PROCEDURE MANUAL
SEM - 1807
Health and Safety Procedure
HSE Audit
REV. : 0
DATE : 2004. 05. 03
PROCEDURE MANUAL
HSE AUDIT
SEM – 1807
REV. : 0
DATE: 2004. 05. 03 PAGE i OF i
Contents.
1. Purpose.
2. Scope.
3. Responsibility.
3.1 HSE Audit Team Leader.
3.2 Head of Audited Organisation.
3.3 Manager of HSE Department.
4. Definitions.
4.1 HSE Audit Team Leader.
4.2 HSE Audit Team.
4.3 Auditee.
5. Instructions.
5.1 Planning of the Audit Programme.
5.2 Formation of Audit Team.
5.3 Conducting the Audit.
5.4 Issue of Reporting and Corrective Request.
5.5 Close-Out of Audit Finding Report.
6. Revision Status.
Appendix.
Ⅰ HSE Audit Finding Report.
Ⅱ HSE Audit Summary Report.
Ⅲ HSE Audit Evaluation Sheet.
PROCEDURE MANUAL
HSE AUDIT
SEM – 1807
REV. : 0
DATE: 2004. 05. 03 PAGE 1 OF 4
PURPOSE.
1. This procedure and guidance information has been developed to define a
system for the conduct of Internal HSE Audits to verify whether HSE activities
and related results comply with planned arrangements and to evaluate the
effectiveness of the implementation of the HSE Management System.
2. SCOPE.
3. To be used by HSE Audit Team members in the SECL Head Office HSE
Department
4. RESPONSIBILITY.
5. HSE Audit Team Leader.
1.1.1 Shall plan, execute and follow-up on the entire Auditing cycle.
1.1.2 Shall coordinate all HSE Audit activities.
1.1.3 Shall oversee the HSE Audit activities and enforce the implementation
of outstanding corrective actions.
1.1.4 Shall report to the manager of HSE department on the findings of each
auditing cycle.
6. Head of Audited Organization.
1.1.5 Shall review, agree and correct deficiencies revealed in the Audit
Corrective Action Request.
1.1.6 Shall ensure the effectiveness of the corrective actions.
7. Manager of HSE Department (Head Office).
1.1.7 Shall review and approve the HSE Audit Programme established by the
Head Office HSE Department.
1.1.8 Shall monitor all HSE Audit activities.
1.1.9 Shall report to Top Management on the effectiveness of the HSE
Management System.
1.1.10 Shall constantly check the work of the HSE Audit Team and provide
guidance to improve the Audit function.
1.1.11 Shall discuss the Audit Findings based on the summary report by the
Audit Team.
8. DEFINITIONS.
9. HSE Audit Team Leader.
1.1.12 A person who is qualified and authorized to manage a team of Auditors.
10. HSE Audit Team.
1.1.13 A group which is qualified and authorized to carry out HSE Audits.
11. Auditee.
1.1.14 A person or organization being audited.
12. INSTRUCTIONS.
13. Planning the Audit Programme.
1.1.15 The entire HSE System of the company which includes all current
projects as well as the organization shall be audited at least once a
year.
1.1.16 The Manager of the HSE Department, Head Office shall prepare the
annual audit programme.
14. Formation of Audit Team.
1.1.17 The Manager of the HSE Department, Head Office shall form HSE
Audit Teams.
1.1.18 The Audit Team Leader shall have a good knowledge on HSE
requirements and also sound auditing skills and techniques.
1.1.19 Audit Team Members should be selected on the basis of
(1) Technical Background.
(2) Impartiality
(3) Knowledge of Auditing skill and technique.
15. Conducting the Audit.
1.1.20 Pre-Audit Meeting.
(1) The Auditee should be informed of the Audit schedule at least a
week in advance through a Audit plan in order to eliminate the
element of surprise.
(2) The Audit Team member should have a formal opening meeting
with the Auditee's Representative(s) prior to commencement of
the Audit, stating the scope of audit tabulated in the Audit Plan and
explain how the audit will operate. The audit plan shall be
acknowledge by the Auditee.
1.1.21 Audit.
(1) The Audit Interview shall be intended for fact-finding and not fault
finding on the system. The Audit Team Members should be
objective in questioning the Auditee.
(2) The Audit Team Members shall ask the Auditee to briefly run down
the procedure, stop for clarification if necessary.
(3) The Audit Team Members should ask for evidence wherever
necessary such as reports, records, minutes, instructions, etc.
(4) The Audit Team Members shall selectively question the
staff/workers at that moment, not to interfere with the routine
activities.
1.1.22 Post-Audit Meeting.
(1) The Audit Team shall hold a meeting with the Auditee's
management to present Audit Findings.
(2) At this meeting, the non-conformities found during the actual audit
and response dates shall be agreed.
16. Issue of Report and Corrective Request.
1.1.23 Within 10 days after the audit, the Audit Team shall issue the 'Audit
Finding Report' to the Auditee, as necessary.
1.1.24 The Auditee must take action on the reported non-conformances and
complete by the stipulated dates.
1.1.25 All 'Audit Finding Reports' issued shall be recorded and updated in the
'Audit Finding Report Log' by the Audit Team.
1.1.26 The Audit Team Leader shall condense facts of the Non-conformances
in the 'Audit Summary Report' and submit them to the manager of HSE
department for his review and approval.
17. Close-out of 'Audit Finding Report'
1.1.27 The Audit Team shall evaluate the corrective action responses.
