HAYTHAM AHMED
Full Name: Haytham Abd El Rehim Ahmed
Present Employment: Technical Director, Environment
Title
Qualification: B.Sc., Faculty of Science, Chemistry Department, Cairo University,
May 1997.
Awards: IBM award for studying the development of internet based systems
2001.
International Computer Driving License, ICDL UNESCO
Nationality: Egyptian
Country Experience: UAE, Egypt, Germany, Japan, Libya, Yemen, Qatar, Iraq
SUMMARY PROFILE
Haytham Ahmed has over 17 years of experience of environmental consultancy in both the public
and private sectors, having worked on a large number of major studies in Egypt, UAE, Iraq, Qatar,
Libya and Yemen. Haytham is highly experienced in the management of large multi-disciplinary
environmental teams to provide practical and innovative environmental and sustainable solutions
for complex projects.
He has worked on wide range of Oil & Gas, Urban Development, Road & Transport, Power &
Water and Industrial projects. As well as extensive project management skills, he also has
technical strengths in environmental pollution modeling (air and noise), monitoring and data
presentation, Emission Inventory preparations, Environmental Impact Assessment (EIA), Health,
Safety & Environmental Assessment (HSEIA), baseline surveys (for air quality, noise, soil,
groundwater, seawater), Occupational Health Risk Assessment (OHRA), Environment, Health &
Safety Management Systems (EHSMS), environmental audits and State of the Environment
reports.
His background is in design and operation of the Environmental Quality Monitoring Networks,
preparation and operation of dispersion analysis using USEPA approved models (ISC and AERMOD,
CALRoads view, mobile view, Tanks 4.09D and Predictor), boundary layer turbulence and
dispersion, use of meteorological data and industrial plants siting studies.
EXPERIENCE HISTORY
2014 – Present : TECHNICAL DIRECTOR, ENVIRONMENT
Dome Oilfield Engineering & Services LLC
2012 – 2014 : Principal Environmental Consultant
Dome Oilfield Engineering & Services LLC
Page 2 of 13
HAYTHAM AHMED
2010 – 2012 : Senior Environmental Consultant
Dome Oilfield Engineering & Services LLC
2006 – 2010 : Environmental Consultant
Dome Oilfield Engineering & Services LLC
1999 – 2006 : Senior Environmental Researcher
Egyptian Environmental Affairs Agency, Ministry of Environment, Egypt.
1998 – 1999 : Environmental Chemist
Value Link for Environmental Analysis, Cairo, Egypt.
RELEVANT EXPERIENCE for ENVID & OHID WORKSHOPS
Haytham Ahmed has chaired and participated in the ENVID and OHID workshops for the following
projects:
 Phase 4 HSEIA for the Maqta – Baniyas Pipeline Project, GASCO as Chairman of the ENVID
and OHID.
 Phase 1 HSEIA of the Natural Gas Supply Pipeline to Global Foundries Project, GASCO as
Chairman of the ENVID and OHID.
 Phase 1 HSEIA of the Replacement of Lean Gas Pipeline Project from Buhasa to Bab, GASCO
as Chairman of the ENVID and OHID.
 Phase 1 HSEIA of the Qusawirah Accommodation Complex Project, ADCO as Chairman of
the ENVID and OHID.
 Zirku Jetty Expansion Project – Concept Design Project, ZADCO as Chairman of the ENVID
and OHID.
 Phase 2 for the Replacement of the Uni-Directional by Bi-Directional Prover System, ADCO
as Chairman of the ENVID and OHID.
 Phase 2 for Installation of Lightning Protection on Crude Oil Tanks – Jebel Dhanna, ADCO as
Chairman of the ENVID and OHID.
 Phase III HSEIA for Bunduq Offshore Facilities, Bunduq as Chairman of the ENVID and OHID.
 Phase 1 for New Crude Oil Storage Tank and Associated Facilities at Halul island, Qatar
Petroleum as ENVID Chairman.
 Phase 3 HSEIA of the AR Site Terminal Project (AR/GA Fields and Causway), ADOC as Scribe
of the ENVID and OHID.
 Phase 3 HSEIA of the Installation of Low Pressure Gas Recovery Compressor Project, ADOC
as Scribe of the ENVID and OHID.
 Phase 1 of the Supply of Sales Gas to Takreer Ruwais Refinery and Masdar Hydrogen Power
Plant Project, GASCO as Scribe of the ENVID and OHID.
 Phase 1 HSEIA of the CICPA Shah Complex Project, ADCO as Scribe of the ENVID and OHID.
Page 3 of 13
HAYTHAM AHMED
SELECTED PROJECT EXPERIENCE
OIL & GAS SECTOR
ENVIRONMENTAL IMPACT ASSESSMENT STUDY FOR 3D/2D SEISMIC SURVEY OF BLOCK 8, IRAQ -
PAKISTAN PETROLEUM PROJECT
Pakistan Petroleum is the operator of Block 8, an exploration block located in eastern Iraq. To
optimize the development of Block 8, Pakistan Petroleum has undertaken 3D/2D seismic survey of
the field. Block 8 is part of Iraq’s twelve (12) new hydrocarbon exploration blocks and is classified
as a gas-prone field, with potential for oil and condensates.
Environmental Impact Assessment (EIA) study was awarded to Dome for the 3D/2D Seismic Survey
of Block 8 project by Pakistan Petroleum. The scope of the study includes identification and
assessment of potential environmental impacts associated with the 3D/2D Seismic survey. The
scope of the study includes undertaking baseline environmental survey for ambient air quality,
ambient noise quality, soil sampling, water sampling, sediment sampling and ecology survey.
Worked as Project Manager and was responsible for project management, guidance to project
team, preparing and reviewing EIA and attending technical clarification meetings, etc.
ENVIRONMENTAL & SOCIAL IMPACT ASSESSMENT STUDY FOR SHAKAL BLOCK DEVELOPMENT,
KURDISTAN REGION, IRAQ - GAZPROM MIDDLE EAST.
Gazprom Middle East is designated to explore and develop the Shakal Block within the Kurdistan
Region of Iraq. Shakal Block is a hydrocarbon field with potential for oil and condensates, located
at the southern-end of Iraq’s Kurdistan Region. Environmental and Social Impact Assessment
(ESIA) study was awarded to Dome for development of Shakal field. The scope of this ESIA study is
limited to the Seismic survey (3D) works and Drilling of two exploratory wells in 2014 (Shakal 3 and
Shakal 2) and one well each in the year 2015 and 2016.
Worked as Project Manager and was responsible for project management, guidance to project
team, preparing and reviewing EIA.
ENVIRONMENTAL & SOCIAL IMPACT ASSESSMENT STUDY FOR HALABJA BLOCK DEVELOPMENT,
KURDISTAN REGION, IRAQ - GAZPROM MIDDLE EAST.
Gazprom Middle East is designated to explore and develop the Halabja Block within the Kurdistan
Region of Iraq. Halabja Block is a hydrocarbon field with potential for oil and condensates, located
adjacent to the Iraq-Iran border within the Sulaymaniyah Province in Iraq’s Kurdistan Region.
Environmental and Social Impact Assessment (ESIA) study was awarded to Dome for development
of Halabja field. The scope of this ESIA study is limited to Seismic survey (2D) works and drilling of
one exploratory well in the years 2015, 2016 and 2017.
Worked as Project Manager and was responsible for project management, guidance to project
team, preparing and reviewing EIA.
PHASE 1 HSEIA STUDY FOR BAB INTEGRATED FACILITIES PROJECT (BIFP) – PETROFAC.
Abu Dhabi Company for Onshore Oil Operations (ADCO) intends to increase its crude oil
production from current production rate of 1.4 Million Barrels Oil per Day (MMBOPD) to 1.8
MMBOPD. This increase in production will be achieved by developing different reserves (building
block development) in ADCO fields. Petrofac Emirates LLC (Petrofac) has been appointed by ADCO
as FEED engineer for the Project. Petrofac has commissioned Dome to carry out the Phase 1
Page 4 of 13
HAYTHAM AHMED
Health, Safety and Environmental Impact Assessment (HSEIA) study for the Project.
Worked as Project Manager and was responsible for project management, guidance to project
team, preparing and reviewing EIA and Occupational Health Risk Assessment Sections.
PHASE III HSEIA FOR BUNDUQ FACILITIES - BUNDUQ OIL PRODUCING COMPANY
Bunduq Oil Producing Company is the operator of Bunduq field, which is an offshore oilfield
located on the border of the Abu Dhabi, UAE and Qatar. The Bunduq concession was granted
directly by the government of Abu Dhabi and Qatar. The first production from the field was in
November 1975. Bunduq commissioned HSEIA study for its existing facilities, which include the
offshore production and processing complex, the headquarters and supply warehouse in the
mainland Abu Dhabi. Dome was retained by Bunduq to carry out the HSEIA study.
Worked as Project Manager and was responsible for project management, guidance to project
team, preparing and reviewing EIA and Occupational Health Risk Assessment Sections.
PHASE I HSEIA FOR CICPA SHAH ACCOMMODATION COMPLEX PROJECT – ABU DHABI ONSHORE OIL
COMPANY (ADCO)
The Abu Dhabi Onshore Oil Company (ADCO) is planning to build accommodation facilities for the
officers of the Critical Infrastructure & Coastal Protection Authority (CICPA) working in Shah Area.
Dome was contracted by ECG, the design consultant for the Project hired by ADCO, to conduct a
Phase I Health, Safety and Environmental Impact Assessment (HSEIA) for this Project.
Worked as author of EIA and OHRA sections of the HSEIA study and air & noise modeler for the
project activities.
ENVIRONMENTAL IMPACT ASSESSMENT STUDY FOR NEW PUMPING STATIONS OF LIGHT PRODUCTS
PIPELINE (SHUAIBA – KARKH), IRAQ – APS ENGINEERING COMPANY.
The “New Pumping Stations of Light Products Pipeline (Shuaiba – Karkh) Project” is part of the
expansion of light products pipeline from Shuaiba to Karkh in Iraq. The Shuaiba-Karkh pipeline
includes a new pipeline with a total length of 533 km, four pumping stations and three receiving
stations.
Worked as Project Manager and was responsible for project management, guidance to project
team and reviewing EIA.
PHASE III HSEIA FOR BAB GAS COMPRESSION PROJECT - ABU DHABI ONSHORE OIL COMPANY
(ADCO)
Gas field reservoir monitoring in recent years reveals significant pressure depletion over gas
produced in Thamama C and D and F Units 6 and 7 reservoirs. In response to this, ADCO is
implementing the Bab Gas Compression Project to boost the pressure in gas trunk lines in order to
sustain gas production and to meet current and future gas demands. The project includes the
installation of three (3) gas compressor stations (GCSs), to increase the pressure of gas from the
Bab field.
Worked as author of EIA and OHRA sections of the HSEIA study and air & noise modeler for the
project activities.
ENVIRONMENTAL IMPACT ASSESSMENT STUDY FOR MANSURIYA GAS FIELD, IRAQ - TURKISH
PETROLEUM OVERSEAS COMPANY
Turkish Petroleum Overseas Company (TPOC), in consortium with Kuwait Energy (KEC) and Korea
Page 5 of 13
HAYTHAM AHMED
Gas Corporation (KOGAS), is undertaking the Preliminary Development Plan (PDP) Phase of the
Mansuriya Gas Field Development Project. The field is targeted to produce 320 MMSCFD of sales
gas for 13 years when fully developed.
Worked as project Manager and was responsible for project management, guidance to field team,
preparing and reviewing the EIA.
PHASE 1 HSEIA STUDY FOR THE REPLACEMENT OF 20” LEAN GAS PIPELINE FROM BUHASA TO
BAB TO TH.C – ABU DHABI GAS INDUSTRIES (GASCO)
Abu Dhabi Gas Industries (GASCO) has intended to replace the existing 20” BuHasa-Bab Lean gas
pipeline by a new 24” pipeline due to external corrosion. The new lean gas Pipeline project will
mainly include the design and construction of a new 24” lean gas pipeline from BuHasa to Bab and
from Bab to Thamama C, including launching and receiving facilities. In addition and due to
external corrosion, the existing 20” Bu Hasa – Bab lean gas pipeline will be demolished
Worked as author of EIA and OHRA sections of the HSEIA study and air & noise modeler for the
