SlideShare a Scribd company logo
1 of 25
Download to read offline
Introduction to
Technical resume
&
Interview PreparationInterview Preparation
For Engineers
December 2014
Mohammadreza Jarollahi, P. Eng., M.Sc.
Civil Engineer
Technical resume & Interview preparationTechnical resume & Interview preparation
This presentation is a brief introduction to
preparation of an engineering interview and based on:
Personal understanding of the APEGBC GuidelinePersonal understanding of the APEGBC Guideline
for registration and
Personal experience as one of the APEGBC
interviewers
Technical resume & Interview preparationTechnical resume & Interview preparation
To become a P.Eng. the Applicant
must have:
A minimum 1 year of application of
theory (design) experience and
a minimum of 3 years of onsite
experience prior to project management
Technical resume & Interview preparationTechnical resume & Interview preparation
ProvideYourTechnical Work Experience
Provide A List Of ProjectsYouWere
Involved
For each project:
Discuss your responsibilities and the
engineering (technical) aspects of your work
Technical resume & Interview preparationTechnical resume & Interview preparation
Provide General Information Of Each Project
The name of project and the location
Name of the client
Name of the consultant or designers
Name of the contractorName of the contractor
Started and Completed Dates of the Project
Amount of the allocated budget for the project in
Canadian Dollars
Categorized the groups and give the number of the
people involved in the project with their positions
and qualifications
Explain in which group you were active
Technical resume & Interview preparationTechnical resume & Interview preparation
For Each Project:
ExplainYour Responsibilities and IntroduceYour Direct Supervisor(s)
Provide the date you were working on the project
ProvideYour Supervisorโ€™s Name,Title and Position
Provide your JobTitle and Position
ExplainYour Responsibilities and what YOU have done
Only talk about what ever you personally performed. If you wereOnly talk about what ever you personally performed. If you were
working in a group, explain what you have done in that group
Itemize and refer to all of your personal activities you performed
Be prepared to explain in detail about all the subjects you might
be questioned
Provide evidences for what you are explaining, just in case the
interviewers asked for them
Provide Design Sheets of the project if You were Designer or
the part which you designed
Provide some drawings as evidences
Provide some pictures of the project if implemented
Technical resume & Interview preparationTechnical resume & Interview preparation
If Applicable,TheTechnicalWork
Experience ShouldTargetTheExperience ShouldTargetThe
Following Items *
Technical resume & Interview preparationTechnical resume & Interview preparation
Quality Control and Assurance
Carry out design and shop drawing reviews
Produce quality control and quality inspection reports
Produce non-conformance and corrective action
reports
Initiate quality control program to ensure outcomesInitiate quality control program to ensure outcomes
are achieved to the required or specified standard
Arrange for and obtain performance tests, witnessing
of said tests and other reviews as necessary to ensure
that material and equipment meet quality and
performance requirements
Ensure commissioning is done properly, approved and
signed-off
Technical resume & Interview preparationTechnical resume & Interview preparation
Ensure Safety
Conduct Job Hazard Analysis (JHA) for all
scheduled activities
Produce safe job practices for JHA activities
and manage prevention of accidentsand manage prevention of accidents
Verify safety and environmental certifications
Demonstrate knowledge of safety and work-
safe regulations
Conduct safety meetings regularly
Manage remedial action and reporting when
accidents occur
Technical resume & Interview preparationTechnical resume & Interview preparation
Budget and Cost Management
Have a thorough understanding and preparation of estimates and
budget costs
Demonstrate understanding of the use of work breakdown
structure to define the scope, estimate costs and organize
schedules
Know the cost of labour, equipment, subsistence and
construction or project set-up
Produce budget, cost coding and all adjustments and reviewsProduce budget, cost coding and all adjustments and reviews
Review time sheets daily re: labour and equipment
Identify and track:
Production (daily);
Costs (daily);
All extra work performed (weekly); and/or
Equipment (owned and rented)
Monitor production of deliverables to ensure that cost trend
deviations from budget are quickly identified and remedied
Technical resume & Interview preparationTechnical resume & Interview preparation
Risk Assessment and Management
Identify risks and their potential impacts
Produce a risk minimization plan
Implement that risk minimization planImplement that risk minimization plan
Technical resume & Interview preparationTechnical resume & Interview preparation
Project Scope and Deliverables
Collaborate with clients/project owners to define
project scope and deliverables
Develop a project plan
Produce overall schedules prior to start of project
Have a thorough understanding of scope of work,Have a thorough understanding of scope of work,
specifications and drawings
Have a thorough understanding of sub-contractorโ€™s
work
Identify measurable outcomes to evaluate the project
on completion
Review requested variations against contract terms
and conditions, agree on project outcomes and
variations in project requirements or conditions
Technical resume & Interview preparationTechnical resume & Interview preparation
Scheduling and Project Implementation
Determine and implement a project program (timeline)
