Smart Monte Carlo: Tricks for schedule risk analysis.
1. Smart Monte Carlo:
Five simple tricks how to make Monte
Carlo schedule risk analysis more
accurate and efficient
Intaver Institute Inc.
400, 7015, Macleod Trail, Calgary, AB, Canada
Tel: +1 (403) 692-2252
www.intaver.com
2. 1. Optimize the Schedule
Eliminate Dangling activities
Minimize Hard Constraints
Schedule Diagnostics
3. 2. Optimize the Simulation Parameters
Convergence Monitoring
Set Margin or Contingency
using High Percentile
output
Instant Monte Carlo