SlideShare a Scribd company logo
1 of 34
1
<Insert Picture Here>
Concepts and Best Practices for the Risk Register in Primavera Risk
Analysis
Matt Candela
Senior Technical Support Engineer
3
The following is intended to outline our general product
direction. It is intended for information purposes only,
and may not be incorporated into any contract. It is
not a commitment to deliver any material, code, or
functionality, and should not be relied upon in making
purchasing decisions.
The development, release, and timing of any features
or functionality described for Oracle’s products remains
at the sole discretion of Oracle.
4
Agenda
• Demo of primary Risk Register functionality in Primavera
Risk Analysis (PRA)
• Detailed look at functionality
• Other options and considerations
• Overview of risk functionality in P6 R8
5
• Uncertainty is inherent to a task.
– Example: digging a trench is scheduled for 10 days. It may only
take 8, or could take up to 12.
• Risks are events that may or may not occur and could
affect a task.
– Example: there is a 5% chance of flooding, which could delay
the digging of the trench by 5 to 8 days.
Risk vs. Uncertainty
6
• Risk scoring
– Thresholds, scoring criteria
• Create risks and assign to tasks
– Qualitative, quantitative probabilities and impacts
– Risk scores generated
• Mitigation
– Post-mitigated probabilities, impacts and risk scores
• Build impacted risk plans
Primary Risk Register Functionality
7
Risk Scoring
• Scores are calculated using Probability and Impact
Scoring Diagram
• Determined by intersection of the probability and impact
8
Qualitative and Quantitative Risks
• Risks have both qualitative and quantitative values
– Quantitative used in impacted risk plan
– Qualitative used to determine risk scores
• Qualitative risks: quantitative values from thresholds
– For probability, low and high are averaged
– For impacts, low is min and high is max
• Quantitative risks: qualitative values determined by
average of min, max, and most likely impacts
9
Qualitative Risks - Example
• Risk HAZ is assigned a high schedule impact
• High schedule threshold is defined as 20 to 40 days in
the risk scoring options
10
Qualitative Risks - Example
• Risk is assigned to a task on Quantitative tab
• Schedule impact is min 20 days and max 40
11
Quantitative Risks - Example
• Risk ACC is quantified and assigned to task 3
• Cost impact is min $50,000 and max $100,000, average
is $75,000
12
Quantitative Risks - Example
• $75,000 is within medium cost threshold
• Qualitative cost impact is medium
13
Qualitative and Quantitative Risks Assigned to
Multiple Tasks
• Qualitative: impacts spread across the tasks, per
following Risk Register options:
– “Spread the risk duration across multiple impacts”
– “Spread the risk costs across multiple impacts”
• Quantitative: impact averages will be summed to
determine qualitative value
14
Mitigation
• Mitigation Response of Avoid, Transfer, or Reduce
allows for post-mitigation values and score.
• Title and Total Cost optional for simple mitigation plan
15
Mitigation - Detailed Actions
• Qualitative tab > Mitigation tab > Use Detailed Actions
• Multiple mitigation actions with additional fields available
16
Mitigation - Detailed Actions
• Total Cost calculated as sum of details actions costs
– Excluding actions set to Rejected
• Post-mitigated values taken from an action
– Rejected actions are not considered
– Action with latest finish date is used
– Tie goes to action with the lowest score
17
• Mitigation Response set to Accept: any other response
allows for mitigation
• Use Detailed Actions is selected: post-mitigated values
taken from an action
• Risk is quantified: post-mitigated values must be set on
Quantitative tab
Post-Mitigated Options Grayed Out
18
Building an Impacted Plan
• (Task ID):B is the original task with no risk impact
– Duration and duration uncertainty of the original task
19
Building an Impacted Plan
• (Task ID):(Risk ID) is the risk event
– Task existence for probability, duration uncertainty for schedule
impact, resource uncertainty (ZCRI) for cost impact
– Zero remaining duration
20
Building an Impacted Plan
• (Task ID) is the summary for base task and risk event
– Logic from original task
– Resource assignments from original task, unless “Cost Impacts
include duration costs” is selected in Risk Register options
21
Correlation
• Available on Risk View tab when a risk is assigned to
multiple tasks
• Impact Ranges 90% correlation, Event Existence 100%
22
Link in Series
• Available on Task View tab when a task has multiple
risks assigned
• When unchecked, risks are in parallel
23
Link in Series - Example 1
• Risks are linked in series
• Cumulative effect, both impact schedule
24
Link in Series - Example 2
• Risks are not linked in series, occur in parallel
• Only longest duration affects schedule
25
Assigning a Risk to a Summary Task
• Risk will impact sub task with latest finish date
• Potential for confusion over which task risk will impact
and/or unexpected impact
26
Assigning a Risk to a Hammock Task
• Crash may occur or impacts may be incorrect
• Ability to do so has been removed in version 8.7.0029
27
Other Considerations and FAQs
• Opportunity on task near Data Date
– Opportunities work by pulling back start date, impact may be
incorrect
• What do risk start and finish dates affect?
– Proximity, exposure plan
• Is there a way to quickly assign a risk to a large number
of tasks?
– Filter on Risk View tab or use “Impacted Task ID(s)” column:
IDs separated by comma, no space
28
• Web only
• Risk scoring
– Thresholds, scoring criteria
• Create risks and assign to tasks
– Qualitative probabilities and impacts
– Risk scores generated
• Mitigation
– Post-mitigated probabilities, impacts and risk scores
Primary P6 R8 Risk Functionality
29
Primary P6 R8 Functionality
Define risk scoring under “Administer…Enterprise Data”
30
Primary P6 R8 Functionality
Select “Risks” on Projects View to create and assign risks
31
Primary P6 R8 Functionality
Use “Response Plans” tab for mitigation
32
Importing a Project from P6 R8 into PRA
• Requires Primavera Risk Analysis 8.7.0029 or later
• Requires Web Services Utility with appropriate settings
– See “Using Web Services to connect” in PRA help
• Run Connection Wizard in PRA
• Use “File…Primavera…Import Primavera P6 Project”
from PRA, no option from P6 R8 Web
• Risks only included in single project import
33
34