Draft, develop and implement an Inspection and Testing Plan
Produce or review custom design and specifications
Produce detailed designs and drawings when required
Installation Supervision
Commissioning of mechanical, electrical, water and/or sewage where
appropriate
Commissioning of service equipment and special installations of
functional, operational or architectural components wherefunctional, operational or architectural components where
appropriate
Produce submittal logs
Monitor project progress
โ€ข Compare progress to program/timeline and initiate remedial
action where necessary
โ€ข Produce next day planner โ€“ daily
โ€ข Tracking of Project schedules โ€“ weekly
โ€ข Produce two week schedules โ€“ bi-weekly
โ€ข Update project schedules โ€“ monthly
โ€ข Schedule sub-contractorsโ€™ activities
Plan and manage the integration of the transition of each stage of
the project cycle
Technical resume & Interview preparationTechnical resume & Interview preparation
Site Inspections
Arrange for and/or carry out inspections at the
vendorsโ€™ place of manufacture, in the contractorsโ€™
shops and on the site.
Review vendorsโ€™ and contractorsโ€™ drawings to ensure
compatibility with other equipment and compliancecompatibility with other equipment and compliance
with the contract documents (designs, drawings,
specifications).
Ensure compliance with safety requirements including
documented onsite safety inspections
Ensure compliance with quality control requirements
Ensure compliance by sub-contractors
Technical resume & Interview preparationTechnical resume & Interview preparation
Procurement and Resources Management
Determine procurement requirements for the project in
accordance with project budget
Produce materials logs
Procurement and expediting
Materials receiving
Inventory control for materials and toolsInventory control for materials and tools
Purchase order administration and packing slips control
Order material deliveries
Develop resource, material conservation, recovery and
waste management plans
Develop strategies to maintain the effective performance
of the resources
Diagnose problems and identify requirements for
appropriate testing
Technical resume & Interview preparationTechnical resume & Interview preparation
Manage People
Implement a people management plan
Monitor team and individual performance targets
Ensure the team has adequate skills and resources to
achieve the project outcomes
Participate in selection of staff
Discuss project scope and objectives with those involvedDiscuss project scope and objectives with those involved
in the project
Delegate achievement of outcomes to ensure cost, time
and material resources are appropriately allocated and
applied
Ensure compliance with safety, risk, cost and
environmental requirements
Provide performance feedback
Inform managers of relationship of project to other
program outcomes
Technical resume & Interview preparationTechnical resume & Interview preparation
Information and Communication
Management
Manage communication across the project
with all stakeholders
Design or agree upon documentation system
across the project
Communicate with the project team, clients,
stakeholders and regulators on project
progress where appropriate
Technical resume & Interview preparationTechnical resume & Interview preparation
Contract andTender Services
Prepare and produce contract or tender
documentation where appropriate
Respond to tender inquiries where
appropriate
Perform contract or tender evaluation and
analysis where appropriate
Prepare addenda
Technical resume & Interview preparationTechnical resume & Interview preparation
Finalize the Project
Review and document the project outcomes
against the project requirements
Establish the acceptance criteria for the
project in consultation with the client
Plan the hand over of the project
Technical resume & Interview preparationTechnical resume & Interview preparation
Environmental and Sustainability and
Regulatory Considerations
Have regard to, develop and implement
environmental and sustainability considerations from
project inception and development stages through to
project finalization
Identify and account for environmental and
sustainability concerns and requirements within thesustainability concerns and requirements within the
project deliverables
Establish environmental and sustainability criteria for
procurement of materials, equipment and services.
Understand, plan for and comply with legal and
regulatory requirements of the project, including
contracts, codes, labour law and other legislation
Understand, plan for, and comply with legal and
regulatory requirements of the project, including
contracts, codes, local and provincial legislation
Technical resume & Interview preparationTechnical resume & Interview preparation
Explain any challenges you were involved and
how you solved the problems
List of obstacles you observed in any stages;
negotiation, design, contractor / subcontractor
evaluation and selection, during implementation ofevaluation and selection, during implementation of
the project, risks, environment, budget, etc.
Explain what you have done to remove the issues
Technical resume & Interview preparationTechnical resume & Interview preparation
Explain Lesson Learned from each project
Explain the Root Cause of the problemsExplain the Root Cause of the problems
Explain the Corrective and Preventive
Actions you have applied
Technical resume & Interview preparationTechnical resume & Interview preparation
IntroduceYour Referrals:
Provide a list of your supervisors with their:
Names
Positions
Contact Information
Phones
Mail address
Email address
Technical resume & Interview preparationTechnical resume & Interview preparation
References:
APEGBC, Registration GuidelineAPEGBC, Registration Guideline
APEGBC Website: https://www.apeg.bc.ca
Thank YouThank You

