ARMANDO ILAGAN
Position Desired: Occupational Health, Safety and Environment Supervisor.
Professional Summary:
A project management Health, Safety & Environment Professional with a solid track of more than ten
years (10) experience in the field of safety in Construction, Pre-Commissioning, Commissioning, Start-up
and Operation and Turn-around shutdowns in various Oil and Gas Plants, such as LNG Plant, Gas Plant,
Petrochemicals, Power Plant, and Desalination Plant, and has been a valuable asset from medium to large
scale of Oil and Gas Projects and Development, has worked for EPC and Subcontractors side for Daelim
Saudi Arabia, Ssangyong Engineering, Hyundai Engineering, Jalkeh Engineering, Woolim Engineering,
and Descon Engineering Ltd.
With expertise in project safety management, hse management systems, environmental management, risk
assessment, job hazard analysis, auditing, accident/incident investigations.
Familiar with the Onshore Offshore Oil & Gas Process in Gas Gathering, Gas Liquefaction, Oil Separation
and Water Recovery and also familiar in technical Risk Management techniques such as: Hazard
Identification (HAZID), Hazard Operability Studies (HAZOP), Safety Integrity Level (SIL), and Fire
Safety Management.
Career Qualifications:
 International Offshore Onshore Oil & Gas HSE Certified (3 Phase: Gas Gathering and Gas
Liquefaction Plant, Oil Separation Plant and Water Recovery) IADC and IOSH Affiliates.
 Basic Offshore Safety Induction and Emergency Training (BOSIET) OPITO Certified.
 Certificate of Proficiency (Basic Training) under STCW Code issued by MARINA.
 OSHAS 18001:2007 Occupational Health and Safety Management System Internal Auditor
Certified.
 ISO 14001:2015 Environmental Management Systems Internal Auditor Certified.
 NEBOSH IGC Certified (NEBOSH International General Certificate).
 OSHA Construction Safety Certified.
 BOSH (Basic Occupational Safety and Health) Certified.
 Authorized Gas Tester Certified.
 Equipment Inspection Trained.
 Climate Change and Global Warming Awareness Certified.
 Hydrogen Sulfide (H2S) Familiarization and Awareness and Breathing Apparatus (SCBA)
Certified.
 Compressed Air Breathing Apparatus (CABA) Trained.
 Helicopter Safety and Escape (HUET) including Emergency Breathing System (EBS) Trained
under OPITO.
 Sea Survival and TEMPSC Trained under OPITO.
 Fire Fighting and Self – Rescue Trained under OPITO.
 Emergency Escape Breathing Device (Hood Type) Trained.
 Emergency Escape Breathing Device (Mask Type) Trained.
 Parat C Escape Breathing Device Trained.
 Hot tapping Operations Awareness Certified.
Area 3, San Roque Bauan, Batangas E- mail add: armandoilagan@yahoo.com
Philippines 4201 Mobile No. +639390304337/+639774574190
2
 Standard First Aid Trained given by Red Cross.
 Basic Life Support Trained given by Red Cross.
 Swimming / Water Safety Training Trained given by Red Cross.
 Elementary First Aid (IMO Model Course 1.13) Trained under STCW Code.
 Personal Survival Techniques (IMO Model Course 1.19) Trained under STCW Code.
 Fire Prevention & Fire Fighting (IMO Model Course 1.20) Trained under STCW Code.
 Personal Safety & Social Responsibility (IMO Model Course 1.21) Trained under STCW Code.
 Emergency Evacuation Drill Trained.
 Scaffolding Inspection Trained.
 Lock Out and Tag Out Trained.
 Permit to Work Trained.
 Confined Space Trained.
 Fire watch Trained.
 Work at Heights Trained.
 Man basket Load Test Trained.
 Hot work Requirements Trained.
Work Experiences:
HSE Supervisor May 2014 – December 2015
Daelim Saudi Arabia Co., Ltd.
SEP- Saudi Elastomers Project
SABIC- KEMYA Al Jubail Petrochemical Company
Jubail, Saudi Arabia
Construction of Saudi Elastomers Plant Project is worth $3.4 billion integrated with the existing Al-Jubail
Petrochemical Company (Kemya) Complex and is a 50/50 joint venture between Saudi Basic Industries
Corporation (SABIC) and Exxon Chemical Arabia Inc., an affiliate of ExxonMobil Chemical Company.
The Al-Jubail Kemya Saudi Elastomers facility will have the capacity to produce up to 400,000 t/y of
synthetic rubber including: Halobutyl, Styrene butadiene,102,000 t/y Polybutadiene, Ethylene propylene
diene monomer (EPDM) rubbers, Thermoplastic specialty polymers, 50,000 t/y Carbon black.
Duties and Responsibilities:
 Ensure the effective implementation of Health, Safety & Environment (HSE) management system and
maintain its high level in order to meet the requirements of the client.
 Interface with the client HSE personnel, Engineers, Construction supervisors, Managing Contractor
and Sub-contractors in the field on a regular basis.
 Participate with the client and managing contractor on scheduled on Occupational Health and Safety
management system (OHSAS 18001) and Environmental management system (ISO 14001) audits.
 Work with the management contractor on programs to improve the construction contractor’s
practices with respect to HSE.
 Assist in the investigation of all accidents, incidents, including near misses, and maintain a log of
these investigations and ensure reports reported as per communication protocol.
 Plan and execute field drills in conjunction with the client HSE and managing contractor to ensure
construction personnel are familiar with the emergency procedures as ERT Team Leader.
3
 Participate in HSE meetings related to construction held with client and managing contractor.
 Prepare contractor monthly report on safety statistics, man hours and safety performance and submit
with the client.
 Assist in the preparation of risk assessment and reviewing method statement prior for the execution
of critical activity.
 Prepare daily observation ticket and data wise analysis
Senior HSE Supervisor / Equipment Inspector January 2011 – March 2014
Daelim Saudi Arabia Co., Ltd.
LDPE- Low Density Poly Ethylene Project
SABIC- Saudi Kayan Petrochemical Complex Mega Projects Jubail, Saudi Arabia
Saudi Kayan is a subsidiary of Saudi Basic Industries Corporation which controls 35%, Kayan company
controls 20%, while 45% of the company is listed in the Saudi stock market (Tadawul). Construction of
Low Density Polyethylene Plant Project is worth $300 million integrated at Al Jubail Industrial City
Complex, Saudi Arabia. The plant will have the capacity to produce 300,000 tonnes per year (tpy) of low
density polyethylene, and will be part of Kayan's giant petrochemical complex.
Duties and Responsibilities:
 Provides HSE leadership and guidance to Managing contractors and sub-contractors related to safety
issues to implement and maintain its high level of Health, Safety & Environment (HSE) management
system in order to meet the requirements of the client.
 Monitor and give assignment to my subordinates and giving response to the problem undertaken
during construction operation.
 Interface with the client HSE personnel, Engineers, Construction supervisors, Managing contractor
and Sub-contractors in the field on a regular basis.
 Conduct weekly Q-Rounds walkthrough as a HSE Q- Captain as part of Plant Readiness Program
together with the construction management, PMT HSE and Plant Process Representative.
 Lead and coordinate the site emergency response team and fire prevention/firefighting team, and
emergency drill mock activities and ensure construction personnel are aware and familiar with the
emergency procedures.
 Participate in all relevant HSE meetings related to construction held the Client and Managing
contractor and prepare the minutes of meeting (MOM).
 Oversee and support of all construction contractor programs related to HSE; training of personnel,
safety induction, toolbox meeting and safety programs.
 Carry-out safety walkthrough on site to see that safe methods of working are in operation and that all
regulations are being observed and followed.
 Assist in the investigation of all accidents, incidents including near misses and maintain a log of these
investigations and ensure report is reported as per communication protocol.
 Prepare contractor monthly report on safety statistics, man hours and safety performance and submit
to the client.
 Assist in the preparation of risk assessment and reviewing method statement prior for the execution
of critical activity.
4
 Inspect the company and sub-contractors construction equipments (Heavy equipment, Mobile
equipment (light equipment), and General line equipment) as the assigned equipment inspector of
the project.
HSE Supervisor / Equipment Inspector March 2010 – January 2011
Daelim Saudi Arabia Co., Ltd.
HDPE- High Density Poly Ethylene Project
SABIC- Saudi Kayan Petrochemical Complex Mega Projects
Jubail, Saudi Arabia
Saudi Kayan has a capital of 15 Billion Saudi Riyals and it is an affiliate of Saudi Basic Industries Corporation
(SABIC). Construction of HighDensity Poly Ethylene Plant Project was awarded to Daelim but originally awarded
to a Chinese contractor as per request of Saudi Kayan and explained that Daelim couldmeet its demands regarding
construction deadlines and technical features and Daelim obtainedthe project as a special appointment contract. The
