• Easy preparation of
isolation certificate
with data fetched
from the equipment
master and tag
register
© 2021 ASK-EHS Engineering & Consultants Pvt. Ltd. All Rights Reserved.
3
• Annotate P&ID
Diagram, Electrical
Line Diagrams in
image
© 2021 ASK-EHS Engineering & Consultants Pvt. Ltd. All Rights Reserved.
4
• Isolation and De-
isolation work flows
• Nomination of
Isolation / De-
isolation task to
competent person
(isolation authority)
• Carry out Sanction to
Test Process with
approval workflow
© 2021 ASK-EHS Engineering & Consultants Pvt. Ltd. All Rights Reserved.
Need for
blanket
isolation
arises
Prepare isolation
certificate specific to a
discipline by entering all
isolation details
(except Lock #) & drawing
attached.
Review the isolation request
(By Commissioning Manager)
Requested
isolation
certificate
appropriate?
Approve isolation request
(By Commissioning
Manager)
Nominate an authorized
person (AEP/AIP/AMP)
that
shall perform isolation
Enter lock # for tag(s) in IC
if not already entered
Verify isolation performed
(By PTW Coordinator)
Isolation
done
satisfactorily?
Approve IC
(By PTW Coordinator)
Isolation
certificate ready
to be used by
permits
5
• Restricting
commence of work
until system de-
energized and safe
to work upon
• Safe management
and coordination
amongst the work
permits sharing the
same isolations
© 2021 ASK-EHS Engineering & Consultants Pvt. Ltd. All Rights Reserved.
6
• Verify isolations
using Mobile App
from field
© 2021 ASK-EHS Engineering & Consultants Pvt. Ltd. All Rights Reserved.
7
• Maintain Lock-Out
and Tag-Out details
along with the
provision to print
ready-to-use
© 2021 ASK-EHS Engineering & Consultants Pvt. Ltd. All Rights Reserved.
8
• Equipment master
data recordkeeping
along with tag
register
• Electronic log book
showing issued or
active lock-outs and
tag-outs
© 2021 ASK-EHS Engineering & Consultants Pvt. Ltd. All Rights Reserved.
https://www.ask-ehs.com/software/digital-ptw-software.html
http://www.ask-ehs.com
ASK-EHS Engineering & Consultants Pvt. Ltd.

More Related Content

What's hot

DOC-20220402-WA0048..ppt- Permit To Work Procedure
DOC-20220402-WA0048..ppt- Permit To Work ProcedureDOC-20220402-WA0048..ppt- Permit To Work Procedure
DOC-20220402-WA0048..ppt- Permit To Work ProcedureHENRY EROMOSELE OIGIANGBE
 
9 lifting operations with tower crane risk assessment templates
9 lifting operations with tower crane risk assessment templates9 lifting operations with tower crane risk assessment templates
9 lifting operations with tower crane risk assessment templatesDwarika Bhushan Sharma
 
LIFTING WORK PERMIT Form # HSEQ - LWP Rev 2.docx
LIFTING WORK PERMIT Form # HSEQ - LWP Rev 2.docxLIFTING WORK PERMIT Form # HSEQ - LWP Rev 2.docx
LIFTING WORK PERMIT Form # HSEQ - LWP Rev 2.docxDwarika Bhushan Sharma
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work trainingKarnav Rana
 
Work Permit System
Work Permit SystemWork Permit System
Work Permit SystemGagan Tanwar
 
WORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docx
WORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docxWORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docx
WORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docxDwarika Bhushan Sharma
 
Safeworkpmits
SafeworkpmitsSafeworkpmits
Safeworkpmitsistrain
 
Health & Safety Induction Training
Health & Safety Induction TrainingHealth & Safety Induction Training
Health & Safety Induction TrainingThe Pathway Group
 
7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docx7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docxDwarika Bhushan Sharma
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptssuser0ebdc3
 
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docxLIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docxDwarika Bhushan Sharma
 
Health And Safety Induction Training
Health And Safety Induction TrainingHealth And Safety Induction Training
Health And Safety Induction Trainingedale07
 
Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis Deepu Rajan
 
EHS induction Presentation slides
EHS induction Presentation slidesEHS induction Presentation slides
EHS induction Presentation slidesMaffino
 
13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templatesDwarika Bhushan Sharma
 