project activities.
ENVIRONMENTAL IMPACT ASSESSMENT STUDY FOR IL & FS PRIME TANK TERMINALS – MUC OIL &
GAS ENGINEERING CONSULTANCY
IL & FS Prime Terminals FZC is establishing IL & FS Prime Tank Terminals project, to be located at
Fujairah Free Zone, Fujairah. The proposed Tank Farm will consist of 25 storage tanks with an
aggregate capacity of 632,678 m3
but with working capacity of 583,191 m3
to store various
petroleum products and will have the potential to carry out physical blending of different fuel oils.
Worked as air & noise modeler for the project activities.
ENVIRONMENTAL MONITORING FOR LUKOIL PROJECT IN WEST QURNA-2, IRAQ.
Ongoing project from year 2013 to 2015, working as project Manager and responsible for project
management, guidance to field team, leading field team, conducting noise, air and river water
sampling, organizing and attending technical clarification meetings, etc.
LUKOIL Mid-East Limited (LUKOIL) is the designated operator of the West Qurna-2 Contract Area.
LUKOIL has initiated a comprehensive plan to conduct Environmental Monitoring of its West
Qurna-2 oilfield in order to assess the effectiveness of operational controls and demonstrate
compliance to South Oil Company (SOC) requirements and Iraqi environmental laws.
ABU DHABI OIL CO. (ADOC) EMISSION INVENTORY
The study comprised of conducting emission inventory, based on ADNOC Codes of Practice for
environmental monitoring and reporting. The basic approach to this study was to conduct
emission quantification for the existing facilities reflecting the current status of the company’s
discharges.
The main objectives of the emission inventory study are to identify & quantify the various
pollution sources associated with the different types of ADOC operations including air, effluents,
waste and noise pollution.
ENVIRONMENTAL IMPACT ASSESSMENT OF BASEMENT PROCESSING UNIT TRAIN, KHARIR BASEMENT
PROJECT PHASE 1 - TOTAL E&P YEMEN
TOTAL E&P Yemen is operating Kharir field, an onshore oil and gas field in Yemen. The facilities are
located east of Shabwa, in the Hadramawt province about 600 km to the East of Sanaa, the capital
Page 6 of 13
HAYTHAM AHMED
of Yemen.
In its efforts to increase oil production, TOTAL has initiated the “Kharir Basement Phase- I Project”.
As a part of this project, TOTAL intends to construct a new dedicated Central Processing Unit train
of 30,000 BPD capacity, for processing reservoir fluid from the Basement Reservoir.
The project included the preparation of the EIA for Kharir Field Development Project including
Environmental Baseline Surveys (EBS) and Environmental Management Plan (EMP).
PHASE 2 HEALTH SAFETY AND ENVIRONMENTAL IMPACT ASSESSMENT FOR THE ADDITION OF 10 NEW
WELLS ON EXISTING WELLHEAD TOWERS IN ZAKUM FIELD - ADMA-OPCO
Abu Dhabi Marine Operating Company (ADMA-OPCO) is undertaking development of Zakum field
Thamama IV as part of Zakum field long term plan to maintain a sustainable production of 325
MSBPD. To achieve this production target, ADMA-OPCO has decided to upgrade 10 wellhead
towers of Zakum field. The existing WHT’s will be modified to accommodate the 10 new wells in
line with the same operational standards/philosophy as for the existing wells.
Worked as author of EIA section of the HSEIA study and air & noise modeler for the project
activities.
PHASE 1 HEALTH SAFETY AND ENVIRONMENTAL IMPACT ASSESSMENT FOR FERTIL 2 PROJECT –
RUWAIS FERTILIZER INDUSTRIES
Ruwais Fertilizer Industries Ltd. (FERTIL) plans to build a second ammonia/urea plant, FERTIL 2, to
increase the overall production of granulated urea. The FERTIL 2 facility will be located in the
Ruwais Industrial Complex adjacent to the existing FERTIL 1 site. The FERTIL 2 consists primarily of
Ammonia, urea melt and urea granulation process units; Facilities for storage of intermediate and
final products; and all necessary supporting facilities.
Worked as air & noise modeler for the project activities as part of an HSEIA study.
PHASE 1 HEALTH SAFETY AND ENVIRONMENTAL IMPACT ASSESSMENT FOR GASCO-BAB GAS
TREATMENT PLANT MODIFICATION.
Worked as air & Noise modeler for GASCO Bab Gas Treatment Plant modification project. The
project will allow the existing plant to handle feed gas with H2S content of up to 7.3 mole percent
from the present 3.3 mole percent.
PHASE 3 HEALTH SAFETY AND ENVIRONMENTAL IMPACT ASSESSMENT FOR GASCO 3RD NGL TRAIN
PROJECT.
Worked as air Modeler for Ruwais 3rd
NGL Train Project which is part of a major initiative being
undertaken by Abu Dhabi Gas Industries Ltd (GASCO) for expansion of its gas processing business,
with the objective of producing more condensate and NGL.
PHASE 1 HEALTH SAFETY AND ENVIRONMENTAL IMPACT ASSESSMENT FOR GUP EXPANSION PROJECT
- TAKREER
Worked as air & Noise Modeler for the General Utility Plant (GUP) at Ruwais Refinery Complex,
240 kilometers west of Abu Dhabi City. The GUP supplies include electricity, seawater, distillate,
potable water; and demineralized water.
Page 7 of 13
HAYTHAM AHMED
HEALTH, SAFETY AND ENVIRONMENTAL IMPACT ASSESSMENT (COMBINED PHASE 1 AND 2) FOR CLOSED
DRAIN SYSTEM PROJECT AT ADCO RDS AT BAB – GALFAR ENGINEERING & CONTRACTING WLL
EMIRATES
Worked as air Modeler for Bab remote degassing station. The project included modifications to
the already existed station to improve operability and safety of the facilities. The proposed
modifications consist of provision of a closed drain system at RDS comprising of drain vessel in
concrete pit, duty / standby and piping.
ENVIRONMENTAL MONITORING STUDIES (EMS) FOR ADCO’S ALL FACILITIES
ADCO was initiated a comprehensive plan to conduct an Environmental Monitoring Study over its
operational oil and gas fields and terminals, in order to assess the effectiveness of operational
controls and demonstrate compliance with ADNOC requirements.
This study involved the monitoring of various in-plant source discharges (air emissions, liquid
discharges and waste), as well as ambient environmental quality in surrounding areas (air, noise,
groundwater, soil and marine). Study was carried out for two seasons i.e. summer (June’10 to
August’10) and winter (December’10 to February’11).
The Scope of Work of the EBS included:
 Air Quality Survey (by Diffusion Tubes);
 Ecological Survey;
 Soil Quality Survey;
 Groundwater Quality Survey;
 Noise Survey;
 Effluent Quality Survey;
 Marine Ecology Survey;
 Radio Active and Non Radio Active Hazardous Survey;
PHASE 4 HSEIA FOR THE REMOVAL OF GASCO’S 16” MAQTA – BANIYAS PIPELINE AND ADCO’S
JARN YAPHOUR – UMM AL NAR 18” TRANSFERLINE
The project included the removal and disposal the 16” Maqta – Baniyas Pipeline (Approx 18.4 km)
including all its ground facilities.
Worked as the main consultant for the Health Safety and Environmental Impact Assessment for
the pipelines and associated facilities.
PHASE 2&3 HEALTH SAFETY AND ENVIRONMENTAL IMPACT ASSESSMENT FOR INTER-REFINERIES
PIPELINE (IRP) - TAKREER
Air and Noise Modeller for the Inter Refinery Pipeline Phase – II (IRP-II) project. The project
included numerous pipelines and storage tanks terminals in Mussafah, Al Ain and Madinat Zayed.
PHASE 3 HEALTH SAFETY AND ENVIRONMENTAL IMPACT ASSESSMENT FOR ZAKUM GAS PROCESSING
FACILITIES (GPF) – ADMA-OPCO
Abu Dhabi Marine Operating Company (ADMA-OPCO) intends to proceed with the commissioning
and operation of the Gas Processing Facilities (GPF) Project in Zakum oilfield. The GPF is a new gas
treatment platform that will augment the existing gas processing capability of Zakum West Super
Complex (ZWSC). It will handle the projected increase in the production of associated gas from
Zakum oilfield and will be connected to the existing ZWSC via a bridge to the ZWSC-NRP (New
Riser Platform).
Page 8 of 13
HAYTHAM AHMED
Worked as author of EIS and OHRA sections of the HSEIA study.
PHASE 1 HEALTH SAFETY AND ENVIRONMENTAL IMPACT ASSESSMENT FOR 3D SEISMIC SURVEY AT
SATAH FIELD - ZAKUM DEVELOPMENT COMPANY (ZADCO)
To optimize further development of Satah field, ZADCO proposed to undertake a high quality/high
definition 3D Seismic survey of the area. The seismic survey will cover an area of approximately
207 km2
over Satah field, which is located 190km WNW of Abu Dhabi city and 17km north of
Arzanah Island.
Worked as author of Occupational Health Risk Assessment (OHRA) section of the HSEIA study.
ENVIRONMENTAL IMPACT ASSESSMENT FOR FUJAIRAH REFINERY TANK FARM – VITOL DUBAI LTD.
The project involved the development of tank farm in the emirate of Fujairah. Full EIA involving
all necessary surveys, air/noise impact modeling, impacts assessment, mitigation measures, and
development of outline environmental management & monitoring plans.
POWER & WATER PROJECTS
IMPLEMENTATION OF ESMP FOR AL HARTHA POWER PLANT, BASRA, IRAQ
Ongoing project from year 2012 to 2014, working as project Manager and Field Team Leader.
Responsibilities including project management, leading field team, organizing and attending
technical clarification meetings, conducting training, environmental audit and baseline surveys.
The Project includes the implementation of the Environmental and Social Management Plan
(ESMP) for the Al-Hartha Power Plant Project to ensure that adverse environmental and social
impacts of the project as identified in the project’s ESIA are minimized or eliminated. To ensure
this the following activities are being undertaken:
 Task 1 - Needs assessment and preparation of a comprehensive work plan for
implementing the ESMP;
 Task 2 - Assistance to the PMU in specifying and selecting environmental monitoring
equipment;
 Task 3 - Implementation of the ESMP requirements during construction;
 Task 4 - Training and capacity building on impacts mitigation and environmental
monitoring during operation.
PRELIMINARY ENVIRONMENTAL REVIEW (PER) FOR THE WATER SUPPLY PIPELINE TO ZARAH WEST
AND ZARAH EAST ISLANDS - HALCROW INTERNATIONAL PARTNERSHIP (HALCROW)
Abu Dhabi Distribution Company (ADDC) is planning to construct a water supply pipeline to Zarah
West and Zarah East Islands from its existing water pipeline system in Samaliya Island. The project
will include the construction and operation of a pumping station, a reservoir tank and associated
equipment in addition to the pipelines. The system will be connected to the existing ADDC pipeline
in Samaliya Island.
Worked as main consultant and project manager for the preparation of the PER study.
POWER AND DESALINATION PLANT, FUJAIRAH - ABU DHABI WATER AND ELECTRICITY AUTHORITY
(ADWEA)
Worked as PM/lead consultant for EIA project for a power and desalination plant in Fujairah. Full
EIA involving all necessary surveys, air/noise impact modeling, impacts assessment, mitigation
Page 9 of 13
HAYTHAM AHMED
measures, and development of outline environmental management & monitoring plans.
INFRASTRUCTURE DEVELOPMENT PROJECTS
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR ARABIAN RANCHES PHASE 2 - EMAAR
Emaar Properties (Emaar) is planning to undertake the Arabian Ranches Phase 2 Project. This
project is an extension of the existing Arabian Ranches Phase 1, a mixed‐use gated community
development. The Arabian Ranches Phase 2 is designed to be a true representation of Emirati
culture as well as hospitality. It is planned to accommodate about 11,689 residents, 417 workers
and 3,925 visitors.
Worked as PM/lead consultant for the project, full EIA involving all necessary surveys, air/noise