plant will have the capacity to produce annual capacity of 400,000 tons of High Density Poly Ethylene. The Saudi
Kayan petrochemical complex is one of the largest in the worldand is locatedin the Jubail Industrial City.
Duties and Responsibilities:
 Ensure effective implementation of the project Health, Safety & Environment (HSE) management
system in order to meet the requirements of the client and maintain reputations of the managing
contractor.
 Interface with the client HSE personnel, Engineers, and Construction Supervisors and Managing
Contractor and Sub – contractors in the field on a regular basis to ensure that the construction operation is
performing as per HSE requirements to anticipate and avoid problems.
 Ensure safety supervision and HSE coordination with sub-contractors on the construction area on a
daily basis with significant site presence and adequate reporting (relevant safety observations shared
with sub-contractors and follow-up).
 Participate and coordinate sub-contractors in Occupational Health and Safety management system
(OHSAS 18001) and Environmental management system (ISO 14001) audits to ensure relevant
personnel, functions and assets are aware of planned audits.
 Attend schedule HSE meetings with subcontractors to discuss the issues related to Health, Safety and
Environment.
 Plan and execute field drills in conjunction with the client HSE and managing contractor to ensure
construction personnel are familiar with the emergency procedures as ERT Team Leader.
 Ensure managing contractor in environmental compliance as specifiedby the local rules specifically in waste
management.
 Assist in the investigation of all accidents, incidents, including near misses and maintains a log of these
investigation and ensure report is reportedas per communication protocol.
 Prepare contractor monthly report on Safety Statistics, Man hours and Safety performance and submit to the
client.
 Assist in the preparation of risk assessment and reviewing methodstatement prior for the execution of the
critical activity.
 Inspect the company and sub-contractors construction equipments (Heavy equipment, Mobile
equipment (light equipment), and General line equipment) as the assigned equipment inspector of
the project.
 Prepare of daily observation ticket anddata wise analysis.
 Dissemination of discrepancy observation by the client, including NCR to all Subcontractors.
 Conduct gas monitoring andcheck atmosphericlevel in hazardous area, as the assignedAuthorizedGas Tester.
Safety Supervisor September 2008 – October 2009
SsangYong Eng’g. Const. Co., Ltd.
5
Marafiq IWPP Power Plant & Desalination Project
Jubail Water and Power Company
Jubail, Saudi Arabia
Construction of Marafiq IWPP Power Plant & Desalination Plant Project is a joint venture between Marafiq, Saudi
Electricity Company (SEC), the PublicInvestment Fund of the Ministry of Finance, and the international Suez
Consortium comprising Suez Energy International of Belgium, Gulf Investment Corporation of Kuwait and ACWA
Power Projects of Saudi Arabia. The primary fuel is natural gas with high-speeddiesel as back-up fuel. The plant is a
dual-purpose facility, with the power plant based on combined-cycle generation process, in which excess heat from
the gas turbine generators is fed into heat recovery steam generators, or HRSGs, to make steam to generate additional
electricity via the steam turbines. This enhances the efficiency of electricity generation to over 60 percent, as opposed
to the usual 50 percent in conventional plants. The entire power output of the plant is supplied to SEC. JWAP,
through Tawreed, supplies 37.5 percent of the daily water production (300,000 cubic meters) to Marafiq for
distribution in Jubail Industrial City. The Saline Water Conversion Corporation (SWCC) takes up the other 62.5
percent (500,000 cubic meters) to supply other parts of the Eastern Province. With its 2,745 megawatt power capacity
and desalination output of 800,000 cubic meters per day, the IWPP in Jubail is the world’s largest integratedwater
and power facility.
Duties and Responsibilities
 Ensure all respect to Health, Safety and Environment during construction of the project in order to
meet the requirements of the client and to maintain the reputation of managing contractor.
 Supporting management in solving all problems relatedto Health, Safety and Environment and in project safety
plans.
 Promote safety awareness to the workforce through HSE meetings and trainings and orientation program to
newly joined employees.
 Carry out safety walkthrough to ensure that the construction activities are carried out in a safe manner and in
adherence to the client and company safety policy.
 Participate in HSE meetings related to construction held the Client and Managing contractor.
 Investigate accidents and near miss incidents and report to management.
 Assist in the preparation of risk assessment and reviewing method statement prior for the execution
of critical activity.
 Verify and re- inspecting of third party certificates of lifting appliances, tools, and tackles, includes construction
tools and equipment.
 Monitor all critical lifting, deepexcavation, heavy structural, piping and scaffolding erection, and heavy vehicle
movement, painting activities, and concreting activities.
 Response the correspondence of the client approved by the Project manager and administer of all related HSE
documents.
 Prepare contractor monthly report on Safety Statistics, Man hours and Safety performance and submit to the
client.
 Disseminate the discrepancy observation including NCR issued by the client to construction management and
follow-up the corrections.
Safety Supervisor September 2006 – April 2008
Hyundai Engineering & Const. Co., Ltd. / Flour Kuwait
Kuwait New Ethane Recovery Plant Project
Kuwait National Petroleum Company :
KNPC- Mina Al Ahmadi Refinery – Kuwait
Construction of Kuwait New Ethane Recovery Plant (Unit 35) Project is integratedthe existing KNPC Mina Al
Ahmadi Refinery installedalong with the necessary modifications at Shuaiba Refinery to establish a 1,140cfd capacity
ethane to supply Equate Olefin-11 Plant and to meet both current and future requirements. The project budget is KD
140 million andawarded to Hyundai Engineering Construction Co., Ltd. under the supervision of Flour Ltd.
6
Duties and Responsibilities:
 Ensure complete application of HSE Management System in construction, pre-commissioning, commissioning,
start-up, turn-around shut down in Green fieldand Brown fieldarea.
 Support the management in preparing project safety plans, carrying out of formal training in safety, and toolbox
talks etc.,
 Ensure brown fieldand green fieldactivities are carried out in a safe manner and in adherence to the client and
company safety policy.
 Coordinate with the client HSE personnel and process plant operations which regard to safe execution of
shutdowns activities.
 Organize weekly management walkthrough to ensure the construction operation are followed the project HSE
requirements.
 Participate in HSE meetings related to construction held with the client, and managing contractor; and
attend with sub-contractors kick-off meeting to ensure that sub-contractors are informedand aware of all Health,
Safety and Environmental issues.
 Coordinate with process plant operation which regards in their emergency alarm and drill schedule and
disseminate information to all level of employees on the project site.
 Assist in the investigation of all accidents, incidents, including near misses and maintain a log of these
investigations andensure report is reportedas per communication protocol.
 Coordinate with the subcontractors HSE personnel and ensures that Permit to Work System are strictly followed
and enforced.
 Conduct job safety analysis and risk assessment before commencement of critical activity in construction, pre-
commissioning, commissioning, and turn-around shut downs.
 Prepare project reporting weekly andmonthly report >manpower statistics, man hours, and safety performance
and submit to the client.
 Verify and re- inspecting of thirdparty certificates of lifting appliances, tools, and tackles, include construction
tools and equipment.
 Monitor critical lifting, deepexcavation, heavy structural, piping and scaffolding erection, and heavy vehicle
movement, painting activities, andconcreting activities.
 Disseminate the discrepancy observation including NCR issuedby the client to all subcontractors and follow-up
the corrections.
 Maintain and records emergency safety equipment and firefighting equipment.
 Conduct gas monitoring in hazardous area including enclosedspaces before the start of activities.
Safety Supervisor July 2005 – March 2006
Jalkeh Eng’g.Co. / Daelim Industrial Company Ltd.
9th Olefins Ethyl Benzene Plant Project
Pars Petrochemical Company
Assaluyeh Busher, Province Iran
Construction of Ethyl Benzene Plant of the 9th Olefins Project (Arya Sasol Petrochemical Complex) is integrated in
Pars Petrochemical Complex is under the supervision of Development Department of the National Petrochemical