1.1.28 If the response is acceptable, the Audit Team shall verify the Corrective
Actions taken and close-out the 'Audit Finding Report'.
1.1.29 If the response is unacceptable, the 'Audit Finding Report' shall be
returned with comments.
18. Revision Status
Rev. No. Rev. Date Rev. Page Description
0 2004.05.03 - Newly legislated
- Prepared Team : Quality, Safety Management
& Technology Support Team
- Prepared by : Mr. Kim Ho Min
- Reviewed by : Mr. Kim Seong Chul
Mr. Roger N. Wagstaff
- Approved by : Mr. Choi Kye Sik
APPENDIX.
Ⅰ HSE Audit Finding Report.
Ⅱ HSE Audit Summary Report.
Ⅲ HSE Management Evaluation Sheet.
APPENDIX.
[Appendix. Ⅰ HSE Audit Finding Report.]
Samsung Engineering Co., Ltd.
Audit Finding Report (AFR)
AFR No. :
Organization Audited. Discussed with. HSE Audit No.
Auditor. Audit Date. Due date of Response.
Reference Document.
Finding Description.
Recommended Corrective Action.
Lead Auditor.
Manager of
HSE Dept.Name, Signature, Date. Name, Signature, Date.
Response by Audited Organization.
Date of
Completion.
Submitted by
Name, Signature, Date.
Verification.
Lead Auditor.
Manager of
HSE Dept.
Name, Signature, Date. Name, Signature, Date.
Appendix Ⅰ
SEM – 1807
REV. : 0
PAGE 1 of 1
[Appendix. Ⅱ HSE Audit Summary Report.]
Samsung Engineering Co., Ltd.
HSE AUDIT Report
Division Name. Audit Date. HSE Audit No.
Auditors. Organization Audited.
A) SCOPE.
B) SUMMARY.
Prepared by Date.
Name, Signature.
Reviewed by Date.
Name, Signature.
Approved by Date.
Name, Signature.
Appendix Ⅱ
SEM – 1807
REV. : 0
PAGE 1 of 1
[Appendix. Ⅲ HSE Audit Evaluation Sheet]
HSE Audit Evaluation Sheet [Construction Activities]
Project Name. HSE Manager. Construction Period. ~ Manpower. (Man-days) Peak: Current:
Project Manager. Audit Team Leader Const. Progress. (%) Plan: %, Actual: %
Current Work
□Civil □Arch. □Stl. Str.
Site Manager. Date of Audit. Accident Free. (M/H) □Mech. □Pipe □ E&I
ITEM.
BASE
POINTS.
CHECK POINTS.
Evaluation
Point Total.
%
1. HSE MANAGEMENT AND ORGANISATION. / 25 □ Managers HSE responsibilities. □
Management attendance at HSE site
inspections. □ Monthly HSE Objectives. □ Sub-Contractors Safety Communication. □ Project Management Daily Site Patrol.
2. LOCAL AND OTHER REQUIREMENTS. □ Local Environmental Protection Laws. □ Local Health and Safety Legislation. □ Clients Environmental Requirements. □
Clients Specific Health and Safety
Requirements. □ Other Applicable HSE Legislation.
3. HSE WORKING PROCEDURES. □
Inventory of HSE documents, including
updates and issue of information. □
Establishment and control of Risk
Assessments. □
Written method statement for high risk
activities. □
Work permits for specific hazardous
operations. □
Control of Substances Hazardous to Health
(Assessments/ MSDS)
4. PROJECT HSE DOCUMENTATION. □ HSE Training Records. □
HSE Reporting to Site Manager.
(Daily Information and Monthly Report) □
Accident Investigation Reports / Dangerous
Occurrences / Near Miss. □ Accident Reporting to Head Office. □ Waste Disposal Records.
5. HSE COMMITTEE AND HSE MEETINGS. □
Establishment-Purpose, Rules, Members,
Dates of Meetings etc. □ HSE Committee Meetings. □ Participation. □ Agenda and Minutes. □ Clients HSE Committee Meetings.
6. HSE PUBLICITY. □
Project Accident Frequency Rate Notice
Board. □ HSE Bulletin Boards. □ Display of HSE Signs in Working Areas. □ HSE Incentive Schemes. □
Company HSE Policy Statement and HSE
Responsibilities.
7. HSE TRAINING. □ New Starters - HSE Induction Training. □ Evacuation Procedures. □ HSE Tool Box Talks. □ Subcontractors HSE Training. □ Project Management HSE Training.
8. EMERGENCY PREPAREDNESS. □
Contact with Local Emergency Services /
Authorities. □ Assembly Points. □ Nominated Wardens. □ Wind socks, flags etc. □ Evacuation and Rescue drills.
9. MEDICAL & FIRST AID FACILITIES. □ First Aid Clinic / Equipment. □ Site Nurse. □ Trained First Aiders. □ Ambulance / Emergency Transport. □ Site First Aid Equipment Boxes.
10. FIRE PREVENTION. □ Fire Extinguishers. □ Smoking Restrictions. □ Fire Prevention Training. □ Permits to Work - Hot Work. □ Fire Protection Measures after Work.
11. PERSONAL PROTECTIVE EQUIPMENT. (PPE) □ Provision of PPE. □ Training / Correct Use of PPE. □ Condition of PPE. □ Fall Arrest Equipment. □ Specialist PPE.
12 SITE COORDINATION. □ Coordination Bulletins. □ Ground Level/ Overhead Work □ Fumes & Dusts □ Road Closures & Diversions. □ Protection of the Public
13.
WORKING AT HEIGHT
(Fall Protection & Falling Materials). □ Ladder Access. □ Openings. □ Edge Protection. □ Lifting / Lowering of Materials. □ Nets/ Fans/ Barricades & Warning signs.
14. SCAFFOLD. (Tube & Fitting). □ Supervision of Erection. □ Tieing / Stability. □ Guard Rails and Toe Boards. □ Hand Over System (Scaff Tag). □ Sole Boards & base Plates.
15. SCAFFOLD. (System). □ Supervision of erection. □ Tieing/ Stability. □ Guard Rails and Toe Boards. □ Hand Over System (Scaff Tag).. □ Sole Boards & base Plates.
16. SCAFFOLD. (Free Standing Mobile Towers). □ Height to Base Ratio. □ Ladder Access. □ Working Platform. □ Guard Rails and Toe Boards. □ Wheels, Castors, Locks.