More Related Content

What's hot

Project Engineer 3
Project Engineer 3Project Engineer 3
Project Engineer 3
Sunil Mall
ย 
10 me667 chap6 performance measures
10 me667 chap6 performance measures10 me667 chap6 performance measures
10 me667 chap6 performance measures
Pavan Kumar
ย 
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJCOST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
Tapesh Ajmera
ย 
Leon Tisdale Show
Leon Tisdale ShowLeon Tisdale Show
Leon Tisdale Show
Leon Tisdale
ย 
Srinivaskumar_cv_16
Srinivaskumar_cv_16Srinivaskumar_cv_16
Srinivaskumar_cv_16
srinivas kumar
ย 
3 pm3 c_2-%20estimating%20costs
3 pm3 c_2-%20estimating%20costs3 pm3 c_2-%20estimating%20costs
3 pm3 c_2-%20estimating%20costs
harwoodr
ย 
Azhar Hameed (Resume-2017)
Azhar Hameed (Resume-2017)Azhar Hameed (Resume-2017)
Azhar Hameed (Resume-2017)
Azhar Abdul Hameed
ย 
ACH 216 Lecture 06 (Pre Construction Planning)
ACH 216 Lecture 06 (Pre Construction Planning)ACH 216 Lecture 06 (Pre Construction Planning)
ACH 216 Lecture 06 (Pre Construction Planning)
Anne Arundel Community College
ย 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
Vikram Prabhakar
ย 
Do it, sf state project lifecycle management (plm) v1.19 091012
Do it, sf state project lifecycle management (plm) v1.19 091012Do it, sf state project lifecycle management (plm) v1.19 091012
Do it, sf state project lifecycle management (plm) v1.19 091012
satish526
ย 
curriculum-vitae-paul-johan-pieters
curriculum-vitae-paul-johan-pieterscurriculum-vitae-paul-johan-pieters
curriculum-vitae-paul-johan-pieters
Pieters (Paul)
ย 

What's hot (20)