Company and EPCC (engineering, procurement, construction, commissioning are Chegalesh andDaelim companies
which we are under them. The plant is expected to start operating with annual production capacity of 645,000 tons
petrochemical andwill be fed by 175,000 tons ethylene from ninth olefin plant of Array Sasol Complex, 40,000 tons of
benzene from the third aromaticplant of Bou Ali Sina Petrochemical Complex, and430,000 tons benzene from the
fourth aromaticplant of Borzouyeh Petrochemical Complex. The plants product will be used as feedstock by
monomer styrene plant of Arya Sasol Petrochemical Complex. When the plant is finished, Irans petrochemical
production will rise by 400,000 tons ethylene, 90,000 tons carbon 3 cuts, 300,000 ton medium and high density
polyethylene, as well as 300,000 tons low density polyethylene per year. The products will be used to make home
appliances, film, utensils, industrial parts, pipes, bags, and cable covering.
Duties and Responsibilities:
 Ensure the effective implementation of Health, Safety and Environment System of the Client and
Management procedures.
7
 Support the Management in solving all problems related to Health, Safety and Environment.
 Organize and attending safety committee meetings with the client and to emphasize the importance of safety at
site.
 Promote awareness of injury prevention and damage control to all levels of employees involved in the project.
 Conduct risk assessment and risk mitigation measures on site before commencement of any critical activity in
construction, pre-commissioning, and commissioning.
 Supervise and maintain records analysis of information on all accidents, incidents, and near misses to avoid
recurrences.
 Conduct daily inspection at site including site offices to verify the compliance to work permit procedures and
requirements.
 Conduct daily tool box meetings and assist in conducting safety orientation to all new personnel mobilized at
site.
 Monitor working environment frequently and inspect unsafe activities and hazardous conditions and advice
corrective actions.
 Conduct inspections on all scaffolding and temporary platforms to verify the condition and compliance to
scaffolding procedure and requirements.
 Set an example to fellow employee by wearing required PPE at all times.
Safety Supervisor April 2004 – April 2005
Woolim Plant Engineering Const. Co.,Ltd. / Hyundai Eng’g. Const.Co.,Ltd.
NC41 Gas Plant Project, Western Libya
AGIPP GAS LIBYA BRANCH
Mellitah, Libya
Construction of NC41 Gas Plant Project is part of Millitah Complex locatedon the Mediterranean coast and treats
the raw gas and un-stabilizedcondensate receivedfrom the Wafa desert and Sabratha Platform, 110 km offshore
Tripoli, via 36” and 10” subsea pipelines. The process units include three trains gas sweetening, gas dehydration,
sulfur recovery, stabilization, LPG fractioning, steam turbine power generation, solid/liquidsulfur storage and
loading, three Gas trains of capacity 695 million cf/d, two NGL trains of capacity 31,000b/d and Sulfur handling of
450 tons capacity. The treatedgas is sent to green stream compression station andthen to Italy. The contract was
awarded to ABB Lummus, Snamprogetti, HDEC Consortium which we are under them.
Duties and Responsibilities:
 Ensure the effective implementation of Health, Safety and Environment of the Client and
Management procedures.
 Support the management in solving all problems related to Health, Safety and Environment.
 Participate in HSE meetings related to construction held the Client and Managing contractor.
 Monitor of all work site activities in order to ensure they met the safety procedures and requirements and to
keep the site safe, healthy and in good conditions. .
 Conduct daily tool box meetings and assist in conducting safety orientation to all new personnel mobilized at
site.
 Participate in weekly management walkthrough to ensure construction followed the project requirements.
 Assist in the investigation of all accidents, incidents, and near miss and maintain a log of these investigation
reports and ensure report is reportedas per communication protocol.
 Prepare contractor monthly report on Safety Statistics, Man hours and Safety performance and submit to the
client.
 Verify and re-inspecting third party inspection certificates of lifting equipment, tools, and tackles, and other
equipments that require third party certificates
 Conduct inspections of all scaffolding and temporary platforms to verify the condition and compliance to
scaffolding procedure and requirements.
Safety Supervisor February 2003 – December 2003
Descon Engineering Limited / Chiyoda Technip Joint Venture
Qatargas 1 LNG Debottlenecking Project #1095
Qatar LiquefiedGas Co. Ltd.
Ras Laffan Industrial City, Qatar
8
Qatargas is the world's largest liquefiednatural gas (LNG) company. The Qatargas offshore production, separation
and treatment facilities on the North Fieldare locatedabout 80 kilometers North-East of Qatar’s mainland. Twenty
production wells have been drilledand completedto supply 1,600 million standardcubic feet (45 million cubic
meters) of raw natural gas per day from the field’s reservoir, underneath the seabed. The processed gas is transferred
to shore with the associatedcondensate via a single 32-inch sub-sea pipeline, where it becomes the feedstock for the
onshore LNG plant. The Onshore LNG plant occupies a site within Ras Laffan Industrial City on a plot of land 3.7
square kilometers in area. The shareholders of the Qatargas1are Qatar Petroleum 65%, ExxonMobil 10%, Total 10%,
Mitsui 7.5% and Marubeni 7.5%. It owns three LNG trains 300 meters long each with original nameplate capacity of
two mtpa each. When the Debottlenecking Project completedwill be result with a total combined capacity of 10
million tonnes (mtpa) per annum of LNG.
Duties and Responsibilities:
 Ensure the effective implementation of Health, Safety and Environment Management systems of the
Client and Management procedures.
 Supporting Management in solving all problems related to Health, Safety and Environment.
 Ensure safe environmental working conditions for all employees to prevent accident/incidents to maintain
project safety target Zero accident and Zero Incident and Injury free.
 Coordinate and participate with process plant operation which regards in their emergency alarm and drill
schedule and disseminate information to all level of employees on the project site.
 Ensure all construction and turn-around shutdowns activities are performed in accordance with HSE
procedures.
 Organize safety trainings, running safety campaigns and conducting competitions, displaying safety slogans,
signs, and posters.
 Organize full accident/incident and near miss investigation and finalized with the identification of
corrective actions to prevent reoccurrence.
 Ensure that daily work permit system are strictly followed and properly maintained.
 Maintain and records emergency safety equipment and firefighting equipment.
 Conduct gas monitoring in hazardous area including enclosedspaces before the start of activities.
 Set an example to fellow employee by wearing required PPE at all times.
Educational Attainment:
Bachelor of Industrial Technology 1998 – 2002
Mechanical Engineering Technology
Batangas State University (Formerly Pablo Borbon Memorial
Institute of Technology) Batangas City
Bauan High School 1994 – 1998
Bauan, Batangas
San Roque, Elementary School 1987 – 1994
San Roque, Bauan, Batangas
Organizations / Affiliations:
Associate Member of Philippine Association of Health, Safety & Environment Engineers Working
For Oil & Gas(PAHSEEWOG).
Manila, Philippines
Associate Member of Philippine Society of Safety Engineers Middle East Region(PSSE-MER).
Dhahran, Kingdom of Saudi Arabia
9
Personal Details:
Birth Date : December 13, 1980
Age : 35 years old
Civil Status : Married
Nationality : Filipino
Passport Number : EC0935811
Seafarer’s Identification and Record BookNumber : C0779614
Philippine Driving License Number : D01 – 14 – 003398
Saudi Driving License Number : 04003501893498
Character References
1.0 Mr. David East
GE EHS Manager
Marafiq IWPP Power Plant & Dessalination Project
2.0 Mr. Nicardo Lacson
Sidem HSE Lead
Marafiq Dessalination Project
3.0 Mr. Edwin Walker
Safety Manager
Flour – Kuwait New Ethane Recovery Project
4.0 Mr. D. S. Lee
Safety Manager
Hyundai – Kuwait New Ethane Recovery Project
5.0 Mr. Larry Munar
Safety Engineer
Hyundai – NC41 Gas Plant Project Libyan Branch
6.0 Mr. Dennies Barrie
Safety Manager - Chiyoda Technip Joint Venture – Qatargas Debottlenecking Project
7.0 Mr. Joselito M. Abrillo
Safety Manager
HDPE - High Density Poly Ethylene Project- SABIC-Saudi Kayan Petrochemical Complex Mega Projects
8.0 Mr Muhammad Imran
Safety Manager
LDPE - Low Density Poly Ethylene Project - SABIC- Saudi Kayan Petrochemical Complex Mega Projects.
9.0 Mr. Haitham Al –Muzaiyek
Safety Manager
SEP – Saudi Elastomer Project- SABIC- KEMYA Al Jubail Petrochemical Company
I hereby certify that all information are true and correct to the best of my knowledge.
Armando A. Ilagan
Applicant Signature