More Related Content

What's hot

Threat Based Risk Assessment
Threat Based Risk AssessmentThreat Based Risk Assessment
Threat Based Risk AssessmentMichael Lines
 
Software Project Management: Risk Management
Software Project Management: Risk ManagementSoftware Project Management: Risk Management
Software Project Management: Risk ManagementMinhas Kamal
 
Risk management
Risk managementRisk management
Risk managementMECandPMV
 
An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14
An introduction to primavera risk analysis  - Oracle Primavera P6 Collaborate 14An introduction to primavera risk analysis  - Oracle Primavera P6 Collaborate 14
An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14p6academy
 
Learn the PRINCE2 Principles ebook
Learn the PRINCE2 Principles ebookLearn the PRINCE2 Principles ebook
Learn the PRINCE2 Principles ebookKnowledge Train
 
The project management process groups a case study
The project management process groups a case studyThe project management process groups a case study
The project management process groups a case studyAfdalArifAmandaPutra
 
The integrated master plan and integrated master schedule
The integrated master plan and integrated master scheduleThe integrated master plan and integrated master schedule
The integrated master plan and integrated master scheduleGlen Alleman
 
Mitigating cost and schedule risk with oracle primavera risk analysis - Oracl...
Mitigating cost and schedule risk with oracle primavera risk analysis - Oracl...Mitigating cost and schedule risk with oracle primavera risk analysis - Oracl...
Mitigating cost and schedule risk with oracle primavera risk analysis - Oracl...p6academy
 
Monte Carlo Schedule Risk Analysis
Monte Carlo Schedule Risk AnalysisMonte Carlo Schedule Risk Analysis
Monte Carlo Schedule Risk AnalysisIntaver Insititute
 
Introduction to Software Project Management
Introduction to Software Project ManagementIntroduction to Software Project Management
Introduction to Software Project ManagementSaadi Jadoon
 
Exploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryExploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryMECandPMV
 
Third-Party Risk Management: Implementing a Strategy
Third-Party Risk Management: Implementing a StrategyThird-Party Risk Management: Implementing a Strategy
Third-Party Risk Management: Implementing a StrategyNICSA
 

What's hot (20)

project management essentials
project management essentialsproject management essentials
project management essentials
 