Construction KPIs & Dashboards
Construction KPIs & DashboardsConstruction KPIs & Dashboards
Construction KPIs & Dashboards
ย 
Project Engineer 3
Project Engineer 3Project Engineer 3
Project Engineer 3
ย 
PROJECT ENGINEER
PROJECT ENGINEERPROJECT ENGINEER
PROJECT ENGINEER
ย 
Project Control System
Project Control SystemProject Control System
Project Control System
ย 
Project Control- Overview Presentation Tafseer
Project Control- Overview Presentation   TafseerProject Control- Overview Presentation   Tafseer
Project Control- Overview Presentation Tafseer
ย 
10 me667 chap6 performance measures
10 me667 chap6 performance measures10 me667 chap6 performance measures
10 me667 chap6 performance measures
ย 
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJCOST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
ย 
Planning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning ProcessPlanning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning Process
ย 
Leon Tisdale Show
Leon Tisdale ShowLeon Tisdale Show
Leon Tisdale Show
ย 
Henry CV
Henry CVHenry CV
Henry CV
ย 
Srinivaskumar_cv_16
Srinivaskumar_cv_16Srinivaskumar_cv_16
Srinivaskumar_cv_16
ย 
3 pm3 c_2-%20estimating%20costs
3 pm3 c_2-%20estimating%20costs3 pm3 c_2-%20estimating%20costs
3 pm3 c_2-%20estimating%20costs
ย 
Azhar Hameed (Resume-2017)
Azhar Hameed (Resume-2017)Azhar Hameed (Resume-2017)
Azhar Hameed (Resume-2017)
ย 
ACH 216 Lecture 06 (Pre Construction Planning)
ACH 216 Lecture 06 (Pre Construction Planning)ACH 216 Lecture 06 (Pre Construction Planning)
ACH 216 Lecture 06 (Pre Construction Planning)
ย 
PMBoK6Ed.lect1.introduction
PMBoK6Ed.lect1.introductionPMBoK6Ed.lect1.introduction
PMBoK6Ed.lect1.introduction
ย 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
ย 
Do it, sf state project lifecycle management (plm) v1.19 091012
Do it, sf state project lifecycle management (plm) v1.19 091012Do it, sf state project lifecycle management (plm) v1.19 091012
Do it, sf state project lifecycle management (plm) v1.19 091012
ย 
curriculum-vitae-paul-johan-pieters
curriculum-vitae-paul-johan-pieterscurriculum-vitae-paul-johan-pieters
curriculum-vitae-paul-johan-pieters
ย 
PRANAB _Resume
PRANAB _ResumePRANAB _Resume
PRANAB _Resume
ย 
Building services planning manual 2007
Building services planning manual 2007Building services planning manual 2007
Building services planning manual 2007
ย 

Viewers also liked

Dissertation Defence
Dissertation DefenceDissertation Defence
Dissertation Defence
Abhijay Sisodia
ย 
Resume preparation
Resume preparationResume preparation
Resume preparation
kumar_satyaveer
ย 
Presentation on interview
Presentation on interviewPresentation on interview
Presentation on interview
Anushka Singh
ย 
Red++ final preso
Red++ final presoRed++ final preso
Red++ final preso
hildeedee
ย 
Andro preso
Andro presoAndro preso
Andro preso
hildeedee
ย 
ใ‚ญใƒฉใ‚ญใƒฉไผš่ญฐ
ใ‚ญใƒฉใ‚ญใƒฉไผš่ญฐใ‚ญใƒฉใ‚ญใƒฉไผš่ญฐ
ใ‚ญใƒฉใ‚ญใƒฉไผš่ญฐ
ๅฎŸ ๆญฆๅœฐ
ย 

Viewers also liked (20)