More Related Content

What's hot (18)

CV JMCNAB
CV JMCNABCV JMCNAB
CV JMCNAB
 
Majid CV
Majid CVMajid CV
Majid CV
 
Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
 
Update CV 01.08.15
Update CV 01.08.15Update CV 01.08.15
Update CV 01.08.15
 
resume azhari bin rahim (1) (2)
resume azhari bin rahim (1) (2)resume azhari bin rahim (1) (2)
resume azhari bin rahim (1) (2)
 
LATEST SHORT CV 2015
LATEST SHORT CV 2015LATEST SHORT CV 2015
LATEST SHORT CV 2015
 
CV SHAHROL AMIN
CV SHAHROL AMINCV SHAHROL AMIN
CV SHAHROL AMIN
 
Introduction
IntroductionIntroduction
Introduction
 
CV_Aswan SAFETY MANAGER
CV_Aswan SAFETY MANAGERCV_Aswan SAFETY MANAGER
CV_Aswan SAFETY MANAGER
 
Pgis Pq 11 01 10
Pgis Pq 11 01 10Pgis Pq 11 01 10
Pgis Pq 11 01 10
 
engineering-africa
engineering-africaengineering-africa
engineering-africa
 
HSE construction environment management plan
HSE construction environment management planHSE construction environment management plan
HSE construction environment management plan
 
Jayakumar-15032015
Jayakumar-15032015Jayakumar-15032015
Jayakumar-15032015
 
Compro PT Prospera Brillar Indonesia
Compro PT Prospera Brillar IndonesiaCompro PT Prospera Brillar Indonesia
Compro PT Prospera Brillar Indonesia
 
CV
CV CV
CV
 
Ahmad Faiz_Resume 2016
Ahmad Faiz_Resume 2016Ahmad Faiz_Resume 2016
Ahmad Faiz_Resume 2016
 
Cv 2021 parbhakar-hse officer-supervisor 2021
Cv 2021 parbhakar-hse officer-supervisor 2021Cv 2021 parbhakar-hse officer-supervisor 2021
Cv 2021 parbhakar-hse officer-supervisor 2021
 

