SlideShare a Scribd company logo
1 of 2
Download to read offline
SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
Research Unit for Modern Architecture Studies in Southeast Asia
Foundation in Natural and Build Environment (FNBE)
Introduction to the Construction Industry [QSB30105]
Prerequisite: None
Lecturers: Hasmanira Mokhtar, Jaqurliyn Ann See Peng
_____________________________________________________________________
FINAL PROJECT
Development Proposal
40% of final marks (10% Group and 30% Individual)
Submission date: 16th July 2015
__________________________________________________________________
Introduction
“Trying to manage a project without project management is like trying to play a football game without a
game plan”. K. Tate
Objectives of Project
The objectives of this project are as follows:
1. To enable students to develop an understanding of the building team, its organization, duties and
inter-relations.
2. To develop an awareness of their professional responsibilities and to appreciate their profession in
the construction industry.
Learning Outcomes of this Project
On successful completion of this assignment, students will be able to demonstrate the following:
1. Explain the need to coordinate and develop an understanding of coherent working relations among
various industry players and to improve the communication channels.
2. Ability to document their observations and understanding from interview session and research
resources as well as to communicate their findings in a systematic and convincing presentation
and reports.
3. Ability to justify the feasibility of a development and improve the proposal to serve the purpose of
the development.
Tasks - Methodology
In a group of 2 students, you need to find a specific empty land to initiate a small construction project. The
size of the land shall between 50m x 50m (2500m2) – 50m x 70m (3500m2).
Individually, you are to propose ONE project that serves on any ONE (1) or combination of TWO (2) or
more of the following purposes. Subsequently, you are required to identify the professions required in
your development. List down the tasks each profession needs to do.
1. Recreation area
2. Commercial area
3. Industrial area
4. Agricultural area
5. Tourism area
6. Residential area
In your Development Brief report, you are required to include (but not limited to):
Group component:
- Introduction to the site - Site plan, Site analysis and observation (It is advisible to visit the site)
Individual component
- Your suggestion and proposal
- The rationale, benefits and impacts of your project to the client and the surrounding
community/end user
- Sketch plan of your proposal (Please note that your proposal should be as close to reality as
possible).
- Sketches of your concept/ideas; images of your ideas.
- List of professions involved and their tasks
Additional Info (bonus and optional)
- Diagram i.e. bubble diagram, flow chart and etc. which you use to develop your proposal.
- Some basic information of the authority procedures or flow that you need to encounter/deal with in
order to get the project done from the inception to the completion i.e the building plan approval
process and procedures.
- Costing
Submission Requirement
A4 sized bounded report of min 20 pages in total. (Compile group and individual components in one report)
You are also required to submit soft copy to your class representative. Class representative is then required
to compile all the softcopies in a CD and submit it to Ms. Ann (not later than 30th July 2015).
Assessment criteria
The assessment for this assignment will be based on your
- demonstrated understanding and intention of the brief
- quality and clarity of content
- method of documenting and composition of the report
- overall compilation and presentation

More Related Content

Viewers also liked (8)

8.3.2 Example 1a
8.3.2 Example 1a8.3.2 Example 1a
8.3.2 Example 1a
 
Dc shoes robbie maddison's pipe dream
Dc shoes robbie maddison's pipe dreamDc shoes robbie maddison's pipe dream
Dc shoes robbie maddison's pipe dream
 
Konstantina Keramyda CV
Konstantina Keramyda CVKonstantina Keramyda CV
Konstantina Keramyda CV
 
defense
defensedefense
defense
 
Sap technical deep dive in a column oriented in memory database
Sap technical deep dive in a column oriented in memory databaseSap technical deep dive in a column oriented in memory database
Sap technical deep dive in a column oriented in memory database
 
8.3.2difficult
8.3.2difficult8.3.2difficult
8.3.2difficult
 
TheRayTracer
TheRayTracerTheRayTracer
TheRayTracer
 
Guideline , rules notice verification reval_2015
Guideline , rules notice verification reval_2015Guideline , rules notice verification reval_2015
Guideline , rules notice verification reval_2015
 

Similar to Final project march 2015 (19)

Ici final project
Ici final projectIci final project
Ici final project
 
Icifinalprojectjan2015
Icifinalprojectjan2015Icifinalprojectjan2015
Icifinalprojectjan2015
 
Icifinalprojectjan2015
Icifinalprojectjan2015Icifinalprojectjan2015
Icifinalprojectjan2015
 
Ici project 2
Ici project 2Ici project 2
Ici project 2
 
Icifinalprojectjan2015
Icifinalprojectjan2015Icifinalprojectjan2015
Icifinalprojectjan2015
 
Icifinalprojectjan2015
Icifinalprojectjan2015Icifinalprojectjan2015
Icifinalprojectjan2015
 