RMP risk management-final exam
RMP risk management-final examRMP risk management-final exam
RMP risk management-final exam
 
Threat Based Risk Assessment
Threat Based Risk AssessmentThreat Based Risk Assessment
Threat Based Risk Assessment
 
Software Project Management: Risk Management
Software Project Management: Risk ManagementSoftware Project Management: Risk Management
Software Project Management: Risk Management
 
Risk management
Risk managementRisk management
Risk management
 
An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14
An introduction to primavera risk analysis  - Oracle Primavera P6 Collaborate 14An introduction to primavera risk analysis  - Oracle Primavera P6 Collaborate 14
An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14
 
Learn the PRINCE2 Principles ebook
Learn the PRINCE2 Principles ebookLearn the PRINCE2 Principles ebook
Learn the PRINCE2 Principles ebook
 
The project management process groups a case study
The project management process groups a case studyThe project management process groups a case study
The project management process groups a case study
 
The integrated master plan and integrated master schedule
The integrated master plan and integrated master scheduleThe integrated master plan and integrated master schedule
The integrated master plan and integrated master schedule
 
Performance Measurement and Weightage Systems
Performance Measurement and Weightage SystemsPerformance Measurement and Weightage Systems
Performance Measurement and Weightage Systems
 
Mitigating cost and schedule risk with oracle primavera risk analysis - Oracl...
Mitigating cost and schedule risk with oracle primavera risk analysis - Oracl...Mitigating cost and schedule risk with oracle primavera risk analysis - Oracl...
Mitigating cost and schedule risk with oracle primavera risk analysis - Oracl...
 
Monte Carlo Schedule Risk Analysis
Monte Carlo Schedule Risk AnalysisMonte Carlo Schedule Risk Analysis
Monte Carlo Schedule Risk Analysis
 
Introduction to Software Project Management
Introduction to Software Project ManagementIntroduction to Software Project Management
Introduction to Software Project Management
 
Risk management
Risk managementRisk management
Risk management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Exploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryExploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project delivery
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overview
 
Irm Risk Appetite
Irm Risk AppetiteIrm Risk Appetite
Irm Risk Appetite
 
Third-Party Risk Management: Implementing a Strategy
Third-Party Risk Management: Implementing a StrategyThird-Party Risk Management: Implementing a Strategy
Third-Party Risk Management: Implementing a Strategy
 
Project management
Project managementProject management
Project management
 

Similar to Concepts and best practices for the risk register in primavera risk analysis

Project risk management
Project risk managementProject risk management
Project risk managementDewang Agrawal
 
Quantitative Project Risk Analysis
Quantitative Project Risk AnalysisQuantitative Project Risk Analysis
Quantitative Project Risk AnalysisIntaver Insititute
 
Quantitative Project Risk Analysis
Quantitative Project Risk AnalysisQuantitative Project Risk Analysis
Quantitative Project Risk AnalysisIntaver Insititute
 
Risk management
Risk managementRisk management
Risk managementtumetr1
 
Risk Management
Risk ManagementRisk Management
Risk ManagementSaqib Raza
 
Project Risk mgt ch3 supplimentary.ppt n
Project Risk mgt ch3 supplimentary.ppt nProject Risk mgt ch3 supplimentary.ppt n
Project Risk mgt ch3 supplimentary.ppt nKevin117905
 
Risk Management Best Practices
Risk Management Best PracticesRisk Management Best Practices
Risk Management Best PracticesPMILebanonChapter
 
05-risk_assesment.ppt
05-risk_assesment.ppt05-risk_assesment.ppt
05-risk_assesment.pptKareemRasmy1
 
PROJECT RISK MANAGEMENT.pdf
PROJECT RISK MANAGEMENT.pdfPROJECT RISK MANAGEMENT.pdf
PROJECT RISK MANAGEMENT.pdfMUST
 
Risk-Management-05012023-025512pm.ppt
Risk-Management-05012023-025512pm.pptRisk-Management-05012023-025512pm.ppt
Risk-Management-05012023-025512pm.pptYasirShaikh34
 
Risk management concepts and learning
Risk management   concepts and learningRisk management   concepts and learning
Risk management concepts and learningVanita Ahuja
 
