โ€ข All excavation shall be measured in successive stages of 1.5 m stating the
commencing level. This shall not apply to cases where no lift is involved as
in hillside cutting.
โ€ข All excavation shall generally be described as โ€˜excavate and get outโ€™.
Getting out shall include throwing the excavated earth at least one metre or
l/3 depth of excavation whichever is more clear of the edge of excavation
โ€ข Filling under floors shall be measured in cubic metres and shall include
spreading in layers not exceeding 20 cm in depth watering, well ramming
and levelling.
1
2
3
Working space
โ€ข In case of the following works, authorized quantities ( calculated on the
basis of authorized working space ) or those actually excavated, whichever
are less, shall be measured:
a) In work which requires form work;
b) In work which will be covered externally with a damp proof covering;
c) In work which will be covered externally with protective masonry work of
brick, stone, precast concrete, etc;
d) Trenches which are to receive post tensioned concrete ground beams;
e) Special works like guniting, etc; and
f) In work which requires workmen to operate from the outside.
โ€ข Authorized working space=60 cm measured from the face of structure at
lowest level, for (case-a,b,c,e,f)
โ€ข Authorized working space= 1.5m measured from the face of structure at
lowest level, for (case-d)
4
Excavation in Trenches for Foundations and for Pipes, Cables, etc
โ€ข Excavation in trenches for foundations and for pipes, cables, etc, not
exceeding 1.5 m in width and for shafts, wells, cesspits and the like not
exceeding 10 m2 on plan shall be so described and measured in
cubicmetres.
โ€ข The authorized quantities ( calculated on the basis of authorized width ) or
those excavated whichever are less shall be measured in case of excavation
for pipes, cables, etc.
โ€ข Case-1, d<1m
โ€ข Working space=25cm+outer dia+25cm
โ€ข Case-2, d>1m
โ€ข Working space=25cm+outer dia+25cm+5 cm/m depth for each side
5
LEAD
โ€ข lead : the area excavate, shall be divided into suitable blocks and for each
block the distance from the centre of the block to centre of placed earth
pertaining to this block shall be taken as lead.
6
LEAD MEASUREMENT UNIT
1. 0 to 250 m 50m
2. 250 to 500m 50m
3. 500 to 5 km 500m
4. More than 5km 1 km
LIFT
โ€ข Lift shall be measured from ground level. Excavation up to 1.5 m depth
below ground level and depositing excavated material on the ground shall
be included in the item of earthwork for various kinds of soil.
โ€ข Extra lift shall be measured in unit of 1.5 m
7
REMOVING TREES AND HEDGES
โ€ข Clearing of shrubs, brushwood, small trees not exceeding 30 cm
girth=SMT(include removal and disposal.)
โ€ข Cutting down hedges and removal of fences=RMT (include removal and
disposal.)
โ€ข Cutting down trees of 30 cm girth and over up to 100 cm girth=NOS
โ€ข Digging out of roots including stacking = NOS
โ€ข The girth shall be measured at one meter above ground level.
8

More Related Content

Similar to earth work.pptx

lecture 5 - Technical Specifications and MM.pptx
lecture 5 - Technical Specifications and MM.pptxlecture 5 - Technical Specifications and MM.pptx
lecture 5 - Technical Specifications and MM.pptx
BossGold
ย 
GOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptxGOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptx
HirenThakkar31
ย 
CASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil worksCASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil works
KumarS250747
ย 
12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimate
imaduddin91
ย 

Similar to earth work.pptx (20)

lecture 5 - Technical Specifications and MM.pptx
lecture 5 - Technical Specifications and MM.pptxlecture 5 - Technical Specifications and MM.pptx
lecture 5 - Technical Specifications and MM.pptx
ย 
Dynamic_compaction.pptx
Dynamic_compaction.pptxDynamic_compaction.pptx
Dynamic_compaction.pptx
ย 
5. Dewatering F1.pdf
5. Dewatering F1.pdf5. Dewatering F1.pdf
5. Dewatering F1.pdf
ย 
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptxSPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
ย 
Building construction
Building constructionBuilding construction
Building construction
ย 
sm-1_chap._6_geotechnical_investigation.pptx
sm-1_chap._6_geotechnical_investigation.pptxsm-1_chap._6_geotechnical_investigation.pptx
sm-1_chap._6_geotechnical_investigation.pptx
ย 
GOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptxGOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptx
ย 
2_2._BOQ.pdf
2_2._BOQ.pdf2_2._BOQ.pdf
2_2._BOQ.pdf
ย 
BUILDING ESTIMATION (Details Estimate For G+2 Storied Building presentation ...
BUILDING ESTIMATION (Details Estimate For G+2  Storied Building presentation ...BUILDING ESTIMATION (Details Estimate For G+2  Storied Building presentation ...
BUILDING ESTIMATION (Details Estimate For G+2 Storied Building presentation ...
ย 
CASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil worksCASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil works
ย 
CASE STUDY. on Restoration and rehabilitation
CASE STUDY. on Restoration and rehabilitationCASE STUDY. on Restoration and rehabilitation
CASE STUDY. on Restoration and rehabilitation
ย 
sample.pptx
sample.pptxsample.pptx
sample.pptx
ย 
BY LAWS CLUSTER HOUSING
BY LAWS CLUSTER HOUSINGBY LAWS CLUSTER HOUSING
BY LAWS CLUSTER HOUSING
ย 
Well Foundation
Well FoundationWell Foundation
Well Foundation
ย 
12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimate
ย 
Earthworks or Groundworks
Earthworks or GroundworksEarthworks or Groundworks
Earthworks or Groundworks
ย 
Imp Aspect of road.ppt
Imp Aspect of road.pptImp Aspect of road.ppt
Imp Aspect of road.ppt
ย 
GROUP 4 LITERATURE.pptx
GROUP 4 LITERATURE.pptxGROUP 4 LITERATURE.pptx
GROUP 4 LITERATURE.pptx
ย 
5. Dewatering.pdf
5. Dewatering.pdf5. Dewatering.pdf
5. Dewatering.pdf
ย 
ABC 1st Week(2hrs
ABC 1st Week(2hrsABC 1st Week(2hrs
ABC 1st Week(2hrs
ย 