17. LADDERS. □ Inspection and Condition. □ Prevention of Movement. □ Stepping off Points. □ Angle of Repose. □ Aluminium Ladders.
18. EXCAVATIONS. □ Permanent/ Temporary Structures. □ Stability / Support. □ Access & Egress. □ Barricading. □ De-watering.
19. MOBILE PLANT AND EQUIPMENT. □ Inspection and Maintenance. □ Operators. □ Reverse Alarms. □ Banksman. □ Passengers.
20. STATIC PLANT (Crushers/ Batching/ Asphalt). □ Emergency Stops. □ Access and Working Platforms. □ Guarding of Moving Parts. □ Hearing Protection. □ Authorised Personnel.
21. CRANES. □ Appointed Persons-Lifting Assessments. □ Inspections / Examinations / Certification. □ Operators - Banksman - Riggers. □ Stability of Appliances. □
Siting. (Structures-Overhead Services-
Excavators etc.)
22. EXCAVATORS □ Lifting Point. □ SWL Displayed. □ Siting. □ Inspections / Certificates. □ Operators.
23. CHAINS ROPES AND LIFTING GEAR. □ Testing-Inspection-Colour Coding. □ Slinging Techniques. □ Safe Working Loads. □ Storage and Quarantine. □ Safety Hooks.
24. STEEL ERECTION. □ Method Statement. □ Access. □ Life Lines. □ Safety Harnesses. □ Openings.
Appendix Ⅲ
SEM – 1807
REV. : 0
PAGE 1 of 2
25. CONFINED SPACES. □ Method Statement. □ General Gas Testing. □ PPE. □ Rescue Procedures. □ Permit to Work.
26. WORKING OVER WATER. □ Rescue Procedure. □ Resuscitation Equipment. □ Edge Protection. □ Life Protection. □ Rescue Boat(s).
27. OVERHEAD & UNDERGROUND SERVICES. □ Goal Posts and Other Protection. □ Warning Notices. □ Contact with Local Authorities. □ Locating Practices. □ Equipment Operation.
28. SITE RADIOGRAPHY. □ Training in the Use, Storage and Maintenance. □ Radiography Request Application. □ Permit to Work System. □ Barriers, Warning Signs etc. □
Communication with Other Persons in the
Vicinity.
29. TEMPORARY WORKS. □ Temporary Works Coordinator. □ Design Drawing. □ Support Props. □ Foundations. □ Bracing / Lacing.
30. SAND / GRIT BLASTING. □ Hoses connections etc. □ Grounding of Cables. □ Shielding / Protection of Other Areas. □ Barricades / Signs. □ PPE.
31. WOODWORKING MACHINERY. □ Guarding of Blades. □ Emergency Isolation. □ Trained Operators. □ Floor Conditions. □ Lighting.
32. TEMPORARY ELECTRICITY. □ Installations by Qualified Personnel. □ Inspection / Maintenance. □ Cable Protection. □ Earth Leakage Circuit Breakers. □ Temporary Lighting.
33. GAS WELDING / CUTTING. □ Cylinders. - Secured / Upright. □ Hoses, Gauges, etc. □ PPE. □ Protective Screens. □ Fire Protection / Prevention.
34. ARC WELDING. □ Clamping / Insulation. □ Electric Shock Protection. □ Screen / Shields. □ PPE. □ Fire Protection / Prevention.
35. HAND TOOLS. □ Quality. □ Handles. □ Chisels. □ Inspection. □ Storage.
36. PNEUMATIC TOOLS. □ Compressors. □ Hoses. □ Connections. □ Air Lines. □ PPE.
37. CARTRIDGE OPERATED TOOLS. □ Trained Personnel. □ Guards. □ Storage of Cartridges. □ PPE. □ Maintenance.
38. ABRASIVE WHEELS. □ Trained Persons. □ Marking of Wheel Speeds. □ Guarding. □ Tool Rests. □ Eye Protection.
39. ELECTRIC HAND TOOLS. □ Insulation. □ Plugs / Sockets. □ Tool Casings. □ PPE. □ Inspection.
40.
STORAGE/ HANDLING OF GAS CYCLINDERS.
(LPG, Oxygen, Acetylene etc.)
□ Secure Covered Storage Facility. □ Upright Storage and Secured. □ Fire Extinguishers. □ Storage / Warning Signs. □ Handling.
41. WAREHOUSE / STORAGE AREAS. □ Access - Aisles - Gangways. □ Storage of Flammables. □ Fire Fighting Equipment. □ Safe Stacking. □ Fork Lift Operations.
42. SITE TRANSPORTATION. □ Driving Licenses - Driving Permits. □ Speed Limit. □ Road Signage. □ Vehicle Parking Restrictions. □ Road Cleaning.
43. LAY DOWN AREAS. □ Vehicle Control. □ Fenced/ Signed □ Housekeeping. □ Lighting. □ Protection.
44. FUEL STORAGE. □ Clearly signed. □ Fire Fighting Equipment. □ Emergency Shut Off.(Accessible/Marked) □ Bund Wall. □ Housekeeping.
45 WELFARE FACILITIES. □ Kitchens and Dining Halls. □ Camp. □ Offices. □ Site. □ Remote Areas.
46. HOUSEKEEPING. □ Loose Materials. □ Projecting Nails. □ Refuse Containers. □ Passageways / Gangways. □ Surplus / Unnecessary Items.
47. DISPOSAL OF WASTE. □ Designated Tipping Area. □ Harmful Substances. □ Security. □ Safety Data Information. □ Control of Waste Disposal Records.
48. PEST CONTROL. □ Fly/ Mosquito Screens. □ Stagnant Water □ Insecticides. □ Disposal Bins/ Covers. □ Drain Cleaning.
49. SITE SECURITY. □ Gate Control □ Traffic Control □ Fencing □ Lighting. □ Patrols.
50. ADDITIONAL ITEMS.
TOTAL BASE POINTS (A) (B)
Remarks. 1) EVALUATED by 5 Points Method. 2) ADJUSTMENT OF BASE POINTS. Lead Auditor Name : Total Evaluation Points (B) =
5
4
3
2
1
0
N.A
Acceptable as a whole but requires maintaining.
Acceptable but continuous improvement must be made.
Requires effort to improve on some work items.
Requires more effort to improve on most work items.
Poor.
Not Acceptable
Not Applicable.
Not Applicable Item is marked with “N.A”
and excluded from base points.
If “N.A” items are 2, base points become 15.
Signature :
Date
Total Base Points (A) =
Auditor Name : B / A =
Signature :
Date
Audit Rating %
Appendix Ⅲ
SEM – 1807
REV. : 0
PAGE 2 of 2
54231708 hse-audit-hse-procedure