Hse monthly report june 2015. rev.01 by.arber dogani example statistics
Hse monthly report   june 2015. rev.01 by.arber dogani  example statisticsHse monthly report   june 2015. rev.01 by.arber dogani  example statistics
Hse monthly report june 2015. rev.01 by.arber dogani example statisticsArber Dogani
 

What's hot (20)

DOC-20220402-WA0048..ppt- Permit To Work Procedure
DOC-20220402-WA0048..ppt- Permit To Work ProcedureDOC-20220402-WA0048..ppt- Permit To Work Procedure
DOC-20220402-WA0048..ppt- Permit To Work Procedure
 
Man and machine interface
Man and machine interfaceMan and machine interface
Man and machine interface
 
Amn safety induction j 175 - staff rev 4 - s 14
Amn safety induction  j 175 - staff rev 4 - s 14Amn safety induction  j 175 - staff rev 4 - s 14
Amn safety induction j 175 - staff rev 4 - s 14
 
9 lifting operations with tower crane risk assessment templates
9 lifting operations with tower crane risk assessment templates9 lifting operations with tower crane risk assessment templates
9 lifting operations with tower crane risk assessment templates
 
Permit to Work Training
Permit to Work TrainingPermit to Work Training
Permit to Work Training
 
LIFTING WORK PERMIT Form # HSEQ - LWP Rev 2.docx
LIFTING WORK PERMIT Form # HSEQ - LWP Rev 2.docxLIFTING WORK PERMIT Form # HSEQ - LWP Rev 2.docx
LIFTING WORK PERMIT Form # HSEQ - LWP Rev 2.docx
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work training
 
Work Permit System
Work Permit SystemWork Permit System
Work Permit System
 
WORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docx
WORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docxWORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docx
WORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docx
 
Safeworkpmits
SafeworkpmitsSafeworkpmits
Safeworkpmits
 
Health & Safety Induction Training
Health & Safety Induction TrainingHealth & Safety Induction Training
Health & Safety Induction Training
 
7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docx7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docx
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.ppt
 
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docxLIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
LIFT SHAFT ENTRY PERMIT Form # HSEQ - LSEP Rev 2 -.docx
 
Health And Safety Induction Training
Health And Safety Induction TrainingHealth And Safety Induction Training
Health And Safety Induction Training
 
Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis
 
Machine Safety
Machine Safety Machine Safety
Machine Safety
 
EHS induction Presentation slides
EHS induction Presentation slidesEHS induction Presentation slides
EHS induction Presentation slides
 
13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates
 
Hse monthly report june 2015. rev.01 by.arber dogani example statistics
Hse monthly report   june 2015. rev.01 by.arber dogani  example statisticsHse monthly report   june 2015. rev.01 by.arber dogani  example statistics
Hse monthly report june 2015. rev.01 by.arber dogani example statistics
 

Similar to LOTO system integration with Permit to Work Software

E&I QC INSPECTOR RESUM AND documents.pdf
E&I QC INSPECTOR RESUM AND  documents.pdfE&I QC INSPECTOR RESUM AND  documents.pdf
E&I QC INSPECTOR RESUM AND documents.pdfIrfan786pak
 
Pp 1 insulation installation training program final
Pp 1 insulation installation training program finalPp 1 insulation installation training program final
Pp 1 insulation installation training program finalScottDickenson2
 
Eng Raeed Senior Security System Engineer
Eng Raeed Senior Security System EngineerEng Raeed Senior Security System Engineer
Eng Raeed Senior Security System EngineerEngineering Rule
 
Loto presentation.pptx
Loto presentation.pptxLoto presentation.pptx
Loto presentation.pptxnaeem41394
 
Snr Systems Engineer ArthitK_CVMar2016
Snr Systems Engineer ArthitK_CVMar2016Snr Systems Engineer ArthitK_CVMar2016
Snr Systems Engineer ArthitK_CVMar2016Arthit Kliangprom
 
Eric Mckethern uptodate resume (1)
Eric Mckethern uptodate resume (1)Eric Mckethern uptodate resume (1)
Eric Mckethern uptodate resume (1)Eric Mckethern
 