impact modeling, impacts assessment, mitigation measures, and development of outline
environmental management & monitoring plans.
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR DAMAC GOLF RESORT COMMUNITY - DAMAC
DAMAC Properties Co. LLC (DAMAC) is planning to develop the Damac Golf Resort Community
(DGRC). This project is a high quality mixed use complex covering an area of approximately 2.65
km2
. The proposed project site is located within the Dubailand in Dubai, adjacent to the west of Al
Qudra Road between Emirates Road and the Dubai Bypass Road.
The main elements of the projects include residential areas, including villas, town houses and
apartments; an 18-hole golf course; a Clubhouse, with hotel and spa; and Commercial retail
outlets.
Worked as PM/lead consultant for the project, full EIA involving all necessary surveys, air/noise
impact modeling, impacts assessment, mitigation measures, and development of outline
environmental management & monitoring plans.
SAADIYAT ISLAND DEVELOPMENT – TOURISM DEVELOPMENT & INVESTMENT COMPANY (TDIC)
The Tourism Development and Investment Company (TDIC) is developing Saadiyat Island into a
unique living and cultural experience that will integrate the best of the UAE’s past and present.
Operating as the master developer, TDIC proposes to fully develop the 2,600 hectare island,
located east of Abu Dhabi Island in the Emirate of Abu Dhabi. Worked as air and noise modeler for
the EIA study carried out for the project.
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR UMM AL QUWAIN MARINA
Member of the project team responsible for the Environmental Impact Assessment study for a
major EMAAR development. The main tasks handled were air and noise modeling and impact
assessment.
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR WHITE BAY DEVELOPMENT
Consultant for the EIA project team for a mixed-use community development in Umm Al Quwain.
The study involved air/noise impact modeling, impacts assessment & mitigation measures.
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR DUBAI PEARL DEVELOPMENT
Air & Noise modeling studies for the proposed development as part of Environmental Impact
Assessment (EIA) for the Dubai Pearl Development.
Page 10 of 13
HAYTHAM AHMED
SITE ASSESSMENT OF MISURATA FREE ZONE, LIBYA
Site Assessment Study for Misurata Free Zone in Libya as part of the development carried out by
Jafza International, a member of EZ World, the global arm of Dubai’s prominent Jebel Ali Free
Zone.
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR PORT RASHID DEVELOPMENT
Provide modeling and advisory support for air and noise aspects associated with an EIA project for
the development of Port Rashid. The work involved air and noise modeling assessment of possible
impacts of proposed development.
ROADS & TRANSPORT
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR DUBAI METRO PROJECT
Provide modeling and advisory support for air, air borne noise and vibration aspects associated
with an EIA project for construction phase of Dubai Metro. The work involved air, noise and
vibration characterization and modeling assessment of possible impacts of proposed
development.
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR THE RTA BUS DEPOT
Air & Noise modeling for a new bus depot in Dubai. The modeling study was been carried out as
part of Environmental Impact Assessment (EIA).
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR AL AIN TO SAIH AL SIDIRA ROAD
The Department of Transport (DoT) Abu Dhabi is currently implementing the Al Ain – Saih Al Sidira
Road Project. The Project involves the construction of new road sections as well as widening of
existing road (E16) between Saih Al Sidira and Al Ain. Worked as air & noise modeler for EIA study.
CONSTRUCTION
EXSYM CONSTRUCTION MANAGEMENT PLAN (CEMP)
Responsible for evaluating the current health and safety plan of the client, identifying construction
related impacts, ecological and socio-economic sensitivity mapping and formulating administrative
and engineering measures/procedures to abate if not eliminate the adverse construction related
impacts. The CEMP was prepared following best international practice on CEMP consistent with
the environment agency’s (EAD) guidelines for similar projects.
ADVANCED MILITARY MAINTENANCE REPAIR AND OVERHAUL CENTRE (AMMROC) ENABLING WORK
PROJECT - CONSTRUCTION MANAGEMENT PLAN (CEMP)
Mubadala Development Company (Mubadala) is undertaking the enabling works of Advanced
Military Maintenance Repair and Overhaul Centre (AMMROC) in Al Ain. The project involves the
setting up of temporary office and welfare facilities, development of temporary site access and
haul roads, erection of site perimeter hoarding, transplanting of existing Ghaf trees to another
location, diversion of 11 kV power cable and diversion of irrigation network. Responsible for the
preparation of the CEMP as per EAD guidelines.
INDUSTRIAL
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR AL NABOODA AUTOMOBILES
Environmental Impact Assessment and mitigation measures for the development of services,
Page 11 of 13
HAYTHAM AHMED
distribution and warehousing center in the transport equipment zone, Dubai Industrial City.
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR AL AIN CEMENT FACTORY AND CONCRETE BLOCK
FACTORY - ARKAN
Arkan Building Materials Company (Arkan) intends to build Al Ain Cement Factory and Concrete
Block Factory. The two factories will be located, adjacent to each other in Arkan Industrial Park in
Al Ain City.
Worked as air and noise modeler for the project activities as part of the EIA study.
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR SIGMA FACTORY FOR STEEL PRODUCTS - DUBAI
INDUSTRIAL CITY
Sigma Factory for Steel Products is one of the companies of IKK Group and plans to establish a
metal fabrication facility in Dubai Industrial City (DIC). SFSP is a manufacturer of different steel
construction products like expanded metals; cladding fixations; cable trays, cable trunking, cable
ladders, cable supports; dry wall ceiling accessories, lintels and block work accessories like
reinforcing mats; garbage and linen chutes; and strut channels.
Worked as PM/lead consultant for the project, EIA involving impacts assessment, mitigation
measures, and development of outline environmental management & monitoring plans.
OCCUPATIONAL HEALTH
METITO NOISE SURVEY
Occupational exposure noise survey for 18 Blowers operated by Metito Company. The scope of
work involved undertaking the occupational exposure noise survey in 3 waste water treatment
plants operated by the company.
GOLTENS OHRA STUDY
The project included OHRA study for Goltens facility at Al Jadaf in Dubai. Goltens provides all the
traditional services related to ship repairing and maintenance and also offers specialized services
like repairing governors, in situ machinery, field system repair, turbo chargers, much of the
mechanical work associated with slow speed and high speed diesel engines, electrical and
mechanical work of a ship and oil rigs.
OCCUPATIONAL HEALTH RISK ASSESSMENT OF GAS PRODUCTION & ASSOCIATED FACILITIES -
ADGAS
A detailed Occupational health Risk Assessment of the ADGAS facilities was carried out between
February and November 2008. The assessment encompassed all the facilities housed on Das
Island, Mina Port, and the Abu Dhabi Headquarters. Worked as team member of the assessment
team.
SEVERAL OHRA AS PART OF THE HSEIA STUDIES CARRIED OUT FOR OIL AND GAS PROJECTS.
Worked as OHRA section author for many HSEIA studies carried out for Oil and Gas projects.
MAJOR EXPERIENCE IN EGYPT
 Siting study, Design and operation of the National Air Quality Monitoring Network,
Ministry of Environment.
 Evaluate and determine air pollution emissions configurations for industrial facilities using
Page 12 of 13
HAYTHAM AHMED
Air pollution models.
 Long experience with USEPA approved ISC & Aermod Air pollution dispersion models.
 Supervise and operate Air Pollution Monitoring Databases (EMC Sys. Man and AQ Mon.)
 Prepare the Environmental Quality data on GIS based systems (Arc view 3.2).
 Undertake environmental evaluation for ENI Petroleum Company.
 Prepare Meteorological data for the Air pollution models.
 Process monitoring data and carry out the final QA/QC on the selected indicators.
 Undertake Field Measurements for Point source emissions.
 Undertake Ambient Air Measurements using thermo Environment analyzers.
 Undertake Particulate matter measurements using High volume samplers.
 Participate in the preparation and implementation of the national program for
Environmental Monitoring and report the data provided thereby.
 Compile and publish periodic reports on the major environmental indicators.
 Prepare studies on the environmental status.
 Prepare Reports on the Environmental Quality in Egypt.
 Participate in the preparation of an integrated national plan for the administration of Early
Warning System of the Air Pollution episodes.
 Gather national and international information on the environmental situation and the
changes affecting it on a periodical basis.
 Prepare an environmental contingency plan and coordinate with the competent bodies
regarding preparation of programs to face environmental disasters.
 Undertake field audit on the Air Quality Monitoring stations.
SELECTED PROJECT EXPERIENCE IN EGYPT
 Participate in the EIA study of Cairo international airport-new terminal done under the
ministry of environment.
 Prepare the EIA study of Borg El Arab airport in Alexandria.
 Prepare the EIA study of Al Qa’a power plant in Sanaa, Yemen.
 Prepare the EIA study of Hurghada international airport in Hurghada.
 Prepare EIA study for LAB Petrochemical plant in el Max area (Alexandria).
 Design and undertake a survey for Air Pollution around E.D.F Power Plant of Suez.
 Design and undertake a survey for Air Pollution around E.D.F Power Plant of Port Said.
 Undertake field measurements for Particulate matter less than 10 micron in Geopetrol
Company (Petroleum facility) in Ras Ghareb area as part of EIA Study.
PAPERS PUBLISHED
“Air Quality in Egypt – As seen from the EEAA/EIMP” Programme presented in the second
international Conference for Environmental Management and Technologies Egypt 99”.
“Study for Air Pollutants during episodes” presented in the international conference for
Environmental Hazard Mitigation, Cairo University Egypt 2000”
“Air Pollution in Egypt” presented in the 12th
World Clean Air & Environment Congress, Seoul,
Korea”.
Page 13 of 13
HAYTHAM AHMED
“Annual Report on the Air Quality in Egypt during 2000” presented under Egyptian
Environmental Affairs Agency”.
“State of Air Environment in Egypt during the year of 2002” presented under the international
conference of Environment, Ain Shams Univeristy2003”.
“Air Quality Monitoring Sites in Egypt” (Sivertsen B, Ahmed H. (2003) EIMP, Kjeller, (Nilu
OR14/2003)”.
“Development of Air Pollution strategy for Egypt” presented in the national conference on
Environment, National Research Institute, Egypt 2004.
“The Role of Egyptian Environmental Affairs Agency to reduce the air pollution in Shoubra El
Kheima area” Presented in the First chemical and environmental engineering conference in The
Technical Military Academy, 2004.
Participate in the preparation of “State of Environment in Egypt” during the year of 2004
published under the agency.
“Monthly Reports” on the Environmental Quality in Egypt since March 1999”.