Similar to Resume of ARMANDO ILAGAN (20)

my cv
my cvmy cv
my cv
 
DEL HSE C.V updated
DEL HSE C.V  updatedDEL HSE C.V  updated
DEL HSE C.V updated
 
RESUME
RESUMERESUME
RESUME
 
KVRcv2015
KVRcv2015KVRcv2015
KVRcv2015
 
Cv shahid hussain_hse manager
Cv shahid hussain_hse managerCv shahid hussain_hse manager
Cv shahid hussain_hse manager
 
Resume Tahir
Resume TahirResume Tahir
Resume Tahir
 
CV Vikram HSE Updatedt Nov 2015
CV Vikram HSE Updatedt Nov 2015CV Vikram HSE Updatedt Nov 2015
CV Vikram HSE Updatedt Nov 2015
 
NABIL_WAGDY_ELBAZ_HSE_2015_doc
NABIL_WAGDY_ELBAZ_HSE_2015_docNABIL_WAGDY_ELBAZ_HSE_2015_doc
NABIL_WAGDY_ELBAZ_HSE_2015_doc
 
Resume-sabu
Resume-sabuResume-sabu
Resume-sabu
 
mahmood_shareef_2523 Updated CV Engineer
mahmood_shareef_2523 Updated CV Engineermahmood_shareef_2523 Updated CV Engineer
mahmood_shareef_2523 Updated CV Engineer
 
HSE ABDUL GULREZ AKHTAR CV
HSE ABDUL GULREZ AKHTAR CV HSE ABDUL GULREZ AKHTAR CV
HSE ABDUL GULREZ AKHTAR CV
 
Hse nitish
Hse nitishHse nitish
Hse nitish
 
mahmood_shareef_2523 Updated CV Engineer
mahmood_shareef_2523 Updated CV Engineermahmood_shareef_2523 Updated CV Engineer
mahmood_shareef_2523 Updated CV Engineer
 
RANJISH S CV
RANJISH S CVRANJISH S CV
RANJISH S CV
 
Garcia ramiro 2016
Garcia ramiro 2016Garcia ramiro 2016
Garcia ramiro 2016
 
essa cv 2016 updated sept
essa cv 2016 updated septessa cv 2016 updated sept
essa cv 2016 updated sept
 
Khaled CV
Khaled CVKhaled CV
Khaled CV
 
Veeraragavan-CV
Veeraragavan-CVVeeraragavan-CV
Veeraragavan-CV
 
CV-Safety Engineer - Ahmed Kaleem Shaik
CV-Safety Engineer - Ahmed Kaleem ShaikCV-Safety Engineer - Ahmed Kaleem Shaik
CV-Safety Engineer - Ahmed Kaleem Shaik
 
Updated cv of lead hse m.shahar
Updated cv of lead hse m.shahar Updated cv of lead hse m.shahar
Updated cv of lead hse m.shahar
 