Project risk management
Project risk managementProject risk management
Project risk managementBarnatuCoffee
 
PROJECT RISK MANAGEMENT
PROJECT  RISK  MANAGEMENTPROJECT  RISK  MANAGEMENT
PROJECT RISK MANAGEMENTNeenu Babu
 
Projectriskmanagement pmbok5
Projectriskmanagement pmbok5Projectriskmanagement pmbok5
Projectriskmanagement pmbok5Dhamo daran
 
SPM RISK PLANNING.pdfddddddddddddddddddddddddddddddddddddddddddddddd
SPM RISK PLANNING.pdfdddddddddddddddddddddddddddddddddddddddddddddddSPM RISK PLANNING.pdfddddddddddddddddddddddddddddddddddddddddddddddd
SPM RISK PLANNING.pdfdddddddddddddddddddddddddddddddddddddddddddddddShepherdChidambaeh
 

Similar to Concepts and best practices for the risk register in primavera risk analysis (20)

Project risk management
Project risk managementProject risk management
Project risk management
 
Basic risk management presentation 17th june 2015
Basic risk management presentation 17th june 2015Basic risk management presentation 17th june 2015
Basic risk management presentation 17th june 2015
 
Project Risk management
Project Risk management Project Risk management
Project Risk management
 
Quantitative Project Risk Analysis
Quantitative Project Risk AnalysisQuantitative Project Risk Analysis
Quantitative Project Risk Analysis
 
Quantitative Project Risk Analysis
Quantitative Project Risk AnalysisQuantitative Project Risk Analysis
Quantitative Project Risk Analysis
 
Risk management
Risk managementRisk management
Risk management
 
RiskyProject Software
RiskyProject SoftwareRiskyProject Software
RiskyProject Software
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Project Risk mgt ch3 supplimentary.ppt n
Project Risk mgt ch3 supplimentary.ppt nProject Risk mgt ch3 supplimentary.ppt n
Project Risk mgt ch3 supplimentary.ppt n
 
Risk Management Best Practices
Risk Management Best PracticesRisk Management Best Practices
Risk Management Best Practices
 
Project risk analysis
Project risk analysisProject risk analysis
Project risk analysis
 
Session 18 -2 PMP 4th edition
Session 18 -2  PMP 4th editionSession 18 -2  PMP 4th edition
Session 18 -2 PMP 4th edition
 
05-risk_assesment.ppt
05-risk_assesment.ppt05-risk_assesment.ppt
05-risk_assesment.ppt
 
PROJECT RISK MANAGEMENT.pdf
PROJECT RISK MANAGEMENT.pdfPROJECT RISK MANAGEMENT.pdf
PROJECT RISK MANAGEMENT.pdf
 
Risk-Management-05012023-025512pm.ppt
Risk-Management-05012023-025512pm.pptRisk-Management-05012023-025512pm.ppt
Risk-Management-05012023-025512pm.ppt
 
Risk management concepts and learning
Risk management   concepts and learningRisk management   concepts and learning
Risk management concepts and learning
 
Project risk management
Project risk managementProject risk management
Project risk management
 
PROJECT RISK MANAGEMENT
PROJECT  RISK  MANAGEMENTPROJECT  RISK  MANAGEMENT
PROJECT RISK MANAGEMENT
 
Projectriskmanagement pmbok5
Projectriskmanagement pmbok5Projectriskmanagement pmbok5
Projectriskmanagement pmbok5
 
SPM RISK PLANNING.pdfddddddddddddddddddddddddddddddddddddddddddddddd
SPM RISK PLANNING.pdfdddddddddddddddddddddddddddddddddddddddddddddddSPM RISK PLANNING.pdfddddddddddddddddddddddddddddddddddddddddddddddd
SPM RISK PLANNING.pdfddddddddddddddddddddddddddddddddddddddddddddddd
 

More from p6academy

Oracle OpenWorld 2015
Oracle OpenWorld 2015Oracle OpenWorld 2015
Oracle OpenWorld 2015p6academy
 
Plan and Execute the Right Projects— Easily and Affordably
Plan and Execute the Right Projects—  Easily and AffordablyPlan and Execute the Right Projects—  Easily and Affordably
Plan and Execute the Right Projects— Easily and Affordablyp6academy
 