Ici final project jan 2015
 Ici final project jan 2015 Ici final project jan 2015
Ici final project jan 2015
 
Icifinalprojectjan2015
Icifinalprojectjan2015Icifinalprojectjan2015
Icifinalprojectjan2015
 
Ici final brief
Ici final briefIci final brief
Ici final brief
 
Ici project 2
Ici project 2 Ici project 2
Ici project 2
 
Ici project 2
Ici project 2Ici project 2
Ici project 2
 
Brief ici final
Brief ici finalBrief ici final
Brief ici final
 
ICI Finale Brief
ICI Finale BriefICI Finale Brief
ICI Finale Brief
 
Ici finalprojectjan2015
Ici finalprojectjan2015Ici finalprojectjan2015
Ici finalprojectjan2015
 
Icifinalprojectjan2015
Icifinalprojectjan2015Icifinalprojectjan2015
Icifinalprojectjan2015
 
Icifinalprojectjan2015 (2)
Icifinalprojectjan2015 (2)Icifinalprojectjan2015 (2)
Icifinalprojectjan2015 (2)
 
Icifinalprojectjan2015 (1)
Icifinalprojectjan2015 (1)Icifinalprojectjan2015 (1)
Icifinalprojectjan2015 (1)
 
Icifinalprojectjan2015 150627142723-lva1-app6891
Icifinalprojectjan2015 150627142723-lva1-app6891Icifinalprojectjan2015 150627142723-lva1-app6891
Icifinalprojectjan2015 150627142723-lva1-app6891
 
Icifinalprojectjan2015
Icifinalprojectjan2015Icifinalprojectjan2015
Icifinalprojectjan2015
 

More from IAMLETTY

More from IAMLETTY (20)

ITD FINAL PROJECT BRIEF
ITD FINAL PROJECT BRIEFITD FINAL PROJECT BRIEF
ITD FINAL PROJECT BRIEF
 
Project 2 ITD BRIEF
Project 2 ITD BRIEFProject 2 ITD BRIEF
Project 2 ITD BRIEF
 
ITD PROJECT 2
ITD PROJECT 2ITD PROJECT 2
ITD PROJECT 2
 
ITD PROJECT 2
ITD PROJECT 2ITD PROJECT 2
ITD PROJECT 2
 
ITD PROJECT 3 (BASIC SPACE)
ITD PROJECT 3 (BASIC SPACE)ITD PROJECT 3 (BASIC SPACE)
ITD PROJECT 3 (BASIC SPACE)
 
ENBE FINAL PROJECT : FUTURE CITY
ENBE FINAL PROJECT : FUTURE CITYENBE FINAL PROJECT : FUTURE CITY
ENBE FINAL PROJECT : FUTURE CITY
 
ENBE VISUAL NOTE TAKING
ENBE VISUAL NOTE TAKINGENBE VISUAL NOTE TAKING
ENBE VISUAL NOTE TAKING
 
ENBE PROJECT 1 INFOGRAPHIC
ENBE PROJECT 1 INFOGRAPHICENBE PROJECT 1 INFOGRAPHIC
ENBE PROJECT 1 INFOGRAPHIC
 
Enbe journal brief
Enbe journal briefEnbe journal brief
Enbe journal brief
 
Enbe final project brief
Enbe final project briefEnbe final project brief
Enbe final project brief
 
ENBE PROJECT 2
ENBE PROJECT 2ENBE PROJECT 2
ENBE PROJECT 2
 
Project 1 (individual)
Project 1 (individual)Project 1 (individual)
Project 1 (individual)
 
Project 1 brief enbe mac 2015
Project 1 brief enbe mac 2015Project 1 brief enbe mac 2015
Project 1 brief enbe mac 2015
 
Idj topics big hero 6
Idj topics   big hero 6Idj topics   big hero 6
Idj topics big hero 6
 
Project 2 graphic journal
Project 2 graphic journalProject 2 graphic journal
Project 2 graphic journal
 
CL Final project
CL Final projectCL Final project
CL Final project
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 
Project 2 cl mac 2015
Project 2 cl mac 2015Project 2 cl mac 2015
Project 2 cl mac 2015
 
CTS BOARD GAME PROCESS
CTS BOARD GAME PROCESSCTS BOARD GAME PROCESS
CTS BOARD GAME PROCESS
 
Project 1 cl mac 2015
Project 1 cl mac 2015Project 1 cl mac 2015
Project 1 cl mac 2015
 

Recently uploaded

會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
中 央社
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
AnaAcapella
 

Recently uploaded (20)

TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
 
The Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDFThe Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDF
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
MOOD STABLIZERS DRUGS.pptx
MOOD     STABLIZERS           DRUGS.pptxMOOD     STABLIZERS           DRUGS.pptx
MOOD STABLIZERS DRUGS.pptx
 