Resume of ARMANDO ILAGAN

  • 1. 1 ARMANDO ILAGAN Position Desired: Occupational Health, Safety and Environment Supervisor. Professional Summary: A project management Health, Safety & Environment Professional with a solid track of more than ten years (10) experience in the field of safety in Construction, Pre-Commissioning, Commissioning, Start-up and Operation and Turn-around shutdowns in various Oil and Gas Plants, such as LNG Plant, Gas Plant, Petrochemicals, Power Plant, and Desalination Plant, and has been a valuable asset from medium to large scale of Oil and Gas Projects and Development, has worked for EPC and Subcontractors side for Daelim Saudi Arabia, Ssangyong Engineering, Hyundai Engineering, Jalkeh Engineering, Woolim Engineering, and Descon Engineering Ltd. With expertise in project safety management, hse management systems, environmental management, risk assessment, job hazard analysis, auditing, accident/incident investigations. Familiar with the Onshore Offshore Oil & Gas Process in Gas Gathering, Gas Liquefaction, Oil Separation and Water Recovery and also familiar in technical Risk Management techniques such as: Hazard Identification (HAZID), Hazard Operability Studies (HAZOP), Safety Integrity Level (SIL), and Fire Safety Management. Career Qualifications:  International Offshore Onshore Oil & Gas HSE Certified (3 Phase: Gas Gathering and Gas Liquefaction Plant, Oil Separation Plant and Water Recovery) IADC and IOSH Affiliates.  Basic Offshore Safety Induction and Emergency Training (BOSIET) OPITO Certified.  Certificate of Proficiency (Basic Training) under STCW Code issued by MARINA.  OSHAS 18001:2007 Occupational Health and Safety Management System Internal Auditor Certified.  ISO 14001:2015 Environmental Management Systems Internal Auditor Certified.  NEBOSH IGC Certified (NEBOSH International General Certificate).  OSHA Construction Safety Certified.  BOSH (Basic Occupational Safety and Health) Certified.  Authorized Gas Tester Certified.  Equipment Inspection Trained.  Climate Change and Global Warming Awareness Certified.  Hydrogen Sulfide (H2S) Familiarization and Awareness and Breathing Apparatus (SCBA) Certified.  Compressed Air Breathing Apparatus (CABA) Trained.  Helicopter Safety and Escape (HUET) including Emergency Breathing System (EBS) Trained under OPITO.  Sea Survival and TEMPSC Trained under OPITO.  Fire Fighting and Self – Rescue Trained under OPITO.  Emergency Escape Breathing Device (Hood Type) Trained.  Emergency Escape Breathing Device (Mask Type) Trained.  Parat C Escape Breathing Device Trained.  Hot tapping Operations Awareness Certified. Area 3, San Roque Bauan, Batangas E- mail add: armandoilagan@yahoo.com Philippines 4201 Mobile No. +639390304337/+639774574190
  • 2. 2  Standard First Aid Trained given by Red Cross.  Basic Life Support Trained given by Red Cross.  Swimming / Water Safety Training Trained given by Red Cross.  Elementary First Aid (IMO Model Course 1.13) Trained under STCW Code.  Personal Survival Techniques (IMO Model Course 1.19) Trained under STCW Code.  Fire Prevention & Fire Fighting (IMO Model Course 1.20) Trained under STCW Code.  Personal Safety & Social Responsibility (IMO Model Course 1.21) Trained under STCW Code.  Emergency Evacuation Drill Trained.  Scaffolding Inspection Trained.  Lock Out and Tag Out Trained.  Permit to Work Trained.  Confined Space Trained.  Fire watch Trained.  Work at Heights Trained.  Man basket Load Test Trained.  Hot work Requirements Trained. Work Experiences: HSE Supervisor May 2014 – December 2015 Daelim Saudi Arabia Co., Ltd. SEP- Saudi Elastomers Project SABIC- KEMYA Al Jubail Petrochemical Company Jubail, Saudi Arabia Construction of Saudi Elastomers Plant Project is worth $3.4 billion integrated with the existing Al-Jubail Petrochemical Company (Kemya) Complex and is a 50/50 joint venture between Saudi Basic Industries Corporation (SABIC) and Exxon Chemical Arabia Inc., an affiliate of ExxonMobil Chemical Company. The Al-Jubail Kemya Saudi Elastomers facility will have the capacity to produce up to 400,000 t/y of synthetic rubber including: Halobutyl, Styrene butadiene,102,000 t/y Polybutadiene, Ethylene propylene diene monomer (EPDM) rubbers, Thermoplastic specialty polymers, 50,000 t/y Carbon black. Duties and Responsibilities:  Ensure the effective implementation of Health, Safety & Environment (HSE) management system and maintain its high level in order to meet the requirements of the client.  Interface with the client HSE personnel, Engineers, Construction supervisors, Managing Contractor and Sub-contractors in the field on a regular basis.  Participate with the client and managing contractor on scheduled on Occupational Health and Safety management system (OHSAS 18001) and Environmental management system (ISO 14001) audits.  Work with the management contractor on programs to improve the construction contractor’s practices with respect to HSE.  Assist in the investigation of all accidents, incidents, including near misses, and maintain a log of these investigations and ensure reports reported as per communication protocol.  Plan and execute field drills in conjunction with the client HSE and managing contractor to ensure construction personnel are familiar with the emergency procedures as ERT Team Leader.
  • 3. 3  Participate in HSE meetings related to construction held with client and managing contractor.  Prepare contractor monthly report on safety statistics, man hours and safety performance and submit with the client.  Assist in the preparation of risk assessment and reviewing method statement prior for the execution of critical activity.  Prepare daily observation ticket and data wise analysis Senior HSE Supervisor / Equipment Inspector January 2011 – March 2014 Daelim Saudi Arabia Co., Ltd. LDPE- Low Density Poly Ethylene Project SABIC- Saudi Kayan Petrochemical Complex Mega Projects Jubail, Saudi Arabia Saudi Kayan is a subsidiary of Saudi Basic Industries Corporation which controls 35%, Kayan company controls 20%, while 45% of the company is listed in the Saudi stock market (Tadawul). Construction of Low Density Polyethylene Plant Project is worth $300 million integrated at Al Jubail Industrial City Complex, Saudi Arabia. The plant will have the capacity to produce 300,000 tonnes per year (tpy) of low density polyethylene, and will be part of Kayan's giant petrochemical complex. Duties and Responsibilities:  Provides HSE leadership and guidance to Managing contractors and sub-contractors related to safety issues to implement and maintain its high level of Health, Safety & Environment (HSE) management system in order to meet the requirements of the client.  Monitor and give assignment to my subordinates and giving response to the problem undertaken during construction operation.  Interface with the client HSE personnel, Engineers, Construction supervisors, Managing contractor and Sub-contractors in the field on a regular basis.  Conduct weekly Q-Rounds walkthrough as a HSE Q- Captain as part of Plant Readiness Program together with the construction management, PMT HSE and Plant Process Representative.  Lead and coordinate the site emergency response team and fire prevention/firefighting team, and emergency drill mock activities and ensure construction personnel are aware and familiar with the emergency procedures.  Participate in all relevant HSE meetings related to construction held the Client and Managing contractor and prepare the minutes of meeting (MOM).  Oversee and support of all construction contractor programs related to HSE; training of personnel, safety induction, toolbox meeting and safety programs.  Carry-out safety walkthrough on site to see that safe methods of working are in operation and that all regulations are being observed and followed.  Assist in the investigation of all accidents, incidents including near misses and maintain a log of these investigations and ensure report is reported as per communication protocol.  Prepare contractor monthly report on safety statistics, man hours and safety performance and submit to the client.  Assist in the preparation of risk assessment and reviewing method statement prior for the execution of critical activity.