More Related Content

What's hot

Qhse objective & target 2015
Qhse objective & target 2015Qhse objective & target 2015
Qhse objective & target 2015Fitri Ifony
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptssuser0ebdc3
 
Job safety analysis
Job safety analysis Job safety analysis
Job safety analysis soumenmakar
 
Occupational Safety & Health Administration (OSHA) 2022 update
Occupational Safety & Health Administration (OSHA) 2022 updateOccupational Safety & Health Administration (OSHA) 2022 update
Occupational Safety & Health Administration (OSHA) 2022 updateTheChamber
 
Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Fitri Ifony
 
HSE construction environment management plan
HSE construction environment management planHSE construction environment management plan
HSE construction environment management planDwarika Bhushan Sharma
 
Permit to work system
Permit to work systemPermit to work system
Permit to work systemAsif Khan
 
Risk Assessment (Master).pdf
Risk Assessment (Master).pdfRisk Assessment (Master).pdf
Risk Assessment (Master).pdfRafiullahKhan88
 
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docx
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docxFIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docx
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docxDwarika Bhushan Sharma
 
HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputGaurav Singh Rajput
 
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docxDanielLove24
 
PORTABLE TOOLS CHECKLIST Form # HSEQ - PTC Rev 2 -.docx
PORTABLE TOOLS CHECKLIST Form # HSEQ - PTC  Rev 2 -.docxPORTABLE TOOLS CHECKLIST Form # HSEQ - PTC  Rev 2 -.docx
PORTABLE TOOLS CHECKLIST Form # HSEQ - PTC Rev 2 -.docxDwarika Bhushan Sharma
 
Global HSE Newsletter March 2014
Global HSE Newsletter March 2014Global HSE Newsletter March 2014
Global HSE Newsletter March 2014Mohammad Ghadban
 
Occupational Health & Safety Management System 01
Occupational Health & Safety Management System 01Occupational Health & Safety Management System 01
Occupational Health & Safety Management System 01Yaowaluk Yuangsoi
 
Safety commitee meeting
Safety commitee meetingSafety commitee meeting
Safety commitee meetingsssaravana
 

What's hot (20)

Qhse objective & target 2015
Qhse objective & target 2015Qhse objective & target 2015
Qhse objective & target 2015
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.ppt
 
Job safety analysis
Job safety analysis Job safety analysis
Job safety analysis
 
Occupational Safety & Health Administration (OSHA) 2022 update
Occupational Safety & Health Administration (OSHA) 2022 updateOccupational Safety & Health Administration (OSHA) 2022 update
Occupational Safety & Health Administration (OSHA) 2022 update
 
Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014
 
HSE construction environment management plan
HSE construction environment management planHSE construction environment management plan
HSE construction environment management plan
 
Permit to work system
Permit to work systemPermit to work system
Permit to work system
 
Risk Assessment (Master).pdf
Risk Assessment (Master).pdfRisk Assessment (Master).pdf
Risk Assessment (Master).pdf
 
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docx
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docxFIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docx
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docx
 
Toolbox talks
Toolbox talks Toolbox talks
Toolbox talks
 
072 Method Statement
072 Method Statement072 Method Statement
072 Method Statement
 
HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh Rajput
 
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
8.1 ATC-FM-009 - Health and Safety Risk Register, 26th April 2018.docx
 
PORTABLE TOOLS CHECKLIST Form # HSEQ - PTC Rev 2 -.docx
PORTABLE TOOLS CHECKLIST Form # HSEQ - PTC  Rev 2 -.docxPORTABLE TOOLS CHECKLIST Form # HSEQ - PTC  Rev 2 -.docx
PORTABLE TOOLS CHECKLIST Form # HSEQ - PTC Rev 2 -.docx
 
HSE Fire Prevention & Protection Plan
HSE Fire Prevention & Protection PlanHSE Fire Prevention & Protection Plan
HSE Fire Prevention & Protection Plan
 
Global HSE Newsletter March 2014
Global HSE Newsletter March 2014Global HSE Newsletter March 2014
Global HSE Newsletter March 2014
 
Work at height safety
Work at height safetyWork at height safety
Work at height safety
 
Occupational health plan
Occupational health planOccupational health plan
Occupational health plan
 
Occupational Health & Safety Management System 01
Occupational Health & Safety Management System 01Occupational Health & Safety Management System 01
Occupational Health & Safety Management System 01
 
Safety commitee meeting
Safety commitee meetingSafety commitee meeting
Safety commitee meeting
 

Viewers also liked

SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)Herman Moral
 
My view imprint 2007 11 - 2
My view imprint 2007   11 - 2My view imprint 2007   11 - 2
My view imprint 2007 11 - 2Clive Burgess
 
HSE Annual Performance
HSE Annual PerformanceHSE Annual Performance
HSE Annual PerformanceArun Kumar
 
Hse frm 09 hse flyer
Hse frm 09 hse flyerHse frm 09 hse flyer
Hse frm 09 hse flyerperwez21
 
Resume HSE Officer (Jitendra dubey)
Resume HSE Officer (Jitendra dubey)Resume HSE Officer (Jitendra dubey)
Resume HSE Officer (Jitendra dubey)Jitendra Dubey
 
Monthly safety report may 2012
Monthly safety report may 2012Monthly safety report may 2012
Monthly safety report may 2012ChinaHarbour
 
JAN2016 - IMPROVEMENT REPORT
JAN2016 - IMPROVEMENT REPORTJAN2016 - IMPROVEMENT REPORT
JAN2016 - IMPROVEMENT REPORTStephen Austria
 
Safety PPE Poster (ONE SAFETY)
Safety PPE Poster (ONE SAFETY)Safety PPE Poster (ONE SAFETY)
Safety PPE Poster (ONE SAFETY)Stephen Austria
 
Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012ChinaHarbour
 
Performance Improvement Roadmap V4
Performance Improvement Roadmap V4Performance Improvement Roadmap V4
Performance Improvement Roadmap V4mulcahymike
 
Fire drill procedure
Fire drill procedureFire drill procedure
Fire drill procedureMaria Hidalgo
 

Viewers also liked (20)

SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
 
My view imprint 2007 11 - 2
My view imprint 2007   11 - 2My view imprint 2007   11 - 2
My view imprint 2007 11 - 2
 
HSE Annual Performance
HSE Annual PerformanceHSE Annual Performance
HSE Annual Performance
 
Hse frm 09 hse flyer
Hse frm 09 hse flyerHse frm 09 hse flyer
Hse frm 09 hse flyer
 