More Related Content

What's hot

Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaSr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Pankaj Kisnadwala
 
Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16
Ron Roof
 
Sreejith_2484_b (2).doc
Sreejith_2484_b (2).docSreejith_2484_b (2).doc
Sreejith_2484_b (2).doc
Sreejith Nair
 
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
PRADIP SAHA,CEng MIGEM
 
Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16
Ron Roof
 
CV_Jagannath Hosmani_10May2016
CV_Jagannath Hosmani_10May2016CV_Jagannath Hosmani_10May2016
CV_Jagannath Hosmani_10May2016
Jagannath Hosmani
 
Vinod kumar senior structural lead engineer
Vinod kumar  senior structural lead  engineerVinod kumar  senior structural lead  engineer
Vinod kumar senior structural lead engineer
Vinodh Kumar
 
B Levitt Resume 03_16_2
B Levitt Resume 03_16_2B Levitt Resume 03_16_2
B Levitt Resume 03_16_2
Brian Levitt
 

What's hot (20)

Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaSr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
 
Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16
 
Sreejith_2484_b (2).doc
Sreejith_2484_b (2).docSreejith_2484_b (2).doc
Sreejith_2484_b (2).doc
 
CV PMG
CV PMGCV PMG
CV PMG
 
Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1
 
Brochure CMR Marine
Brochure CMR MarineBrochure CMR Marine
Brochure CMR Marine
 
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
 
Pramitee Engineering & Surveys Private Limited, Navi Mumbai, Survey Services
Pramitee Engineering & Surveys Private Limited, Navi Mumbai, Survey ServicesPramitee Engineering & Surveys Private Limited, Navi Mumbai, Survey Services
Pramitee Engineering & Surveys Private Limited, Navi Mumbai, Survey Services
 
41946 ind-seia
41946 ind-seia41946 ind-seia
41946 ind-seia
 
Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16
 
MP Singh_ Resume 001
MP Singh_ Resume 001MP Singh_ Resume 001
MP Singh_ Resume 001
 
Linked In Pres R Toet Rev2
Linked In Pres R Toet Rev2Linked In Pres R Toet Rev2
Linked In Pres R Toet Rev2
 
ATB PE Portfolio2016
ATB PE Portfolio2016ATB PE Portfolio2016
ATB PE Portfolio2016
 
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
 
DE LANGE - CV
DE LANGE - CVDE LANGE - CV
DE LANGE - CV
 
CV_Jagannath Hosmani
CV_Jagannath HosmaniCV_Jagannath Hosmani
CV_Jagannath Hosmani
 
CV_Jagannath Hosmani_10May2016
CV_Jagannath Hosmani_10May2016CV_Jagannath Hosmani_10May2016
CV_Jagannath Hosmani_10May2016
 
RESUME
RESUMERESUME
RESUME
 
Vinod kumar senior structural lead engineer
Vinod kumar  senior structural lead  engineerVinod kumar  senior structural lead  engineer
Vinod kumar senior structural lead engineer
 
B Levitt Resume 03_16_2
B Levitt Resume 03_16_2B Levitt Resume 03_16_2
B Levitt Resume 03_16_2
 

Viewers also liked

Proyecto de ingles
Proyecto de inglesProyecto de ingles
Proyecto de ingles
LULO29
 
Chapter 5 unit 9
Chapter 5 unit 9Chapter 5 unit 9
Chapter 5 unit 9
42364339
 

Viewers also liked (10)

Power point
Power pointPower point
Power point
 
01. Становішча ў Беларусі напярэдадні Кастрычніцкай рэвалюцыі
01. Становішча ў Беларусі напярэдадні Кастрычніцкай рэвалюцыі01. Становішча ў Беларусі напярэдадні Кастрычніцкай рэвалюцыі
01. Становішча ў Беларусі напярэдадні Кастрычніцкай рэвалюцыі
 
Proyecto de ingles
Proyecto de inglesProyecto de ingles
Proyecto de ingles
 
Chapter 5 unit 9
Chapter 5 unit 9Chapter 5 unit 9
Chapter 5 unit 9
 
CAP Group Award
CAP Group Award CAP Group Award
CAP Group Award
 
Caixa Empreender Award 2016| Health - B2s (Cohitec)
Caixa Empreender Award 2016| Health - B2s (Cohitec)Caixa Empreender Award 2016| Health - B2s (Cohitec)
Caixa Empreender Award 2016| Health - B2s (Cohitec)
 
Anupam_Resume
Anupam_ResumeAnupam_Resume
Anupam_Resume
 
Monitoring & Evaluation of Adaptation to Climate Change in the context of IND...
Monitoring & Evaluation of Adaptation to Climate Change in the context of IND...Monitoring & Evaluation of Adaptation to Climate Change in the context of IND...
Monitoring & Evaluation of Adaptation to Climate Change in the context of IND...
 