Dissertation Defence
Dissertation DefenceDissertation Defence
Dissertation Defence
ย 
University Of Brighton Ho P David Davies 270410 V2
University Of Brighton   Ho P   David Davies 270410 V2University Of Brighton   Ho P   David Davies 270410 V2
University Of Brighton Ho P David Davies 270410 V2
ย 
6 Sigma 10 Min Interview Presentation 070509
6 Sigma 10 Min Interview Presentation 0705096 Sigma 10 Min Interview Presentation 070509
6 Sigma 10 Min Interview Presentation 070509
ย 
Resume preparation pictoria slideshow
Resume preparation pictoria slideshowResume preparation pictoria slideshow
Resume preparation pictoria slideshow
ย 
Resume Preparation Tips
 Resume Preparation Tips Resume Preparation Tips
Resume Preparation Tips
ย 
Resume preparation
Resume preparationResume preparation
Resume preparation
ย 
Interview presentation
Interview presentationInterview presentation
Interview presentation
ย 
Presentation on interview
Presentation on interviewPresentation on interview
Presentation on interview
ย 
Copysniper How to Create/edit Sales Page
Copysniper How to Create/edit Sales Page Copysniper How to Create/edit Sales Page
Copysniper How to Create/edit Sales Page
ย 
Ann Perty
Ann PertyAnn Perty
Ann Perty
ย 
Attracting and retaining instructors in a competitive market - AOPA Flight Sc...
Attracting and retaining instructors in a competitive market - AOPA Flight Sc...Attracting and retaining instructors in a competitive market - AOPA Flight Sc...
Attracting and retaining instructors in a competitive market - AOPA Flight Sc...
ย 
LORENA CULLQUIPUMA
LORENA CULLQUIPUMALORENA CULLQUIPUMA
LORENA CULLQUIPUMA
ย 
Red++ final preso
Red++ final presoRed++ final preso
Red++ final preso
ย 
Chu de02 tunghiencuu_nhom07
Chu de02 tunghiencuu_nhom07Chu de02 tunghiencuu_nhom07
Chu de02 tunghiencuu_nhom07
ย 
Step by step process for issuance of student pilot certificates using updated...
Step by step process for issuance of student pilot certificates using updated...Step by step process for issuance of student pilot certificates using updated...
Step by step process for issuance of student pilot certificates using updated...
ย 
Andro preso
Andro presoAndro preso
Andro preso
ย 
ใ‚ญใƒฉใ‚ญใƒฉไผš่ญฐ
ใ‚ญใƒฉใ‚ญใƒฉไผš่ญฐใ‚ญใƒฉใ‚ญใƒฉไผš่ญฐ
ใ‚ญใƒฉใ‚ญใƒฉไผš่ญฐ
ย 
Chude01 tu nghiencuu_nhom07
Chude01 tu nghiencuu_nhom07Chude01 tu nghiencuu_nhom07
Chude01 tu nghiencuu_nhom07
ย 
Chu de03 tunghiencuu_nhom07
Chu de03 tunghiencuu_nhom07Chu de03 tunghiencuu_nhom07
Chu de03 tunghiencuu_nhom07
ย 
Social media of Yesterday, Today and Tomorrow
Social media of Yesterday, Today and Tomorrow Social media of Yesterday, Today and Tomorrow
Social media of Yesterday, Today and Tomorrow
ย 

Similar to R2 technical resume & interview preparation

Daniel Lee
Daniel LeeDaniel Lee
Daniel Lee
Daniel Lee
ย 
CV_RBMerida
CV_RBMeridaCV_RBMerida
CV_RBMerida
Rodel Merida
ย 
CV - Kelum Hemka Siriwardhena
CV - Kelum Hemka SiriwardhenaCV - Kelum Hemka Siriwardhena
CV - Kelum Hemka Siriwardhena
Kelum Siriwardhena
ย 
Resume_Supply chain Specialist
Resume_Supply chain SpecialistResume_Supply chain Specialist
Resume_Supply chain Specialist
Rahul Ramachandran
ย 
CVJ_Eng. Ali Oreidi M
CVJ_Eng. Ali Oreidi MCVJ_Eng. Ali Oreidi M
CVJ_Eng. Ali Oreidi M
Ali oreidi
ย 
Senior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiSenior Subcontracts officer-Mehadi
Senior Subcontracts officer-Mehadi
Md Mehadi Hasan
ย 
Taha Anjum Updated CV
Taha Anjum Updated CVTaha Anjum Updated CV
Taha Anjum Updated CV
Taha Anjum
ย 
Nelson Resume
Nelson ResumeNelson Resume
Nelson Resume
Nelson Adan
ย 
Nelson Resume
Nelson ResumeNelson Resume
Nelson Resume
Nelson Adan
ย 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR
ย 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
ramiz reyad
ย 
IMRAN PROJECT ENGINEER CV
IMRAN PROJECT ENGINEER CVIMRAN PROJECT ENGINEER CV
IMRAN PROJECT ENGINEER CV
Imran Asghar Malik
ย 
Chetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerChetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical Engineer
CHETAN SHARMA
ย 