Resume HSE Officer (Jitendra dubey)
Resume HSE Officer (Jitendra dubey)Resume HSE Officer (Jitendra dubey)
Resume HSE Officer (Jitendra dubey)
 
Monthly safety report may 2012
Monthly safety report may 2012Monthly safety report may 2012
Monthly safety report may 2012
 
6th smester
6th smester6th smester
6th smester
 
JAN2016 - IMPROVEMENT REPORT
JAN2016 - IMPROVEMENT REPORTJAN2016 - IMPROVEMENT REPORT
JAN2016 - IMPROVEMENT REPORT
 
Contoh Monthly Reports
Contoh  Monthly  ReportsContoh  Monthly  Reports
Contoh Monthly Reports
 
5S Urdu Training
5S Urdu Training5S Urdu Training
5S Urdu Training
 
Safety PPE Poster (ONE SAFETY)
Safety PPE Poster (ONE SAFETY)Safety PPE Poster (ONE SAFETY)
Safety PPE Poster (ONE SAFETY)
 
Safety officer (k3 officer)
Safety officer (k3 officer)Safety officer (k3 officer)
Safety officer (k3 officer)
 
Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012
 
FIRE DRILL
FIRE DRILLFIRE DRILL
FIRE DRILL
 
Induction QHSE
Induction QHSEInduction QHSE
Induction QHSE
 
Work place safety
Work place safetyWork place safety
Work place safety
 
Performance Improvement Roadmap V4
Performance Improvement Roadmap V4Performance Improvement Roadmap V4
Performance Improvement Roadmap V4
 
Hse plan
Hse planHse plan
Hse plan
 
Safety Posters
Safety  Posters Safety  Posters
Safety Posters
 
Fire drill procedure
Fire drill procedureFire drill procedure
Fire drill procedure
 

Similar to 54231708 hse-audit-hse-procedure

Best Practices of Auditing an Energy Management System
Best Practices of Auditing an Energy Management SystemBest Practices of Auditing an Energy Management System
Best Practices of Auditing an Energy Management SystemPECB
 
Audit and regulatory compliance
Audit  and  regulatory complianceAudit  and  regulatory compliance
Audit and regulatory complianceArchana Chavhan
 
ARC 1-19^J 1-5(12marks).pptx
ARC 1-19^J 1-5(12marks).pptxARC 1-19^J 1-5(12marks).pptx
ARC 1-19^J 1-5(12marks).pptxSohailSheikh62
 
Internal audit procedure
Internal audit procedureInternal audit procedure
Internal audit procedurebhavikjariwala
 
Inspeksi-dan-Audit-K3.pdf
Inspeksi-dan-Audit-K3.pdfInspeksi-dan-Audit-K3.pdf
Inspeksi-dan-Audit-K3.pdfSoedarjotosdy
 
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdfAddisu15
 
a-guide-to-project-auditing.pdf
a-guide-to-project-auditing.pdfa-guide-to-project-auditing.pdf
a-guide-to-project-auditing.pdfWorldGemini
 
Project hse plan kikeh spar
Project hse plan kikeh sparProject hse plan kikeh spar
Project hse plan kikeh sparAbdul Yusof
 
tech3.pdf
tech3.pdftech3.pdf
tech3.pdfSuad45
 
Health and safety management system csctp
Health and safety management system csctpHealth and safety management system csctp
Health and safety management system csctpHeshantha Kosala Perera
 
Internal Audit Methodology.docx
Internal Audit Methodology.docxInternal Audit Methodology.docx
Internal Audit Methodology.docxAminAbdullah26
 
Internal auditor training by Er. Manish Dwivedi
Internal auditor training by Er. Manish DwivediInternal auditor training by Er. Manish Dwivedi
Internal auditor training by Er. Manish DwivediEr. Manish Dwivedi
 
Presentation on Occupational Health & Safety
Presentation on Occupational Health & SafetyPresentation on Occupational Health & Safety
Presentation on Occupational Health & Safetymanik980318
 

Similar to 54231708 hse-audit-hse-procedure (20)

Best Practices of Auditing an Energy Management System
Best Practices of Auditing an Energy Management SystemBest Practices of Auditing an Energy Management System
Best Practices of Auditing an Energy Management System
 
Audit and regulatory compliance
Audit  and  regulatory complianceAudit  and  regulatory compliance
Audit and regulatory compliance
 
ARC 1-19^J 1-5(12marks).pptx
ARC 1-19^J 1-5(12marks).pptxARC 1-19^J 1-5(12marks).pptx
ARC 1-19^J 1-5(12marks).pptx
 
Uhc office ehs implementation plan
Uhc office ehs implementation planUhc office ehs implementation plan
Uhc office ehs implementation plan
 
Uhc office ehs implementation plan
Uhc office ehs implementation planUhc office ehs implementation plan
Uhc office ehs implementation plan
 
Internal audit procedure
Internal audit procedureInternal audit procedure
Internal audit procedure
 
Inspeksi-dan-Audit-K3.pdf
Inspeksi-dan-Audit-K3.pdfInspeksi-dan-Audit-K3.pdf
Inspeksi-dan-Audit-K3.pdf
 
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
 
a-guide-to-project-auditing.pdf
a-guide-to-project-auditing.pdfa-guide-to-project-auditing.pdf
a-guide-to-project-auditing.pdf
 
Project hse plan kikeh spar
Project hse plan kikeh sparProject hse plan kikeh spar
Project hse plan kikeh spar
 
Safety cycle
Safety cycleSafety cycle
Safety cycle
 
Ia audit process_lisd
Ia audit process_lisdIa audit process_lisd
Ia audit process_lisd
 
Hse inspection presentation
Hse inspection presentationHse inspection presentation
Hse inspection presentation
 
tech3.pdf
tech3.pdftech3.pdf
tech3.pdf
 
Health and safety management system csctp
Health and safety management system csctpHealth and safety management system csctp
Health and safety management system csctp
 
Internal Audit Methodology.docx
Internal Audit Methodology.docxInternal Audit Methodology.docx
Internal Audit Methodology.docx
 
Basics of ISO14001
Basics of ISO14001Basics of ISO14001
Basics of ISO14001
 
Internal auditor training by Er. Manish Dwivedi
Internal auditor training by Er. Manish DwivediInternal auditor training by Er. Manish Dwivedi
Internal auditor training by Er. Manish Dwivedi
 