Country Manager Final Report
Country Manager Final ReportCountry Manager Final Report
Country Manager Final Report
 
Surf Lessons at Middleton SA 15-16th December 2013 with Surf & Sun
Surf Lessons at Middleton SA 15-16th December 2013 with Surf & Sun Surf Lessons at Middleton SA 15-16th December 2013 with Surf & Sun
Surf Lessons at Middleton SA 15-16th December 2013 with Surf & Sun
 

Similar to Haytham Ahmed CV - Technical Director - Oct 2015

Ian Ahrens CV Jan2016
Ian Ahrens CV Jan2016Ian Ahrens CV Jan2016
Ian Ahrens CV Jan2016
Ian Ahrens
 
Raafat C.V October.14
Raafat C.V October.14Raafat C.V October.14
Raafat C.V October.14
raafat sayed
 
A R Ram CV 2016_04 QHSSE Rev00
A R Ram CV 2016_04 QHSSE  Rev00A R Ram CV 2016_04 QHSSE  Rev00
A R Ram CV 2016_04 QHSSE Rev00
A R Ram
 
CV of Lead HSE Supervisor-Ghulam Shabbeer
CV of Lead HSE Supervisor-Ghulam ShabbeerCV of Lead HSE Supervisor-Ghulam Shabbeer
CV of Lead HSE Supervisor-Ghulam Shabbeer
Ghulam Shabbeer
 
CV-Safety Engineer - Ahmed Kaleem Shaik
CV-Safety Engineer - Ahmed Kaleem ShaikCV-Safety Engineer - Ahmed Kaleem Shaik
CV-Safety Engineer - Ahmed Kaleem Shaik
Ahmed Kaleem Shaik
 
Ahmed Atef - Management Professional- October 2015
Ahmed Atef - Management Professional- October 2015Ahmed Atef - Management Professional- October 2015
Ahmed Atef - Management Professional- October 2015
Ahmed Atef
 
apjcv2016 rev1
apjcv2016 rev1apjcv2016 rev1
apjcv2016 rev1
Phil Jones
 
essa cv 2016 updated sept
essa cv 2016 updated septessa cv 2016 updated sept
essa cv 2016 updated sept
Said Diploma
 
RANJISH S CV
RANJISH S CVRANJISH S CV
RANJISH S CV
Ranjish S
 
Resume of ARMANDO ILAGAN
Resume of ARMANDO  ILAGANResume of ARMANDO  ILAGAN
Resume of ARMANDO ILAGAN
Armando Ilagan
 

Similar to Haytham Ahmed CV - Technical Director - Oct 2015 (20)

Ian Ahrens CV Jan2016
Ian Ahrens CV Jan2016Ian Ahrens CV Jan2016
Ian Ahrens CV Jan2016
 
Raafat C.V October.14
Raafat C.V October.14Raafat C.V October.14
Raafat C.V October.14
 
Khaled HSE
Khaled HSEKhaled HSE
Khaled HSE
 
Khaled CV
Khaled CVKhaled CV
Khaled CV
 
A R Ram CV 2016_04 QHSSE Rev00
A R Ram CV 2016_04 QHSSE  Rev00A R Ram CV 2016_04 QHSSE  Rev00
A R Ram CV 2016_04 QHSSE Rev00
 
Biju_cv__nov_2015
Biju_cv__nov_2015Biju_cv__nov_2015
Biju_cv__nov_2015
 
CV of Lead HSE Supervisor-Ghulam Shabbeer
CV of Lead HSE Supervisor-Ghulam ShabbeerCV of Lead HSE Supervisor-Ghulam Shabbeer
CV of Lead HSE Supervisor-Ghulam Shabbeer
 
CV-Safety Engineer - Ahmed Kaleem Shaik
CV-Safety Engineer - Ahmed Kaleem ShaikCV-Safety Engineer - Ahmed Kaleem Shaik
CV-Safety Engineer - Ahmed Kaleem Shaik
 
Ahmed Atef - Management Professional- October 2015
Ahmed Atef - Management Professional- October 2015Ahmed Atef - Management Professional- October 2015
Ahmed Atef - Management Professional- October 2015
 
r.o.ggs1 ..
r.o.ggs1 ..r.o.ggs1 ..
r.o.ggs1 ..
 
apjcv2016 rev1
apjcv2016 rev1apjcv2016 rev1
apjcv2016 rev1
 
Mechanical Engineer_JBYosores_RMEE_PMP_RMP_MBA.pdf
Mechanical Engineer_JBYosores_RMEE_PMP_RMP_MBA.pdfMechanical Engineer_JBYosores_RMEE_PMP_RMP_MBA.pdf
Mechanical Engineer_JBYosores_RMEE_PMP_RMP_MBA.pdf
 
essa cv 2016 updated sept
essa cv 2016 updated septessa cv 2016 updated sept
essa cv 2016 updated sept
 
Clough Enercore Brochure
Clough Enercore BrochureClough Enercore Brochure
Clough Enercore Brochure
 
RANJISH S CV
RANJISH S CVRANJISH S CV
RANJISH S CV
 
Resume of ARMANDO ILAGAN
Resume of ARMANDO  ILAGANResume of ARMANDO  ILAGAN
Resume of ARMANDO ILAGAN
 
Ahmed Reedy CVf
Ahmed Reedy CVfAhmed Reedy CVf
Ahmed Reedy CVf
 
CV-VA- March2016
CV-VA- March2016CV-VA- March2016
CV-VA- March2016
 
EIA - Meticulous management of coal Handling at Karachi Port Trust
EIA - Meticulous management of coal Handling at Karachi Port TrustEIA - Meticulous management of coal Handling at Karachi Port Trust
EIA - Meticulous management of coal Handling at Karachi Port Trust
 
Meticulous management
Meticulous managementMeticulous management
Meticulous management
 