What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1p6academy
 
Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2p6academy
 
Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2p6academy
 
What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1p6academy
 
What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1p6academy
 
What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1p6academy
 
What's New in Unifier 16.1
What's New in Unifier 16.1What's New in Unifier 16.1
What's New in Unifier 16.1p6academy
 
20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktopp6academy
 
Oracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 AnnouncedOracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 Announcedp6academy
 
Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1p6academy
 
P6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations OverviewP6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations Overviewp6academy
 
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM  (Web) Release 8 and laterAdministering Users, Access and Views in P6 EPPM  (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and laterp6academy
 
P6 Release 8 Installation Orientation
P6 Release 8 Installation OrientationP6 Release 8 Installation Orientation
P6 Release 8 Installation Orientationp6academy
 
Oracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value PropositionOracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value Propositionp6academy
 
Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition p6academy
 
Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)p6academy
 
Oracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study GuideOracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study Guidep6academy
 
Oracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study GuideOracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study Guidep6academy
 

More from p6academy (20)

Oracle OpenWorld 2015
Oracle OpenWorld 2015Oracle OpenWorld 2015
Oracle OpenWorld 2015
 
Plan and Execute the Right Projects— Easily and Affordably
Plan and Execute the Right Projects—  Easily and AffordablyPlan and Execute the Right Projects—  Easily and Affordably
Plan and Execute the Right Projects— Easily and Affordably
 
What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1
 
Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2
 
Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2
 
What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1
 
What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1
 
What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1
 
What's New in Unifier 16.1
What's New in Unifier 16.1What's New in Unifier 16.1
What's New in Unifier 16.1
 
20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop
 
Oracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 AnnouncedOracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 Announced
 
Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1
 
P6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations OverviewP6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations Overview
 
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM  (Web) Release 8 and laterAdministering Users, Access and Views in P6 EPPM  (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
 
P6 Release 8 Installation Orientation
P6 Release 8 Installation OrientationP6 Release 8 Installation Orientation
P6 Release 8 Installation Orientation
 
Oracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value PropositionOracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value Proposition
 
Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition
 
Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)
 
Oracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study GuideOracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study Guide
 
Oracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study GuideOracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study Guide
 