Presentation on Occupational Health & Safety
Presentation on Occupational Health & SafetyPresentation on Occupational Health & Safety
Presentation on Occupational Health & Safety
 
HSE plan and Bridging document
HSE plan and Bridging documentHSE plan and Bridging document
HSE plan and Bridging document
 

Recently uploaded

Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersRaghuram Pandurangan
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 

Recently uploaded (20)

Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information Developers
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 

54231708 hse-audit-hse-procedure

  • 1. PROCEDURE MANUAL SEM - 1807 Health and Safety Procedure HSE Audit REV. : 0 DATE : 2004. 05. 03
  • 2. PROCEDURE MANUAL HSE AUDIT SEM – 1807 REV. : 0 DATE: 2004. 05. 03 PAGE i OF i Contents. 1. Purpose. 2. Scope. 3. Responsibility. 3.1 HSE Audit Team Leader. 3.2 Head of Audited Organisation. 3.3 Manager of HSE Department. 4. Definitions. 4.1 HSE Audit Team Leader. 4.2 HSE Audit Team. 4.3 Auditee. 5. Instructions. 5.1 Planning of the Audit Programme. 5.2 Formation of Audit Team. 5.3 Conducting the Audit. 5.4 Issue of Reporting and Corrective Request. 5.5 Close-Out of Audit Finding Report. 6. Revision Status. Appendix. Ⅰ HSE Audit Finding Report. Ⅱ HSE Audit Summary Report. Ⅲ HSE Audit Evaluation Sheet.
  • 3. PROCEDURE MANUAL HSE AUDIT SEM – 1807 REV. : 0 DATE: 2004. 05. 03 PAGE 1 OF 4 PURPOSE. 1. This procedure and guidance information has been developed to define a system for the conduct of Internal HSE Audits to verify whether HSE activities and related results comply with planned arrangements and to evaluate the effectiveness of the implementation of the HSE Management System. 2. SCOPE. 3. To be used by HSE Audit Team members in the SECL Head Office HSE Department 4. RESPONSIBILITY. 5. HSE Audit Team Leader. 1.1.1 Shall plan, execute and follow-up on the entire Auditing cycle. 1.1.2 Shall coordinate all HSE Audit activities. 1.1.3 Shall oversee the HSE Audit activities and enforce the implementation of outstanding corrective actions. 1.1.4 Shall report to the manager of HSE department on the findings of each auditing cycle. 6. Head of Audited Organization. 1.1.5 Shall review, agree and correct deficiencies revealed in the Audit Corrective Action Request. 1.1.6 Shall ensure the effectiveness of the corrective actions. 7. Manager of HSE Department (Head Office). 1.1.7 Shall review and approve the HSE Audit Programme established by the Head Office HSE Department. 1.1.8 Shall monitor all HSE Audit activities. 1.1.9 Shall report to Top Management on the effectiveness of the HSE Management System. 1.1.10 Shall constantly check the work of the HSE Audit Team and provide guidance to improve the Audit function. 1.1.11 Shall discuss the Audit Findings based on the summary report by the Audit Team.
  • 4. 8. DEFINITIONS. 9. HSE Audit Team Leader. 1.1.12 A person who is qualified and authorized to manage a team of Auditors. 10. HSE Audit Team. 1.1.13 A group which is qualified and authorized to carry out HSE Audits. 11. Auditee. 1.1.14 A person or organization being audited. 12. INSTRUCTIONS. 13. Planning the Audit Programme. 1.1.15 The entire HSE System of the company which includes all current projects as well as the organization shall be audited at least once a year. 1.1.16 The Manager of the HSE Department, Head Office shall prepare the annual audit programme. 14. Formation of Audit Team. 1.1.17 The Manager of the HSE Department, Head Office shall form HSE Audit Teams. 1.1.18 The Audit Team Leader shall have a good knowledge on HSE requirements and also sound auditing skills and techniques. 1.1.19 Audit Team Members should be selected on the basis of (1) Technical Background. (2) Impartiality (3) Knowledge of Auditing skill and technique. 15. Conducting the Audit. 1.1.20 Pre-Audit Meeting. (1) The Auditee should be informed of the Audit schedule at least a week in advance through a Audit plan in order to eliminate the element of surprise. (2) The Audit Team member should have a formal opening meeting with the Auditee's Representative(s) prior to commencement of the Audit, stating the scope of audit tabulated in the Audit Plan and explain how the audit will operate. The audit plan shall be acknowledge by the Auditee. 1.1.21 Audit. (1) The Audit Interview shall be intended for fact-finding and not fault finding on the system. The Audit Team Members should be objective in questioning the Auditee. (2) The Audit Team Members shall ask the Auditee to briefly run down the procedure, stop for clarification if necessary. (3) The Audit Team Members should ask for evidence wherever