Haytham Ahmed CV - Technical Director - Oct 2015

  • 1. Page 1 of 13 HAYTHAM AHMED Full Name: Haytham Abd El Rehim Ahmed Present Employment: Technical Director, Environment Title Qualification: B.Sc., Faculty of Science, Chemistry Department, Cairo University, May 1997. Awards: IBM award for studying the development of internet based systems 2001. International Computer Driving License, ICDL UNESCO Nationality: Egyptian Country Experience: UAE, Egypt, Germany, Japan, Libya, Yemen, Qatar, Iraq SUMMARY PROFILE Haytham Ahmed has over 17 years of experience of environmental consultancy in both the public and private sectors, having worked on a large number of major studies in Egypt, UAE, Iraq, Qatar, Libya and Yemen. Haytham is highly experienced in the management of large multi-disciplinary environmental teams to provide practical and innovative environmental and sustainable solutions for complex projects. He has worked on wide range of Oil & Gas, Urban Development, Road & Transport, Power & Water and Industrial projects. As well as extensive project management skills, he also has technical strengths in environmental pollution modeling (air and noise), monitoring and data presentation, Emission Inventory preparations, Environmental Impact Assessment (EIA), Health, Safety & Environmental Assessment (HSEIA), baseline surveys (for air quality, noise, soil, groundwater, seawater), Occupational Health Risk Assessment (OHRA), Environment, Health & Safety Management Systems (EHSMS), environmental audits and State of the Environment reports. His background is in design and operation of the Environmental Quality Monitoring Networks, preparation and operation of dispersion analysis using USEPA approved models (ISC and AERMOD, CALRoads view, mobile view, Tanks 4.09D and Predictor), boundary layer turbulence and dispersion, use of meteorological data and industrial plants siting studies. EXPERIENCE HISTORY 2014 – Present : TECHNICAL DIRECTOR, ENVIRONMENT Dome Oilfield Engineering & Services LLC 2012 – 2014 : Principal Environmental Consultant Dome Oilfield Engineering & Services LLC
  • 2. Page 2 of 13 HAYTHAM AHMED 2010 – 2012 : Senior Environmental Consultant Dome Oilfield Engineering & Services LLC 2006 – 2010 : Environmental Consultant Dome Oilfield Engineering & Services LLC 1999 – 2006 : Senior Environmental Researcher Egyptian Environmental Affairs Agency, Ministry of Environment, Egypt. 1998 – 1999 : Environmental Chemist Value Link for Environmental Analysis, Cairo, Egypt. RELEVANT EXPERIENCE for ENVID & OHID WORKSHOPS Haytham Ahmed has chaired and participated in the ENVID and OHID workshops for the following projects:  Phase 4 HSEIA for the Maqta – Baniyas Pipeline Project, GASCO as Chairman of the ENVID and OHID.  Phase 1 HSEIA of the Natural Gas Supply Pipeline to Global Foundries Project, GASCO as Chairman of the ENVID and OHID.  Phase 1 HSEIA of the Replacement of Lean Gas Pipeline Project from Buhasa to Bab, GASCO as Chairman of the ENVID and OHID.  Phase 1 HSEIA of the Qusawirah Accommodation Complex Project, ADCO as Chairman of the ENVID and OHID.  Zirku Jetty Expansion Project – Concept Design Project, ZADCO as Chairman of the ENVID and OHID.  Phase 2 for the Replacement of the Uni-Directional by Bi-Directional Prover System, ADCO as Chairman of the ENVID and OHID.  Phase 2 for Installation of Lightning Protection on Crude Oil Tanks – Jebel Dhanna, ADCO as Chairman of the ENVID and OHID.  Phase III HSEIA for Bunduq Offshore Facilities, Bunduq as Chairman of the ENVID and OHID.  Phase 1 for New Crude Oil Storage Tank and Associated Facilities at Halul island, Qatar Petroleum as ENVID Chairman.  Phase 3 HSEIA of the AR Site Terminal Project (AR/GA Fields and Causway), ADOC as Scribe of the ENVID and OHID.  Phase 3 HSEIA of the Installation of Low Pressure Gas Recovery Compressor Project, ADOC as Scribe of the ENVID and OHID.  Phase 1 of the Supply of Sales Gas to Takreer Ruwais Refinery and Masdar Hydrogen Power Plant Project, GASCO as Scribe of the ENVID and OHID.  Phase 1 HSEIA of the CICPA Shah Complex Project, ADCO as Scribe of the ENVID and OHID.
  • 3. Page 3 of 13 HAYTHAM AHMED SELECTED PROJECT EXPERIENCE OIL & GAS SECTOR ENVIRONMENTAL IMPACT ASSESSMENT STUDY FOR 3D/2D SEISMIC SURVEY OF BLOCK 8, IRAQ - PAKISTAN PETROLEUM PROJECT Pakistan Petroleum is the operator of Block 8, an exploration block located in eastern Iraq. To optimize the development of Block 8, Pakistan Petroleum has undertaken 3D/2D seismic survey of the field. Block 8 is part of Iraq’s twelve (12) new hydrocarbon exploration blocks and is classified as a gas-prone field, with potential for oil and condensates. Environmental Impact Assessment (EIA) study was awarded to Dome for the 3D/2D Seismic Survey of Block 8 project by Pakistan Petroleum. The scope of the study includes identification and assessment of potential environmental impacts associated with the 3D/2D Seismic survey. The scope of the study includes undertaking baseline environmental survey for ambient air quality, ambient noise quality, soil sampling, water sampling, sediment sampling and ecology survey. Worked as Project Manager and was responsible for project management, guidance to project team, preparing and reviewing EIA and attending technical clarification meetings, etc. ENVIRONMENTAL & SOCIAL IMPACT ASSESSMENT STUDY FOR SHAKAL BLOCK DEVELOPMENT, KURDISTAN REGION, IRAQ - GAZPROM MIDDLE EAST. Gazprom Middle East is designated to explore and develop the Shakal Block within the Kurdistan Region of Iraq. Shakal Block is a hydrocarbon field with potential for oil and condensates, located at the southern-end of Iraq’s Kurdistan Region. Environmental and Social Impact Assessment (ESIA) study was awarded to Dome for development of Shakal field. The scope of this ESIA study is limited to the Seismic survey (3D) works and Drilling of two exploratory wells in 2014 (Shakal 3 and Shakal 2) and one well each in the year 2015 and 2016. Worked as Project Manager and was responsible for project management, guidance to project team, preparing and reviewing EIA. ENVIRONMENTAL & SOCIAL IMPACT ASSESSMENT STUDY FOR HALABJA BLOCK DEVELOPMENT, KURDISTAN REGION, IRAQ - GAZPROM MIDDLE EAST. Gazprom Middle East is designated to explore and develop the Halabja Block within the Kurdistan Region of Iraq. Halabja Block is a hydrocarbon field with potential for oil and condensates, located adjacent to the Iraq-Iran border within the Sulaymaniyah Province in Iraq’s Kurdistan Region. Environmental and Social Impact Assessment (ESIA) study was awarded to Dome for development of Halabja field. The scope of this ESIA study is limited to Seismic survey (2D) works and drilling of one exploratory well in the years 2015, 2016 and 2017. Worked as Project Manager and was responsible for project management, guidance to project team, preparing and reviewing EIA. PHASE 1 HSEIA STUDY FOR BAB INTEGRATED FACILITIES PROJECT (BIFP) – PETROFAC. Abu Dhabi Company for Onshore Oil Operations (ADCO) intends to increase its crude oil production from current production rate of 1.4 Million Barrels Oil per Day (MMBOPD) to 1.8 MMBOPD. This increase in production will be achieved by developing different reserves (building block development) in ADCO fields. Petrofac Emirates LLC (Petrofac) has been appointed by ADCO as FEED engineer for the Project. Petrofac has commissioned Dome to carry out the Phase 1
  • 4. Page 4 of 13 HAYTHAM AHMED Health, Safety and Environmental Impact Assessment (HSEIA) study for the Project. Worked as Project Manager and was responsible for project management, guidance to project team, preparing and reviewing EIA and Occupational Health Risk Assessment Sections. PHASE III HSEIA FOR BUNDUQ FACILITIES - BUNDUQ OIL PRODUCING COMPANY Bunduq Oil Producing Company is the operator of Bunduq field, which is an offshore oilfield located on the border of the Abu Dhabi, UAE and Qatar. The Bunduq concession was granted directly by the government of Abu Dhabi and Qatar. The first production from the field was in November 1975. Bunduq commissioned HSEIA study for its existing facilities, which include the offshore production and processing complex, the headquarters and supply warehouse in the mainland Abu Dhabi. Dome was retained by Bunduq to carry out the HSEIA study. Worked as Project Manager and was responsible for project management, guidance to project team, preparing and reviewing EIA and Occupational Health Risk Assessment Sections. PHASE I HSEIA FOR CICPA SHAH ACCOMMODATION COMPLEX PROJECT – ABU DHABI ONSHORE OIL COMPANY (ADCO) The Abu Dhabi Onshore Oil Company (ADCO) is planning to build accommodation facilities for the officers of the Critical Infrastructure & Coastal Protection Authority (CICPA) working in Shah Area. Dome was contracted by ECG, the design consultant for the Project hired by ADCO, to conduct a Phase I Health, Safety and Environmental Impact Assessment (HSEIA) for this Project. Worked as author of EIA and OHRA sections of the HSEIA study and air & noise modeler for the project activities. ENVIRONMENTAL IMPACT ASSESSMENT STUDY FOR NEW PUMPING STATIONS OF LIGHT PRODUCTS PIPELINE (SHUAIBA – KARKH), IRAQ – APS ENGINEERING COMPANY. The “New Pumping Stations of Light Products Pipeline (Shuaiba – Karkh) Project” is part of the expansion of light products pipeline from Shuaiba to Karkh in Iraq. The Shuaiba-Karkh pipeline includes a new pipeline with a total length of 533 km, four pumping stations and three receiving stations. Worked as Project Manager and was responsible for project management, guidance to project team and reviewing EIA. PHASE III HSEIA FOR BAB GAS COMPRESSION PROJECT - ABU DHABI ONSHORE OIL COMPANY (ADCO) Gas field reservoir monitoring in recent years reveals significant pressure depletion over gas produced in Thamama C and D and F Units 6 and 7 reservoirs. In response to this, ADCO is implementing the Bab Gas Compression Project to boost the pressure in gas trunk lines in order to sustain gas production and to meet current and future gas demands. The project includes the installation of three (3) gas compressor stations (GCSs), to increase the pressure of gas from the Bab field. Worked as author of EIA and OHRA sections of the HSEIA study and air & noise modeler for the project activities. ENVIRONMENTAL IMPACT ASSESSMENT STUDY FOR MANSURIYA GAS FIELD, IRAQ - TURKISH PETROLEUM OVERSEAS COMPANY Turkish Petroleum Overseas Company (TPOC), in consortium with Kuwait Energy (KEC) and Korea