Mattingly "AI & Prompt Design: Named Entity Recognition"
Mattingly "AI & Prompt Design: Named Entity Recognition"Mattingly "AI & Prompt Design: Named Entity Recognition"
Mattingly "AI & Prompt Design: Named Entity Recognition"
 
Observing-Correct-Grammar-in-Making-Definitions.pptx
Observing-Correct-Grammar-in-Making-Definitions.pptxObserving-Correct-Grammar-in-Making-Definitions.pptx
Observing-Correct-Grammar-in-Making-Definitions.pptx
 
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
 
Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...
 
diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
 
Supporting Newcomer Multilingual Learners
Supporting Newcomer  Multilingual LearnersSupporting Newcomer  Multilingual Learners
Supporting Newcomer Multilingual Learners
 
How To Create Editable Tree View in Odoo 17
How To Create Editable Tree View in Odoo 17How To Create Editable Tree View in Odoo 17
How To Create Editable Tree View in Odoo 17
 
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptxAnalyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
 
AIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptAIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.ppt
 
OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...
 
How to Manage Website in Odoo 17 Studio App.pptx
How to Manage Website in Odoo 17 Studio App.pptxHow to Manage Website in Odoo 17 Studio App.pptx
How to Manage Website in Odoo 17 Studio App.pptx
 
Including Mental Health Support in Project Delivery, 14 May.pdf
Including Mental Health Support in Project Delivery, 14 May.pdfIncluding Mental Health Support in Project Delivery, 14 May.pdf
Including Mental Health Support in Project Delivery, 14 May.pdf
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
 
How to Send Pro Forma Invoice to Your Customers in Odoo 17
How to Send Pro Forma Invoice to Your Customers in Odoo 17How to Send Pro Forma Invoice to Your Customers in Odoo 17
How to Send Pro Forma Invoice to Your Customers in Odoo 17
 

Final project march 2015

  • 1. SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Research Unit for Modern Architecture Studies in Southeast Asia Foundation in Natural and Build Environment (FNBE) Introduction to the Construction Industry [QSB30105] Prerequisite: None Lecturers: Hasmanira Mokhtar, Jaqurliyn Ann See Peng _____________________________________________________________________ FINAL PROJECT Development Proposal 40% of final marks (10% Group and 30% Individual) Submission date: 16th July 2015 __________________________________________________________________ Introduction “Trying to manage a project without project management is like trying to play a football game without a game plan”. K. Tate Objectives of Project The objectives of this project are as follows: 1. To enable students to develop an understanding of the building team, its organization, duties and inter-relations. 2. To develop an awareness of their professional responsibilities and to appreciate their profession in the construction industry. Learning Outcomes of this Project On successful completion of this assignment, students will be able to demonstrate the following: 1. Explain the need to coordinate and develop an understanding of coherent working relations among various industry players and to improve the communication channels. 2. Ability to document their observations and understanding from interview session and research resources as well as to communicate their findings in a systematic and convincing presentation and reports. 3. Ability to justify the feasibility of a development and improve the proposal to serve the purpose of the development.
  • 2. Tasks - Methodology In a group of 2 students, you need to find a specific empty land to initiate a small construction project. The size of the land shall between 50m x 50m (2500m2) – 50m x 70m (3500m2). Individually, you are to propose ONE project that serves on any ONE (1) or combination of TWO (2) or more of the following purposes. Subsequently, you are required to identify the professions required in your development. List down the tasks each profession needs to do. 1. Recreation area 2. Commercial area 3. Industrial area 4. Agricultural area 5. Tourism area 6. Residential area In your Development Brief report, you are required to include (but not limited to): Group component: - Introduction to the site - Site plan, Site analysis and observation (It is advisible to visit the site) Individual component - Your suggestion and proposal - The rationale, benefits and impacts of your project to the client and the surrounding community/end user - Sketch plan of your proposal (Please note that your proposal should be as close to reality as possible). - Sketches of your concept/ideas; images of your ideas. - List of professions involved and their tasks Additional Info (bonus and optional) - Diagram i.e. bubble diagram, flow chart and etc. which you use to develop your proposal. - Some basic information of the authority procedures or flow that you need to encounter/deal with in order to get the project done from the inception to the completion i.e the building plan approval process and procedures. - Costing Submission Requirement A4 sized bounded report of min 20 pages in total. (Compile group and individual components in one report) You are also required to submit soft copy to your class representative. Class representative is then required to compile all the softcopies in a CD and submit it to Ms. Ann (not later than 30th July 2015). Assessment criteria The assessment for this assignment will be based on your - demonstrated understanding and intention of the brief - quality and clarity of content - method of documenting and composition of the report - overall compilation and presentation