  • 5. necessary such as reports, records, minutes, instructions, etc. (4) The Audit Team Members shall selectively question the staff/workers at that moment, not to interfere with the routine activities. 1.1.22 Post-Audit Meeting. (1) The Audit Team shall hold a meeting with the Auditee's management to present Audit Findings. (2) At this meeting, the non-conformities found during the actual audit and response dates shall be agreed. 16. Issue of Report and Corrective Request. 1.1.23 Within 10 days after the audit, the Audit Team shall issue the 'Audit Finding Report' to the Auditee, as necessary. 1.1.24 The Auditee must take action on the reported non-conformances and complete by the stipulated dates. 1.1.25 All 'Audit Finding Reports' issued shall be recorded and updated in the 'Audit Finding Report Log' by the Audit Team. 1.1.26 The Audit Team Leader shall condense facts of the Non-conformances in the 'Audit Summary Report' and submit them to the manager of HSE department for his review and approval. 17. Close-out of 'Audit Finding Report' 1.1.27 The Audit Team shall evaluate the corrective action responses. 1.1.28 If the response is acceptable, the Audit Team shall verify the Corrective Actions taken and close-out the 'Audit Finding Report'. 1.1.29 If the response is unacceptable, the 'Audit Finding Report' shall be returned with comments. 18. Revision Status Rev. No. Rev. Date Rev. Page Description 0 2004.05.03 - Newly legislated - Prepared Team : Quality, Safety Management & Technology Support Team - Prepared by : Mr. Kim Ho Min
  • 6. - Reviewed by : Mr. Kim Seong Chul Mr. Roger N. Wagstaff - Approved by : Mr. Choi Kye Sik APPENDIX. Ⅰ HSE Audit Finding Report. Ⅱ HSE Audit Summary Report. Ⅲ HSE Management Evaluation Sheet.
  • 7. APPENDIX. [Appendix. Ⅰ HSE Audit Finding Report.] Samsung Engineering Co., Ltd. Audit Finding Report (AFR) AFR No. : Organization Audited. Discussed with. HSE Audit No. Auditor. Audit Date. Due date of Response. Reference Document. Finding Description. Recommended Corrective Action. Lead Auditor. Manager of HSE Dept.Name, Signature, Date. Name, Signature, Date. Response by Audited Organization. Date of Completion. Submitted by Name, Signature, Date. Verification. Lead Auditor. Manager of HSE Dept. Name, Signature, Date. Name, Signature, Date. Appendix Ⅰ SEM – 1807 REV. : 0 PAGE 1 of 1
  • 8. [Appendix. Ⅱ HSE Audit Summary Report.] Samsung Engineering Co., Ltd. HSE AUDIT Report Division Name. Audit Date. HSE Audit No. Auditors. Organization Audited. A) SCOPE. B) SUMMARY. Prepared by Date. Name, Signature. Reviewed by Date. Name, Signature. Approved by Date. Name, Signature. Appendix Ⅱ SEM – 1807 REV. : 0 PAGE 1 of 1
  • 9. [Appendix. Ⅲ HSE Audit Evaluation Sheet] HSE Audit Evaluation Sheet [Construction Activities] Project Name. HSE Manager. Construction Period. ~ Manpower. (Man-days) Peak: Current: Project Manager. Audit Team Leader Const. Progress. (%) Plan: %, Actual: % Current Work □Civil □Arch. □Stl. Str. Site Manager. Date of Audit. Accident Free. (M/H) □Mech. □Pipe □ E&I ITEM. BASE POINTS. CHECK POINTS. Evaluation Point Total. % 1. HSE MANAGEMENT AND ORGANISATION. / 25 □ Managers HSE responsibilities. □ Management attendance at HSE site inspections. □ Monthly HSE Objectives. □ Sub-Contractors Safety Communication. □ Project Management Daily Site Patrol. 2. LOCAL AND OTHER REQUIREMENTS. □ Local Environmental Protection Laws. □ Local Health and Safety Legislation. □ Clients Environmental Requirements. □ Clients Specific Health and Safety Requirements. □ Other Applicable HSE Legislation. 3. HSE WORKING PROCEDURES. □ Inventory of HSE documents, including updates and issue of information. □ Establishment and control of Risk Assessments. □ Written method statement for high risk activities. □ Work permits for specific hazardous operations. □ Control of Substances Hazardous to Health (Assessments/ MSDS) 4. PROJECT HSE DOCUMENTATION. □ HSE Training Records. □ HSE Reporting to Site Manager. (Daily Information and Monthly Report) □ Accident Investigation Reports / Dangerous Occurrences / Near Miss. □ Accident Reporting to Head Office. □ Waste Disposal Records. 5. HSE COMMITTEE AND HSE MEETINGS. □ Establishment-Purpose, Rules, Members, Dates of Meetings etc. □ HSE Committee Meetings. □ Participation. □ Agenda and Minutes. □ Clients HSE Committee Meetings. 6. HSE PUBLICITY. □ Project Accident Frequency Rate Notice Board. □ HSE Bulletin Boards. □ Display of HSE Signs in Working Areas. □ HSE Incentive Schemes. □ Company HSE Policy Statement and HSE Responsibilities. 7. HSE TRAINING. □ New Starters - HSE Induction Training. □ Evacuation Procedures. □ HSE Tool Box Talks. □ Subcontractors HSE Training. □ Project Management HSE Training. 8. EMERGENCY PREPAREDNESS. □ Contact with Local Emergency Services / Authorities. □ Assembly Points. □ Nominated Wardens. □ Wind socks, flags etc. □ Evacuation and Rescue drills. 9. MEDICAL & FIRST AID FACILITIES. □ First Aid Clinic / Equipment. □ Site Nurse. □ Trained First Aiders. □ Ambulance / Emergency Transport. □ Site First Aid Equipment Boxes. 10. FIRE PREVENTION. □ Fire Extinguishers. □ Smoking Restrictions. □ Fire Prevention Training. □ Permits to Work - Hot Work. □ Fire Protection Measures after Work. 11. PERSONAL PROTECTIVE EQUIPMENT. (PPE) □ Provision of PPE. □ Training / Correct Use of PPE. □ Condition of PPE. □ Fall Arrest Equipment. □ Specialist PPE. 12 SITE COORDINATION. □ Coordination Bulletins. □ Ground Level/ Overhead Work □ Fumes & Dusts □ Road Closures & Diversions. □ Protection of the Public 13. WORKING AT HEIGHT (Fall Protection & Falling Materials). □ Ladder Access. □ Openings. □ Edge Protection. □ Lifting / Lowering of Materials. □ Nets/ Fans/ Barricades & Warning signs. 14. SCAFFOLD. (Tube & Fitting). □ Supervision of Erection. □ Tieing / Stability. □ Guard Rails and Toe Boards. □ Hand Over System (Scaff Tag). □ Sole Boards & base Plates. 