Similar to R2 technical resume & interview preparation (20)

Daniel Lee
Daniel LeeDaniel Lee
Daniel Lee
ย 
CV_RBMerida
CV_RBMeridaCV_RBMerida
CV_RBMerida
ย 
CV - Kelum Hemka Siriwardhena
CV - Kelum Hemka SiriwardhenaCV - Kelum Hemka Siriwardhena
CV - Kelum Hemka Siriwardhena
ย 
2015 - CV of Michael Julius Orjaleza
2015 - CV  of Michael Julius Orjaleza 2015 - CV  of Michael Julius Orjaleza
2015 - CV of Michael Julius Orjaleza
ย 
Resume_Supply chain Specialist
Resume_Supply chain SpecialistResume_Supply chain Specialist
Resume_Supply chain Specialist
ย 
136 work planning and programming
136 work planning and programming136 work planning and programming
136 work planning and programming
ย 
CVJ_Eng. Ali Oreidi M
CVJ_Eng. Ali Oreidi MCVJ_Eng. Ali Oreidi M
CVJ_Eng. Ali Oreidi M
ย 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
ย 
Senior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiSenior Subcontracts officer-Mehadi
Senior Subcontracts officer-Mehadi
ย 
Taha Anjum Updated CV
Taha Anjum Updated CVTaha Anjum Updated CV
Taha Anjum Updated CV
ย 
Nelson Resume
Nelson ResumeNelson Resume
Nelson Resume
ย 
Nelson Resume
Nelson ResumeNelson Resume
Nelson Resume
ย 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
ย 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
ย 
Mohamad Seth Farabi - Resume
Mohamad Seth Farabi - ResumeMohamad Seth Farabi - Resume
Mohamad Seth Farabi - Resume
ย 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
ย 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
ย 
cp civil (1)
cp civil (1)cp civil (1)
cp civil (1)
ย 
IMRAN PROJECT ENGINEER CV
IMRAN PROJECT ENGINEER CVIMRAN PROJECT ENGINEER CV
IMRAN PROJECT ENGINEER CV
ย 
Chetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerChetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical Engineer
ย 

Recently uploaded

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
ย 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
ย 
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 

Recently uploaded (20)

Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
ย 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
ย 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
ย 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
ย 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
ย 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
ย 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
ย 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
ย 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
ย 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
ย 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ย 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
ย 
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
ย 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
ย 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
ย 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
ย 

