John Setty Resume Rev2
John Setty Resume Rev2
 
Kevin Resume 3-12-2016
Kevin Resume 3-12-2016Kevin Resume 3-12-2016
Kevin Resume 3-12-2016
 
Gerardo 2016
Gerardo 2016Gerardo 2016
Gerardo 2016
 
msanjuan_RESUME
msanjuan_RESUMEmsanjuan_RESUME
msanjuan_RESUME
 
John smith 7.22.2015 1
John smith 7.22.2015 1John smith 7.22.2015 1
John smith 7.22.2015 1
 

Bilingual Engineer Resume Summary

  • 1. Javier Gómez García 4600 Westway Ave, McAllen, Tx Cel: 956-890-1037 jonuli1505@gmail.com SUMMARY Bilingual: English / Spanish, Electronic Engineering degreed, with solid background in PCB manufacturing. Well deep analysis failure reporting. EDUCATION / TRAINING Carrier Electronic Engineer, 1997 Instituto Tecnologico de Reynosa Certified Electronic Engineer, 2002 Siemens Prog & Maint Agile Basic SAP Wave Solder Process Autocad AirVac Repair Station Lead Free Solder paste Router Lean Manufacturing Conformal TIMMS (SONY Programming sfw) X Ray Inspection GREN BELT Stencil Desing Transferring Leader (NY to Reynosa) (Fort Worth to Reynosa) EXPERIENCE Work visa H1B Air Solutions Heating & AC January/11 to present Responsible to coordinate jobs on site, implement new software to calculate Manual J’s for residence AC system, analyze mal functions boards, carry out infiltration test for residence to improve energy savings. Use infrared gun to find leaks for lose energy on residences, install new systems AC system for residence to improve the energy saving. Motorola June /10 to Dic/10 Reynosa, Tamps. Sr SMT Process Engineer. Responsible to maintain running the SMT lines, keep our process without defects. Review the yield average for all the models in the final assembly to know the defects that my customers find. Make any change in the SMT process to fix the problem and improvements for the models, that include improve tools & operations techniques. Analyze the defects that our customers find as solder join, with die test performing as a first level analysis. If the problem is regarding to the solder join under the component I use the X ray inspection to find missing solder paste or short solder join or component damaged. Motorola January/00 to April/09 Reynosa, Tamps. Asist PCB Engineering Manager. Responsible for all engineering aspects of PCB level, cash management, inventory control spare part. Arrange and manage all the different shifts to support Production, control and maintain placement programs.
  • 2. Support new technologies introduction, scheduling training to support team, implement lean manufacturing in the current layout, improve PM program for all the equipments, coordinate run rates to have a Capacity Model for scheduling. Introduce Lead Free process; re-design profiles according to the LF components, set all the tools and materials for LF. Under my responsibilities there are 7 engineers and 5 technicians. Accomplishments: • Reduce Scrap from $192K to $45K for all PCBA • Router analysis, calibration machine and new tools added • Solder shorts under BGA elimination by new apertures on stencil. $20.5 K saved. • Yield improvement from 95 to 98, PCBA actions taken. • Re-design stencils. • Re-design profiles for LF components. • New pallets for Wave solder process. • New pallets for conformal coating. • Improve machines efficiency from 34 % to 55 %, on going. • Reduce Change Over number • Grouping setups families. • Schedule only high placement models in new SMT lines • Downtime improvement from 224 hrs to 100 hrs, on going. • Review maintenance task for each machine • High maintenance performance for lines with major DT. • CO improvement from 25 sec to 15 sec • Analysis operations to eliminate no-value operation • Cascade CO. • Define task per technician • 5’s culture improve from 1.8 to 3.9 metric Kimball 09/97 to 12/99 Reynosa, Tamps. SMT Process Engineer Responsible for maintain running the machines; establish a schedule maintenance for all the SMT equipments. Improve the performance of the machines doing analysis for placement optimization, buy spare parts to reach the goal of performance. Re-active machine without use for new models to run, coordinate high maintenance for Fuji machines, coordinate transferring model from Jasper Indiana to Reynosa for new products introduction. Give training to technicians on conformal and silicon machines dispensing and profiles charts. Coordinate Temporally Change on production according to our customers. Under my responsibility were 7 technicians. • Introduce new Microsoft project (re-active CP VI, and GSP Fuji Machines) • Introduce new GE project (Conformal Included) Delnosa. 10/91 to 09/97 Reynosa, Tamps. Product Engineer. Analysis CAR computer from GM. Define process to improve the lead time for remanufacturing the Car Computers. Coordinate ramp up for new requirements, require tools and spare parts to support the production, assign human resources for the process. Coordinate EC for new introductions; validate each test to release to Production.