  • 5. Page 5 of 13 HAYTHAM AHMED Gas Corporation (KOGAS), is undertaking the Preliminary Development Plan (PDP) Phase of the Mansuriya Gas Field Development Project. The field is targeted to produce 320 MMSCFD of sales gas for 13 years when fully developed. Worked as project Manager and was responsible for project management, guidance to field team, preparing and reviewing the EIA. PHASE 1 HSEIA STUDY FOR THE REPLACEMENT OF 20” LEAN GAS PIPELINE FROM BUHASA TO BAB TO TH.C – ABU DHABI GAS INDUSTRIES (GASCO) Abu Dhabi Gas Industries (GASCO) has intended to replace the existing 20” BuHasa-Bab Lean gas pipeline by a new 24” pipeline due to external corrosion. The new lean gas Pipeline project will mainly include the design and construction of a new 24” lean gas pipeline from BuHasa to Bab and from Bab to Thamama C, including launching and receiving facilities. In addition and due to external corrosion, the existing 20” Bu Hasa – Bab lean gas pipeline will be demolished Worked as author of EIA and OHRA sections of the HSEIA study and air & noise modeler for the project activities. ENVIRONMENTAL IMPACT ASSESSMENT STUDY FOR IL & FS PRIME TANK TERMINALS – MUC OIL & GAS ENGINEERING CONSULTANCY IL & FS Prime Terminals FZC is establishing IL & FS Prime Tank Terminals project, to be located at Fujairah Free Zone, Fujairah. The proposed Tank Farm will consist of 25 storage tanks with an aggregate capacity of 632,678 m3 but with working capacity of 583,191 m3 to store various petroleum products and will have the potential to carry out physical blending of different fuel oils. Worked as air & noise modeler for the project activities. ENVIRONMENTAL MONITORING FOR LUKOIL PROJECT IN WEST QURNA-2, IRAQ. Ongoing project from year 2013 to 2015, working as project Manager and responsible for project management, guidance to field team, leading field team, conducting noise, air and river water sampling, organizing and attending technical clarification meetings, etc. LUKOIL Mid-East Limited (LUKOIL) is the designated operator of the West Qurna-2 Contract Area. LUKOIL has initiated a comprehensive plan to conduct Environmental Monitoring of its West Qurna-2 oilfield in order to assess the effectiveness of operational controls and demonstrate compliance to South Oil Company (SOC) requirements and Iraqi environmental laws. ABU DHABI OIL CO. (ADOC) EMISSION INVENTORY The study comprised of conducting emission inventory, based on ADNOC Codes of Practice for environmental monitoring and reporting. The basic approach to this study was to conduct emission quantification for the existing facilities reflecting the current status of the company’s discharges. The main objectives of the emission inventory study are to identify & quantify the various pollution sources associated with the different types of ADOC operations including air, effluents, waste and noise pollution. ENVIRONMENTAL IMPACT ASSESSMENT OF BASEMENT PROCESSING UNIT TRAIN, KHARIR BASEMENT PROJECT PHASE 1 - TOTAL E&P YEMEN TOTAL E&P Yemen is operating Kharir field, an onshore oil and gas field in Yemen. The facilities are located east of Shabwa, in the Hadramawt province about 600 km to the East of Sanaa, the capital
  • 6. Page 6 of 13 HAYTHAM AHMED of Yemen. In its efforts to increase oil production, TOTAL has initiated the “Kharir Basement Phase- I Project”. As a part of this project, TOTAL intends to construct a new dedicated Central Processing Unit train of 30,000 BPD capacity, for processing reservoir fluid from the Basement Reservoir. The project included the preparation of the EIA for Kharir Field Development Project including Environmental Baseline Surveys (EBS) and Environmental Management Plan (EMP). PHASE 2 HEALTH SAFETY AND ENVIRONMENTAL IMPACT ASSESSMENT FOR THE ADDITION OF 10 NEW WELLS ON EXISTING WELLHEAD TOWERS IN ZAKUM FIELD - ADMA-OPCO Abu Dhabi Marine Operating Company (ADMA-OPCO) is undertaking development of Zakum field Thamama IV as part of Zakum field long term plan to maintain a sustainable production of 325 MSBPD. To achieve this production target, ADMA-OPCO has decided to upgrade 10 wellhead towers of Zakum field. The existing WHT’s will be modified to accommodate the 10 new wells in line with the same operational standards/philosophy as for the existing wells. Worked as author of EIA section of the HSEIA study and air & noise modeler for the project activities. PHASE 1 HEALTH SAFETY AND ENVIRONMENTAL IMPACT ASSESSMENT FOR FERTIL 2 PROJECT – RUWAIS FERTILIZER INDUSTRIES Ruwais Fertilizer Industries Ltd. (FERTIL) plans to build a second ammonia/urea plant, FERTIL 2, to increase the overall production of granulated urea. The FERTIL 2 facility will be located in the Ruwais Industrial Complex adjacent to the existing FERTIL 1 site. The FERTIL 2 consists primarily of Ammonia, urea melt and urea granulation process units; Facilities for storage of intermediate and final products; and all necessary supporting facilities. Worked as air & noise modeler for the project activities as part of an HSEIA study. PHASE 1 HEALTH SAFETY AND ENVIRONMENTAL IMPACT ASSESSMENT FOR GASCO-BAB GAS TREATMENT PLANT MODIFICATION. Worked as air & Noise modeler for GASCO Bab Gas Treatment Plant modification project. The project will allow the existing plant to handle feed gas with H2S content of up to 7.3 mole percent from the present 3.3 mole percent. PHASE 3 HEALTH SAFETY AND ENVIRONMENTAL IMPACT ASSESSMENT FOR GASCO 3RD NGL TRAIN PROJECT. Worked as air Modeler for Ruwais 3rd NGL Train Project which is part of a major initiative being undertaken by Abu Dhabi Gas Industries Ltd (GASCO) for expansion of its gas processing business, with the objective of producing more condensate and NGL. PHASE 1 HEALTH SAFETY AND ENVIRONMENTAL IMPACT ASSESSMENT FOR GUP EXPANSION PROJECT - TAKREER Worked as air & Noise Modeler for the General Utility Plant (GUP) at Ruwais Refinery Complex, 240 kilometers west of Abu Dhabi City. The GUP supplies include electricity, seawater, distillate, potable water; and demineralized water.
  • 7. Page 7 of 13 HAYTHAM AHMED HEALTH, SAFETY AND ENVIRONMENTAL IMPACT ASSESSMENT (COMBINED PHASE 1 AND 2) FOR CLOSED DRAIN SYSTEM PROJECT AT ADCO RDS AT BAB – GALFAR ENGINEERING & CONTRACTING WLL EMIRATES Worked as air Modeler for Bab remote degassing station. The project included modifications to the already existed station to improve operability and safety of the facilities. The proposed modifications consist of provision of a closed drain system at RDS comprising of drain vessel in concrete pit, duty / standby and piping. ENVIRONMENTAL MONITORING STUDIES (EMS) FOR ADCO’S ALL FACILITIES ADCO was initiated a comprehensive plan to conduct an Environmental Monitoring Study over its operational oil and gas fields and terminals, in order to assess the effectiveness of operational controls and demonstrate compliance with ADNOC requirements. This study involved the monitoring of various in-plant source discharges (air emissions, liquid discharges and waste), as well as ambient environmental quality in surrounding areas (air, noise, groundwater, soil and marine). Study was carried out for two seasons i.e. summer (June’10 to August’10) and winter (December’10 to February’11). The Scope of Work of the EBS included:  Air Quality Survey (by Diffusion Tubes);  Ecological Survey;  Soil Quality Survey;  Groundwater Quality Survey;  Noise Survey;  Effluent Quality Survey;  Marine Ecology Survey;  Radio Active and Non Radio Active Hazardous Survey; PHASE 4 HSEIA FOR THE REMOVAL OF GASCO’S 16” MAQTA – BANIYAS PIPELINE AND ADCO’S JARN YAPHOUR – UMM AL NAR 18” TRANSFERLINE The project included the removal and disposal the 16” Maqta – Baniyas Pipeline (Approx 18.4 km) including all its ground facilities. Worked as the main consultant for the Health Safety and Environmental Impact Assessment for the pipelines and associated facilities. PHASE 2&3 HEALTH SAFETY AND ENVIRONMENTAL IMPACT ASSESSMENT FOR INTER-REFINERIES PIPELINE (IRP) - TAKREER Air and Noise Modeller for the Inter Refinery Pipeline Phase – II (IRP-II) project. The project included numerous pipelines and storage tanks terminals in Mussafah, Al Ain and Madinat Zayed. PHASE 3 HEALTH SAFETY AND ENVIRONMENTAL IMPACT ASSESSMENT FOR ZAKUM GAS PROCESSING FACILITIES (GPF) – ADMA-OPCO Abu Dhabi Marine Operating Company (ADMA-OPCO) intends to proceed with the commissioning and operation of the Gas Processing Facilities (GPF) Project in Zakum oilfield. The GPF is a new gas treatment platform that will augment the existing gas processing capability of Zakum West Super Complex (ZWSC). It will handle the projected increase in the production of associated gas from Zakum oilfield and will be connected to the existing ZWSC via a bridge to the ZWSC-NRP (New Riser Platform).
  • 8. Page 8 of 13 HAYTHAM AHMED Worked as author of EIS and OHRA sections of the HSEIA study. PHASE 1 HEALTH SAFETY AND ENVIRONMENTAL IMPACT ASSESSMENT FOR 3D SEISMIC SURVEY AT SATAH FIELD - ZAKUM DEVELOPMENT COMPANY (ZADCO) To optimize further development of Satah field, ZADCO proposed to undertake a high quality/high definition 3D Seismic survey of the area. The seismic survey will cover an area of approximately 207 km2 over Satah field, which is located 190km WNW of Abu Dhabi city and 17km north of Arzanah Island. Worked as author of Occupational Health Risk Assessment (OHRA) section of the HSEIA study. ENVIRONMENTAL IMPACT ASSESSMENT FOR FUJAIRAH REFINERY TANK FARM – VITOL DUBAI LTD. The project involved the development of tank farm in the emirate of Fujairah. Full EIA involving all necessary surveys, air/noise impact modeling, impacts assessment, mitigation measures, and development of outline environmental management & monitoring plans. POWER & WATER PROJECTS IMPLEMENTATION OF ESMP FOR AL HARTHA POWER PLANT, BASRA, IRAQ Ongoing project from year 2012 to 2014, working as project Manager and Field Team Leader. Responsibilities including project management, leading field team, organizing and attending technical clarification meetings, conducting training, environmental audit and baseline surveys. The Project includes the implementation of the Environmental and Social Management Plan (ESMP) for the Al-Hartha Power Plant Project to ensure that adverse environmental and social impacts of the project as identified in the project’s ESIA are minimized or eliminated. To ensure this the following activities are being undertaken:  Task 1 - Needs assessment and preparation of a comprehensive work plan for implementing the ESMP;  Task 2 - Assistance to the PMU in specifying and selecting environmental monitoring equipment;  Task 3 - Implementation of the ESMP requirements during construction;  Task 4 - Training and capacity building on impacts mitigation and environmental monitoring during operation. PRELIMINARY ENVIRONMENTAL REVIEW (PER) FOR THE WATER SUPPLY PIPELINE TO ZARAH WEST AND ZARAH EAST ISLANDS - HALCROW INTERNATIONAL PARTNERSHIP (HALCROW) Abu Dhabi Distribution Company (ADDC) is planning to construct a water supply pipeline to Zarah West and Zarah East Islands from its existing water pipeline system in Samaliya Island. The project will include the construction and operation of a pumping station, a reservoir tank and associated equipment in addition to the pipelines. The system will be connected to the existing ADDC pipeline in Samaliya Island. Worked as main consultant and project manager for the preparation of the PER study. POWER AND DESALINATION PLANT, FUJAIRAH - ABU DHABI WATER AND ELECTRICITY AUTHORITY (ADWEA) Worked as PM/lead consultant for EIA project for a power and desalination plant in Fujairah. Full EIA involving all necessary surveys, air/noise impact modeling, impacts assessment, mitigation