CODE OF PRACTICE FOR SAFE WORKING ON LOW VOLTAGE SYSTEMS Rev 3
CODE OF PRACTICE FOR SAFE WORKING ON LOW VOLTAGE SYSTEMS Rev 3CODE OF PRACTICE FOR SAFE WORKING ON LOW VOLTAGE SYSTEMS Rev 3
CODE OF PRACTICE FOR SAFE WORKING ON LOW VOLTAGE SYSTEMS Rev 3Mark Platten
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)Vijayakumar Kumar
 
PRO-00014 Corporate Safety - Energy Tag and Lockout Procedure.pdf
PRO-00014 Corporate Safety - Energy Tag and Lockout Procedure.pdfPRO-00014 Corporate Safety - Energy Tag and Lockout Procedure.pdf
PRO-00014 Corporate Safety - Energy Tag and Lockout Procedure.pdfOkeke Livinus
 
Ahmed Rageh_CV (3)
Ahmed Rageh_CV (3)Ahmed Rageh_CV (3)
Ahmed Rageh_CV (3)Ahmed Rageh
 
2 cm-ms-bld-012 - roof fan & natural ventilator
2   cm-ms-bld-012 - roof fan & natural ventilator2   cm-ms-bld-012 - roof fan & natural ventilator
2 cm-ms-bld-012 - roof fan & natural ventilatorMinh Bui Si
 
Trailblazers (Power) Install Substation Circuit Breakers
Trailblazers (Power) Install Substation Circuit BreakersTrailblazers (Power) Install Substation Circuit Breakers
Trailblazers (Power) Install Substation Circuit BreakersMarty Stevenson
 
PV solar Design and Installtion
PV solar Design and InstalltionPV solar Design and Installtion
PV solar Design and InstalltionEli Israeli
 

Similar to LOTO system integration with Permit to Work Software (20)

EESS 2018 Day 1 - Tim Webster
EESS 2018 Day 1 - Tim WebsterEESS 2018 Day 1 - Tim Webster
EESS 2018 Day 1 - Tim Webster
 
Alaa QA-QC last Applicant CV-2
Alaa QA-QC  last Applicant CV-2Alaa QA-QC  last Applicant CV-2
Alaa QA-QC last Applicant CV-2
 
CV
CVCV
CV
 
E&I QC INSPECTOR RESUM AND documents.pdf
E&I QC INSPECTOR RESUM AND  documents.pdfE&I QC INSPECTOR RESUM AND  documents.pdf
E&I QC INSPECTOR RESUM AND documents.pdf
 
kolligars-I-1
kolligars-I-1kolligars-I-1
kolligars-I-1
 
Pp 1 insulation installation training program final
Pp 1 insulation installation training program finalPp 1 insulation installation training program final
Pp 1 insulation installation training program final
 
Eng Raeed Senior Security System Engineer
Eng Raeed Senior Security System EngineerEng Raeed Senior Security System Engineer
Eng Raeed Senior Security System Engineer
 
Loto presentation.pptx
Loto presentation.pptxLoto presentation.pptx
Loto presentation.pptx
 
Snr Systems Engineer ArthitK_CVMar2016
Snr Systems Engineer ArthitK_CVMar2016Snr Systems Engineer ArthitK_CVMar2016
Snr Systems Engineer ArthitK_CVMar2016
 
City & guilds 2392
City & guilds 2392City & guilds 2392
City & guilds 2392
 
Eric Mckethern uptodate resume (1)
Eric Mckethern uptodate resume (1)Eric Mckethern uptodate resume (1)
Eric Mckethern uptodate resume (1)
 
CODE OF PRACTICE FOR SAFE WORKING ON LOW VOLTAGE SYSTEMS Rev 3
CODE OF PRACTICE FOR SAFE WORKING ON LOW VOLTAGE SYSTEMS Rev 3CODE OF PRACTICE FOR SAFE WORKING ON LOW VOLTAGE SYSTEMS Rev 3
CODE OF PRACTICE FOR SAFE WORKING ON LOW VOLTAGE SYSTEMS Rev 3
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)
 
MMeadowsRSM922016
MMeadowsRSM922016MMeadowsRSM922016
MMeadowsRSM922016
 
PRO-00014 Corporate Safety - Energy Tag and Lockout Procedure.pdf
PRO-00014 Corporate Safety - Energy Tag and Lockout Procedure.pdfPRO-00014 Corporate Safety - Energy Tag and Lockout Procedure.pdf
PRO-00014 Corporate Safety - Energy Tag and Lockout Procedure.pdf
 