Concepts and best practices for the risk register in primavera risk analysis

  • 1. 1
  • 2. <Insert Picture Here> Concepts and Best Practices for the Risk Register in Primavera Risk Analysis Matt Candela Senior Technical Support Engineer
  • 3. 3 The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making purchasing decisions. The development, release, and timing of any features or functionality described for Oracle’s products remains at the sole discretion of Oracle.
  • 4. 4 Agenda • Demo of primary Risk Register functionality in Primavera Risk Analysis (PRA) • Detailed look at functionality • Other options and considerations • Overview of risk functionality in P6 R8
  • 5. 5 • Uncertainty is inherent to a task. – Example: digging a trench is scheduled for 10 days. It may only take 8, or could take up to 12. • Risks are events that may or may not occur and could affect a task. – Example: there is a 5% chance of flooding, which could delay the digging of the trench by 5 to 8 days. Risk vs. Uncertainty
  • 6. 6 • Risk scoring – Thresholds, scoring criteria • Create risks and assign to tasks – Qualitative, quantitative probabilities and impacts – Risk scores generated • Mitigation – Post-mitigated probabilities, impacts and risk scores • Build impacted risk plans Primary Risk Register Functionality
  • 7. 7 Risk Scoring • Scores are calculated using Probability and Impact Scoring Diagram • Determined by intersection of the probability and impact
  • 8. 8 Qualitative and Quantitative Risks • Risks have both qualitative and quantitative values – Quantitative used in impacted risk plan – Qualitative used to determine risk scores • Qualitative risks: quantitative values from thresholds – For probability, low and high are averaged – For impacts, low is min and high is max • Quantitative risks: qualitative values determined by average of min, max, and most likely impacts
  • 9. 9 Qualitative Risks - Example • Risk HAZ is assigned a high schedule impact • High schedule threshold is defined as 20 to 40 days in the risk scoring options
  • 10. 10 Qualitative Risks - Example • Risk is assigned to a task on Quantitative tab • Schedule impact is min 20 days and max 40
  • 11. 11 Quantitative Risks - Example • Risk ACC is quantified and assigned to task 3 • Cost impact is min $50,000 and max $100,000, average is $75,000
  • 12. 12 Quantitative Risks - Example • $75,000 is within medium cost threshold • Qualitative cost impact is medium
  • 13. 13 Qualitative and Quantitative Risks Assigned to Multiple Tasks • Qualitative: impacts spread across the tasks, per following Risk Register options: – “Spread the risk duration across multiple impacts” – “Spread the risk costs across multiple impacts” • Quantitative: impact averages will be summed to determine qualitative value
  • 14. 14 Mitigation • Mitigation Response of Avoid, Transfer, or Reduce allows for post-mitigation values and score. • Title and Total Cost optional for simple mitigation plan
  • 15. 15 Mitigation - Detailed Actions • Qualitative tab > Mitigation tab > Use Detailed Actions • Multiple mitigation actions with additional fields available
  • 16. 16 Mitigation - Detailed Actions • Total Cost calculated as sum of details actions costs – Excluding actions set to Rejected • Post-mitigated values taken from an action – Rejected actions are not considered – Action with latest finish date is used – Tie goes to action with the lowest score
  • 17. 17 • Mitigation Response set to Accept: any other response allows for mitigation • Use Detailed Actions is selected: post-mitigated values taken from an action • Risk is quantified: post-mitigated values must be set on Quantitative tab Post-Mitigated Options Grayed Out
  • 18. 18 Building an Impacted Plan • (Task ID):B is the original task with no risk impact – Duration and duration uncertainty of the original task
  • 19. 19 Building an Impacted Plan • (Task ID):(Risk ID) is the risk event – Task existence for probability, duration uncertainty for schedule impact, resource uncertainty (ZCRI) for cost impact – Zero remaining duration
  • 20. 20 Building an Impacted Plan • (Task ID) is the summary for base task and risk event – Logic from original task – Resource assignments from original task, unless “Cost Impacts include duration costs” is selected in Risk Register options
  • 21. 21 Correlation • Available on Risk View tab when a risk is assigned to multiple tasks • Impact Ranges 90% correlation, Event Existence 100%
  • 22. 22 Link in Series • Available on Task View tab when a task has multiple risks assigned • When unchecked, risks are in parallel
  • 23. 23 Link in Series - Example 1 • Risks are linked in series • Cumulative effect, both impact schedule
  • 24. 24 Link in Series - Example 2 • Risks are not linked in series, occur in parallel • Only longest duration affects schedule
  • 25. 25 Assigning a Risk to a Summary Task • Risk will impact sub task with latest finish date • Potential for confusion over which task risk will impact and/or unexpected impact
  • 26. 26 Assigning a Risk to a Hammock Task • Crash may occur or impacts may be incorrect • Ability to do so has been removed in version 8.7.0029
  • 27. 27 Other Considerations and FAQs • Opportunity on task near Data Date – Opportunities work by pulling back start date, impact may be incorrect • What do risk start and finish dates affect? – Proximity, exposure plan • Is there a way to quickly assign a risk to a large number of tasks? – Filter on Risk View tab or use “Impacted Task ID(s)” column: IDs separated by comma, no space
  • 28. 28 • Web only • Risk scoring – Thresholds, scoring criteria • Create risks and assign to tasks – Qualitative probabilities and impacts – Risk scores generated • Mitigation – Post-mitigated probabilities, impacts and risk scores Primary P6 R8 Risk Functionality
  • 29. 29 Primary P6 R8 Functionality Define risk scoring under “Administer…Enterprise Data”
  • 30. 30 Primary P6 R8 Functionality Select “Risks” on Projects View to create and assign risks
  • 31. 31 Primary P6 R8 Functionality Use “Response Plans” tab for mitigation
  • 32. 32 Importing a Project from P6 R8 into PRA • Requires Primavera Risk Analysis 8.7.0029 or later • Requires Web Services Utility with appropriate settings – See “Using Web Services to connect” in PRA help • Run Connection Wizard in PRA • Use “File…Primavera…Import Primavera P6 Project” from PRA, no option from P6 R8 Web • Risks only included in single project import
  • 33. 33
  • 34. 34