  • 9. Page 9 of 13 HAYTHAM AHMED measures, and development of outline environmental management & monitoring plans. INFRASTRUCTURE DEVELOPMENT PROJECTS ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR ARABIAN RANCHES PHASE 2 - EMAAR Emaar Properties (Emaar) is planning to undertake the Arabian Ranches Phase 2 Project. This project is an extension of the existing Arabian Ranches Phase 1, a mixed‐use gated community development. The Arabian Ranches Phase 2 is designed to be a true representation of Emirati culture as well as hospitality. It is planned to accommodate about 11,689 residents, 417 workers and 3,925 visitors. Worked as PM/lead consultant for the project, full EIA involving all necessary surveys, air/noise impact modeling, impacts assessment, mitigation measures, and development of outline environmental management & monitoring plans. ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR DAMAC GOLF RESORT COMMUNITY - DAMAC DAMAC Properties Co. LLC (DAMAC) is planning to develop the Damac Golf Resort Community (DGRC). This project is a high quality mixed use complex covering an area of approximately 2.65 km2 . The proposed project site is located within the Dubailand in Dubai, adjacent to the west of Al Qudra Road between Emirates Road and the Dubai Bypass Road. The main elements of the projects include residential areas, including villas, town houses and apartments; an 18-hole golf course; a Clubhouse, with hotel and spa; and Commercial retail outlets. Worked as PM/lead consultant for the project, full EIA involving all necessary surveys, air/noise impact modeling, impacts assessment, mitigation measures, and development of outline environmental management & monitoring plans. SAADIYAT ISLAND DEVELOPMENT – TOURISM DEVELOPMENT & INVESTMENT COMPANY (TDIC) The Tourism Development and Investment Company (TDIC) is developing Saadiyat Island into a unique living and cultural experience that will integrate the best of the UAE’s past and present. Operating as the master developer, TDIC proposes to fully develop the 2,600 hectare island, located east of Abu Dhabi Island in the Emirate of Abu Dhabi. Worked as air and noise modeler for the EIA study carried out for the project. ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR UMM AL QUWAIN MARINA Member of the project team responsible for the Environmental Impact Assessment study for a major EMAAR development. The main tasks handled were air and noise modeling and impact assessment. ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR WHITE BAY DEVELOPMENT Consultant for the EIA project team for a mixed-use community development in Umm Al Quwain. The study involved air/noise impact modeling, impacts assessment & mitigation measures. ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR DUBAI PEARL DEVELOPMENT Air & Noise modeling studies for the proposed development as part of Environmental Impact Assessment (EIA) for the Dubai Pearl Development.
  • 10. Page 10 of 13 HAYTHAM AHMED SITE ASSESSMENT OF MISURATA FREE ZONE, LIBYA Site Assessment Study for Misurata Free Zone in Libya as part of the development carried out by Jafza International, a member of EZ World, the global arm of Dubai’s prominent Jebel Ali Free Zone. ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR PORT RASHID DEVELOPMENT Provide modeling and advisory support for air and noise aspects associated with an EIA project for the development of Port Rashid. The work involved air and noise modeling assessment of possible impacts of proposed development. ROADS & TRANSPORT ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR DUBAI METRO PROJECT Provide modeling and advisory support for air, air borne noise and vibration aspects associated with an EIA project for construction phase of Dubai Metro. The work involved air, noise and vibration characterization and modeling assessment of possible impacts of proposed development. ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR THE RTA BUS DEPOT Air & Noise modeling for a new bus depot in Dubai. The modeling study was been carried out as part of Environmental Impact Assessment (EIA). ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR AL AIN TO SAIH AL SIDIRA ROAD The Department of Transport (DoT) Abu Dhabi is currently implementing the Al Ain – Saih Al Sidira Road Project. The Project involves the construction of new road sections as well as widening of existing road (E16) between Saih Al Sidira and Al Ain. Worked as air & noise modeler for EIA study. CONSTRUCTION EXSYM CONSTRUCTION MANAGEMENT PLAN (CEMP) Responsible for evaluating the current health and safety plan of the client, identifying construction related impacts, ecological and socio-economic sensitivity mapping and formulating administrative and engineering measures/procedures to abate if not eliminate the adverse construction related impacts. The CEMP was prepared following best international practice on CEMP consistent with the environment agency’s (EAD) guidelines for similar projects. ADVANCED MILITARY MAINTENANCE REPAIR AND OVERHAUL CENTRE (AMMROC) ENABLING WORK PROJECT - CONSTRUCTION MANAGEMENT PLAN (CEMP) Mubadala Development Company (Mubadala) is undertaking the enabling works of Advanced Military Maintenance Repair and Overhaul Centre (AMMROC) in Al Ain. The project involves the setting up of temporary office and welfare facilities, development of temporary site access and haul roads, erection of site perimeter hoarding, transplanting of existing Ghaf trees to another location, diversion of 11 kV power cable and diversion of irrigation network. Responsible for the preparation of the CEMP as per EAD guidelines. INDUSTRIAL ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR AL NABOODA AUTOMOBILES Environmental Impact Assessment and mitigation measures for the development of services,
  • 11. Page 11 of 13 HAYTHAM AHMED distribution and warehousing center in the transport equipment zone, Dubai Industrial City. ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR AL AIN CEMENT FACTORY AND CONCRETE BLOCK FACTORY - ARKAN Arkan Building Materials Company (Arkan) intends to build Al Ain Cement Factory and Concrete Block Factory. The two factories will be located, adjacent to each other in Arkan Industrial Park in Al Ain City. Worked as air and noise modeler for the project activities as part of the EIA study. ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR SIGMA FACTORY FOR STEEL PRODUCTS - DUBAI INDUSTRIAL CITY Sigma Factory for Steel Products is one of the companies of IKK Group and plans to establish a metal fabrication facility in Dubai Industrial City (DIC). SFSP is a manufacturer of different steel construction products like expanded metals; cladding fixations; cable trays, cable trunking, cable ladders, cable supports; dry wall ceiling accessories, lintels and block work accessories like reinforcing mats; garbage and linen chutes; and strut channels. Worked as PM/lead consultant for the project, EIA involving impacts assessment, mitigation measures, and development of outline environmental management & monitoring plans. OCCUPATIONAL HEALTH METITO NOISE SURVEY Occupational exposure noise survey for 18 Blowers operated by Metito Company. The scope of work involved undertaking the occupational exposure noise survey in 3 waste water treatment plants operated by the company. GOLTENS OHRA STUDY The project included OHRA study for Goltens facility at Al Jadaf in Dubai. Goltens provides all the traditional services related to ship repairing and maintenance and also offers specialized services like repairing governors, in situ machinery, field system repair, turbo chargers, much of the mechanical work associated with slow speed and high speed diesel engines, electrical and mechanical work of a ship and oil rigs. OCCUPATIONAL HEALTH RISK ASSESSMENT OF GAS PRODUCTION & ASSOCIATED FACILITIES - ADGAS A detailed Occupational health Risk Assessment of the ADGAS facilities was carried out between February and November 2008. The assessment encompassed all the facilities housed on Das Island, Mina Port, and the Abu Dhabi Headquarters. Worked as team member of the assessment team. SEVERAL OHRA AS PART OF THE HSEIA STUDIES CARRIED OUT FOR OIL AND GAS PROJECTS. Worked as OHRA section author for many HSEIA studies carried out for Oil and Gas projects. MAJOR EXPERIENCE IN EGYPT  Siting study, Design and operation of the National Air Quality Monitoring Network, Ministry of Environment.  Evaluate and determine air pollution emissions configurations for industrial facilities using
  • 12. Page 12 of 13 HAYTHAM AHMED Air pollution models.  Long experience with USEPA approved ISC & Aermod Air pollution dispersion models.  Supervise and operate Air Pollution Monitoring Databases (EMC Sys. Man and AQ Mon.)  Prepare the Environmental Quality data on GIS based systems (Arc view 3.2).  Undertake environmental evaluation for ENI Petroleum Company.  Prepare Meteorological data for the Air pollution models.  Process monitoring data and carry out the final QA/QC on the selected indicators.  Undertake Field Measurements for Point source emissions.  Undertake Ambient Air Measurements using thermo Environment analyzers.  Undertake Particulate matter measurements using High volume samplers.  Participate in the preparation and implementation of the national program for Environmental Monitoring and report the data provided thereby.  Compile and publish periodic reports on the major environmental indicators.  Prepare studies on the environmental status.  Prepare Reports on the Environmental Quality in Egypt.  Participate in the preparation of an integrated national plan for the administration of Early Warning System of the Air Pollution episodes.  Gather national and international information on the environmental situation and the changes affecting it on a periodical basis.  Prepare an environmental contingency plan and coordinate with the competent bodies regarding preparation of programs to face environmental disasters.  Undertake field audit on the Air Quality Monitoring stations. SELECTED PROJECT EXPERIENCE IN EGYPT  Participate in the EIA study of Cairo international airport-new terminal done under the ministry of environment.  Prepare the EIA study of Borg El Arab airport in Alexandria.  Prepare the EIA study of Al Qa’a power plant in Sanaa, Yemen.  Prepare the EIA study of Hurghada international airport in Hurghada.  Prepare EIA study for LAB Petrochemical plant in el Max area (Alexandria).  Design and undertake a survey for Air Pollution around E.D.F Power Plant of Suez.  Design and undertake a survey for Air Pollution around E.D.F Power Plant of Port Said.  Undertake field measurements for Particulate matter less than 10 micron in Geopetrol Company (Petroleum facility) in Ras Ghareb area as part of EIA Study. PAPERS PUBLISHED “Air Quality in Egypt – As seen from the EEAA/EIMP” Programme presented in the second international Conference for Environmental Management and Technologies Egypt 99”. “Study for Air Pollutants during episodes” presented in the international conference for Environmental Hazard Mitigation, Cairo University Egypt 2000” “Air Pollution in Egypt” presented in the 12th World Clean Air & Environment Congress, Seoul, Korea”.
  • 13. Page 13 of 13 HAYTHAM AHMED “Annual Report on the Air Quality in Egypt during 2000” presented under Egyptian Environmental Affairs Agency”. “State of Air Environment in Egypt during the year of 2002” presented under the international conference of Environment, Ain Shams Univeristy2003”. “Air Quality Monitoring Sites in Egypt” (Sivertsen B, Ahmed H. (2003) EIMP, Kjeller, (Nilu OR14/2003)”. “Development of Air Pollution strategy for Egypt” presented in the national conference on Environment, National Research Institute, Egypt 2004. “The Role of Egyptian Environmental Affairs Agency to reduce the air pollution in Shoubra El Kheima area” Presented in the First chemical and environmental engineering conference in The Technical Military Academy, 2004. Participate in the preparation of “State of Environment in Egypt” during the year of 2004 published under the agency. “Monthly Reports” on the Environmental Quality in Egypt since March 1999”.