Ahmed Rageh_CV (3)
Ahmed Rageh_CV (3)Ahmed Rageh_CV (3)
Ahmed Rageh_CV (3)
 
2 cm-ms-bld-012 - roof fan & natural ventilator
2   cm-ms-bld-012 - roof fan & natural ventilator2   cm-ms-bld-012 - roof fan & natural ventilator
2 cm-ms-bld-012 - roof fan & natural ventilator
 
Trailblazers (Power) Install Substation Circuit Breakers
Trailblazers (Power) Install Substation Circuit BreakersTrailblazers (Power) Install Substation Circuit Breakers
Trailblazers (Power) Install Substation Circuit Breakers
 
076 circuit breaker install 1.0
076 circuit breaker install 1.0076 circuit breaker install 1.0
076 circuit breaker install 1.0
 
PV solar Design and Installtion
PV solar Design and InstalltionPV solar Design and Installtion
PV solar Design and Installtion
 

More from ASK EHS Engineering & Consultants

Environmental Impact Assessment for Data Center Facilities.pdf
Environmental Impact Assessment for Data Center Facilities.pdfEnvironmental Impact Assessment for Data Center Facilities.pdf
Environmental Impact Assessment for Data Center Facilities.pdfASK EHS Engineering & Consultants
 

More from ASK EHS Engineering & Consultants (20)

Safety Observation Through Digital Lens.pdf
Safety Observation Through Digital Lens.pdfSafety Observation Through Digital Lens.pdf
Safety Observation Through Digital Lens.pdf
 
Digital Transformation in Hazard Reporting.pdf
Digital Transformation in Hazard Reporting.pdfDigital Transformation in Hazard Reporting.pdf
Digital Transformation in Hazard Reporting.pdf
 
The Future of Safety Observations (1).pdf
The Future of Safety Observations (1).pdfThe Future of Safety Observations (1).pdf
The Future of Safety Observations (1).pdf
 
Data Analytics & EHS.pdf
Data Analytics & EHS.pdfData Analytics & EHS.pdf
Data Analytics & EHS.pdf
 
EHS and Advanced Data Analytics.pdf
EHS and Advanced Data Analytics.pdfEHS and Advanced Data Analytics.pdf
EHS and Advanced Data Analytics.pdf
 
EHS and Sustainability.pdf
EHS and Sustainability.pdfEHS and Sustainability.pdf
EHS and Sustainability.pdf
 
Software Solutions for HSE Management in Data Centers.pdf
Software Solutions for HSE Management in Data Centers.pdfSoftware Solutions for HSE Management in Data Centers.pdf
Software Solutions for HSE Management in Data Centers.pdf
 
HSE Training & Employee Awareness in Data Centers.pdf
HSE Training & Employee Awareness in Data Centers.pdfHSE Training & Employee Awareness in Data Centers.pdf
HSE Training & Employee Awareness in Data Centers.pdf
 
Site EHS Manager vs. Safety Officer.pdf
Site EHS Manager vs. Safety Officer.pdfSite EHS Manager vs. Safety Officer.pdf
Site EHS Manager vs. Safety Officer.pdf
 
Environmental Impact Assessment for Data Center Facilities.pdf
Environmental Impact Assessment for Data Center Facilities.pdfEnvironmental Impact Assessment for Data Center Facilities.pdf
Environmental Impact Assessment for Data Center Facilities.pdf
 
CaseStudy-Navin-Fluorine-Safe
CaseStudy-Navin-Fluorine-SafeCaseStudy-Navin-Fluorine-Safe
CaseStudy-Navin-Fluorine-Safe
 
CaseStudy-Global healthcare company-PPT.pdf
CaseStudy-Global healthcare company-PPT.pdfCaseStudy-Global healthcare company-PPT.pdf
CaseStudy-Global healthcare company-PPT.pdf
 
CaseStudy-Leading producer and distributor of natural gas
CaseStudy-Leading producer and distributor of natural gasCaseStudy-Leading producer and distributor of natural gas
CaseStudy-Leading producer and distributor of natural gas
 
Best Practices for EHS Management in Data Centers.pdf
Best Practices for EHS Management in Data Centers.pdfBest Practices for EHS Management in Data Centers.pdf
Best Practices for EHS Management in Data Centers.pdf
 
How to make cast house operations more efficient.pdf
How to make cast house operations more efficient.pdfHow to make cast house operations more efficient.pdf
How to make cast house operations more efficient.pdf
 