More from HiteshParmar311308 (10)

Performance appraisal for employes .pptx
Performance appraisal for employes .pptxPerformance appraisal for employes .pptx
Performance appraisal for employes .pptx
ย 
hh.pptx erp related business ppt for mba
hh.pptx erp related business ppt for mbahh.pptx erp related business ppt for mba
hh.pptx erp related business ppt for mba
ย 
marketing 1.pptx
marketing 1.pptxmarketing 1.pptx
marketing 1.pptx
ย 
Marketing STP(MM)(APPROVED-PPT).pptx
Marketing STP(MM)(APPROVED-PPT).pptxMarketing STP(MM)(APPROVED-PPT).pptx
Marketing STP(MM)(APPROVED-PPT).pptx
ย 
Performance Appraisal.pptx
Performance Appraisal.pptxPerformance Appraisal.pptx
Performance Appraisal.pptx
ย 
str.%20analysis.pptx
str.%20analysis.pptxstr.%20analysis.pptx
str.%20analysis.pptx
ย 
earth.pptx
earth.pptxearth.pptx
earth.pptx
ย 
Group_28_17CE334_Deepa.A.sinha.pptx
Group_28_17CE334_Deepa.A.sinha.pptxGroup_28_17CE334_Deepa.A.sinha.pptx
Group_28_17CE334_Deepa.A.sinha.pptx
ย 
7_to_infinity_beyond_aug.ppt
7_to_infinity_beyond_aug.ppt7_to_infinity_beyond_aug.ppt
7_to_infinity_beyond_aug.ppt
ย 
earthwork ruel.pptx
earthwork ruel.pptxearthwork ruel.pptx
earthwork ruel.pptx
ย 

Recently uploaded

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
ย 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
ย 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
ย 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
sivaprakash250
ย 
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
ย 

Recently uploaded (20)

Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
ย 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
ย 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
ย 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
ย 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
ย 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
ย 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
ย 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
ย 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
ย 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ย 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
ย 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
ย 
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
ย 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
ย 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
ย 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
ย 

earth work.pptx

  • 1. Important notes โ€ข All excavation shall be measured in successive stages of 1.5 m stating the commencing level. This shall not apply to cases where no lift is involved as in hillside cutting. โ€ข All excavation shall generally be described as โ€˜excavate and get outโ€™. Getting out shall include throwing the excavated earth at least one metre or l/3 depth of excavation whichever is more clear of the edge of excavation โ€ข Filling under floors shall be measured in cubic metres and shall include spreading in layers not exceeding 20 cm in depth watering, well ramming and levelling. 1
  • 2. 2
  • 3. 3
  • 4. Working space โ€ข In case of the following works, authorized quantities ( calculated on the basis of authorized working space ) or those actually excavated, whichever are less, shall be measured: a) In work which requires form work; b) In work which will be covered externally with a damp proof covering; c) In work which will be covered externally with protective masonry work of brick, stone, precast concrete, etc; d) Trenches which are to receive post tensioned concrete ground beams; e) Special works like guniting, etc; and f) In work which requires workmen to operate from the outside. โ€ข Authorized working space=60 cm measured from the face of structure at lowest level, for (case-a,b,c,e,f) โ€ข Authorized working space= 1.5m measured from the face of structure at lowest level, for (case-d) 4
  • 5. Excavation in Trenches for Foundations and for Pipes, Cables, etc โ€ข Excavation in trenches for foundations and for pipes, cables, etc, not exceeding 1.5 m in width and for shafts, wells, cesspits and the like not exceeding 10 m2 on plan shall be so described and measured in cubicmetres. โ€ข The authorized quantities ( calculated on the basis of authorized width ) or those excavated whichever are less shall be measured in case of excavation for pipes, cables, etc. โ€ข Case-1, d<1m โ€ข Working space=25cm+outer dia+25cm โ€ข Case-2, d>1m โ€ข Working space=25cm+outer dia+25cm+5 cm/m depth for each side 5
  • 6. LEAD โ€ข lead : the area excavate, shall be divided into suitable blocks and for each block the distance from the centre of the block to centre of placed earth pertaining to this block shall be taken as lead. 6 LEAD MEASUREMENT UNIT 1. 0 to 250 m 50m 2. 250 to 500m 50m 3. 500 to 5 km 500m 4. More than 5km 1 km
  • 7. LIFT โ€ข Lift shall be measured from ground level. Excavation up to 1.5 m depth below ground level and depositing excavated material on the ground shall be included in the item of earthwork for various kinds of soil. โ€ข Extra lift shall be measured in unit of 1.5 m 7
  • 8. REMOVING TREES AND HEDGES โ€ข Clearing of shrubs, brushwood, small trees not exceeding 30 cm girth=SMT(include removal and disposal.) โ€ข Cutting down hedges and removal of fences=RMT (include removal and disposal.) โ€ข Cutting down trees of 30 cm girth and over up to 100 cm girth=NOS โ€ข Digging out of roots including stacking = NOS โ€ข The girth shall be measured at one meter above ground level. 8