  • 4. 4  Inspect the company and sub-contractors construction equipments (Heavy equipment, Mobile equipment (light equipment), and General line equipment) as the assigned equipment inspector of the project. HSE Supervisor / Equipment Inspector March 2010 – January 2011 Daelim Saudi Arabia Co., Ltd. HDPE- High Density Poly Ethylene Project SABIC- Saudi Kayan Petrochemical Complex Mega Projects Jubail, Saudi Arabia Saudi Kayan has a capital of 15 Billion Saudi Riyals and it is an affiliate of Saudi Basic Industries Corporation (SABIC). Construction of HighDensity Poly Ethylene Plant Project was awarded to Daelim but originally awarded to a Chinese contractor as per request of Saudi Kayan and explained that Daelim couldmeet its demands regarding construction deadlines and technical features and Daelim obtainedthe project as a special appointment contract. The plant will have the capacity to produce annual capacity of 400,000 tons of High Density Poly Ethylene. The Saudi Kayan petrochemical complex is one of the largest in the worldand is locatedin the Jubail Industrial City. Duties and Responsibilities:  Ensure effective implementation of the project Health, Safety & Environment (HSE) management system in order to meet the requirements of the client and maintain reputations of the managing contractor.  Interface with the client HSE personnel, Engineers, and Construction Supervisors and Managing Contractor and Sub – contractors in the field on a regular basis to ensure that the construction operation is performing as per HSE requirements to anticipate and avoid problems.  Ensure safety supervision and HSE coordination with sub-contractors on the construction area on a daily basis with significant site presence and adequate reporting (relevant safety observations shared with sub-contractors and follow-up).  Participate and coordinate sub-contractors in Occupational Health and Safety management system (OHSAS 18001) and Environmental management system (ISO 14001) audits to ensure relevant personnel, functions and assets are aware of planned audits.  Attend schedule HSE meetings with subcontractors to discuss the issues related to Health, Safety and Environment.  Plan and execute field drills in conjunction with the client HSE and managing contractor to ensure construction personnel are familiar with the emergency procedures as ERT Team Leader.  Ensure managing contractor in environmental compliance as specifiedby the local rules specifically in waste management.  Assist in the investigation of all accidents, incidents, including near misses and maintains a log of these investigation and ensure report is reportedas per communication protocol.  Prepare contractor monthly report on Safety Statistics, Man hours and Safety performance and submit to the client.  Assist in the preparation of risk assessment and reviewing methodstatement prior for the execution of the critical activity.  Inspect the company and sub-contractors construction equipments (Heavy equipment, Mobile equipment (light equipment), and General line equipment) as the assigned equipment inspector of the project.  Prepare of daily observation ticket anddata wise analysis.  Dissemination of discrepancy observation by the client, including NCR to all Subcontractors.  Conduct gas monitoring andcheck atmosphericlevel in hazardous area, as the assignedAuthorizedGas Tester. Safety Supervisor September 2008 – October 2009 SsangYong Eng’g. Const. Co., Ltd.
  • 5. 5 Marafiq IWPP Power Plant & Desalination Project Jubail Water and Power Company Jubail, Saudi Arabia Construction of Marafiq IWPP Power Plant & Desalination Plant Project is a joint venture between Marafiq, Saudi Electricity Company (SEC), the PublicInvestment Fund of the Ministry of Finance, and the international Suez Consortium comprising Suez Energy International of Belgium, Gulf Investment Corporation of Kuwait and ACWA Power Projects of Saudi Arabia. The primary fuel is natural gas with high-speeddiesel as back-up fuel. The plant is a dual-purpose facility, with the power plant based on combined-cycle generation process, in which excess heat from the gas turbine generators is fed into heat recovery steam generators, or HRSGs, to make steam to generate additional electricity via the steam turbines. This enhances the efficiency of electricity generation to over 60 percent, as opposed to the usual 50 percent in conventional plants. The entire power output of the plant is supplied to SEC. JWAP, through Tawreed, supplies 37.5 percent of the daily water production (300,000 cubic meters) to Marafiq for distribution in Jubail Industrial City. The Saline Water Conversion Corporation (SWCC) takes up the other 62.5 percent (500,000 cubic meters) to supply other parts of the Eastern Province. With its 2,745 megawatt power capacity and desalination output of 800,000 cubic meters per day, the IWPP in Jubail is the world’s largest integratedwater and power facility. Duties and Responsibilities  Ensure all respect to Health, Safety and Environment during construction of the project in order to meet the requirements of the client and to maintain the reputation of managing contractor.  Supporting management in solving all problems relatedto Health, Safety and Environment and in project safety plans.  Promote safety awareness to the workforce through HSE meetings and trainings and orientation program to newly joined employees.  Carry out safety walkthrough to ensure that the construction activities are carried out in a safe manner and in adherence to the client and company safety policy.  Participate in HSE meetings related to construction held the Client and Managing contractor.  Investigate accidents and near miss incidents and report to management.  Assist in the preparation of risk assessment and reviewing method statement prior for the execution of critical activity.  Verify and re- inspecting of third party certificates of lifting appliances, tools, and tackles, includes construction tools and equipment.  Monitor all critical lifting, deepexcavation, heavy structural, piping and scaffolding erection, and heavy vehicle movement, painting activities, and concreting activities.  Response the correspondence of the client approved by the Project manager and administer of all related HSE documents.  Prepare contractor monthly report on Safety Statistics, Man hours and Safety performance and submit to the client.  Disseminate the discrepancy observation including NCR issued by the client to construction management and follow-up the corrections. Safety Supervisor September 2006 – April 2008 Hyundai Engineering & Const. Co., Ltd. / Flour Kuwait Kuwait New Ethane Recovery Plant Project Kuwait National Petroleum Company : KNPC- Mina Al Ahmadi Refinery – Kuwait Construction of Kuwait New Ethane Recovery Plant (Unit 35) Project is integratedthe existing KNPC Mina Al Ahmadi Refinery installedalong with the necessary modifications at Shuaiba Refinery to establish a 1,140cfd capacity ethane to supply Equate Olefin-11 Plant and to meet both current and future requirements. The project budget is KD 140 million andawarded to Hyundai Engineering Construction Co., Ltd. under the supervision of Flour Ltd.
  • 6. 6 Duties and Responsibilities:  Ensure complete application of HSE Management System in construction, pre-commissioning, commissioning, start-up, turn-around shut down in Green fieldand Brown fieldarea.  Support the management in preparing project safety plans, carrying out of formal training in safety, and toolbox talks etc.,  Ensure brown fieldand green fieldactivities are carried out in a safe manner and in adherence to the client and company safety policy.  Coordinate with the client HSE personnel and process plant operations which regard to safe execution of shutdowns activities.  Organize weekly management walkthrough to ensure the construction operation are followed the project HSE requirements.  Participate in HSE meetings related to construction held with the client, and managing contractor; and attend with sub-contractors kick-off meeting to ensure that sub-contractors are informedand aware of all Health, Safety and Environmental issues.  Coordinate with process plant operation which regards in their emergency alarm and drill schedule and disseminate information to all level of employees on the project site.  Assist in the investigation of all accidents, incidents, including near misses and maintain a log of these investigations andensure report is reportedas per communication protocol.  Coordinate with the subcontractors HSE personnel and ensures that Permit to Work System are strictly followed and enforced.  Conduct job safety analysis and risk assessment before commencement of critical activity in construction, pre- commissioning, commissioning, and turn-around shut downs.  Prepare project reporting weekly andmonthly report >manpower statistics, man hours, and safety performance and submit to the client.  Verify and re- inspecting of thirdparty certificates of lifting appliances, tools, and tackles, include construction tools and equipment.  Monitor critical lifting, deepexcavation, heavy structural, piping and scaffolding erection, and heavy vehicle movement, painting activities, andconcreting activities.  Disseminate the discrepancy observation including NCR issuedby the client to all subcontractors and follow-up the corrections.  Maintain and records emergency safety equipment and firefighting equipment.  Conduct gas monitoring in hazardous area including enclosedspaces before the start of activities. Safety Supervisor July 2005 – March 2006 Jalkeh Eng’g.Co. / Daelim Industrial Company Ltd. 9th Olefins Ethyl Benzene Plant Project Pars Petrochemical Company Assaluyeh Busher, Province Iran Construction of Ethyl Benzene Plant of the 9th Olefins Project (Arya Sasol Petrochemical Complex) is integrated in Pars Petrochemical Complex is under the supervision of Development Department of the National Petrochemical Company and EPCC (engineering, procurement, construction, commissioning are Chegalesh andDaelim companies which we are under them. The plant is expected to start operating with annual production capacity of 645,000 tons petrochemical andwill be fed by 175,000 tons ethylene from ninth olefin plant of Array Sasol Complex, 40,000 tons of benzene from the third aromaticplant of Bou Ali Sina Petrochemical Complex, and430,000 tons benzene from the fourth aromaticplant of Borzouyeh Petrochemical Complex. The plants product will be used as feedstock by monomer styrene plant of Arya Sasol Petrochemical Complex. When the plant is finished, Irans petrochemical production will rise by 400,000 tons ethylene, 90,000 tons carbon 3 cuts, 300,000 ton medium and high density polyethylene, as well as 300,000 tons low density polyethylene per year. The products will be used to make home appliances, film, utensils, industrial parts, pipes, bags, and cable covering. Duties and Responsibilities:  Ensure the effective implementation of Health, Safety and Environment System of the Client and Management procedures.