CaseStudy-A renowned data center platform company
CaseStudy-A renowned data center platform companyCaseStudy-A renowned data center platform company
CaseStudy-A renowned data center platform company
 
CaseStudy-A Leading Pan-Asian Steel Manufacturer
CaseStudy-A Leading Pan-Asian Steel ManufacturerCaseStudy-A Leading Pan-Asian Steel Manufacturer
CaseStudy-A Leading Pan-Asian Steel Manufacturer
 
CaseStudy-Leading Natural Gas manufacturer-PPT.pdf
CaseStudy-Leading Natural Gas manufacturer-PPT.pdfCaseStudy-Leading Natural Gas manufacturer-PPT.pdf
CaseStudy-Leading Natural Gas manufacturer-PPT.pdf
 
Emergency Renewable
Emergency RenewableEmergency Renewable
Emergency Renewable
 
Steps of an ideal LOTO Procedure.pdf
Steps of an ideal LOTO Procedure.pdfSteps of an ideal LOTO Procedure.pdf
Steps of an ideal LOTO Procedure.pdf
 

Recently uploaded

Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed DataAlluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed DataAlluxio, Inc.
 
英国UN学位证,北安普顿大学毕业证书1:1制作
英国UN学位证,北安普顿大学毕业证书1:1制作英国UN学位证,北安普顿大学毕业证书1:1制作
英国UN学位证,北安普顿大学毕业证书1:1制作qr0udbr0
 
Balasore Best It Company|| Top 10 IT Company || Balasore Software company Odisha
Balasore Best It Company|| Top 10 IT Company || Balasore Software company OdishaBalasore Best It Company|| Top 10 IT Company || Balasore Software company Odisha
Balasore Best It Company|| Top 10 IT Company || Balasore Software company Odishasmiwainfosol
 
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样umasea
 
What is Advanced Excel and what are some best practices for designing and cre...
What is Advanced Excel and what are some best practices for designing and cre...What is Advanced Excel and what are some best practices for designing and cre...
What is Advanced Excel and what are some best practices for designing and cre...Technogeeks
 
Intelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalmIntelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalmSujith Sukumaran
 
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024StefanoLambiase
 
Unveiling the Future: Sylius 2.0 New Features
Unveiling the Future: Sylius 2.0 New FeaturesUnveiling the Future: Sylius 2.0 New Features
Unveiling the Future: Sylius 2.0 New FeaturesŁukasz Chruściel
 
Software Project Health Check: Best Practices and Techniques for Your Product...
Software Project Health Check: Best Practices and Techniques for Your Product...Software Project Health Check: Best Practices and Techniques for Your Product...
Software Project Health Check: Best Practices and Techniques for Your Product...Velvetech LLC
 
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...stazi3110
 
React Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief UtamaReact Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief UtamaHanief Utama
 
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxKnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxTier1 app
 
CRM Contender Series: HubSpot vs. Salesforce
CRM Contender Series: HubSpot vs. SalesforceCRM Contender Series: HubSpot vs. Salesforce
CRM Contender Series: HubSpot vs. SalesforceBrainSell Technologies
 
Folding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a seriesFolding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a seriesPhilip Schwarz
 
What are the key points to focus on before starting to learn ETL Development....
What are the key points to focus on before starting to learn ETL Development....What are the key points to focus on before starting to learn ETL Development....
What are the key points to focus on before starting to learn ETL Development....kzayra69
 
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...Christina Lin
 
SpotFlow: Tracking Method Calls and States at Runtime
SpotFlow: Tracking Method Calls and States at RuntimeSpotFlow: Tracking Method Calls and States at Runtime
SpotFlow: Tracking Method Calls and States at Runtimeandrehoraa
 
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte Germany
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte GermanySuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte Germany
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte GermanyChristoph Pohl
 
Introduction Computer Science - Software Design.pdf
Introduction Computer Science - Software Design.pdfIntroduction Computer Science - Software Design.pdf
Introduction Computer Science - Software Design.pdfFerryKemperman
 

Recently uploaded (20)

Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed DataAlluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
 
英国UN学位证,北安普顿大学毕业证书1:1制作
英国UN学位证,北安普顿大学毕业证书1:1制作英国UN学位证,北安普顿大学毕业证书1:1制作
英国UN学位证,北安普顿大学毕业证书1:1制作
 
Balasore Best It Company|| Top 10 IT Company || Balasore Software company Odisha
Balasore Best It Company|| Top 10 IT Company || Balasore Software company OdishaBalasore Best It Company|| Top 10 IT Company || Balasore Software company Odisha
Balasore Best It Company|| Top 10 IT Company || Balasore Software company Odisha
 
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
 
What is Advanced Excel and what are some best practices for designing and cre...
What is Advanced Excel and what are some best practices for designing and cre...What is Advanced Excel and what are some best practices for designing and cre...
What is Advanced Excel and what are some best practices for designing and cre...
 
Intelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalmIntelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalm
 
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
 
Unveiling the Future: Sylius 2.0 New Features
Unveiling the Future: Sylius 2.0 New FeaturesUnveiling the Future: Sylius 2.0 New Features
Unveiling the Future: Sylius 2.0 New Features
 
Software Project Health Check: Best Practices and Techniques for Your Product...
Software Project Health Check: Best Practices and Techniques for Your Product...Software Project Health Check: Best Practices and Techniques for Your Product...
Software Project Health Check: Best Practices and Techniques for Your Product...
 
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
 
React Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief UtamaReact Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief Utama
 
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxKnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
 
CRM Contender Series: HubSpot vs. Salesforce
CRM Contender Series: HubSpot vs. SalesforceCRM Contender Series: HubSpot vs. Salesforce
CRM Contender Series: HubSpot vs. Salesforce
 
Folding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a seriesFolding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a series
 
What are the key points to focus on before starting to learn ETL Development....
What are the key points to focus on before starting to learn ETL Development....What are the key points to focus on before starting to learn ETL Development....
What are the key points to focus on before starting to learn ETL Development....
 
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
 
SpotFlow: Tracking Method Calls and States at Runtime
SpotFlow: Tracking Method Calls and States at RuntimeSpotFlow: Tracking Method Calls and States at Runtime
SpotFlow: Tracking Method Calls and States at Runtime
 
2.pdf Ejercicios de programación competitiva
2.pdf Ejercicios de programación competitiva2.pdf Ejercicios de programación competitiva
2.pdf Ejercicios de programación competitiva
 
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte Germany
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte GermanySuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte Germany
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte Germany
 
Introduction Computer Science - Software Design.pdf
Introduction Computer Science - Software Design.pdfIntroduction Computer Science - Software Design.pdf
Introduction Computer Science - Software Design.pdf
 

LOTO system integration with Permit to Work Software

  • 1. 1
  • 2. 2 • Easy preparation of isolation certificate with data fetched from the equipment master and tag register © 2021 ASK-EHS Engineering & Consultants Pvt. Ltd. All Rights Reserved.
  • 3. 3 • Annotate P&ID Diagram, Electrical Line Diagrams in image © 2021 ASK-EHS Engineering & Consultants Pvt. Ltd. All Rights Reserved.
  • 4. 4 • Isolation and De- isolation work flows • Nomination of Isolation / De- isolation task to competent person (isolation authority) • Carry out Sanction to Test Process with approval workflow © 2021 ASK-EHS Engineering & Consultants Pvt. Ltd. All Rights Reserved. Need for blanket isolation arises Prepare isolation certificate specific to a discipline by entering all isolation details (except Lock #) & drawing attached. Review the isolation request (By Commissioning Manager) Requested isolation certificate appropriate? Approve isolation request (By Commissioning Manager) Nominate an authorized person (AEP/AIP/AMP) that shall perform isolation Enter lock # for tag(s) in IC if not already entered Verify isolation performed (By PTW Coordinator) Isolation done satisfactorily? Approve IC (By PTW Coordinator) Isolation certificate ready to be used by permits
  • 5. 5 • Restricting commence of work until system de- energized and safe to work upon • Safe management and coordination amongst the work permits sharing the same isolations © 2021 ASK-EHS Engineering & Consultants Pvt. Ltd. All Rights Reserved.
  • 6. 6 • Verify isolations using Mobile App from field © 2021 ASK-EHS Engineering & Consultants Pvt. Ltd. All Rights Reserved.
  • 7. 7 • Maintain Lock-Out and Tag-Out details along with the provision to print ready-to-use © 2021 ASK-EHS Engineering & Consultants Pvt. Ltd. All Rights Reserved.