R2 technical resume & interview preparation

  • 1. Introduction to Technical resume & Interview PreparationInterview Preparation For Engineers December 2014 Mohammadreza Jarollahi, P. Eng., M.Sc. Civil Engineer
  • 2. Technical resume & Interview preparationTechnical resume & Interview preparation This presentation is a brief introduction to preparation of an engineering interview and based on: Personal understanding of the APEGBC GuidelinePersonal understanding of the APEGBC Guideline for registration and Personal experience as one of the APEGBC interviewers
  • 3. Technical resume & Interview preparationTechnical resume & Interview preparation To become a P.Eng. the Applicant must have: A minimum 1 year of application of theory (design) experience and a minimum of 3 years of onsite experience prior to project management
  • 4. Technical resume & Interview preparationTechnical resume & Interview preparation ProvideYourTechnical Work Experience Provide A List Of ProjectsYouWere Involved For each project: Discuss your responsibilities and the engineering (technical) aspects of your work
  • 5. Technical resume & Interview preparationTechnical resume & Interview preparation Provide General Information Of Each Project The name of project and the location Name of the client Name of the consultant or designers Name of the contractorName of the contractor Started and Completed Dates of the Project Amount of the allocated budget for the project in Canadian Dollars Categorized the groups and give the number of the people involved in the project with their positions and qualifications Explain in which group you were active
  • 6. Technical resume & Interview preparationTechnical resume & Interview preparation For Each Project: ExplainYour Responsibilities and IntroduceYour Direct Supervisor(s) Provide the date you were working on the project ProvideYour Supervisorโ€™s Name,Title and Position Provide your JobTitle and Position ExplainYour Responsibilities and what YOU have done Only talk about what ever you personally performed. If you wereOnly talk about what ever you personally performed. If you were working in a group, explain what you have done in that group Itemize and refer to all of your personal activities you performed Be prepared to explain in detail about all the subjects you might be questioned Provide evidences for what you are explaining, just in case the interviewers asked for them Provide Design Sheets of the project if You were Designer or the part which you designed Provide some drawings as evidences Provide some pictures of the project if implemented
  • 7. Technical resume & Interview preparationTechnical resume & Interview preparation If Applicable,TheTechnicalWork Experience ShouldTargetTheExperience ShouldTargetThe Following Items *
  • 8. Technical resume & Interview preparationTechnical resume & Interview preparation Quality Control and Assurance Carry out design and shop drawing reviews Produce quality control and quality inspection reports Produce non-conformance and corrective action reports Initiate quality control program to ensure outcomesInitiate quality control program to ensure outcomes are achieved to the required or specified standard Arrange for and obtain performance tests, witnessing of said tests and other reviews as necessary to ensure that material and equipment meet quality and performance requirements Ensure commissioning is done properly, approved and signed-off
  • 9. Technical resume & Interview preparationTechnical resume & Interview preparation Ensure Safety Conduct Job Hazard Analysis (JHA) for all scheduled activities Produce safe job practices for JHA activities and manage prevention of accidentsand manage prevention of accidents Verify safety and environmental certifications Demonstrate knowledge of safety and work- safe regulations Conduct safety meetings regularly Manage remedial action and reporting when accidents occur
  • 10. Technical resume & Interview preparationTechnical resume & Interview preparation Budget and Cost Management Have a thorough understanding and preparation of estimates and budget costs Demonstrate understanding of the use of work breakdown structure to define the scope, estimate costs and organize schedules Know the cost of labour, equipment, subsistence and construction or project set-up Produce budget, cost coding and all adjustments and reviewsProduce budget, cost coding and all adjustments and reviews Review time sheets daily re: labour and equipment Identify and track: Production (daily); Costs (daily); All extra work performed (weekly); and/or Equipment (owned and rented) Monitor production of deliverables to ensure that cost trend deviations from budget are quickly identified and remedied
  • 11. Technical resume & Interview preparationTechnical resume & Interview preparation Risk Assessment and Management Identify risks and their potential impacts Produce a risk minimization plan Implement that risk minimization planImplement that risk minimization plan
  • 12. Technical resume & Interview preparationTechnical resume & Interview preparation Project Scope and Deliverables Collaborate with clients/project owners to define project scope and deliverables Develop a project plan Produce overall schedules prior to start of project Have a thorough understanding of scope of work,Have a thorough understanding of scope of work, specifications and drawings Have a thorough understanding of sub-contractorโ€™s work Identify measurable outcomes to evaluate the project on completion Review requested variations against contract terms and conditions, agree on project outcomes and variations in project requirements or conditions