  • 7. 7  Support the Management in solving all problems related to Health, Safety and Environment.  Organize and attending safety committee meetings with the client and to emphasize the importance of safety at site.  Promote awareness of injury prevention and damage control to all levels of employees involved in the project.  Conduct risk assessment and risk mitigation measures on site before commencement of any critical activity in construction, pre-commissioning, and commissioning.  Supervise and maintain records analysis of information on all accidents, incidents, and near misses to avoid recurrences.  Conduct daily inspection at site including site offices to verify the compliance to work permit procedures and requirements.  Conduct daily tool box meetings and assist in conducting safety orientation to all new personnel mobilized at site.  Monitor working environment frequently and inspect unsafe activities and hazardous conditions and advice corrective actions.  Conduct inspections on all scaffolding and temporary platforms to verify the condition and compliance to scaffolding procedure and requirements.  Set an example to fellow employee by wearing required PPE at all times. Safety Supervisor April 2004 – April 2005 Woolim Plant Engineering Const. Co.,Ltd. / Hyundai Eng’g. Const.Co.,Ltd. NC41 Gas Plant Project, Western Libya AGIPP GAS LIBYA BRANCH Mellitah, Libya Construction of NC41 Gas Plant Project is part of Millitah Complex locatedon the Mediterranean coast and treats the raw gas and un-stabilizedcondensate receivedfrom the Wafa desert and Sabratha Platform, 110 km offshore Tripoli, via 36” and 10” subsea pipelines. The process units include three trains gas sweetening, gas dehydration, sulfur recovery, stabilization, LPG fractioning, steam turbine power generation, solid/liquidsulfur storage and loading, three Gas trains of capacity 695 million cf/d, two NGL trains of capacity 31,000b/d and Sulfur handling of 450 tons capacity. The treatedgas is sent to green stream compression station andthen to Italy. The contract was awarded to ABB Lummus, Snamprogetti, HDEC Consortium which we are under them. Duties and Responsibilities:  Ensure the effective implementation of Health, Safety and Environment of the Client and Management procedures.  Support the management in solving all problems related to Health, Safety and Environment.  Participate in HSE meetings related to construction held the Client and Managing contractor.  Monitor of all work site activities in order to ensure they met the safety procedures and requirements and to keep the site safe, healthy and in good conditions. .  Conduct daily tool box meetings and assist in conducting safety orientation to all new personnel mobilized at site.  Participate in weekly management walkthrough to ensure construction followed the project requirements.  Assist in the investigation of all accidents, incidents, and near miss and maintain a log of these investigation reports and ensure report is reportedas per communication protocol.  Prepare contractor monthly report on Safety Statistics, Man hours and Safety performance and submit to the client.  Verify and re-inspecting third party inspection certificates of lifting equipment, tools, and tackles, and other equipments that require third party certificates  Conduct inspections of all scaffolding and temporary platforms to verify the condition and compliance to scaffolding procedure and requirements. Safety Supervisor February 2003 – December 2003 Descon Engineering Limited / Chiyoda Technip Joint Venture Qatargas 1 LNG Debottlenecking Project #1095 Qatar LiquefiedGas Co. Ltd. Ras Laffan Industrial City, Qatar
  • 8. 8 Qatargas is the world's largest liquefiednatural gas (LNG) company. The Qatargas offshore production, separation and treatment facilities on the North Fieldare locatedabout 80 kilometers North-East of Qatar’s mainland. Twenty production wells have been drilledand completedto supply 1,600 million standardcubic feet (45 million cubic meters) of raw natural gas per day from the field’s reservoir, underneath the seabed. The processed gas is transferred to shore with the associatedcondensate via a single 32-inch sub-sea pipeline, where it becomes the feedstock for the onshore LNG plant. The Onshore LNG plant occupies a site within Ras Laffan Industrial City on a plot of land 3.7 square kilometers in area. The shareholders of the Qatargas1are Qatar Petroleum 65%, ExxonMobil 10%, Total 10%, Mitsui 7.5% and Marubeni 7.5%. It owns three LNG trains 300 meters long each with original nameplate capacity of two mtpa each. When the Debottlenecking Project completedwill be result with a total combined capacity of 10 million tonnes (mtpa) per annum of LNG. Duties and Responsibilities:  Ensure the effective implementation of Health, Safety and Environment Management systems of the Client and Management procedures.  Supporting Management in solving all problems related to Health, Safety and Environment.  Ensure safe environmental working conditions for all employees to prevent accident/incidents to maintain project safety target Zero accident and Zero Incident and Injury free.  Coordinate and participate with process plant operation which regards in their emergency alarm and drill schedule and disseminate information to all level of employees on the project site.  Ensure all construction and turn-around shutdowns activities are performed in accordance with HSE procedures.  Organize safety trainings, running safety campaigns and conducting competitions, displaying safety slogans, signs, and posters.  Organize full accident/incident and near miss investigation and finalized with the identification of corrective actions to prevent reoccurrence.  Ensure that daily work permit system are strictly followed and properly maintained.  Maintain and records emergency safety equipment and firefighting equipment.  Conduct gas monitoring in hazardous area including enclosedspaces before the start of activities.  Set an example to fellow employee by wearing required PPE at all times. Educational Attainment: Bachelor of Industrial Technology 1998 – 2002 Mechanical Engineering Technology Batangas State University (Formerly Pablo Borbon Memorial Institute of Technology) Batangas City Bauan High School 1994 – 1998 Bauan, Batangas San Roque, Elementary School 1987 – 1994 San Roque, Bauan, Batangas Organizations / Affiliations: Associate Member of Philippine Association of Health, Safety & Environment Engineers Working For Oil & Gas(PAHSEEWOG). Manila, Philippines Associate Member of Philippine Society of Safety Engineers Middle East Region(PSSE-MER). Dhahran, Kingdom of Saudi Arabia
  • 9. 9 Personal Details: Birth Date : December 13, 1980 Age : 35 years old Civil Status : Married Nationality : Filipino Passport Number : EC0935811 Seafarer’s Identification and Record BookNumber : C0779614 Philippine Driving License Number : D01 – 14 – 003398 Saudi Driving License Number : 04003501893498 Character References 1.0 Mr. David East GE EHS Manager Marafiq IWPP Power Plant & Dessalination Project 2.0 Mr. Nicardo Lacson Sidem HSE Lead Marafiq Dessalination Project 3.0 Mr. Edwin Walker Safety Manager Flour – Kuwait New Ethane Recovery Project 4.0 Mr. D. S. Lee Safety Manager Hyundai – Kuwait New Ethane Recovery Project 5.0 Mr. Larry Munar Safety Engineer Hyundai – NC41 Gas Plant Project Libyan Branch 6.0 Mr. Dennies Barrie Safety Manager - Chiyoda Technip Joint Venture – Qatargas Debottlenecking Project 7.0 Mr. Joselito M. Abrillo Safety Manager HDPE - High Density Poly Ethylene Project- SABIC-Saudi Kayan Petrochemical Complex Mega Projects 8.0 Mr Muhammad Imran Safety Manager LDPE - Low Density Poly Ethylene Project - SABIC- Saudi Kayan Petrochemical Complex Mega Projects. 9.0 Mr. Haitham Al –Muzaiyek Safety Manager SEP – Saudi Elastomer Project- SABIC- KEMYA Al Jubail Petrochemical Company I hereby certify that all information are true and correct to the best of my knowledge. Armando A. Ilagan Applicant Signature