15. SCAFFOLD. (System). □ Supervision of erection. □ Tieing/ Stability. □ Guard Rails and Toe Boards. □ Hand Over System (Scaff Tag).. □ Sole Boards & base Plates. 16. SCAFFOLD. (Free Standing Mobile Towers). □ Height to Base Ratio. □ Ladder Access. □ Working Platform. □ Guard Rails and Toe Boards. □ Wheels, Castors, Locks. 17. LADDERS. □ Inspection and Condition. □ Prevention of Movement. □ Stepping off Points. □ Angle of Repose. □ Aluminium Ladders. 18. EXCAVATIONS. □ Permanent/ Temporary Structures. □ Stability / Support. □ Access & Egress. □ Barricading. □ De-watering. 19. MOBILE PLANT AND EQUIPMENT. □ Inspection and Maintenance. □ Operators. □ Reverse Alarms. □ Banksman. □ Passengers. 20. STATIC PLANT (Crushers/ Batching/ Asphalt). □ Emergency Stops. □ Access and Working Platforms. □ Guarding of Moving Parts. □ Hearing Protection. □ Authorised Personnel. 21. CRANES. □ Appointed Persons-Lifting Assessments. □ Inspections / Examinations / Certification. □ Operators - Banksman - Riggers. □ Stability of Appliances. □ Siting. (Structures-Overhead Services- Excavators etc.) 22. EXCAVATORS □ Lifting Point. □ SWL Displayed. □ Siting. □ Inspections / Certificates. □ Operators. 23. CHAINS ROPES AND LIFTING GEAR. □ Testing-Inspection-Colour Coding. □ Slinging Techniques. □ Safe Working Loads. □ Storage and Quarantine. □ Safety Hooks. 24. STEEL ERECTION. □ Method Statement. □ Access. □ Life Lines. □ Safety Harnesses. □ Openings. Appendix Ⅲ SEM – 1807 REV. : 0 PAGE 1 of 2
  • 10. 25. CONFINED SPACES. □ Method Statement. □ General Gas Testing. □ PPE. □ Rescue Procedures. □ Permit to Work. 26. WORKING OVER WATER. □ Rescue Procedure. □ Resuscitation Equipment. □ Edge Protection. □ Life Protection. □ Rescue Boat(s). 27. OVERHEAD & UNDERGROUND SERVICES. □ Goal Posts and Other Protection. □ Warning Notices. □ Contact with Local Authorities. □ Locating Practices. □ Equipment Operation. 28. SITE RADIOGRAPHY. □ Training in the Use, Storage and Maintenance. □ Radiography Request Application. □ Permit to Work System. □ Barriers, Warning Signs etc. □ Communication with Other Persons in the Vicinity. 29. TEMPORARY WORKS. □ Temporary Works Coordinator. □ Design Drawing. □ Support Props. □ Foundations. □ Bracing / Lacing. 30. SAND / GRIT BLASTING. □ Hoses connections etc. □ Grounding of Cables. □ Shielding / Protection of Other Areas. □ Barricades / Signs. □ PPE. 31. WOODWORKING MACHINERY. □ Guarding of Blades. □ Emergency Isolation. □ Trained Operators. □ Floor Conditions. □ Lighting. 32. TEMPORARY ELECTRICITY. □ Installations by Qualified Personnel. □ Inspection / Maintenance. □ Cable Protection. □ Earth Leakage Circuit Breakers. □ Temporary Lighting. 33. GAS WELDING / CUTTING. □ Cylinders. - Secured / Upright. □ Hoses, Gauges, etc. □ PPE. □ Protective Screens. □ Fire Protection / Prevention. 34. ARC WELDING. □ Clamping / Insulation. □ Electric Shock Protection. □ Screen / Shields. □ PPE. □ Fire Protection / Prevention. 35. HAND TOOLS. □ Quality. □ Handles. □ Chisels. □ Inspection. □ Storage. 36. PNEUMATIC TOOLS. □ Compressors. □ Hoses. □ Connections. □ Air Lines. □ PPE. 37. CARTRIDGE OPERATED TOOLS. □ Trained Personnel. □ Guards. □ Storage of Cartridges. □ PPE. □ Maintenance. 38. ABRASIVE WHEELS. □ Trained Persons. □ Marking of Wheel Speeds. □ Guarding. □ Tool Rests. □ Eye Protection. 39. ELECTRIC HAND TOOLS. □ Insulation. □ Plugs / Sockets. □ Tool Casings. □ PPE. □ Inspection. 40. STORAGE/ HANDLING OF GAS CYCLINDERS. (LPG, Oxygen, Acetylene etc.) □ Secure Covered Storage Facility. □ Upright Storage and Secured. □ Fire Extinguishers. □ Storage / Warning Signs. □ Handling. 41. WAREHOUSE / STORAGE AREAS. □ Access - Aisles - Gangways. □ Storage of Flammables. □ Fire Fighting Equipment. □ Safe Stacking. □ Fork Lift Operations. 42. SITE TRANSPORTATION. □ Driving Licenses - Driving Permits. □ Speed Limit. □ Road Signage. □ Vehicle Parking Restrictions. □ Road Cleaning. 43. LAY DOWN AREAS. □ Vehicle Control. □ Fenced/ Signed □ Housekeeping. □ Lighting. □ Protection. 44. FUEL STORAGE. □ Clearly signed. □ Fire Fighting Equipment. □ Emergency Shut Off.(Accessible/Marked) □ Bund Wall. □ Housekeeping. 45 WELFARE FACILITIES. □ Kitchens and Dining Halls. □ Camp. □ Offices. □ Site. □ Remote Areas. 46. HOUSEKEEPING. □ Loose Materials. □ Projecting Nails. □ Refuse Containers. □ Passageways / Gangways. □ Surplus / Unnecessary Items. 47. DISPOSAL OF WASTE. □ Designated Tipping Area. □ Harmful Substances. □ Security. □ Safety Data Information. □ Control of Waste Disposal Records. 48. PEST CONTROL. □ Fly/ Mosquito Screens. □ Stagnant Water □ Insecticides. □ Disposal Bins/ Covers. □ Drain Cleaning. 49. SITE SECURITY. □ Gate Control □ Traffic Control □ Fencing □ Lighting. □ Patrols. 50. ADDITIONAL ITEMS. TOTAL BASE POINTS (A) (B) Remarks. 1) EVALUATED by 5 Points Method. 2) ADJUSTMENT OF BASE POINTS. Lead Auditor Name : Total Evaluation Points (B) = 5 4 3 2 1 0 N.A Acceptable as a whole but requires maintaining. Acceptable but continuous improvement must be made. Requires effort to improve on some work items. Requires more effort to improve on most work items. Poor. Not Acceptable Not Applicable. Not Applicable Item is marked with “N.A” and excluded from base points. If “N.A” items are 2, base points become 15. Signature : Date Total Base Points (A) = Auditor Name : B / A = Signature : Date Audit Rating % Appendix Ⅲ SEM – 1807 REV. : 0 PAGE 2 of 2