  • 13. Technical resume & Interview preparationTechnical resume & Interview preparation Scheduling and Project Implementation Determine and implement a project program (timeline) Draft, develop and implement an Inspection and Testing Plan Produce or review custom design and specifications Produce detailed designs and drawings when required Installation Supervision Commissioning of mechanical, electrical, water and/or sewage where appropriate Commissioning of service equipment and special installations of functional, operational or architectural components wherefunctional, operational or architectural components where appropriate Produce submittal logs Monitor project progress โ€ข Compare progress to program/timeline and initiate remedial action where necessary โ€ข Produce next day planner โ€“ daily โ€ข Tracking of Project schedules โ€“ weekly โ€ข Produce two week schedules โ€“ bi-weekly โ€ข Update project schedules โ€“ monthly โ€ข Schedule sub-contractorsโ€™ activities Plan and manage the integration of the transition of each stage of the project cycle
  • 14. Technical resume & Interview preparationTechnical resume & Interview preparation Site Inspections Arrange for and/or carry out inspections at the vendorsโ€™ place of manufacture, in the contractorsโ€™ shops and on the site. Review vendorsโ€™ and contractorsโ€™ drawings to ensure compatibility with other equipment and compliancecompatibility with other equipment and compliance with the contract documents (designs, drawings, specifications). Ensure compliance with safety requirements including documented onsite safety inspections Ensure compliance with quality control requirements Ensure compliance by sub-contractors
  • 15. Technical resume & Interview preparationTechnical resume & Interview preparation Procurement and Resources Management Determine procurement requirements for the project in accordance with project budget Produce materials logs Procurement and expediting Materials receiving Inventory control for materials and toolsInventory control for materials and tools Purchase order administration and packing slips control Order material deliveries Develop resource, material conservation, recovery and waste management plans Develop strategies to maintain the effective performance of the resources Diagnose problems and identify requirements for appropriate testing
  • 16. Technical resume & Interview preparationTechnical resume & Interview preparation Manage People Implement a people management plan Monitor team and individual performance targets Ensure the team has adequate skills and resources to achieve the project outcomes Participate in selection of staff Discuss project scope and objectives with those involvedDiscuss project scope and objectives with those involved in the project Delegate achievement of outcomes to ensure cost, time and material resources are appropriately allocated and applied Ensure compliance with safety, risk, cost and environmental requirements Provide performance feedback Inform managers of relationship of project to other program outcomes
  • 17. Technical resume & Interview preparationTechnical resume & Interview preparation Information and Communication Management Manage communication across the project with all stakeholders Design or agree upon documentation system across the project Communicate with the project team, clients, stakeholders and regulators on project progress where appropriate
  • 18. Technical resume & Interview preparationTechnical resume & Interview preparation Contract andTender Services Prepare and produce contract or tender documentation where appropriate Respond to tender inquiries where appropriate Perform contract or tender evaluation and analysis where appropriate Prepare addenda
  • 19. Technical resume & Interview preparationTechnical resume & Interview preparation Finalize the Project Review and document the project outcomes against the project requirements Establish the acceptance criteria for the project in consultation with the client Plan the hand over of the project
  • 20. Technical resume & Interview preparationTechnical resume & Interview preparation Environmental and Sustainability and Regulatory Considerations Have regard to, develop and implement environmental and sustainability considerations from project inception and development stages through to project finalization Identify and account for environmental and sustainability concerns and requirements within thesustainability concerns and requirements within the project deliverables Establish environmental and sustainability criteria for procurement of materials, equipment and services. Understand, plan for and comply with legal and regulatory requirements of the project, including contracts, codes, labour law and other legislation Understand, plan for, and comply with legal and regulatory requirements of the project, including contracts, codes, local and provincial legislation
  • 21. Technical resume & Interview preparationTechnical resume & Interview preparation Explain any challenges you were involved and how you solved the problems List of obstacles you observed in any stages; negotiation, design, contractor / subcontractor evaluation and selection, during implementation ofevaluation and selection, during implementation of the project, risks, environment, budget, etc. Explain what you have done to remove the issues
  • 22. Technical resume & Interview preparationTechnical resume & Interview preparation Explain Lesson Learned from each project Explain the Root Cause of the problemsExplain the Root Cause of the problems Explain the Corrective and Preventive Actions you have applied
  • 23. Technical resume & Interview preparationTechnical resume & Interview preparation IntroduceYour Referrals: Provide a list of your supervisors with their: Names Positions Contact Information Phones Mail address Email address
  • 24. Technical resume & Interview preparationTechnical resume & Interview preparation References: APEGBC, Registration GuidelineAPEGBC, Registration Guideline APEGBC Website: https://www.apeg.bc.ca